Improvements to Florida s Rail Network. CSX Transportation, Inc. AMEC Environment & Infrastructure, Inc.

Size: px
Start display at page:

Download "Improvements to Florida s Rail Network. CSX Transportation, Inc. AMEC Environment & Infrastructure, Inc."

Transcription

1 Improvements to Florida s Rail Network CSX Transportation, Inc. AMEC Environment & Infrastructure, Inc. Florida Brownfield Conference October 29, 2012

2 Introduction Keith A. Brinker CSX Transportation, Inc. W. Troy Neisz AMEC Environment & Infrastructure, Inc.

3 Improvements to Florida s Rail Network Orlando Commuter Rail Project Reallocation of Freight Operations Along Existing A-line and S-line Routes Construct Freight Rail Support Tracks at Three Locations along the Commuter Rail Corridor Construct New Intermodal/Automotive Terminal Facility in Winter Haven

4 Orlando Commuter Rail Project 61.5-mile commuter rail system from Deland to Poinciana FDOT acquired approximately 61.5 miles of CSXT A-line and additional adjacent properties Passenger service for the commuter rail network to commence in 2014

5 Operations and Infrastructure Changes FDOT acquired 61.5 miles of current CSXT A-line. The A-line generally parallels Interstate 4 and US Certain A-line freight traffic to be redirected to S-line. CSXT S-line corridor parallels US 301. To handle the additional freight traffic, the CSXT S-line corridor must have improvements to the existing infrastructure (signals, sidings, bridges, cross-overs, etc.) for additional traffic. Source: FDOT Relocation of Orlando CSXT Intermodal facility and consolidation of Orlando/Tampa Automotive facilities to the new state of the art Winter Haven Intermodal/Automotive facility.

6 Environmental Permitting & Compliance for Rail Construction Environmental Constraints Analysis Stream Surveys Wetland Delineations Hydraulic and Hydrologic Analysis Geotechnical Assessments Archaeological Surveys Endangered Species Erosion and Sediment Control (ESC) Design Mitigation Plans and Over Site Environmental Permitting Environmental Permit Compliance ESC QA Inspections

7 Typical Project Sequence of Activities Initial Site Visit Complete Constraints Analysis Assist with Final Site Selection Detailed Field Surveys Construction Plans ESC Design Final Construction Plans Permit Submissions Permit Approvals Construction ESC Site Inspections In-Service

8 Typical Environmental Permits for Florida Projects USACE Wetland and Stream Impact Permit (404 Permit) Environmental Resources Permit through the local Water Management District offices - including the State 401 Water Quality Certifications Threatened and Endangered Species Take Permits (USFWS and FDEP) Florida Division of Historical Resources Concurrence letters State, County, and Local Floodplain Permits (FEMA) FDEP Stormwater Permits (NPDES) o Submit Notice of Intent (NOI) o Weekly/Post-rain site inspections o Monthly QA inspections by outside consultant

9 Portfolio of S-line Projects CSXT identified 24 potential S-line Infrastructure Improvement Projects Prioritized to 16 Projects to be fully permitted and constructed Construction commenced in 2010 o Four projects in service o Nine projects under construction

10 Winter Haven Terminal Facility In February 2007, AMEC and BDA were requested to assist CSXT and RPI with the environmental permitting for the Winter Haven Project. 318 acres for the terminal facility with over 46 acres of wetland impacts miles of newly constructed Pollard Road Extension with approximately 2 acres of wetland impacts.

11 Winter Haven Intermodal/Automotive Terminal Site Plan Intermodal Terminal: - 15,000 Processing Track Wheeled Parking Spaces - 2,100 Container Stacking Capacity

12 Pollard Road Extension Access Road to Terminal Old Bartow Lake Wales Road Peace Creek Bridge Pollard Rd extension - 6 month build out Bridge Open July 2012 to construction traffic

13 Winter Haven Intermodal/Automotive Terminal Environmental Efficiencies Electric Wide-Span Cranes will reduce carbon emissions Administration Building to be Certified LEED Silver Personal vehicle parking lots to be pervious concrete Extra measures taken to treat the drainage runoff

14 Winter Haven Intermodal/Automotive Terminal - Construction Status Pollard Road Open July 2012 Terminal and Track construction underway Lift equipment to be delivered and assembled 2Q 2013 Terminal Open April 2014

15 Environmental Concerns - Wetland Areas Crawford Baldwin-Fouraker Winter Haven CSXT minimized and avoided impacts where possible. Worked with WMD to offset wetland impacts by purchase mitigation credits from a USACE-approved mitigation bank.

16 Environmental Concerns Threatened & Endangered Species Eastern Indigo Snake State-Listed Gopher Tortoise American Bald Eagles Florida Scrub Jays Sand Skink Sherman Fox Squirrel Wood Stork Gopher Tortoise

17 Environmental Considerations - Plant Species Plant Rescue Conservation Coordination with Bok Tower Gardens for the Transplantation and Conservation of Protected Plants (Scrub Lupine, Britton s Beargrass and Florida Bonamia)

18 Questions/Comments THANK YOU!!!

Intermodal Port Strategy AAPA Vancouver Conference November 6, 2013

Intermodal Port Strategy AAPA Vancouver Conference November 6, 2013 Intermodal Port Strategy AAPA Vancouver Conference November 6, 2013 Intermodal industry volume has steadily grown North American Intermodal Volume (1980 2012) Units in Millions Volume has increased more

More information

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION. Project Commitment. Public Yes Design/ Permitting (Prior to Construction Beginning)

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION. Project Commitment. Public Yes Design/ Permitting (Prior to Construction Beginning) Project Development & Environment Environmental Document Approval : TBD Robin Rhinesmith FM#: 432734 1 Environmental Document Type: (Type 1 or 2 CE, EA, EIS, SEIR, or NMSA): EA 432734 1 Due to the presence

More information

COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING

COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING Draft Environmental Assessment Five-Year Capital Improvement Program Punta Gorda Airport, Charlotte County, Florida March 2019 Project Overview The Charlotte County

More information

Rail Enterprise Presentation

Rail Enterprise Presentation Rail Enterprise Presentation Rail Enterprise: Work Program Fiscal Years 2012/13 2016/17 Product $1,109.1 98.9% Product Support $12.7 1.1% (in Millions) 12/13 13/14 14/15 15/16 16/17 Total Product 262.1

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Michael J. Usen, AICP Sustainability Program Coordinator King County Metro Transit Seattle, Washington

Michael J. Usen, AICP Sustainability Program Coordinator King County Metro Transit Seattle, Washington Strategies and Tools for Sustainable Infrastructure Michael J. Usen, AICP Sustainability Program Coordinator King County Metro Transit Seattle, Washington King County Metro Transit Infrastructure 390,000+

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

COON CREEK WATERSHED DISTRICT PERMIT REVIEW 16-054 Woodland Creek Wetland Banking Restoration Project, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 11 FILE NUMBER: 16-054 ITEM: Woodland Creek

More information

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9 January 2011 Table of Contents Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9 Table of Figures and Tables Figure 1 Florida Rail System Map... 2 Figure

More information

Transportation Project Delivery Process & Mitigation

Transportation Project Delivery Process & Mitigation Florida Department of TRANSPORTATION Transportation Project Delivery Process & Mitigation Marjorie Kirby State Environmental Program Administrator State Environmental Management Office July 2015 Florida

More information

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS). This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW Applicant: Reviewer: Permit No.: The following tables contain a checklist of the requirements before a review for a Site Development Permit submittal will be accepted. Not all requirements pertain to every

More information

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION November, 2014 TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY POND SITING REPORT Summary of section 1.0 & 2.0. Specify datum used in the design calculations and the construction plans.

More information

SR 50 PD&E Study

SR 50 PD&E Study SR50 Project Development & Environment Study Public Hearing November 1, 2011 SR 50 PD&E Study 427056-1-22-01 1 Purpose of the Public Hearing Afford persons the opportunity to express their views about

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Ave NE Ham Lake, MN 55304

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Ave NE Ham Lake, MN 55304 18-151 Meyer Garage, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: January 28, 2019 AGENDA NUMBER: 9 FILE NUMBER: 18-151 ITEM: Meyer Garage RECOMMENDATION: Approve with 2 Stipulations

More information

GUIDELINES FOR SUBDIVISION PERMITTING

GUIDELINES FOR SUBDIVISION PERMITTING GUIDELINES FOR SUBDIVISION PERMITTING To provide information to owner and /or developer, contractor, and engineering desiring to obtain Subdivision constructions permit. Step 1 - Development Review Meeting

More information

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

Concept, Feasibility & Mobility Studies. Southport Connector Expressway Concept, Feasibility & Mobility Studies Southport Connector Expressway Project Background FDOT Alternative Corridor Evaluation (ACE) Study Advanced Notification Package distributed September 2012 ETDM

More information

Pullman Airport Expansion Permitting Process Overview, Wetlands and Mitigation. October 25, 2017

Pullman Airport Expansion Permitting Process Overview, Wetlands and Mitigation. October 25, 2017 Pullman Airport Expansion Permitting Process Overview, Wetlands and Mitigation October 25, 2017 Overview of the Airport Project The Pullman Airport Expansion Project includes: Realignment of Runway 6/24

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

Public Input Meeting. Proposed Central New York Wetland Mitigation Bank. March 20, 2017

Public Input Meeting. Proposed Central New York Wetland Mitigation Bank. March 20, 2017 Public Input Meeting Proposed Central New York Wetland Mitigation Bank March 20, 2017 What in the world is wetlands mitigation? What is a wetland? Hydrology (surface water or groundwater) Hydric soil Hydrophytes

More information

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610 REPLY TO ATTENTION OF May 8, 2015 Regulatory Division South Permits Branch Tampa

More information

NOW LEASING 407, 400 SQUARE FEET FLORIDASGATEWAY.COM

NOW LEASING 407, 400 SQUARE FEET FLORIDASGATEWAY.COM NOW LEASING 407, 400 SQUARE FEET BUILT TO MOVE MORE WITH LESS FLORIDA S GATEWAY The Region's Premier Intermodal Logistics Center WINTER HAVEN, FL At Florida s Gateway, ship more goods at a faster, repeatable

More information

Wetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012

Wetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012 DuPage County Stormwater Ordinance Update- Wetlands and Buffers PRESENTED BY: MARY BETH FALSEY WETLAND SPECIALIST Wetlands Section 15-18.A.1.a: If a Stormwater Administrator has the expertise, he/she can

More information

5. Other Environmental Consequences

5. Other Environmental Consequences 5. Other Environmental Consequences 5.1 Unavoidable Adverse Impacts Impacts to the following environmental resources were evaluated for Alternative D, the preferred alternative, to determine if they would

More information

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION PERMIT GUIDELINES FOR PHASED NPDES STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY PERMITS, CHAPTER 102 EROSION AND SEDIMENT

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2014-00083-1 Date: December 22, 2014 Comments Due: January 16, 2015 TO WHOM

More information

CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting

CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting CFWI STORMWATER SUBTEAM PROJECTS REPORT Steering Committee Meeting October 24, 2014 Stephen R. Miller, PE Subteam Leader Other Stormwater, Dispersed, Storage, etc. County CFWI SubRegions Project Name Implementing

More information

Final Design Guideline

Final Design Guideline Final Design Guideline May, 2016 July, 2011 Check the Capital Project Delivery website to ensure this is the current version Table of Contents Purpose... 1 Introduction... 1 FD Support... 1 Roadway and

More information

CITY OF SANIBEL Planning Department - Public Works Department STORMWATER & DE-WATERING EROSION CONTROLS (WITH APPLICATION INFORMATION)

CITY OF SANIBEL Planning Department - Public Works Department STORMWATER & DE-WATERING EROSION CONTROLS (WITH APPLICATION INFORMATION) CITY OF SANIBEL Planning Department - Public Works Department STORMWATER & DE-WATERING PERMIT No: TAX STRAP NUMBER: - 46 - - T -. STREET ADDRESS OF PROPERTY: PROJECT DESCRIPTION: SITE CONTACT: NAME TITLE

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot 17-082 Van Sloun Residence, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: May 8, 2017 AGENDA NUMBER: 17 FILE NUMBER: 17-082 ITEM: Van Sloun Residence RECOMMENDATION: Approve with

More information

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830 THE TIMMONS REPORT Draft Executive Summary of Preliminary Engineering, Environmental and Master Planning Report for Meadowville Technology Park Chesterfield County, Virginia Submitted to: Mr. Jim Dunn

More information

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Lane NE East Bethel, MN 55005

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Lane NE East Bethel, MN 55005 18-115 South Terrace Cove, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: July 23, 2018 AGENDA NUMBER: 8 FILE NUMBER: 18-115 ITEM: South Terrace Cove RECOMMENDATION: Approve with

More information

Stormwater Management - Basic Overview for Municipal Employees

Stormwater Management - Basic Overview for Municipal Employees Stormwater Management - Basic Overview for Municipal Employees October 13 th, 2011 Scott D. Cook Environmental Program Specialist 2 NYSDEC - Region 7 Syracuse Division of Water 315-426-7502 sdcook@gw.dec.state.ny.us

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,

More information

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida LOCATION HYDRAULICS REPORT SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: FLORIDA DEPARTMENT OF

More information

NORTH I-75 MASTER PLAN Summary Report

NORTH I-75 MASTER PLAN Summary Report NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties,

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 J O I N T P U B L I C N O T I C E CHARLESTON AND SAVANNAH DISTRICTS- US ARMY

More information

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts

More information

Winter Haven, FL & the Peace Creek Watershed. Howard T. Odum Center for Wetlands University of Florida

Winter Haven, FL & the Peace Creek Watershed. Howard T. Odum Center for Wetlands University of Florida Winter Haven, FL & the Peace Creek Watershed Howard T. Odum Center for Wetlands University of Florida Sustainable Water Resource Management: the use of water resources in a way that meets the needs of

More information

Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012

Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012 Carmel River Reroute & San Clemente Dam Removal Project (PLN110373) Monterey County Planning Commission Workshop July 25, 2012 URS1 Workshop Agenda 1. Background 2. Project Overview 3. Tree Removals/Mitigation

More information

Neptune Cargill Overpass Extension

Neptune Cargill Overpass Extension Project Environmental Review UPDATE November 23, 2017 Northshore Waterfront Liaison Committee Teck Agenda Project Objectives Project Description Project Discussion VFPA PER process Project Review Status

More information

Stibnite Gold Project. Environmental Impact Statement (EIS)

Stibnite Gold Project. Environmental Impact Statement (EIS) Stibnite Gold Project Environmental Impact Statement (EIS) 1 Mining History Coeur d Alene Stibnite Mining District McCall Cascade BOISE IDAHO 2 Mining Laws and Regulations on National Forest System lands

More information

Items in this checklist identify the base requirements that are to be provided by the design professional.

Items in this checklist identify the base requirements that are to be provided by the design professional. The Project Manager or other Owner designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of the Owner. The Plan Reviewer s role is to review the submitted

More information

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL JOINT MEETING OCTOBER 12, 2018 Future Corridors Auburndale Winter Haven ILC (CSX Rwy) Tampa Airport

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

Northern Branch Corridor CLC Meeting. June 30, 2008

Northern Branch Corridor CLC Meeting. June 30, 2008 Northern Branch Corridor CLC Meeting June 30, 2008 Agenda Introductions Project Status Environmental Process Technical Findings Capital Costs Next Steps Break Out Areas Introductions Project Status Preliminary

More information

North I-75 Master Plan Summary

North I-75 Master Plan Summary North I-75 Master Plan Summary Florida Section ITE Annual Meeting November 3, 2017 The I-75 Relief Task Force Established by Secretary Boxold in October 2015 with broad membership Overarching goals Provide

More information

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

WRECO LOGO CMYK. Civil Engineering Water Resources Environmental Compliance Geotechnical Engineering

WRECO LOGO CMYK. Civil Engineering Water Resources Environmental Compliance Geotechnical Engineering WRECO LOGO CMYK Civil Engineering Water Resources Environmental Compliance Geotechnical Engineering About WRECO WRECO s civil, hydraulic, geotechnical, and environmental staff aim to meet our clients project

More information

Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology

Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology The Pinellas County Metropolitan Planning Organization s 2035 Long Range

More information

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4 When will the Turnpike have right-of-way and parcel maps available? We anticipate receipt of 100% plans, parcel sketches and legal descriptions in late June or early July of 2015. When will the Turnpike

More information

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist For Middle Tennessee State University (MTSU) projects, the Project Manager or other MTSU designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of MTSU.

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination 4-65 Interstate 73 FEIS: I-95 to the Myrtle Beach Region 4-66 Comment noted. The use of existing roadways was considered during alternative development (refer to Chapter 2, Section 2.1, page 2-1 and the

More information

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009 POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report ADOPTED June 18, 2009 TABLE OF CONTENTS CHAPTER 1 Introduction and Prior Planning Effort...Page 1-1 CHAPTER 2 Population and Employment

More information

S.R. 2027, Section 02B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

S.R. 2027, Section 02B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat S.R. 2027, Section 02B PADEP Environmental Assessment Form Description of Aquatic Habitat Water resources that exist within the project area include Hosensack Creek and two palustrine emergent (PEM) wetlands.

More information

ARTICLE 14: ADMINISTRATION

ARTICLE 14: ADMINISTRATION ARTICLE 14: ADMINISTRATION The purpose of this article is to provide guidance on the responsibilities of both the District and an authorized municipality for the enforcement of the regulations contained

More information

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1 City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated

More information

Tall Trees HOA Update

Tall Trees HOA Update A Regional Transportation Solution Tall Trees HOA Update June 9, 2016 Meeting Agenda I. Brief Section Update II. List of Community Concerns Received III. Responses to Each Concern IV. Recap Action Items

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS - MOBILE DISTRICT BIRMINGHAM FIELD OFFICE 218 SUMMIT PARKWAY, SUITE 222 HOMEWOOD, AL 35209

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS - MOBILE DISTRICT BIRMINGHAM FIELD OFFICE 218 SUMMIT PARKWAY, SUITE 222 HOMEWOOD, AL 35209 DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS - MOBILE DISTRICT BIRMINGHAM FIELD OFFICE 218 SUMMIT PARKWAY, SUITE 222 HOMEWOOD, AL 35209 CESAM-RD-I-N December 7, 2012 PUBLIC NOTICE NO. SAM-2012-01506-LCB

More information

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706) Memo To: From: cc: Local Issuing Authorities, Design Professionals, Plan Reviewers and Other Interested Parties The Georgia Soil and Water Conservation Commission and the Georgia Environmental Protection

More information

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL 36628-0001 CESAM RD-A April 15, 2018 PUBLIC NOTICE NO. SAM-2018-01191-DCH JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

University of Illinois at Urbana-Champaign April 2, 2010

University of Illinois at Urbana-Champaign April 2, 2010 1 1 CSXT Network Planning: The View in 2010 University of Illinois at Urbana-Champaign April 2, 2010 1 CSX connects the nation and the globe CSX facts: 30,000000 employees 21,000 route miles Chicago Buffalo

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS I-694/ I-494/ I-94 Interchange Improvements State Project No. 8286-81 Prepared by: Minnesota Department of Transportation July, 2018 CONTENTS STATEMENT OF ISSUE... 2 ADMINISTRATIVE

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. KTJ 314, LLC Blaine, MN 55449

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. KTJ 314, LLC Blaine, MN 55449 18-118 ABRA Auto Body, Page 1 of 8 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 13, 2018 AGENDA NUMBER: 14 FILE NUMBER: 18-118 ITEM: ABRA Auto Body RECOMMENDATION: Approve with 6 Stipulations

More information

FDOT Innovative Approaches to Satisfying MS4 Permit & TMDL Requirements

FDOT Innovative Approaches to Satisfying MS4 Permit & TMDL Requirements FDOT Innovative Approaches to Satisfying MS4 Permit & TMDL Requirements Presented by: Applied Technology & Management, Inc. Mr. Steven Peene, Ph.D., Water Resources Director October 15, 2015 10 th Annual

More information

FROM THE CHAIR By: Michael Dorweiler, AICP 2007 Chairman for the Tampa Bay Applications Group DATES TO REMEMBER

FROM THE CHAIR By: Michael Dorweiler, AICP 2007 Chairman for the Tampa Bay Applications Group DATES TO REMEMBER An Open Forum for Transportation-Related Issues TAMPA BAY APPLICATIONS GROUP February 2007 DATES TO REMEMBER Meeting dates for Tampa Bay Applications Group Year 2007 February 22 May 17 August 23 November

More information

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE EDGE OF PAVEMENT EXIST SIDEWALK PROPOSED SIDEWALK PROPOSED SIDEWALK EXIST PIPE DBI SD 12 FT 12 FT LANDSCAPING LANDSCAPING EXIST DITCH TO BE REMOVED EXISTING PLAN (RIGHT SIDE SHOWN, LEFT SIDE SIMILAR) PROPOSED

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum To: Marlon Bizerra, PE From: Thirulokesh Krishnan Email: thirulokesh.krishnan@atkinsglobal.com Phone: 210.321.2019 Date: Nov 25, 2014 Ref: cc: Kim Warren, Doug Reed, PE Subject: SR 60 Grade Separation

More information

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 I. Purpose The purpose of this policy is to address home and property drainage issues relating to stormwater

More information

Instructions for the SDDOT Categorical Exclusion Checklist and Environmental Commitments Checklist

Instructions for the SDDOT Categorical Exclusion Checklist and Environmental Commitments Checklist Instructions for the SDDOT Categorical Exclusion Checklist and South Dakota Department of Transportation Office of Project Development Environmental Becker-Hansen Building 700 E. Broadway Ave. Pierre,

More information

Post-Development Stormwater Runoff Performance Standards

Post-Development Stormwater Runoff Performance Standards Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final

More information

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat

S.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat S.R. 4007, Section 14B PADEP Environmental Assessment Form Description of Aquatic Habitat Cresheim Creek is the only water resource that exists within the project area. No jurisdictional wetlands were

More information

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY The Indian Creek Watershed covers a 38 square mile area in southern Lake County, Illinois that drains 24,116 acres before discharging into the Des Plaines

More information

AASHTO Subcommittee on Design

AASHTO Subcommittee on Design Stormwater Regulations and Transportation: The Maine Department of Transportation Experience AASHTO Subcommittee on Design Annual Meeting - Portland, Maine June 12, 2012 Stephen W. Tibbetts, PE Senior

More information

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN 1 PRESENTERS David Bourff, Director of Environmental Planning Simon Davies, LEED AP, Environmental Scientist Summer O Brien, PWS, Senior Environmental Scientist Contact Information: RW Armstrong Union

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

Florida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland

Florida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland Florida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland DMMA Facility Authored by Lori Brownell, P.E. and John

More information

Sandpoint Junction Connector

Sandpoint Junction Connector Sandpoint Junction Connector BNSF Railway MAY 23, 2018 BNSF is a Leading Railroad A Berkshire Hathaway, Inc. company 32,500 route miles in 28 states and 3 Canadian provinces 42,000 employees Approximately

More information

Project Planning area. King County Department of Transportation Road Services Division

Project Planning area. King County Department of Transportation Road Services Division NE Novelty Hill Road Transportation Improvement Citizen Advisory Group Presentation Project Planning area King County Department of Transportation Road Services Division i i February 25, 2009 Why are we

More information

Public Notice. Applicant: BNSF Railway Company Project No.: SWF Date: November 27, 2018

Public Notice. Applicant: BNSF Railway Company Project No.: SWF Date: November 27, 2018 Public Notice Applicant: BNSF Railway Company Project No.: SWF-2018-00246 Date: November 27, 2018 The purpose of this public notice is to inform you of a proposal for work in which you might be interested.

More information

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District Notice of Intent to Prepare a Draft Environmental Impact Statement for the Proposed Jasper Ocean Terminal in Jasper County,

More information

Overview of Section 2

Overview of Section 2 Overview of Section 2 2.0 Section 2 addresses Steps 1 through 3 of the GESC Permit Process: Step 1. Confirm that a Temporary Batch Plant, Standard GESC, Annual Maintenance GESC, or Small Utility GESC Permit

More information

General Construction Permit (GCP) Storm Water Inspections. Scott Bulgrin Pueblo of Sandia

General Construction Permit (GCP) Storm Water Inspections. Scott Bulgrin Pueblo of Sandia General Construction Permit (GCP) Storm Water Inspections Scott Bulgrin Pueblo of Sandia Storm Water The 1987 Amendments to the CWA set the process of controlling storm water pollution into motion. In

More information

Bank Stabilization, Flood Reduction and Water Quality Improvement Design Build Project. ASFPM 2017 Presenter: Ajay Jain, PE, CFM, Practice Leader

Bank Stabilization, Flood Reduction and Water Quality Improvement Design Build Project. ASFPM 2017 Presenter: Ajay Jain, PE, CFM, Practice Leader Bank Stabilization, Flood Reduction and Water Quality Improvement Design Build Project Presenter: Ajay Jain, PE, CFM, Practice Leader PROJECT LOCATION 2 ILLINOIS ROUTE 25 PROJECT LOCATION / CURRENT REGULATORY

More information

EXHIBIT A SCOPE OF SERVICES FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT IV DISTRICT-WIDE MITIGATION, WILDLIFE AND ENVIRONMENTAL SUPPORT SERVICES

EXHIBIT A SCOPE OF SERVICES FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT IV DISTRICT-WIDE MITIGATION, WILDLIFE AND ENVIRONMENTAL SUPPORT SERVICES EXHIBIT A SCOPE OF SERVICES FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT IV DISTRICT-WIDE MITIGATION, WILDLIFE AND ENVIRONMENTAL SUPPORT SERVICES A. OBJECTIVE The Florida Department of Transportation,

More information

JOINT PUBLIC NOTICE Savannah District/State of Georgia

JOINT PUBLIC NOTICE Savannah District/State of Georgia UEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31402-0889 Regulatory Branch 200003600 JOINT PUBLIC NOTICE Savannah District/State of Georgia The

More information

Public Notice. Applicant: TXI Operating, LP Project No.: SWF Date: April 2, Name: Mr. Darvin Messer Phone Number:

Public Notice. Applicant: TXI Operating, LP Project No.: SWF Date: April 2, Name: Mr. Darvin Messer Phone Number: Public Notice Applicant: TXI Operating, LP Project No.: SWF-2012-00125 Date: April 2, 2013 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It

More information

District One Freight Mobility & Trade Study and Implementation Plan Joint Charlotte & Sarasota/Manatee MPO Board Meeting January 25, 2016 Keith

District One Freight Mobility & Trade Study and Implementation Plan Joint Charlotte & Sarasota/Manatee MPO Board Meeting January 25, 2016 Keith District One Freight Mobility & Trade Study and Implementation Plan Joint Charlotte & Sarasota/Manatee MPO Board Meeting January 25, 2016 Keith Robbins District Freight Coordinator, FDOT District One Purpose

More information

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet Authority s Regional Water Supply Infrastructure The RV Griffin Reserve (RVG) property is owned by the

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 3E From: Date: Subject: Staff May 19, 2017 Council Meeting Local Government Comprehensive Plan Review Draft

More information

NDDOT Erosion & Sediment Control Construction Course

NDDOT Erosion & Sediment Control Construction Course NDDOT Erosion & Sediment Control Construction Course Module 4: Stormwater Pollution Prevention Plan (SWPPP) 1 What s covered in this module? 1. What is a SWPPP 2. Important initial considerations that

More information

Kane County Natural Hazards Mitigation Committee

Kane County Natural Hazards Mitigation Committee Kane County Natural Hazards Mitigation Committee Annual Report For 2004 TO: Members of the Kane County Board FROM: Kane County Natural Hazards Mitigation Committee SUBJECT: Annual Report for 2004 Date:

More information

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA Lena Rivera, P.E., D.WRE (CDM); Lee P. Wiseman, P.E., BCEE (CDM); Scott Mays, P.E. (Volusia County); and George Recktenwald

More information

STORMWATER MANAGEMENT DESIGN REPORT

STORMWATER MANAGEMENT DESIGN REPORT January, 2018 STORMWATER MANAGEMENT DESIGN REPORT (To be later inserted into the Drainage Design Documentation) Note: This report outline is not all-inclusive. There may be situations when information

More information