1 City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011

2 Public Improvement Hearing: Special Assessments Local public improvements to the City s infrastructure t based on State t of Minnesota Statute Chapter 429. Palmer Lake East Area Street and Utility Improvements Project No , 01, -02, -03 and -04

3 Palmer Lake East Reconstruction Project

4 Capital li Improvement Program City Initiated Program in 1993 Reconstruct Aging Public Streets and Utilities 70.7 miles (67%) Completed 2011 will be the 18 th Consecutive Year Projected Completion Miles Remaining Est. Cost : 2025: $89 million

5 Project Planning Project Need and Evaluation Sanitary Sewer Water Main Storm Drainage Streets, Sidewalks/Trails Street Lights Other

6 Sanitary Sewer Collection System Collection System Installed in and 1978 Extensive Root Intrusion- root sawing required to maintain conveyance capacity Condition Survey / Televising Inspections (worn pipe, cracked pipe, sags) Proposed Improvements - new trunk sewers and services within streets

7 Water Distribution ib i System Distribution System Installed: Cast Iron Pipe in relatively good condition (couple issue areas) Issue - Undermining Cast Iron Pipe (during sanitary sewer replacement) Proposed Improvements - Replace most valves and hydrants throughout project area - Replace Some Water Main (where adjacent to deep sanitary sewer replacement approx. 50%) - Replace Service Lines, Curb Stops

8 Storm Water Drainage System Storm sewer inlet locations fairly well developed throughout neighborhood with some isolated flat areas Improvements /repairs needed Coordination with water and sewer replacement Water quality treatment t t infiltration basins, underground facilities, outlet sediment removal and other improvements where feasible

9 Pavement Condition vs. Drainage (Typical) Pavement Condition Subgrade (Foundation) Condition Poor Drainage Material Deterioration

10 Street Reconstruction Proposed Improvements New Curb and Gutter Full Depth Pavement and Aggregate Base Reconstruction roadway to 30-ft wide Sidewalk Repairs

11 Street Reconstruction Sidewalk Safety Improvements Misc. sidewalk repairs Missing segments

12 Street Lighting Replace 26 lights

13 Public Right-of-Way Right-of-way and easements are dedicated to the public for construction and maintenance of streets and utilities Delineated on subdivision plats. Boundary of right-of-way extends beyond the edge of street pavement. Typical right-of-way width is 50 to 66. Other sidewalk and utility easements are adequate.

14 During Construction - Inconvenience

15 Preliminary Project Budget CIP Est. Project Amount Percent Total Special Assessments $ 1,798,000, 25% Water Utility $ 1,055,000 14% Sanitary Sewer Utility $ 1,330,000 18% Storm Drainage Utility $ 1,029, % Street Light Utility $ 150,000 2% Street Reconstruction Fund $ 1,976,000 27% Total $ 7,338, % Note: These are preliminary estimated amounts.

16 Proposed Assessment Area

17 Special Assessments - Estimated Amounts & Payment Options Full Street Reconstruction with New Curb and Gutter 2010 Assessment Rates: $3,559 (street) + $1,068(drainage) = $4, Pay in full - No interest between March & Sept. 30, Pay in full from Oct. 1 to Nov. 29, 2011 with interest from Oct Pay in installments with property taxes over a 10-year period starting in Partial prepayments cannot be accepted No Bill will be sent

18 Preliminary Project Schedule Neighborhood Info Mtg. January 11, 2011 Council Receives Report January 24, 2011 Public Hearing February 14, 2011 Project Bidding March 2011 Begin Construction May 2011 Substantial Completion October 2011 Tree Replacements Fall 2011/ Spring 2012

19 City of Brooklyn Center Palmer Lake East Area Neighborhood Street and Utility Improvements Project Staff Recommendations: -Authorize Project -Certify Special Assessments February 11, 2011

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008 2008 Street and Utility Improvement Project West Golden Lake Road C P Public Informational Meeting January 3, 2008 Presentation Summary Project Location Existing Conditions Proposed Improvements Project

More information

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing 2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements December 11, 2017 Public Improvement Hearing Project Objectives Reconstruct Deteriorated Streets Upgrade City Underground

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections: Schedule H to Bylaw 7452, Subdivision Bylaw Page 1 1. INTRODUCTION 1.1 Contents of Engineering Specifications 1.1.1 The Engineering Specifications contains the following sections: 1. Introduction 2. General

More information

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS Section Title Page 12.1 General... 12-1 12.2 Design Standards... 12-1 12.2.1 General Requirements...12-1 12.2.2 Minimum Depth...12-1

More information

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL Date Submitted: Project Number: CITY OF ALEXANDRIA 8236 WEST MAIN STREET ALEXANDRIA, KY 41001 (859) 635-4125 FAX (859) 635-4127

More information

I. STREET CONSTRUCTION AND RECONSTRUCTION

I. STREET CONSTRUCTION AND RECONSTRUCTION CITY OF OSHKOSH POLICY FOR SPECIAL ASSESSMENTS A. GENERAL I. STREET CONSTRUCTION AND RECONSTRUCTION 1. Assessments shall be levied according to the front foot dimensions of the abutting property to the

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES CHAPTER 8: OTHER UTILITIES Sections Page # 8.0 INTRODUCTION 4 8.1 GENERAL 4 8.1.1 Act 287: PA OneCall 4 8.2 LOCATION 4 8.3 TRENCHING AND BACKFILL STANDARDS 4 8.4 EASEMENTS 6 8.5 PETROLEUM AND NATURAL GAS

More information

Sidewalk Repair Program. Charter Township of Canton Engineering Services

Sidewalk Repair Program. Charter Township of Canton Engineering Services Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined

More information

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011 East Manawa Porous Paving Project Council Bluffs, Iowa International Public Works Congress & Exposition APWA September 19, 2011 Presented by Scott Renaud, P.E., FOX Engineering Project Location Phase 1

More information

Infrastructure Evaluation. Preliminary Scope and Cost Estimates

Infrastructure Evaluation. Preliminary Scope and Cost Estimates Infrastructure Evaluation Preliminary Scope and Cost Estimates January 25, 2016 Infrastructure Evaluation Existing Conditions Street Improvements Pavement Management Street Condition Inventory Underground

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

General Legend Details...100

General Legend Details...100 SECTION 1 - ROADWAYS TABLE OF CONTENTS General Legend Details......100 Details Roadway Section......... 110 Residential Street Intersection.........115 Waterway and Waterway Transition Detail........116

More information

ENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner.

ENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner. ENGINEERING DEPARTMENT MISSION STATEMENT: Provide engineering and public improvements in the most economical manner. The Engineering Department performs the following services to maintain and improve the

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

study for 2018 include:

study for 2018 include: MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION

More information

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX Rev. 2016 STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX ARTICLE PAGE 1. Pavement Removal and Restoration... P-1 2. Street

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR CONSTRUCTION PLANS FOR VICINITY MAP (NOT TO SCALE) DEVELOPER/OWNER: CHRISTOPHER SLOVAN ENTERPRISE HOLDINGS, INC. 284 MALLORY STATION RD, SUITE 120 FRANKLIN, TN 37067 PH: 615-309-9621 DAVIDSON CO., TENNESSSEE

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS LAKE IDA DRAINAGE IMPROVEMENTS = LIMITS OF PROJECT AREA 1760G01.DWG SURVEY LEGEND: SURVEY SYMBOL LEGEND: PLAT LEGEND: STATEMENT OF PURPOSE: SURVEY TREE LEGEND: SITE BENCHMARKS: SURVEY PREPARED BY: DENNIS

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

Division 33. Utilities

Division 33. Utilities See Section 32 for requirements on Utility Plan Preparation. 33 10 00. Water Utilities 33 11 00. Water Utility Distribution Piping 1. All underground pipe material, 4 inch diameter and larger shall be

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL TECHNICAL SUPPORTIVE SERVICES IN IDOT DISTRICTS 2 & 3 FOR CERTIFIED

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

Department of Street Services

Department of Street Services Department of Street Services FY 07-08 Proposed Budget Briefing to the City Council September 5, 2007 Purpose An overview of the Department of Street Services Scope of operation and maintenance activities

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required. SUBDIVISION CHECKLIST Subdivision Name Account Number Review Engineer Prior To Review Preliminary plan approved by Planning Commission / Council as required. Review fee paid. Statement of Responsibility

More information

Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings

Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings SANITARY SEWER SYSTEM How the system was designed Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings What age has

More information

UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER:

UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER: UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER: REVIEWING ENGINEER: WATERSHED (INCLUDE SUBSCRIPT) I. PRELIMINARY ITEMS

More information

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984 1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE

More information

APPLICATION FOR A SITE CONSTRUCTION PERMIT

APPLICATION FOR A SITE CONSTRUCTION PERMIT CITY OF KLAMATH FALLS PUBLIC WORKS ENGINEERING 226 S. 5 th St., Klamath Falls, OR 97601 Phone (541) 883-5368 Fax (541) 883-5287 APPLICATION FOR A SITE CONSTRUCTION PERMIT For City Use Only: APPLICATION

More information

TOWN OF WINDSOR CONCRETE RATING GUIDE

TOWN OF WINDSOR CONCRETE RATING GUIDE TOWN OF WINDSOR CONCRETE RATING GUIDE December 2007 TOWN OF WINDSOR Engineering Department Concrete Rating Guide The Concrete Rating system is designed to prioritize concrete replacement and assist in

More information

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

N.J.A.C. 19: This file includes all Regulations adopted and published through the New Jersey Register, Vol. 50 No. 1, January 2, 2018

N.J.A.C. 19: This file includes all Regulations adopted and published through the New Jersey Register, Vol. 50 No. 1, January 2, 2018 N.J.A.C. 19:66-8.1 19:66-8.1 Purpose (a) This subchapter serves the following purposes: 1. To provide for the comprehensive and orderly development of the district in accordance with the Tourism District

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

FOCUS ENGINEERING, inc. OLD VILLAGE PHASE 3 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 30TH STREET N 10TH STREET N

FOCUS ENGINEERING, inc. OLD VILLAGE PHASE 3 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 30TH STREET N 10TH STREET N OLD VILLAGE PHASE 3 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 30TH STREET N 20TH STREET 10TH STREET N NOVEMBER, 2016 CITY OF LAKE ELMO, MN. Project No. 2016.133 www.focusengineeringinc.com FOCUS ENGINEERING,

More information

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

INSPECTION AND ACCEPTANCE FOR MAINTENANCE Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example

More information

3.9 times the average 3.8 times the average 3.6 times the average

3.9 times the average 3.8 times the average 3.6 times the average ARTICLE VI DESIGN OF SANITARY SEWERS M'RSMIN. VOL.281 JA 2 4 2001 IMAGE; Section 601 Determination of the Amount of Sewage for Sanitary Sewers A. MSD Design Standards for estimating sanitary sewage flow

More information

CITY OF GARLAND - ENGINEERING DEPARTMENT - PRIVATE DEVELOPMENT PAVING SUMMARY CASE NUMBER: PROJECT NAME: CONTRACTOR: PHONE NUMBER: (rev.

CITY OF GARLAND - ENGINEERING DEPARTMENT - PRIVATE DEVELOPMENT PAVING SUMMARY CASE NUMBER: PROJECT NAME: CONTRACTOR: PHONE NUMBER: (rev. PAVING SUMMARY 5" Concrete Street Paving including curbs 6" Concrete Street Paving including curbs 7" Concrete Street Paving including curbs 8" Concrete Street Paving including curbs 8-5-8 Concrete Alley

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : GRADING, BIT MILL & SURFACING, LIGHTING AND UTILITIES CONTRACT LOCATION: LOCATED ON TH 210 FROM 100 FT WEST OF GRAND AVE TO SIXTH STREET IN CARLTON RECOMMENDATION: AWARD

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

Addendum No. 1 Issue Date: March 29, 2016

Addendum No. 1 Issue Date: March 29, 2016 Addendum No. 1 Issue Date: Project: Bonson and Short Street Reconstruction Contract: #1-16 Owner: City of Platteville, Wisconsin Engineer: Delta 3 Engineering, Inc. Daniel J. Dreessens, P.E. 875 South

More information

BONDING REQUIREMENTS AND PROCEDURES

BONDING REQUIREMENTS AND PROCEDURES Town of Apex Development Services 73 Hunter Street, 3 rd Floor Apex, NC 27502 (919) 249-3394 BONDING REQUIREMENTS AND PROCEDURES ORDINANCE RATIFYING THE REQUIREMENT FOR BONDING: (From the Unified Development

More information

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 November 17, 2017 Ms. Sheila Page, Town Planner 101 Main

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

STAFF REPORT. Honorable Mayor and City Council

STAFF REPORT. Honorable Mayor and City Council DATE: November 14, 2012 STAFF REPORT TO: FROM: SUBJECT: Honorable Mayor and City Council Planning Commission Brandon Snyder, Planning Staff Will Peterson, Scale Construction seeking final approval of the

More information

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania. CHAPTER 21 PART 2 TUNNELING AND EXCAVATIONS 201. Definitions. The following words and phrases, when used in this Part, shall have the meanings ascribed to them in this 201, except in those instances where

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ) FREQUENTLY ASKED S (FAQ) The purpose of this document is to provide detailed information about the Harvard Road Reconstruction & Water Main Replacement Project. This project will directly affect residents

More information

4/23/2014 Item #10D Page 1

4/23/2014 Item #10D Page 1 MEETING DATE: April 23, 2014 PREPARED BY: Masih Maher DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Engineering/PW CITY MANAGER: Gus Vina SUBJECT: STREET IMPROVEMENT STANDARDS RECOMMENDATION: Direct staff to

More information

MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS

MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS Presented By: Joe Lombardo, ASA Regional Vice President Suncorp Valuations Ltd. Overview of

More information

Engineering Status Report

Engineering Status Report Prepared By: Derek Kiss, E.I. and Dustin P. Doherty, P.E. Date: VILLAGE PROJECTS ODNR Dam Failure Emergency Action Plan (EAP) The Village is under official notice by the ODNR to develop an emergency action

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and

More information

Long-Term Capital Improvement Funding Plan. March 18, 2014 City Council Study Session

Long-Term Capital Improvement Funding Plan. March 18, 2014 City Council Study Session Long-Term Capital Improvement Funding Plan March 18, 2014 City Council Study Session Overview Long-term 10 year view to know what s planned Project Overview Focus on FY 2014-15 and FY 2015-16 Funding Plan

More information

Curb and Gutter Replacement Project Phase I

Curb and Gutter Replacement Project Phase I Phase I Prepared for: Prepared by: Cheyenne Downtown Development Authority / Main Street 1601 Capitol Avenue Cheyenne, WY 82001 307 433 9730 BenchMark Engineers, PC 1920 Thomes Avenue, Suite 620 Cheyenne,

More information

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406) Public Works Department 201 1 st Ave East Kalispell, Montana 59901 (406) 758-7720 Note: This permit is separate from any permits required by the Montana Department of Environmental Quality. A State Stormwater

More information

OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for

OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for all roadways. Identify utility locations/separations from gutter lip and

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390

CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390 CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390 ENGINEERING DESIGN STANDARDS Prepared by: Boss Engineering Howell, Michigan October 5, 2016 TABLE OF CONTENTS PART I. INTRODUCTION SECTION 1.0

More information

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

Improvement Plan Cost Estimate

Improvement Plan Cost Estimate Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

Stormwater line will be ABOVE ground corrugated pipe (No need to bury) running down to basin on NW 99 th St. It is simple and approved.

Stormwater line will be ABOVE ground corrugated pipe (No need to bury) running down to basin on NW 99 th St. It is simple and approved. Stormwater Drainage: Stormwater line will be ABOVE ground corrugated pipe (No need to bury) running down to basin on NW 99 th St. It is simple and approved. Please see pages 11 and 12 of the document below

More information

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Pavement Management Plan

Pavement Management Plan Planning Report February 12, 2010 Pavement Management Plan Prepared for: WSB Project 1140-61 City of Excelsior 339 3rd Street Excelsior, MN 55331 Prepared by: 701 Xenia Avenue South, Suite 300 Minneapolis,

More information

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 Resolution 2004-5 Resolution of the Board of Trustees of LaGrange Township, Lorain County, Ohio, adopting general rules and regulations

More information

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF 30051 FURNISH AND INSTALL AGGREGATE SLURRY BACKFILL 589 CY 50.00 29,450.00 55.00 32,395.00 50.00 29,450.00 30584 FURNISH AND INSTALL 8" CRUSHED AGGREGATE DRIVEWAY APPROACH BASE 480 SF 0.75 360.00 0.85

More information

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Project Name: Project Location: Date Submitted: TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Last Revised January 31, 2014 Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( )

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

Project: Developer/Designer: Reviewer:

Project: Developer/Designer: Reviewer: City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;

More information

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL CPC-2014-3808-GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL Pursuant to Los Angeles Municipal Code Section 12.32 G, the T Tentative Classification shall

More information

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and

More information

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD Schedule 5 Page 1 GENERAL DETAILS G1 General Legend for Contract Drawings Deleted (Per City A-size Drawing Block) G2 Legend for Materials

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information