Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by
|
|
- Jasmin French
- 6 years ago
- Views:
Transcription
1 Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM
2 MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers to collect, convey, and store wastewater originated by local sewer systems. Local systems are operated and maintained by municipalities within the District and those contracted with MMSD. Wastewater flows to the local systems, is collected by the District's intercepting system, and then conveyed to MMSD's two wastewater treatment plants.
3 Main Components of System Metropolitan Interceptor Sewer (MIS) System Inline Storage System (Deep Tunnels) Central Control System
4 Metropolitan Interceptor Sewer (MIS) System A network of sanitary sewers that intercept wastewater from local sanitary and combined sewer systems within service area. Divided into seven subsystems for purposes of flow monitoring analysis and system control. Flows can be diverted between the subsystems for conveyance to either the Jones Island or South Shore treatment facilities, or to the District's Inline Storage System (Deep Tunnels), where they can be stored until the plants have available capacity for treatment.
5 Inline Storage System (Deep Tunnels) Consists of 19.4 miles of tunnels 300 feet below ground that temporarily stores peak wastewater flows that exceed treatment plant or MIS capacities. Can hold up to 405 million gallons of flow and was designed to eliminate overflows from the separated sewer area and to greatly reduce overflows in the combined sewer area. Became fully operational in 1994 and has substantially reduced the number of annual average overflows from about 50 down to two or three.
6 Central Control System Flows are monitored using continuous and intermittent monitors. Continuous monitors are permanently installed in more than 300 locations and use telephone lines and a wireless communication system to transmit data back to MMSD's Central Control System. Intermittent monitors are temporarily installed and rely on field crews to retrieve the data. Along with monitoring flow data, allows remote operation of the conveyance system. Goal is to ensure that treatment plant and conveyance capacity is utilized in the most efficient manner.
7 Wastewater Travel Times
8 Deep Tunnel (In-Line Storage System) 19.4 miles long 300 feet below ground Up to 32 feet in diameter Storage capacity is 405 million gallons. Main component of $2.3 billion Water Pollution Abatement Program started in
9
10
11
12 Sewer Overflows Separated Sewer Area: Storm sewer flow is discharged to local waterways through local storm sewers. Sanitary sewage travels into local sanitary sewers, MIS, and treatment plants. If local sanitary sewers or MIS cannot handle excessive infiltration tion into the sanitary sewer system, it is bypassed to nearby waterways. Flow also diverted to the deep tunnel, where it is stored until the plants have capacity to treat it. Combined Sewer Area: Sanitary sewage travels into local combined sewers, where it mixes with stormwater from runoff. Flow from combined sewers empties into the MIS, and excess flow is bypassed to nearby waterways at combined sewer outfalls. MIS conveys flows to the plants for treatment. If plants are not be able to handle excessive infiltration and inflow; i excess is diverted to the deep tunnel. If the deep tunnel is filled, it is discharged to local waterways.
13 Deep Tunnel System Benefits Improved water quality of local rivers, streams and Lake Michigan: Sewer overflows have been reduced from more than 50 per year to about 3 per year. Sewer system connections for 10,000 homes which formerly used septic systems. Nineteen small treatment plants in outlying areas were closed. Rock from tunnel used to protect against lakefront erosion, reconstruction of McKinley Beach, and creation of Summerfest Island.
14
15 MACRO Model Developed to evaluate the operation of the Milwaukee Metropolitan Sewerage District (MMSD) conveyance and storage system. Fortran Language program. Routing model that simulates movement of flow through Metropolitan Intercepting Sewer (MIS) subsystems to the following locations: Wastewater treatment plants South Shore Wastewater Treatment Plant (SSWWTP) Jones Island Wastewater Treatment Plant (JIWWTP) Inline Storage System (ISS) System overflow outfalls Separate Sewer Overflow (SSO) Outfall Combined Sewer Overflow (CSO) Outfall Flow continuity is maintained throughout each time step of the simulation.
16
17 Blending at Jones Island WWTP
18
19
20
21 Ways to Prevent Overflows Increase treatment / blending capacity Increase storage capacity Somehow manage the treatment and storage to reduce overflows
22 Operating Decisions Adjust VRSSI dynamically, or VRSSI min Increase blending (need permit, and also need to increase chlorination limit) Divert more/less to South Shore WWTP
23 Capital Investments Increase tunnel (ISS) volume: $15/ft 3 Increase pumping capacities from ISS to WWTPs: : 45 cfs pump costs $5 million Increase siphon capacity at JIWWTP (each siphon costs $12 million to upgrade to 400 cfs) Increase treatment capacity at JIWWTP: $1 million/cfs
Chapter 5: Conveyance Assessment 2020 Baseline Conditions
Chapter 5: Conveyance Assessment 2020 Baseline Conditions 5.1 Introduction The performance of the conveyance system for 2020 Baseline conditions is assessed in this chapter using the hydraulic models.
More informationChapter 10: Conveyance Recommended Plan
2020 Facilities Plan Conveyance Report Chapter 10: Conveyance Recommended Plan 10.1 Introduction and Plan Summary 10.1.1 Background As a regional governmental agency providing wastewater treatment and
More informationChapter 2: Description of Treatment Facilities
2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes
More informationChapter 1: Introduction
Chapter 1: Introduction 1.1 Purpose The purpose of this chapter is to describe the contents of the Conveyance Report, which is a component of the Milwaukee Metropolitan Sewerage District (MMSD) 2020 Facilities
More informationTable of Contents Chapter 1: Introduction Chapter 2: Description of Conveyance Facilities
Table of Contents Chapter 1: Introduction... 1-1 1.1 Purpose... 1-1 1.2 Description and Responsibilities of Milwaukee Metropolitan Sewerage District... 1-1 1.3 History of Facilities Planning... 1-1 1.4
More informationDecember 20, MMSD Contract No: M03002P01 MMSD File Code: M009PE000.P7400
December 20, 2011 MMSD Contract No: M03002P01 MMSD File Code: M009PE000.P7400 Determining the Potential of Green Infrastructure to Reduce Overflows in Milwaukee Prepared for: Milwaukee Metropolitan Sewerage
More information2020 Facilities Plan State of the Art Report. Table of Contents. Chapter 1: Introduction Appendix 1A: Production Theory...
Table of Contents Chapter 1: Introduction... 1-1 1.1 Background... 1-1 1.2 Objectives of the Production Theory Analysis... 1-5 Chapter 1 Figures 1-1 RWQMPU Study Area and MMSD 2020 Planning Boundary...
More informationChapter 9: Alternative Analysis
Chapter 9: Alternative Analysis 9.1 Introduction The development and evaluation of alternatives are key elements in the facilities planning process. The purpose of this chapter is to evaluate alternatives
More informationFoster Park Retrieval Shaft
Fort Wayne Tunnel Works Foster Park Retrieval Shaft October 25, 2017 Agenda Brief review of the Tunnel & Shafts project Why we have to be in Foster Park Retrieval Shaft Drop Shaft What the project is going
More informationChapter 3: Analytical Methods/Data Sources
3.1 Introduction Chapter 3: Analytical Methods/Data Sources This chapter describes hydrologic and hydraulic models of the conveyance system and defines the range of application of each. This chapter also
More informationEvaluation of Collection System Design Standards
Wastewater Master Plan DWSD Project No. CS-1314 Evaluation of Collection System Design Standards Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: CDM Table of Contents
More informationTable of Contents. Chapter 1: Introduction Facilities Plan Facilities Plan Report
Table of Contents Chapter 1: Introduction... 1-1 1.1 Purpose... 1-1 1.2 Description and Responsibilities of Milwaukee Metropolitan Sewerage District... 1-1 1.3 History of Facilities Planning... 1-3 1.3.1
More informationTunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions
City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles
More informationSanitary Sewer Rates Now and in the Future
Sanitary Sewer Rates Now and in the Future December 2008 Steve Nielsen, Chief Engineer/Deputy Director Indianapolis Department of Public Works Mark C. Jacob, Program Manager Indianapolis Clean Stream Team
More informationManaging Water Where It Falls: Green Infrastructure in Milwaukee, Wisconsin
Managing Water Where It Falls: Green Infrastructure in Milwaukee, Wisconsin Presented by: Kevin L. Shafer, Executive Director Milwaukee Metropolitan Sewerage District (MMSD) Hosted by the Association of
More informationExecutive Summary. Introduction
Executive Summary Introduction The City of Terre Haute has developed a (CSO LTCP), which describes the measures they will take to reduce the combined sewer overflows and improve water quality in the Wabash
More informationSTATUS OF THE DEEP TUNNEL PROJECT OF GREATER CHICAGO
250 STATUS OF THE DEEP TUNNEL PROJECT OF GREATER CHICAGO by W. J. Bauer Bauer Engineering, Inc. Chicago, Illin o is Banquet Speaker - Thursday Evening - April 17 Construction Work Although no comprehensive
More informationChapter 3: Analytical Methods/Data Sources
Chapter 3: Analytical Methods/Data Sources 3.1 Introduction A large amount of data was collected and analyzed to assess the existing and future conditions in the Milwaukee Metropolitan Sewerage District
More informationTechnical Memorandum No. 1
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment Technical Memorandum No. 1 Multi-Jurisdictional Use Facilities Capital Cost Allocation DRAFT April 17, 2013
More informationDesign and Construction of Local Public and Private Sewers and Ancillary Facilities
Chapter 2 Design and Construction of Local Public and Private Sewers and Ancillary Facilities Subchapter I - General 2.101 Purpose...1 2.102 Applicability...1 2.103 Electronic data...1 2.104 Effect of
More informationPHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017
PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed
More informationNJ Future CSO Permittee Meeting
NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create
More informationInterim Interconnector Sewer Operational Plan
Interim Interconnector Sewer Operational Plan Gary Hickman Plant Manager Jackson Pike Wastewater Treatment Plant Jeff Hall Assistant Plant Manager Southerly Wastewater Treatment Plant Columbus Area Collection
More informationTHE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT
THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL
More informationSomerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility
Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation
More informationENGINEERED SOLUTIONS. Wastewater Solutions
ENGINEERED SOLUTIONS Wastewater Solutions Municipal and Industrial Wastewater Solutions For more than 100 years (since 1904), Contech Engineered Solutions LLC has been a leader in the pipe industry. From
More informationThe South Hartford Conveyance and Storage Tunnel
The South Hartford Conveyance and Storage Tunnel South Hartford The Metropolitan District June 16 th -17 th, 2015 Purpose of This Public Meeting Communicate with Residents Directly Adjacent to the Project
More informationMetropolitan St. Louis Sewer District. CSO LTCP Update EXECUTIVE SUMMARY
Metropolitan St. Louis Sewer District Purpose The Metropolitan St. Louis Sewer District (MSD) provides wastewater and stormwater service to approximately 1.4 million people in a 535-square-mile service
More informationWELCOME TO THE SEPTEMBER EDITION OF THE 2016 M&R SEMINAR SERIES
2006 R&D SEMINAR SERIES WELCOME TO THE SEPTEMBER EDITION OF THE 2016 M&R SEMINAR SERIES SAFETY PRECAUTIONS BEFORE WE BEGIN PLEASE FOLLOW EXIT SIGN IN CASE OF EMERGENCY EVALUATION AUTOMATED EXTERNAL DEFIBRILLATOR
More informationChapter 8 Addressing I/I Issues and High Flows
Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of
More informationMilwaukee Metropolitan Sewerage District
Milwaukee Metropolitan Sewerage District Notice of Information Gathering for Proposed Rule Making Regarding Acceptance by MMSD of Discharges of Noncontact Cooling Water The Milwaukee Metropolitan Sewerage
More informationIntegrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016
Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to
More informationControlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project
Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director Engineering & Construction Services City
More informationCombined Sewer Overflow Long Term Control Plan Update. March 21, 2017
Combined Sewer Overflow Long Term Control Plan Update March 21, 2017 CSO LTCP Update Background Indiana has over 100 CSO communities that account for ± 12.5% of national total Lafayette has 10 active CSO
More informationLIMITED ENVIRONMENTAL REVIEW For. Northeast Ohio Regional Sewer District. Kingsbury Run Preliminary Engineering Early Action CSO CS
LIMITED ENVIRONMENTAL REVIEW For Kingsbury Run Preliminary Engineering Early Action CSO CS391430-0133 Applicant: Ms. Kyle Dreyfuss-Wells, Chief Executive Officer 3900 Euclid Avenue Cleveland, Ohio 44115
More informationLIMITED ENVIRONMENTAL REVIEW. Northeast Ohio Regional Sewer District, Southerly Electrical Infrastructure Improvements SEII/1401A
LIMITED ENVIRONMENTAL REVIEW Project Identification Project: Applicant: Loan Number: Northeast Ohio Regional Sewer District, Southerly Electrical Infrastructure Improvements SEII/1401A Ms. Kyle Dreyfuss-Wells,
More informationConsent Decree Appendix 1. Control Measures and Performance Criteria
Case: 1:10-cv-02895-DCN Doc #: 2-2 Filed: 12/22/10 1 of 6. PageID #: 82 United States and State of Ohio v. Northeast Ohio Regional Sewer District Consent Decree Appendix 1 Control Measures and Performance
More informationAPPENDIX 14. Inflow and Infiltration in the CRD
APPENDIX 14 Inflow and Infiltration in the CRD As documented in the CRD-published discussion paper Cost versus Benefit of Reducing Inflow and Infiltration inflow and infiltration refers to rainwater and
More informationAPPENDIX 4C ISS PUMPOUT ANALYSIS
2020 Facilities Plan Treatment Report APPENDIX 4C ISS PUMPOUT ANALYSIS Notes No. Storm Event 1 Average Total ISS Pump 1 Pump 2 Pump 3 (MGD) Average Individual Pumpout Per Storm Event Pumpout 2 1 8/4/1998
More informationCity of Lansing s Triple Bottom Line Approach to Wet Weather Control Planning
MWEA 86 th Annual Conference June 27, 2011 City of Lansing s Triple Bottom Line Approach to Wet Weather Control Planning Chad A. Gamble, P.E. City of Lansing Jim Smalligan, P.E. Fred Cowles, P.E. FTC&H
More informationCity of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet
City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet WHY IS THE CITY OF OREGON DOING THIS PROJECT? Along with other communities across the country,
More informationThis page is blank to facilitate double-sided printing.
Supplement No. 2 September 2013 This page is blank to facilitate double-sided printing. Introduction and Purpose The Metropolitan St. Louis Sewer District (MSD) prepared an update to its Combined Sewer
More informationRULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM
RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER 0400-46-01 PRIORITY RANKING SYSTEM TABLE OF CONTENTS 0400-46-01-.01 Priority Ranking System: General 0400-46-01-.03
More informationArea. Kinnickinnic River 24.7 Menomonee River Milwaukee River Oak Creek 28.2 Root River Lake Michigan Direct 40.
Area Watershed (square miles) Kinnickinnic River 24.7 Menomonee River 135.8 Milwaukee River 700.0 Oak Creek 28.2 Root River 197.6 Lake Michigan Direct 40.7 Drainage Area Total 1,127.0 Number of Counties
More informationWater and Sewer Infrastructure
Chapter 11: Water and Sewer Infrastructure A. INTRODUCTION This chapter evaluates the potential for significant adverse impacts on water and sewer infrastructure that could result from the proposed project.
More informationChapter 5: Treatment Assessment Future Condition
2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment
More informationLong-Term Control Plan Orientation. July 1, 2009
Long-Term Control Plan Orientation July 1, 2009 Introductions City Staff Program Management Team Agenda LTCP Development CSO Controls & Costs Implementation Schedule Phases Implementation Approach LTCP
More informationHydraulic Modeling of Deep Tunnel Provides Cost Savings
5 Hydraulic Modeling of Deep Tunnel Provides Cost Savings Taymour El-Hosseiny, Karen Reinhart and M. P. Cherian In 2005, the City of Columbus, Ohio submitted a plan to the Ohio Environmental Protection
More informationSewage Overflows in the Detroit River. Photo Credit: Bob Burns, Detroit Riverkeeper
Sewage Overflows in the Detroit River Photo Credit: Bob Burns, Detroit Riverkeeper Great Lakes Regional Collaboration In May of 2004, President Bush issued an Executive Order Recognized Great Lakes as
More informationRulemaking Hearing Rules of the Tennessee Department of Environment and Conservation State Revolving Fund Loan Program
Rulemaking Hearing Rules of the Tennessee Department of Environment and Conservation State Revolving Fund Loan Program Chapter 1200-22-01 Priority Ranking System Amendments Table of Contents 1200-22-01-.01
More informationChapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116
Fremont Facility Planning Area Designated Management Agency Responsibilities: Fremont: Owns and operates the wastewater treatment plant, and sanitary sewers within its corporate limits. Sandusky Township
More informationPERMITTEE/FACILITY NAME: City of Detroit Water and Sewerage Department / Detroit Wastewater Treatment Plant
Permit No. MI0080 FACT SHEET PERMITTEE/FACILITY NAME: City of Detroit / Detroit Wastewater Treatment Plant COUNTY: Wayne RECEIVING WATERS: The Detroit River is protected for agricultural uses, navigation,
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationStorm Water and Sanitary Sewer
Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements
More information2. DEFINITIONS. American Association of State Highway and Transportation Officials.
2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:
More informationOmaha CSO Program and the South Omaha Industrial Area Lift Station, Force Main and
Omaha CSO Program and the South Omaha Industrial Area Lift Station, Force Main and Gravity Sewer Projects November 16, 2010 Welcome Agenda CSO Program Overview Community Enhancements Project Overview Detours
More informationWHAT IS GREEN INFRASTRUCTURE?
WHAT IS GREEN INFRASTRUCTURE? November 17, 2010 Khris Dodson, Environmental Finance Center Why use Green Infrastructure? Stormwater/combined sewer benefits Eliminates pollutants at the source Reduces discharge
More informationLandbase Systems Draft 5/2/2014 Page: 1
Study of the potential Green Stormwater Infrastructure (GSI) strategies and options to reduce localized flooding and combined sewer overflows in conjunction with combined network adjustments along and
More information1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change
1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure
More informationHARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES
HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES THOMAS A. TYLER, PE GREGORY S. BAZYDOLA, PE NEWEA Conference January 22, 2018 Presentation Agenda
More informationThe Maine Drain: Stormwater Management Strategies and Solutions June 12, Portland s Approach. Michael Bobinsky, Director of Public Services
The Maine Drain: Stormwater Management Strategies and Solutions June 12, 2013 Portland s Approach Michael Bobinsky, Director of Public Services Clean Water Clean Growth You can t build a vibrant economy
More informationWastewater Collection System
WASTEWATER COLLECTION SYSTEM CE 370 1 Wastewater Collection System The function of the collection system is to collect the wastewater from residential, commercial, and industrial areas within the service
More informationMINUTES SEWRPC ADVISORY COMMITTEE ON REGIONAL WATER QUALITY MANAGEMENT PLAN UPDATE FOR THE GREATER MILWAUKEE WATERSHEDS
MINUTES SEWRPC ADVISORY COMMITTEE ON REGIONAL WATER QUALITY MANAGEMENT PLAN UPDATE FOR THE GREATER MILWAUKEE WATERSHEDS DATE: December 14, 2006 TIME: PLACE: 1:30 p.m. City of Mequon City Hall Upper Level
More informationPublic Sewer and Water Service
Vibrant. Green. Connected. Competitive. Public Sewer and Water Service Statement of Purpose Ensuring that all of the region s residents have an adequate and consistently high quality water supply is of
More informationUsing SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System
15 Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System Mi Chen, Fang Cheng, Edward Burgess, Gregory Barden, Hunter Kelly and Timothy Fallara The City of Columbus wastewater
More informationCity of Columbus Update
City of Columbus Update 5 Cities Conference August 17, 2017 Columbus Division of Sewerage & Drainage 5 County Treatment Area Two large treatment plants: 61 Billion gallons treated Jackson Pike (150 mgd
More informationLAKE MICHIGAN DIVERSION ACCOUNTING WATER YEAR 2008 ANNUAL REPORT
LAKE MICHIGAN DIVERSION ACCOUNTING WATER YEAR 2008 ANNUAL REPORT EXECUTIVE SUMMARY This document is the Water Year (WY) 2008 Annual Report of the Chicago District, U. S. Army Corps of Engineers activities
More informationKings Run Project Public Meeting. July 31, 2014
Kings Run Project Public Meeting July 31, 2014 Welcome and Overview Lower Mill Creek - Kings Run Project Details Q&A Kings Run Project Stations (opportunity to talk to MSD staff) MSD is under a federal
More informationOVERVIEW CAPACITY & CONDITION
OVERVIEW The nation s 14,748 wastewater treatment plants protect public health and the environment. Years of treatment plant upgrades and more stringent federal and state regulations have significantly
More information17.0 INFRASTRUCTURE AND ENERGY
17.0 INFRASTRUCTURE AND ENERGY The Project would place demands on the existing infrastructure systems for supplying water, treating sewage, providing energy and disposing of solid waste. The Project would
More informationUpdating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois
Updating the MWRD s Excessive Infiltration and Inflow Control Program February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois MWRD SEPARATE SEWER AND COMBINED SEWER AREAS LEGEND: Separate/Unsewered
More informationLarge Decentralized Systems a Sustainable Wastewater Solution
Large Decentralized Systems a Sustainable Wastewater Solution Agenda The Good Fight Centralized Exposed in the Real World Decentralized Model System Examples Dennis F. Hallahan, P.E. Technical Director
More informationHYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY
HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY Fernando Gonzalez, Adel Hagekhalil, Bryan Trussell, City of Los Angeles Bureau of Sanitation
More informationSEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY
SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY INTRODUCTION AND BACKGROUND By letter of January 12, 2009,
More informationHartford WPCF Master Plan Clean Water Project. Executive Summary. February 2010
Hartford WPCF Master Plan Clean Water Project Executive Summary February 2010 An outline of work at the Hartford Water Pollution Control Facility that will achieve compliance with regulatory requirements
More informationImprovements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library
Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject Public Meeting June 4, 2013 South Omaha Public Library Agenda Welcome and Introductions CSO Program Overview Missouri River
More informationThe Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017
The Metropolitan District Stormwater & I/I Reduction Presentation March 16, 2017 AGENDA Introductions/MDC Background CWP Background Consent Decree/SSO Program Discussion Private Inflow Discussion Program
More informationSUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM
THE CITY OF ST. CATHARINES SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM SUSTAINABLE MUNICIPAL WATER MANAGEMENT PROGRAM THE CITY OF ST. CATHARINES Background As a member of the Great Lakes and St. Lawrence
More information2011 ANNUAL REPORT. Prepared For The: City of South Euclid. Cuyahoga County Department of Public Works
Prepared For The: City of South Euclid Cuyahoga County Department of Public Works Table of Contents Introduction...1 Mission Statement & Overview......2 Appendix Description.....11 Community Streets Cleaned
More informationCommunity Open House
Mayor Kasim Reed The Department of Watershed Management & Atlanta Memorial Park Conservancy Community Open House 10/28/2016 1 AGENDA: Meet & Greet Opening Remarks & Introductions District 8 Council Member
More informationLEHIGH COUNTY REGIONAL SEWER SYSTEM
LEHIGH COUNTY AUTHORITY Lowhill Township New Tripoli, PA 18066 LEHIGH COUNTY REGIONAL SEWER SYSTEM Kline s Island WWTP EPA Administrative Order Public Meeting Lehigh County Government Center November 13,
More informationPublic Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
STAFF REPORT ACTION REQUIRED Contract Award - Request for Proposals No. 9117-13-7210 Professional Engineering Services for the Design and Construction Administration of the Wet Weather Flow System to Control
More informationVillage of Niles. Combined Sewer Overflows. NPDES Permit # ILM580035
Village of Niles Combined Sewer Overflows NPDES Permit # ILM580035 Combined Sewer Overflows OVERVIEW Combined sewer systems are sewers that are designed to collect rainwater runoff, domestic sewage, and
More informationMunicipal Sanitary Authority of the City of New Kensington
Municipal Sanitary Authority of the City of New Kensington Public Workshop Number 2 Long Term Control Plan Update Presentation to the Cities of New Kensington, Arnold, Lower Burrell and Borough of Plum
More informationLICK RUN WATERSHED MASTER PLAN. Community Design Workshop #1 August 11, 2011
LICK RUN WATERSHED MASTER PLAN Community Design Workshop #1 August 11, 2011 Overview What s the Challenge? Combined Sewer Overflows (CSOs) Impacts on our Communities What s the Solution? Consent Decree
More informationLong-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel
Massachusetts Water Resources Authority Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel Frederick A. Laskey Executive Director March 8, 2004 How Sewer Separation Works 2 How
More informationManagement of Aging Wastewater Infrastructure -- Challenges and Strategies --
Management of Aging Wastewater Infrastructure -- Challenges and Strategies -- Jerry N. Johnson, General Manager District of Columbia Water and Sewer Authority Washington, D.C. Overview of the Aging Situation
More informationCity of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility
December 16, 2014 City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility Prepared by CBBEL Project Background & Timeline June and July 2010 Severe storm events hit Elmhurst,
More informationGreater Milwaukee Watersheds Pathogen Source Identification
Greater Milwaukee Watersheds Pathogen Source Identification Executive Summary MMSD Contract No. M03016P02 Greater Milwaukee Watersheds Pathogen Source Identification Executive Summary Report: March 1,
More informationCity of Cleveland Heights
2015 Annual Report Prepared For The: City of Cleveland Heights By the DEPARTMENT OF PUBLIC WORKS OVERVIEW Established in 1919, the office of the Cuyahoga County Sanitary Engineer was created to provide
More informationPamela Reitsma Environmental Scientist Narragansett Bay Commission
Pamela Reitsma Environmental Scientist Narragansett Bay Commission Narragansett Bay Commission Narragansett Bay Commission (NBC) is a quasi-state agency which oversees the two largest WWTFs in Rhode Island:
More informationAppendix E Public Hearing Information
Appendix E Public Hearing Information 0 STATE OF MICHIGAN In the Matter of: Clinton-Oakland Sewage Disposal System State Revolving Fund Project Plan Oakland County Water Resources Commissioner / PUBLIC
More informationManaging Peak Wastewater Flows
Metropolitan Council Environmental Services Managing Peak Wastewater Flows Presented at the American Public Works Conference September 12, 2005 Donald Bluhm Interceptor Services Dept. Inflow and Infiltration
More informationRussell Avenue Slip Technical Report
Russell Avenue Slip Technical Report Prepared by Jenny C. Fisher, Courtney L. Winter, Sandra L. McLellan School of Freshwater Sciences University of Wisconsin-Milwaukee Summary: The McLellan lab has monitored
More informationWastewater Management in Metro Vancouver. Margaret Morales 14 March 2011 PLAN 597
Wastewater Management in Metro Vancouver Margaret Morales 14 March 2011 PLAN 597 Outline Metro Vancouver an overview Wastewater Management in Metro Vancouver ILWMP What makes it Integrated? Governance
More informationCapacity, Management, Operation and Maintenance (CMOM) Program Annual Report for Milwaukee Metropolitan Sewerage District
Capacity,, Operation and Maintenance (CMOM) Program Annual Report for 2009 Milwaukee Metropolitan Sewerage District TABLE OF CONTENTS Section 1: Program Overview Section 2: Plan Section 3: Plan Section
More informationSewer Separation and Stormwater Management (with Emphasis on Flood Control)
Sewer Separation and Stormwater Management (with Emphasis on Flood Control) July 15, 2002 Justin Wiedeman, P.E. NPU A Board Member Chastain Civic Association Board Member This Presentation Came About Because:
More informationWerk & Westbourne Enhanced High Rate Treatment Facility. Find a better graphic for here. Community Information Meeting October 22, 2015
Werk & Westbourne Enhanced High Rate Treatment Facility Find a better graphic for here Community Information Meeting October 22, 2015 Mr. Kevin Celarek Green Township Administrator Ms. MaryLynn Lodor Deputy
More information5.5 Additional Item WMC June 8, 2011
5.5 Additional Item WMC June 8, 2011 Waste Management Committee Meeting Date: June 8, 2011 To: From: Waste Management Committee Fred Nenninger, Project Manager, Wastewater Secondary Treatment Upgrades
More informationCity of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation
City of Gardiner, Maine Wastewater Committee Meeting CSO Storage Tank & Screening Evaluation December 11, 2013 Introduction - Update on field work - Flow monitoring - Survey - GIS - Borings - Assessment
More information