STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17.

Size: px
Start display at page:

Download "STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17."

Transcription

1 STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. SURVEY NO.81/2, NEAR VILLAGE - KODIDRA, TALUKA- VERVAL, DISTRICT GIRSOMANATH, (GUJARAT) PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: LACS Details of Area Total Area ha, Near Village- Kodidra, Taluka-Veraval District-Gir Somnath (Gujarat) Applicant M/s. GHCL Ltd. At.& P.O. - Sutrapada, Distt. - Gir Somanath, (Gujarat) E- mail psarkar@ghcl.co.in 1

2 STANDARD TEMPLATE & FORM - I 2

3 Contents for the Standard Template and Form-1 Sr.no Contents Page. 1. Standard Template For Evaluation of All Form -I

4 Sr.. STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES Information required Information to be furnished by the project proponent 1. Name of the project or activity Kodidra Limestone mining lease Area 2. Name of the organization/owner M/s. GHCL LTD 3. Address for communication M/s. GHCL Ltd, GHCL House, Opp. Punjabi hall, Near Navrangpura Bus Stand, Ahmedabad Telephone numbers , ID of the organization or contact person 6. Location of the Proposed project or activity. 7. Appraisal Category (B2 or B1) B2 8. Nearest habitation and distance from the project or activity. Navarangpura, Kodidra Lime Stone Mine Near Village Kodidra Taluka -Veraval Dist.-Gir Somnath (Gujarat) Kodidra about 2.0 km from Mining lease N direction. 9. Installed capacity / Production Proposed production 28,000 Capacities. TPA 10. Specify the Fuel (Coal / CNG / 0.5 KLD biomass/others) and quantity required. 11. Details of Land use/land Cover. The mining lease area is Govt. waste Land (4.70 hectare). Mining lease area generally flat and have poor vegetation and no buildings in the area. So no clearance will be required for existing land, vegetation, and building. 12. Occupancy, ownership of the land in which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13. If it is a Forest land, the following details shall be furnished: (Whether it is a Reserved forest / Protected forest/demarcated forest/ National Parks/Sanctuaries/any land in possession of Forest Department.) The mining lease area is Govt. Waste Land Key plan enclosed with PFR Plate no. 2 4

5 a (The village map with Sy.. indicating nearest forest boundary line from the site shall be enclosed) 14. Total investment of the project/activity Lac Funds allocated for EMP (capital cost 1.50 Lac / annum and recurring cost per annum) 15. Brief description of the project with special reference to specific pollution and its control measures. Dust emission from handling of material and transport, which will be very less and cause very less impact. Only dust emission from handling of material, which will very less and not cause any negative impact. odour will develop. ise from operation of drill machine & dumpers/tippers. Blasting in small scale will be done so noise will be momentary. There will be vibrations from blasting but no long term impact on nearby area will be anticipated. The quarrying activity shall increase the SPM, RSPM, So2 & CO levels to some extent but they are in negligible quantities. 16 Compliance report on the following : i Status of compliance of the conditions and environmental safeguards stipulated in the earlier clearance letters. ii Details of the court cases, if any, pending in any Court of Law against the project as well as any directions passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, given to the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, Present proposal is for Environmental Clearance. court case is pending against the proposed project 5

6 17. Whether the project attracts the provisions laid under the OM dt issued by the MoEF, GOI, w.r.t. violation of EIA tification, 2006 and its amendments there of? ( / ) Present stage and status of the Project : The proposed lease area is a Existing mine area. 18. Name of the Consultant: This is a B2 category project so no need for Consultant. 6

7 APPENDIX - I FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Kodidra Limestone Mining Lease Area 2. S.. in the schedule 1(a) B2 category. 3. Proposed capacity/area/length/tonnage to be Proposed Production 28,000 TPA Mining Lease area 4.70 hectare handled/command area/lease area/number of well to be drilled 4. New/Expansion/Modernization New 5. Existing capacity/ Area etc hectare mining lease area 6. Category of Project i.e. A or B B2 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify Location Plot/Survey/Khasra. Survey no. 81/P 9. Near Village Kodidra Tehsil Veraval District Gir Somnath (earlier Gir Somnath) State Gujarat 10. Nearest Railway Station / Airport along with distance in Km (by Road) Nearest Railway Station is Veraval at a distance of 26 km from the ML area. Airport Keshod at a distance of 75 km from Nearest Town City District Headquarter Village Panchayat / Zila parishad / Municipal Corporation / local body 13. Name of the Applicant/Lessee M/s. GHCL Ltd. the ML area. Veraval Veraval Gir Somnath (earlier Gir Somnath) (Gujarat). Village Panchayat Kodidra Zila Parishad Gir Somnath (earlier Gir Somnath) Registered Address M/s. GHCL Ltd, GHCL House, Opp. Punjabi hall, Near Navrangpura Bus Stand, Navarangpura, Ahmedabad Address for Correspondence Name Manish Kumar Designation(Owner/Partner/CEO) Power of attorney Holder Address: B-7, Sanjay Nagar, GHCL Colony, Sutrapada, Gir Somnath. Pin code

8 16. E mail Telephone./ Mobile , Fax /83 Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet. 17. Interlinked Project 18. Whether separate application of interlinked project has been submitted 19. If yes, date of submission N.A. 20. If no reason N.A. 21. Whether the proposal involves approval / clearance under : a) The Forest (Conservation) Act, 1980 b) The Wildlife (Protection) Act, 1972 c) The C.R.Z. tification,1991 N.A. Mining lease area is site specific. Key Plan Enclosed. 22. Forest land Involved(hectares) 23. Whether there is any litigation pending against the project and/or land in which S.. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Land use pattern (Hects.) Land use Category Pre Operation al Phase Opera tional Phase Post Operation al Phase Top Soil Dump Waste Dump (External) Excavation (Voids Only) * Road & Built Up Area Township Area Afforestation Reclamation (Backfilled) Mineral Storage / Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1) The mining lease area comprises Govt. waste Land. 2) The topography of the area is generally flat. The highest elevation of the lease area is 48 mrl and lowest being 45 mrl. 3) The permanent change in land use within the lease area due to mining. Detail of land use up to post-operational phase is given in tabular form. 8

9 Processing (Crushing) Undisturbed Area Total *About hectare area will be used as water storage. 1.2 Clearance of existing land, vegetation and buildings? The mining lease area is Govt. waste Land (4.70 hectare). Mining lease area generally flat and have poor vegetation and no buildings in the area. So no clearance will be required for existing land, vegetation, and building. 1.3 Creation of new land uses? In way of pitting & plantations. Details given in tabular form in above point Pre-construction investigations e.g. bore houses, soil -- testing? 1.5 Construction works? Demolition works? Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? The laborers deployed will be from nearby villages only. Rest shelter will be provided. As per the rule 62 & 63 of Mines Rules Mine excavation in the form of pits. -- At the Post-operational Phase Plantation In the operational phase about 2000 saplings will be planted. Plantation will be done along the lease boundary, on backfilled area etc Dredging? Offshore structures? -- 9

10 1.13 Production & manufacturing processes? Limestone 28,000 TPA. Open Cast manual. Benches of 0.5 to 3 m height and width more than height. Drilling will be done by Jackhammer. Drilled holes will be blasted using slurry explosive. The mineral will be used in the Soda Ash Industry Facilities for storage of goods or materials? In the office/store at project site Facilities for treatment or disposal of solid waste or Mineral will be used in Soda Ash liquid effluents? Industry etc. liquid effluent 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? will be discharged. The mine workers will be from nearby villages so no long term housing facility is required. Tipper/dumper will be required for material transportation from project site to destination. The existing mode of transportation will be used. new facility is required Closure or diversion of existing transport routes or -- infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or -- pipelines? 1.21 Impoundment, damming, culverting, realignment or -- other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? There is no flowing water stream or lake as a surface water source in the core zone. Requirement of water in the area is mostly met from PHED supply & underground sources through tube wells and hand pumps. change in water bodies, drainage or runoff is anticipated Transport of personnel or materials for construction, operation or decommissioning? Road transportation for personnel will be arranged by lessee vehicles and mineral will be transported by Tippers/dumpers Long-term dismantling or decommissioning or -- 10

11 restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? -- About 36 people will get employment. Most of the people will be employed from nearby villages Introduction of alien species Loss of native species or genetic diversity? loss of native species or genetic diversity Any other actions Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): S.. Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land(ha) 2.2 Water (expected source & competing users) unit : KLD / Details thereof (with approximate quantities/rates, wherever possible) with source of information data Govt. waste land will be used for mining. PHED Supply & Hand pump/tube well situated in nearby village & water tanker and no competing users. Detail of water requirements in KLD as given below : 1. Dust Suppression Drinking & Sanitation 3 Green belt Total Minerals(MT) Limestone 28,000 TPA 2.4 Construction Material-Stone, aggregates -- and /soil(expected source-mt) 2.5 Forest and timber(source-mt) Energy including electricity and fuels electricity is required. Fuel (source. Competing users) Unit : (HSD) will be obtained from fuel(mt), energy(mw) authorized public fuel station or from plant & about 0.5 KLD H.S.D. 2.7 Any other natural resources(use appropriate standard units) will be used

12 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., / Details thereof (with approximate quantities/rates, wherever possible) with source of information data Drill hole will be filled with slurry explosive for column charge & booster and blasting with excel. Explosive will be handled and used by persons certified under MMR Mine management will look after the undeveloped area to improve the socio-economic level and enhance the skill of the local people. About 36 persons will get employment. Village Kodidra will be adopted for social development. Total fund is about Rs. 1.0 Lac /Annum Any other causes Production of solid wastes during construction or operation or decommissioning (MT/month) -- S.. Information/Checklist confirmation / Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.1 Soil, overburden or mine wastes Mineral will be used in the Soda ash industry etc. If soil encountered, soil will be stacked at separate site, and it will be simultaneously used for plantation. About 3654 cum of undersized limestone was generated during plan period. 4.2 Municipal waste (domestic and or Domestic and office effluent will be commercial wastes) treated in individual septic tanks. 4.3 Hazardous wastes (as per Hazardous -- Waste Management Rules) 4.4 Other industrial process wastes Surplus product -- 12

13 4.6 Sewage sludge or other sludge from effluent treatment Toilet waste will be attached to soak pit, when removed used as fertilizer in plantation. 4.7 Construction or demolition wastes Redundant machinery or equipment t, till closer of mining operation. Machinery will be used at the other site. 4.9 Contaminated soils or other materials Agricultural wastes Other solid wastes Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources / Details thereof (with approximate quantities/rates, wherever possible) with source of information data HSD (0.5 KLD) will be used in machineries during mining. Mostly mobile equipment s and their expected emission will be very less and will have less impact. 5.2 Emissions from production processes The production process will involve excavation and loading which will generate emissions and will cause little impact. 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odors from handling of materials including construction materials, sewage and waste Dust emission from handling of mineral and transport, which will be very less and cause very less impact. -- Only dust emission from handling of mineral, which will very less and not cause any negative impact. odor will develop. 5.6 Emissions from incineration of waste Emissions from burning of waste in open air -- (e.g. slash materials, construction debris) 5.8 Emissions from any other sources -- 13

14 6. Generation of ise and Vibration, and Emissions of Light and Heat : / Details thereof (with approximate S.. Information/Checklist confirmation quantities/rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, ise from operation of drill machine ventilation plant, crushers & dumper/ tippers. 6.2 From industrial or similar processes From construction or demolition From blasting or piling Blasting in small scale will be done so noise will be momentary. There will be vibrations from blasting but no long term impact on nearby area will be anticipated. From construction or operational traffic During operational stage running of 6.5 dumpers/tippers will produce very less noise, which will not cause any impact. 6.6 From lighting or cooling systems From any other sources Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: / Details thereof (with approximate S.. Information/Checklist confirmation quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Explosives will be procured /supplied by license contractor on the day of working and will be handled and used by persons certified under MMR Only waste water discharged to land will be from septic tanks. Dust settling on land is expected to be very low and will be non-toxic. 7.4 From any other sources Is there a risk of long term buildup of pollutants in the environment from these sources? -- 14

15 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate / quantities/rates, wherever S.. Information/Checklist confirmation possible) with source of information data 8.1 From explosions, spillages, fires etc. from storage, handling, use or production of hazardous substances Hazardous substance will be only explosive for which there are separate laws which will be strictly followed. 8.2 From any other causes The risks of accidents are envisaged due to the operation of equipment s, failure of mine pit etc. Pits slope will be kept at 52. Bench slope will be kept at 85. loose stone or debris will be allowed to remain near the edges of excavation and along the sites of haul road. However, good safety practices will be adopted at the site. All precautionary measures will be adopted and use of protective equipment s will be mandatory. However, to meet the minor incidences and accidents first aid measures at site will be provided. 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)? Low probability of earthquake as the area falls in seismic zone III. It is Moderate risk zone intensity VII. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approx. / quantities /rates, wherever S.. Information / Check list confirmation possible) with source of information data 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries Proposed project will result in further growth of the surrounding area by increasing direct and indirect employment opportunities in the region. All supporting temporary infrastructure will be developed. Temporary Office, rest shelter, will be constructed & first aid will be provide. 15

16 supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment The top mined out benches will be converted and used as a water storage, it will be recharge the ground water table. 9.3 Set a precedent for later developments Mined out area will ultimately be fenced properly all around its periphery to prevent any entry into the area. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects A number of small mines in surrounding area have either restarted or increases combined environmental impacts, particularly due to increased road traffic for materials transport/ dispatch. Mitigation measures to control environment pollution in mine are carried out to minimize the impact. S.. (II) Environmental Sensitivity Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. - 2 Areas which are important or sensitive Kapila River 0.15 km in W for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration - direction, from the mining area. 4 Inland, coastal, marine or - underground waters 5 State, National boundaries - 6 Routes or facilities used by the public SH 26 about 7.5 km in NE direction 16

17 for access to recreation or other tourist, pilgrim areas. 7 Defense installations ne -- 8 Densely populated or built-up area Veraval About 25 km from ML area. 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Veraval About 25 km from ML area. 10 Areas containing important, high ne -- quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) ne Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) ne -- (IV).Proposed Environment Management Plan & Social Development: (A) Suggested by the Applicant 1. Proper plantation of saplings, suitable for the region will be carried out side the lease area & along lease boundary, in consultation with Gram Panchayat, forest department & Private land. 2. Regular maintenance of machineries, vehicles etc and use of PPE. 3. Regular water sprinkling to suppress dust. 4. Garland drain will be made all around working pit. 5. Development activities like hand pump for drinking water, maintenance of road etc. will be taken up. 6. Education, safety & health campaigns will be carried out in surrounding villages. 7. Measures of socio economic influence to the local community. 8. Detailed environmental management plan. 9. Proposed EMP fund Rs Lac. 10. Proposed Social development fund Rs. 1.0 Lac. (B) Suggested by the Expert Appraisal Committee: 17

18 UNDERTAKING I hereby gives an undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place: Manish Kumar (Authorized Signatory) Power of Attorney Holder M/s. GHCL Ltd., Sutrapada, Distt. - Gir Somnath 18

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone Mining (ML. 15/95) 2. S.. in the schedule B1- Mining of Mineral 3. Proposed capacity/area/length/tonnage

More information

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone, Red Ocher and China Clay (ML. 81/82) 2. S.. in the schedule 1 (a) - Mining of Mineral

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to

More information

FORM 1 BASIC INFORMATION S.NO.

FORM 1 BASIC INFORMATION S.NO. FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY Asst.Director of Mines and Geology, Rajamahendravaram Ordinary Sand Land Details : Govt Land Extent : 3.9634 Ha. VILLAGE

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s Sri A. Narasimulu 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be handled/command

More information

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00

More information

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 To be submitted By SHRI SANJAY SINGH S/O SHRI MAHENDRA SINGH RATHORE To Madhya

More information

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN Appendix I Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML 219/1997 PRODUCTION CAPACITY: 50,000 TPA

More information

APPENDIX- I FORM- 1. (I) Basic Information:

APPENDIX- I FORM- 1. (I) Basic Information: (I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)

More information

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL

More information

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 FORM 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 (I) Basic Information: S. Item Details 1. Name of the Project/s : Expansion

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project Size of the project (in terms of total area) CRZ classification of the area Expected cost of the project Contact Information

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

NON FOREST LAND Ref. NO

NON FOREST LAND Ref. NO NON FOREST LAND Ref. NO. 2019100004124 FORM I FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment tification, 2006) KHED BAJARI MINE LEASE AREA NEAR VILLAGE KHED,

More information

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION

More information

FORM-I for seeking clearance for project attracting CRZ notification

FORM-I for seeking clearance for project attracting CRZ notification AnnexureIV FORM-I for seeking clearance for project attracting CRZ notification Basic information: SEA CLIFF RESORTS TOURISM PROJECT (.1682/A3/15/KCZMA/S&TD) Name of the Project: THE SEACLIFF Location

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)

More information

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no.

More information

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) Venkateswara Mines & Minerals (Earlier: Sri Bode Vijayasen Reddy), Kannaraopet Village, Nallabelli Mandal, JayashankarBhupalpally

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage

More information

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Mine lease area is 8.91 Ha,

More information

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh. Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 3.000 Hectares, in Sy. : 143 of Bharthupuram village, Nandigam Mandal, Srikakulam District, Andhra

More information

Sri.T.N.Balasubramanya

Sri.T.N.Balasubramanya Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As

More information

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project 2 S. number in schedule 8(a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (AI) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item Details 1 Name of the Project WHITE LILLIES (Residential Project) 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage

More information

FORM-I Basic Information

FORM-I Basic Information FORM-I Basic Information. Item Details 1. Name of the Project/s BHURI BERI Sandstone mine. 2. S.. in the schedule 1(a) 3. Proposed Proposed Capacity-1710 of Sandstone capacity/area/length/tonnage to Quarry

More information

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. FORM 1 Basic Information Item Details 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. located at Survey : 64 ne Lagu, Sabarmati Nadi Patt Village:

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new tification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.. Item Details 1. Name of the project/s M/s. S.L.N.S. Granites Mining of Colour Granite 4.90 Ha 2. S..

More information

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX - I (See paragraph 6) FORM 1 APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 Form-1 & Project Feasibility Report for Mopar Limestone Mine (13.25 hect) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr.

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr. in the Schedule 1-A 3. Proposed capacity/area/length/tonnage to be handles/command

More information

FORM-I. Environmental Clearance (EC)

FORM-I. Environmental Clearance (EC) FORM-I Environmental Clearance (EC) FOR M/S. Mahanth mica mines (MICA, QUARTZ & FELDSPAR MINES) Léase Area : 47.01 Acres/ 19.05 Ha Sy.. 140/P, 142, 143/P & 139/3 Kalichedu (V), Sydapuram (M), SPSR Nellore

More information

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I. FORM- I Page 0 of 15 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sati & Garhi Sand Ghat on Ulai River of District- Jamui. 2. S.. in the schedule

More information

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN Appendix I Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 27/1990 ( R ) 53/2009 PROPOSED PRODUCTION

More information

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Residential Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals) Details required for submitting Fresh EC Application (Category B2 Projects: Mining of Minor Minerals) 1. Project Sector (Non-Coal Mining) 2. Project Type (New, Expansion, Modernization) If Project Type

More information

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 9.890 ha. of Proposed Colour Granite Mine of Sri S. Senthil Kumar 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Squadm Mines & Minerals Pvt. Ltd - Road Metal & Building Stone 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s .APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information. Item Details 1. Name of the project/s Peddayekkaluru White Shale Mine M/s. Swathi Mines 2.. in the schedule Proposed capacity/area/length/ tonnage

More information

M/S Overseas Min Tech Consultants, Jaipur 1

M/S Overseas Min Tech Consultants, Jaipur 1 (I) Basic Information: APPENDIX I (See paragraph 6) FORM 1 S.. Item Details 1. Name of Project Proposed Soapstone Mining Project, Khasra 60, 61, 63, Area: 11.1830Hect., Production: 17508 TPA, Near Village:

More information

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45,800.00 sq.mt. be handled/command

More information

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD. Annexure - III UPDATED FORM I For Amendment to Environmental Clearance (Environmental Clearance issued by MOEF vide. F.. J-11011/366/2007-IA-II (I) Dated, 15.04.2008.) SUBMISSION To Ministry of Environment

More information

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity

More information

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State Khasra.- 1273-min, Area: 4.459 Ha, Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Limestone Mine 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be/ handled

More information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar

More information

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

A 'N 'E B 'N 'E C 'N 'E D 'N 'E Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item

More information

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) FORM 1 (I) Basic Information Item Details 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number

More information

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 6.490 ha. of Proposed Colour Granite Mine of M/s. Alief Exports 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a) FORM I (I) Basic Information S.. Item Details 1. Name of the project Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage

More information

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE At: Brahmanipali, Dustrict: Sambalpur, Odisha Sri Fakir Rohidas Prepared By Centre for Envotech and Management Consultancy Pvt. Ltd. Bhubaneswar

More information

(I) Basic Information:

(I) Basic Information: (I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased

More information

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1 Proposed Ordinary Sand Mining Project at Gata.- 8Ka/195, Village- Ratauli, (I) Basic Information: Sl. Item Details. 1 Name of the project Proposed Ordinary Sand Mining Project in Sharda River at Gata.-

More information

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District Application for Prior Environmental Clearance (Form 1) For Proposed Road Metal / Building Stone/ Robo/Manufacture Sand Mine Over An Extent Of 9.712 Hectares, in Sy.. 743 of Somandepalli Village, Somandepalli

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental

More information

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (22309.63 SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR,

More information

FORM 1 Riverbed Sand Mining Project

FORM 1 Riverbed Sand Mining Project FORM 1 Riverbed Sand Mining Project At Gata. 117ध, 1306म ( Kuda River) Village: Gujarauliya, Beltikar, Tehsil: Naugarh, District: Siddharthnagar, Submitted by M/s Baburam Construction Address-1769 B-5

More information

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat

More information

APPENDIX I. (See Paragraph 6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1 APPENDIX I (See Paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the Project Satva Shiva Gold 2 S. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to be handled/ command

More information

FORM 1 Riverbed Sand/Morrum / Mining Project

FORM 1 Riverbed Sand/Morrum / Mining Project FORM 1 Riverbed Sand/Morrum / Mining Project At Khand. 19/3 (River Betwa) Village: Tikapur, Tehsil: Maudaha District:Hamirpur, Uttar Pradesh Submitted by Suresh Chandra Gupta S/o Narayan Das Gupta R/o-60

More information

FORM I (OPENCAST LATERITE MINE ha)

FORM I (OPENCAST LATERITE MINE ha) SHAIK IMAM SURVEY. 172, 173 & 174, SIDDLOOR VILLAGE, VIKARABAD MANDAL AND DISTRICT, TELANGANA STATE FORM I (OPENCAST LATERITE MINE- 6.176 ha) SUBMITTED BY Sri Shaik Imam R/o 8-2-579/B, Road No. 8, Banjara

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I)Basic Information S. Item Details 1 Name of the project 1.79Acr nakti Limestone Mines (Minor Mineral) 2 S.. in schedule Category B, Project or Activity 1(a) (As

More information

FORM 1 Riverbed Sand Mining Project

FORM 1 Riverbed Sand Mining Project FORM 1 Riverbed Sand Mining Project At Gata. 1255 क Village: Bara Tehsil: Sewrai, District: Ghazipur, Uttar Pradesh. Submitted by M/s Vatsya Infrastructure Private Limited,Lucknow Sh. Rajeev Kumar Pandey

More information

MANAKAWAS PLOT-1 TEHSIL-DADRI, DISTRICT-BHIWANI, HARYANA

MANAKAWAS PLOT-1 TEHSIL-DADRI, DISTRICT-BHIWANI, HARYANA FORM-I MINING OF STONE ALONG WITH ASSOCIATED MINOR MINERALS, PRODUCTION CAPACITY- 22,50,000 TPA, MINING LEASE AREA-20.34 HECTARE LEASE PERIOD: 10 YEARS PROJECT COST: 8.00 CRORES COST FOR EMP: 13.50 LAKHS

More information

Haridarshan Residency ( Row Type House & School Building )

Haridarshan Residency ( Row Type House & School Building ) Survey.. 18, Moje: : Shekhpur, Tal: Kamrej, Dist.: Surat, Gujarat 394 130 FORM 1 AND BASIC INFORMATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR NEW PROJECT OF Haridarshan Residency Block. 18, Village:

More information

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu Application for Prior (Environmental Clearance) Transfer of EC- Form 1 For Transfer of EC from Ms.K.M.Altaf Kouser to Ms.Thriveni Earthmovers Private Limited Over an Extent of 4.838 Hectares of Road Metal

More information

Sl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A)

Sl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A) Form-I (APPENDIX-, PARAGRAPH-6) I. BASIC INFORMATION. Item Details. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2.. of the Schedule : Category B-2 of Activity (A) 3. Proposed capacity

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project 3.274 Ha Kapsada Limestone Mines (Minor Mineral) of M/s I.V.R.C.L Limited 2 S.. in schedule Category B,

More information

Application for Prior Environmental Clearance (EC)

Application for Prior Environmental Clearance (EC) Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu Form 1 as per EIA tification 2006 for Chockampatti Earth Quarry of Thiru.T.Poosai Durai, Chockampatti Village, Kadayanallur Taluk, Tirunelveli District, Tamil Nadu State. Application Form for Obtaining

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information APPENDIX I (See paragraph - 6) FORM 1 SN Contents 1 Name of Project : Mining of Soapstone at Village-Kimoli, Tehsil & Dist -Bageshwar, Uttarakhand with an area 4.984 ha. 2 S. in Schedule

More information

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1 APPENDIX-I FORM-1 (I) Basic Information Sr. Item Details. 1 Name of the project Salai Godhani Stone Quarry Project of Mr. Arvind Janraoji Gajbhiye 2 Sl.. in the schedule 1(a) as per MoEF notification dated

More information

FORM 1 (Application for Environment Clearance)

FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: Location / site alternatives under consideration: Size of the Project: Shreedhar Sparsh

More information

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s. FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,

More information

FORM 1. Basic Information. Sl. No.

FORM 1. Basic Information. Sl. No. (I) Basic Information FORM 1 Sl.. Item Details 1. Name of the project/s Dimensional Stone Useful For Cubes & Kerbs Quarry Of M/s. R.R Stones Private Limited 2. S.. in the schedule Item- 1(a) Mining of

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Ambey Mahila Swa Sahayata Samuh 2 S.. in schedule Category B, Project or Activity 1(a) (As per EIA tification

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M.. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

FORM-1, PRE FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE

FORM-1, PRE FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE FORM-1, PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. SURVEY NO.81/2, NEAR VILLAGE - KODIDRA, TALUKA- VERVAL, DISTRICT GIRSOMANATH, (GUJARAT) PROPOSED

More information

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX - I (See paragraph 6) FORM 1 APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1. Name of the project Amendment in existing Environmental Clearance i. To reduce the Mining Lease area from 281.339 ha to 252.105

More information

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH. Natham Group Village. Kamuthi Taluk, Ramanathapuram District

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH. Natham Group Village. Kamuthi Taluk, Ramanathapuram District APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH AT SURVEY NOS. 275/1A4, 275/1A6, 275/1A16, 275/1A26 and 275/1A11 Natham Group Village Kamuthi Taluk, Ramanathapuram District

More information

HIMALAYA MINES & MINERALS SURVEY NO. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I

HIMALAYA MINES & MINERALS SURVEY NO. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I HIMALAYA MINES & MINERALS SURVEY. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I SUBMITTED BY Sri K. Narsi Reddy House No. 2-7-618, Excise Colony,

More information

THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company)

THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company) APLICATION IN UPDATED FORM - I FOR ENVIRONMENTAL CLEARANCE AMENDMENT (Ref.: As per MoEF tification. S.O. 1533 dated 14.09.2006 & Subsequent Amendments vide S.O. 3067 dated 01.12.2009) IN RESPECT OF JALAGAM

More information

M/S. JUMBO MINING LIMITED Surya Arcade, 4th Floor /4F & D, Near Indian Oil Petrol Pump, Begumpet,Hyderabad Telangana.

M/S. JUMBO MINING LIMITED Surya Arcade, 4th Floor /4F & D, Near Indian Oil Petrol Pump, Begumpet,Hyderabad Telangana. Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 20.0 Hectares, in Sy..1/1 of Chinnagorigedda Village, Madugula Mandal, Visakhapatnam District,

More information

S. Item : Details 1. Name of the Project : Flourspar, Quartz Mine (M.L.No. 4/95) 2. S. No. in the schedule : 1(a)

S. Item : Details 1. Name of the Project : Flourspar, Quartz Mine (M.L.No. 4/95) 2. S. No. in the schedule : 1(a) FORM - 1 1 APPENDIX I (See paragraph 6) FORM - 1 I Basic Information S. Item : Details. 1. Name of the Project : Flourspar, Quartz Mine (M.L.. 4/95) 2. S.. in the schedule : 1(a) 3. Proposed capacity/

More information

M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD

M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD ` SUBMISSION OF FORM I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD (Residential Apartment Construction Project) Sy.. 298/1 & 2 Vepagunta,

More information

Revised FORM - I & PRE-FEASIBILITY REPORT

Revised FORM - I & PRE-FEASIBILITY REPORT Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,

More information

Proposed Multiplex & Commercial Complex FORM I

Proposed Multiplex & Commercial Complex FORM I I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Multiplex cum Commercial Complex 2 no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 13,218.80

More information

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project 1 SCOPING 1.1 FORM 1 The scoping for the project has been done based on Form-I, as per EIA tification, dated September 14, 2006 amended as on date. The scoping details are as follows: I. Basic Information

More information

Form-1 FORM 1. Proposed salhan-bagda limestone mine ha( acres) M/s Jharkhand State Mineral Development Corporation Ltd.

Form-1 FORM 1. Proposed salhan-bagda limestone mine ha( acres) M/s Jharkhand State Mineral Development Corporation Ltd. i. Basic Information Sl. Item FORM 1 Details 1. Name of the project/s Proposed Limestone Mining at Village- Bagda, Chaingarha & Salhan, Thana- Ranchi & Budmu, District- Ranchi, State- Jharkhand. 2. S..

More information

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information