Reliability Centered Maintenance Plan for the Utility Section of a Fertilizer Industry: A Case Study

Size: px
Start display at page:

Download "Reliability Centered Maintenance Plan for the Utility Section of a Fertilizer Industry: A Case Study"

Transcription

1 Reliability Centered Maintenance Plan for the Utility Section of a Fertilizer Industry: A Case Study Muhammad Abid*, Suleman Ayub, Humza Wali, Muhammad Najam Tariq Faculty of Mechanical Engineering, Ghulam Ishaq Khan Institute of Engineering Sciences & Technology, Topi, 23640, Swabi, KPK, Pakistan *abid@giki.edu.pk Abstract This paper provides an insight to the application of Reliability Centered Maintenance (RCM) and life data analysis. The objective is to formulate a Failure Management Policy for the utility section of a fertilizer industry. It focuses on how key elements of the RCM process can be combined to select appropriate policies for managing a system s failure modes and their consequences, using an RCM decision algorithm. The foremost objective of Reliability Centered Maintenance plan is to optimize reliability of physical assets while being cost effective. Furthermore in addition to traditional RCM, life data of the machinery is analyzed using empirical analysis of Weibull distribution. The estimates of the parameters of Weibull distribution are found using Median Rank Regression (MRR) method. Each machine is then matched with one of the six most widely accepted patterns of failure. In the end these two techniques i.e. RCM and Weibull Analysis are integrated in a manner to formulate an optimized Failure Management Policy. The plan is in compliance with RCM SAE JA1011 standard. example, deductions and results obtained can be applied to the all the systems of ammonia/urea complex plant. II. THEORETICAL BACKGROUND A. Failure Curves Failure rate or hazard rate is defined as probability density function divided by reliability [2]. There are a total of six failure curves associated with most of the equipment installed in an Industry which are shown in Fig. 1. The shape of the failure curve allows us to identify whether the failure mode was an early life or infant mortality stage failure, a randomly induced failure or due to wear out and aging. These curves are formed by plotting failure rate of equipment with respect to time. Keywords: RCM, Reliability Engineering, Failure Management Policy, Life data analysis. I. INTRODUCTION Utility plant is a very important and critical section of a Fertilizer Industry. The utility plant provides services to the ammonia/urea complex and other areas. The main products of the company are ammonia and urea. This paper aims at formulating a maintenance plan based on RCM methodology for the utility plant machinery. Application of RCM can improve reliability and availability while minimizing the downtime and maintenance cost. Reliability centered Maintenance is a process used to determine what must be done to ensure that any physical asset continues to do what its users wanted it to do in its present operating context [1]. RCM philosophy employs preventive maintenance, predictive maintenance (PdM), real-time monitoring (RTM), run-to-failure (RTF) and proactive maintenance techniques, in an integrated manner to increase the probability that a machine or component will function in the required manner over its design life cycle with a minimum of maintenance [1]. Although it has been established that we need to implement either of the above mentioned five maintenance techniques but the real challenge is to find the correct and the most effective combination of each, for different equipment, with different failure curves. In this paper we have taken Condensate recovery and boiler feed water system as a working Figure 1 Six Failure Patterns as Identified by Nolan and Heap. [3] 9

2 B. Weibull Distribution Weibull Distribution is one of the most widely incorporated distribution which is used to carry out life data analyses in reliability engineering..it s probability density function (PDF) or f(t) is given by [4]: Where: ( ) ( ) β is the Weibull shape parameter which determines the shape of the Weibull plot. α is the scale parameter which represents the characteristic life at which 63.2% of the population is expected to fail. "γ" is the location parameter or failure free life. t is the time. The Weibull Distribution is said to be two-parameter distribution if γ=0 [5]. Keeping all the parameters constant and varying β can give different failure curves [6]. β<1 Early life or infant mortality stage failure. β=1 Constant failure rate curve. β>1 Wear out or failure due to age curve. III. RELIABILITY CENTERED MAINTENANCE For an effective RCM plan the following tools and techniques were applied. A. Selection of system System selected for the implementation of RCM plan is Utility Section of a Urea Plant. (1) B. Selection of subsystem Following Subsystems from the plant are selected: 1) Condensate Recovery and boiler feed water system. 2) Electricity Generation System. 3) Fire Water System. 4) Plant and Instrument Air system. Condensate Recovery and boiler feed water system is selected as a case study for this paper. Same steps and maintenance decisions combinations can be applied to the rest of the systems. Fig. 2 shows the functional block diagram for condensate recovery and boiler feed water system. C. Acquiring the failure data Complete failure data was acquired from the plant using the Enterprise Resource Planning (ERP) software AS 400, produced by IBM. D. Identification of functions The function of the Condensate recovery and feed water system is to supply high-pressure water to the boiler. The feed water is physically and chemically de-aerated, further preheated in steam Boiler feed water heater and distributed to the process steam Boilers and miscellaneous users. Under normal operating conditions two of the three 50% capacity High pressure Feed water Pumps (P402 A B and C) take suction from the de-aerator storage section and pump feed water to the Steam Boiler Feed water Heater (E- 403, which is not a part of this system). The System automatically maintains the proper flow to the boiler drum. A minimum head of 1850 ft. is required from the pumps rated at 615 gpm, these pumps have an initial capability of 1950 ft., and 100 ft. is the margin for deterioration after which the pump will be repaired or replaced. Figure 2 Condensate Recovery and Boiler Feed water system Schematic diagram [7]. 10

3 Figure 3 Condensate Recovery and Boiler Feed water system functional block diagram The boiler feed water system is a flow process in compliance with ISO This system operates for 24 hrs. per day and has a redundant pump (P402 C). All spare parts of a pump are available in the warehouse [7]. E. Selection of Critical Equipment Following critical equipment were selected. a) Pump (P-402A) b) Pump (P-402B) c) Pump (P-402C) d) Turbine (TP-402AB) e) Motor (MP-402C) Criticality of the equipment was based on the functionality and importance of the functions performed by the above mentioned equipment. P-402 A and B are run by TP 402AB which is also as critical as P402 A and B. Pump P402 AB and TP 402AB are the most critical and work all the time to deliver the feed water, while the P 402C is a standby pump and is not as critical as P402 A/B. MP 402C is used to run P 402C in standby operations. F. Actuarial Analysis of the failure Data The Weibull cumulative distribution function (CDF), denoted by F w (t) is given by: (2) Since for our case the failure free life γ=0 [5] therefore the analysis will become two-parameter Weibull analysis: And the Reliability is given by: (3) ( ) (4) The linear form of CDF equation is given by: ( ( )) (5) For the estimation of Weibull parameters there are two widely used methods to calculate Cumulative Density Function which are given below: a) Median Rank Method using Benard s Formula [8]. b) Kaplan-Meier Estimation. Since Kaplan-Meier estimation requires a large data size to give a useful plot therefore Median rank method using Benard s Formula is utilized in our analyses [9]. F w (t) can be estimated by using Benard s Formula [8] for median rank estimator which is given by: (6) Weibull parameters can be estimated by the following methods: a) Maximum likely hood estimation (MLE). b) Rank regression on X. c) Rank regression on Y. Rank regression on X is used for estimation since MLE is used for censored data whereas the failure data obtained for critical equipment is complete data and regression generally works best for small data sizes (10-11 samples in our case). Rank regression on Y is not used because uncertainty is in time to failure which changes with sample to sample and it is on x-axis of the plots. 11

4 Therefore Regression on X is used which is given by [9]: ( ( )) (7) Comparing the equation with the equation of Straight line i.e. Hence ; ( ( ( ( )); ; ( ) ( ) )) As β (shape parameter) is less than 1 it suggest an early failure i.e. infant mortality. Hazard rate decreases exponentially right from the start as shown in Fig. 5. G. P-402A and P-402B Analysis For pump 402A β (Shape parameter) is 0.78 and α (Scale parameter) is 577 days which is shown in Fig. 4. Hazard rate is very high in the beginning due to infant mortality and decreases with time. P402B follows the same distribution and model as of P402 A and has a β = 0.85 and α =338 days. Similar results were found of P402B. H. TP-402A/B Analysis For Turbine TP402A/B β is 3.58 and α is 1662 days as shown in Fig. 6. As β is greater than 1 it suggest failure due to wear out. Hazard rate increases exponentially, at approximately 500 days as shown in Fig. 7. The reliability of TP 402A/B decreases exponentially after 400 days, hence scheduled restoration task at approximately after 400 days is recommended as shown in reliability curve Fig. 8. I. P402-C and MP402-C Analysis (Standby System): For Standby systems we perform failure finding tasks. For these tasks failure finding interval (FFI) [10] is determined which is given below: For Standby Systems an availability of 90% is required therefore unavailability is 10%. From the given data MTBF = 100 days (8) Figure 4 shows the Probability-Weibull plot. Shape and scale parameters for P-402A are estimated 12

5 Figure 5 shows the failure rate or hazard rate plot for P-402A Figure 6 shows the Probability-Weibull plot. Shape and scale parameters for TP-402A/B are estimated. 13

6 Figure 7 shows the failure rate or hazard rate plot for TP-402AB. Figure 8 shows the reliability plot for TP-402A/B. 14

7 1 TABLE I. FAILURE MODES AND EFFECT ANALYSIS. Function (F) Condensate recovery system collects condensate and returns it to feed water system, which distributes feed water to process steam boilers and misc. users. Functional Failure (FF) (Loss of Function) A Failed to supply high pressure water to the boiler during startup, normal & emergency operations by achieving a differential head of 1950ft. Failure Mode (FM) (Cause of Failure) 1 P402A fails 2 P402B Fails J. Failure Modes and Effect Analysis An RCM process that conforms to SAE JA1012 states, All the failed states associated with each failure shall be identified [10]. A failure mode could be defined as any event which is likely to cause an asset (or system or process) to fail. A system can fail for many reasons, for the complete plant these failure modes or reasons can rise into thousands. For our system we have listed down the following main causes that prevent the system from performing its complete function. These causes could be drilled down further into the function failures of sub systems, but we have to decide on the level which is practically feasible for a particular industry. Once the failure modes are identified it then becomes possible to assess the root cause of these failures and decide on the relative maintenance techniques and intervals. Function failure that represents total failure can be identified easily, for our system a total failure will take place when either of pumps P402 A/B or P402 C fails TP402 A/B Fails P402C Fails (Standby) MP402C Fails (Standby) Partial failures may be many for example if only one pump fails, turbine fails of motor fails which is shown in Table 1. K. RCM tree Diagram and Decision Worksheet: RCM decision diagram (Fig. 9) integrates all the decision processes into a single framework. The RCM decision worksheet, Table 2 is filled with the help of RCM decision diagram and Table I (Failure modes and effect analysis). Furthermore the proposed tasks and interval are selected by considering Actuarial analysis of RCM methodology. From Table 1 it can be seen that equipment with early life failure curve are put on increased monitoring directly after commissioning and keeping a spare nearby may be helpful until the cause of failure is found and resolved. Root cause analysis of the equipment itself is recommended to find out the cause and eliminate it. For equipment with wear out failure a Scheduled restoration task is suggested so that potential failure could be avoided and hence making the whole maintenance cost effective. For Standby equipment a failure finding interval of 20 days is determined. IV. CONCLUSION All the techniques of maintenance including preventive, predictive and proactive techniques are currently being applied in the fertilizer plant under study. A new approach has been used in which RCM is integrated with life data analysis in order to accurately estimate the failure mode followed by each component of the system. Using this technique a better failure management policy is developed keeping in view the health of each equipment. This RCM plan helps to optimize reliability of the system while being cost effective and decreasing the system downtime. In addition determination of maintenance tasks and their intervals was achieved by the use RCM as shown in Table II. Figure 9 shows RCM Decision Diagram 15

8 TABLE II. RCM DECISION WORKSHEET TABLE Failed to supply high pressure water to the boiler during startup, normal & emergency operations by achieving a differential head of 1950ft p Consequence Evaluation H1 S1 F FF FM H S E O O1 N1 H2 S2 O2 N2 H3 S3 O3 N3 Default Action H4 H5 S4 Proposed Task Interval Can be done by 1 A 1 Y N N N Y N/A N/A N/A N/A N/A Scheduled On-condition task 1 day Technician 1 A 2 Y N N Y Y N/A N/A N/A N/A N/A Scheduled On-condition task 1 day Technician 1 A 3 Y N N N N Y N/A N/A N/A N/A Scheduled restoration task 400 days Technician 1 A 4 N N/A N/A N/A N N N Y N/A N/A Schedule Failure finding task 20 days Technician 1 A 5 N N/A N/A N/A N N N Y N/A N/A Schedule Failure finding task 20 days Technician V. ACKNOWLEDGMENT The authors acknowledge Ikram.Ahmad Khan, Dawood Hercules Fertilizers Limited for all cooperation for completing this study. VI. REFERENCES [1] J. Moubray, Reliability-centered maintenance., Vols. ISBN , New York: Industrial Press, [2] P. MacDiarmid and S. Morris, Reliability Toolkit (Commercial Practices ed.), Rome; New York: Reliability Analysis Center and Rome Laboratory.. [3] F. S. Nowlan and H. F. Heap, Reliability-Centered Maintenance, San Francisco: Dolby Access Press, [4] R. B. Abernathy, The New Weibull Handbook, Houston: Dr. Robert B. Abernethy, [5] C.-c. Liu, "A Comparison between the Weibull and Lognormal Models used to Analyze Reliability Data. P.hd thesis," University of Nottingham, UK, Nottingham, [6] J. F. Lawless, Statistical Models and Methods of life, New York: J WILEY & SONS, [7] Dawood Hercules Fertilizers Ltd., Utility Plant Training Manual, Lahore: Technical Training Department, [8] M. S. K. A. H. P. G.R Pasha, "Empirical Analysis of The Weibull Distribution," Journal of Statistics, vol. 13, no. 1, pp , [9] NIST/SEMATECH, e-handbook of Statistical Methods, [10] S. International, Evaluation Criteria for Reliability-Centered Maintenance (Rcm) Processes- General requirements. SAEJA1012,

Failure Analysis on Development Drilling Rigs

Failure Analysis on Development Drilling Rigs Failure Analysis on Development Drilling Rigs Buhan Song Richard Durham 1, Melinda Hodkiewicz 2 1. School of Civil and Resource Engineering 2. School of Mechanical and Chemical Engineering Andrew Cooper

More information

PRINCIPLES OF RELIABILITY ENGINEERING

PRINCIPLES OF RELIABILITY ENGINEERING Training Title PRINCIPLES OF RELIABILITY ENGINEERING Training Duration 5 Days Training Date & Venue Principles of Reliability Engineering 14 18 April $3,750 Doha, Qatar In any of the 5 star hotels. The

More information

Deployment of Reliability Centered Maintenance Methodology On a Machine To Avoid Unscheduled Downtime

Deployment of Reliability Centered Maintenance Methodology On a Machine To Avoid Unscheduled Downtime Deployment of Reliability Centered Maintenance Methodology On a Machine To Avoid Unscheduled Downtime Laxman Pangeni*, Amandeep Nagpal**, Sridhar Krishnaswamy*** Eaton Technologies Private Limited, Pune,

More information

Maintenance Management for Reliability Training Course Day 1 Content. Disclaimer slides do not replace education, training, skills and experience

Maintenance Management for Reliability Training Course Day 1 Content. Disclaimer slides do not replace education, training, skills and experience Course Content Maintenance Management for Reliability Training Course Day 1 Content Introduction to Equipment Reliability Concepts Disclaimer slides do not replace education, training, skills and experience

More information

Chapter 4. Mathematical Modeling of Service Outages

Chapter 4. Mathematical Modeling of Service Outages Chapter 4 Mathematical Modeling of Service Outages 4.1 Introduction The end to end availability of mobile communication network is a function of the availability of all the intermediate elements. The physical

More information

Proceeding of 9 th International Seminar on Industrial Engineering and Management ISSN : X

Proceeding of 9 th International Seminar on Industrial Engineering and Management ISSN : X Proceeding of 9 th International Seminar on Industrial Engineering and Management ISSN : 1978-774X PROPOSED MAINTENANCE POLICY AND SPARE PART MANAGEMENT OF GOSS UNIVERSAL PRINTING MACHINE WITH RELIABILITY

More information

Evaluating Your Electrical Distribution System

Evaluating Your Electrical Distribution System Evaluating Your Electrical Distribution System September 22, 2016 Doug Marshall, P.Eng, Reliability Engineer Magna IV Engineering 2 Introduction Virtually all industrial and commercial installations are

More information

Design for Reliability of Complex System with Limited Failure Data; Case Study of a Horizontal Drilling Equipment

Design for Reliability of Complex System with Limited Failure Data; Case Study of a Horizontal Drilling Equipment Design for Reliability of Complex System with Limited Failure Data; Case Study of a Horizontal Drilling Equipment Morteza Soleimani a*, Mohammad Pourgol-Mohammad b a Tabriz University, Tabriz, Iran b Sahand

More information

RELIABILITY ANALYSIS OF THERMAL POWER GENERATING UNITS BASED ON WORKING HOURS

RELIABILITY ANALYSIS OF THERMAL POWER GENERATING UNITS BASED ON WORKING HOURS Journal of Reliability and Statistical Studies; ISSN (Print): 0974-8024, (Online):2229-5666 Vol. 7, Issue 1 (2014): 113-123 RELIABILITY ANALYSIS OF THERMAL POWER GENERATING UNITS BASED ON WORKING HOURS

More information

If P&C Insurance Company Ltd. PANNDAGARNA 2018: POWER PLANT ISSUES. 17 April 2018

If P&C Insurance Company Ltd. PANNDAGARNA 2018: POWER PLANT ISSUES. 17 April 2018 If P&C Insurance Company Ltd. PANNDAGARNA 2018: POWER PLANT ISSUES 17 April 2018 TOPICS Panndagarna 2018 If P&C Insurance Company Ltd. STEAM TURBINE PORTFOLIO 17 April 2018 OUR STEAM TURBINE PORTFOLIO

More information

RELIABILITY, AVAILABILITY AND MAINTAINABILITY CONCEPTS

RELIABILITY, AVAILABILITY AND MAINTAINABILITY CONCEPTS UNIT 9 RELIABILITY, AVAILABILITY AND MAINTAINABILITY CONCEPTS Total Quality and Maintenance Objectives After studying this unit, you should be able to: understand the concept of reliability, availability

More information

Opportunities for Data Analytics in Power Generation Prognostics: The Final Frontier

Opportunities for Data Analytics in Power Generation Prognostics: The Final Frontier Opportunities for Data Analytics in Power Generation Prognostics: The Final Frontier Scott Affelt XMPLR Energy June 30, 2016 XMPLR Energy Consulting Business Strategy Disruptive Technology Introduction

More information

Developing a reliability program for maintenance and operation

Developing a reliability program for maintenance and operation Developing a reliability program for maintenance and operation João Luís Ribeiro de Oliveira joaoribeirooliveira@hotmail.com Instituto Superior Técnico - Departamento de Engenharia Aeroespacial Avenida

More information

Reliability Data Analysis with Excel and Minitab

Reliability Data Analysis with Excel and Minitab Reliability Data Analysis with Excel and Minitab Kenneth S. Stephens ASQ Quality Press Milwaukee, Wisconsin Table of Contents CD-ROM Contents List of Figures and Tables xiii xvii Chapter 1 Introduction

More information

Plant Reliability Improvement and Financial Gain: What s the Connection?

Plant Reliability Improvement and Financial Gain: What s the Connection? ASSET MANAGEMENT Plant Reliability Improvement and Financial Gain: What s the Connection? By Marcus B. Punch As hydro plant owners modernize and replace generating equipment, they are considering how decisions

More information

KopyKitab. Quality, Reliability and Maintainability. Statistical Methods for. K. Muralidharan A. Syamsundar. Maintainability

KopyKitab. Quality, Reliability and Maintainability. Statistical Methods for. K. Muralidharan A. Syamsundar. Maintainability Statistical Methods for Quality, Reliability and Maintainability LSL Design width USL Bathtub failure rate curve Maintainability Time K. Muralidharan A. Syamsundar Statistical Methods for Quality, Reliability

More information

Characterization of resolution cycle times of corrective actions in mobile terminals

Characterization of resolution cycle times of corrective actions in mobile terminals Powered by TCPDF (www.tcpdf.org) This is an electronic reprint of the original article. This reprint may differ from the original in pagination and typographic detail. Author(s): Mwegerano, A.; Kytösaho,

More information

Need for incorporating reliability and availability in payback calculations

Need for incorporating reliability and availability in payback calculations of Achievements in Materials and Manufacturing Engineering VOLUME 31 ISSUE 2 December 28 Need for incorporating reliability and availability in payback calculations P.V. Shouri, P.S. Sreejith* School of

More information

Maximizing Your Assets Life Through Reliability. James Decker, PE, CRL

Maximizing Your Assets Life Through Reliability. James Decker, PE, CRL Maximizing Your Assets Life Through Reliability James Decker, PE, CRL Asset Management helps to answer the five fundamental questions of Infrastructure Management 1. What assets do we own? 2. What is their

More information

CHAPTER 3 HEURISTIC APPROACH TO MODELING THE BOILER FURNACE

CHAPTER 3 HEURISTIC APPROACH TO MODELING THE BOILER FURNACE CHAPTER 3 HEURISTIC APPROACH TO MODELING THE BOILER FURNACE 3.1 INTRODUCTION Modeling and simulation of boiler systems has been an interesting subject of investigation for many years. Mathematical modeling

More information

Australian Journal of Basic and Applied Sciences

Australian Journal of Basic and Applied Sciences Australian Journal of Basic and Applied Sciences, 8(3) August 24, Pages: 32-39 AENSI Journals Australian Journal of Basic and Applied Sciences ISSN:99-878 Journal home page: wwwajbaswebcom Reliability

More information

Determining a defensible preventive maintenance plan

Determining a defensible preventive maintenance plan Determining a defensible preventive maintenance plan Presented by Jim Kennedy, CPEng, CFAM, CAMA Interlogis Consulting Page 1 1 August 2017 Interlogis Consulting Page 2 Course Agenda Day 1 Introduction

More information

Maintenance Tactics. Are you doing the right maintenance??

Maintenance Tactics. Are you doing the right maintenance?? Are you doing the right maintenance?? Excellence in Maintenance truly requires that you have good control over your maintenance activities. As with just about any process, it is crucial to firstly understand

More information

Business Quantitative Analysis [QU1] Examination Blueprint

Business Quantitative Analysis [QU1] Examination Blueprint Business Quantitative Analysis [QU1] Examination Blueprint 2014-2015 Purpose The Business Quantitative Analysis [QU1] examination has been constructed using an examination blueprint. The blueprint, also

More information

WILEY A JOHN WILEY & SONS, INC., PUBLICATION

WILEY A JOHN WILEY & SONS, INC., PUBLICATION POWER DISTRIBUTION SYSTEM RELIABILITY Practical Methods and Applications Ali A. Chowdhury Don O. Koval IEEE PRESS SERIES ON POWER ENGINEERING IEEE Press WILEY A JOHN WILEY & SONS, INC., PUBLICATION Preface

More information

Introduction to RAM. What is RAM? Why choose RAM Analysis?

Introduction to RAM. What is RAM? Why choose RAM Analysis? Introduction to RAM What is RAM? RAM refers to Reliability, Availability and Maintainability. Reliability is the probability of survival after the unit/system operates for a certain period of time (e.g.

More information

The Impact of Upgrades on ERP System Reliability F. Urem, K. Fertalj, I. Livaja

The Impact of Upgrades on ERP System Reliability F. Urem, K. Fertalj, I. Livaja Vol:5, No:, 2 The Impact of Upgrades on ERP System Reliability F. Urem, K. Fertalj, I. Livaja International Science Index, Economics and Management Engineering Vol:5, No:, 2 waset.org/publication/435 Abstract

More information

RCM Theory and Concepts Workshop Module 2- RCM Process Overview

RCM Theory and Concepts Workshop Module 2- RCM Process Overview RCM Theory and Concepts Workshop Module 2- RCM Process Overview For Official Use Only Agenda RCM Process Introduction Planning & Preparation RCM Analysis Equipment Kick-off Meeting Initial Data gathering

More information

Available online at ScienceDirect. J.A. Sainz*, M.A. Sebastián b

Available online at  ScienceDirect. J.A. Sainz*, M.A. Sebastián b Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 63 ( 2013 ) 852 860 The Manufacturing Engineering Society International Conference, MESIC 2013 Methodology for the Maintenance

More information

Reliability Module. By: Alex Miller and Mark Robinson. Material Summarized from Reliability Module

Reliability Module. By: Alex Miller and Mark Robinson. Material Summarized from Reliability Module Reliability Module By: Alex Miller and Mark Robinson Material Summarized from Reliability Module Derived from original material on the NASA Space Systems Engineering Website (http://spacese.spacegrant.org/).

More information

Maintenance Strategy Improvement Design in Cigarette Paper Machine Station

Maintenance Strategy Improvement Design in Cigarette Paper Machine Station Maintenance Strategy Improvement Design in Cigarette Paper Machine Station Dejoi Irfian Situngkir 1 1 Student Department of Industrial Engineering, University of North Sumatera, Indonesia Rahim Matondang

More information

DETERMINING A DYNAMIC MAINTENANCE THRESHOLD USING MAINTENANCE OPTIONS

DETERMINING A DYNAMIC MAINTENANCE THRESHOLD USING MAINTENANCE OPTIONS DETERMINING A DYNAMIC MAINTENANCE THRESHOLD USING MAINTENANCE OPTIONS Gilbert Haddad a, Peter Sandborn a, and Michael Pecht a,b a Center for Advanced Life Cycle Engineering (CALCE), University of Maryland,

More information

Emerson s Plantweb Advisor Suite helps drive Operational Certainty

Emerson s Plantweb Advisor Suite helps drive Operational Certainty October 25, 2016 Media contact: Grace Capwell O 1 (512) 834-7214 M 1 (512) 840 8209 Grace.Capwell@Emerson.com Emerson s Plantweb Advisor Suite helps drive Operational Certainty New Health Advisor and Performance

More information

Reliability Optimization in the cutting area

Reliability Optimization in the cutting area IOSR Journal of Mathematics (IOSR-JM) e-issn: 2278-5728, p-issn: 2319-765X. Volume 14, Issue 6 Ver. II (Nov - Dec 2018), PP 01-10 www.iosrjournals.org Reliability Optimization in the cutting area Fatima

More information

Process Reliability: Do You Have It? What s It Worth To Your Plant To Get It?

Process Reliability: Do You Have It? What s It Worth To Your Plant To Get It? Process Reliability: Do You Have It? What s It Worth To Your Plant To Get It? Paul Barringer, P.E. Barringer & Associates, Inc. And Woodrow T. Roberts, Jr. Ph.D Dow Chemical Company Presented by Kirtan

More information

Describing DSTs Analytics techniques

Describing DSTs Analytics techniques Describing DSTs Analytics techniques This document presents more detailed notes on the DST process and Analytics techniques 23/03/2015 1 SEAMS Copyright The contents of this document are subject to copyright

More information

Analysis of Reliability and Availability of Ironore Vibrating Screen

Analysis of Reliability and Availability of Ironore Vibrating Screen Kritesh Hirwani and Sanjay Kr. Singh 11 Analysis of Reliability and Availability of Ironore Vibrating Screen Kritesh Hirwani and Sanjay Kr. Singh Abstract: In this paper reliability and availability analysis

More information

Appendix B. Glossary of Steam Turbine Terms

Appendix B. Glossary of Steam Turbine Terms Operator s Guide to General Purpose Steam Turbines: An Overview of Operating Principles, Construction, Best Practices, and Troubleshooting. Robert X. Perez and David W. Lawhon. 2016 Scrivener Publishing

More information

AP1000 European 21. Construction Verification Process Design Control Document

AP1000 European 21. Construction Verification Process Design Control Document 2.4 Steam and Power Conversion Systems 2.4.1 Main and Startup Feedwater System See Section 2.2.4 for information on the main feedwater system. Design Description The startup feedwater system supplies feedwater

More information

AMERICAN SOCIETY FOR QUALITY CERTIFIED RELIABILITY ENGINEER (CRE) BODY OF KNOWLEDGE

AMERICAN SOCIETY FOR QUALITY CERTIFIED RELIABILITY ENGINEER (CRE) BODY OF KNOWLEDGE AMERICAN SOCIETY FOR QUALITY CERTIFIED RELIABILITY ENGINEER (CRE) BODY OF KNOWLEDGE The topics in this Body of Knowledge include additional detail in the form of subtext explanations and the cognitive

More information

RSA RELIABILITY & MAINTENANCE CONSULTANCY FIRM

RSA RELIABILITY & MAINTENANCE CONSULTANCY FIRM Dear Sir / Mam, Home Office :Block 27, Lot 10, Phase III, Golden City, Do. Dila, Sta. Rosa, Laguna We would like to offer your company an opportunity to uplift the technical competence of your maintenance

More information

UNIT-II LOAD FORECAST AND UNIT COMMITMENT

UNIT-II LOAD FORECAST AND UNIT COMMITMENT UNIT-II LOAD FORECAST AND UNIT COMMITMENT 2.1 COMPONENT OF SYSTEM LOAD System load characteristics Load is a device that takes energy from the network. The load ranges from a few watt night lamps to mega

More information

Fundamentals of Asset Management. Step 7. Optimize Operations & Maintenance (O&M) Investment A Hands-On Approach

Fundamentals of Asset Management. Step 7. Optimize Operations & Maintenance (O&M) Investment A Hands-On Approach Fundamentals of Asset Management Step 7. Optimize Operations & Maintenance (O&M) Investment A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 Fourth of 5 core questions 4. What are my

More information

Optimal Economic Life Interval Evaluation Method of Transformers

Optimal Economic Life Interval Evaluation Method of Transformers Energy and Power Engineering, 2017, 9, 78-87 http://www.scirp.org/journal/epe ISSN Online: 1947-3818 ISSN Print: 1949-243X Optimal Economic Life Interval Evaluation Method of Transformers Zhen Mei 1*,

More information

TIME DEPENDENT RELIABILITY OF EMRGENCY DIESEL GENERATOR STATION

TIME DEPENDENT RELIABILITY OF EMRGENCY DIESEL GENERATOR STATION Indian J.Sci.Res.1(2) : 453-460, 2014 ISSN:2250-0138(Online) ISSN : 0976-2876 (Print) TIME DEPENDENT RELIABILITY OF EMRGENCY DIESEL GENERATOR STATION SIMA RASTAYESH 1a, SAJJAD BAHREBAR b, AND KAMRAN SEPANLOO

More information

AKTUELLE FORSCHUNGSERGEBNISSE ZUR INSTANDHALTUNG UND WEITERBETRIEB VON WINDTURBINEN

AKTUELLE FORSCHUNGSERGEBNISSE ZUR INSTANDHALTUNG UND WEITERBETRIEB VON WINDTURBINEN AKTUELLE FORSCHUNGSERGEBNISSE ZUR INSTANDHALTUNG UND WEITERBETRIEB VON WINDTURBINEN Lisa Ziegler 26. Windenergietage Warnemünde, 08.11.2017 AWESOME AWESOME = Advanced wind energy systems operation and

More information

Prediction of Life Time of Rail Rubber Pad using Reliability Analysis Method

Prediction of Life Time of Rail Rubber Pad using Reliability Analysis Method IJR International Journal of Railway Vol. 6, No. 1 / March 2013, pp. 13-25 Prediction of Life Time of Rail Rubber Pad using Reliability Analysis Method Dae-Geun Park Abstract Railpad prevents damage of

More information

CESSNA AIRCRAFT COMPANY AIRCRAFT DIVISION WICHITA, KANSAS Report No: RE-GEN-004 Rev B Reliability Substantiation and Program Requirements

CESSNA AIRCRAFT COMPANY AIRCRAFT DIVISION WICHITA, KANSAS Report No: RE-GEN-004 Rev B Reliability Substantiation and Program Requirements CESSNA AIRCRAFT COMPANY AIRCRAFT DIVISION WICHITA, KANSAS 67277 Report No: Reliability Substantiation and Program Requirements DATE: October 24, 2008 Written By: Checked By: Approved By: Approved By: Original

More information

What is Reliability Centered Maintenance? A Brief History of RCM. Reliability Centered Maintenance By Al Rose. August 1, 2002 TECHNICAL BULLETIN 014

What is Reliability Centered Maintenance? A Brief History of RCM. Reliability Centered Maintenance By Al Rose. August 1, 2002 TECHNICAL BULLETIN 014 What is Reliability Centered Maintenance? August 1, 2002 Reliability Centered Maintenance By Al Rose TECHNICAL BULLETIN 014 Reliability-Centered Maintenance (RCM) is the process of determining the most

More information

Electrical Rotating Equipment- Dragline Reliability Approach. Dale Thompson-Senior Dragline Electrical Specialist

Electrical Rotating Equipment- Dragline Reliability Approach. Dale Thompson-Senior Dragline Electrical Specialist Electrical Rotating Equipment- Dragline Reliability Approach Dale Thompson-Senior Dragline Electrical Specialist 1 Agenda Introduction Reliability Definition Approaches to Reliability Modeling Cost Controls

More information

Choosing Appropriate Distribution yb Minitay s17 Software to Analysis System Reliability

Choosing Appropriate Distribution yb Minitay s17 Software to Analysis System Reliability ( Number 8 Choosing Appropriate Distribution yb Minitay s17 Software to Analysis System Reliability Asst. Prof. Dr. Ahmed Abdulrasool Ahmed Department of Mechanical Engineering College of Engineering Baghdad

More information

An Assessment of Wind Availability for Turbine Power Generation in Kano, Nigeria

An Assessment of Wind Availability for Turbine Power Generation in Kano, Nigeria IOSR Journal of Applied Physics (IOSR-JAP) e-issn: 2278-4861.Volume 6, Issue 5 Ver. II (Sep.-Oct. 2014), PP 30-36 An Assessment of Wind Availability for Turbine Power Generation in Kano, Nigeria Joseph

More information

Introduction to Reliability Centered Maintenance

Introduction to Reliability Centered Maintenance One Introduction to Reliability Centered Maintenance I am always excited to discuss Reliability Centered Maintenance (RCM) because I have seen first hand the overwhelming positive results that can be reaped

More information

OPTIMIZING TURNAROUND MAINTENANCE PERFORMANCE

OPTIMIZING TURNAROUND MAINTENANCE PERFORMANCE OPTIMIZING TURNAROUND MAINTENANCE PERFORMANCE Farag Elfeituri 1*, Salah Massoud Elemnifi 2 1 Department of Industrial & Manufacturing Systems Engineering University of Garyounis P.O. Box 9476 Benghazi,

More information

Optimization of the NAS Battery Control System

Optimization of the NAS Battery Control System Optimization of the NAS Battery Control System Background PG&E has purchased a 4MW, 28MWh sodium-sulfur (NAS) battery to be installed October, 2010 in San Jose at Hitachi headquarters. The site was chosen

More information

Focus on Asset Reliability: Cincinnati MSD's O&M Optimization Journey. Don Linn, John Shinn, Jr. and Sam Paske

Focus on Asset Reliability: Cincinnati MSD's O&M Optimization Journey. Don Linn, John Shinn, Jr. and Sam Paske Focus on Asset Reliability: Cincinnati MSD's O&M Optimization Journey Don Linn, John Shinn, Jr. and Sam Paske Metropolitan Sewer District of Greater Cincinnati Serves large portion of Hamilton County population

More information

Power Optimization Center Leveraging plant process data for advanced analytical diagnostics. June 16, 2016

Power Optimization Center Leveraging plant process data for advanced analytical diagnostics. June 16, 2016 Power Optimization Center Leveraging plant process data for advanced analytical diagnostics June 16, 2016 POWER OPTIMIZATION CENTER: OVERVIEW Jamie Dugan Equipment Reliability Manager Mike Batte Fleet

More information

Classification of Probability Densities on the Basis of Pearson Curves with Application to Small Hydro Potential Analysis

Classification of Probability Densities on the Basis of Pearson Curves with Application to Small Hydro Potential Analysis International Journal of Applied Engineering Research ISSN 097-456 Volume 1, Number 4 (017) pp. 14589-14595 Classification of Probability Densities on the Basis of Pearson Curves with Application to Small

More information

Software Reliability Modeling with Test Coverage: Experimentation and Measurement with A Fault-Tolerant Software Project

Software Reliability Modeling with Test Coverage: Experimentation and Measurement with A Fault-Tolerant Software Project 18th IEEE International Symposium on Software Reliability Engineering Software Reliability Modeling with Test Coverage: Experimentation and Measurement with A Fault-Tolerant Software Project Xia Cai and

More information

Arrelic Corporate Brochure

Arrelic Corporate Brochure SCAN IT Arrelic Corporate Brochure Consulting Services Predictive Maintenance Training & Development IT Solutions Predictive Analytics i CONTENTS About Arrelic 02 Our Services Consulting Services 03 Predictive

More information

Probabilistic Issue of Reliability for Power Machinery Operating in Coal Fired Power Plants

Probabilistic Issue of Reliability for Power Machinery Operating in Coal Fired Power Plants Journal of Power and Energy Engineering, 014,, 139-145 Published Online April 014 in SciRes. http://www.scirp.org/journal/jpee http://dx.doi.org/10.436/jpee.014.400 Probabilistic Issue of Reliability for

More information

Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency

Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency S. R. Sunasara 1, J. J. Makadia 2 * 1,2 Mechanical Engineering Department, RK University Kasturbadham, Rajkot-Bhavngar highway,

More information

A Hybrid Group Acceptance Sampling Plan for Lifetimes Having Generalized Pareto Distribution

A Hybrid Group Acceptance Sampling Plan for Lifetimes Having Generalized Pareto Distribution ISSN 1684-8403 Journal of Statistics Volume 19, 2012. pp. 31-42 A Hybrid Group Acceptance Sampling Plan for Lifetimes Having Generalized Pareto Distribution Abstract Jaffer Hussain 1, Abdur Razzaque Mughal

More information

Engineering Thermodynamics

Engineering Thermodynamics Unit 61: Engineering Thermodynamics Unit code: D/601/1410 QCF level: 5 Credit value: 15 Aim This unit will extend learners knowledge of heat and work transfer. It will develop learners understanding of

More information

Australian Journal of Basic and Applied Sciences

Australian Journal of Basic and Applied Sciences AENSI Journals Australian Journal of Basic and Applied Sciences ISSN:99-878 Journal home page: www.ajbasweb.com Reliability Assessment of Cooling Pump For Parts Inventory Planning in Power Plant System,

More information

Energy Advisor. Introduction. Energy Advisor. Product Data Sheet October 2014

Energy Advisor. Introduction. Energy Advisor. Product Data Sheet October 2014 Product Data Sheet Energy Advisor Reduce energy consumption and increase energy visibility with Energy Advisor Manage energy targets with up-to-the minute information across multiple Energy Account Centers

More information

PUMP STATION CONDITION ASSESSMENT PROGRAMS: CASE STUDIES IN NORTH AND SOUTH CAROLINA

PUMP STATION CONDITION ASSESSMENT PROGRAMS: CASE STUDIES IN NORTH AND SOUTH CAROLINA PUMP STATION CONDITION ASSESSMENT PROGRAMS: CASE STUDIES IN NORTH AND SOUTH CAROLINA ABSTRACT Kathryn Benson, PE CH2MHILL; Raleigh, NC kbenson@ch2m.com The most efficient method to assess the condition

More information

Certain Studies on Acceptance Sampling Plans for Percentiles Based on the Modified Weibull Distribution

Certain Studies on Acceptance Sampling Plans for Percentiles Based on the Modified Weibull Distribution International Journal of Statistics and Systems ISSN 973-2675 Volume 12, Number 2 (217), pp. 343-354 Research India Publications http://www.ripublication.com Certain Studies on Acceptance Sampling Plans

More information

Steam balance optimisation strategies

Steam balance optimisation strategies Steam balance optimisation strategies Publicado en Chemical Engineering, Noviembre 2002 Background Optimising a steam balance in a plant with several steam mains pressures is not always a simple intuitive

More information

Fundamentals of Asset Management. Background: Optimized Investment Decision Making A Hands-On Approach

Fundamentals of Asset Management. Background: Optimized Investment Decision Making A Hands-On Approach Fundamentals of Asset Management Background: Optimized Investment Decision Making A Hands-On Approach View 6: AM plan 10-step process Develop Asset Registry Assess Condition, Failure Modes Determine Residual

More information

Reliability Analysis of Mining Equipment Considering Operational Environments- A Case Study

Reliability Analysis of Mining Equipment Considering Operational Environments- A Case Study International Journal of Performability Engineering, Vol. 9, No. 3, May 2013, pp. 287-294. RAMS Consultants Printed in India Reliability Analysis of Mining Equipment Considering Operational Environments-

More information

Use of Reliability Concepts to Support Pas 55 Standard Application to Improve Hydro Power Generator Availability

Use of Reliability Concepts to Support Pas 55 Standard Application to Improve Hydro Power Generator Availability Use of Reliability Concepts to Support Pas 55 Standard Application to Improve Hydro Power Generator Availability Gilberto F. M. de Souza a(*), Erick M.P. Hidalgo a, Claudio C. Spanó b, and Juliano N. Torres

More information

Dynamic Reliability Assessment of Slurry Pumps via Condition Monitoring

Dynamic Reliability Assessment of Slurry Pumps via Condition Monitoring Dynamic Reliability Assessment of Slurry Pumps via Condition Monitoring Introduction Ming J Zuo, PhD, PEng University of Alberta, Canada Email: ming.zuo@ualberta.ca Time-based reliability models and tools

More information

OPPORTUNITIES FOR ENERGY EFFICIENCY AND DEMAND RESPONSE IN CORRUGATED CARDBOARD MANUFACTURING FACILITIES

OPPORTUNITIES FOR ENERGY EFFICIENCY AND DEMAND RESPONSE IN CORRUGATED CARDBOARD MANUFACTURING FACILITIES OPPORTUNITIES FOR ENERGY EFFICIENCY AND DEMAND RESPONSE IN CORRUGATED CARDBOARD MANUFACTURING FACILITIES Sandra Chow BASE Energy, Inc. * San Francisco, CA 94103 Ahmad R. Ganji, Ph.D., P.E. San Francisco

More information

Turbine Efficiency Pump Performance. Using AF AUSTIN REGIONAL SEMINAR Copyright 2017 OSIsoft, LLC Copyright 2017 OSIsoft, LLC

Turbine Efficiency Pump Performance. Using AF AUSTIN REGIONAL SEMINAR Copyright 2017 OSIsoft, LLC Copyright 2017 OSIsoft, LLC Turbine Efficiency Pump Performance Using AF CPS Energy San Antonio s Municipal Gas & Electric Diversified with Coal, Gas, Solar & Wind Business Decision Enterprise Asset Customer Downtown decision Comes

More information

Maintenance Engineering and Management

Maintenance Engineering and Management Maintenance Engineering and Management Smooth running Condition monitoring Performance change detectable Condition monitoring Impending failure Failed K. Venkataraman Maintenance Engineering and Management

More information

Development of a Condition Monitoring Framework for Water Corporation Assets.

Development of a Condition Monitoring Framework for Water Corporation Assets. Development of a Condition Monitoring Framework for Water Corporation Assets. Aoife Breathnach Kecheng Shen Melinda Hodkiewicz School of Mechanical and Chemical Engineering Chris Traianou Barry Parker

More information

Driving your targets

Driving your targets Driving your targets World-class Maintenance: Operation excellent Maintenance activities ARE YOU ABLE TO FOLLOW THE RIGHT PRIORITY? Maintenance strategy for reliability, productivity and efficiency WHEREVER

More information

ENERGY MODEL FOR AN INDUSTRIAL PLANT USING GEOTHERMAL STEAM IN NEW ZEALAND

ENERGY MODEL FOR AN INDUSTRIAL PLANT USING GEOTHERMAL STEAM IN NEW ZEALAND ENERGY MODEL FOR AN INDUSTRIAL PLANT USING GEOTHERMAL STEAM IN NEW ZEALAND G.W. Hotson 1 and G. Everett 2 1 Project Engineer, Fletcher Challenge Paper Australasia Ltd, Private Bag, Kawerau, New Zealand

More information

RELIABILITY ANALYSIS OF ELECTRONIC EQUIPAMENT BASED ON WARRANTY FAILURE DATABASE

RELIABILITY ANALYSIS OF ELECTRONIC EQUIPAMENT BASED ON WARRANTY FAILURE DATABASE ABCM Symposium Series in Mechatronics - Vol. 3 - pp.395-404 Copyright c 2008 by ABCM RELIABILITY ANALYSIS OF ELECTRONIC EQUIPAMENT BASED ON WARRANTY FAILURE DATABASE Danielli Villar Lemes Escola Politécnica

More information

OPTIMIZATION OF PARAMETERS FOR HEAT RECOVERY STEAM GENERATOR (HRSG) IN COMBINED CYCLE PLANTS

OPTIMIZATION OF PARAMETERS FOR HEAT RECOVERY STEAM GENERATOR (HRSG) IN COMBINED CYCLE PLANTS OPTIMIZATION OF PARAMETERS FOR HEAT RECOVERY STEAM GENERATOR (HRSG) IN COMBINED CYCLE PLANTS Muammer Alus, Milan V. Petrovic University of Belgrade-Faculty of Mechanical Engineering, Laboratory of Thermal

More information

Wastewater Minimization in Process Industry Through Pinch Technology:

Wastewater Minimization in Process Industry Through Pinch Technology: WASTEWATER MINIMIZATION IN PROCESS 101 Jr. of Industrial Pollution Control 22 (1)(2006) pp 101-110 Enviromedia Printed in India. All rights reserved Wastewater Minimization in Process Industry Through

More information

PJM Manual 22: Generator Resource Performance Indices Revision: 17 Effective Date: April 1, Prepared by Resource Adequacy Planning

PJM Manual 22: Generator Resource Performance Indices Revision: 17 Effective Date: April 1, Prepared by Resource Adequacy Planning PJM Manual 22: Generator Resource Performance Indices Revision: 17 Effective Date: April 1, 2017 Prepared by Resource Adequacy Planning PJM 2017 Table of Contents Table of Contents Table of Exhibits...3

More information

MAINTENANCE ENGINEERING BUREAU USING MAINTENANCE DATA TO DRIVE IMPROVEMENT

MAINTENANCE ENGINEERING BUREAU USING MAINTENANCE DATA TO DRIVE IMPROVEMENT MAINTENANCE ENGINEERING BUREAU USING MAINTENANCE DATA TO DRIVE IMPROVEMENT S Safi & B Bigdeli Covaris Pty Ltd Summary: This paper presents an objective methodology for maintenance data analysis. The purposes

More information

ISF Institute of Research and Education (IIRE)

ISF Institute of Research and Education (IIRE) ISF Institute of Research and Education (IIRE) IIRE JOURNAL OF MARITIME RESEARCH & DEVELOPMENT (IJMRD) Volume 2 Issue 1 May 2018 The IIRE Journal of Maritime Research and Development (IJMRD) provides a

More information

Non-Operational Stockpile Reliability Prediction Methods Using Logistic Regression Techniques

Non-Operational Stockpile Reliability Prediction Methods Using Logistic Regression Techniques Non-Operational Stockpile Reliability Prediction Methods Using Logistic Regression Techniques Lou Gullo Raytheon Missile Systems October, 2013 Copyright 2013 Raytheon Company. All rights reserved. Customer

More information

Reliability From A Service Provider s Perspective (Mark Adams, Senior Director: Reliability, Quality and Network Assets) May, 2009

Reliability From A Service Provider s Perspective (Mark Adams, Senior Director: Reliability, Quality and Network Assets) May, 2009 Reliability From A Service Provider s Perspective (Mark Adams, Senior Director: Reliability, Quality and Network Assets) May, 2009 Observations from a Service Provider For many equipment suppliers, life

More information

Developing a Quantitative Risk-based Methodology for Maintenance Scheduling Using Bayesian Network

Developing a Quantitative Risk-based Methodology for Maintenance Scheduling Using Bayesian Network 235 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 48, 2016 Guest Editors: Eddy de Rademaeker, Peter Schmelzer Copyright 2016, AIDIC Servizi S.r.l., ISBN 978-88-95608-39-6; ISSN 2283-9216 The

More information

Energy Saving Efforts in Indian Ammonia Urea Plants

Energy Saving Efforts in Indian Ammonia Urea Plants Energy Saving Efforts in Indian Ammonia Urea Plants M A NISH G OSWAMI Deputy c h ief (Technical) Fertiliser association of India New Delhi, India tech@faidelhi.org Capacity & Production Of Fertiliser Products

More information

International Journal of Railway Research, Vol. 4, No. 1, (2017), International Journal of

International Journal of Railway Research, Vol. 4, No. 1, (2017), International Journal of International Journal of Railway Research, Vol. 4, No. 1, (2017), 1-11 1. Introduction Railway is a complex system because it comprises a mix of components with different age and status that have to work

More information

Methodology for Selecting the Preferred Networked Computer System Solution for Dynamic Continuous Defense Missions

Methodology for Selecting the Preferred Networked Computer System Solution for Dynamic Continuous Defense Missions Methodology for Selecting the Preferred Networked Computer Solution for Dynamic Continuous Defense Missions San Diego Dr. Glenn S. Tolentino Command & Control and Enterprise Engineering Department SPAWAR

More information

International Journal of Railway Research

International Journal of Railway Research International Journal of Railway Research, Vol. 4, No. 1, (2017), 1-12 ` International Journal of Railway Research ISSN: 2361-5376 Reliability Analysis of Switches and Crossings A Case Study in Swedish

More information

4»IEEE POWER SYSTEMS .*ISK ASSESSMENT OF. Models, Methods, and Applications. Wiley. Ph.D., Fellow, IfE, CAE, EIC SECOND EDITION

4»IEEE POWER SYSTEMS .*ISK ASSESSMENT OF. Models, Methods, and Applications. Wiley. Ph.D., Fellow, IfE, CAE, EIC SECOND EDITION .*ISK ASSESSMENT OF POWER SYSTEMS Models, Methods, and Applications SECOND EDITION Wenyuan Li, Ph.D., Fellow, IfE, CAE, EIC Chongqing University, China BC H> Canada, n IEEE PRESS SERIES ON POWER ENGINEERING

More information

Due Diligence: Efficiency Increase in Existing Power Stations - a Practice Report-

Due Diligence: Efficiency Increase in Existing Power Stations - a Practice Report- Due Diligence: Efficiency Increase in Existing Power Stations - a Practice Report- Nick Peters, Dr. Wolfgang A. Benesch Steag Energy Services Germany 1 Background and methodology Steag owns and operates

More information

Digital FM The New Era (Case Study: Burj Khalifa) Bashar Kassab, Director HFM, Emaar Properties

Digital FM The New Era (Case Study: Burj Khalifa) Bashar Kassab, Director HFM, Emaar Properties Digital FM The New Era (Case Study: Burj Khalifa) Bashar Kassab, Director HFM, Emaar Properties World Voice Water Feature Burj Khalifa s Facts & Figures W O R L D R E C O R D S Tallest building. Tallest

More information

Quiz Questions. For Process Integration. Fill in the blanks type Questions

Quiz Questions. For Process Integration. Fill in the blanks type Questions Quiz Questions For Process Integration Fill in the blanks type Questions 1. is the key parameter used in the Pinch Technology. ( T min ) 2. In onion diagram pinch technology in applied at. (the boundary

More information

1.Introduction. Hazard rate. Local time

1.Introduction. Hazard rate. Local time 1.Introduction This document discusses first important aspects of maintenance optimization in general. This involves interval optimization of component maintenance, optimum time for renewal of systems,

More information

LIFE CYCLE COSTING USED FOR JUSTIFYING TRANSITION TO PREDICTIVE MAINTENANCE STRATEGIES 1. INTRODUCTION

LIFE CYCLE COSTING USED FOR JUSTIFYING TRANSITION TO PREDICTIVE MAINTENANCE STRATEGIES 1. INTRODUCTION Journal of Machine Engineering, Vol., No. 4, 0 reliability, life cycle costing, predictive maintenance Jerzy MIKLER LIFE CYCLE COSTING USED FOR JUSTIFYING TRANSITION TO PREDICTIVE MAINTENANCE STRATEGIES

More information

Study into the Life Cycle Cost of Ductile Iron and Stainless Steel Pumps

Study into the Life Cycle Cost of Ductile Iron and Stainless Steel Pumps Study into the Life Cycle Cost of Ductile Iron and Stainless Steel Pumps Daniel Habekost Dr. Jeremy Leggoe School of Mechanical Engineering, University of Western Australia Dr. Melinda Hodkiewicz School

More information

A PERFORMANCE MODELING AND DECISION SUPPORT SYSTEM FOR A FEED WATER UNIT OF A THERMAL POWER PLANT

A PERFORMANCE MODELING AND DECISION SUPPORT SYSTEM FOR A FEED WATER UNIT OF A THERMAL POWER PLANT A PERFORMANCE MODELING AND DECISION SUPPORT SYSTEM FOR A FEED WATER UNIT OF A THERMAL POWER PLANT S. Gupta1, P.C. Tewari2 and A.K. Sharma3 1 Department of Mechanical Engineering HCTM, Kaithal (Haryana),

More information