1 Gas-Electric Infrastructure Challenges WPUI Gas Program September 17, 2012

2 MISO EPA/Gas related efforts - Timeline EPA Rules & Regulations MISO EPA Impact Study, Oct 2011 Gas Consultant Phase 1 Study, Feb 2012 Gas Consultant Phase 2 Study, July 2012 MISO Gas Electric Infrastructure Workshops, July 2012 FERC Gas Electric Technical Conferences, Aug 2012 MISO Gas Pipeline discussions, Present 2

3 Overview of Impacts 12.6 GW of coal capacity Identified as at-risk Expected retirement dates to be in the 2014/2015 calendar years 12.6 GW of retirement would erode MISO projected reserve margins by 12 percentage points, dropping system resources 6 to 7 percentage points below required targets. Capital investment of $33.0 Billion will be required to retrofit and/or replace units Average energy prices may increase by $5/MWh Energy Cost Impacts EPA Compliance Retrofit Capital Costs New Capacity Capital Fixed Charges Fixed O&M Capital Costs Transmission Capital Costs Total Capital Costs 12,652 MW of Retirements $5/MWh $22.5B $9.6B $0.0B $0.9B $33.0B 3

4 Key Issues Affecting Compliance (3-5 years) MATS related - coordination of outages required to install compliance equipment Maintenance margin calculator tool Quarterly survey Investigate Reciprocal Internal Combustion Engines (RICE) standards and their impact on Behind the Meter Generation (BTMG) Sufficient manufacturing, engineering and other resource availability to meet necessary timelines Ability of the natural gas infrastructure to meet the anticipated fuel switching requirements 4

5 Why should MISO be concerned about gas? Forecast Perspective Capacity Factors (CF) increase significantly for the existing gas fleet under changing regulatory and gas price scenarios Historic CF is based on 20 year averages. No new EPA rules, no retirements and $4.50 gas Phase 1 is based on EPA rules, 12,000 MW of retirements and $4.50 gas price Phase 2 Expected is based on EPA rules, 12,000 MW of retirements and $2.50 gas price CT CC Phase 2 Max based on existing gas units running at same level as new gas units 5

6 Why should MISO be concerned about gas? Real Time Perspective 90% Contribution to Total Energy Served Jan thru June only 80% 70% 60% 50% 40% 30% 20% 10% 77% 78% 75% 65% 14% 14% 14% 14% 3% 3% 4% 5% 5% 2% 11% 8% 0% Year Coal Nuclear Gas Wind 6

7 Lack of Fuel for Gas Units Summary Total of 168 outages were recorded with an overall of 19,015 MW of power and 1,045,576 MWH of energy. These 168 outages have two different cause codes and are divided into five main categories. 7

8 Outages with Cause Code 9130 Category Category Description Sum of Instances Total Loss (MWH) Range of Loss (MWH) Total Reduction (AVG MW) Range of Reduction (MW) Lack of Supply Maintenance or Technical Issues at Other Points 4 6,392 1,598 1, Lack/Loss Fuel Supply 23 33, , No Fuel Contract 1 4,472 4,472 4, Lack of Supply Total ,536 2,178 Maintenance Station/Pipeline/Valve Maintenance 22 69, ,023 1, Maintenance Total 22 69,236 1,477 Pipe Contingency Restrictions placed because of Excessive 1 3,285 3,285 3, Demand Supply Valve/Pipeline Failure/Outage 5 88, ,040 1, Pipe Contingency Total 6 91,494 1,785 Pressure Low Gas Pressure; some because of 24 38, ,789 2, Maintenance/Technical Issues at Other Points Pressure Total 24 38,672 2,537 N/A No Information was Provided , ,224 4, N/A Total ,539 4,748 *Cause Code 9130: Lack of fuel where the operator is not in control of contracts, supply lines, or delivery of fuels 8

9 Outages with Cause Code 9131 Category Category Description Sum of Instances Total Loss (MWH) Range of Loss (MWH) Total Reduction (AVG MW) Range of Reduction (MW) Lack of Supply Lack/Loss Fuel Supply 6 65, , Maintenance or Technical Issues at Other Points 5 5, , Lack of Supply Total 11 70,609 1,282 Maintenance Software/System Upgrade Maintenance Total Pipe Contingency Pipe Contingency Total Pressure Restrictions placed because of Excessive 8 12, ,388 1, Demand Supply Valve/Pipeline Failure/Outage 11 75, ,920 1, ,587 2,346 Low Gas Pressure; some because of Maintenance/Technical Issues at Other Points 4 2, , Pressure Total 4 2, N/A No Information was Provided 8 231, ,103 1, N/A Total 8 231,020 1,903 *Cause Code 9131: Lack of fuel (interruptible supply of fuel part of fuel contract) 9

10 Contingency Type vs. Unit Size Pressure Pipe Contingency Maintenance Lack of Supply Unit Capacity (MW) This Plot represents that units are involved with Pressure and Pipeline contingencies regardless of their size where as, Maintenance and Lack of Supply are constraints that mainly happen to units smaller than 300 MWs. 10

11 Key Gas-Electric Interdependency Issues Information Sharing & Communication Flexible Solutions to Interdependency Issues Cross-Industry Education Involvement of State and Federal Regulators Coordination of Emergency Operations 11

12 Workshop feedback received to-date MISO Coordinate communication, but not gas infrastructure planning and expansion Examine the treatment of firm vs. non-firm service going forward Examine the feasibility of aligning the MISO electric day with the gas day Extend MISO s forward capacity market Write flexibility into the generator retirement reporting requirements (Attachment Y) for definitive retirements Gas Industry Review the no-bump rule Work to provide clarity on existing pipeline services/contractual arrangements Work with FERC to develop a streamlined regulatory process for pipelines to incorporate more flexible service in their tariffs Help improve understanding of the gas industry by electric industry players Examine the possibility of adding nomination periods across pipelines Incorporate forward-looking planning into business operations Improve industry transparency Joint Partnership Improve information sharing and communication Improve system emergency planning and coordination 12

13 Next Steps MISO will coordinate with INGAA to provide Planning & Operations Training for gas industry professionals MISO will establish a stakeholder group (Gas-Electric Task Force) to offer a forum for moving forward on gas-electric efforts A tariff workshop will be scheduled to address potential tariff changes related to gas-electric issues 13

14 Appendix 14

15 Environmental Protection Agency Proposing Four New Regulations Clean Water Act Develop Rule Compliance Prep Period Compliance Coal Combustion Residuals Develop Rule Compliance Prep Period Compliance Clean Air Transport Rule/Cross State Air Pollution Rule Develop Rule Compliance Vacated Mercury and Air Toxics Standards Develop Rule Compliance Prep Period State Exten -sion EPA Exten -sion Compliance

16 Purpose of the Phase 1 and Phase 2 Studies 1. Review and analyze current and future natural gas pipelines, storage facilities and related infrastructure, and extrapolate the impact for natural gas-fired electric power generation from in the MISO region. 2. Build upon the Phase 1 analysis and incorporate the impacts of lower gas prices; and, correspondingly higher capacity factors on the existing gas fleet, on the existing pipeline infrastructure in the MISO region. 16

17 Results Phase 1 (Feb 2012) Wellhead Gas supply is not expected to be an issue Additional gas pipeline infrastructure is needed to accommodate fuel switching Additional inter-regional and intra-regional (solely within MISO) main line development needed Lateral pipelines and compressor additions development needed Timing for development of new pipeline infrastructure is the main issue Planning, siting, regulatory and construction of new main line gas pipelines will be on the order of 5-6 years, if started now Compliance with Mercury and Air Toxics Standards is 3-5 years 17

18 Results Phase 2 Modified-Backcast analysis based on the existing gas infrastructure with existing and new gas capacity additions running with a $2.50/Mbtu gas price: The analyses were not intended to be a detailed market-area engineering analysis that uses sophisticated forward looking flow analysis. Over 65% of the Pipelines have insufficient capacity at measurement points into their market area to fully meet the needs of the existing (embedded) units operating at expected capacity factors. For the period , almost 90% of the pipelines have insufficient capacity for the existing units plus an incremental 12,000 MW of coal-to-gas retirement. Gas industry participants reviewed the report and provided comments that were more optimistic than the conclusions, which are contained in Appendix 2. 18

19 Results Phase 2 continued Pipelines sourcing gas supply from the Gulf Coast have significantly higher levels of insufficient capacity compared to the Southwest and Mid-Continent pipeline sources. Shale gas supplies in proximity to MISO will need pipeline flow changes and infrastructure build-out. To ensure generator availability, gas storage may be required Need to be addressed further. On site diesel or liquid natural gas (LNG) appear as viable options Tariff changes may be needed to add qualifications to generators Regional coordination of MISO members will produce a better solution than each stakeholder acting alone No obvious venue (except FERC) for that coordination exists, other than MISO 19

20 Pipeline Specific Capacity Assessment New pipeline infrastructure is needed to manage volatility and ensure reliability 21 major pipelines are in the MISO footprint With the advent of shale gas, the pipeline flow usage is in a state of flux Some are essentially fully subscribed and some are not New gas-fired generation will be served off different lines New main lines as well as lateral lines (line from the main line to the power plant) will be needed On-site storage of fuel, either diesel or LNG, may substantially lessen the need for new pipeline capacity. The costs and trade-offs need to be studied going forward. 20

21 Overview of MISO Region Major Pipelines 21

Impacts Associated with EPA Regulations and Gas- Electric Infrastructure Analysis

Impacts Associated with EPA Regulations and Gas- Electric Infrastructure Analysis Impacts Associated with EPA Regulations and Gas- Electric Infrastructure Analysis Platts Transmission Planning & Development Conference, Washington, DC September 11, 2012 John Lawhorn MISO Overview Regional

More information

ADEQ/APSC Comments of MISO 7/21/2014

ADEQ/APSC Comments of MISO 7/21/2014 ADEQ/APSC Comments of MISO 7/21/2014 Who We Are Our mission is to deliver reliable, least-cost energy for end-use consumers. MISO is an independent, non-profit organization responsible for maintaining

More information

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012 Wind Update Renewable Energy Integration Lessons Learned March 28, 212 Contents Summary Review of Historical Wind Growth and Output Impact of Wind on Operations Wind Curtailments Dispatchable Intermittent

More information

Mid-Continent Independent System Operator (MISO) Overview. INCMA February 15, 2017

Mid-Continent Independent System Operator (MISO) Overview. INCMA February 15, 2017 Mid-Continent Independent System Operator (MISO) Overview INCMA February 15, 2017 1 2 ISO s/rto s manage flows on the transmission system by directing generator usage 3 North American Electric Grid Operators

More information

2011 Special Reliability Assessment: A Primer on the Natural Gas and Electric Power Interdependency in the United States

2011 Special Reliability Assessment: A Primer on the Natural Gas and Electric Power Interdependency in the United States 2011 Special Reliability Assessment: A Primer on the Natural Gas and Electric Power Interdependency in the United States Timeline Phase I Sept 13-14 October 25 November 18 Mid November Report sent to PC

More information

MTEP18 Futures. Planning Advisory Committee June 14, 2017

MTEP18 Futures. Planning Advisory Committee June 14, 2017 MTEP18 Futures Planning Advisory Committee June 14, 2017 Overview Objective: Present final MTEP18 Futures and an overview of stakeholder feedback Key Takeaways: Four Futures to be used in MTEP18 to consider

More information

DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans

DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans ENTERGY GULF STATES LOUISIANA, L.L.C. & ENTERGY LOUISIANA, LLC LPSC DOCKET NO. I-33014 DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans This version

More information

ATC Stakeholder Update 2019 PROMOD Study Assumptions. Tom Dagenais Todd Tadych ATC Economic Planning

ATC Stakeholder Update 2019 PROMOD Study Assumptions. Tom Dagenais Todd Tadych ATC Economic Planning ATC Stakeholder Update 2019 PROMOD Study Assumptions Tom Dagenais Todd Tadych ATC Economic Planning 7-10-09 1 Agenda / Introduction MISO RGOS Model Description MISO RGOS Model History and Background MISO

More information

MISO PJM Cross-Border Planning

MISO PJM Cross-Border Planning MISO PJM Cross-Border Planning July 24, 2014 MISO-PJM JCM Planning Coordination Issues 2 At a previous JCM meeting, several issues related to planning coordination were raised: Market Efficiency Planning

More information

NERC Probabilistic Assessments Overview & Future Improvements

NERC Probabilistic Assessments Overview & Future Improvements NERC Probabilistic Assessments Overview & Future Improvements Noha Abdel-Karim, PhD. NERC IEEE LOLEWG Meeting July 31, 2015 Overview NERC Probabilistic Assessment (ProbA) reports extend the LTRA data with

More information

2015 Economic Planning Study Assumptions

2015 Economic Planning Study Assumptions 2015 Economic Planning Study Assumptions Erik Winsand, ATC Economic Planning May 13, 2015 atcllc.com Introduction Process Overview and Timeline MISO MTEP16 Futures Assumptions Next Steps atcllc.com 2 Process

More information

Gas-Electric System Needs and Reliability

Gas-Electric System Needs and Reliability Gas-Electric System Needs and Reliability Mike Nygaard Engineer, Policy Studies, MISO Geographically, MISO is the largest Independent System Operator in North America Transmission: ~66,000 miles Peak load:

More information

Northern States Power Company Minnesota. Northern States Power Company. Wisconsin. Public Service Company of. Public Service. Southwestern.

Northern States Power Company Minnesota. Northern States Power Company. Wisconsin. Public Service Company of. Public Service. Southwestern. Perspective on Regional Challenges Judy M. Poferl President and CEO NSP Minnesota September 15, 2011 Xcel Energy Service Territories Northern States Power Company Minnesota Public Service Company of Colorado

More information

Resource Availability and Need

Resource Availability and Need Resource Availability and Need Issues Statement Whitepaper March 30, 2018 Table of Contents 1. Executive Summary... 2 2. Aging and Retirement of the Portfolio s Generating Units... 5 2.1. Retirements reduce

More information

Aliso Canyon Gas Electric Coordination

Aliso Canyon Gas Electric Coordination Aliso Canyon Gas Electric Coordination Cathleen Colbert Senior Market Design and Policy Developer Market & Infrastructure Policy Working Group Meeting April 6, 2016 Agenda Time Topic Presenter 10:00 10:30

More information

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017

Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017 Evolution of the Grid in MISO Region Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017 1 MISO s mission is to ensure reliable delivery of low-cost energy through efficient,

More information

North American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011

North American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011 North American Midstream Infrastructure Through 2035 A Secure Energy Future Press Briefing June 28, 2011 Disclaimer This presentation presents views of ICF International and the INGAA Foundation. The presentation

More information

National Council on Electricity Policy Annual Meeting & Workshop Denver, CO. May 8, Jeff Bladen Executive Director Market Development

National Council on Electricity Policy Annual Meeting & Workshop Denver, CO. May 8, Jeff Bladen Executive Director Market Development National Council on Electricity Policy Annual Meeting & Workshop Denver, CO May 8, 2018 Jeff Bladen Executive Director Market Development Assessing the Challenge MISO region is undergoing rapid and substantial

More information

2016 Integrated Resource Plan Executive Summary

2016 Integrated Resource Plan Executive Summary 2016 Integrated Resource Plan Executive Summary The electric industry is in the midst of unprecedented change. Customer needs and the way energy is consumed continues to evolve. Technologies are rapidly

More information

ELL 2019 IRP Stakeholder Meeting 2

ELL 2019 IRP Stakeholder Meeting 2 title style ELL 2019 IRP Stakeholder Meeting 2 Entergy Louisiana, LLC 1 November 27, 2018 title Purpose style and Agenda The purpose of this presentation is to review and to seek stakeholder feedback on

More information

Infrastructure Needs: Electricity-Natural Gas Interdependencies

Infrastructure Needs: Electricity-Natural Gas Interdependencies J U N E 3 0, 2 0 1 4 M A N C H E S T E R, N H Infrastructure Needs: Electricity-Natural Gas Interdependencies Regional Energy Forum: Tackling New England's Energy Challenges Gordon van Welie P R E S I

More information

Overview. Net Revenue

Overview. Net Revenue 2009 Quarterly State of the Market Report for PJM: January through June Section 3 Energy Market, Part 2 The Market Monitoring Unit (MMU) analyzed measures of PJM Energy Market structure, participant conduct

More information

Making Sense of U.S. Energy Markets

Making Sense of U.S. Energy Markets Making Sense of U.S. Energy Markets Task Force on Energy Supply National Conference of State Legislators Richard McMahon Vice President, Energy Supply and Finance January 14, 2017 Wholesale Markets RTO/ISO

More information

Energy Costs for Water Suppliers: Prospects and Options

Energy Costs for Water Suppliers: Prospects and Options Energy Costs for Water Suppliers: Prospects and Options Bill Kemp Vice President, Business Strategy & Planning Services AMWA Annual Meeting October 20, 2008 BUILDING A WORLD OF DIFFERENCE Agenda Energy

More information

Natural Gas Outlook for Connecticut. March 14, 2012 Connecticut Power and Energy Society

Natural Gas Outlook for Connecticut. March 14, 2012 Connecticut Power and Energy Society Natural Gas Outlook for Connecticut March 14, 2012 Connecticut Power and Energy Society 1 1 % of penetration of gas % CT Home Heating Market Connecticut Has High Growth Potential 2 CT Home Heating Market

More information

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Harvard Electricity Policy Group 68 th Plenary Session Paul M. Sotkiewicz, Ph.D. Chief Economist PJM Interconnection October

More information

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Transmission Planning at the Midwest ISO Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Midwest ISO: What We Do Monitor flow of power over the high voltage

More information

JCM Drill Down Report. February 19, 2015

JCM Drill Down Report. February 19, 2015 JCM Drill Down Report February 19, 2015 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill Down Report

More information

Managing the Reliability of the Electric Grid While the Power Industry Undergoes Rapid Transformation

Managing the Reliability of the Electric Grid While the Power Industry Undergoes Rapid Transformation SEPTEMBER 19, 2014 BOSTON, MA Managing the Reliability of the Electric Grid While the Power Industry Undergoes Rapid Transformation Massachusetts Restructuring Roundtable Gordon van Welie PRESIDENT & CEO

More information

Combined Heat and Power: Markets and Challenges

Combined Heat and Power: Markets and Challenges Combined Heat and Power: Markets and Challenges Bruce A. Hedman ICF International Roundtable on Industrial Energy Efficiency and CHP June 28, 2012 Acknowledgements Based on work supported by: DOE s Advanced

More information

MISO-PJM Joint and Common Market Drill Down Report

MISO-PJM Joint and Common Market Drill Down Report MISO-PJM Joint and Common Market Drill Down Report February 28, 2017 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan

More information

Aliso Canyon Gas Electric Coordination Discussion

Aliso Canyon Gas Electric Coordination Discussion Aliso Canyon Gas Electric Coordination Discussion Market Surveillance Committee Meeting April 19, 2016 Cathleen Colbert Senior Market Design and Policy Developer Market & Infrastructure Policy Aliso Canyon

More information

Transformation of the Electric Grid in New England: Winter Challenges and Price Impacts

Transformation of the Electric Grid in New England: Winter Challenges and Price Impacts NOVEMBER 12, 2014 CROMWELL, CT Transformation of the Electric Grid in New England: Winter Challenges and Price Impacts Connecticut Power and Energy Society Anne George VICE PRESIDENT, EXTERNAL AFFAIRS

More information

Northeast Energy Summit 1 Veterans Way, Suite 200 Carnegie, PA Steve Dean, ASA, P.E. Managing Principal (412)

Northeast Energy Summit 1 Veterans Way, Suite 200 Carnegie, PA Steve Dean, ASA, P.E. Managing Principal (412) Gas Price Spikes and the Impacts on Power Prices and Dispatch September 17, 2014 Management Consultants, Inc. Northeast Energy Summit 1 Veterans Way, Suite 200 Carnegie, PA 15106 Steve Dean, ASA, P.E.

More information

Optimal Generation Expansion Planning with Integration of Variable Renewables and Bulk Energy Storage Systems Zhouxing Hu Ward T.

Optimal Generation Expansion Planning with Integration of Variable Renewables and Bulk Energy Storage Systems Zhouxing Hu Ward T. Optimal Generation Expansion Planning with Integration of Variable Renewables and Bulk Energy Storage Systems Zhouxing Hu Ward T. Jewell Electrical Engineering and Computer Science Wichita State University

More information

APPENDIX A: RESOURCE PLANNING ANALYSIS

APPENDIX A: RESOURCE PLANNING ANALYSIS PUBLIC DOCUMENT TRADE SECRET DATA EXCISED APPENDIX A: RESOURCE PLANNING ANALYSIS Minnesota Power has studied many options for meeting environmental regulations on Boswell Energy Center Unit 4 ( BEC4 )

More information

JCM Drill Down Report. May 27, 2015

JCM Drill Down Report. May 27, 2015 JCM Drill Down Report May 27, 2015 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill Down Report

More information

2011 IRP Public Input Meeting. December 15, Pacific Power Rocky Mountain Power PacifiCorp Energy

2011 IRP Public Input Meeting. December 15, Pacific Power Rocky Mountain Power PacifiCorp Energy 2011 IRP Public Input Meeting December 15, 2010 Pacific Power Rocky Mountain Power PacifiCorp Energy Agenda 2011 IRP schedule update and next steps Resource portfolio development status Supply Side Resources

More information

EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results

EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results Paul Sotkiewicz Chief Economist Muhsin Abdur-Rahman Senior Engineer, Market Simulation Members Committee Webinar November 17,

More information

Agenda. Natural gas and power markets overview. Generation retirements and in developments. Future resource mix including large hydro

Agenda. Natural gas and power markets overview. Generation retirements and in developments. Future resource mix including large hydro Agenda Natural gas and power markets overview Generation retirements and in developments Future resource mix including large hydro Balancing environmental, reliability and cost impacts 1 Northeast Utilities

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary I. Introduction Southern Indiana Gas and Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc. ( Vectren ) engaged in a planning exercise during 2016 to evaluate its electric

More information

PJM s Experience with the RPM Capacity Market

PJM s Experience with the RPM Capacity Market PJM s Experience with the RPM Capacity Market 2013 Austin Electricity Conference Panel 1: Are Capacity Market Necessary to Ensure Adequate Generating Reserve Paul M. Sotkiewicz, Ph.D. Chief Economist PJM

More information

Electric/Gas Coordination in the Northwest

Electric/Gas Coordination in the Northwest Electric/Gas Coordination in the Northwest Presentation for Mid-C Seminar July 25, 2012 Presented by Malcolm McLellan Greg Junge Van Ness Feldman The Issue Greater reliance on natural gas has increased

More information

UK Future Energy Scenarios. Richard Smith Future Transmission Networks Manager

UK Future Energy Scenarios. Richard Smith Future Transmission Networks Manager UK Future Energy Scenarios Richard Smith Future Transmission Networks Manager January 2012 Cautionary Statement This presentation contains certain statements that are neither reported financial results

More information

Overview. IEEE Boston Chapter ISO New England Inc.

Overview. IEEE Boston Chapter ISO New England Inc. Overview New England s power system will undergo major changes in the coming years to integrate renewables, demand response, smart grid and other new technologies Good planning helps overcome integration

More information

Power Flow Control Through Topology Optimization Software: Applications and Case Studies

Power Flow Control Through Topology Optimization Software: Applications and Case Studies 1 Power Flow Control Through Topology Optimization Software: Applications and Case Studies Pablo A. Ruiz IEEE PES Transmission & Distribution Conference and Expo Denver, CO, April 17, 2018 2 Current Congestion

More information

Generation Attribute Tracking System (GATS) Overview of PJM-EIS

Generation Attribute Tracking System (GATS) Overview of PJM-EIS Generation Attribute Tracking System (GATS) Overview of PJM-EIS Presented at the GATS Subscriber Group Meeting April 15, 2005 Overview PJM Environmental Information Services, Inc. (PJM EIS) owns and administers

More information

Power Sector Transition: GHG Policy and Other Key Drivers

Power Sector Transition: GHG Policy and Other Key Drivers Power Sector Transition: GHG Policy and Other Key Drivers JENNIFER MACEDONIA ARKANSAS 111(D) STAKEHOLDER MEETING MAY 28, 214 5/23/14 POWER SECTOR TRANSITION: GHG POLICY AND OTHER KEY DRIVERS 2 Purpose

More information

CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast

CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe

More information

MISO-PJM Joint and Common Market Drill Down Report

MISO-PJM Joint and Common Market Drill Down Report MISO-PJM Joint and Common Market Drill Down Report August 22, 2017 The purpose of this document is to provide a brief description of each component listed on the Joint and Common Market (JCM) Work Plan

More information

WSPP Operating Committee Meeting. October 25, Bob Hayes Vice President Physical Trading & Operations

WSPP Operating Committee Meeting. October 25, Bob Hayes Vice President Physical Trading & Operations WSPP Operating Committee Meeting October 25, 2012 Bob Hayes Vice President Physical Trading & Operations Safe Harbor Statement Forward-Looking Statements The information contained in this presentation

More information

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report ERCOT Public 2016 LTRA Probabilistic Reliability Assessment Final Report November 21, 2016 Contents Summary... 1 Software Model Description... 3 Demand Modeling... 3 Controllable Capacity Demand Response

More information

Ancillary Service Markets

Ancillary Service Markets Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;

More information

PJM briefing. Greater Philadelphia Chapter of the Association of Energy Engineers. PJM Interconnection

PJM briefing. Greater Philadelphia Chapter of the Association of Energy Engineers. PJM Interconnection PJM briefing Greater Philadelphia Chapter of the Association of Energy Engineers PJM Interconnection Mike Bryson, Executive Director, System Operations Steve Boyle, Director, State Government Affairs January

More information

Joint and Common Market ITEM 4 PSEUDO TIES

Joint and Common Market ITEM 4 PSEUDO TIES Joint and Common Market ITEM 4 PSEUDO TIES Agenda 1. Overview 2. Background 3. Common Issues 4. PJM Update 5. MISO Update 6. Double-Counting 7. Next Steps 2 Overview Purpose Provide a status update on

More information

The Year to Date in PJM: Operations and Markets

The Year to Date in PJM: Operations and Markets The Year to Date in PJM: Operations and Markets Kerry Stroup Manager, State Government Policy PJM Interconnection OMA Energy Committee July 30, 2014 OMA Energy Committee Presentation Outline PJM s mission:

More information

Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting. Kevin Larson Sr. Manager Resource Adequacy October 20, 2010

Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting. Kevin Larson Sr. Manager Resource Adequacy October 20, 2010 Midwest ISO Resource Adequacy Overview ATC Network Customer Meeting Kevin Larson Sr. Manager Resource Adequacy October 20, 2010 Agenda Role of Resource Adequacy Planning Reserve Margin Requirements LSE

More information

NPCC 2018 New England Interim Review of Resource Adequacy

NPCC 2018 New England Interim Review of Resource Adequacy NPCC 2018 New England Interim Review of Resource Adequacy ISO New England Inc. APPROVED BY NPCC RCC DECEMBER 4, 2018 Section 1 Executive Summary This report is ISO New England s (ISO) 2018 annual assessment

More information

2015 The Coal Institute Spring Conference. Swati Daji, SVP Fuels and System Optimization

2015 The Coal Institute Spring Conference. Swati Daji, SVP Fuels and System Optimization 2015 The Coal Institute Spring Conference Swati Daji, SVP Fuels and System Optimization CAUTION REGARDING PRESENTATION INFORMATION AND FORWARD-LOOKING STATEMENTS Duke Energy, its subsidiaries and affiliates,

More information

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit Craig Glazer Vice President, Federal Government Policy PJM Interconnection June, 2018 Topics 1. PJM Overview 2. Evolution of PJM

More information

OVERVIEW OF DESERT SOUTHWEST POWER MARKET AND ECONOMIC ASSESSMENT OF THE NAVAJO GENERATING STATION

OVERVIEW OF DESERT SOUTHWEST POWER MARKET AND ECONOMIC ASSESSMENT OF THE NAVAJO GENERATING STATION OVERVIEW OF DESERT SOUTHWEST POWER MARKET AND ECONOMIC ASSESSMENT OF THE NAVAJO GENERATING STATION ARIZONA CORPORATION COMMISSION APRIL 6, 2017 DALE PROBASCO MANAGING DIRECTOR ROGER SCHIFFMAN DIRECTOR

More information

Ensuring Resource Availability meets Need (RAN) in MISO. MRO Spring Reliability Conference May 23, 2018 Kevin Vannoy, Director Market Design

Ensuring Resource Availability meets Need (RAN) in MISO. MRO Spring Reliability Conference May 23, 2018 Kevin Vannoy, Director Market Design Ensuring Resource Availability meets Need (RAN) in MISO MRO Spring Reliability Conference May 23, 2018 Kevin Vannoy, Director Market Design Purpose & Key Takeaways Purpose: Discuss MISO s Resource Availability

More information

MISO LOLE Modeling of Wind and Demand Response. Item-9b LOLE Best Practices Working Group July 26-27, 2012

MISO LOLE Modeling of Wind and Demand Response. Item-9b LOLE Best Practices Working Group July 26-27, 2012 MISO LOLE Modeling of Wind and Demand Response Item-9b LOLE Best Practices Working Group July 26-27, 2012 1 Overview Wind Capacity Modeling MISO performs a detailed analysis to determine what the capacity

More information

Summary of 2016 MISO State of the Market Report

Summary of 2016 MISO State of the Market Report Summary of 2016 MISO State of the Market Report Presented to: MISO Board Markets Committee David B. Patton, Ph.D. MISO Independent Market Monitor July 20, 2017 Introduction As the Independent Market Monitor

More information

Vectren Corporation 2014 Integrated Resource Plan

Vectren Corporation 2014 Integrated Resource Plan Vectren Corporation 2014 Integrated Resource Plan Vectren Electric Overview 2 Emissions Control 4 Vectren s Integrated Resource Plan (IRP) Summary 6 Overview of Public Stakeholder Process 12 Conclusions

More information

FERC Order 841 Electric Storage Resource Compliance Straw Proposal Overview

FERC Order 841 Electric Storage Resource Compliance Straw Proposal Overview FERC Order 841 Electric Storage Resource Compliance Straw Proposal Overview Market Subcommittee Planning Advisory Committee Reliability Subcommittee Resource Adequacy Subcommittee June 6, 2018 Purpose

More information

The Public Need for Gas/Electric Coordination

The Public Need for Gas/Electric Coordination Pennsylvania Independent Oil & Gas Association May 14, 2014 The Public Need for Gas/Electric Coordination Richard Kruse, VP Regulatory Spectra Energy Our Strong Portfolio of Assets Natural Gas Transmission

More information

JCM Drill Down Report -- Draft. March 21, 2014

JCM Drill Down Report -- Draft. March 21, 2014 JCM Drill Down Report -- Draft March 21, 2014 The purpose of this document is to provide a brief description of each component listed on the JCM Work Plan Timeline compiled by PJM and MISO. This Drill

More information

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation. Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required

More information

New England Electricity Outlook

New England Electricity Outlook O C T O B E R 2 1, 2 0 1 6 S O U T H P O R T L A N D, M E New England Electricity Outlook Environmental and Energy Technology Council of Maine (E2Tech) Eric Johnson D I R E C T O R, E X T E R N A L A F

More information

Managing Risk and Volatility in Gas-Fired Generation

Managing Risk and Volatility in Gas-Fired Generation Managing Risk and Volatility in Gas-Fired Generation The Institute for Regulatory Policy Studies May 1, 2008 Jay Dibble Director of Gas Regulatory Calpine Corporation TABLE OF CONTENTS CALPINE OVERVIEW

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Communication of Operational Information ) Docket No. RM13-17-000 Between Natural Gas Pipelines and Electric ) Transmission Operators

More information

DOE Staff Report on Electricity Markets and Reliability. Kelly Lefler Office of Energy Policy and Systems Analysis November 15, 2017

DOE Staff Report on Electricity Markets and Reliability. Kelly Lefler Office of Energy Policy and Systems Analysis November 15, 2017 DOE Staff Report on Electricity Markets and Reliability Kelly Lefler Office of Energy Policy and November 15, 2017 Secretary Perry requested a grid study in April 2017 The memo asked staff to examine:

More information

Paul M. Sotkiewicz, Ph.D. Chief Economist M. Gary Helm Senior Market Strategist PJM Interconnection October 20, 2011

Paul M. Sotkiewicz, Ph.D. Chief Economist M. Gary Helm Senior Market Strategist PJM Interconnection October 20, 2011 Coal Capacity at Risk for Retirement in PJM: Potential Impacts of the Finalized EPA Cross State Air Pollution Rule and Proposed National Emissions Standards for Hazardous Air Pollutants Paul M. Sotkiewicz,

More information

2018 Integrated Resource Plan Executive Summary

2018 Integrated Resource Plan Executive Summary 2018 Integrated Resource Plan Executive Summary At NIPSCO, we re proud that our work provides the energy that northern Indiana families and businesses rely on to power their daily lives. We work each day

More information

In Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012

In Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012 In Response to the New York Energy Highway RFI Spectra Energy Corp s Comments May 30, 2012 Spectra Energy Corp ( Spectra Energy ) appreciates the opportunity to provide comments to the New York Energy

More information

National Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008

National Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008 National Association of Publicly Traded Partnerships MLP Conference Presentation New York, New York May 21, 2008 Safe Harbor Statement Some of the statements in this document concerning future company

More information

CLOSING THE POWER PLANT CARBON POLLUTION LOOPHOLE: SMART WAYS THE CLEAN AIR ACT CAN CLEAN UP AMERICA S BIGGEST CLIMATE POLLUTERS

CLOSING THE POWER PLANT CARBON POLLUTION LOOPHOLE: SMART WAYS THE CLEAN AIR ACT CAN CLEAN UP AMERICA S BIGGEST CLIMATE POLLUTERS CLOSING THE POWER PLANT CARBON POLLUTION LOOPHOLE: SMART WAYS THE CLEAN AIR ACT CAN CLEAN UP AMERICA S BIGGEST CLIMATE POLLUTERS We limit the amount of toxic chemicals like mercury and sulfur and arsenic

More information

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013 Energy Imbalance Market Design Straw Proposal and Issue Paper Stakeholder Meeting April 11, 2013 Agenda Time Topic Presenter 10:00 10:10 Introduction Mercy Parker-Helget 10:10 10:45 Opening Remarks Don

More information

Entergy Arkansas, Inc Integrated Resource Plan. Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp

Entergy Arkansas, Inc Integrated Resource Plan. Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp Entergy Arkansas, Inc. 2018 Integrated Resource Plan Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp Follow-up Materials to the 2018 IRP Stakeholder Meeting The following information is provided

More information

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission Wholesale Electricity Markets and New England Independent System Operator Commissioner Mark Vannoy Maine Public Utilities Commission March 26, 2014 Overview and Background 2 Wholesale Electricity Markets

More information

Managing the Rapid Transformation of New England s Energy Resources

Managing the Rapid Transformation of New England s Energy Resources NOVEMBER 13, 2015 BOSTON, MA Managing the Rapid Transformation of New England s Energy Resources New England-Canada Business Council Gordon van Welie PRESIDENT AND CEO New England Has Seen Dramatic Changes

More information

EEI Financial Conference. November 8-10, 2015

EEI Financial Conference. November 8-10, 2015 EEI Financial Conference November 8-10, 2015 Safe Harbor Statement The information contained herein is as of the date of this presentation. Many factors may impact forward-looking statements including,

More information

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009 The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009 Growth of Wind Generation in ERCOT MW 12,000 10,000 8,000

More information

AGA Financial Forum Business Update. May 17-19, 2015

AGA Financial Forum Business Update. May 17-19, 2015 AGA Financial Forum Business Update May 17-19, 2015 Safe Harbor Statement The information contained herein is as of the date of this presentation. Many factors may impact forward-looking statements including,

More information

Reforms to Improve Gas-Electric Coordination Mark R. Haskell, Floyd L. Norton, IV, Brett A. Snyder April 29, 2014

Reforms to Improve Gas-Electric Coordination Mark R. Haskell, Floyd L. Norton, IV, Brett A. Snyder April 29, 2014 Reforms to Improve Gas-Electric Coordination Mark R. Haskell, Floyd L. Norton, IV, Brett A. Snyder April 29, 2014 www.morganlewis.com Presentation Overview Revisions to the operating and scheduling processes

More information

Marc de Croisset FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue

Marc de Croisset FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue Marc de Croisset. 646.885.5423. mdecroisset@fbr.com FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue September 20, 2012 Disclosures Important disclosures can be found at the end of

More information

Resource Adequacy Straw Proposal. Seasonality. for addressing. July 31, 2015 MISO Staff

Resource Adequacy Straw Proposal. Seasonality. for addressing. July 31, 2015 MISO Staff Resource Adequacy Straw Proposal for addressing Seasonality July 31, 2015 MISO Staff Executive Summary MISO appreciates the stakeholder feedback it received in response to its Issues Statement on Facilitating

More information

EIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015

EIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015 EIPC Interconnection-wide Webinar and Stakeholder Discussion November 17, 2015 Webinar Outline Presentation on 2025 Summer Peak (2025S) and 2025 Winter Peak (2025W) Roll-up Case Development Report to be

More information

Year Assessment. Initial Stakeholder Meeting. October 16,2008 Pewaukee MRA Building

Year Assessment. Initial Stakeholder Meeting. October 16,2008 Pewaukee MRA Building 2009 10-Year Assessment Initial Stakeholder Meeting October 16,2008 Pewaukee MRA Building 1 CDAA This presentation has been posted on the OASIS. It does not contain any market sensitive or critical infrastructure

More information

Ten Years After Gas & Power in Perspective

Ten Years After Gas & Power in Perspective Regional Market Trends Forum Ten Years After Gas & Power in Perspective Richard Levitan, rll@levitan.com May 1, 2014 Agenda 2014 Polar Vortex v. 2004 Cold Snap Northeast Gas & Power 10 Years After Gas

More information

Resource Adequacy Modeling update. Technical Workgroup #4 June 14, 2018 AESO External

Resource Adequacy Modeling update. Technical Workgroup #4 June 14, 2018 AESO External Resource Adequacy Modeling update Technical Workgroup #4 June 14, 2018 Demand Curve Workgroup Objective: AESO Resource Adequacy Model Through the WG process, AESO seeks workgroup members review and feedback

More information

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh) For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold

More information

Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013

Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013 Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013 1 Who is MISO? Midwest Independent Transmission System Operator, Inc. Changing name to the Midcontinent t Independent d tsystem Operator,

More information

2018 Economic Planning Study Results

2018 Economic Planning Study Results 2018 Economic Planning Study Results Anna Torgerson, Economic Planning October 25, 2018 atcllc.com Introduction Process Overview and Timeline MTEP18 Futures Refresh Study Area Results Next Steps atcllc.com

More information

CO2, SO2 and NOX Emission Rates. March 15, 2018

CO2, SO2 and NOX Emission Rates. March 15, 2018 March 15, 2018 This page is intentionally left blank. PJM 2018 www.pjm.com 1 P age Introduction To support the efforts of regulators, stakeholders, and other interested parties as they work towards achieving

More information

Environmental Compliance (Slides 7-15) Angila Retherford, Vice President Environmental Affairs and Corporate Sustainability

Environmental Compliance (Slides 7-15) Angila Retherford, Vice President Environmental Affairs and Corporate Sustainability Vectren 2016 Integrated Resource Plan (IRP) July 22, 2016 Stakeholder Meeting 2 Summary The following is a summary of the second of three Vectren IRP stakeholder meetings in 2016 and is meant to provide

More information

2009 Integrated Resource Plan. PNUCC Board of Directors Meeting. January 7, Copyright 2010 Portland General Electric. All Rights Reserved.

2009 Integrated Resource Plan. PNUCC Board of Directors Meeting. January 7, Copyright 2010 Portland General Electric. All Rights Reserved. 2009 Integrated Resource Plan PNUCC Board of Directors Meeting January 7, 2011 1 Copyright 2010 Portland General Electric. All Rights Reserved. IRP Public Process 2 2009 IRP / Boardman Public Process:

More information

MISO Energy Storage Study DRAFT Scope

MISO Energy Storage Study DRAFT Scope MISO Energy Storage Study DRAFT Scope MISO Energy Storage Study DRAFT Scope July 19, 2011 MISO Page 1 Table of Contents 1. Introduction... 3 2. Study Objectives... 3 3. Study Drivers... 4 4. Study Description...

More information

Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component

Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component Results and Assumptions For Single Economic Dispatch Production Cost Study PROMOD Component Last Revised: May 25, 26 Disclaimer: "MIDWEST ISO MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND, EXPRESS

More information