1 November 2015 Contaminated Land Assessment in NSW
2 Contaminated Site Assessment and Management Process Prompts for assessing site contamination: Acquisition or divestment of property Site rezoning or DA consent /SEPP 55 Trigger Known or foreseeable contamination triggering duty to report to NSW EPA Investigation/Assessment Stages: Preliminary Site Investigation Detailed Site Investigation Preparation of Remedial Action Plan (if unacceptable contamination identified) Remediation Validation Reporting Site Management Plan (if required) Preliminary Site Investigation Detailed Site Investigation Remedial Action Plan Remediation Validation Sampling and Reporting Site Audit Statement 2 November 2015
3 The National Environmental Protection (Assessment of Site Contamination) Measure 2013 Amendment Original 1999 NEPM presented rigid criteria for soil based on four landuse categories: Residential A Residential B Recreational Open Space Commercial/Industrial These still present in new NEPM (though revised to reflect new science) but a number of other health and environmental based criteria have been added New criteria are less rigid and require input of site specific parameters for their generation (e.g. contaminant depth, particle size, soil type, ph, cation exchange capacity, etc.) The shift of the NEPM has been towards providing a framework for site-specific risk-based criteria. Other additions include: New asbestos criteria Benzo(a)pyrene Toxic Equivalence Quotient (TEQ) Total Recoverable Hydrocarbons Vapour Risk 3 November 2015
4 Investigation Criteria vs. Clean-up/Remediation Criteria NEPM presents investigation criteria It states specifically that they aren t designed as cleanup or remediation criteria The investigation criteria, though focused on being more site specific than the 1999 NEPM are still very conservative as they are required to cover a broad range of landuse and natural scenarios (e.g. Public Open Space criteria covers parks, playgrounds, playing fields, secondary schools and footpaths) However, investigation criteria is still heavily used as cleanup criteria Site specific human health risk assessment (HHRA) and ecological risk assessment (ERA) to derive specific criteria (specified in Schedule B4 of the NEPM 2013 Amendment) Cost of doing HHRA at start of a remediation project to derive site specific criteria has the potential to significantly counterbalance the cost of unnecessary remediation of soil and/or water 4 November 2015
5 Oversight of Contaminated Site Projects in NSW NSW EPA sometimes gets directly involved in remediation projects (e.g. Barangaroo), but generally don t have the resources to oversee all Council usually finds themselves involved as consent authority for rezoning and DA but often lack resources and technical expertise in contamination management in-house To compensate for these issues, the NSW Site Auditor Scheme was introduced in 1998 The Site Auditor acts as an independent expert and a representative of NSW EPA The purpose of a CLM Audit is to oversee a consultant s work in determining: Nature and extent of contamination Nature and extent of management/remediation Whether remedial works have been successful in achieving project outcomes Whether site is suitable for the proposed landuse What ongoing management (if any) is required New Site Auditor Guidelines are currently under internal review by NSW EPA and will come out for external review in early November 2015
6 Duty to Report Contamination Duty to Report Contamination is provided for under Section 60 of the Contaminated Land Management Act 1997 Where it meets relevant criteria, a site may trigger the duty of an individual to notify NSW EPA of contamination or foreseeable contamination The following people are required to notify the NSW EPA: Anyone whose activities have contaminated land An owner of land that has been contaminated Such a person is required to notify the NSW EPA in the following circumstances: The level of the contaminant in, or on, soil is equal to or above a level of contamination set out in the NEPM or other approved guideline value with respect to a current or approved use of the land, and people have been, or foreseeably will be, exposed to the contaminant; or The contamination meets a criterion prescribed by the regulations; or The contaminant or a by-product has entered, or will foreseeably enter, neighbouring land, the atmosphere, groundwater or surface water, and is above, or will foreseeably be above, a level of contamination set out in the NEPM or other approved guidelines and will foreseeably continue to remain equal to or above that level. The original 2009 Guidelines were updated in Main changes include: More comprehensive adoption of the NEPM 2013 New guidance on groundwater, surface water, vapour intrusion and asbestos in soils Better definition of what is considered foreseeable 6 November 2015
7 New Consultant Certification Schemes New consultant certification scheme developed to ensure a standard of quality in the industry Currently two operating schemes run by EIANZ (CEnvP) and CRC CARE (SCPA). A third also being prepared by CPSS Both CEnvP and SCPA to be endorsed by NSW EPA. Different states and territories currently moving to endorse one or the other or both Requirements for certification include CPD logs, interviews, proof of academic background, references, detailed CV, etc. The regulator in the future, is going to require all reports submitted to NSW EPA to be reviewed and approved by a SCPA or CEnvP practitioner. Such reports would relate to the following: Preliminary Investigation Orders Management Orders Voluntary Management Orders Ongoing Maintenance Orders Duty to Report Contamination The system is currently in a 24 month transition period. The full commencement of the scheme is set to take place from 1 July November 2015
8 Waste Management Overview in NSW Overarching legislation for waste in NSW Protection of the Environment Operations Act 1997 Covers everything from how waste is classified and transported to who can accept it Also covers the licensing and environmental management of waste management facilities Waste generated on-site is classified into the following: Liquid Waste General Solid Waste (Putrescible) General Solid Waste (Non-Putrescible) Restricted Solid Waste Hazardous Waste Special Waste (an additional classification which overlies the General Solid Waste or Restricted Solid Waste classification which includes asbestos, tyre and clinical wastes Waste tracking requirements both within NSW and interstate have changed recently 8 November 2015
9 Waste Reuse and Improved Characterisation Since the POEO Act came in in 1997 there has been a growing need to divert waste materials away from landfill and minimise the inappropriate landfilling of otherwise useable waste. The Protection of the Environment Operations Regulations since 2005 (the latest being 2014) have been put in place in part to redress the balance. One means of doing this has been to provide exemptions to parts of the POEO Act so that certain types of materials can be beneficially reused. These exemptions can be split into two types: General Exemptions (e.g. the Excavated Natural Materials Exemption and the Recovered Aggregate Exemption); and Specific Exemptions (developed specific to a waste generated by a particular site or individual who wants to find a beneficial reuse for that waste. Requires direct consultation with NSW EPA) These exemptions coupled with escalation of the waste levy represent part of a carrot and stick approach implemented by the EPA to minimise waste generation and unnecessary landfilling 9 November 2015
10 Waste Reuse and Improved Characterisation (Cont d) Classification of wastes can be further characterised and potentially downgraded from their initial classification through a range of means: Further characterisation: Leachability (TCLP) testing Statistical analysis (95% UCL) Remediation of waste material: On-site prior to off-site disposal (e.g. bioremediation of hydrocarbon impacted soils) Off-site remediation at a specific remediation site For hazardous waste which cannot be disposed off-site without prior treatment, immobilisation of the contaminant, including: Natural immobilisation already deemed immobile because of natural properties of the contaminant or matrix Chemical fixation chemically converted to a stable form Micro-encapsulation Treated to physically lock up contamination in the structure of the waste Macro-encapsulation Emplacement in a specifically engineered cell at the waste facility 10 November 2015
11 Questions 11 November 2015
12
Regulation and Management of Contaminated Land in NSW. NSW EPA, Stephanie Yu CLM Program 18 November 2015
Regulation and Management of Contaminated Land in NSW NSW EPA, Stephanie Yu CLM Program 18 November 2015 1 Overview NSW legislation and Contaminated Land Framework Roles and responsibilities Significantly
More informationReviewing Contaminated Site Assessment Reports. What the NEPM means for you
Reviewing Contaminated Site Assessment Reports What the NEPM means for you Legislative Framework EPAA (1979) EPAA Regulation (2000) State Environmental Planning Policy 55 POEO Act(1997) POEO Regulations
More informationRegister of Contaminated Land Consent Conditions
Regional Contaminated Land Capacity Building Program Register of Contaminated Land Consent Conditions AUGUST 2017 Regional Contaminated Land Capacity Building Program This publication was produced by the
More informationQld Contaminated Land Auditor Process - Changes for the Industry. Brad May DEHP Contaminated Land Auditor Epic Environmental
Qld Contaminated Land Auditor Process - Changes for the Industry Brad May DEHP Contaminated Land Auditor Epic Environmental Outline How is contaminated land managed in Qld EPOLA Act update and expected
More informationQld Contaminated Land Auditor Process. What is it and What do they want? Brad May DEHP Contaminated Land Auditor
Qld Contaminated Land Auditor Process What is it and What do they want? Brad May DEHP Contaminated Land Auditor bmay@epicenvironmental.com.au Outline How is contaminated land managed The process and drivers
More informationCentral NSW Regional Contaminated Land Policy Template
Central NSW Regional Contaminated Land Policy Template Contamination Central: Supporting safe, stable and sustainable redevelopment of land in Central West NSW. Funded by the New South P a g e 1 {Instruction
More informationPolicy Document. Contaminated Land Management Policy. Address. Online. Phone & Fax: Chelmsford Place Leeton NSW 2705
Policy Document Contaminated Land Management Policy Address Phone & Fax: Online 23-25 Chelmsford Place Leeton NSW 2705 Phone: (02) 6953 0911 Fax: (02) 6953 3337 Email: Website: council@leeton.nsw.gov.au
More informationDraft Submission on Proposed Remediation of Land SEPP. April 2018
Draft Submission on Proposed Remediation of Land SEPP April 2018 Table of contents Opening 3 Purpose 3 Background 3 Response to Key Policy Changes 4 Categories of Remediation Work 4 Certified Practitioners
More informationContaminated Land Auditing Charting Complex Waters
Presentation to Environmental Health Association Perth, September 2013 Contaminated Land Auditing Charting Complex Waters Roger Parker Principal Accredited Contaminated Site Auditor Content of Presentation
More information19 April
19 April 2012 Christopher McElwain Manager Waste Management Environment Protection Authority PO Box A290 SYDNEY SOUTH NSW 1232 christopher.mcelwain@environment.nsw.gov.au Dear Chris The Australian Sustainable
More informationCity of Sydney Contaminated Land Development Control Plan 2004
City of Sydney Contaminated Land Development Control Plan 2004 Table of Contents 1. Introduction 1 1.1. Citation 1 1.2. Area to which the development control plan applies 1 1.3 Commencement 2 1.4 Relationship
More informationWaste Matters. Scott Hunter Head Waste Compliance Unit Coffs Harbour
Waste Matters Scott Hunter Head Waste Compliance Unit Coffs Harbour 1 Who is the NSW EPA? The NSW Environment Protection Authority protects our environment and community We do this by being a leader, a
More informationManaging Land Contamination Planning Guidelines SEPP 55 Remediation of Land
Managing Land Contamination Planning Guidelines SEPP 55 Remediation of Land 1998 Department of Urban Affairs and Planning Environment Protection Authority Crown copyright 1998 Printed August 1998; reprinted
More informationManagement of Underground Petroleum Storage Systems
Management of Underground Petroleum Storage Systems Its all about prevention David A Johnson A/Unit Head, Hydrocarbon Management & Regulation EIANZ forum, Ballina 21 June 2017 1 2 ~ 30KM SE Tamworth ~200
More informationProposed Amendments to the National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health
Proposed Amendments to the National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health CONSULTATION DOCUMENT Disclaimer The opinions and options contained in
More informationASC NEPM 1999 Transition, implementation and EPA guidance
South Australia s Environment Protection Authority ASC NEPM 1999 Transition, implementation and EPA guidance ACLCA, Wednesday 10 July 2013 Wendy Boyce, Mark Hassam & Danielle Torresan Overview amendment
More informationDo Australian Clean Up Projects Currently Accord with the Concept of Sustainable Remediation?
Do Australian Clean Up Projects Currently Accord with the Concept of Sustainable Remediation? Peter Nadebaum Australasian Land and Groundwater Association SuRF Australia, CRC CARE, GHD Pty Ltd Clean Up
More informationApril 21, 2010 (Revised June 21, 2010) Re: Ontario Regulation 511/09 Impact on Management of Surplus Construction Site Soils and Fill
Frank J. E. Zechner Professional Corporation Barrister & Solicitor 24 Beresford Avenue, phone: 416 319 2004 Toronto, Ontario, Canada M6S 3A8 fax: 416 987 6877 email: frankzechner@sympatico.ca RESIDENTIAL
More informationPotentially Contaminated Land
Potentially Contaminated Land General Practice Note June 2005 This General Practice Note is designed to provide guidance for planners and applicants about: how to identify if land is potentially contaminated
More informationEPA Inquiry: Submission on behalf of Paper Australia Pty Ltd
Our reference AGPAPE16499-9101755/01 567 Collins Street, Melbourne VIC 3000 GPO Box 9925 Melbourne VIC Tel +61 396723000 Fax +61 396723010 www.corrs.com.au CORRS CHAMBERS WESTGARTH lawyers Sydney Melbourne
More informationEXTENDED PRODUCER RESPONSIBILITY
EXTENDED PRODUCER RESPONSIBILITY POLICY STATEMENT 29 June 2005 A new approach to waste reduction The Government is committed to a more sustainable future for Western Australia and to a new approach towards
More informationleft over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or
14. Waste Management 14.1. Waste Management Regulations The regulatory requirements governing waste management are provided within the EP Act, the EPR and associated Environmental Protection (Waste Management)
More informationLNAPL Extraction Practicability Assessment. Transpacific Industries Group Ltd Tullamarine Closed Landfill
LNAPL Extraction Practicability Assessment Transpacific Industries Group Ltd Tullamarine Closed Landfill Background In the IRP s view, the Stage 1 LNAPL Extraction Trial (Baildown Tests) has been appropriately
More informationADVISORY NOTICE. PLANNING Advisory Notices are issued to assist in the interpretation of the Development Act Site Contamination
Planning SA Development Act 1993 ADVISORY NOTICE PLANNING Advisory Notices are issued to assist in the interpretation of the Development Act 1993 Site Contamination December 01 This Advisory Notice is
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Contamination Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site
More informationSubmission to the Energy from Waste Technology Inquiry. May 2017
Submission to the Energy from Waste Technology Inquiry May 2017 Table of contents Opening 3 Terms of reference (TOR) 3 Current provision of waste disposal and recycling 3 Impact of waste levies 4 Role
More informationFact Sheet: Anglesea Power Station and Mine Rehabilitation Overview
Fact Sheet: Anglesea Power Station and Mine Rehabilitation Overview After 46 years of operation Alcoa s Anglesea Power Station and Coal Mine was permanently shut down on 31 August 2015. The planning for
More information5 Contaminated Sites
5 Contaminated Sites 5.1 Introduction For the purpose of this Plan, a contaminated site is a site at which hazardous substances occur at concentrations above background levels and where assessment indicates
More informationTitle: Environmental Management Tools Issued by: Environment Department
Guideline No.: EN/017 Issue Date: July 2010 1.0 General Title: Environmental Management Tools Issued by: Environment Department In order to improve industrial environmental performance cost-effectively,
More informationVariation of NEPM Schedule B1
Variation of NEPM Schedule B1 CRC CARE s Role Prashant Srivastava Outline q The NEPM Review and recommendations q CRC CARE and its petroleum program q Health Screening Levels (HSLs) Project q NEPM variation
More informationTighes Hill Remediation Project Update
3 September 2015 Tighes Hill Remediation Project Update This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply)
More informationin brief corrs Policy What it means for developments in april 2012
corrs in brief april 2012 Delivery of the Strategic Regional Land Use Policy What it means for developments in regional areas The NSW Government has recently released a number of draft plans, policies
More informationFill Material and Soil Management
Fill Material and Soil Management What You Need to Know The purpose of this fact sheet is to describe how fill material and excess soil can be reused properly during the cleanup and redevelopment of properties
More informationRelevant legislation (Administering Authority Commonwealth legislation
Commonwealth legislation Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) [Commonwealth Department of Sustainability, Environment, Water, Population and Communities (SEWPaC)] New
More informationBENGALLA Mining Company. Contamination Assessment
BENGALLA Mining Company U Contamination Assessment U CONTINUATION OF BENGALLA MINE PRELIMINARY CONTAMINATION ASSESSMENT Prepared by: HANSEN BAILEY 6 / 127 129 John Street SINGLETON NSW 2330 July 2013 For:
More informationNSW - Sydney Branch: The Evolving NSW Waste Industry & New Waste Regula>ons
NSW - Sydney Branch: The Evolving NSW Waste Industry & New Waste Regula>ons ALGA NSW Sydney Branch: The Evolving NSW Waste Industry & New Waste Regula@ons THE PROTECTION OF THE ENVIRONMENT OPERATIONS (WASTE)
More informationEnvironment protection reform
Environment protection reform Environment Protection Amendment Bill 2018 Kath Rowley Executive Director, Climate Change Division Department of Environment, Land, Water and Planning 2 Environment Protection
More informationPOLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)
Established 1907 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) DATE: JULY 2018 Version Date Section Modified 1 July 2018 All Reason for Modification Original Management Plan Review Team MCC Environmental,
More informationForthcoming Events Calender
The Australian Land & Groundwater Association Newsletter ISSUE #6 SEPT 2009 Contents: Pg. 2 E10 Pg. 3 NSW Pg. 4 NSW Pg. 5 Qld Pg. 6 SA Pg. 7 Vic Forthcoming Events Calender SEPTEMBER The 3rd International
More informationFill Material Classification and Use
1 Fill Material Classification and Use 6 NYCRR Part 360.13 David Gibb, P.E., Deputy Regional Materials Management Engineer November 8, 2018 2 Discussion Topics Background Qualified environmental professionals
More informationThe Dirt on Excess Soil Across Canada How Will Brownfields Be Affected?
The Dirt on Excess Soil Across Canada How Will Brownfields Be Affected? John Georgakopoulos Partner, Certified Specialist in Environmental Law by the Law Society of Upper Canada Jacquelyn Stevens Partner,
More informationFACTS. Highlights of Legislation and Regulations ON CONTAMINATED SITES
3 FACTS ON CONTAMINATED SITES Highlights of Legislation and Regulations January 2009 Comprehensive contaminated sites legislation was passed by the BC legislature in June 1993. It came into effect on April
More informationDULUXGROUP DISTRIBUTION CENTRE. 3 Harris Avenue. Marsden Park NSW
DULUXGROUP DISTRIBUTION CENTRE 3 Harris Avenue Marsden Park NSW Resources and Industrials Page 1 of 15 Contents 1 Introduction... 3 2 Abbreviations and Definitions... 4 3 Risk Management Framework... 5
More informationHuman Health Risk Assessment Process Overview
Human Health Risk Assessment Process Overview Deb MacKenzie-Taylor, Ph.D. Toxicology Specialist Michigan Department of Environmental Quality Waste and Hazardous Materials Division mackenzd@michigan.gov
More informationModern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting
Modern Electroplating Site Update Dudley Vision Advisory Task Force September 2008 Meeting 1 Modern Electroplating Uncontrolled Waste Site Key elements that define a site relative to MA DEP and US EPA
More informationENVIRONMENTAL AUDITING GUIDE TD 16/16/E
ENVIRONMENTAL AUDITING GUIDE MIDDLE EAST GASES ASSOCIATION (MEGA) European Business Center, Office BC 25 Dubai Investments Park, PO Box: 166 Dubai-UAE Tel: +971-4-8135525 / Fax: +971-4-8135575 / E-mail:
More informationRegulatory Compliance and Enforcement Framework
Contents 1. About us... 3 1.1 Our Mission and Values... 3 2. Relevant Legislation and Obligations... 4 3. Approach to Regulatory Compliance and Enforcement... 4 3.1 Our Approach... 4 3.2 Working with Stakeholders...
More informationBARANGAROO SOUTH BUILDING C1 WASTE MANAGEMENT PLAN
LEND LEASE BUILDING PTY LIMITED 97 000 098 162 BARANGAROO SOUTH BUILDING C1 15/06/2018 Revision No: 1 LEND LEASE BUILDING PTY LIMITED 97 000 098 162 Sub Plan Revision Status Date Revision Purpose and Summary
More informationRSB ESMP (environmental and social management plan) Guidelines
Type of document: RSB Guidelines Status: Approved for Certification Date: [01-03- 2011] Version: [version 2.1] RSB ESMP (environmental and social management plan) Guidelines RSB reference code: [RSB- GUI-
More informationANY LIMITED (WMP) Version. Review. Date. All. Plan 5 Yearly. December All. MCC Environmental, Technical. December Yearly.
MUSWELLBROOK COAL COMPA ANY LIMITED WASTE MANAGEMENT PLAN (WMP) December 2015 Version 1 February 2005 All 2 3 Date December 2010 December 2015 Section Modified All All Reason for Modification Original
More informationRemedial Action Plan
Remedial Action Plan for Leichhardt Park - Mary Street Lilyfield NSW 4 Prepared for: Leichhardt Municipal Council Revised July, (Report: C64Q37B333 Leichhardt Park RAP FC) COPYRIGHT: The concepts, information
More informationPOLLUTION INCIDENT RESPONSE
Table of Contents Section 1. POLLUTION INCIDENT RESPONSE 1. Process..2 2. Definition of Pollution Incident..3 3. Description and Likelihood of hazards..3 4. Pre-emptive actions to be taken.4 5. Inventory
More informationAppendix B7 Construction Waste Management Plan
Appendix B7 Project: Keepit Dam Work Package 2 - Post Tensioning Works Location: Keepit Dam, Namoi River, Northern NSW Client: WaterNSW Contract: 04532F31 Page 2 of 27 Document Acceptance and Release Notice
More informationBUILDING PRODUCT SAFETY LEGISLATION BRIEFING
This briefing document provides a summary of the new or proposed laws and regulations concerning non-conforming building products (including building cladding. Contents New South Wales... 1 Queensland...
More informationWaste Management Policy
Waste Management Policy Contents 1. Introduction 2. Policy Statement 3. Policy Objectives 4. Application 5. Organisation and Management 6. Glossary of Terms Document Control Information: Last updated on:
More informationSMART 1 - Managing Soil From Closed Small Arms Firing Ranges
SMART 1 - Managing Soil From Closed Small Arms Firing Ranges Presented By: Michael F. Warminsky, PE Presented at the 2007 Joint Services Environmental Management Conference Columbus, Ohio 24 May 2007 States
More informationFacts About. LMA Fill Material and Soil Management Guidance. Introduction. What Soils and Fill Material are Subject to the Policy?
Facts About LMA Fill Material and Soil Management Guidance The purpose of this guidance is to describe how fill material and excess soil can be reused properly during the cleanup and redevelopment of properties
More informationRisk-Based Decision Making for Site Cleanup
Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk-based decision-making process to provide a framework for determining cleanup requirements
More informationA Proposed Framework for a Waste-Free Ontario Ministry of the Environment and Climate Change
A Proposed Framework for a Waste-Free Ontario Ministry of the Environment and Climate Change Winter 2016 Purpose Provide an overview of: Proposed Legislation: Bill 151, the Waste-Free Ontario Act, 2015
More informationtechnical report Safe on-site retention of contaminants Part 2: A risk-based approach
CRC for Contamination Assessment and Remediation of the Environment no. 16 technical report Safe on-site retention of contaminants Part 2: A risk-based approach P. Nadebaum CRC for Contamination Assessment
More informationFIVE-YEAR REVIEW PROCESS CAMP RAVENNA
FIVE-YEAR REVIEW PROCESS CAMP RAVENNA James R Stachowski, PE Environmental Engineer US Army Corps of Engineers, Buffalo November 16, 2016 US Army Corps of Engineers Introduction Basis for doing five-year
More informationConstruction Environment Management Plan
Construction Environment Management Plan Guidance Material July 2013 ABSTRACT This CEMP guidance material has been prepared by MAC to assist the identification and management of environmental risks associated
More informationContained-in Determination Nonrule Policy Document & Uncontaminated Soil Nonrule Policy Document
Contained-in Determination Nonrule Policy Document & Uncontaminated Soil Nonrule Policy Document Contained-in Policy Established to clarify hazardous waste regulations To facilitate site cleanup activities
More informationAppendix X.6 Queensland Government CSG Water Management Policy
Appendix X.6 Queensland Government CSG Water Management Policy Coal Seam Gas Water Management Policy June 2010 Tomorrow s Queensland: strong, green, smart, healthy and fair Purpose The purpose of this
More informationGarth Hill College WASTE MANAGEMENT POLICY
Garth Hill College WASTE MANAGEMENT POLICY (Bracknell Forest Council Policy) Policy Owner: Site Manager Amended: No changes Ratified by Environment Committee: 18-03-2015 Recorded by Board of Governors:
More informationFrom Risk to Remediation
From Risk to Remediation Australia s most comprehensive training to manage and remediate contaminated sites globally. 4 MARCH 8 MARCH 2019 UNIVERSITY OF NEWCASTLE Knowledge & experiences you can t Google.
More informationContaminated Land Update
Contaminated Land Update A legal perspective on managing contaminated land around Australia Liability limited by a scheme approved under Professional Standards Legislation Key laws and policies - definitions
More informationDEVELOPMENT OF A REVISED WASTE CLASSIFICATION SYSTEM FOR SOUTH AFRICA. Updated Framework: REVISED WASTE CLASSIFICATION & MANAGEMENT SYSTEM (WCMS)
DEVELOPMENT OF A REVISED WASTE CLASSIFICATION SYSTEM FOR SOUTH AFRICA Updated Framework: REVISED WASTE CLASSIFICATION & MANAGEMENT SYSTEM (WCMS) Prepared by: EScience Associates Report No : ESA-HAZR-FG-01V4
More informationCODE OF CONDUCT REGULATION
Province of Alberta ELECTRIC UTILITIES ACT GAS UTILITIES ACT CODE OF CONDUCT REGULATION Alberta Regulation 58/2015 Extract Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park
More informationProfessional Services HCR is a one-stop shop for all your design and construction needs.
Professional Services HCR is a one-stop shop for all your design and construction needs. www.hcr-llc.com Our in-house licensed professionals give us the unique ability to handle everything from assessing
More informationSustainable remediation in New Zealand
Sustainable remediation in New Zealand Joanne Ferry and Peter Cochrane Tonkin & Taylor Ltd jferry@tonkin.co.nz Introduction What is sustainable remediation? The practice of demonstrating, in terms of environmental,
More informationEnvironmental Regulations New and changing law. Jamie Bearman
Environmental Regulations New and changing law Jamie Bearman Social enterprise operating in the North of England All profits reinvested into community projects Accredited to ISO 9001, ISO 14001, OHSAS
More informationWhat Gets Measured Gets Managed 25 th Annual National Compost Conference. September 16-18, 2015
1 What Gets Measured Gets Managed 25 th Annual National Compost Conference September 16-18, 2015 2 Who We Are OWMA is non-profit industry trade association Represent over 300 private & public sector members
More informationChapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements
Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Contents Page number 4. Planning and statutory requirements 4-1 4.1 Approval under the EPBC Act 4-1 4.1.1 Controlled
More informationI. Statewide Application of Wisconsin's Quality Assurance/Quality Control Program for Environmental Data Collection
Quality Assurance/Quality Control Program for Environmental Data Collection during Site Remediation for Wisconsin s Ready for Reuse Loan and Grant Program and the US EPA Brownfields Cleanup Grant Former
More informationOVERVIEW CAPACITY & CONDITION
OVERVIEW Over 18,000 sites and an associated 22 million acres of land are related to the primary hazardous waste programs that comprise much of the nation s hazardous waste infrastructure, and more than
More informationLate 2007 saw two particular requirements come into force under the Landfill Directive/Landfill Regulations. (England and Wales), namely:
The Landfill Regulations in relation to off site disposal of contaminated soil What are the requirements?, How do things work in practice?, What do we need to know? Introduction The subject of disposal
More informationPROBLEM > SOLUTION >
PROBLEM > SOLUTION > Spent drilling mud can be a costly problem. By the time you recover it, tanker it off-site, make certain it meets all environmental regulatory requirements and pay tipping fees to
More informationA Proposed Framework for a Waste-Free Ontario Ministry of the Environment and Climate Change Technical Briefing
A Proposed Framework for a Waste-Free Ontario Ministry of the Environment and Climate Change Technical Briefing Fall 2015 Purpose Overview: Background Proposed Legislation: Waste-Free Ontario Act, including:
More informationNevada National Security Site Industrial Sites Project Closeout 12498
Nevada National Security Site Industrial Sites Project Closeout 12498 Kevin Cabble*, Mark Krauss, and Pat Matthews * U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office,
More information7.7 HAZARDOUS SUBSTANCES AND CONTAMINATED LAND
7.7 HAZARDOUS SUBSTANCES AND CONTAMINATED LAND 7.7.1 BACKGROUND (1) Hazardous substances are used by the agriculture, horticulture, forestry and industrial sectors, as well as the domestic sector (but
More informationBrownfield Program in California
Brownfield Program in California Weixing Tong, Ph.D. P.G., C.H.G., C.E.G. California Regional Water Quality Control Board Los Angeles Region Brownfield Definition Brownfields are real property, the expansion,
More informationADELAIDE BRIGHTON LIMITED ACN
ADELAIDE BRIGHTON LIMITED ACN 007 596 018 AUDIT, RISK AND COMPLIANCE COMMITTEE COMMITTEE CHARTER 1 Membership of the committee The committee shall consist of: only non-executive directors a majority of
More informationStatements of Membership Obligations 1 7
IFAC Board Statements of Membership Obligations Issued April 2004 Statements of Membership Obligations 1 7 The mission of the International Federation of Accountants (IFAC) is to serve the public interest,
More informationASH MANAGEMENT PLAN. U.S. Environmental Protection Agency Region 4, Atlanta, GA. Mr. Joe Alfano, Remedial Project Manager
ASH MANAGEMENT PLAN U.S. Environmental Protection Agency Region 4, Atlanta, GA Mr. Joe Alfano, Remedial Project Manager 404-562-8933 City of Jacksonville Environmental and Compliance Department Site Investigation
More information2 nd SE Brownfields Conference October 18, 2016
2 nd SE Brownfields Conference October 18, 2016 EPA Brownfields Program A brownfield site is real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential
More information2011 Advanced Risk Assessment Workshop Program
2011 Advanced Risk Assessment Workshop Program WEDNESDAY 20 JULY PRESENTER: JACKIE WRIGHT 8.30 am Registration 9.00 am Introductions Overview of Risk Assessment Site Characterisation for Risk Assessment
More informationDevelopment of Potentially Contaminated Land Guidance Note for Developers, Agents and Consultants
Development of Potentially Contaminated Land Guidance Note for Developers, Agents and Consultants and Consultants Helping you get it right CONTENTS Page No 1.0 INTRODUCTION 2 2.0 WHAT IS CONTAMINATED LAND
More informationComments to Proposed Regulatory Reforms 310 CMR , The Massachusetts Contingency Plan
50 Hampshire Street Cambridge, Massachusetts 02139 tel: 617 452-6000 fax: 617 452-8000 Ms. Elizabeth Callahan Department of Environmental Protection Bureau of Waste Site Cleanup One Winter Street, 6th
More informationVBA External Wall Cladding Audit Preliminary Report. VBA External Wall Cladding Audit Report. VBA External Wall Clad. Preliminary Report
VBA External Wall Cladding Audit Preliminary Report VBA External Wall Cladding Audit Report VBA External Wall Clad Preliminary Report 17 February 2016 Issued 4 December 2015 www.vba.vic.gov.au Page 0 of
More informationFIT & PROPER REQUIREMENTS FOR TRUSTEES: WHERE DO WE SET THE BAR? TASHIA JITHOO, Director, Bowman Gilfillan Inc.
FIT & PROPER REQUIREMENTS FOR TRUSTEES: WHERE DO WE SET THE BAR? TASHIA JITHOO, Director, Bowman Gilfillan Inc. A FAIR ASSESSMENT? Trusteeship today requires significant expertise, yet many have identified
More informationEPS Alumni Student Forum. Environmental Consulting Perspectives & Information By: Mauricio Escobar and Nick Walchuk December 3, 2008
EPS Alumni Student Forum Environmental Consulting Perspectives & Information By: Mauricio Escobar and Nick Walchuk December 3, 2008 Introduction Who are these guys? What can I learn from them? What is
More informationTechnical Impracticability Determinations
Voluntary Remediation Program (VRP) (307) 777-7752 http://deq.state.wy.us/volremedi/index.asp Technical Impracticability Determinations In its 2000 session, the Wyoming Legislature created new opportunities,
More information17 Non-mining Waste 17-1
Non-mining Waste17 CONTENTS 17 Non-mining Waste 17-1 17.1 17.1 Introduction Introduction 17-1 17-1 17.2 17.2 Waste Waste 17-1 17-1 17.2.1 Regulatory Requirements 17-1 17.2.1 Regulatory Requirements 17-1
More informationNSW Site Auditor Scheme SITE AUDIT STATEMENT
NSW Site Auditor Scheme SITE AUDIT STATEMENT A site audit statement summarises the findings of a site audit. For full details of the site auditor s findings, evaluations and conclusions, refer to the associated
More informationContaminated Land Management
Contaminated Land Management Helen Jones WSP Speaker Introduction Helen Jones WSP 2 Technical Executive in Contaminated Land Management at WSP. BSc Hon degree in Engineering Geology 22 years experience
More informationTittabawassee River Floodplain
Tittabawassee River, Saginaw River & Bay Site Tittabawassee River Floodplain Mary P. Logan U.S. EPA CAG Meeting July 21, 2014 Agenda Recap of floodplain conditions Recap of 2013 outreach summary Remedy
More information(Adopted by the Board of Directors on 13 May 2009 and amended on 24 September 2009, 13 September 2012 and 27 November 2013)
Thomas Cook Group plc THE AUDIT COMMITTEE TERMS OF REFERENCE (Adopted by the Board of Directors on 13 May 2009 and amended on 24 September 2009, 13 September 2012 and 27 November 2013) Chairman and members
More informationAttention: Trevor Brown Standard Post
NSW GOVERNMENT Environment, Climate Change & Water OUf reference: DOC11/10471 Contact Helen Prifti, (02) 9995 5717 Andrew Dunne General Manager Engineering and Environment Port Kembla Port Corporation
More informationIEMA Associate Certificate Supplement
Introduction IEMA Associate Certificate Supplement IEMA Associate Certificate in Environmental Management This Supplement has been prepared to advise you of updates to your study material for the IEMA
More information