1 Design study of ship LNG storage and engine feeding system Gerasimos Theotokatos NAOME, University of Strathclyde

2 Introduction This study focuses on the design of the LNG storage and feeding system of a vessel and the machinery required to maintain the LNG in very low temperature (-163 o C) into the appropriate conditions to be consumed by the vessel engines. The study has based on regulations from national and international classification societies (HRS, GL, DNV) regarding the entire LNG system installations. The above rules have been employed in order to provide, for the specific case study, the appropriate design of the piping and storage system (materials, dimensions, insulation, routes and supports). The particular ship type (i.e. Ro-Ro passenger ship) and ship route was mainly considered. The basics of the LNG supply system are: LNG tanks Distribution network Evaporation skid and heating system Gas valve units Engine room machinery arrangement Note that the design procedure is a back & forward process until the finalization of all the aspects of the ship s studies (structural issues, stability, safety systems, modifications, etc)

3 Ano Hora II - Ro-Ro passenger ship

4 The LNG system arrangement

5 LNG tank size calculations During the journey, to and from the island, the ship uses each time 2 of the 4 its engines Cat 3512B corresponding to the direction of the journey. It, also, uses one of the two auxiliary engine, but its load doesn t exceed the 50% of load. During on port the vessel uses one of its two auxiliary engines at 85%. Tank size calculations are based on a 1 week wanted autonomy plus a 10% of tank capacity The required volume of LNG is calculated to 95m 3 for 7 days autonomy.

6 LNG tanks Type In the project the option of removable cassette LNG fuel tank containers was selected instead of permanent fixed tanks. Non-existent shore-based LNG distribution network. These containers can be transported by truck or by ship to the nearest LNG terminal for refilling, and then loaded onboard the ship. 1. No fuel bunkering station necessity (limited space in open deck). 2. No bunkering procedures required at the port.

7 LNG tanks Location The three cassettes can be located in open-deck or in enclosed space Open deck scenario: Tanks should be located at least B/5 from the ship s side Tanks must be located in such a way that sufficient natural ventilation is provided Fitted with drip trays below the tank which should be of sufficient capacity to contain the volume which could escape in the event of a pipe connection failure Confined space scenario: The tank and all associated equipment (valves, piping etc) should be confined in a space (Tank room) designed to act as a second barrier Storage tank(s) should be placed as close as possible to the centre line of the ship: minimum, the lesser of B/5 and 11,5 m from the ship s side minimum, the lesser of B/15 and 2 m from the bottom plating not less than 760 mm from the shell plating in all cases Tank room should not be located near Category A machinery spaces or near other high risk spaces. If it is adjacent to machinery space, the two spaces are to be separated by means of a cofferdam at least 900 mm thick

8 Cassettes LNG tanks Location inside the lower garage was rejected due to very limited available space and due to safety distances limitations. The three LNG fuel tank containers are intended to be located on the open deck at the after of the vessel. An appropriate platform will be fitted at the after of the ship. Natural ventilation is ensured at all times. The minimum safety distance from ship s sides is satisfied.

9 Cassettes LNG tanks The inner and outer tanks are manufactured in steel of grade A304L. Each LNG fuel tank container is fitted with the pressure build-up system (PBU) for maintaining an operational pressure of approximately 5 bar in the tank. The LNG fuel tank containers are connected to the on board gas system in a docking station. The docking station consists of the connections between the LNG fuel tank container and the fuel gas handling system and a connection to the water spraying system built onto the LNG fuel tank container.

10 The forecastle of the vessel

11 The metallic platform The LNG tank containers, the docking station and the evaporator skid will be placed on a specially designed metallic platform that will be constructed next to the after castle. The three LNG fuel tank cassettes will be loaded by the port derrick and fastened and secured by twistlocks on the metallic platform. Drip rays will be installed under the evaporator skid and also under the hose connections the docking station. Things to be further assessed: Structural integrity (total weight of 115 tones approx.) and effect on ship s stability.

12 Cassettes LNG tanks The container consists of an IMO type C inner tank, an outer tank secondary barrier, and vacuum insulation for minimizing heat transfer. The inner and outer vessels are manufactured in steel of grade A304L. To modeling the LNG tank a computational analysis is performed. The tank dimensions, the distance of the interbarrier, the stiffering rings and the supports have been studied based on heat transfer and static structural calculations.

13 Heating the LNG The purpose of the evaporator skid is to turn the stored in the tank liquefied natural gas into a form that is consumable by the vessel engines (20⁰C-25⁰C). The calculations for the LNG evaporator are based on the total power of the 2 Cat 3512B engines and the auxiliary engine at 100% load.

14 Heating the LNG The heating system transfers the required heat to LNG by a heating mean that flows in a secondary circuit is the glycol-water skid that is located in the after engine room. The heating media is the 50% ethylene-glycol & water solution that enters the evaporator skid at 50⁰C and exits at -15⁰C. This solution has low viscosity, lowest freezing point and high safety on board and is the most used heat transfer intermediate fluid in marine applications. The glycol-water skid uses engine cooling water at 91⁰C in order for the glycol-water to regain its temperature.

15 Heating the LNG To modeling the heat exchanger a computational analysis is performed. Shell-and-tube heat exchanger of stainless steel 304L. The form of the heat exchanger involves 10 tubes and 7 passes. Overall dimensions of the outer shell 1.7m x 1.22m x 1.04m (LxWxH). Position on the metallic platform.

16 Machinery room type ESD-protected machinery room Emergency shut-down-esd type requires that in the event of a gas hazard, all non-safe equipment (ignition sources) and machinery is to be automatically shutted-down (single wall gas piping accepted). Gas safe machinery room Arrangements in machinery spaces are such that the spaces are considered gas safe under all conditions (double wall gas piping is required).

17 GVU arrangement and NG pipelines at the after and fore engine room of the lower deck

18 The gas valve unit It is a containerized compact unit of stainless steel that includes two quick closing valves and a ventilation valve in-between, filter, pressure transmitters, a gas temperature transmitter and control cabinet. The gas valve unit regulates the gas pressure to the engine and ensuring a fast and reliable shut down of the gas supply. Four GVUs in enclosure one for each engine, should be considered They should be installed ina vertical position inside the two engine rooms

19 The piping system Pipeline of LNG tanks to the evaporator skid Consists of a double pipe of steel A304L with vacuum insulation in the interbarrier space for thermal insulation. Pipeline of NG from evaporator skid to GVU & main engines All pipelines inside each engine room are of double-wall type (from the boundaries of the room until the boundaries of each GVU and also from each GVU to the corresponding gas fueled engine) These inner and outer pipes are made of steel 304L alloy while the space between the concentric pipes will contain ventilated air under pressure, having a capacity of at least 30 air changes per hour.

20 The vessel

21 Implementation of LNG fuel in Ano Hora II Safety issues Environmental protection Performance Convenience for passengers and personnel THANK YOU!!!

Risk Assessment of Operation of LNG Tankers. LNG Conference Copenhagen

Risk Assessment of Operation of LNG Tankers. LNG Conference Copenhagen Risk Assessment of Operation of LNG Tankers LNG Conference Copenhagen Risk Assessment of LNG Tanker Operations Liquefied Gas ships are unlike any other in the risks that they pose to the ship and environment.

More information

LNG as a marine bunker fuel

LNG as a marine bunker fuel LNG as a marine bunker fuel Technical Committees September 2012 Tim Kent Technical Director, Marine Agenda Drivers for the use of LNG as fuel Issues associated with the use of LNG as fuel Rules, Regulations

More information

MAN Diesel & Turbo. Alternative LNG supply systems & bunkering solutions M/S Stavangerfjord MAN Diesel & Turbo MAN Cryo

MAN Diesel & Turbo. Alternative LNG supply systems & bunkering solutions M/S Stavangerfjord MAN Diesel & Turbo MAN Cryo MAN Diesel & Turbo Alternative LNG supply systems & bunkering solutions M/S Stavangerfjord 2018-04-12 < 1 > MAN Diesel & Turbo M/S Stavangerfjord 2018-04-12 1 MAN at a glance 2 Why LNG? 3 Case study LNG

More information

BOW OR STERN LOADING AND UNLOADING (BLU or SLU) FOR OIL CARRIERS, LIQUEFIED GAS CARRIERS OR CHEMICAL CARRIERS

BOW OR STERN LOADING AND UNLOADING (BLU or SLU) FOR OIL CARRIERS, LIQUEFIED GAS CARRIERS OR CHEMICAL CARRIERS Guide for the Class Notation Bow or Stern Loading and Unloading (BLU or SLU) for Oil Carriers, Chemical Carriers or Liquefied Gas Carriers GUIDE FOR THE CLASS NOTATION FOR BOW OR STERN LOADING AND UNLOADING

More information

ConferenzaGNL 2014 GENOVA 27/10/2014. Tipologie e caratteristiche di navi con propulsione GNL e relative sistemazioni degli impianti M.E.S.

ConferenzaGNL 2014 GENOVA 27/10/2014. Tipologie e caratteristiche di navi con propulsione GNL e relative sistemazioni degli impianti M.E.S. 27/10/2014 GENOVA 27/10/2014 Tipologie e caratteristiche di navi con propulsione GNL e relative sistemazioni degli impianti M.E.S. MARINE ENGINEERING SERVICES PRESENTATION Introduction INTRODUCTION M.E.S.

More information

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN Plan of the lecture 1. DRILLS AND EMERGENCY EXERCISES (general requirements) 2. Emergency procedures and

More information

The general design of a LNG-terminal. Background

The general design of a LNG-terminal. Background The general design of a LNG-terminal Project MAGALOG (Marin Gas Logistics) is a contribution to addressing port emission problems in Europe, with a special focus on the Baltic Sea, through the establishment

More information

BOW OR STERN LOADING AND UNLOADING (BLU or SLU) FOR OIL CARRIERS, LIQUEFIED GAS CARRIERS OR CHEMICAL CARRIERS

BOW OR STERN LOADING AND UNLOADING (BLU or SLU) FOR OIL CARRIERS, LIQUEFIED GAS CARRIERS OR CHEMICAL CARRIERS Guide for the Class Notation Bow or Stern Loading and Unloading (BLU or SLU) for Oil Carriers, Chemical Carriers or Liquefied Gas Carriers GUIDE FOR THE CLASS NOTATION FOR BOW OR STERN LOADING AND UNLOADING

More information

The IGF code for GAS FUELLED SHIPS Development, content, supporting class rules

The IGF code for GAS FUELLED SHIPS Development, content, supporting class rules MARITIME The IGF code for GAS FUELLED SHIPS Development, content, supporting class rules DNV DNV GL GL 2014 03 November 2015 SAFER, SMARTER, GREENER 2 The development trend is moving from LOCAL 2000 2013

More information

LNG Systems for Marine Application. LNG Reliquefaction & LNG Regasification. Oil & Gas Systems

LNG Systems for Marine Application. LNG Reliquefaction & LNG Regasification. Oil & Gas Systems LNG Systems for Marine Application LNG Reliquefaction & LNG Regasification Oil & Gas Systems LNG reliquefaction plant arrangement for a Q-flex membrane tanker Reliquefaction system for LNG Carriers Hamworthy

More information

Classification Rules: safety requirements & special risk based studies for LNG risk mitigation

Classification Rules: safety requirements & special risk based studies for LNG risk mitigation Classification Rules: safety requirements & special risk based studies for LNG risk mitigation Stockholm, 21st September 2011 Martial CLAUDEPIERRE R&D Project Manager Environmental impact of shipping The

More information

K-Sim Engine Diesel Electric Dual Fuel Cruise Ferry. Evy Kristine Sæter Product Advisor Engine Room Simulator

K-Sim Engine Diesel Electric Dual Fuel Cruise Ferry. Evy Kristine Sæter Product Advisor Engine Room Simulator K-Sim Engine Diesel Electric Dual Fuel Cruise Ferry Evy Kristine Sæter Product Advisor Engine Room Simulator International Maritime Organization - Legislation 2017 1 January 2017 SOLAS IGF Code International

More information

LNG Terminal Equipment. Juan Manuel Martín Ordax

LNG Terminal Equipment. Juan Manuel Martín Ordax LNG Terminal Equipment Juan Manuel Martín Ordax Terminal equipment. General aspects The aspects considered are: o Main equipment used for cargo transfer are loading arms or hard arms, which are jetty based.

More information

Truck/ship LNG bunkering checklist HKD 28 ENG /1

Truck/ship LNG bunkering checklist HKD 28 ENG /1 Truck/ship LNG bunkering checklist HKD 28 ENG 092016/1 Date of receipt: Who fills in this form? The master of the receiving ship and the driver of the truck. Who receives this form? This form should be

More information

Guidance for. LNG Fuel Ready Ships

Guidance for. LNG Fuel Ready Ships 2017 Guidance for LNG Fuel Ready Ships KR APPLICATION OF "GUIDANCE FOR LNG FUEL READY SHIPS" 1. Unless expressly specified otherwise, the requirements in the Guidance apply to LNG Fuel Ready Ships for

More information

Creating Optimal LNG Storage Solutions. 40 in detail

Creating Optimal LNG Storage Solutions. 40 in detail [ MARINE / IN DETAIL ] [ MARINE / IN DETAIL ] Creating Optimal LNG Storage Solutions AUTHOR: Sören Karlsson, Business Development Manager, Wärtsilä Marine Solutions mail: soren.karlsson@wartsila.com 40

More information

Marine Facilities for LNG Carrier Transfer Alternatives

Marine Facilities for LNG Carrier Transfer Alternatives 2.3.3.2 Marine Facilities for LNG Carrier Transfer Alternatives Two alternatives were considered for the marine facilities to support the transfer of LNG between the LNG carriers and onshore storage tanks.

More information

FOR INDONESIA. P.T GoLNG Indonesia January 2015

FOR INDONESIA. P.T GoLNG Indonesia January 2015 SMALL LNG SOLUTIONS FOR INDONESIA P.T GoLNG Indonesia January 2015 believes in Corporate Social Responsibilities. We are Committed to our firm belief that there is no job so URGENT that it cannot be done

More information

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN Plan of the lecture 1. DRILLS AND EMERGENCY EXERCISES (general requirements) 2. Emergency procedures and

More information

Storage & loading on site SOFREGAZ

Storage & loading on site SOFREGAZ Large Cryogenic above ground LNG Tank Full Containment (9% inner wall + Pre-stressed concrete outer wall) Typical Construction Sequence March 4 th 2011 Storage & loading on site Storage & loading on site

More information

IMO future plans for regulation

IMO future plans for regulation 1) / MARPOL Annex VI SOx Emission Limit Data: tri-zen MARPOL Annex VI NOx Emission Limits Data: tri-zen IMO future plans for regulation The vessel which has been built since January, 2013 should observe

More information

MSC Guidelines for Review of IMO High-Speed Craft Code General Arrangements, Structural Fire Protection, and Means of Escape

MSC Guidelines for Review of IMO High-Speed Craft Code General Arrangements, Structural Fire Protection, and Means of Escape S. E. HEMANN, CDR, Chief, Hull Division Purpose References The purpose of the Plan Review Guideline is to provide the submitter with general guidance and information for the preparation and submission

More information

Aim of BSR LNG Competence Center

Aim of BSR LNG Competence Center Aim of BSR LNG Center Gathering knowledge, experience, competence and training infrastructure to prepare people for LNG. Network of collaborating institutions will be able to train enough staff with the

More information

The world s first commercial LNG fuel tank made of high manganese austenitic steel

The world s first commercial LNG fuel tank made of high manganese austenitic steel The world s first commercial LNG fuel tank made of high manganese austenitic steel Jiwon Yu 1), Kihwan Kim 1), Do-Won Seo 1), Sung Tae Yun 1), Geon Shin 1), Hyun Kug Lee 2) 1) POSCO 2) Ilshin Marine Transport

More information

LNG study for MPSE project

LNG study for MPSE project ! 1/! LNG study for MPSE project 1. Fuel alternatives LNG is considered in this study as it meets the most stringent environmental restrictions. However, the ship will also be equipped with Marine Gas

More information

SMALL-SCALE LNG BUNKERING

SMALL-SCALE LNG BUNKERING SMALL-SCALE LNG BUNKERING Small-scale bunkering The Samsoe solution The Samsoe solution is a modular, bunkering installation for the Danish Samsoe Ferry. The solution is very lean and light, easy to operate

More information

04 November LNG Ready Capabilities

04 November LNG Ready Capabilities 04 November 2015 LNG Ready Capabilities Ships Fuel in Transition? Reminiscent of coal to oil. could it be oil to LNG next? Conventional wisdom: status quo (i.e. LSFO in ECA only) until IMO decides when

More information

Equipment and Solutions LNG / NG STARVAP TM REGASIFICATION APPLICATIONS

Equipment and Solutions LNG / NG STARVAP TM REGASIFICATION APPLICATIONS Equipment and Solutions LNG / NG STARVAP TM REGASIFICATION APPLICATIONS THE CRYOSTAR GROUP CRYOSTAR is a cryogenic equipment manufacturer with more than 600 employees including 150 engineers. With its

More information

Tentative rules for Gas ready ships

Tentative rules for Gas ready ships RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 35 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Tentative rules for Gas ready ships JANUARY 2015 The electronic pdf version of this document

More information

LNG carriers and bunkering vessels

LNG carriers and bunkering vessels ConferenzaGNL - ROMA 10/04/2014 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES PRESENTATION SUMMARY INTRODUCTION SUMMARY COMPANY PROFILE History PRODUCTS / SERVICES LNG Extract from

More information

MSC Guidelines for Review of Ventilation System Plans

MSC Guidelines for Review of Ventilation System Plans K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most

More information

A class of its own JUMAG STEAM BOILER COMPACT INFORMATION STEAM BOILER WATER SUPPLY MODULES BLOW DOWN VESSEL COMPACT STEAM SYSTEM.

A class of its own JUMAG STEAM BOILER COMPACT INFORMATION STEAM BOILER WATER SUPPLY MODULES BLOW DOWN VESSEL COMPACT STEAM SYSTEM. A class of its own JUMAG STEAM BOILER COMPACT INFORMATION STEAM BOILER WATER SUPPLY MODULES BLOW DOWN VESSEL COMPACT STEAM SYSTEM www.jumag.de OIL OR GAS FIRED STEAM BOILER A class of its own Steam within

More information

CRYOGENIC FLUIDS CHAPTER 55

CRYOGENIC FLUIDS CHAPTER 55 CHAPTER 55 CRYOGENIC FLUIDS SECTION 5501 GENERAL 5501.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also

More information

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL International Gas Union Research Conference 2011 ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL Youngchul.Eum Seunghyuk.Kim Kyoungmin.Doh MunKeun.Ha SAMSUNG HEAVY INDUSTRIES, Geoje-Si, Gyeongsangnam-do,

More information

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Paper 4d Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Liquefied Ammonia, or Liquid NH3, is (like LNG or liquefied natural gas) a cryogenic fluid and production

More information

Public Safety Issues at the Proposed Harpswell LNG Terminal

Public Safety Issues at the Proposed Harpswell LNG Terminal Public Safety Issues at the Proposed Harpswell LNG Terminal James A. Fay 77 Massachusetts Avenue, Rm. 3-258 Cambridge, MA 02139 November 5, 2003 1 Introduction Fairwinds 1 has proposed to lease a site

More information

Green FSRU for the future

Green FSRU for the future Green FSRU for the future Presentation at GREEN4SEA Athens April 6 th 2016 Dr. John Kokarakis Vice President Technology & Business Development, Africa, S. Europe Hellenic, Black Sea & Middle East Zone

More information

Experience of DNVGL with LNG fuelled vessels and the IGF code in our rules

Experience of DNVGL with LNG fuelled vessels and the IGF code in our rules Experience of DNVGL with LNG fuelled vessels and the IGF code in our rules Benjamin Scholz 1 SAFER, SMARTER, GREENER Content Background Experience with LNG as fuel some indications Bunkering of LNG IGF-Code

More information

Handling and Transportation of LNG

Handling and Transportation of LNG Handling and Transportation of LNG History and Examples of LNG use Whereas Liquid Petroleum Gas (LPG) is carried under pressure, Liquid Natural Gas (LNG) is carried at atmospheric pressure and has been

More information

Econoclave Integration Features

Econoclave Integration Features Econoclave Integration Features The following photos are offered as comparison between ASC s autoclave and autoclave s from European suppliers (i.e. Scholz, Terruzzi, etc.) ASC s Econoclave features a

More information

Experiences of LNG Fuel supply to AidaPrima

Experiences of LNG Fuel supply to AidaPrima Version / Revision # / date Experiences of LNG Fuel supply to AidaPrima 18 October 2016 Carbon reduction The first of our 2020 sustainability goals 2020 Goals Page 2020 Goals 1 Why LNG? When we considered

More information

SECTION B PLAN SUBMITTAL

SECTION B PLAN SUBMITTAL SECTION B PLAN SUBMITTAL Structural Design Requirements B-1 Submitting Plans... B-4 General Requirements for Plans... B-7 Midship Section Plans... B-8 Outboard Profile Plans... B-11 Inboard Profile Plans...

More information

Flammable Cryogenic Liquid Carriers

Flammable Cryogenic Liquid Carriers Flammable Cryogenic Liquid Carriers Thank You to the Seminar Sponsor Saturday, March 19, 2016 Newport County, Rhode Island, USA Seminar Provider and Host Copyright 2016 United States Maritime Resource

More information

SMALL LNG SOLUTIONS FOR INDONESIA

SMALL LNG SOLUTIONS FOR INDONESIA SMALL LNG SOLUTIONS FOR INDONESIA P.T GoLNG Indonesia January 2017 believes in Corporate Social Responsibilities. We are Committed to our firm belief that there is no job so URGENT that it cannot be done

More information

LNG systems for natural gas propelled ships

LNG systems for natural gas propelled ships LNG systems for natural gas propelled ships Jaroslaw Polinski, Maciej Chorowski, Pawel Duda, Janusz Skrzypacz Wrocław University of Technology, Poland Cryogenic Engineering Conference (CEC 25) Tucson,

More information

World s First Dual-Fuel Cruise Ship Challenges and perspectives

World s First Dual-Fuel Cruise Ship Challenges and perspectives World s First Dual-Fuel Cruise Ship Challenges and perspectives Anthony Teo, Technology and LNG Business Development Director 25 September 2017 1 SAFER, SMARTER, GREENER About DNV GL 154 Year History Energy

More information

Matthias Ritters

Matthias Ritters LNG as alternative ti fuel -status t and outlook Matthias Ritters 2013-06-19 Content Why LNG as ship fuel? Regulatory development Overview on activities and technologies LNG supply chain and bunkering

More information

Gas Access To Europe

Gas Access To Europe Gas Access To Europe 2 3 LNG is cool and hot Import- and throughput of LNG at Gate terminal Close to the port entrance on the Maasvlakte, right at the corner of the North Sea, an LNG import and throughput

More information

Swivel and Marine Systems. Swivel stack and fluid transfer systems for multiple applications

Swivel and Marine Systems. Swivel stack and fluid transfer systems for multiple applications Swivel and Marine Systems Swivel stack and fluid transfer systems for multiple applications Swivel Stack Systems The swivel stack is the heart of the turret mooring and fluid transfer system (FTS). Reliability,

More information

CFD Based Simulation of LNG Release during Bunkering and Cargo Loading/Unloading Simultaneous Operations of a Containership

CFD Based Simulation of LNG Release during Bunkering and Cargo Loading/Unloading Simultaneous Operations of a Containership Journal of Shipping and Ocean Engineering 7 (2017) 51-58 doi 10.17265/2159-5879/2017.02.001 D DAVID PUBLISHING CFD Based Simulation of LNG Release during Bunkering and Cargo Loading/Unloading Simultaneous

More information

DNV GL Gas ready notation

DNV GL Gas ready notation MARITIME DNV GL Gas ready notation ISTEC WG on Alternative Fuels Olav Tveit 12th February 2015 1 DNV GL 2013 12th February 2015 SAFER, SMARTER, GREENER 2 Purpose of a GAS READY notation Preparation of

More information

LNG Bunkering and the risks involved in operations using LNG as fuels

LNG Bunkering and the risks involved in operations using LNG as fuels LNG Bunkering and the risks involved in operations using LNG as fuels May 2018 1 SAFER, SMARTER, GREENER How to handle LNG mainly driven by: Physical properties The Fundamental role of Class to ensure

More information

Implementation Requirement for TSG Supervision Regulation on Safety Technology for Stationary Pressure Vessel [SESA Notice No.

Implementation Requirement for TSG Supervision Regulation on Safety Technology for Stationary Pressure Vessel [SESA Notice No. Implementation Requirement for TSG 21-2016 Supervision Regulation on Safety Technology for Stationary Pressure Vessel [SESA Notice No.46 (2016)] Quality and Technical Supervision Bureaus of provinces,

More information

VVER-440/213 - The reactor core

VVER-440/213 - The reactor core VVER-440/213 - The reactor core The fuel of the reactor is uranium dioxide (UO2), which is compacted to cylindrical pellets of about 9 height and 7.6 mm diameter. In the centreline of the pellets there

More information

LNG BUNKER CHECKLIST PORT OF ENERGY IN GOTHENBURG SHORE TO SHIP

LNG BUNKER CHECKLIST PORT OF ENERGY IN GOTHENBURG SHORE TO SHIP POT OF ENEGY IN GOTHENBUG SHOE TO SHIP Original: Ship Copy 1: Copy 2: Copy 3: 1/7 LNG Berth of arrival Time of arrival The presence of the letters, or P in the column entitled indicates the following:

More information

Mapping of ISO standards on LNG

Mapping of ISO standards on LNG Mapping of ISO standards on LNG Date /07/18 Reference ISO/TC 67/SC9 N 135 Resolution 15/ was taken by ISO/TC 67/SC9 on -10-19 to produce a mapping of existing standards in LNG equipment and installation.

More information

LR Marine bunker pipe systems. Single & Double wall piping for LNG Propulsion

LR Marine bunker pipe systems. Single & Double wall piping for LNG Propulsion LR Marine bunker pipe systems Single & Double wall piping for LNG Propulsion LNG as fuel for Ships The global shipping industry is facing challenges as International Marine Organization (IMO) has put in

More information

1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units

1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc.

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc. LNG Carriers Ship Life Extension Ed Waryas Lloyd s Register North America, Inc. Longevity Study - Outline Owners Records Classification Records Ship inspection RAM Study Structural Integrity Analysis Owner

More information

LNG as fuel. OTMW-Module 5 Monday 23 rd of November 2015 University of Piraeus. Working together for a safer world

LNG as fuel. OTMW-Module 5 Monday 23 rd of November 2015 University of Piraeus. Working together for a safer world LNG as fuel OTMW-Module 5 Monday 23 rd of November 2015 University of Piraeus Working together for a safer world What is LNG? Economical Drivers Regional - US LNG export dynamics - ECA-NOx area - USCG

More information

Safety Standards for LNG Fueled Vessels

Safety Standards for LNG Fueled Vessels Safety Standards for LNG Fueled Vessels Transportation Research Board Marine Board Fall Meeting October 29, 2014 CAPT John W. Mauger Office of Design & Engineering Standards U.S. Coast Guard Headquarters

More information

CRYOGENIC FLUIDS CHAPTER 32

CRYOGENIC FLUIDS CHAPTER 32 CHAPTER 32 CRYOGENIC FLUIDS SECTION 3201 GENERAL 3201.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also

More information

CRYOGENIC FLUIDS CHAPTER 32

CRYOGENIC FLUIDS CHAPTER 32 CHAPTER 32 CRYOGENIC FLUIDS SECTION 3201 GENERAL 3201.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also

More information

LNG BUNKER CHECKLIST PORT OF ENERGY IN GOTHENBURG SHIP TO SHIP

LNG BUNKER CHECKLIST PORT OF ENERGY IN GOTHENBURG SHIP TO SHIP PORT OF ENERGY IN GOTHENBURG SHIP TO SHIP Original: Ship Copy 1: Bunker Copy 2: 1/7 Bunker name Berth Port of arrival Time of arrival Terminal The presence of the letters, R or P in the column entitled

More information

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS 1. Crop Feedstocks for Bio-Ethanol 2. Cellulose Feedstocks for Bio-Ethanol 3. Wood Feedstocks

More information

Stowage of Explosives on Vessels and issues noted with Small Ships

Stowage of Explosives on Vessels and issues noted with Small Ships Information Sheet (relevant until the 1st of January 2012 only) Stowage of Explosives on Vessels and issues noted with Small Ships INTRODUCTION The purpose of this Information Sheet is to advise all ship

More information

Braemar Technical Services

Braemar Technical Services Braemar Technical Services Cargo Handling and Emergency Shutdown Systems in an LNG cargo vessel - What is the Connection? By Ray Martyn 20 th April 2017 Overview Introduction to the Cargo Handling System

More information

SPECIFICATION FOR 20,000 GALLON LIQUID NITROGEN STORAGE TANK D-ZERO PROJECT FERMILAB G. T. MULHOLLAND G. STEPANEK

SPECIFICATION FOR 20,000 GALLON LIQUID NITROGEN STORAGE TANK D-ZERO PROJECT FERMILAB G. T. MULHOLLAND G. STEPANEK SPECIFICATION FOR 20,000 GALLON LIQUID NITROGEN STORAGE TANK D-ZERO PROJECT FERMILAB G. T. MULHOLLAND G. STEPANEK DECEMBER 1985 1.0 SCOPE LIQUID NITROGEN STORAGE TANK SPECIFICATION PAGE 1 ------------------------------------------

More information

General presentation May 2016

General presentation May 2016 General presentation May 2016 Disclaimer This presentation (the "Presentation") has been prepared by LNG New Technologies ("the Company"). This Presentation has been compiled by LNG New Technologies in

More information

WO 2016/ Al. 23 June 2016 ( ) P O P C T. v o

WO 2016/ Al. 23 June 2016 ( ) P O P C T. v o (12) INTERNATIONAL APPLICATION PUBLISHED UNDER THE PATENT COOPERATION TREATY (PCT) (19) World Intellectual Property Organization International Bureau (10) International Publication Number (43) International

More information

Replacement Works for the Steam Generator and the Reactor Pressure Vessel Upper Head

Replacement Works for the Steam Generator and the Reactor Pressure Vessel Upper Head Unit 2, Genkai Nuclear Power Plant Replacement Works for the Steam Generator and the Reactor Pressure Vessel Upper Head Replacement works for the above components were conducted at Unit 2 of the Genkai

More information

CERTIFICATE OF FIRE APPROVAL

CERTIFICATE OF FIRE APPROVAL LR427.203.2 CERTIFICATE OF FIRE APPROVAL This is to certify that The product detailed below will be accepted for compliance with the applicable Lloyd s Register Rules and Regulations and with the International

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

LNG as Fuel - Bunkering

LNG as Fuel - Bunkering LNG as Fuel - Bunkering Summit 1st Blue Shipping Environmental Cpt. Stephen BLIGH June 2011 LNG as a Fuel Increased focus on environmental emissions from the shipping industry is materialising as new requirements,

More information

A Green Solutions Company TM ENGINEERED PRODUCTS

A Green Solutions Company TM ENGINEERED PRODUCTS A Green Solutions Company ENGINEERED PRODUCTS A Green Solutions Company Table of Contents The World Leader EZ-FLO Injection systems has proudly offered premium grade injectors, fertilizing products, and

More information

LNG INFRASTRUCTURE AND INSTALLATIONS. George Pratikakis General Director Naval Architecture Progress (NAP)

LNG INFRASTRUCTURE AND INSTALLATIONS. George Pratikakis General Director Naval Architecture Progress (NAP) LNG INFRASTRUCTURE AND INSTALLATIONS George Pratikakis General Director Naval Architecture Progress (NAP) Poseidon Med Stakeholders Conference (19 th November 2015 Zappeion Athens) ACTIVITY 3: LNG INFRASTRUCTURE

More information

LNG BUNKER CHECKLIST PORT OF ENERGY IN GOTHENBURG TRUCK TO SHIP

LNG BUNKER CHECKLIST PORT OF ENERGY IN GOTHENBURG TRUCK TO SHIP POT OF ENEGY IN GOTHENBUG TUCK TO SHIP Original: Ship Copy 1: Truck Copy 2: Terminal Copy 3: Energy 1/7 Driver of LNG supplying tank truck Berth of arrival Time of arrival Terminal The presence of the

More information

AB-1020 EP Dust Free Vacuum Blast Machine

AB-1020 EP Dust Free Vacuum Blast Machine AB-1020 EP Dust Free Vacuum Blast Machine This compact electric-pneumatic driven injection vacuum blasting machine with an average blasting pattern of 16 mm width, is excellent to apply for blast cleaning

More information

Lifting Appliances of Ships and Offshore Installations

Lifting Appliances of Ships and Offshore Installations CCS Rule Change Notice For: Lifting Appliances of Ships and Offshore Installations Version: May, 2016. RCN No.1 Effective date: 19 May, 2016 Beijing CONTENTS Chapter 3 CRANES, LIFTS, RAMPS AND SELF-LOADING

More information

LNG Sampling, Analytically Accurate Practices & Techniques. Ken Thompson President/CEO

LNG Sampling, Analytically Accurate Practices & Techniques. Ken Thompson President/CEO LNG Sampling, Analytically Accurate Practices & Techniques Ken Thompson President/CEO Key Features North America net LNG export to exceed about half of today s total market North America projected to

More information

Cork Institute of Technology. Summer 2008 Process Plant Design (Time: 3 Hours)

Cork Institute of Technology. Summer 2008 Process Plant Design (Time: 3 Hours) Cork Institute of Technology Bachelor of Science (Honours) in Process Plant Technology Award (EPPTN_8_Y4) (EPPTN_8_Y5) (EPPTE_8_Y4) Instructions: Answer FIVE questions. Answer at least TWO questions from

More information

Oregon State University s Small Modular Nuclear Reactor Experimental Program

Oregon State University s Small Modular Nuclear Reactor Experimental Program Oregon State University s Small Modular Nuclear Reactor Experimental Program IEEE Conference on Technologies for Sustainability August 1, 2013 Portland, Oregon Brian Woods Oregon State University brian.woods@oregonstate.edu,

More information

ANSYS CALCULATIONS REPORT Outer Vessel Ansys outer vessel Sylvain ANTOINE Amaury PORHIEL - Rev C

ANSYS CALCULATIONS REPORT Outer Vessel Ansys outer vessel Sylvain ANTOINE Amaury PORHIEL - Rev C SUMMARY 1. REVISION RECORD... 2 2. ABSTRACT... 2 3. FEA Software... 2 4. USER S DESIGN SPECIFICATION... 2 5. FEA MODEL GEOMETRY AND MESHING... 3 6. FEA MODEL CONTACT AND BOUNDARIES CONDITIONS... 4 7. FEA

More information

FW LNG-PIPE Liquid Natural Gas -162 C FW STEEL-CASED PIPE-IN-PIPE systems for LNG-Powered Ships

FW LNG-PIPE Liquid Natural Gas -162 C FW STEEL-CASED PIPE-IN-PIPE systems for LNG-Powered Ships LNG-PIPE FERNWÄRME-TECHNIK GmbH FW LNG-PIPE Liquid Natural Gas -162 C FW STEEL-CASED PIPE-IN-PIPE systems for LNG-Powered Ships FW-FERNWÄRME-TECHNIK The FW LNG-PIPE-SYSTEM Liquefied Natural Gas LNG (Liquefied

More information

SAFETY-GUARD BSS01/BSS02 SAMPLE STATION (SITE SPECIFIC BACTERIOLOGICAL SAMPLING POINT)

SAFETY-GUARD BSS01/BSS02 SAMPLE STATION (SITE SPECIFIC BACTERIOLOGICAL SAMPLING POINT) Specifically for (Client Name): 1. GENERAL DESCRIPTION 1.1 The equipment furnished under this Section to the above-named client shall be water quality sampling equipment designed to allow for the capture

More information

Class III Pipes Fittings (Dy 500 mm)

Class III Pipes Fittings (Dy 500 mm) p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-P003 Class

More information

World best of parts for LNG Carrier & Offshore

World best of parts for LNG Carrier & Offshore World best of parts for LNG Carrier & Offshore World best of parts for LNG Carrier & Offshore 113 1, Hwacheon 1-gil, Chilbuk myeon, Haman gun, Gyeongsangnam- do, KOREA Te l : +82-55-587-1310 Fax : +82-55-587-1311

More information

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat - Doc. : 08C00031_e Date : 02.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e

More information

HAZOP Checklist for Sewage Treatment Plant

HAZOP Checklist for Sewage Treatment Plant HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur

More information

FreezeFree TM Automated Anti-Icing System GENERAL SPECIFICATIONS

FreezeFree TM Automated Anti-Icing System GENERAL SPECIFICATIONS FreezeFree TM Automated Anti-Icing System GENERAL SPECIFICATIONS I. GENERAL All FreezeFree Automated Anti-Icing Systems shall be designed and manufactured by Energy Absorption Systems, Incorporated, of

More information

The following sub-systems are provided and the integration of these is described below:

The following sub-systems are provided and the integration of these is described below: The following sub-systems are provided and the integration of these is described below: Pretreatment Plant The Pretreatment Plant typically comprises an amine system for gas sweetening and a molecular

More information

IBAU HAMBURG Self-Discharging Cement Carriers

IBAU HAMBURG Self-Discharging Cement Carriers IBAU HAMBURG I BAU HAMBURG Your efficient partner for modern and effective bulk material handling PLANT DESIGN - ENGINEERING - EPC-CONTRACTING CEMENT - THERMAL POWER - MINERALS Central Cone Silos Single

More information

Part 0 - Classification and Surveys Classification and Surveys I Classification and Surveys I

Part 0 - Classification and Surveys Classification and Surveys I Classification and Surveys I This edition of GL rules & guidelines is the latest and current edition. Previous editions of GL rules & guidelines, as well as all DNV GL rules and supporting documents, are available from https://www.dnvgl.com/rules-standards.

More information

THE LEADER IN VISUAL LUBRICATION SYSTEMS

THE LEADER IN VISUAL LUBRICATION SYSTEMS THE LEADER IN VISUAL LUBRICATION SYSTEMS 5S LEAN Modernize your Lubricant Storage & Handling Practices Traditionally, machinery lubrication has been seen as a function of low importance, being messy work,

More information

MOBILE OFFSHORE UNITS

MOBILE OFFSHORE UNITS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS 2018 NOTICE NO. 1 JULY 2018 The following Rule Changes were approved by the ABS Rules Committee on 1 June 2018 and become EFFECTIVE AS OF 1 JULY 2018.

More information

Terminal Particulars Questionnaire

Terminal Particulars Questionnaire Terminal Particulars Questionnaire Terminal Port Port authority Last updated Terminal General Date this TPQ document was completed/updated Specify units used Port Details Port Name UN LOCODE 3. Country

More information

Design Characteristics of the Cold Neutron Source in HANARO Process System and Architecture Design

Design Characteristics of the Cold Neutron Source in HANARO Process System and Architecture Design Design Characteristics of the Cold Neutron Source in HANARO Process System and Architecture Design Sang Ik Wu, Young Ki Kim, Kye Hong Lee, Hark Rho Kim Korea Atomic Energy Research Institute (KAERI), Daejeon,

More information

The factory assembled air handler shall conform to the requirements outlined ASHRAE 90.1.

The factory assembled air handler shall conform to the requirements outlined ASHRAE 90.1. PAGE 1 of 5 1.1. REFERENCE STANDARDS 1.1.1. The factory assembled air handler shall conform to the requirements outlined ASHRAE 90.1. 1.1.2. Unit shall be designed to conform to ASHRAE 15. 1.1.3. Unit

More information

Cargo Handling Systems. for LPG, NH3 & Ethylene. Oil & Gas Systems

Cargo Handling Systems. for LPG, NH3 & Ethylene. Oil & Gas Systems Cargo Handling Systems for LPG, NH3 & Ethylene Oil & Gas Systems Cargo handling systems for LPG, NH 3 & Ethylene Gas Carrier Technology Hamworthy s gas system know-how originates from its heritage with

More information

COLD Heat Fire

COLD Heat Fire www.stenca.com COLD Heat Fire INsulation Accommodation Advising INDEX Stenca Trading - A good partner... 3 See what we can... 4 See where we can... 5 Stenca Pipe... 6 Stenca Tank Plates... 7 Stenca HT

More information