1 4 Desired Levels of Service (LOS) LOS are a key business driver and influence all asset management decisions. LOS statements describe the outputs Halton intends to deliver to its residents and commonly relate to service attributes such as quality, capacity, reliability, responsiveness, sustainability, timeliness, accessibility and cost. Halton s customer LOS will be highlighted for each service area in the coming subsections. It should be noted that each service area also has technical and legislated LOS that are specific to the type and nature of the program infrastructure. PW meets or exceeds legislated and technical LOS for each of the service areas. This includes meeting maintenance standards for the roadway and bridge structures, the Safe Drinking Water Act, 2002, Environmental Protection Act and Ontario Water Resources Act for wastewater, and Ministry of the Environment (MOE) legislated requirements for open landfills. The PW Department is committed to excellence in public service through: engaged employees, visionary leadership, excellent customer service, community trust, and continuous improvements. The Building a Better Halton infrastructure communications strategy was launched to promote two-way communication between Halton Region and the community. The strategy includes a dedicated look, construction signage, webbased information at and consistent, frequent information updates to residents. Feedback gathered from residents is used to continuously evaluate the LOS. 4.1 Defined Levels of Service LOS for the PW department are based on the following: technical requirements legislated requirements customer requirements Transportation The Region s Official Plan, through Section 173(19) of ROPA 38, requires staff to monitor the overall performance of Halton s Transportation System and to report annually to Council through Halton Region Asset Management Plan

2 the Transportation Services Progress Report P13 on the Region s activities relating to the planning, design, construction, operation and maintenance of the Region s transportation system. Key system performance indicators provided in the report enable the overall state of the Regional road system to be tracked and measured over time. Annual programs are undertaken to ensure that regional roads are operating in the safest and most efficient way possible, and that the service life of infrastructure is optimized. The following detailed LOS are defined for the Transportation Division. a) Technical LOS Road Capacity The need for additional road capacity is determined by comparing the evening (PM) peak-hour traffic volume at the screenline level versus the available capacity. Capacity deficiencies are determined based on achieving a target through the volume/capacity (v/c) ratio. At a v/c ratio of 0.90, the transportation network crossing the screenline is operating at 90 per cent of its functional capacity. For screenlines that exceed a v/c ratio of 0.90, the construction of additional lanes is considered to provide sufficient additional capacity to return the screenline to 90 per cent of its capacity. The current Transportation Master Plan (2031) The Road to Change used this methodology to determine the preferred roadway solutions to accommodate travel demand growth in the Region to 2031 as outlined in Section 5 of the report P14. (ii) Pavement Management The pavement condition within the Regional road system is monitored through Pavement Management Data Collection and Review performed on a three-year cycle. The pavement data is used to measure how well the road network is performing through Pavement Condition Indices (Surface Distress, Ride Comfort and Pavement Quality). The monitoring program provides consistent and accurate condition information that allows for timely and optimized preservation, upgrading and replacement of pavement infrastructure. The objective is to maintain an overall network average PQI at a level of 7 out of 10 or good. (iii) Road Needs Study The Road Needs Study is prepared annually to provide an overview of the condition of the road sections comprising the Regional network, and uses the Ministry of Transportation Inventory Manual for Municipal Roads methodology to consider factors such as capacity, geometry, surface width, surface type, structural adequacy, and drainage. Refer to Appendix PW9 for a roadway appraisal sheet. Halton Region Asset Management Plan

3 The scoring from the study provides overall system adequacy and time of need per road section, which is used to evaluate the adequacy of the entire network P15. The objective is to maintain overall road system adequacy of 75 per cent as a minimum based on lane kilometres. (iv) PW 2013 Infrastructure Condition Report Card The first PW infrastructure condition report card on the state of infrastructure in Transportation and PW as a whole was presented to Council through Report PW and reflected 2010 data. The report has been updated to reflect 2013 data and the intent is to update it every 3 years. This report identified areas requiring further investigation to improve service levels. The 2013 report card is included in Section 3.4 of this document. b) Legislated LOS Road Maintenance Halton Region has adopted a Road Maintenance LOS P16 that defines the activities to be carried out as part of the maintenance of the Region s road infrastructure to ensure safety, preservation and quality of life, and establishes the timeframes within which those activities will be completed. The Road Maintenance LOS meets the Ontario Regulation 239/02 Minimum Standards for Municipal Highways (MMSMH) P17. Regional road maintenance in Halton is primarily performed through maintenance agreements with the Region s lower-tier municipalities to performance standards outlined in the Contractors Maintenance Services document. (ii) Bridges and Major Structures Biannual structure inspections are performed on all bridges and major structures in accordance with Ontario Regulation 104/97 Standards for Bridges P18 to ensure structures are kept safe and in good repair. Refer to Appendix PW10 for a structure inspection form. c) Customer LOS Council Directives based on Citizens Priorities Work to respond to technical and legislated levels of service is supplemented by priority projects and activities identified by Regional Council based on the Citizens Priorities Action Plan. Halton Region Asset Management Plan

4 Water The following detailed LOS are defined for the Water Division. a) Technical LOS The Sustainable Halton Water and Wastewater Master Plan Section 6 P19 (SHMP) This is a planning document which follows the Municipal Class Environmental Assessment process. At five-year intervals, the Master Plan identifies system capacities and compares them to projected needs for a specified planning horizon. In addition, it identifies target pressures, unit demand rates, peaking factors, minimum fire flows, storage requirements and production and pumping rates for water which are used to establish a list of growth-related capital projects that are required to deliver the future service needs. (Appendix 1.5 Policy Paper of the SHMP includes a number of statements related to the provision of water services and the implications of each statement as it relates to the design of the system. The Design Criteria, Appendix 1.6 of the SHMP provides an executive summary of the design criteria as well as additional context). (ii) Condition Assessment Reports Consulting firms are retained by Halton Region to assess the condition of the water treatment plants, reservoirs, booster stations and municipal wells. The assessments typically include structural, process, building, HVAC, and site reviews. The reports will recommend maintenance or capital projects with timing and cost estimates and these assessments are typically performed every five years. (iii) Halton Design Criteria Technical criteria and design standards for the provision of water services (pressures, quantities, fire flows, sizing materials, etc.). This criteria aligns with the MOE Design Guidelines for Drinking Water Systems, (iv) Capital Budget Targets Identify work required to maintain infrastructure in a state of good repair. Capital budget requirements are gathered through annual review of fire flow test break Halton Region Asset Management Plan

5 records and other performance indicators, along with capital need assessment study findings. This results in the creation of projects for placement in the annual Capital Budget. (v) Preventative Maintenance Program Program to inspect, maintain and identify needs for asset maintenance, renewal or replacement prior to actual failure. This method ensures water quality is maintained and proactively identifies potential problems in the existing system. For example, watermain flushing ensures water quality within the system by monitoring residuals and proactively refreshing water and removing sediment. The program includes but is not limited to the following: valve preventative maintenance hydrant preventative maintenance watermain flushing program watermain swabbing program leak detection program (vi) Water Efficiency Program Program in the community to promote the reduction of water use through education and the use of water efficient fixtures. The program includes but is not limited to the following: Toilet Rebate Program Outdoor Water Use education Indoor Water Efficiency Household Guide to Water Efficiency Rain Barrel Sales (v) PW 2013 Infrastructure Condition Report Card (Refer to Transportation subsection.) b) Legislated LOS Source Water Protection, Clean Water Act Ontario's Clean Water Act helps to protect drinking water from source to tap with a Halton Region Asset Management Plan

6 multi-barrier approach that stops contaminants from entering sources of municipal drinking water - lakes, rivers and aquifers. Ontario's Clean Water Act: requires that local residents, businesses and municipalities - through local Source Protection Committees - assess existing and potential threats to their municipal water sources, and that they set out and implement the actions needed to reduce or eliminate these threats empowers communities to take action to prevent threats from becoming significant requires public participation on every local source protection plan - the planning process for source protection is open to anyone in the community requires that all plans and actions are based on sound science. (ii) Safe Water Drinking Act, 2002 The purpose of the Safe Drinking Water Act is to protect human health through the control and regulation of drinking-water systems and drinking-water testing. Building on existing policy and practice in Ontario's treatment and distribution of drinking water, the Safe Drinking Water Act requires that all municipal drinking water systems obtain an approval from the Director of the Ministry of the Environment in order to operate. Operators are required to be trained and certified to provincial standards. The act also provides legally binding standards for testing of drinking water and requires that testing be done in licensed and accredited laboratories. (iii) Municipal Drinking Water License To be a water purveyor, a provincial licence is required under the municipal drinking water licensing program. The licensing program replaced the Certificates of Approval program for municipal residential drinking water systems. In order to receive a Municipal Drinking Water License from the province, a municipality must have the following in place. Drinking Water Works Permit Permit to Take Water Approved Operational Plan Be an Accredited Operating Authority Financial Plan Halton Region Asset Management Plan

7 All of Halton s municipal water systems are fully licensed under the MOE. The licenses detail how to operate each water system including general conditions and rated capacity. The drinking water works permit lists system components, details how modifications can be made to the system, and details system-specific conditions. These documents must be renewed on a five-year cycle and are amended from time to time, as required, mainly due to significant system alterations or new conditions. (iv) Drinking Water Systems Flow Summary Report A summary of flows and description of any failures to meet requirements of the act or regulations. Also identifies a summary of Provincial legislation significant to water operations and lists annual reports required by legislation or regulation. (v) Annual Water Quality Report Includes water quality test results along with corrective action for adverse test results. (vi) Drinking Water Quality Management Systems (DWQMS) DWQMS is a repository of information for Halton s drinking water system and all related business processes. It contains all PW procedures, policies, manuals, instructions, specifications and forms related to operation of the water infrastructure. It also contains the Operational Plan as required by the Drinking Water Licence. c) Customer LOS Council Directives based on Citizens Priorities (Refer to Transporation subsection) Wastewater The following detailed LOS are defined for the Wastewater Division. a) Technical LOS The Sustainable Halton Water and Wastewater Master Plan Section 6 P19 (SHMP) Identifies target pressures, unit demand rates, peaking factors, existing and future pumping rates for wastewater which are used to establish lists of growth- Halton Region Asset Management Plan

8 related projects. The new flows are modeled and existing capacity is reviewed. For wastewater linear assets, if the projected flow of a sewer is greater than 85 per cent (industry practice); the sewer main will be identified for upsizing. (Also see the Water subsection). (ii) Condition Assessment Reports Consulting firms are retained by Halton Region to assess the condition of the wastewater treatment plants and pumping stations. The assessments typically include structural, process, building, HVAC, and site reviews. The reports will recommend maintenance or capital projects with timing and cost estimates and these assessments are typically performed every five years. (iii) CCTV Inspection of Linear Assets Halton Region has a CCTV inspection program for mainline sewers that assesses the condition and scores each asset. In October 2013, Halton transferred over to the new Pipeline Assessment and Certification Program (PACP) industry coding standards, which generate a score between 1 and 5, where 1 is considered new and 5 indicates that work is required for a sewer right away. If a main has a high score of 3 or 4, a project is identified to replace the sewer in the 10-year Capital Budget. If a sewer scores a 5 or is found to be in need of immediate replacement, the main is fixed through the spot repair program. Currently, the wastewater mains in Halton Region are inspected on a cycle of one in every 20 years. (iv) Manhole Inspection Program An outside consultant is hired to perform a condition assessment on a predetermined number of manholes. All manholes are inspected and scored based on Manhole Assessment and Certification Program (MACP) industry standards. Any manholes identified with deficiencies are repaired or replaced as needed. All manholes that score a MACP score of 5 (worst rating) are addressed immediately. (v) Preventative Maintenance Program The Preventative Maintenance Program is performed as recommended by the original equipment manufacturer (OEM). (vi) Annual Maintenance Flushing Program Halton s standards require plastic pipes to be flushed every four years and non-plastic pipes every two years. Halton Region Asset Management Plan

9 (vii) (viii) (ix) Flushing of Identified Linear Trouble Sections Halton has a two-month and a six-month flushing program for identified trouble sections of sewers within the collection system. The flushing removes debris, grit, grease and other items to ensure the sewer main capacity isn t compromised. Capital Budget Targets (Refer to Water subsection.) PW 2013 Infrastructure Condition Report Card (Refer to Transportation subsection.) b) Legislated LOS Environmental Compliance Approvals (ECAs) Include regulations mandated by the MOE on emission levels of air and discharges from wastewater treatment facilitates. The list of effluent parameters, along with compliance limits, performance objectives, monitoring and reporting requirements, are all detailed in the ECA for each treatment plant. (ii) Preventative Maintenance Program Inspection, testing and calibration of electrical, mechanical, instrumentation, and control equipment is performed and documented by fully-trained and qualified technicians. c) Customer LOS Council Directives based on Citizens Priorities (Refer to Transporation subsection) Waste Management The following detailed LOS are defined for the Waste Management Division. a) Technical LOS Waste Diversion Halton has implemented an increase in diversion from the Halton Waste Management Site as per the Solid Waste Management Strategy, staff report PW Halton Region Asset Management Plan

10 The current target is 65 per cent diversion by 2016 through a number of programs. Most diversion programs will extend the service life of the asset. (ii) PW 2013 Infrastructure Condition Report Card (Refer to Transportation subsection.) b) Legislated LOS Certificate of Approval Desired LOS are prescribed to meet or exceed the Certificate of Approval from the MOE. The Region typically exceeds these requirements. c) Customer LOS Council Directives based on Citizens Priorities (Refer to Transporation subsection) 4.2 External Trends and Issues External trends and issues affecting expected LOS or the Region s ability to meet the desired LOS include the following. Transportation Ontario Regulation 413/12 under the Accessibility for Ontarians with Disabilities (AODA) Act, 2005 P20 The Big Move P21, Metrolinx, The Regional Transportation Plan Region s Official Plan (ROPA38) P22 Provincial legislation such as Places to Grow Act, 2005 and the Greenbelt Plan. Population and employment forecasts which will impact infrastructure use. Minimum Maintenance Standards Regulation 239/02. Water Sustainable Halton Water and Wastewater Master Plan including factors such as climate change, growth and regulatory changes. DWQMS P23 Source Water Protection Act Local municipal bylaws Halton Region Asset Management Plan

11 External funding available which may affect the projects undertaken. LOS may be affected if the rate of aging infrastructure is higher than the rehabilitation and replacement program funding available. Infrastructure failing prematurely due to environmental factors and construction practices requiring repair or replacement much earlier than the expected life of the asset. Water use patterns such as conservation which negatively affect rate revenue. Population forecasts which will impact asset use Provincial legislation such as Places to Grow Act, Wastewater Sustainable Halton Water and Wastewater Master Plan including factors such as growth and regulatory changes. Changing regulations governing wastewater such as Wastewater Systems Effluent Regulations (WSER) and local municipal bylaws Climate change; changing storm events and patterns. Higher frequency storms occurring more regularly impact the increased inflow and infiltration (I/I) entering the collection system. External funding available which may affect the projects undertaken. LOS may be affected if the rate of aging infrastructure is higher than the rehabilitation and replacement program funding available. Infrastructure failing prematurely due to environmental factors construction practices thus requiring repair or replacement much earlier than the expected life of the asset. Water use patterns such as conservation which negatively affect rate revenue. Low-flush toilets and other water conservation fixtures are impacting the wastewater treatment plants as wastewater entering the plants is more concentrated. Population forecasts which will impact asset use. Provincial legislation such as Places to Grow Act, Waste Management Expected population growth projections to 2045 which may impact future diversion targets. Public demand for diversion programs which may extend the useful life of the landfill. Landfill disposal public concerns. Changes in Provincial legislation o Landfill standards o Waste Diversion Act Halton Region Asset Management Plan

12 4.3 Performance Measurement This section explains how PW tracks current performance of assets relative to expected targets. Transportation The Transportation division tracks current performance of assets using the following measures. Pavement Quality Index (PQI) - Pavement Management System [Road Matrix] Bridge Condition Index (BCI) Structures Inventory Road Needs Study (System Adequacy) Performance Management Programs a) Average BCI (Bridge and Culvert condition assessed as good to very good) b) Municipal Performance Management Program (MPMP) which includes provincewide efficiency and effectiveness metrics and reporting to promote transparency and accountability related to municipal service levels. P24 (Bridge and Culvert condition assessed as good to very good and Pavement Condition where it is assessed as good to very good.) PW 2013 Infrastructure Condition Report Card (refer to Section 3.4 for the most recent report). Water The Water division tracks asset performance using the following measures. Drinking Water Systems Flow P23 Summary Report provides a summary of flows and descriptions of any failures to meet requirements of the Safe Drinking Water Act, 2002 or other regulations. Annual Water Quality Report gives water quality test results along with corrective action for adverse test results. Permit to Take Water Annual Report gives conditions set out in individual permits to take water. Participation in the National Water and Wastewater Benchmarking Initiative P25. Municipal Performance Measurement Program (MPMP) which includes province-wide efficiency and effectiveness metrics and reporting to promote transparency and accountability related to municipal service levels. Annual review of fire flow tests and watermain break records results in the creation of projects for placement in the annual Capital Budget. In general, watermains having history of multiple breaks and/or substandard fire flow test results (in comparison to the needs of adjacent land uses) are considered as candidates for creation of capital projects. Halton Region Asset Management Plan

13 PW 2013 Infrastructure Condition Report Card (refer to Section 3.4 for the most recent report). Condition assessment of water infrastructure. Wastewater The Wastewater division tracks asset performance using the following measures. Wastewater Systems Effluent Regulation (WSER, 2012), established National Performance Standards for deleterious substances (Total Suspended Solids-TSS, carbonaceous Biochemical Oxygen Demand-cBOD and unionized ammonia). Halton s wastewater treatment program met or bettered the National Performance Standards (Q1 & Q2, 2014), refer to Appendix PW11 for a sample report. Wastewater System Performance Report. An annual report and appendices for each wastewater treatment plant in Halton. It provides a summary of the wastewater treatment system, ensures that Halton is meeting regulatory requirements for testing and includes analytical, plant flow, bypass, operational and biosolids data. MOE F-Series Guidelines (Containment and Treatment). Despite the hydraulic challenges caused by extraneous stormwater, Halton continues to provide legislated level (1) of treatment or higher to the significant majority of the wastewater volume generated. Refer to Appendix PW12 for a sample report. Municipal Performance Measurement Program (MPMP) which includes province-wide efficiency and effectiveness metrics and reporting to promote transparency and accountability related to municipal service levels. Participation in the National Water and Wastewater Benchmarking Initiative. PW 2013 Infrastructure Condition Report Card (refer to Section 3.4 for the most recent report). Waste Management The Waste Management division tracks asset performance using the following measures. Maintenance records which are an appropriate indicator of infrastructure performance. Municipal Performance Measurement Program (MPMP) which includes province-wide efficiency and effectiveness metrics and reporting to promote transparency and accountability related to municipal service levels. PW 2013 Infrastructure Condition Report Card (refer to Section 3.4 for the most recent report). Halton Region Asset Management Plan

5 Asset Management Strategy

5 Asset Management Strategy 5 Asset Management Strategy 5.1 Non-infrastructure Solutions The LOS ensure that adequate system capacity is provided and that the infrastructure is maintained in a state of good repair. A number of non-infrastructure

More information

Integrating Asset Management and Growth Planning Ontario West Municipal Conference London, Ontario November 20, 2015

Integrating Asset Management and Growth Planning Ontario West Municipal Conference London, Ontario November 20, 2015 Integrating Asset Management and Growth Planning 2015 Ontario West Municipal Conference London, Ontario November 20, 2015 Presentation Outline 1. The City of Brantford 2. Asset Management Planning at the

More information

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility 2017 Performance Report for Bobcaygeon Waste Water Treatment Facility Amended Environmental Certificate of Approval (ECA) #3028-AEUKDQ Section 11(4) requires the Performance Reports to contain the following:

More information

2018 Water and Wastewater Budget Summary

2018 Water and Wastewater Budget Summary 2018 Water and Wastewater Budget Summary Each day, clean, safe water travels through the City s watermains for use by residents and businesses. Similarly, wastewater flows through the City s sewer system

More information

City of Guelph Transfer of Review Procedures 7 March, 2017

City of Guelph Transfer of Review Procedures 7 March, 2017 Step 1-Determine where the project is located on the City of Guelph Vulnerability Map If the project is found not to be located in a vulnerability area with a vulnerability score of 8 or higher (See Attachment

More information

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some

More information

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...

More information

THE TOWN OF EAST GWILLIMBURY DRINKING WATER QUALITY MANAGEMENT STANDARDS OPERATIONAL PLAN

THE TOWN OF EAST GWILLIMBURY DRINKING WATER QUALITY MANAGEMENT STANDARDS OPERATIONAL PLAN THE TOWN OF EAST GWILLIMBURY DRINKING WATER QUALITY MANAGEMENT STANDARDS OPERATIONAL PLAN HOLLAND LANDING/QUEENSVILLE/SHARON, MOUNT ALBERT AND YONGE/GREEN LANE CLASS I WATER DISTRIBUTION SYSTEMS Online

More information

CITY OF HAMILTON LYNDEN RURAL SETTLEMENT AREA...

CITY OF HAMILTON LYNDEN RURAL SETTLEMENT AREA... TABLE OF CONTENTS 13.0 CITY OF HAMILTON LYNDEN RURAL SETTLEMENT AREA... 13-1 13.1 Definitions... 13-1 13.2 City Of Hamilton Lynden Rural Settlement Area Source Protection Plan Policies... 13-1 13.3 Policies

More information

13.0 CITY OF HAMILTON LYNDEN RURAL SETTLEMENT AREA

13.0 CITY OF HAMILTON LYNDEN RURAL SETTLEMENT AREA TABLE OF CONTENTS 13.0 CITY OF HAMILTON LYNDEN RURAL SETTLEMENT AREA... 13-1 13.1 Definitions... 13-1 13.2 City Of Hamilton Lynden Rural Settlement Area Source Protection Plan Policies... 13-1 13.3 Policies

More information

LOCAL GOVERNMENT. General Government % %

LOCAL GOVERNMENT. General Government % % LOCAL GOVERNMENT General Government 1.4% 1.6% Operating costs for governance and corporate management as a percentage of total municipal operating costs. Efficient municipal government FIRE SERVICES Fire

More information

CITY OF WINDSOR Municipal Performance Measurement Program (MPMP) 2011 RESULTS 1.1 GENERAL GOVERNMENT - EFFICIENCY 3.7% 4.7%

CITY OF WINDSOR Municipal Performance Measurement Program (MPMP) 2011 RESULTS 1.1 GENERAL GOVERNMENT - EFFICIENCY 3.7% 4.7% Local Government 1.1 a) Operating costs for governance and corporate management as a percentage of total municipal operating costs. 1.1 b) Total costs for governance and corporate management as a percentage

More information

The Township of Bonnechere Valley Asset Management Plan for Water and Sewer Infrastructure and Arena/Community Hall

The Township of Bonnechere Valley Asset Management Plan for Water and Sewer Infrastructure and Arena/Community Hall arena is approximately 20,000 ft 2 in area with a 5,000 ft², two-storey community centre (Eagles Nest) addition constructed in the 1980s. Since then, there has been regular maintenance, numerous upgrades

More information

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Section 8 System Evaluation and Capacity Assurance Plan (SECAP) System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement

More information

THE TOWN OF EAST GWILLIMBURY DRINKING WATER QUALITY MANAGEMENT STANDARDS OPERATIONAL PLAN

THE TOWN OF EAST GWILLIMBURY DRINKING WATER QUALITY MANAGEMENT STANDARDS OPERATIONAL PLAN THE TOWN OF EAST GWILLIMBURY DRINKING WATER QUALITY MANAGEMENT STANDARDS OPERATIONAL PLAN HOLLAND LANDING/QUEENSVILLE/SHARON, MOUNT ALBERT AND YONGE/GREEN LANE CLASS I WATER DISTRIBUTION SYSTEMS Revision

More information

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1

More information

DRINKING WATER SYSTEM. Summary Report toronto.ca/water

DRINKING WATER SYSTEM. Summary Report toronto.ca/water DRINKING WATER SYSTEM Summary Report 2017 toronto.ca/water R.C. Harris WTP 2017 Summary Report 2017 Summary Report Toronto (R.C. Harris) Water Treatment Plant Contents: 1.0 General Overview 2.0 System

More information

City of Markham 2018 Proposed Water/Wastewater Rates. General Committee November 6, 2017

City of Markham 2018 Proposed Water/Wastewater Rates. General Committee November 6, 2017 City of Markham 2018 Proposed Water/Wastewater Rates General Committee November 6, 2017 2 Agenda 1. About Markham s Environmental Services Department 2. 2017 Comparative Municipal Water/Wastewater Rates

More information

Business Plan Summary

Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Environmental Services Service grouping Wastewater & Treatment Service Wastewater Removal and Storm Water Management Type Public Service Ron Standish, Director,

More information

Business Plan: Drinking Water Supply

Business Plan: Drinking Water Supply Business Plan: Drinking Water Supply How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with all regulatory requirements

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater PROJECT APPROACH The focus of the

More information

Drainage Services Master Plan Aspirational Plan May 5, 2014

Drainage Services Master Plan Aspirational Plan May 5, 2014 May 5, 2014 Background Drainage Services provides wastewater and stormwater drainage services to Edmonton residents by planning, building, operating, and maintaining the pipes, tunnels, pump stations,

More information

HALTON REGION Budget and Business Plan Water & Wastewater Overview

HALTON REGION Budget and Business Plan Water & Wastewater Overview HALTON REGION and Business Plan Water & Wastewater Overview Water & Wastewater Overview Operating Summary Water and wastewater services are not funded from property taxes. These services are fully funded

More information

PERFORMANCE MEASURES: NOTES (OPTIONAL) MAH Code: for the year ended December 31, 2010

PERFORMANCE MEASURES: NOTES (OPTIONAL) MAH Code: for the year ended December 31, 2010 Municipalities may enter information to explain the unique circumstances of the municipality which affect MPMP results. All Measures from Schedule 91 and 92 are available, however information is not required

More information

Asset Management & Investment Plan

Asset Management & Investment Plan The Town of Aurora Asset Management & Investment Plan Securing Sustainability of our Infrastructure Approved by Aurora Council on October 31, 2015 Includes 2016 Detailed 10-Year Financial Forecast for

More information

REGIONAL OFFICIAL PLAN AMENDMENT 5 TO THE OFFICIAL PLAN FOR THE NIAGARA PLANNING AREA

REGIONAL OFFICIAL PLAN AMENDMENT 5 TO THE OFFICIAL PLAN FOR THE NIAGARA PLANNING AREA REGIONAL OFFICIAL PLAN AMENDMENT 5 TO THE OFFICIAL PLAN FOR THE NIAGARA PLANNING AREA PART A - THE PREAMBLE The preamble provides an explanation of the Amendment including the purpose, location, background,

More information

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 Summary of LAE ONTARIO 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 2. Information (editorial, revised, new): LO G 1 (revised) LO NGS 1 (revised) LO G 2 (revised) LO SEW 2 (revised) LO G 6 (revised) LO

More information

Asse t Man age m e n t P lan. Providing essential services that meet approved standards at minimum cost

Asse t Man age m e n t P lan. Providing essential services that meet approved standards at minimum cost Asse t Man age m e n t P lan Providing essential services that meet approved standards at minimum cost Executive Summary The Town of Pelham s existing infrastructure is aging while demand grows for better

More information

Desired Levels of Service

Desired Levels of Service SECTION 4 Desired Levels of Service 4.1 Levels of Service Fundamentally, delivering Levels of Service (LOS) is why the City of London is in business. Assets exist for the purpose of supporting the delivery

More information

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater

More information

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver

More information

Water and Wastewater & Treatment Budgets. Strategic Priorities & Policy Committee. January 15, 2015

Water and Wastewater & Treatment Budgets. Strategic Priorities & Policy Committee. January 15, 2015 Water and Wastewater & Treatment 2015 Budgets Strategic Priorities & Policy Committee January 15, 2015 Agenda 1. Supporting London s Strategic Priorities 2. Core Business Objectives 3. Current Operating

More information

COUNTY OF PERTH. Public Works Department Business Plan

COUNTY OF PERTH. Public Works Department Business Plan COUNTY OF PERTH Public Works Department 2017-2019 Business Plan October 1, 2016 This document is formatted for double-sided printing. No part of this document may be reproduced, stored in or introduced

More information

City of Greater Sudbury MPMP Report to Citizens

City of Greater Sudbury MPMP Report to Citizens City of Greater Sudbury 2013 MPMP Report to Citizens 1 Table of Contents Introduction... 3 Common Definitions of Terms/References contained in Report... 4 1. General Government... 5 2. Protection - Fire...

More information

M A R K H A M S WAT E R

M A R K H A M S WAT E R M A R K H A M S WAT E R The Cost of Water I S S U E # 3 E N V I RONMENTA L S E RV I C E S Evolution of Clean Safe Drinking Water in Ontario Prior to the development of Ontario s modern day water systems,

More information

NIAGARA REGION ASSET MANAGEMENT PLAN 2014

NIAGARA REGION ASSET MANAGEMENT PLAN 2014 2014 1 EXECUTIVE SUMMARY The Regional Municipality of Niagara (the Region) delivers a variety of services that support public health and safety, protect the environment, and contribute to the economic

More information

Business Plan: Wastewater Removal and Stormwater Management

Business Plan: Wastewater Removal and Stormwater Management Business Plan: Wastewater Removal and Stormwater Management How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with

More information

CORPORATION OF THE TOWNSHIP OF RUSSELL. By-law# Being a by-law to adopt the Strategic Asset Management Policy.

CORPORATION OF THE TOWNSHIP OF RUSSELL. By-law# Being a by-law to adopt the Strategic Asset Management Policy. CORPORATION OF THE TOWNSHIP OF RUSSELL By-law# 2018-163 Being a by-law to adopt the Strategic Asset Management Policy. WHEREAS under Section 8 (1) of the Municipal Act, 2001, S.O., 2001, c.25, as amended,

More information

City of Markham 2017 Proposed Water/Wastewater Rates

City of Markham 2017 Proposed Water/Wastewater Rates City of Markham 2017 Proposed Water/Wastewater Rates Agenda 1. About Markham s Waterworks Department 2. 2016 Comparative Municipal Water/Wastewater Rates ($/m 3 ) 3. Components of the 2017 Water/Wastewater

More information

Review of on-site and communal water and sanitation systems for remote communities

Review of on-site and communal water and sanitation systems for remote communities Environmental Economics and Investment Assessment II 275 Review of on-site and communal water and sanitation systems for remote communities A. Perks & T. Johnson R.V. Anderson Associates Limited, Ottawa,

More information

MUNICIPAL DRINKING WATER LICENCE

MUNICIPAL DRINKING WATER LICENCE MUNICIPAL DRINKING WATER LICENCE Licence Number: 076-101 Issue Number: 4 Pursuant to the Safe Drinking Water Act, 2002, S.O. 2002, c. 32, and the regulations made thereunder and subject to the limitations

More information

TOWN OF AURORA DRINKING WATER QUALITY ANNUAL REPORT

TOWN OF AURORA DRINKING WATER QUALITY ANNUAL REPORT TOWN OF AURORA DRINKING WATER QUALITY ANNUAL REPORT JANUARY 1 TO DECEMBER 31, 2009 New Regulations Amendments to Ontario Regulation 170/03 came into effect on June 5, 2006. The provincially mandated amendments

More information

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM STORM WATER ASSET MANAGEMENT PLAN & PROGRAM City of Walker, MI September 2017 System Goals and Action Plan INTRODUCTION About this Document This document is our Storm Water Asset Management Plan & Program

More information

Regional District LGDE Help Manual

Regional District LGDE Help Manual [Type text] Regional District LGDE Help Manual Issued by: Local Government Infrastructure and Finance Branch December, 2016 Table of Contents 7. STATISTICS SCHEDULES... 49 7(A) SCHEDULE C1 GENERAL STATISTICS

More information

City of Victoria Aging Infrastructure Review and Assessment

City of Victoria Aging Infrastructure Review and Assessment City of Victoria Aging Infrastructure Review and Assessment Presented by Engineering and Public Works Department February 2012 Presentation Outline Infrastructure Definition and Examples City of Victoria

More information

Measure Type Description Objective Comment. Efficient general government supporting local services

Measure Type Description Objective Comment. Efficient general government supporting local services Local government Operating cost for general government The cost for general government as a percentage of the total municipal operating cost Efficient general government supporting local 1.2% 1.4% Library

More information

sewers ANd storm drains Storm Drain Under Construction, 1916

sewers ANd storm drains Storm Drain Under Construction, 1916 sewers ANd storm drains Storm Drain Under Construction, 1916 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital Improvement Program FY 218 FY 219

More information

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT CERTIFICATE OF APPROVAL: # 7599-7PCKPU INTRODUCTION The Conger Marsh Water Pollution Control Plant (WPCP), which services the community of MacTier, is owned

More information

APPENDIX Y. Audit Closeout Memo. Revision History

APPENDIX Y. Audit Closeout Memo. Revision History APPENDIX Y Audit Closeout Memo Revision History Revision Date Approval Reason 0 12/19/11 Original 1 05/19/16 M. Esquer Addressed 2013 Audit Findings 2 06/30/16 M. Esquer Addressed 2015 Audit Findings ORANGE

More information

Transportation BUSINESS PLAN ACCOUNTABILITY STATEMENT

Transportation BUSINESS PLAN ACCOUNTABILITY STATEMENT Transportation BUSINESS PLAN 2003-06 ACCOUNTABILITY STATEMENT The for the three years commencing April 1, 2003 was prepared under my direction in accordance with the Government Accountability Act and the

More information

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please

More information

DRINKING WATER SUMMARY REPORT

DRINKING WATER SUMMARY REPORT Environmental Services City of Vaughan 2800 Rutherford Road Vaughan, ON L4K 2N9 www.vaughan.ca/water DRINKING WATER SUMMARY REPORT 2017 Description of the Vaughan Water Distribution System to fulfill the

More information

WASTEWATER ASSET MANAGEMENT PLAN

WASTEWATER ASSET MANAGEMENT PLAN Must be kept on file and available upon request until 2032 (per 2014 MDEQ/SAW grant requirements) WASTEWATER ASSET MANAGEMENT PLAN CITY OF NORTON SHORES, MI May 2017 Where we re going: System Goals INTRODUCTION

More information

QUALITY MANAGEMENT SYSTEM OPERATIONAL PLAN MARKHAM DISTRIBUTION SYSTEM REVISION 7.0

QUALITY MANAGEMENT SYSTEM OPERATIONAL PLAN MARKHAM DISTRIBUTION SYSTEM REVISION 7.0 QUALITY MANAGEMENT SYSTEM OPERATIONAL PLAN MARKHAM DISTRIBUTION SYSTEM TABLE OF CONTENTS Table of Contents 1 Introduction.. 2 Element 1 Quality Management System.. 3 Element 2 Quality Management System

More information

Water Security Agency. Plan for saskatchewan.ca

Water Security Agency. Plan for saskatchewan.ca Water Security Agency Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 6 Financial Summary...

More information

MUNICIPAL DRINKING WATER LICENCE

MUNICIPAL DRINKING WATER LICENCE MUNICIPAL DRINKING WATER LICENCE Licence Number: 078-101 Issue Number: 4 Pursuant to the Safe Drinking Water Act, 2002, S.O. 2002, c. 32, and the regulations made thereunder and subject to the limitations

More information

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans Maine State Library Maine State Documents Land and Water Quality Documents Environmental Protection 9-1-1994 Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, WASTEWATER COLLECTION SYSTEM AND STORMWATER MANAGEMENT REPORT

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, WASTEWATER COLLECTION SYSTEM AND STORMWATER MANAGEMENT REPORT CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, 2018 Item 4, Report No. 12, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the

More information

A more detailed description of Transportation, and its programs and initiatives can be found at

A more detailed description of Transportation, and its programs and initiatives can be found at Business Plan 2018 21 Transportation Accountability Statement This business plan was prepared under my direction, taking into consideration our government s policy decisions as of March 7, 2018. original

More information

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

Water, Wastewater and Stormwater 2017 Budget 2018 Plan Executive Summary Water, Wastewater and Stormwater In May 2000, the E.coli outbreak and water contamination events in the Town of Walkerton led to an inquiry under Justice Dennis O Conner. The recommendations

More information

To provide information to Council and obtain support to implement a Drinking Water System Backflow Prevention Program in Haldimand County.

To provide information to Council and obtain support to implement a Drinking Water System Backflow Prevention Program in Haldimand County. HALDIMAND COUNTY Report PW-WW-03-2017 Drinking Water System Backflow Prevention Program For Consideration by Committee of the Whole on December 7, 2017 OBJECTIVE: To provide information to Council and

More information

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment Ministry of the Environment Soil Management A Guide for Best Management Practices The Ministry of the Environment (ministry) encourages the beneficial reuse of excess soils in a manner promoting sustainability

More information

Promote fiscally responsible asset management of existing and proposed new infrastructure.

Promote fiscally responsible asset management of existing and proposed new infrastructure. 10.0 Infrastructure Goals Promote fiscally responsible asset management of existing and proposed new infrastructure. Promote all sources of water as a valuable resource through the conservation of water,

More information

Public Information Centre #1. March 2010

Public Information Centre #1. March 2010 Public Information Centre #1 March 2010 Purpose of Public Information Centre Halton Region is initiating a Transportation Master Plan (2031) The Road to Change The Plan will develop a sustainable, integrated

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On Site Sewage Treatment 3. Inter Community Services 4. Future Demand Forecast 5. Infiltration and

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On-Site Sewage Treatment 3. Inter-Community Services 4. Future Demand Forecast 5. Infiltration and

More information

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director Engineering & Construction Services City of Toronto

More information

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON. REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the

More information

Our Values: Accountability, Dependability, Reliability ~ Honesty & Integrity ~ Respect ~ Teamwork and Collaboration ~ Open and Transparency

Our Values: Accountability, Dependability, Reliability ~ Honesty & Integrity ~ Respect ~ Teamwork and Collaboration ~ Open and Transparency Our Values: Accountability, Dependability, Reliability ~ Honesty & Integrity ~ Respect ~ Teamwork and Collaboration ~ Open and Transparency The Corporation of the Town of Arnprior Job Description Job Title:

More information

Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES

Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES TABLE OF CONTENTS 1.0 Introduction.. 2 1.1 Transportation Impact Study...... 2 1.2 Need and Justification... 2 1.3 Purpose of Guidelines... 2

More information

City of Brantford Managing Linear Assets

City of Brantford Managing Linear Assets City of Brantford Claudia Puchalski A.Sc.T. May 2009 Agenda Asset Management in the City of Brantford Challenges to Infrastructure Management at the City of Brantford Obstacles/Solutions Recommendations/Benefits

More information

BRACEBRIDGE WASTEWATER TREATMENT

BRACEBRIDGE WASTEWATER TREATMENT 2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES GOAL 1: Public Facilities. Needed public facilities shall be provided in a manner which protects investments in existing facilities and promotes orderly compact urban growth.

More information

Improved Inflow & Infiltration (I&I) Monitoring Program

Improved Inflow & Infiltration (I&I) Monitoring Program City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring Program Submission For 2009 UBCM Community Excellence Awards Best Practices City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring

More information

Town of Bradford West Gwillimbury Asset Management Plan. Subject to Council Approval

Town of Bradford West Gwillimbury Asset Management Plan. Subject to Council Approval Subject to Council Approval Executive Summary In the fall of 2012, the Province of Ontario introduced a strategy requiring municipalities that request provincial infrastructure funding to demonstrate how

More information

Appendix 2A Water and Wastewater Servicing Principles and Policies Paper

Appendix 2A Water and Wastewater Servicing Principles and Policies Paper Appendix 2A Water and Wastewater Servicing Principles and Policies Paper Regional Municipality of Peel 2013 Water and Wastewater Master Plan for the Lake-Based Systems Water and Wastewater Policy Paper

More information

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS 1 of 5 8/1/2013 2:10 PM INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS Project Location and Description Glen Mayberry, Project Manager Roy F. Weston, Houston, TX The project is in

More information

Toronto Water Services. Wastewater. Treatment. and Supply. Water. Treatment. Water Pumping Stations. Water Treatment. Water.

Toronto Water Services. Wastewater. Treatment. and Supply. Water. Treatment. Water Pumping Stations. Water Treatment. Water. WATER SERVICES PROGRAM MAP Toronto Services Treatment and Supply Wastewater Treatment and Supply Stormwater Management Distribution Treatment Service Connections Distribution System Pumping Stations Treatment

More information

Integrated Management System Update for Water, Wastewater and Waste Management

Integrated Management System Update for Water, Wastewater and Waste Management Clause 3 in Report No.6 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on March 26, 2015. 3 2014 Integrated Management

More information

ODOT Asset Management Plan 0

ODOT Asset Management Plan 0 ODOT Asset Management Plan 0 Table of Contents Executive Summary... 1 ODOT s Experience with Asset Management... 1 A New Way of Doing Business... 2 ODOT s Investment Plans... 3 Moving Forward... 5 1.0

More information

Spills to the Environment and Reporting Policy

Spills to the Environment and Reporting Policy Applicable Legislation: Environmental Protection Act, R.S.O. 1990 O.Reg. 675/98, Classification and Exemption of Spills, Guelph By-Law Number (1996)-15202 to regulate the discharge of wastes into the sanitary

More information

MUNICIPAL DRINKING WATER LICENCE

MUNICIPAL DRINKING WATER LICENCE MUNICIPAL DRINKING WATER LICENCE Licence Number: 121-103 Issue Number: 2 Pursuant to the Safe Drinking Water Act, 2002, S.O. 2002, c. 32, and the regulations made thereunder and subject to the limitations

More information

OF CONTENTS 14.0 COUNTY OF BRANT...

OF CONTENTS 14.0 COUNTY OF BRANT... TABLE OF CONTENTS 14.0 COUNTY OF BRANT... 14-1 14.1 Definitions... 14-1 14.2 County Of Brant Source Protection Plan Policies... 14-2 14.3 Policies Addressing Prescribed Drinking Water Threats... 14-6 14.4

More information

Request for Proposals

Request for Proposals Request for Proposals The Marina Coast Water District wishes to contract for an individual or firm to prepare Master Plans and Capacity Fees for Sewer, Water and Recycled Water Proposals due 4:00 PM October

More information

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1 Sustainable Halton Water & Wastewater Master Plan Public Information Centre #1 Welcome to Public Information Centre #1 Please sign in on the sheet provided. Our representatives will be pleased to discuss

More information

PRINCIPAL ENGINEER. 4. Prepare plans and studies to forecast section and division needs; implement recommendations.

PRINCIPAL ENGINEER. 4. Prepare plans and studies to forecast section and division needs; implement recommendations. PRINCIPAL ENGINEER Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect all duties performed

More information

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group.

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group. Ministry of the Environment and Climate Change Transfer of Review Presentation for Wastewater Practitioners Group November 29, 2017 Outline of Presentation Transfer of Review (TOR) Program Context TOR

More information

b. Equipment cleaning and maintenance (including vehicle and equipment rehabilitation, mechanical repairs, painting, fueling, and lubrication).

b. Equipment cleaning and maintenance (including vehicle and equipment rehabilitation, mechanical repairs, painting, fueling, and lubrication). Page 1 of 7 PART VII. SECTOR-SPECIFIC REQUIREMENTS The Permittee shall comply with Part VII (sector-specific requirements) for any primary SIC code and/or narrative activity and co-located industrial activities

More information

Service Business Plan

Service Business Plan Service Business Plan Service Name Transportation Network Planning Service Type Public Service Owner Name Kaylan Edgcumbe Budget Year 2017 Service Owner Title Service Description Acting Senior Transportation

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

Memorandum Karen Nickols, Project Manager Michigan Department of Environmental Quality (MDEQ) Revolving Loan Section

Memorandum Karen Nickols, Project Manager Michigan Department of Environmental Quality (MDEQ) Revolving Loan Section Memorandum To: Karen Nickols, Project Manager Michigan Department of Environmental Quality (MDEQ) Revolving Loan Section From: CC: John Michalski, P.E.; Eric Wahrman, E.I.T Oakland County Water Resource

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES GOAL 1: Public Facilities. Needed public facilities shall be provided in a manner which protects investments in existing facilities and promotes orderly compact urban growth.

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure GENERAL INFRASTRUCTURE ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee

More information

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations ENVIRONMENTAL MANAGEMENT 1 ENVIRONMENTAL CODE ADOPTION) E-10.22 REG 2 The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations being Chapter E-10.22 Reg 2 (effective

More information

Hydraulic Modeling, PUDs & Managing Water System Growth

Hydraulic Modeling, PUDs & Managing Water System Growth Hydraulic Modeling, PUDs & Managing Water System Growth American Water Resources Association Intermountain Section October 9, 2013 Utah Division of Drinking Water Ying-Ying Macauley Presentation Topics

More information

ORDINANCE NO NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GARLAND, TEXAS: SECTION 1

ORDINANCE NO NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GARLAND, TEXAS: SECTION 1 ORDINANCE NO. 6781 AN ORDINANCE AMENDING CHAPTER 51, "GENERAL UTILITY PROVISIONS", OF THE CODE OF ORDINANCES OF THE CITY OF GARLAND, TEXAS; PROVIDING A PENALTY CLAUSE, A SAVINGS CLAUSE, AND A SEVERABILITY

More information

MUNICIPAL DRINKING WATER LICENCE

MUNICIPAL DRINKING WATER LICENCE MUNICIPAL DRINKING WATER LICENCE Licence Number: 114-102 Issue Number: 2 Pursuant to the Safe Drinking Water Act, 2002, S.O. 2002, c. 32, and the regulations made thereunder and subject to the limitations

More information

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review City of Ottawa Water, Wastewater and Stormwater Rate Structure Review The City of Ottawa is developing a new rate structure to fund its water, wastewater and stormwater infrastructure. We need your help

More information

Core Business Area: Highway Operations Outcome Measure Data Target Strategic Actions to Achieve Target

Core Business Area: Highway Operations Outcome Measure Data Target Strategic Actions to Achieve Target Transportation and Public Works Performance Measures 2005-2006 Core Business Area: Highway Operations Highway services that address customers needs. Per cent Nova Scotians indicating they are satisfied