COAL RESOURCE BASE IN POLAND FROM THE PERSPECTIVE OF USING THE JORC CODE

Size: px
Start display at page:

Download "COAL RESOURCE BASE IN POLAND FROM THE PERSPECTIVE OF USING THE JORC CODE"

Transcription

1 COAL RESOURCE BASE IN POLAND FROM THE PERSPECTIVE OF USING THE JORC CODE * E. J. Sobczyk, and P.W. Saluga Mineral and Energy Economy Research Institute of the Polish Academy of Sciences ul. Wybickiego 7 PL Kraków (*Corresponding author: jsobczyk@meeri.eu) 1

2 COAL RESOURCE BASE IN POLAND FROM THE PERSPECTIVE OF USING THE JORC CODE ABSTRACT The article will present a comparison of classifications of resources according to the JORC Code System with Polish classification, basing on system used in Eastern Europe. The differences between these classifications are significant. The information about mineral resources in Poland is not comparable to the main international system of reporting reserves like JORC, SAMREC, PERC etc. Although comparisons between these systems are used, the transfer of particular categories of resources from the Polish system into a JORC category is not simple. Basing on the examples of privatization of Polish coal companies through initial public offering on the Warsaw Stock Exchange, the current practices providing guidelines how to convert resources from the Polish classification to the JORC system are described. Such independent assessment of resources is necessary for development of Mineral Expert s Report (MER or CPR) which is an integral attachment to the prospectus. KEYWORDS Resources and reserves, classification systems, JORC, CRIRSCO INTRODUCTION In the complex and changing world the same understanding of notions is of crucial importance. It is one of the challenges of the global community misunderstanding leads to various conflicts. This insight is also applied to the mining industry and reporting of mineral reserves and resources. From exploration to production, the development of a mineral property can cost millions of dollars. One needs reserves and resources statements for different purposes: raising funds either through the industry or the market, supporting any public accounts to the stock exchanges, negotiating a concession or a mining licence, maintaining licences or permits, settling the level of state or private royalty payable on mine production, etc. Regulation of the reporting of reserves and resources of mineral properties has increased substantially in the last decades and is constantly evolving mostly due to frauds, litigation and other problems. Australia has been a pioneer country in the development of standards for disclosure of reserves and resources. In 1979 the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy (AusIMM), the Australian Institute of Geoscientists (AIG), and Minerals Council of Australia introduced a strong code for estimating resources and reserves the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (commonly known as the JORC Code). The JORC Code provides a uniform set of reserve and resource definitions. Since the date of publication the code has undergone several revisions (the current version was issued in 2012). The JORC Code has strong enforcement provisions and has been incorporated in its entirety into the listing rules of the Australian Stock Exchange, as has been the case since its introduction. Since the date of publication one can observe growing international acceptance of the JORC Code the code has been become an international standard and many countries have been studying it in order to see if they can improve their corporate governance regime and assure adequate public revealing in the assessment of mineral properties. JORC-type regulations are embodied in the similar codes, guidelines and standards published and adopted by the relevant professional bodies in other countries. 2

3 In 1994 CRIRSCO was formed Committee for Mineral Reserves International Reporting Standards (CRIRSCO). It is recognised by global organisations such as the International Accounting Standards Board (IASB), the United Nations Economic Commission for Europe (UNECE) and the International Council on Mining and Metals (ICMM), as the key international organisation representing the mining industry on issues relating to the classification and reporting of mineral assets. The current members represent Australia, Canada, Chile, South Africa, Western Europe including the United Kingdom and USA, with the prospect of other regions and countries joining in the future. The CRIRSCO template is a set of standard definitions and principles which are incorporated in a group of standards developed nationally by the affiliated reporting organisations: the JORC Code (Australia), CIM Standards (Canada), SAMREC Code (South Africa), PERC Code (Europe), SME Guidelines (United States), Certification Code (Chile). Definitions of resources and reserves constitute for some of the most important parts in the CRIRSCO template... Before any further comments are made, it is important to distinguish between meanings of resources and reserves in the common and mining understanding in the first case resources mean volumes available for the current use and reserves saved for the future. In the international mining community these notions have quite opposite meanings reserves are mineral quantities that may be available for current exploitation net of dilution, deletion, and processing losses, whilst resources include ore volumes that may be available in the future (Niec, 2008). It is important to note that CRIRSCO template recognizes resources and reserves in the mining sense. Poland and some other post-communist countries (e.g. Russia, Ukraine) have used mineral quantities assessment and classification systems developed in the Soviet Union in the 1960s. These governmental standards are derived by following strict rules and procedures and fully meet the requirements for which they were defined: reliable State accounting, efficient use of mineral resources, development of strategic planning and replenishment of mineral resources. The Soviet-rooted classifications are well understood in the West but they are much different from the international codes for resources and reserves. Under the post-soviet reporting systems all assessed mineral volumes are classified as different categories of resources ; a term of reserves is not being used. Whilst general comparisons are used between both systems it is not accurate to simply transfer categories of resources from the post-soviet systems into the resources/reserves categories of the CRIRSCO template. Despite the strengths of Soviet-rooted reporting systems one needs efforts to harmonize these systems with CRIRSCO platform. This is mostly due to the fact, that in many cases the data and information reported under any post-soviet classification system is not acceptable on international capital markets and assessments quoted within these systems are liable to misunderstanding by foreign investors.moreovermoreover, estimates obtained by the two systems are often difficult to conciliate. Soviet-rooted and international resource reporting systems differ and require further clarification. The needs of mutual understanding and speaking the same language forced Russian representatives to develop CRIRSCO-aligned reporting standard called NAEN Code. Cooperation between the Russians and CRIRSCO has been maintained since 2008 and followed the stages of founding working group, signing protocols of intent, developing rules for harmonization of reporting standards and developing Russian code for public reporting exploration results, resources and reserves. Russia, then, the mother-country of originate Soviet classification system is also the first one which adjusted it to the international standards. In Poland transferring worldwide ideas into specific domestic rules is the initiative of the Polish Association of Mineral Asset Valuators (PAMAV), founded in In 2008 Polish Code for Mineral Asset Valuation (POLVAL Code) was published. The Code introduces the international notion of reserves, identifying a corresponding term in Polish classification. In recent years a number of significant privatizations in the Polish coal mining industry have occurred (LW Bogdanka, JSW, KWB Konin and Adamow) and PAMAV experts have taken part in the JORC reporting processes with Wardell Amstrong s competent persons. Unfortunately, Polish experiences did not find expression in development of any domestic reporting standards which would be compliant with CRIRSCO template. 3

4 The paper sets guidelines and ways for transferring Polish resource classification classes into international categories of resources and reserves. Conversion is made on the example of an underground hard coal deposit. INTERNATIONAL RESOURCE & RESERVE REPORTING PATTERN As it was stated previously, regulations set of the Australasian JORC Code have become a pattern for other national mineral resource and ore reserves codes. The JORC Code sets minimum standards for public reporting (in Australia & New Zealand) of Exploration Results, Mineral Resources and Ore Reserves. The Code provides a mandatory system for classification of tonnage/grade estimates according to geological confidence and technical/economic considerations. The Australasian standard requires that the documentation on which such report is based must be prepared by, or under the direction of, and signed by, a Competent Person or Persons (CP); it describes the qualifications and type of experience required to be a CP. Finally, the document provides extensive guidelines on the criteria to be considered when preparing reports on Exploration Results, Mineral Resources and Ore Reserves. The Code was incorporated into the ASX Listing Rules in Under the JORC Code, the fundamentally important definitions are as follows: Resource is that portion of the deposit for which there is a reasonable prospect of economic extraction. This is divided into Measured, Indicated and Inferred, with decreasing levels of geological assurance. For coal deposits that have been explored, but for which there are no reasonable prospects for economic recovery at the time of estimating, or in the foreseeable future, the JORC Coal Guidelines introduce a new term: Inventory Coal, though this term is not accepted by the JORC Code. Inventory Coal can also be classified as Measured, Indicated or Inferred. Reserve is the economically mineable part of the Measured and Indicated Resource, allowing for dilution and modifying factors such as mining methods, legal, environmental and government factors. In this case, the economic mineability is based on a techno-economic study, such as a Feasibility Study. Reserves are classified as Proved, when originating from Measured Resources, and Probable, when originating from Indicated Resources, but in some circumstances from Measured. Reserves should normally have extant licenses/concessions. The JORC Code can be applied to all mineral deposits, and for coal there is a JORC Guidelines document for the estimation and reporting of coal resources and reserves (Australian Guidelines for Estimating and Reporting of Inventory Coal, Coal Resources and Coal Reserves, 2003). These guidelines contain definitions of various categories of Resources and Reserves, Points of Observation (PoOs), such as drill holes, underground proving etc., as well as recommendations for minimum spacings of PoOs for various categories of geological confidence (e.g. Measured, Indicated and Inferred). The fundamentals of the JORC Code for Coal, as set out in the JORC Coal Guidelines (2003), are presented in the Figure 1. As stated before, the assessment is carried out and signed off by a CP of proven experience and professional standing. Depending on the geological complexity of the deposit, the CP can vary the spacings of PoOs for various categories, but it is not as prescriptive as the Polish system using the 3 State determined levels of complexity. Recommended spacings of PoOs for different categories of Resources are as follows: Measured: a maximum spacing of 500 m; Indicated: spacings between 500 m and 1000 m; Inferred: spacings greater than 1000 m and up to 3000 m. However, the CP may vary these, according to the geological complexity, in line with his experience. 4

5 The JORC Code has served also as a model for CRIRSCO international reporting template. One may may notice that since introduction of the JORC Code considerable progress has been made towards widespread adoption of consistent reporting standards throughout the world. Further developments in resource/reserve reporting issues is underway. But the problem with any so-called International System is that individual Governments will often adopt their own system for reasons such as granting of mining concessions, calculation of State royalty levels etc. Figure 1 Framework for classifying of Inventory Coal, Coal Resources and Coal Reserves (Coalfield Geology Council..., 2003) POLISH RESOURCE CLASSIFICATION Under the Polish system (Fig. 2), all coal is assessed initially on thickness, as determined from boreholes, surface exposures etc, within certain limits of ash and sulphur content, and calorific value. Coal seams with an average thickness above 0.6 m and a minimum calorific value of 15MJ/kg and a maximum depth of 1,250 m is considered to be Balanced Resources (Balanced Resources are considered to be approximately equivalent to JORC s term Resources ). This is essentially an inventory of coal which is registered with the State, and the mine may treat these reserves as allocated for future mining. In reality, mines have their own mineable thickness cut-off of m, which means that the thinnest seams of Balanced Resources are not always mined (Sobczyk, 2009). Prior to 2001, some coal was classified as Out-of-Balance Resources when it was actually assessed to be greater than 1 m thick, but where other factors, such as tectonic disturbances, prevented it being from considered as Balanced. This was classified as Out-of-Balance Group B. Under amendments to the mining legislation (2005) some of these resources are now allowed to be reclassified as Balanced Resources. At the next stage of classification, economic and modifying factors are considered, and areas of coal allocated for mining are chosen. Those volumes, depending on certain modifying factors, are classified as Industrial Resources and the rest of Balanced Resources as Non-Industrial Resources. As it was mentioned earlier, in post-soviet system there is no notion of reserves but, in fact to be understood internationally the mineable parts of Balance Resources should be rather called Industrial Reserves. Because these don t strictly correspondent with JORC Reserves we will call them in this paper Industrial Reserve Base. For the Industrial tonnages, mining layouts and dilution factors are applied, and the coal estimated to be recoverable from the coal faces is termed Operational Resources (or better understood in the international manner Operational Reserves ). Conventionally, such coal is estimated on a net basis, that is the tonnage and quality of clean coal excluding any in-seam waste bands greater than 5 cm thick, 5

6 GEOLOGICAL RESOURCES BALANCED RESOURCES INDUSTRIAL RESOURCES/RESERVES EXPLOITATION RESERVES OPERATIONAL RESERVES R E S E R V E S and not on a gross run-of-mine basis. In-seam waste bands up to 5 cm are included in the net coal reserves and included in net seam coal quality data. OUT-OF-BALANCE RESOURCES NON-INDUSTRIAL RESOURCES losses dillution Figure 2 Polish resource classification system (Saluga, 2011) (Exploitation Resources and Operational Resources refer to international category of Reserves the first term is used in ore mining whilst the second in the coal industry) Under the Polish system, resources/reserves (Balanced, Industrial and Operational) are only estimated at critical times, for example when documentation on new or revised concessions has to be submitted to the State. Balanced Resources and Industrial Reserve Base are not generally estimated by the mine, but by panels of experts appointed by the mine on behalf of the State. As the systems were introduced in the 1960s before computers were routinely used for such purposes, even today the estimations are often by traditional block-estimating methods, rather than using 3D geological resource modelling software. The results of such evaluations, comprising plans of coal areas (showing areas of Balanced coal Resources and Industrial coal Reserve Base) and the quality and tonnage of those resources/reserves are submitted to and approved by the State, in this case the Ministry of the Environment. This way, the mine does not have a direct involvement with the estimation or classification of Balanced Resources and Industrial Reserve Base, and under the centrally-planned economy, the mine was simply the agent that mined the evaluated coal on behalf of the State. A situation therefore arises commonly where resources are estimated at a date in the past, based on information which is superseded. For example, areas of resources may now contain additional boreholes, or underground proving/samplings, but the resources are not routinely updated and reclassified as the new information becomes available. Operational Reserves are estimated by the mines based on mine layouts, and registered with the State annually. Updated assessments of the remaining Operational Reserves are made by making deductions from previous, state registered, assessments to take account of coal mined since the last formal assessment. These updates to the Operational Reserves are usually made annually and are linked to the annual returns to the State of statistics on the coal mined in that year. However, the historic values of Balanced Resources and Industrial Reserve Base are not always adjusted. This is the fundamental difference between the traditional resource assessment methods of former Soviet countries and those applied by modern western mining companies, who constantly update resource and reserve assessments in real time using new information as it becomes available, usually using thirdparty s or in-house geological and geostatistical software, according to international codes of reporting. Under Polish systems, mining areas are classified by the State into three categories of geological complexity, from I to III, and resources/reserves are classified into categories of geological knowledge and reliability. These include the four principal categories of A, B, C 1 and C 2, plus in Poland a lesser category, 6

7 D, which was not used in the original Russian system. In general, these are the resources/reserves which can be aligned to CRIRSCO systems. Resources of category D are delimited when geologists can estimate borders and geological structure of deposit and possible volumes of coal, especially relied on data from separated mine workings, natural outcrops and/or based on extrapolation geological interpretation of geophysical data. The stated accuracy limit can be greater than 40%. The range of the deposit of resources/reserves of category C 2 is identified from reconnaissance workings, coalbed outcrops or geophysical survey based on interpolation or substantiated extrapolation. The main characteristics of the coalbody, its structure and tectonics are known. Preliminary conditions of mining are preliminarily conceptualized, coal quality is recognized based on systematic sampling in reference its possible use. The stated accuracy limit may not extend 40%. The incidence of the deposit of resources/reserves of category C 1 is identified from reconnaissance workings, coalbed outcrops or geophysical survey based on interpolation or to a limited extent on extrapolation. The recognition data of the body is sufficient for preparing the pre-feasibility study especially a detailed form, internal structure and tectonics of deposit and mining conditions are determined and environmental impacts assessments made. The size and characteristic form of the mineral body and main particularities of the conditions of formation and internal structure are explained; variability and possible discontinuity of the mineral body are estimated. The stated accuracy limit may not extend 30%. The outline of resources/reserves of category B is precisely identified based onn data from dedicated workings or appropriate geological surveys. The form, internal structure, layer correlation and tectonics of the deposit are definitely known; quality and technical properties of coal are industrially confirmed. The stated accuracy limit may not extend 20%. Resources/reserves of category A are recognized at the level enabling current planning, mining and possibly optimal exploitation. The form, internal structure and tectonics of the deposit and volumes of resources/reserves are deduced from mine development workings, gate roads and faces, quality of coal, its technical properties based on systematic sampling of mine workings and data from current exploitation. The stated accuracy limit of mean resource parameters in the individual panels may not extend 10%. Principle of deposit complexity is well understood. The problem is formally recognised in the Polish resource classification system therere are specific exploration rules for every complexity group. The guidelines on borehole and datapoint spacings for each level of geological complexity are given in Table 1. Table 1 Geological complexity guidelines on borehole spacings Group* Spacings between boreholes and/or underground roadways (m) A B C 1 C 2 I With roadways 1,500-1,000 3,000-1,500 4,000-3,000 up to 500 II With roadways 1, , including 1,500-1,000 3,000-1,500 up to 300 at least one roadway III With roadways up to , including at least one roadway 1, ,500-1,000 * Group of geological complexity HARMONIZATION BETWEEN POLISH & INTERNATIONAL RESOURCE CATEGORIES It has been suggested by international committees and by common practice that there is broad equivalence between JORC and the systems of the former Soviet centrally planned economies. They are depicted in Table 2 and on Figure 3. 7

8 Increasing level of geological knowledge and confidence Table 2 Harmonisation between Polish resource classification system and the JORC / CRIRSCO Polish JORC / CRIRSCO Resources D Inferred C 2 Indicated or Inferred C 1 Indicated A & B Measured Reserves C 2 Probable (indicated Resources), or not Reserves (if Inferred) C 1 Probable A & B Proved This broad equivalence is often used as a guide to how Resources and Reserves in the Polish system might relate to JORC, but it cannot be relied upon. The only reliable way of estimating to JORC standards is to revert to base data and for a CP to carry out a new, independent estimation, usually using modern 3D geological modelling and geostatistical software. This is not a mechanical translation but must be conducted by a professional with relevant knowledge and experience. Exploration Results C o a l R e s o u r c e s C o a l R e s e r v e s Inferred Balanced Resources (category C 2 and D) Indicated Balanced Resources (category C 1 and sometimes C 2 ) Measured Balanced Resources (category A + B) Probable Operational Reserves in estimated and fully explored deposits (category C 1 + C 2 ) Proved Operational Reserves in fully explored deposits (category A + B) Impact of geologic and mining, working, economic, marketing, legal, environment, social and administrative factors (so called modification factors ) Figure 3 Translation of Polish resource classification system into JORC / CRIRSCO template In the case of C 2 resources, all of them can be aligned with the JORC category of Indicated Resources or Probable Reserves. In general, C 2 resources in ex-soviet reporting systems are often allineated with JORC Inferred Resources, based on wide drilling spacings, and limited data. But in some cases (better geological reconnaissance) C 2 areas can be classified as JORC Indicated Resources. In some seams, Balanced Resources are not considered for mining, due to constraints on thickness, quality, consistency, accessibility, etc. These Balanced Resources, are considered to be Inventory Coal, as defined by the JORC Guidelines, as the company currently has no reasonable prospects for their economic recovery. One fundamental part of a JORC assessment is in the reliability of the base data. For example, the JORC Guidelines specify that core recovery for a seam in a borehole has to be at least 95% of core length; otherwise the PoO should be rejected for thickness, and also for not having a representative analysis. The CP can relax this, and often does, to say 90%, in cases where there is good supporting data such as downhole geophysical logs, which allow the seam thickness to be estimated quite accurately from 8

9 boreholes. However, seams with core recoveries less than this have to be rejected from the coal quality and density databases, meaning that they cannot be used for Resource/Reserve estimation and classification. This is a fundamental problem when dealing with historic Polish borehole data. Prior to recent times, drilling techniques in Poland were not capable always of achieving these requirements and it is common for Polish resources to rely on, and be classified from, borehole coal seam intersections with core recoveries in the range 50-80%. In some cases the CP examines a number of historic deep boreholes from the surface to find some poor core recoveries. It is common for later, more modern, underground boreholes from the mines, and direct measurements and channel samples in underground boreholes, to prove thicknesses in excess of those recorded in historic surface boreholes. Therefore reserve assessments based on old drilling data might be more often underestimated than overestimated. As it was stated before, the Polish estimation process defines certain levels of accuracy (e.g. +/- 30% for C 1, +/- 40% for Class C 2 ). Errors in recorded seam thicknesses in historical boreholes are unlikely to put estimates of coal reserve volumes (and similarly tonnes and qualities) outside these tolerances. Finally, with regard to JORC requirements for Marketable Reserves, taking into account coal beneficiation and yields from run-of-mine reserves (one of the modifying factors ), it is very often hard to have accurate data for converting the net reserve tonnes per seam or coal face to Marketable or Saleable Reserves. This is because in-seam waste bands greater than 5 cm are not sampled, whereas waste bands up to 5cm are included. But in general, it is understood that a 95% recovery factor to convert Net Operational Reserves to Marketable Reserves is generally applicable. RESULTS The rules for comparison of Polish resource classification with the JORC Code presented above have been used for verification of amount of resources/reserves in a particular hard coal mine X and for presenting total resource/reserve base of hard coal in Poland. The resources/reserves in mine X, accordingly to the classification system used in Poland, have been presented in Table 3. One has to emphasise that these resources/reserves include only the seams planned for mining, upon which the future production plans of the mine are based. According to the production schedule a division has been made: for the reserves planned for mining before the current mining permit expires in 2020 and for those planned for mining during the period of the next mining concession. Table 3 Resources/reserves accordingly to the classification system used in Poland (Mt) Operational Reserves Balanced Resources* Industrial Reserve Base* until 2020 after 2020 A+B C 1 +C 2 Total A+B C 1 +C 2 Total A+B C 1 +C 2 Total Total * only in seams planned for mining The Balanced Resources in the deposit of the X mine amount for Mt. In this amount the Industrial Reserve Base may be distinguished which may be the subject of profitable exploitation. These amount for Mt. The remaining part, Mt in total, account for the Non-Industrial Resources. The Industrial Reserve Base needs to be deducted by the losses which in result produces the amount of reserves planned for mining, namely the Operational Reserves. These reserves in total, until 2020 and after this date, are estimated at 88.4 Mt. The amounts of Resources and Reserves estimated accordingly to the JORC Code have been compared in Table 4. The total amount of 88.4 Mt of operational reserves is located within the area covered by the mining concession currently in force. However, the reserves of only 43.9 Mt are covered by the current 9

10 concession, therefore only these reserves are in compliance with the Reserves category defined by the JORC system. The remaining part of the operational reserves, planned for mining after 2020 will be classified to the Reserves category in compliance with the JORC system definition only when the period of concession s is extended. Table 4 Resources and reserves according to the JORC Code (Mt) Resources Reserves Measured Indicated Total Concession period Proved Probable Total Until After Total * Reserves after the year 2020 depend on the renewal of the concession Because of the fact that Mt of Balanced Resources are qualified as Non-Industrial Resources and at the moment the possibilities to mine these volumes are non-existent, accordingly to the guidelines applicable to the JORC system, one may consider them only as inventory coal and not as resources. If the economic or technological conditions will change in the future and a part of the Non-Industrial Resources will be qualified as mineable, they will potentially be included into the resources category. In the resource/reserve report of X mine the Non-Balanced Resources of B group are also mentioned. In the new documentation they will be qualified as Balanced Resources before the concession is renewed in These resources, potentially totaling ca. 335 Mt, have been presented in Table 5. They can also be qualified as resources accordingly to the JORC classification. A part of these resources may be re-qualified in the future and may potentially become the Industrial Reserve Base or the Operational Reserves. Potential resources Table 5 The Non-Balanced Resources of Group B (Mt) A+B C 1 +C 2 total The X mine undertakes attempts to obtain concession for mining of the PI deposit. The area of this deposit is adjacent to the mining area of the mine. The potential resources/reserves possible to obtain in the future have been presented in Table 6. Table 6 The potential resources/reserves possible to obtain in the future, accordingly to the classification system used in Poland (Mt) Concession potentially Balanced Resources potential Industrial potentially Operational Reserves A+B C 1 +C 2 total Reserve Base A+B C 1 +C 2 total PI deposit Accordingly to the JORC Code system the potential Resources and Reserves have been presented as estimates in Table 7. Because of the fact that X mine currently does not hold a concession for this area, these tonnages cannot be considered, accordingly to the methodology of the JORC system or the JORC system guidelines. Table 7 Resources and Reserves for the concession of the PI deposit, accordingly to the JORC Code (Mt) Potential Resources Potential Reserves Concession Indicated Inferred Total Proved Probable Total PI

11 Using analogous method of comparison of Polish resource classification standards with their equivalents in the JORC Code system, Tables 8 and 9 present the size of resource volume of hard coal in the deposits of operating mines. Table 8 Hard coal resources/reserves in the deposits of the operating mines accordingly to the classification system used in Poland (Gt) Operational Reserves Balanced Resources Industrial (in the period of concession s (after the period of Reserve Base validity) concession s validity) A+B C 1 +C 2 Total A+B C 1 +C 2 Total A+B C 1 +C 2 Total Table 9 Resources and reserves in the deposits of the operating mines according to the JORC Code system (Gt) Resources Reserves Measured Indicated Total Licence period Proved Probable Total Within the concession s validity After the concession s validity Total CONCLUSIONS In the last years one can observe an increasing involvement of international mining companies, consultants, and investors in the Polish mining industry. On the other hand, some Polish enterprises (e.g. KGHM Polska Miedz or ZGH Boleslaw) invest in foreign mineral projects. That is why mutual understanding of different national resource classification standards is necessary. In Poland all mineral resources that can be mined using the underground system are owned by the State. These resources may not be the subject of trade the State grants a right to exploit them in the form of a mining licence. The mining licence regulates the scope and period of mining. The resource reporting system in Poland is rule-based and prescriptive, and very different from the principal international reporting codes for Resources and Reserves, such as JORC, SAMREC, PERC etc. Whilst general comparisons are used between domestic system and international ones, it is incorrect to simply transfer categories of resources/reserves from the Polish system into the Resources and Reserves categories of the JORC Code. In the Polish classification system resources/reserves volumes depending on reliability and geological knowledge are classified into five categories: A, B, C 1, C 2 and D; in addition to that mining fields are classified by the State into three categories of geological complexity: I, II and III. The Polish resource reporting standard fully meets the requirements for which it was assigned: reliable State accounting, efficient use of resources, development of strategic plans for management and discoveries of new resources. This paper has confirmed this statement. Unfortunately, the Polish system has displayed some shortcomings firstly the Polish and international classifications differ slightly they require further interpretation, otherwise the resource/reserve assessments can be difficult to reconcile. Secondly, resource estimates presented under the Polish system are not acceptable on major international capital markets which can lead to misunderstanding by foreign investors. And finally, the need for reporting resources in the international manner involves duplication of reporting efforts. Therefore, applying the same terminology is fundamental and mutual understanding of terminology is critical. 11

12 As it has been stated above, in 2011 Russian CRIRSCO aligned Code for public reporting exploration results, resources, and reserves. A need of similar or corresponding ventures should be negotiated by Polish mining industry representatives. The idea of Polish Code for public reporting of exploration results, reserves and resources should be implemented. Such Code should be based on the CRIRSCO template with guidelines from the Polish resource reporting system. The new standard should be designed for use in international markets, in parallel with the Polish classification used for State purposes. REFERENCES Coalfield Geology Council of New South Wales and the Queensland Mining Council (2003). Australian Guidelines for Estimating and Reporting of Inventory Coal, Coal Resources and Coal Reserves. Retrived from King, H.F., McMahon, D.W. and Bujtor, G.J., (1982). A Guide to the Understanding of Ore Reserve Estimation (21 pp). Melbourne, NSW: Australasian Institute of Mining and Metallurgy. Niec, M., (2008). International Classifications of Mineral Resources And Reserves. Problems of harmonization (in Polish: Miedzynarodowe klasyfikacje zasobów zloz kopalin. Problemy unifikacji). Gospodarka Surowcami Mineralnymi, 24, 2/4, Saluga, P.W. (2011). Managerial Flexibility in Mineral Project Valuation (in Polish: Elastycznosc decyzyjna w procesach wyceny projektow geologiczno-gorniczych). Studia, Rozprawy, Monografie, no 167 (pp. 269). Cracow, Poland: IGSMiE PAN Publishing House. Sobczyk, E.J. (2009). Arduousness of Hard Coal Mining and Geologic Conditions and Their Influence on Resources Management (in Polish: Uciazliwosc geologiczno-gorniczych warunkow eksploatacji wegla kamiennego i jej wplyw na gospodarke zlozem). Studia, Rozprawy, Monografie, no 150. Cracow, Poland: IGSMiE PAN Publishing House. 12

An overview of the CRIRSCO International Reporting Template and its relationship with UNFC 2009 Roger Dixon South Africa Representative, CRIRSCO New

An overview of the CRIRSCO International Reporting Template and its relationship with UNFC 2009 Roger Dixon South Africa Representative, CRIRSCO New An overview of the CRIRSCO International Reporting Template and its relationship with UNFC 2009 Roger Dixon South Africa Representative, CRIRSCO New Delhi Oct 30, 2013 Acknowledgements Ministry of Mines

More information

Estimating and Reporting of

Estimating and Reporting of AUSTRALIAN GUIDELINES FOR Estimating and Reporting of Inventory Coal, Coal Resources and Coal Reserves 2003 EDITION PREPARED BY THE COALFIELDS GEOLOGY COUNCIL OF NEW SOUTH WALES AND THE QUEENSLAND MINING

More information

CRIRSCO Best Practices

CRIRSCO Best Practices CRIRSCO Best Practices Prepared by Deborah McCombe, Past President, CRIRSCO, and Pat Stephenson, Co-Chairman CRIRSCO 2005/06. Presented by Pat Stephenson Workshop on Polymetallic Nodules Resource Classification

More information

The CRIRSCO Template and its relationship to UNFC-2009 and PRMS. Stephen Henley CRIRSCO

The CRIRSCO Template and its relationship to UNFC-2009 and PRMS. Stephen Henley CRIRSCO The CRIRSCO Template and its relationship to UNFC-2009 and PRMS Stephen Henley CRIRSCO Who is CRIRSCO? Minerals reporting standards The CRIRSCO classification Mapping to PRMS Mapping to UNFC Who is CRIRSCO?

More information

THE JORC CODE AND THE COAL GUIDELINES

THE JORC CODE AND THE COAL GUIDELINES THE JORC CODE AND THE COAL GUIDELINES Hunter Region Branch AusIMM 26 June 2015 Peter Stoker HonFAusIMM (CP) Deputy Chairman JORC JORC Representative CRIRSCO. 1 The JORC Code JORC is a voluntary committee

More information

CRIRSCO and UNFC. Stephen Henley. Deputy Chairman, PERC; PERC representative on CRIRSCO Member of EGRC Communications Sub-committee

CRIRSCO and UNFC. Stephen Henley. Deputy Chairman, PERC; PERC representative on CRIRSCO Member of EGRC Communications Sub-committee CRIRSCO and UNFC Stephen Henley Deputy Chairman, PERC; PERC representative on CRIRSCO Member of EGRC Communications Sub-committee PUBLIC REPORTING OF MINERAL RESOURCES AND RESERVES Disclosure for companies

More information

CRIRSCO and UNFC. Stephen Henley. Deputy Chairman, PERC; PERC representative on CRIRSCO Member of EGRC Communications Sub-committee

CRIRSCO and UNFC. Stephen Henley. Deputy Chairman, PERC; PERC representative on CRIRSCO Member of EGRC Communications Sub-committee CRIRSCO and UNFC Stephen Henley Deputy Chairman, PERC; PERC representative on CRIRSCO Member of EGRC Communications Sub-committee PUBLIC REPORTING OF MINERAL RESOURCES AND RESERVES Disclosure for companies

More information

CRIRSCO International Reporting Template and its Application to Classification and Reporting of Polymetallic Seabed Nodules Prepared by Pat

CRIRSCO International Reporting Template and its Application to Classification and Reporting of Polymetallic Seabed Nodules Prepared by Pat CRIRSCO International Reporting Template and its Application to Classification and Reporting of Polymetallic Seabed Nodules Prepared by Pat Stephenson, Co-Chairman CRIRSCO 2005/06. Based on presentations

More information

INTERNATIONAL ASPECTS OF RESOURCE AND RESERVE REPORTING STANDARDS

INTERNATIONAL ASPECTS OF RESOURCE AND RESERVE REPORTING STANDARDS INTERNATIONAL ASPECTS OF RESOURCE AND RESERVE REPORTING STANDARDS JEAN-MICHEL RENDU Vice President, Resources and Mine Planning Newmont Mining Corporation, Member CMMI International Resources/Reserves

More information

crirsco AN OVERVIEW OF THE CRIRSCO INTERNATIONAL REPORTING TEMPLATE UNFC COMMITTEE FOR MINERAL RESERVES INTERNATIONAL REPORTING STANDARDS CHILE

crirsco AN OVERVIEW OF THE CRIRSCO INTERNATIONAL REPORTING TEMPLATE UNFC COMMITTEE FOR MINERAL RESERVES INTERNATIONAL REPORTING STANDARDS CHILE crirsco AN OVERVIEW OF THE CRIRSCO INTERNATIONAL REPORTING TEMPLATE AND ITS RELATIONSHIP WITH THE UNFC CHILE Edmundo TULCANAZA 27 September, 2012 Chile representative CRIRSCO México Agenda Overview CRIRSCO

More information

An independent view of Global Mineral Resources and Mineral Reserves Certification

An independent view of Global Mineral Resources and Mineral Reserves Certification An independent view of Global Mineral Resources and Mineral Reserves Certification Dr Norman Lock Private Consultant norman.lock@yahoo.co.uk +1 647 242 9471 Presentation to IBRAM, August 2014 Public Reporting

More information

Peter Stoker Chairman JORC Principal Consultant AMC Consultants Pty Ltd

Peter Stoker Chairman JORC Principal Consultant AMC Consultants Pty Ltd The JORC Code and Coal AusIMM Hunter Region Branch Maitland Wednesday 29 April Peter Stoker Chairman JORC Principal Consultant AMC Consultants Pty Ltd Disclaimer and Acknowledgements Peter Stoker is a

More information

A commentary on the reporting of Coal Exploration Results, Coal Resources and Coal Reserves

A commentary on the reporting of Coal Exploration Results, Coal Resources and Coal Reserves A commentary on the reporting of Coal Exploration Results, Coal Resources and Coal Reserves Steven Rupprecht, P.R.Eng. PhD FSAIMM University of Johannesburg stevenr@uj.ac.za The purpose of this aid memoire

More information

Appendix 5A. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code)

Appendix 5A. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code) Appendix 5A Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The ) Introduced 1/7/96. Origin: Appendix 17. Amended 1/9/99, 17/12/2004 A U S T R A L I A N I N

More information

Global Developments in Reserve and Resource Reporting

Global Developments in Reserve and Resource Reporting Global Developments in Reserve and Resource Reporting Denver Gold Group Restoring American Mining s Competiveness Denver, Colorado December 8, 2011 Ian H. Douglas Background CRIRSCO Template Outline Core

More information

Application of United Nations Framework Classification 2009 (UNFC-2009) to nuclear fuel resources IAEA

Application of United Nations Framework Classification 2009 (UNFC-2009) to nuclear fuel resources IAEA Application of United Nations Framework Classification 2009 (UNFC-2009) to nuclear fuel resources Harikrishnan Tulsidas, ; Shengxiang Li, China; Bradley Van Gosen, USA; Roberto Villas-Bôas, Brazil; Leesa

More information

Reserve & Resource Statements a perspective of a junior company. Colin J Andrew 15 th May 2009

Reserve & Resource Statements a perspective of a junior company. Colin J Andrew 15 th May 2009 Reserve & Resource Statements a perspective of a junior company Colin J Andrew 15 th May 2009 Introduction What junior companies are expected to do: Compliance with listing requirements; Compliance with

More information

Australasian Code for Reporting of Mineral Resources and Ore Reserves

Australasian Code for Reporting of Mineral Resources and Ore Reserves 1999 Edition Australasian Code for Reporting of Mineral Resources and Ore Reserves (The JORC Code) Prepared by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian

More information

QUARTERLY REPORT March 2011

QUARTERLY REPORT March 2011 QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The

More information

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015 # 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENT UPDATE The evaluation of a mining project from exploration through development and production is a lengthy and complicated process. Mine development

More information

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

Initial Coal Quality Testing Indicates Metallurgical Coal Potential

Initial Coal Quality Testing Indicates Metallurgical Coal Potential ASX RELEASE 31 October 2013 Initial Coal Quality Testing Indicates Metallurgical Coal Potential Highlights: Initial coal quality test results conducted on the recent drill cores from the Company s 100%

More information

Papua New Guinea Mineral resources and ore reserves

Papua New Guinea Mineral resources and ore reserves Harmony Annual Report 2009 139 Papua New Guinea and ore reserves Geology: Papua New Guinea (PNG) lies at the northern end of the Australian Plate and has three major components: a continental cratonic

More information

INDUSTRIAL MINERALS INDUSTRIAL MINERALS GM Minerals Consultants GM Minerals Consultants (Trading as Geos Mining) ABN ABN

INDUSTRIAL MINERALS INDUSTRIAL MINERALS GM Minerals Consultants GM Minerals Consultants (Trading as Geos Mining) ABN ABN GEOS MINING CAPABILITY STATEMENT INDUSTRIAL MINERALS Mission We are an ethical business and have our staff and clients interests at heart in providing comprehensive, best practice, exploration and related

More information

Statoil N-4035 Stavanger, Norway Mobile:

Statoil N-4035 Stavanger, Norway   Mobile: NATIONS UNIES UNITED NATIONS COMMISSION ECONOMIQUE POUR L'EUROPE ECONOMIC COMMISSION FOR EUROPE Industrial Restructuring, Energy Telephone: (41-22) 917-5721, 917-2417 or 917-1234 and Enterprise Development

More information

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Thermal Coal: Indonesia - Kalimantan In Major Coal Provinces South and East Kalimantan Close to Asian Markets # 1 thermal coal

More information

The Proposed 2016 SAMREC Code

The Proposed 2016 SAMREC Code The Proposed 2016 SAMREC Code Steven Rupprecht University of Johannesburg, Johannesburg, South Africa Corresponding author: stevenr@uj.ac.za The South African Code for the Reporting of Exploration Results,

More information

For personal use only

For personal use only 9 August 2012 PRAIRIE DOWNS SECURES A LARGE COAL PROJECT IN POLAND Prairie Downs Metals Limited ( Prairie or Company ) is pleased to advise that the Company has secured a highly prospective and potentially

More information

PERC. Niall Young John A Clifford ROVANIEMI, FINLAND DECEMBER 3 RD 2009

PERC. Niall Young John A Clifford ROVANIEMI, FINLAND DECEMBER 3 RD 2009 THE PAN-EUROPEAN REPORTING CODE PERC 1 ROVANIEMI, FINLAND DECEMBER 3 RD 2009 Ruth Allington Ruth Allington Niall Young John A Clifford PRESENTATION OUTLINE 2 Background CRIRSCO JORC, PERC, SAMREC, CIM

More information

15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes

15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes ASX/Media Announcement 10 September 2012 Level 12, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3337 9944 fax + 61 (0) 7 3337 9945 Carbon

More information

Carbon Energy Low cost, low emission energy has arrived

Carbon Energy Low cost, low emission energy has arrived Carbon Energy Low cost, low emission energy has arrived Investor Presentation Andrew Dash Managing Director Australian Securities Exchange Spotlight Conference London 10th March 2011 Important Statements

More information

ACQUISITION OF CROYDON COAL LTD

ACQUISITION OF CROYDON COAL LTD Registered Office: Level 2, 395 Collins Street Melbourne, Victoria 3000 Telephone (03)8611 5320 4th December 2013 ACQUISITION OF CROYDON COAL LTD 3D Resources Ltd. ( 3D Resources or the company ) is pleased

More information

For personal use only

For personal use only ASX / MEDIA ANNOUNCEMENT 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 5 September 2012 INVESTOR PRESENTATION SEPTEMBER 2012 Pan Asia Corporation Ltd (the

More information

For personal use only

For personal use only NEWS RELEASE October 17, 2011 SIGNIFICANT INCREASE IN CLEAN COAL YIELD CONFIRMED BY COAL QUALITY TEST PROGRAM AT VISTA Highlights: Overall clean coal yield increases substantially to 56%, up from previous

More information

For personal use only

For personal use only 16 September 2011 SULTAN ACCELERATES GROWTH WITH ACQUISITION OF HIGHLY STRATEGIC POLISH BASE METALS PROJECT Secures Bogdan Project Located Adjacent to Europe s Largest Copper Mine 42 sq km tenement sits

More information

Introduction: CRIRSCO's Role in International Minerals Reporting Standards

Introduction: CRIRSCO's Role in International Minerals Reporting Standards Introduction: CRIRSCO's Role in International Minerals Reporting Standards Deborah McCombe, Chairperson, CRIRSCO CRIRSCO Annual Meeting, London, United Kingdom, November 3, 2011 Agenda Who is CRIRSCO Role

More information

Cardero Provides Update on Metallurgical Coal Quality at the Carbon Creek Deposit, Northeast British Columbia

Cardero Provides Update on Metallurgical Coal Quality at the Carbon Creek Deposit, Northeast British Columbia NR13-20 August 15, 2013 Cardero Provides Update on Metallurgical Coal Quality at the Carbon Creek Deposit, Northeast British Columbia Wood Mackenzie Completes Positive Project Benchmarking Study Vancouver,

More information

Toro Energy Limited ASX Investor Series

Toro Energy Limited ASX Investor Series Toro Energy Limited ASX Investor Series Australia s Leading Development Stage Uranium Company Vanessa Guthrie Managing Director October 2014 Toro Energy: A Pure Play Uranium Company Australia s Most Advanced

More information

2018 Resources and Reserves

2018 Resources and Reserves 2018 Resources and Reserves Aeris Resources Limited has updated its Mineral Resource and Ore Reserves estimates for its Tritton Copper Operations as at 30 June 2018. reported Measured and Indicated Mineral

More information

ASX ANNOUNCEMENT 15 August 2011

ASX ANNOUNCEMENT 15 August 2011 ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ 6 Million Tonnes Maiden Guyra Resource: High-Grade Bauxite Company resources grow to 68 million tonnes 1,2 Maiden Resource: 6 million tonnes of gibbsite-rich

More information

Great Western Scoping Study Update & Onsite Gold Processing

Great Western Scoping Study Update & Onsite Gold Processing ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its

More information

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project ASX ANNOUNCEMENT 16th October 2015 Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project Hot Chili and its partner in the Productora Project, Compañía Minera del Pacífico S.A. (CMP)

More information

Stakeholder Requirements and Developing Specifications for the United Nations Framework Classification (UNFC-2009) Presented by Charlotte Griffiths

Stakeholder Requirements and Developing Specifications for the United Nations Framework Classification (UNFC-2009) Presented by Charlotte Griffiths Stakeholder Requirements and Developing Specifications for the United Nations Framework Classification (UNFC-2009) Presented by Charlotte Griffiths UNFC Workshop Bangkok, 9-10 February 2012 Acknowledgements

More information

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES 7 November 2008 UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES Highlights Broken Hill Ore Reserves increase life of mine to 9 years at conservative price assumptions Substantial Resource base

More information

For personal use only

For personal use only Initial JORC Reserves Estimate for Bluff Project HIGHLIGHTS Initial JORC Reserves Estimate of 11 Mt mineable for Bluff Project In-fill drilling program completed to support further Resources and Reserves

More information

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

Membership of CRIRSCO. Ian Goddard, Secretary CRIRSCO CRIRSCO 2013 Annual Meeting Bogota, Colombia 20 November, 2013

Membership of CRIRSCO. Ian Goddard, Secretary CRIRSCO CRIRSCO 2013 Annual Meeting Bogota, Colombia 20 November, 2013 Membership of CRIRSCO Ian Goddard, Secretary CRIRSCO CRIRSCO 2013 Annual Meeting Bogota, Colombia 20 November, 2013 NAME Committee for Mineral Reserves International Reporting Standards CRIRSCO To promote

More information

United Nations Framework Classification (UNFC-2009) Harmonisation without Homogenisation

United Nations Framework Classification (UNFC-2009) Harmonisation without Homogenisation United Nations Framework Classification (UNFC-2009) Harmonisation without Homogenisation Presented on behalf of the EGRC By Jim Ross, Ross Petroleum Ltd Reserves & Resources Reporting Continuing Education

More information

CARBON ENERGY. May Morné Engelbrecht Acting Chief Executive Officer

CARBON ENERGY. May Morné Engelbrecht Acting Chief Executive Officer CARBON ENERGY May 2013 Morné Engelbrecht Acting Chief Executive Officer IMPORTANT STATEMENTS Disclaimer The information contained in this presentation is given without any liability whatsoever to Carbon

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

FURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA

FURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA 288 Churchill Avenue Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 9380 9800 E:enquiries@balamara.com.au 27 July 2015 FURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA

More information

The United Nations Framework Classification for Fossil Energy and Mineral Resources

The United Nations Framework Classification for Fossil Energy and Mineral Resources The United Nations Framework Classification for Fossil Energy and Mineral Resources George Kowalski Former Director, Sustainable Energy Division, UNECE Charlotte Griffiths Programme Officer, UNECE Group

More information

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018 ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT March 2018 Transaction Highlights 2 High Grade Vanadium in Drilling Significant Whole Rock Results include1: 9m at 1.34% V2O5 + 10.5% TiO2 from 9m (SFR019)

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

The competent person in mine-site evaluation and responsibilities for study design, management and findings

The competent person in mine-site evaluation and responsibilities for study design, management and findings The competent person in mine-site evaluation and responsibilities for study design, management and findings Sufficient information Balanced Transparency Not Misleading Unambiguous Clear All relevant information

More information

For personal use only

For personal use only ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ Binjour Bauxite Resource Increased 46% to 24.5 Million Tonnes Company resources grow to 106 million tonnes 1,2,3,4 24.5 million tonnes of thick, gibbsite-rich

More information

ASX ANNOUNCEMENT 29 June 2012

ASX ANNOUNCEMENT 29 June 2012 ASX ANNOUNCEMENT AUSTRALIAN BAUXITE LIMITED ASX: ABZ Binjour Bauxite Resource Increased 46% to 24.5 Million Tonnes Company resources grow to 106 million tonnes 1,2,3,4 24.5 million tonnes of thick, gibbsite-rich

More information

Mapping of Petroleum and Minerals Reserves and Resources Classification Systems

Mapping of Petroleum and Minerals Reserves and Resources Classification Systems Committee for Mineral Reserves International Reporting Standards Mapping of Petroleum and Minerals Reserves and Resources Classification Systems A Joint Report submitted by: Committee for Mineral Reserves

More information

Mineral Resource and Mineral Reserve governance and reporting for AngloGold Ashanti

Mineral Resource and Mineral Reserve governance and reporting for AngloGold Ashanti Mineral Resource and Mineral Reserve governance and reporting for AngloGold Ashanti R. Peattie 1, V. Chamberlain 2, and T. Flitton 3 1 Vice President: Mineral Resources, AngloGold Ashanti 2 Senior Vice

More information

OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT

OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT ASX Release 19 February 2010 OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT HIGHLIGHTS Option to purchase 100% of USA based Buena Vista Iron ore deposit for total consideration of $US8 million over approximately

More information

STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS

STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS ASX RELEASE 30th January 2014 STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS Uranium developer Toro Energy Limited (ASX: TOE) (Toro) today announced the completion of an independent Mining

More information

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate

More information

Hot Chili Commences Scoping Study on Productora Copper Project, Chile

Hot Chili Commences Scoping Study on Productora Copper Project, Chile ASX ANNOUNCEMENT Thursday 12th January 2012 Hot Chili Commences Scoping Study on Productora Copper Project, Chile Leading engineering and project development group AUSENCO appointed to undertake study

More information

For personal use only

For personal use only 24 August 2015 PROPOSED COAL SEAM ACCESS AT BUCK CREEK NO.2 MINE CONFIRMS LOW CAPITAL COST HIGHLIGHTS: Shallow depth of coal seam (100 to 125 feet / 30 to 38 metres) at proposed Buck Creek No. 2 Mine allows

More information

ABN Lublin Coal Project. Company Presentation. March 2013 ASX: PDZ

ABN Lublin Coal Project. Company Presentation. March 2013 ASX: PDZ ABN 23 008 677 852 Lublin Coal Project Company Presentation March 2013 ASX: PDZ Investment Highlights Massive, Untapped, First World Resource Base 1.6Bt Inferred JORC Resource 1.6Bt Inferred Maiden Coal

More information

ABN ASX: PDZ LUBLIN COAL PROJECT HIGHLIGHTS

ABN ASX: PDZ LUBLIN COAL PROJECT HIGHLIGHTS ABN 23 008 677 852 ASX: PDZ LUBLIN COAL PROJECT HIGHLIGHTS OCTOBER 2012 ABN 23 008 677 852 Lublin Coal Project Summary Large Lublin Coal Basin Position 18,200 ha (182km 2 ) Granted Coal Exploration Concessions

More information

Resource and Reserve Valuation Practices in CIS Countries

Resource and Reserve Valuation Practices in CIS Countries AUTHOR'S VERSION OF THE ARTICLE THE ARTICLE IN THE ORIGINAL CAN BE ORDERED AT THE E-MAIL: publications@ausimm.com.au IN THE PUBLICATIONS Second edition, Monograph,30 MINERAL RESOURCE AND ORE RESERVE ESTIMATION

More information

For personal use only

For personal use only NEWS RELEASE TSX.V/ASX: FCC OTCQX: FTSSF First Cobalt Assessing Restart of Canadian Refinery TORONTO, ON (October 10, 2018) First Cobalt Corp. (TSX-V: FCC; ASX: FCC; OTCQX: FTSSF) (the Company ) is pleased

More information

For personal use only

For personal use only 28 January 2014 HOT COMMISSIONING COMMENCES AT KANGALA COAL OPERATION Maiden coal production on track for February 2014 Panoramic view of Kangala Colliery Universal Coal (ASX: UNV) is set to become Africa

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE 28 December 2011 BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE Highlights The Ore Reserve has been established and a new Life of Mine plan for Southern Operations has been developed with economic

More information

Draft document prepared by the Task Force on Application of UNFC-2009 to Renewable Energy Resources 1

Draft document prepared by the Task Force on Application of UNFC-2009 to Renewable Energy Resources 1 Version 12 June 2014 UN Economic Commission for Europe Expert Group on Resource Classification Specifications for the Application of the United Nations Framework Classification for Fossil Energy and Mineral

More information

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold ASX ANNOUNCEMENT 2 February 2013 ASX Code: BDR MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 58,000 tonnes @ 3.8 g/t for 71,000 oz gold MAIDEN DUCKHEAD HANGINGWALL STARTER PIT RESERVE 272,000 tonnes @ 3.2

More information

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results 31 January 2007 ASX ANNOUNCEMENT. Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results The Company is pleased to announce results of infill drilling at the Mt Thirsty Cobalt Nickel Project, strategically

More information

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET May 30 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET First Gold poured from Dalgaranga

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

2016 Mineral Resource Tritton Tenement Package

2016 Mineral Resource Tritton Tenement Package 2016 Mineral Resource Tritton Tenement Package Tritton Underground Measured 3,850 1.9 73 2,750 2.1 59 Indicated 4,940 1.2 61 4,140 1.6 66 Total M + I 8,790 1.5 133 6,890 1.8 125 Inferred 1,960 1.2 24 3,140

More information

Coal Resources and Coal Reserves for 2018

Coal Resources and Coal Reserves for 2018 ASX ANNOUNCEMENT 9 August 2018 Coal Resources and Coal Reserves for 2018 Whitehaven Coal Limited has updated its managed Coal Resources and Coal Reserves under the JORC Code 2012 as set out in the following

More information

ASX Announcement 25 January 2017

ASX Announcement 25 January 2017 ASX Announcement 25 January 2017 COMPANY DETAILS Davenport Resources Limited ABN: 64 153 414 852 ASX CODE: DAV PRINCIPAL AND REGISTERED OFFICE (& Postal Address) Davenport Resources Limited Level 14, 31

More information

The International Mineral Reporting Codes The importance of the Competent Person

The International Mineral Reporting Codes The importance of the Competent Person The International Mineral Reporting Codes The importance of the Competent Person Lomberg, K.G. South African Representative on CRIRSCO. ken.lomberg@coffey.com 35th IGC Cape Town, South Africa 1 Introduction

More information

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT ASX RELEASE 30 DECEMBER 2016 STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT HIGHLIGHTS Independent Pre-Feasibility Study (PFS) supports development of the Urquhart Bauxite

More information

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan

More information

JORC Code Background, operation, and the Competent Person AMC Consultants Pty Ltd

JORC Code Background, operation, and the Competent Person AMC Consultants Pty Ltd JORC Code Background, operation, and the Competent Person AMC Consultants Pty Ltd Peter Stoker, Principal Geologist Mark Berry, Principal Geologist Outline of first presentation: the JORC Code Part 1 Overview

More information

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST For electronic distribution 12 th May 2014 Highlights PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST A Prefeasibility Study for an underground coal mine based on a 200Mt portion of the A Seam within

More information

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months ASX ANNOUNCEMENT Wednesday 18 th May 2016 CMP to Purchase Additional Stake in Productora for US$1.5 Million Sprott Loan to be Reduced and Extended by 12 Months Hot Chili Limited (ASX Code: HCH) is pleased

More information

For personal use only

For personal use only Friday, 2 November 2012 ASX release Cape Alumina sells Hey Point bauxite tenements and makes placement In a transaction valued at approximately $3.4 million, Cape Alumina Limited (ASX Code: CBX) has reached

More information

JORC RESOURCE FOR OLD KONONGO TAILINGS DAM

JORC RESOURCE FOR OLD KONONGO TAILINGS DAM ASX Release Friday 5 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 JORC RESOURCE FOR OLD KONONGO TAILINGS DAM The Company

More information

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process

More information

For personal use only

For personal use only a Level 14, 31 Queen Street Melbourne, Victoria 3000 t +61 3 8610 8633 f +61 3 8610 8666 e info@aruntaresources.com.au www.aruntaresources.com.au ABN 73 089 224 402 18 August 2015 ASX ANNOUNCEMENT (ASX:

More information

Krasny project JORC resources update: oz of gold at 1,200 USD/oz gold price

Krasny project JORC resources update: oz of gold at 1,200 USD/oz gold price Kopy Goldfields AB (publ) Press release 11/2016 Stockholm, May 26, 2016 Krasny project JORC resources update: 955 000 oz of gold at 1,200 USD/oz gold price Kopy Goldfields AB (publ) ( Kopy Goldfields or

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 30th September, 2014 ABM s Development Plan & Production Guidance for Old Pirate High-Grade Gold Deposit Highlights: 50,000 to 60,000 ounces of gold production

More information

AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M

AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M 6 May 2013 AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M Highlights Following continued negotiations Avalon and Hannans have signed a Heads of Agreement for Avalon

More information

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

For personal use only

For personal use only December 24 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE Dalgaranga Operational Update: The project remains Lost

More information

United Nations Framework Classification (UNFC-2009)

United Nations Framework Classification (UNFC-2009) United Nations Framework Classification (UNFC-2009) Presented by Jim Ross International Workshop, EuroGeoSource Rotterdam 8 th www.rosspetroleum.com UNFC-2009 Why is it required? What is the UNFC? How

More information

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserves Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq.

More information

For personal use only

For personal use only ASX: GGG, GGGO US OTC: GDLNF.PK Company Announcement: Tuesday June 21st, 2011 Kvanefjeld Project, Technical Update: Major Improvements in Mine Schedule, Beneficiation and Rare Earth Recoveries Greenland

More information

Carbon Energy UCG Projects update. UCG Association London March 2011

Carbon Energy UCG Projects update. UCG Association London March 2011 Carbon Energy UCG Projects update UCG Association London March 2011 Cliff Mallett Technical Director Important Statements Disclaimer The information contained in this presentation is given without any

More information

For personal use only

For personal use only MEDIA/ASX RELEASE 13 JANUARY 2011 NEW EXPLORATION LICENCE GRANTED WITH JORC KAOLIN RESOURCE OF 65 MT AT AMMG'S MECKERING PROJECT (COMPRISING 16.77MT INDICATED 48.28MT INFERRED) HIGHLIGHTS AMMG granted

More information