1 Environmental and Social Management Plan Capital Works State Highway 205 / Schist Street Intersection Upgrade 21 September 2015 NZTA142200
2 Page ii Record of amendment Amendment number Description of change Effective date Updated by
3 Page iii Contents 1. Background Project Scope Description Location Management Plan Framework Environmental Policy Environmental Objectives Roles and Responsibility Environmental and Social Management Environmental and Social Impacts Legislative and Consent Compliance Requirements Implementation and Operation Aspect Specific Environmental Management Plans Operating Procedures Emergency Contacts and Response Complaints Management Training Monitoring and Review Compliance Monitoring Environmental Compliance Site Audits Corrective and Preventive Action Management Review 19 Appendix A. Requirements Checklist 20
4 Page 4 1. Background 1.1 Project Scope Description This Environmental and Social Management Plan (ESMP) has been developed to detail environmental management requirements for the conversion of the State Highway 205 / Schist Street intersection in Bridgeton from a roundabout to a signal controlled intersection (hereafter referred to as the Project). The works will occur over a twelve week period from 24 January 2016, and require the removal of the current centre and median islands, minor widening and realignment of the eastern Schist Street, and Southern SH205 intersection points, and establishment of traffic signals, including pedestrian signals. The key project parameters are outlined below. Table 1: : Contract details Item Project Name State Highway Classification Nature of Project works Details SH205/Schist Street Intersection Upgrade Regional Connector SH205 Minor realignment and installation of traffic signals Commencement 24 January 2016 Project End Date 18 April 2016 Contractor Contract Manager Councils with Jurisdiction Cone Construction Harvey Wilson Furniston Regional Council Coalburn District Council
5 Page Location The location of the Project is presented at a National, regional and local scale in Figure 1. Figure 1: Location of the Project. Bridgeton
6 Page Management Plan Framework The structure of the project management plan framework is shown diagrammatically in Figure 2. This ESMP is part of a suite of plans which together provide the framework for meeting Cone Constructions obligations under the SH205/Schist Street Intersection Conversion Contract, and should be read in conjunction with these plans. This plan has been prepared in accordance with the NZTA Guideline for Preparing an Environmental and Social Management Plan. A copy of the NZTA Guidelines Requirements checklist is included in Appendix A. A number of sub management plans provide processes for specific environmental aspects for the project. These plans are the Construction Noise and Vibration Management Plan and Erosion and Sediment Control Plan. The ESMP and its sub management plans are live documents and will be reviewed and updated as required during the course of the project. At any time the most recent version of this plan will be held by the Environment Manager as identified in Section 1.4, and located on the Environmental Sharepoint space. Readers relying on information within this plan should check with the Environment Manager that they have the most recent version. Figure 2: Management Plan Framework Contract Plan Quality Management Plan Environmental and Social Management Plan Traffic Management Plan Stakeholder Communications Plan H&S Management Plan Construction Noise and Vibration Management Plan Erosion and Sediment Control Plan
7 Page Environmental Policy The ESMP shall give effect both to the Transport Agency s Environmental and Social Responsibility Policy and Cone Constructions Environmental and Sustainability Policy.
8 Page 8
9 Page Environmental Objectives The Transport Agency has a number of environmental objectives which are detailed in the State highway environmental plan: improving environmental sustainability and public health in New Zealand. The objectives that are specific to this project are detailed in Table 2 below. These objectives should be considered in all aspects of the SH205/Schist Street Intersection Upgrade. Table 2: : Relevant Environmental Objectives Code Aspect N3 A3 W1 W2 Noise Air Quality Water Resources Water Resources Objective Manage construction and maintenance noise to acceptable levels. Contribute to reducing emissions where the State highway network is a significant source of exceedances of national ambient air quality standards. Ensure run-off from State highways complies with RMA requirements. Limit the adverse effects of run-off from State highways on sensitive receiving environments. ES1 Erosion and Sediment Control Ensure construction and maintenance activities avoid, remedy or mitigate effects of soil erosion, sediment run-off and sediment deposition. SR1 Social Responsibility Enhance and contribute to community cohesion. H1 Culture and Heritage Proactively limit the disturbance of significant cultural and heritage features along the State highway network. E1 Ecological Resources Promote biodiversity on the State highway network. E3 Ecological Resources Limit the spread of pest plants. S2 RE1 RE2 VQ2 V2 V3 Spill Response and Contamination Resource Efficiency Resource Efficiency Visual Quality Vibration Vibration Ensure the removal, placement and disposal of contaminated soils is achieved in accordance Manage energy consumption and waste associated with NZTA s business in a cost effective and sustainable manner. Make resource efficiency an integral part of all state highway activities. Improve the visual quality of the existing state highway network. Mitigate vibration where levels are unreasonable and exceed relevant criteria set in New Zealand or internationally accepted thresholds. Avoid or reduce, as far as practicable, the disturbance or communities from vibration during construction or maintenance.
10 Page Roles and Responsibility The organisation structure for the contract is presented in Figure 3. All staff are responsible for considering environmental and social impacts when they manage and undertake their work. Cone Construction is committed to continuous improvement in Environmental and Social Management. Key personnel who are responsible for implementing the ESMP are presented in Table 3. Figure 3: Contract Organisation Chart Table 3: Accountabilities in the ESMP Role Whom Responsibilities Project Manager Harvey Wilson Overall responsibility for the Project Implement, review and update ESMP Responsible for complying with relevant legislation requirements. Environmental Manager Alex Clearwater Environmental compliance and management, including being the CS VUE condition manager Complaints manager relevant to this ESMP Responsible for managing compliance with relevant legislative requirements as outlined in Section 2.2. Construction Manager William Ding Ensure construction activities comply with ESMP and related procedures Responsible for complying with relevant legislation requirements Design Manager Marama Green Incorporates environmental requirements into design Advise of design issues that may impact on environmental compliance Environmental Coordinator Charles Cobham Supporting Environmental Manager, updating condition compliance in CS Vue
11 Page Environmental and Social Management 2.1 Environmental and Social Impacts The potential environmental and social impacts have been assessed for the works to be undertaken for the Project. In assessing these, consideration has been given to the Z19 State Highway Environmental and Social Responsibility Standard as well as Clause Environmental and Social Management Plan within the ESMP (NZTA141201). These impacts are summarised in Table 4. The environmental management approach to be implemented to avoid or minimise impact is given in Section 3. Table 4: Potential environmental and social impacts associated with the Project Environmental Aspect Activity Impact Mitigation (refer to Section3) Air Quality Excavation/removal of dry materials, generating dust. Work on unsealed sections of road, generating dust. Dust nuisance to people and property. Odour affecting neighbours. Air Quality CC-SOP Spraying of hot cutback binder. Archaeology Values Excavation works uncovering archaeological material (e.g. a midden); Loss of heritage values. Potential damage to an archaeological item. Accidental Discovery CC-SOP Landscapes and Visual Aspects Erection of traffic signals. Visual intrusion on landscape. The effect of traffic signals is a minor effect on the landscape which design has addressed. There is no management plan as part of the construction. Noise and Vibration Operation of heavy machinery. Piling and compacting operations Physical damage to land/buildings. Human disturbance. Noise and Vibration Plan CC-WMP Water Quality Excavation/removal of dry materials Hazardous substances entering the stormwater system and/or stream including fuel spills. Resurfacing and pavement surface repairs with bituminous material Sedimentation. Reduced water flows; Reduction/loss of habitat. Discharges (including water into water) to Fern Brook. Contamination following spills or runoff of hazardous substances. Erosion and sediment control SOP CC-WMP Emergency Response CC-WMP Detrimental effect on aquatic ecosystems
12 Page Legislative and Consent Compliance Requirements The legislative requirements associated with the Project activities Cone Construction are responsible for are summarised in Table 5. Consent conditions and permitted activity requirements are identified in Table 5. Table 5: The legislative requirements and accountabilities Legislation Description Requirement Regulator Responsibility Reference Resource Management Act 1991 Resource Management Act Emergency Works National Environmental Standard (NES) for Air Quality 2004 To promote the sustainable management of natural and physical resources. The RMA provides the local and regional authorities with the necessary powers to formulate plans, and set rules and standards for a multitude of activities. Sections 330, 330A and 331 of the RMA permit certain works to be carried out without the prior need for resource consent, provided the incident requiring the works and the works proposed comply with those sections. In terms of the RMA, an emergency is eligible for consideration under these provisions if it affects (s330(1)(a) (c)): (a) Any public work for which any person has financial responsibility; or (b) Any natural and physical resource or area for which a local authority or consent authority has jurisdiction under this Act; or (c) Any project or work [or network utility operation] for which any network utility operator is approved as a requiring authority under section 167. Regulations made under the Resource Management Act 1991 which aim to set a guaranteed minimum level of health protection for all New Zealanders. Every person has a duty to avoid, remedy, or mitigate any adverse effect on the environment arising from an activity carried on or on behalf of that person, whether or not the activity is in accordance with s rule in a plan, a resource consent, a designation section 10, section 10A, or section 20A. The activities which may be carried out in an emergency are those necessary to either: Remove the cause of the emergency, or To mitigate any actual or likely adverse effect of an emergency. The work must be immediate and/or urgent. Generally the work should deal adequately with the emergency only. There is follow-up action required when the emergency provisions have been relied upon (s330a), namely: The appropriate consent authority must be advised of work carried out during an emergency within 7 days. If resource consent is needed for the work then an application for the resource consent must be made within 20 working days. Burning of bitumen on the road is prohibited. Ministry for the Environment (and Local Authorities) Ministry for the Environment (and Local Authorities) Furniston Regional Council Contract Manager Environmental Manager Operations Manager act/public/1991/0069/latest/d LM html act/public/1991/0069/latest/d LM html regulation/public/2004/0309/la test/dlm html?search =ta_regulation_r_rc%40rinf% 40rnif_an%40bn%40rn_25_a &p=3
13 Page 13 NES for Assessing and Managing Contaminants in Soil to Protect Human Health 2012 The Furniston Regional Plan Coalburn District Plan Hazardous Substances and New Organisms Act 1996 Provides a nationally consistent set of planning controls and soil contaminant values ensures that land affected by contaminants in soil is appropriately identified and assessed before it is developed - and if necessary the land is remediated or the contaminants contained to make the land safe for human use. Intended to provide direction regarding the use, development and protection of natural and physical resources in the region, including use of and discharges to, Water, River and Lake Beds, Land and Soil, Air, and Coastal Resources. To promote the sustainable management of natural and physical resources. It includes Objectives, Policies and Methods to achieve the sustainable management of these resources within the Whangarei District. To protect the environment, and the health and safety of communities, by preventing or managing the adverse effects of hazardous substances and new organisms. For roading activities, any activity that disturbs soil over 25m 3 in volume has the potential to trigger the need for approval under this NES. Activities carried out under this contract must comply with the rules defined within the Regional Plan. Activities will be defined as permitted, controlled, discretionary, or noncomplying. Activities defined as prohibited cannot be undertaken. Activities carried out under this contract must comply with the rules defined within the District Plan. Activities will be defined as permitted, controlled, discretionary, or noncomplying. Activities defined as prohibited cannot be undertaken. Activities which require hazardous substances must be managed in compliance with the controls identified by the Act. Furniston Regional Council Waimatao district council Coalburn district council Pointville district council Furniston Regional Council Coalburn District Council Environmental Protection Authority Construction Manager Environmental Manager Environmental Manager Operations Manager Iwi Protocols Environmental Manager The National Radiation Laboratory The use of the nuclear densometer (NRL) administers the Radiation National Radiation to check density and moisture Protection Act 1965 and the Protection Act 1965 and content of pavement repairs or National Radiation Radiation Protection Regulations Construction Manager National Radiation rehabilitations will require activities to Laboratory 1982 on behalf of the New Zealand Protection Regulations 1982 be undertaken in accordance with Government. The legislation this Act and the relevant regulations. controls the use of ionising radiation regulation/public/2011/0361/la test/dlm html?searc h=ts_regulation_contaminant s_resel&p=1&sr=1 vt.nz/council/policy-andplans/rules-andregulation/regional-plan/ /services/environmentalpolicy-and-forwardplanning/district-plan act/public/1996/0030/latest/d LM html regulation/public/1982/0072/la test/whole.html
14 Page 14 Table 6: Consent condition requirements Environmental Effect Condition and/or Consent Ref Activities ESMP Management Monitoring and reporting requirements (including compliance evidence required for CSVue) Archaeology/cultural heritage FRC53322 Works involving the disturbance of ground may come across unknown cultural or heritage values. CC-SOP CC-SOP Records of any accidental discovery Land contaminants discharge to land FRC53330 FRC53331 FRC54000 Earthworks, concrete cutting, vegetation clearance, spills CC-WMP Erosion and sediment control plans, spill response plan, spill response training, ESC maintenance records. Water Quality contaminants discharged to water FRC53330 FRC53331 Earthworks, concrete cutting, vegetation clearance, spills CC-WMP Erosion and sediment control plans, spill response plan, spill response training, ESC maintenance records. Table 7: : Permitted activities Environmental Effect Condition and/or Consent Ref Activities ESMP Management Monitoring and reporting requirements (including compliance evidence required for CSVue) Air Quality - Dust Permitted Activity Dust resulting from construction work Noise Permitted Activity Noise resulting from construction work CC-SOP CC-WMP CC-SOP CC-WMP Any dust complaints received will be logged and recorded on Cone Constructions Incident Reporting form (CC-RF01-005). They will be forwarded to the Environmental Manager who will respond quickly and appropriately to close it out Any noise complaints received will be logged and recorded on Cone Constructions Incident Reporting form (CC-RF01-005). They will be forwarded to the Environmental Manager who will respond quickly and appropriately to close it out
15 Page Implementation and Operation 3.1 Aspect Specific Environmental Management Plans Cone Construction has developed a comprehensive suite of Management Plans which describe the processes used to manage specific environmental aspects associated with this contract. Each management plan has a suite of relevant standard operating procedures (SOP s). Everybody working on the Project, including sub-contractors shall be familiar with SOP s relevant to their work. All staff are to be familiar with CC-SOP02_007 Emergency Response. A summary of the relevant Management Plans is presented in Table 8. Table 8: Aspect-specific specific Management Plans Management Plan Summary Reference Noise and Vibration Erosion and Sediment Control Details performance standards, and describes methods and processes to be followed to limit or reduce the impact of noise and vibration from the projects activities. Describes methods and processes to be followed to limit or reduce the impact of erosion and resulting sediment and dust generation, on sensitive environment associated with the project. CC-WMP CC-WMP Operating Procedures Standard operating procedures (SOP s) have been developed for specific activities. These are to be implemented when undertaking the relevant activity to reduce the potential environmental impact of that activity. SOP s work with the aspect specific Management Plans detailed in Table 7to ensure that activities relating to this contract (including those specifically detailed within consent conditions), are undertaken in an environmentally and socially responsible manner. Activities that require SOP s are presented in Table 9. SOP requirements are communicated to staff through specific training sessions along with toolbox talk sessions (refer Section 3.5). Copies of these operating procedures are available in the site office and via Cone Constructions Sharepoint site. Table 9: : Standard Operating Procedures Operating Procedure Summary Reference Accidental discovery Erosion and sediment control Emergency works Emergency Response Stormwater assets Standard procedures to be followed in the event of the accidental discovery of cultural or historic artefacts, as the result of any physical disturbance to the existing ground surface. Standard procedures to be followed to reduce erosion and manage sediment during construction activities. Standard procedures to be followed when undertaking works associated with immediate response, reopening, and/or restoration of land transport infrastructure in the event of a defined, major, short-duration, natural event. Specific procedures to be followed in the event of an environmental emergency, including a fuel and/or hazardous substances spill. Describes processes to be followed to maintain stormwater assets to limit or reduce the impact of runoff from the road network on sensitive environments, including terrestrial, coastal, and aquatic. CC-SOP CC-SOP CC-SOP CC-SOP CC-SOP
16 Page 16 Noise and vibration Air quality Describes on site procedures to be followed to limit or reduce the impact of noise and vibration from construction activities. Describes methods and processes to be followed to limit or reduce the impact from dust generation, on the public, and sensitive environments associated with construction activities. CC-SOP CC-SOP Emergency Contacts and Response The key contact points, internally and externally, in the event of an emergency are identified in Table 10 and Table 11 respectively. Table 10: Internal Environmental Emergency Contact Details Role Name Organisation Phone Environmental Manager Alex Clearwater Cone Construction Construction Manager William Ding Cone Construction Environmental Coordinator Charles Cobham Cone Construction Health and Safety Manager Sam Spectre Cone Construction Table 11: External Environmental Emergency Contact Details Role Organisation Phone Emergency Services Fire, Police, Ambulance 111 NA Pollution Response Team Furniston Council Iwi liaison Iwi Heritage protection Heritage New Zealand Pouhere Taonga Conservation emergencies Department of Conservation Poisonous substances National Poison Centre Complaints Management Complaints relating to environmental and social matters will be managed in accordance with Cone Construction s Customer and Stakeholder Communications Management Plan (CC-WMP ). All complaints received will be logged and recorded on Cone Constructions Incident Reporting form (CC- RF01-005). Any complaints relevant to this ESMP will be forwarded to the Environmental Manager who will respond quickly and appropriately to close it out. Complaints may also be received via NZTA s Client Relationship Management system (CRMS) ( Any complaint received via this channel will be actioned in the same way.
17 3.5 Training In accordance with Cone Construction s Health & Safety procedures and Quality Plan, all employees are required to be adequately skilled and experienced for the work they undertake. No employee is asked to perform any task without the proper skills, experience and qualifications, unless adequate training and induction is immediately available. As such, environmental and social management training will be required to be undertaken by staff working under this contract. Environmental and social management training is captured by Cone Construction s training record database which records the type, purpose, convenor, completion and renewal date of training provided for each employee. The database is maintained and stored on Sharepoint. A summary of key project training courses provided is presented in Table 11. Table 12: Training requirements for Cone Construction staff Type of Training Purpose Convenor Required attendees Date completed Staff Induction Induct new staff to the company, including general environmental practice and policy. Cone Construction All staff 12/07/2015 Erosion and Sediment Control Emergency Spill Response Training Train staff in the awareness of erosion and sediment control on site. To train staff how to safely contain a spill. R Mitchell Site staff 22/07/2015 R. Mitchell Site staff 22/07/2015
18 Page Monitoring and Review Cone Contracting take a pro-active approach to environmental management and compliance monitoring. Periodic environmental compliance checks and audits are to be undertaken against relevant consent conditions, permitted activity rules, and company Environmental Management Plans. Table 12 presents the different environmental monitoring, audit and reporting requirements. Compliance monitoring, the ESMP audit and corrective/preventative actions are detailed below. 4.1 Compliance Monitoring CSVue is a web-based software programme that is used to manage and monitor compliance of all relevant designations, resource consents, Heritage New Zealand Pouhere Taonga permits, Department of Conservation concessions, and other environmental permits. alerts are generated by CS VUE to keep the Environmental Manager up-to-date on the compliance status of each condition. Conditions require management (i.e. snoozing or signing off as compliant) once the phase of work to which they relate commences. Conditions are labelled as non-compliant until they are actioned. Alerts are sent when the following events occur: A condition requires management by either snoozing or signing off as compliant. A condition has not been managed for an extended period of time and is therefore showing up as non-compliant. A condition will require management in the near future. When notified of non-compliance or a pending non-compliance, Cone Construction will complete actions required to demonstrate compliance and update CS VUE with this information. This may take the form of: Site notes and photographs Laboratory test reports Other supporting information. 4.2 Environmental Compliance Site Audits Environmental compliance audits of the project site will be undertaken weekly. The objective of the audits is to determine if the environmental management requirements are being implemented and maintained, assess the effectiveness of the environmental controls being applied, and identify areas of noncompliance so that corrective actions can be taken. Any erosion and sediment control devices in place shall be inspected daily. An audit report will be prepared identifying any opportunities for improvement and any corrective actions required. The results of the audit will be used as a learning outcome to ensure that best practice continues to be adopted on the ground and reflected in the ESMP. The Project Manager has responsibility for ensuring that timely corrective actions are taken to remedy deficiencies found during audits. 4.3 Corrective and Preventive Action Corrective or preventative actions identified to eliminate the causes of actual and potential nonconformance shall be appropriate to the magnitude of problems and commensurate with the environmental harm encountered. Ultimately the Project Manager has responsibility for ensuring assessment and follow-up reviews on the effectiveness of corrective and preventive actions taken are carried out and the outcomes documented, communicated, and implemented. Corrective actions associated with the ESMP are captured by Cone Construction s corrective action record database stored on the project Sharepoint site.
19 4.4 Management Review The Contract Manager is responsible for ensuring that an audit of compliance with environmental legislation and objectives and targets is carried out. The review will include consideration of the results/recommendations of ESMP audits undertaken, and assess if the ESMP is achieving its current objectives. The Contract Manager has responsibility for ensuring recommendations are undertaken for any areas of improvement identified in the review. Table 13: : Monitoring, auditing and reporting requirements Monitoring/Auditing Requirements Description Frequency Undertaken By: Reporting Compliance monitoring ESMP Review management review Erosion and sediment control inspections Environmental site audits and associated corrective and preventative action Track and manage resource consent and designation conditions. Update the ESMP as required should there be any changes to environmental management processes or new risks identified. Inspect any erosion and sediment controls that are in place to ensure they have been implemented correctly and maintained. Regular site audits to check Cones Construction are operating in a way that minimises impact on the environment. Identify new risk. Monthly Environmental Manager CS Vue (NZ Transport Agency is also able to access) Included in monthly report As required Contract Manager ESMP Record of Amendment Daily Weekly Environmental Coordinator Environmental Manager Daily inspection sheet Site inspection sheets Opportunity for improvement forms Complaint-triggered actions Environmental complaints (ESMP Section 3.4) As they occur Environmental Manager Incident reporting form (CC-RF01-005) Environmental incidents/ Emergency Environmental incidents As they occur Either Construction, Operations or Environmental Manager depending on situation (ESMP S3.3) Incident reporting form CC-RF Internal feedback Track issues identified by Cone Construction staff As they occur All staff Opportunity for improvement forms
20 Page 20 Appendix A. Requirements Checklist [This checklist is to be filled in, which will allow the reviewer of the Environmental and Social Management Plan to clearly establish if the minimum requirements have been complied with] 1. Background ESMP Scope Description Location Management Plan Framework Included Yes No Comment Environmental and Social Responsibility Policy Environmental Objectives Roles and Responsibility 2. Environmental and Social Management Environmental and Social Impacts Legislative Requirements 3. Implementation and Operation Environmental Aspect Management Plans or Maps Operating Procedures Emergency Contacts Training 4. Monitor and Review Monitoring Audits Corrective and Preventive Action Management Review
Environmental and Social Management Plan
Environmental and Social Management Plan Capital Works 21 September 2015 NZTA142200 Page iii Record of amendment Amendment number Description of change Effective date Updated by Page iv Contents 1. Background
More informationEnvironmental and Social Management Plan
Environmental and Social Management Plan Structures Maintenance Contract 20 September 2015 NZTA141304 Page i Record of amendment Amendment number Description of change Effective date Updated by Furniston
More informationEnvironmental and Social Management Plan for Capital Works
Environmental and Social Management Plan for Capital Works Northern Arterial For resource consent - July 2014 DRAFT Page iii [This is a template to be used to prepare an Environmental and Social Management
More informationGUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08
CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date
More informationAuckland Unitary Plan Operative in part 1
Designation Schedule - New Zealand Refining Company Number Purpose 6500 Operation, maintenance and repair, upgrade and renewal of the existing petroleum transmission pipeline and ancillary facilities...
More informationThis part of the Plan explains what a District Plan is and provides a user friendly guide.
This part of the Plan explains what a District Plan is and provides a user friendly guide. If you have any questions about this Plan and how it might affect a project you are contemplating, then you are
More informationAppendix D: Draft designation and resource consent conditions
Appendix D: Draft designation and resource consent conditions Page 307 MT MESSENGER BYPASS PROJECT - DRAFT DESIGNATION CONDITIONS 14 DECEMBER 2017 DEFINITIONS FOR DESIGNATION AND RESOURCE CONSENT CONDITIONS
More informationHastings District Council. Whakatu Arterial Link Construction Environmental Management Plan
Hastings District Council Whakatu Arterial Link Construction Environmental Management Plan June 2014 Table of contents 1. Overview... 4 1.1 Environmental Management Scope... 4 1.2 Purpose of the CEMP...
More information13 Land Use Activities and Indigenous Biological Diversity
13 Land Use Activities and Indigenous Biological Diversity 13.1 Land Use Activities 13.1.1 Objectives Objective 13-1: Accelerated erosion* - regulation of vegetation clearance*, land disturbance*, forestry*
More informationReport for Agenda Item: 2
QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage
More informationGUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08
CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Environmental Specialist Responsible Manager: Head of Environment Responsible Executive:
More informationEnvironmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review
Environmental Management Plan Introduction This Environmental Management Plan (EMP) has been prepared for SEF Energy Co. Ltd. for the purpose of providing a stand-alone plan for managing the potential
More informationForm 1: Application for resource consent
Form 1: Application for resource consent All sections must be completed in full and accompanied by the initial fixed application fee (see section 11) and the relevant activity form (see section 7). Failure
More informationFinal Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome
Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Ball Plant in Germiston A Report For: Scaw South Africa
More informationAlberta Transportation The City of Edmonton The City of Calgary
Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for
More informationLast amended 3 May 2011 Earthworks Operative 27/07/2000
29 Earthworks 29.1 Introduction Earthworks are essential to the development of the City. They create the areas of level land used for living, business and recreation, and the even gradients for paths and
More informationConstruction Environment Management Plan
Construction Environment Management Plan Guidance Material July 2013 ABSTRACT This CEMP guidance material has been prepared by MAC to assist the identification and management of environmental risks associated
More informationChapter 13 Management and Monitoring
Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2
More informationA smaller 7.65MW wind farm at Mount Stuart, comprising 9 turbines with a maximum height of 75- metres, was also constructed in 2011.
3.4. ENERGY 3.4.1. INTRODUCTION The use of energy is of fundamental importance to the development and functioning of modern society. The RMA definition of natural and physical resources includes energy
More informationConsent Steps Assessing the Application and Assessment of Environmental Effects
2017 Consent Steps Assessing the Application and Assessment of Environmental Effects Assessing the Application and Assessment of Environmental Effects This guidance has been updated to include the changes
More informationChapter 13 Management and Implementation
Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction
More information5.2 Discharges to water and land
5.2 Discharges to water and land Interpretation If an activity is covered by more than one rule, then the rule that applies is the rule that is more specific for the relevant activity, area or resource,
More informationTransmission Gully Project
Indicative Construction Environmental Management Plan This report has been prepared for the benefit of the NZ Transport Agency (NZTA). No liability is accepted by this company or any employee or sub-consultant
More information5.9 MARAE DEVELOPMENT ZONE
5.9 MARAE DEVELOPMENT ZONE 5.9.1 ZONE PURPOSE (1) The provision of a specific zone in which Maori people can undertake ongoing development of their culture, traditions and social infrastructure, is one
More informationURBAN SETTLEMENT ZONE - RULES
URBAN SETTLEMENT ZONE - RULES.1 Rule Statement The following rules, shall apply to all land shown as being within the Urban Settlement Zone in the District Plan Maps. These rules shall be read in conjunction
More information30 November New Zealand Transport Agency, Christchurch Attn To: Richard Shaw PO Box 1479 Christchurch Dear Richard
30 November 2017 New Zealand Transport Agency, Christchurch Attn To: Richard Shaw PO Box 1479 Christchurch 8140 Dear Richard Notice of Resource Consent Decision Record Numbers: CRC182598 - CRC182601, CRC182761
More informationRevised functions for Resource Management Act 1991 decision-makers
RESOURCE LEGISLATION AMENDMENTS 2017 FACT SHEET 2 Revised functions for Resource Management Act 1991 decision-makers This is part of a series of 16 fact sheets that give an overview of recent resource
More informationFORM B: DAMMING AND DIVERSION OF WATER
APPLICATION FOR RESOURCE CONSENT FORM B: DAMMING AND DIVERSION OF WATER NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan
More informationENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)
ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) Disclaimer: The information contained in this communication document is intended solely for the use of guidance cannot be
More information12. Environmental management
12. Environmental management 12.1 Overview This section summarises the framework for managing environmental risks associated with construction, commissioning and operation of the Project. It also includes
More informationAPPENDIX 6 RECOMMENDED CONDITIONS SHOULD CONSENT BE GRANTED. RECOMMENDED CONDITIONS LAND USE [RM180023] General Conditions
RECOMMENDED CONDITIONS LAND USE [RM180023] General Conditions No / Title 1 General Accordance Requirement The activity being the establishment and operation of a BP Service Station and Quick Service Restaurant
More information2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS
Section 2 Earthworks and Geotechnical Requirements 2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS CONTENTS 2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS... I 2.1 Introduction... 2-1 2.1.1 Objectives... 2-1 2.1.2
More informationApplication for resource consent Form B Damming and diversion of water
Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or
More informationOHS Management of Contractors in Capital Works and Maintenance
OHS Management of Contractors in Capital Works and Maintenance Physical Resources/Risk, Health and Safety Prepared by: Physical Resources/Risk, Health and Safety Version: 08/04/2008 Contents Page 1. INTRODUCTION...
More informationMPT.2.8. Management Plan Technique. Index. Description and Explanations
MPT.1 Management Plan Technique Index MPT.1 Management Plan Technique MPT.1.1 MPT.1.2 MPT.1.3 MPT.1.4.1.2.3.4.5.6.7.8 Description and Expectations Eligibility Rule Objectives Explanation Description and
More informationRural Development Strategy. Contaminated Sites: Issues and Options
Rural Development Strategy Contaminated Sites: Issues and Options Prepared by Carine Andries, Policy Planner 11/4819 January 2011 2 Table of contents 1 Introduction... 4 2 Policy Framework... 4 2.1 National
More information8 Subdivision and Development
8 Subdivision and Development 8.1 Significant Issues Subdivision and development can provide a catalyst for environmental protection and enhancement. Subdivision and development can provide opportunities
More informationTraffic Management Plan. Environmental Management and Monitoring Program. Appendix VI
Traffic Management Plan Environmental Management and Monitoring Program Appendix VI Gunlake Quarries December 2009 Olsen Consulting Group Pty Ltd 6/25 Victoria Street WOLLONGONG 2500 PO Box 353 FIGTREE
More informationBEVERAGE CANS REVESBY
BEVERAGE CANS REVESBY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Environment Protection Authority License 643 Item ID: 8409 Version: 1.2 Page 1 of 16 1.0 OVERVIEW AND LEGAL REQUIREMENTS This Pollution
More informationSustainable remediation in New Zealand
Sustainable remediation in New Zealand Joanne Ferry and Peter Cochrane Tonkin & Taylor Ltd jferry@tonkin.co.nz Introduction What is sustainable remediation? The practice of demonstrating, in terms of environmental,
More informationWATER MONITORING MANAGEMENT PLAN
WATER MONITORING MANAGEMENT PLAN Project Name: Energy from Waste CHP Facility Project Number: Document Reference: /WWP/014 Location: Devonport, Plymouth Approved by: D. Primmer Dated: 10/11/11 Signed:
More informationContents GR Geothermal Resources... 1
Geothermal Resources 14 September 2017 Contents GR Geothermal Resources... 1 Issues... 1 Objectives... 4 Policies... 4 Methods of Implementation... 9 Rules... 14 BAY OF PLENTY REGIONAL COUNCIL TOI MOANA
More informationD21. Sites and Places of Significance to Mana Whenua Overlay
D21. Sites and Places of Significance to Mana Whenua Overlay D21.1. Background The Sites and Places of Significance to Mana Whenua Overlay applies to sites and places that have been scheduled and protected
More informationBosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT
Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina
More informationJSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN JSP Construction Ltd 11-13 City Road Cardiff CF24 3BJ Revisions Issue Description Approved By Signed Date 19/10/16 1st issue AN JP 19.10/16 Rev A Updated with
More information19 GENETICALLY MODIFIED ORGANISMS
19 GENETICALLY MODIFIED ORGANISMS CONTEXT Genetic modification (GM) refers to a set of techniques that alter genetic makeup by adding, deleting or moving genes (within or between species) to produce new
More informationPROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015
1.0 Summary of Changes 1.1 This is a new joint procedure/sop for Essex Police and Kent Police. 2.0 What this Procedure is about 2.1 This document identifies how Essex Police and Kent Police shall manage
More informationDRAFT FOR CONSULTATION OCTOBER 7, 2014
The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness
More informationGeneral A. General A.1 Activities Not Specifically Provided For A.2 Temporary Activities... 3
Section Contents General... 2 4A. General... 2 4A.1 Activities Not Specifically Provided For... 2 4A.2 Temporary Activities... 3 4A.3 Activities on the Surface of Water... 6 4A.4 Status of Roads... 7 4A.5
More informationRural Living Environment
1 RLE.1 Rural Living Environment RLE.1.1 Description & Expectations The Rural Living Environment (RLE) covers rural areas within the District that are either already characterised by lifestyle activities
More informationSubstation Developments Environmental Guidelines Checklist for Applicants
Substation Developments Environmental Guidelines Checklist for Applicants Effective date: February 1, 2016 These guidelines are intended to be used in conjunction with the flowchart in Figure 1 which conceptually
More informationBAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795
Far North District Council John Butler Centre Kerikeri Road Kerikeri Attention Ms Louise Wilson 30 May 2018 Dear Louise, BAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795 Kerikeri Phone
More informationNZQA Expiring unit standard 1508 version 8 Page 1 of 7. Plan and organise construction activities as an asphalt paving supervisor
Page 1 of 7 Title Plan and organise construction activities as an asphalt paving supervisor Level 4 Credits 15 Purpose This unit standard is designed for people working, in the pavement surfacing industry,
More informationWORK HEALTH AND SAFETY AUDIT STANDARD
WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...
More informationARDILL PAYNE & P a r t n e r s ABN:
ARDILL PAYNE & P a r t n e r s www.ardillpayne.com.au e:info@ardillpayne.com.au ABN: 51 808 558 977 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Submission to: NSW Environment Protection Authority At: Lot
More informationSummary of Relief Sought by Transpower New Zealand Limited
Summary of Relief Sought by Transpower New Zealand Limited Relief sought in Transpower s further submission and supported by evidence The following consolidates the amendments to the Proposed Southland
More informationEnvironmental Management Plan
Environmental Management Plan EMP for the Stage 1 Construction and Operation of the Trainers Allotment Area at the Pakenham Racecourse located at Nar Nar Goon / Longwarry Road, Tynong Pty Ltd abn: 44 706
More informationResource Management (National Environmental Standards for Plantation Forestry) Regulations 2017 Consenting and Compliance Guide - May 2018
Resource Management (National Environmental Standards for Plantation Forestry) Regulations 2017 Consenting and Compliance Guide - May 2018 Prepared for Ministry for Primary Industries By 4Sight Consulting
More informationConstruction Management Plan (CMP) 227 Princess Highway, Dandenong
Construction Management Plan (CMP) 227 Princess Highway, Dandenong - Construction Management Plan (CMP) June 2017 S2966 CMP.D2 PREPARED BY: Sustainable Development Consultants 2nd Floor, 555 Riversdale
More informationPapua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV
Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV-000018-008 LNG Project Page 2 of 14 CONTENTS 1.0
More informationCITY OF NAPIER DISTRICT PLAN. The following resource management issues have been identified as significant throughout Napier City:
Chapter 60 TREES 60.1 RESOURCE MANAGEMENT ISSUES: The following resource management issues have been identified as significant throughout Napier City: 60.1.1 The identification and protection of both individual
More informationResource Consent Application (RM180178) 250 Westminster Avenue, Parklands, Napier
23 October 2018 Infrastructure Services, Napier City Council C/- Sara Field 231 Hastings Street Napier 4110 Dear Sara Resource Consent Application (RM180178) 250 Westminster Avenue, Parklands, Napier Consideration
More information5. Contaminated Sites
5. Contaminated Sites 5.1 Issues What is a Contaminated Site? A contaminated site is: A site at which hazardous substances occur at concentrations above background levels and where assessment indicates
More informationH28. Special Purpose Quarry Zone
H28. Special Purpose Quarry Zone H28.1. Zone description Mineral resources are important to Auckland s economy and development. The Special Purpose Quarry Zone provides for significant mineral extraction
More informationWorks, services and infrastructure code
9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the
More information30A RULES FOR RENEWABLE ENERGY GENERATION
30A RULES FOR RENEWABLE ENERGY GENERATION Policies 16A.4.1 Activities Tables 30A.1 Subdivision Activities Activity Status The operation and maintenance of existing renewable energy generation facilities
More informationEnvironmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group
Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date
More informationEnvironmental Control Plan
Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which
More information13 Section 32 Summary for the Residential Chapter
13 Section 32 Summary for the Residential Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Residential Zone Chapter of the Proposed
More informationEnvironmental impact assessment of council roadside activities
Environmental impact assessment of council roadside activities Developed on behalf of LGNSW for the Council Roadside Reserve Project 2016-2019 Introduction These slides cover legislative obligations in
More informationNational Environmental Standards for Plantation Forestry. Overview of the regulations
National Environmental Standards for Plantation Forestry Overview of the regulations New national rules for plantation forestry Plantation forestry is New Zealand s third largest primary sector. It delivers
More informationPOLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)
Established 1907 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) DATE: JULY 2018 Version Date Section Modified 1 July 2018 All Reason for Modification Original Management Plan Review Team MCC Environmental,
More informationCCSD#1 Stormwater Standards
SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless
More informationPahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)
Tararua District Council Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) NOTE: This is a draft ESCP in current preparation. Additional and updated information will
More informationS e c t i o n B i o d i ve r s i t y
S e c t i o n 2. 2 - B i o d i ve r s i t y The District has a wealth of ecosystems which support indigenous vegetation and habitats of indigenous fauna. Many of these ecosystems are the remnants of the
More informationAppendix B6 Construction Heritage Management Plan
Appendix B6 Project: Keepit Dam Work Package 2 - Post Tensioning Works Location: Keepit Dam, Namoi River, Northern NSW Client: WaterNSW Contract: 04532F31 Page 2 of 21 Document Acceptance and Release Notice
More informationStep 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.
Overview of Section 9 9.0 The GESC Permit Section provides a description of the Small Utility GESC Permit Program. Step 1. Determine if a GESC Permit is Applicable and if a Project Specific GESC Plan is
More informationWINGECARRIBEE SHIRE COUNCIL Southern Regional Livestock Exchange POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
WINGECARRIBEE SHIRE COUNCIL Southern Regional Livestock Exchange POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to
More informationRepublic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY
More informationSANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN
Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal
More informationAmaila Hydropower ESIA Update Section 7
Contents 7 Environment and Social Management... 7-1 7.1 Hydropower Facility and Electrical Interconnection Control and Mitigation Measures... 7-2 7.2 Hydropower Facility and Electrical Interconnection
More informationPollution Incident Response Management Plan - Summary. Medway Mine Medway
Pollution Incident Response Management Plan - Summary Medway Mine Medway Table of Contents 1. General Information... 3 1.1 Foreword... 3 1.2 Background and legislative requirements... 3 1.3 Definition
More informationResponse to a Bridge Strike. at a Bridge carrying the Railway. over a Road
Response to a Bridge Strike at a Bridge carrying the Railway over a Road A Protocol for Highway and Road Managers, Emergency Services and Bridge Owners NR/GPG/CIV/008 3 rd March 2009 Note This protocol
More informationNetwork utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.
5.3.2. Rural Zone 5.3.2.1. Permitted Activities 5.3.2.1.1. Residential, recreational, agricultural, exotic forestry or tourist related activities which comply with the standards for permitted activities
More informationSAFE WORK METHOD STATEMENT
COMPANY DETAILS: Company Name Address CLIENT DETAILS: Principal contractor Contact name Phone no. Mobile: Phone no. Mobile: Works manager Contact no.: Project/owner name Work activity Scope of work covered
More informationEnvironmental Assessment Approval
Environmental Assessment Approval Approval Date: Original Dated April 20, 2012 Trimper Sand and Gravel Pit Expansion Ivan H. Trimper Construction Ltd., Proponent Annapolis County, Nova Scotia The Trimper
More informationWI-ENV-PER-0013 GROUND DISTURBANCE PERMIT
WI-ENV-PER-0013 GROUND DISTURBANCE PERMIT PERMIT NUMBER PERMIT NAME DATE RECEIVED PERMIT APPROVAL DATE PERMIT EXPIRY DATE GDP- (Office use only) This Ground Disturbance Permit (GDP) is to be completed
More informationMurra Warra Wind Farm Project Environmental Management Plan
1. Introduction This (EMP) covers the pre-construction, construction, operation and decommissioning phases for the Murra Warra Wind Farm Project. RES Australia recognises the importance of reducing human
More informationDRAFT SUBMISSION ON NES FOR PLANTATION FORESTRY
Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT 30 JULY 2015 Meeting Status: Public Purpose of Report: For Decision DRAFT SUBMISSION ON NES FOR PLANTATION FORESTRY PURPOSE OF REPORT
More informationRA.1 Rural Area. Index. RA.1.1 Description and Expectations
RA.1 Subsequent to the receipt of appeals, a 'marked up' version of the Proposed District Plan was prepared. The provisions of the Proposed Version of the Plan subject to an Environment Court appeal have
More informationALBANY PORT AUTHORITY ENVIRONMENTAL MANAGEMENT SYSTEM
ALBANY PORT AUTHORITY ENVIRONMENTAL MANAGEMENT SYSTEM May 2006 Document Status Rev Author Reviewer/s Date Approved for Issue No. Name Distributed To Date 1 J. Prout V. Ee 26/05/06 V. Ee Albany Port Authority
More information9 Cross Boundary Processes
Auckland Regional Council 9-1 9 Cross Boundary Processes 9.1 Introduction Section 67(2)(f) of the RMA states: A regional plan may state the processes for dealing with issues (i) That cross local authority
More informationChapter 4. Airport Authority Governance, Statutes and Policies
Chapter 4 Airport Authority Governance, Statutes and Policies Table of Contents 4. Airport Authority Governance, Statutes and Policies... 4-1 4.1 The Federal Government and Airport Authorities... 4-1 4.2
More informationHEALTH AND SAFETY POLICY AND PROCEDURES
HEALTH AND SAFETY POLICY AND PROCEDURES Relevant Legislation The Health and Safety At Work Act 1974 The Management of Health and Safety At Work Regulations 1999(as amended) All associated Health and Safety
More informationEnvironmental Assessment Approval
Environmental Assessment Approval Approval Date: Original Dated October 1, 2010 Hants County Aggregate Quarry Extension Project Municipal Enterprises Ltd., Proponent Hants County, Nova Scotia The Hants
More informationRESIN & WAX HOLDINGS LIMITED, PO BOX 5228, WELLESLEY STREET, AUCKLAND 1141
Resource Consent FILE: 39163 (01 07) New Document Date: 29.03.2018 Pursuant to the Resource Management Act 1991, the Northland Regional Council (hereinafter called the Council ) does hereby grant a Resource
More informationSection 51 Light Industrial Zone
Section 51 Light Industrial Zone 51.1 ZONE DESCRIPTION The Light Industrial Zone is located outside and within the settlements of Pauanui, Tairua, Coromandel, Thames, Whangamata and Matarangi. The Zone
More informationFurther Submission on Proposed Natural Resources Plan for the Wellington Region
Property Group National Service Centre Alexander Road Private Bag 902 Trentham Upper Hutt 5140, New Zealand Further on Proposed Natural Resources Plan for the Wellington Region Clauses 8 of First Schedule,
More informationSulcor Pollution Incident Response Management Plan (PIRMP)
Sulcor Pollution Incident Response Management Plan (PIRMP) The Sulcor Limestone open cut mine is located 30Km north-west of Tamworth NSW. The limestone mined by conventional drill and blast processes is
More informationAPPLICATION FOR LANDUSE RESOURCE CONSENT
(Section 88 of the Resource Management Act 1991) Form 9 APPLICATION FOR LANDUSE RESOURCE CONSENT I,.. (full name) being the applicant residing at the below address, apply to the Waitaki District Council
More information