Game-theoretic Modeling of Curtailment Rules and their Effect on Transmission Line Investments Andoni, Merlinda; Robu, Valentin; Fruh, Wolf-Gerrit

Size: px
Start display at page:

Download "Game-theoretic Modeling of Curtailment Rules and their Effect on Transmission Line Investments Andoni, Merlinda; Robu, Valentin; Fruh, Wolf-Gerrit"

Transcription

1 Heriot-Watt University Heriot-Watt University Researh Gateway Game-theoreti Modeling of Curtailment Rules and their Effet on Transmission Line Investments Andoni, Merlinda; Robu, Valentin; Fruh, Wolf-Gerrit Published in: Proeedings of the IEEE Power Engineering Soiety 6th Innovative Smart Grid Tehnologies Europe Conferene Publiation date: 16 Doument Version Peer reviewed version Link to publiation in Heriot-Watt University Researh Gateway Citation for published version (APA): Andoni, M., Robu, V., & Fruh, W-G. (16). Game-theoreti Modeling of Curtailment Rules and their Effet on Transmission Line Investments. In Proeedings of the IEEE Power Engineering Soiety 6th Innovative Smart Grid Tehnologies Europe Conferene IEEE.

2 Game-theoreti Modeling of Curtailment Rules and their Effet on Transmission Line Investments Merlinda Andoni, Valentin Robu and Wolf-Gerrit Früh Heriot-Watt University, Edinburgh, UK Abstrat This paper provides a study of the impat of urtailment shemes, applied when generation exeeds demand, on the Capaity Fator (CF) of wind generators, inluding the effet of spatial wind orrelation among different loations. Moreover, we disuss how a round-robin urtailment rule ould be implemented to guarantee approximately equally urtailment ratio for generators of unequal rated apaity. Next, we onsider a two-loation problem, where exess renewable energy generation and demand are not o-loated. We study the ombined effet that urtailment shemes and line aess rules have on the deision to invest in new transmission lines. In partiular, we show that, for ommon aess rules, this an lead to a Stakelberg game between transmission and loal generation apaity investors, and we haraterise the equilibrium of this game. Finally, we apply and exemplify our model to a onrete problem of building a transmission link in western Sotland, and we propose a mehanism for setting transmission harges that assures both that the transmission line gets built, but investors from the loal ommunity an also benefit from investing in renewable energy. I. INTRODUCTION Integrating energy generated from renewable energy soures (RES) into existing grids is one of the key fators for ensuring a sustainable, arbon-free energy future [1], yet sets a new set of hallenges to eletriity networks []. A key problem is that loations whih are best suited for installing new apaity due to favourable resoure onditions or soial approval, e.g. large wind turbines, are typially remote loations (suh as windy islands), situated far from population/industry entres. Hene, a lot of new RES apaity installed is subjet to generation urtailment, a strategy where distributed generators are granted non-firm grid aess and are required to adjust their outputs aording to the system operator s instrutions, foremost due to network onstraints, low loal demand or insuffiient distribution or transmission network apaity. Tehnial and regulatory aspets of urtailment have been extensively studied [3], however, it is beoming inreasingly lear, that espeially in areas of network ongestion, eah loation s urtailment level (and the urtailment poliy applied) an play a ruial role on the total installed generation apaity, due to their effet on investor deisions [4] and might therefore disourage future RES investment. The long term solution is to build or reinfore transmission and distribution lines, between remote and areas of high demand. Network upgrade often presents prohibitively high osts and is traditionally performed, or partially supported by publi investment means, usually through the transmission system or loal distribution network operator (TSO/DNO). From a publi poliy standpoint, it would be highly desirable to inentivise private investors to undertake part of the required grid infrastruture investment. An approah would be that power lines are built under a ommon aess priniple, where the line investors may be given a liense under the obligation to allow line aess from third parties, subjet to a transmission fee per unit of energy transported, the level of whih is subjet to a ap set by the regulator. The interplay between urtailment rules and priniples of aess applied to power lines, raises potentially omplex issues, espeially as the line investor, regulator and loal RES investors may have different underlying goals [5]. In this paper, we use the tools from game theory to examine these interations and show that a omplex Stakelberg game an our, in whih the deision to build a transmission line depends on the equilibrium strategy of loal investors to invest in additional generation apaity. Various ommerial and aademi studies [3], [4], [6], [7] disuss the appliation of urtailment strategies, primarily fousing on their tehnial, legal and regulatory impliations, rather than their impat on investor s deision-making, regarding generation or transmission assets, whih is the fous of our work. In the ontext of deregulated eletriity markets, transmission planning tehniques need to adopt optimisation [8] and strategi modeling of market partiipants [9], as opposed to intuitive approahes, adopted by utility ompanies in the past [1]. This is where game theory tools an play a signifiant role. Strategial behaviour of energy investors has been simulated, with agent-based modeling [11], [1], or by examining alternative market strutures, where network upgrade is performed by system operators or private investors, leading to different optimal results [13]. In [14], oalition formation is used to oordinate privately developed power grid lines, in order to redue ineffiienies and transmission losses, while transmission planning and expansion at areas of network ongestion were studied in [15]. Curtailment strategies or line aess rules were not onsidered in these works. However, as the profitability of any sheme is diretly affeted by suh rules, we fous on this fator for our work. Stakelberg games have been used to model transmission upgrade, using eonomi analysis with soial welfare [16], Loational Marginal Priing [17] or highlighting the unertainties of RES generation [18]. Reent works on the renewable energy /16/$ IEEE

3 domain, use Stakelberg game analysis to desribe energy trading of mirogrids [19], [] or propose novel funding shemes for RES investment [1]. In summary, the ontribution of this work to the state of the art an be stated as follows: First, we formalise the effet of ommonly-used urtailment rules on the RES apaity installed at a partiular loation. We show that the resulting apaity built and profitability of different generators an differ widely under different urtailment models or wind orrelation, and we propose a new round-robin rule. Seond, we study the network upgrade as a Stakelberg game between the line and loal RES investors, for ommon aess rules, and we derive the amounts generated and profits in the equilibrium of this game. Finally, we exemplify our analytial results for the ase of a grid reinforement and the finanial parameters of the Kintyre-Hunterston link, in the UK, and determine a feasible range of the transmission harges. The remainder of this paper is organised as follows: Setion II elaborates on urtailment strategies. Effets on transmission investment are shown in Setion III. Numerial results of a line upgrade ase-study are presented in Setion IV, while Setion V onludes. II. CURTAILMENT STRATEGIES The seletion of a urtailment strategy (see [7], [] for an extensive review) needs to aount for several assessment riteria, suh as fairness, transpareny, effiieny or reliability. The shemes proposed take into onsideration: the tehnial harateristis of the generators, their size, loation, expeted response time, and ruially, the order of onnetion to the power grid. In this paper, we fous our attention to the main mehanisms found in the literature or applied to ommerial Ative Network Management (ANM) shemes 1 :last-in-firstout (LIFO), Pro Rata (or proportional) and Rota. In LIFObased urtailment, generators are urtailed based on the inverse order in whih they were granted the right to onnet to the distribution network. By ontrast, Pro Rata shares urtailment equally among installed generators, proportionally to the rated apaity or atual power output at the time of urtailment. Finally, Rota urtails generators at a rotational basis or a predetermined rota, as speified by the system operator. To illustrate the effets and operation of these shemes, we onsider a simple network of three wind generators of P N1 = 7 MW, P N = MW and P N3 = 3 MW rated apaity, where the subsript denotes the hronologial order of their onnetion to the power grid. For simpliity, we assume there is no export apability and the demand is onstant and equal to P D,t = 6 MW, t. For a given time interval t, if all generators are produing their nominal output power, a total of P C,t = 6 MW needs to be urtailed. The alloation of this 1 LIFO is used in: and Pro Rata is used in: Projets/tier--projets/Flexible-Plug-and-Play-(FPP)/ power to the generators depends on the sheme seleted: With LIFO, the third and seond generator are ompletely urtailed and the first is urtailed by 1 MW. On the other hand, when Rota is implemented, the generators take turns, resulting here in the first generator being urtailed by 6 MW, while the other generators are not affeted. In the next urtailment event, the seond generator is required to be urtailed and so on. By ontrast, with Pro Rata the allowed export is alloated proportionally to the generator s output, resulting in 3.5 MW, 1 MW and 1.5 MW urtailed power, respetively. If Pro Rata is not always desirable (tehnially speaking, it may require modified pith-ontrolled wind turbines, suh that their output an be adjusted as needed, whih may be more expensive), we an think of an equivalent Rota-type strategy with the same fairness properties, a strategy we all Frational Round Robin (FRR). With FRR, the power urtailed is distributed sequentially on a rotation basis, aording to the number of rated apaity units installed, so that larger generators are hosen proportionally more times, in diret relation to their size. This means for instane that, on average, every 1 times a urtailment of 6 MW is needed, the first generator will be urtailed 7 times, the seond times and the third 3 times. Being aware in advane of the urtailment order, the unertainty of short-term power output predition of a generator an be redued. Moreover, for a suffiiently long period of time (i.e. many years, the typial lifetime of a wind turbine), the urtailment rate under FRR onverges to the proportional urtailment rate with Pro Rata. We implement a simulation proess, in the ourse of one year, to ompute the apaity fators of the wind generators, under different shemes. However, sine network onstraints are usually appliable to a partiular geographial area of the grid, where wind onditions may be similar, the power output of the generators presents a level of spatial orrelation, whih is signifiant for the required urtailment level at this area. To model orrelation, we apply the tehnique developed by Früh (15) [3]. First of all, we generate 876 data points of wind speed u rand,i for i = generators, from three random and independent samples of a Weibull distribution (one for eah generator), using the typial UK values of = 9 m/s and k = 1.8. We set the wind speed at the first generator s loation as a referene u Ref and we produe random, yet rossorrelated wind data series u i at eah generator s loation, by the following equations: u i (t) = r u Ref (t) + (1 r ) u rand,i (t) (1) r = 1 aros(1 r) () π where r is the Pearson s orrelation oeffiient. The data series are then onverted to power outputs, using a generi model of a wind turbine. If the aggregate power at time t exeeds the power demanded, then urtailment is required, whih is alloated to the generators aording to the strategy imposed. Based on the power urve of Eneron E44 ommerial wind turbine.

4 Average apaity fator variane Capaity fator (%) Average apaity fator (%) 35 LIFO Rota Pro Rata FRR 3 LIFO Rota Pro Rata FRR Generators Pearson oeffiient r Fig. 1. Curtailment mehanisms effets on the CF of wind generators under LIFO, Rota, Pro Rata and FRR Fig. 3. Correlation effets on average CF under different urtailment shemes LIFO Rota Pro Rata FRR Average number of urtailment events Fig.. Fairness under different urtailment shemes Fig. 1 shows the CF results for eah generator under the four different shemes for onditions of perfet orrelation (r = 1). LIFO learly favours early onnetions, while the third generator suffers a redution of 67.4%. Rota an disadvantage smaller-sized generators. On the ontrary, Pro Rata produes equal CF redution for all generators, while FRR produes similar results to Pro Rata, as expeted. A measure of fairness is the variane of the average CF for eah strategy. In Fig., we illustrate, for r = 1, this variane with the average of the number of urtailment events required. LIFO presents a poor performane with respet to fairness, as opposed to Pro Rata, whih requires the largest number of urtailment events. FRR an present similar fairness properties to Pro Rata, while reduing signifiantly the number of urtailment events per generator. Finally, Rota is fairer than LIFO and requires the smallest number of urtailment events ompared to all shemes. Finally, as shown in Fig.3, the required total urtailment inreases, as we proeed from no orrelation to perfet orrelation, resulting in lower CFs. In the following setion, we turn our attention to modeling the grid infrastruture investment, at areas where generation urtailment is applied. III. CURTAILMENT & NETWORK UPGRADE Here, we study how the applied urtailment influenes the deision to build or reinfore transmission lines. We onsider two loations: A is a net onsumer (where demand exeeds supply, e.g. a mainland loation with industry or signifiant population density) and B is a net energy produer (favourable RES onditions, e.g. a remote region rih in wind resoure). In pratie, there would be some loal demand and supply, onsidered here negligible, and installation of new RES apaity is not be feasible without a network upgrade. Loation A has a net demand of E D,A, equal to loal demand minus loal generation. Moreover, we onsider two players: the line investor, who an be merhant-type or a utility ompany and is building the A B interonnetion and possibly renewable generation apaity at B, equal to E G1,B, and a loal player, who represents the loal RES generators or investors loated at B, E G,B. This seond player an be thought of as investors from the loal ommunity, who do not have the tehnial/finanial apaity to build a line, but may have aess to heaper land, find it easier to get ommunity permission to build turbines et., hene may have a lower per-unit generation ost 3. Essentially, E Gi represents the expeted energy units, for the projet lifetime, aording to the resoure on the site s loation, without enountering urtailment. Note that, while for a partiular time period, suh as an hour or a day, the expeted generation is unertain, for the overall lifetime of a RES projet, it an be estimated with relatively high ertainty from the weather and wind patterns at this loation. For simpliity, we assume there is no RES apaity installed at loation B prior to the onstrution of the power line. However, the deision of building the power line will eliit a reation from loal investors. This two-stage proess is analysed as a Stakelberg game. Cruially, the line investor 3 Note that in Sotland, or other ountries suh as Denmark, loal groups often at together to make land available and invest in RES projets. Community Energy Sotland (CES) is an umbrella organisation of suh groups.

5 has a first mover advantage, as only he an build the grid infrastruture, whih is expensive, tehnially hallenging and only a limited set of investors (e.g. DNO-approved) have the expertise and regulatory approval to arry it out. The power line ost is estimated as C T = I T + M T over the projet lifetime, where I T is the ost of building the line (or initial investment) and M T the ost of operation and maintenane. The monetary value of the power line is proportional to the energy flowing from B to A, harged under ommon aess rules with p T transmission fee per energy unit. Moreover, the ost of expeted generation per unit Gi (for onstant depreiation) is Gi = (I G,i + M Gi )/E Gi, where I Gi the ost of building the plant and M Gi the operation and maintenane osts, and we assume that the energy generated by a RES unit is sold at a onstant feed-in-tariff prie (FIT), equal to p G. The line investor or leader an assess and evaluate the reation of other investors to determine his strategy (i.e. the line and RES apaity to be installed), aiming to influene the equilibrium prie. Loal generators or followers an only at after observing the leader s strategy. The equilibrium of the game is found by bakward indution. First, the leader estimates the best response of loal generators, given its own output and then deides his strategy aiming to maximise his profit. At a seond stage, the follower observes this strategy and deides his generation apaity, as his best response, i.e. maximising his own profit, as antiipated by the leader. The network aess arrangements play here a ruial role for the market equilibrium formed. Hene, we define a new parameter, whih quantifies the urtailment imposed to eah generator. If the expeted urtailed energy units are E Ci, then the urtailment rate CR i of i generator, is defined as the ratio of expeted urtailment to expeted generation, over the projet lifetime CR i = E Ci /E Gi and it is ruial for the viability of existing and future RES investment. Here, CR i < 1 and an be interpreted as CF redution, e.g. CR i = 5% results in a 5% CF redution. Next, we fous and present the equilibrium results for LIFO and a fair urtailment sheme, whih an be an expression of either Pro Rata or FRR. A. LIFO sheme Under a LIFO sheme, the leader is proteted from any urtailment, hene he an build all generation apaity to serve E D,A himself and maximise his profits. The loal investors have to provide all urtailment required, as late onnetions, thus there is no inentive for them to invest in new apaity. Lemma 1: The transmission investment game between the line investor and loal generators with LIFO urtailment results in the expeted generation and profits, at Stakelberg equilibrium: E G 1,B = E DA (3) E G,B = (4) Π 1 = (p G G1 ) E DA (5) Π = (6) Proof: The apaity of the transmission line is bound by the demand at mainland, therefore total generation apaity at loation B, (E G1,B + E G,B ) annot exeed E DA. Any generation apaity built exeeding the demanded energy, has to be urtailed. Taking this into aount, the profit funtions of the two players are Π 1 = p T E DA + (p G p T G1 ) E G1,B C T Π = (E DA E G1,B ) (p G p T G ) Aounting for the leader s market advantage, we derive the desired equations. B. Pro Rata or FRR sheme The main differene from LIFO, is that proportional rules are imposed to all generators, regardless of their order of onnetion. Therefore, more total apaity E G,B = E G1,B + E G,B than the energy demanded at A an potentially be installed, as long as the urtailment rate or energy urtailed E C,B = E G,B E D,A allows for the investments to be profitable. The urtailment rate at loation B is given by E D,A CR B = 1 E G1,B + E G,B Given this, the general profit funtions of the players, whih are funtions of both players energy outputs Π(E G1,B, E G,B), an be expressed as: ( pg E D,A Π 1 = E G1,B + E G,B G1 ) E G1,B (7) + p T E D,A E G,B C T (8) E G1,B + E [ G,B ] (pg p T ) E D,A Π = G E G,B (9) E G1,B + E G,B Before stating our main Stakelberg equilibrium results, we need to define the players best responses. Proposition 1: Given the output of the leader E G1,B, the follower s best response is: E G,B = (p G p T ) E D,A E G1,B G E G1,B (1) Proof: Let the value of E G,B, whih maximises the profit of the follower, be E G,B = argmax Π. Setting as E G,B zero the partial derivative of Π in (9), with respet to E G,B and rearranging, we get (1). Proposition : Given the output of the follower EG, the,b leader s best response is: E G 1,B = (p G p T ) G E D,A 4 G1 (11) Proof: Let the value of E G1,B, whih maximises the profit of the follower, be E G1,B = argmax Π 1. Substituting E G1,B (1) in (8) and then setting as zero the partial derivative of Π 1 with respet to E G1,B gives the stated expression. Lemma : The transmission investment game between the line investor and loal generators with a proportional sheme

6 results in expeted generation and assoiated profits, at Stakelberg equilibrium: E G 1,B = (p G p T ) G E D,A 4 G1 (1) E G,B = (p G p T ) ( G1 G ) E D,A 4 G1 (13) Π 1 = (p G p T ) G E D,A 4 G1 + p T E D,A C T (14) Π = ( G 1 G ) (p G p T ) E D,A 4 (15) G 1 Proof: Replaing Prop. in (1), the optimum output of loal generators EG,B is found, i.e. (13). Finally, substituting the energy outputs at equilibrium (1) and (13), in (8) and (9), we derive the equilibrium profits Π 1 = max Π 1 and Π = max Π. Finally, note that this strategi interation requires the total generation apaity to exeed the demand at A, i.e. E G1,B + E G,B > E D,A. This onstraint yields the following onditions, whih must hold for the setting to atually be game-theoreti (and for our analysis to be relevant): G < p G p T (16) G1 < p G p T IV. CASE STUDY (17) In this setion, we apply the theoretial framework of the Stakelberg game with Pro Rata (.f. Lemma ) to the onrete ase-study of Kintyre-Hunterston grid reinforement projet 4, urrently under development in the UK. Grid infrastruture in the Kintyre peninsula was originally designed and built to serve a typial rural area of low demand. Wind generation rapid growth, due to substantial inentives, quikly led to high volumes of renewable investment in the region. RES apaity was expeted to reah 454 MW by the end of 15, and future onnetions estimations exeed 793 MW. The neessity for large transmission investment soon beame apparent, therefore the loal DNO proeeded in a 3m network upgrade projet onneting existing Hunterston substation, partially through a sub-sea link to Crossaig, thus reating headroom for additional 15 MW renewable apaity estimated to provide a net lifetime benefit of 5m [4]. Based on these projet figures, we onsider a simplified two-node network, in whih the energy demand in the mainland, met by generation in Kintyre, equals the energy transmitted through the power line. With the majority of investment being wind projets, we estimate the total energy demand as E D,A = 9, 855, MWh for 5 years projet lifetime. As urrently valid in UK for medium size wind projets, the FIT prie was set to p G = 8.6/MWh. In Figure 4, we summarise the results of our model, namely the generation apaity built and assoiated profits at Stakelberg equilibrium, for three senarios: Senario 1 orresponds to the plots of the first olumn and shows the effet of varying the loal investors generation ost, keeping all other parameters at onstant values (set as G1 = p T =.3p G and 4 G =... G1 ), Senario in the seond olumn shows the effet of varying the line investor s generation ost (with settings: G = p T =.3p G and G1 =.15p G....35p G ) and Senario 3 in the third olumn shows the effet of varying the transmission fee (with other parameters set at G1 =.3p G, G =.9 G1 and p T =....4p G ). For eah senario, the range of the free parameter (fixing the others) is determined from the onstraints in (16) and (17). Given a ertain FIT (this parameter is ontrolled by the regulatory authority), the line investment feasibility depends diretly on the generation ost G1 and transmission fee p T. If the line is built, it sets up a level of total feasible generation investment at B whih, ombined with Pro Rata aess rule, leads to larger volumes of apaity being built than atual demand (see 1st row of Fig. 4), as long as the urtailment rate is kept under reasonable levels. Note the level of total generation does not depend on the generation osts of loal investors, sine they annot at without the existene of the line (see Fig. 4 1st row, 1st olumn). For all settings, the size of G relative to G1 determines how exportable level of generation apaity is shared. Cheaper generation has an advantage in all 3 sets of results (.f. Fig. 4 first row), although as the graphs show, the dependeny is not neessarily linear. Another onlusion is that transmission harges, agreed by the line investor and an independent regulatory authority, has to be set within a speifi range. Low values of p T may lead to transmission investment being aborted, somewhat larger values might theoretially be suffiient to ahieve profitability for the line investor, however, hide the risk of free-riding from loal investors, who benefit from the leader s investment at ost muh less than to leader s himself. What the result in Fig. 4 (row, ol. 3) shows is that there exists a range in whih p T an be set suh as to assure the line gets built (i.e. when the leader s profits are above in our ase, transmission harges need to be at least 8/MWh), but also not disourage other loal renewable investors. V. CONCLUSIONS & FUTURE WORK To our knowledge, this is the first work examining the ombined effets of urtailment strategies and transmission aess rules on RES apaity investment and network expansion. Our researh foused on the effets of the urtailment shemes to investment deisions and market behaviour. We model grid reinforement, as a two-stage strategi game between the line investor and loal generators and determine generation apaities and profits at equilibrium. Based on a UK grid reinforement projet, we propose a method to alulate transmission harges, under ommon aess rules, whih enables the implementation of both transmission and loal generation investments. Future work inludes expanding the developed two-loation model to more omplex settings and multiple loations. We also plan to expand the equilibrium results to settings with partial orrelation.

7 * ( millions) * ( millions) * ( millions) E G * (MWh) E G * (MWh) E G * (MWh) Total 1 7 Total Total G G p T G G p T Fig. 4. Rows (1) and () show generation apaity built and profits at Stakelberg equilibrium, respetively, olumn (1) shows dependeny on generation ost of loal generators, () on generation ost of line investor and (3) on transmission fee REFERENCES [1] S. Ramhurn, P. Vytelingum, A. Rogers, and N. R. Jennings, Putting the smarts into the smart grid: A grand hallenge for artifiial intelligene, Communiations of the ACM, vol. 55, no. 4, pp , Apr. 1. [] A. S. Brouwer, M. van den Broek, A. Seebregts, and A. Faaij, Impats of large-sale intermittent renewable energy soures on eletriity systems and how these an be modeled, Renewable and Sustainable Energy Reviews, vol. 33, pp , Mar. 14. [3] L. Kane and G. Ault, Evaluation of wind power urtailment in ative network management shemes, IEEE Transations on Power Systems, vol. 3, no., pp , 15. [4] A. Laguna Estopier, E. Crosthwaite Eyre, S. Georgiopoulos, and C. Marantes, FPP low arbon networks: Commerial solutions for ative network management, in CIRED, Stokholm, 13. [5] E. E. Sauma and S. S. Oren, Eonomi riteria for planning transmission investment in restrutured eletriity markets, IEEE Transations on Power Systems, vol., no. 4, pp , Nov. 7. [6] Baringa Partners and UK Power Networks, Flexible Plug and Play Priniples of Aess Report, Teh. Rep., De. 1. [7] R. Currie, B. O Neill, C. Foote, A. Gooding, R. Ferris, and J. Douglas, Commerial arrangements to failitate ative network management, in 1st International Conferene on Eletriity Distribution. Frankfurt: CIRED, June 11. [8] C. Ruiz, A. J. Conejo, J. David Fuller, S. A. Gabriel, and B. F. Hobbs, A tutorial review of omplementarity models for deision-making in energy markets, EURO Journal on Deision Proesses, vol., pp. 91 1, Ot. 13. [9] C. J. Day, B. F. Hobbs, and J.-S. Pang, Oligopolisti ompetition in power networks: a onjetured supply funtion approah, IEEE Transations on Power Systems, vol. 17, no. 3, pp , Aug.. [1] B. F. Hobbs, Optimization methods for eletri utility resoure planning, European Journal of Operational Researh, vol. 83, pp. 1, [11] L. Baringo and A. J. Conejo, Transmission and wind power investment, IEEE Transations on Power Systems, vol. 7, no., pp , May 1. [1] A. Motamedi, H. Zareipour, M. O. Buygi, and W. D. Rosehart, A transmission planning framework onsidering future generation expansions in eletriity markets, IEEE Transations on Power Systems, vol. 5, no. 4, pp , Nov. 1. [13] L. Maurovih-Horvat, T. K. Boomsma, and A. S. Siddiqui, Transmission and wind investment in a deregulated eletriity industry, IEEE Transations on Power Systems, vol. 3, no. 3, pp , May 15. [14] A. Perrault and C. Boutilier, Effiient oordinated power distribution on private infrastruture, in Int. Conferene on Autonomous Agents and Multi-Agent Systems. Paris: AAMAS, May 14, pp [15] P. Joskow and J. Tirole, Transmission rights and market power on eletri power networks, RAND Journal of Eonomis, vol. 31, no. 3, pp , Autumn. [16] E. E. Sauma and S. S. Oren, Proative planning and valuation of transmission investments in restrutured eletriity markets, Journal of Regulatory Eonomis, vol. 3, no. 3, pp. 61 9, Sep. 6. [17] G. B. Shrestha and P. A. J. Fonseka, Congestion-driven transmission expansion in ompetitive power markets, IEEE Transations on Power Systems, vol. 19, no. 3, pp , Aug. 4. [18] A. H. van der Weijde and B. F. Hobbs, The eonomis of planning eletriity transmission to aommodate renewables: Using two-stage optimisation to evaluate flexibility and the ost of disregarding unertainty, Energy Eonomis, vol. 34, no. 6, pp , Feb. 1. [19] G. E. Asimakopoulou, A. L. Dimeas, and N. D. Hatziargyriou, follower strategies for energy management of multi-mirogrids, IEEE Transations on Smart Grid, vol. 4, no. 4, pp , De. 13. [] J. Lee, J. Guo, J. K. Choi, and M. Zukerman, Distributed energy trading in mirogrids: A game theoreti model and its equilibrium analysis, IEEE Transations on Industrial Eletronis, vol. 6, no. 6, pp , June 15. [1] R. Zheng, Y. Xu, N. Chakraborty, and K. Syara, A rowdfunding model for green energy investment, in 4th Int. Joint Conferene on Artifiial Intelligene. Buenos Aires: IJCAI, July 15, pp [] L. Kane and G. Ault, A review and analysis of renewable energy urtailment shemes and Priniples of Aess: Transitioning towards business as usual, Energy Poliy, vol. 7, pp , May 14. [3] W.-G. Früh, From loal wind energy resoure to national wind power prodution, AIMS Energy, vol. 3, no. 1, pp. 11 1, Feb. 15. [4] Sinlair Knight Merz (SKM), Kintyre-Hunterston 13kV transmission network reinforement ost benefit analysis, Teh. Rep., Jan. 13.

REVENUE SHARING CONTRACT OR WHOLESALE PRICE CONTRACT? ANALYTICAL RESULTS FROM VARIOUS CHANNEL POWER ARRANGEMENTS IN A TOURISM SUPPLY CHAIN

REVENUE SHARING CONTRACT OR WHOLESALE PRICE CONTRACT? ANALYTICAL RESULTS FROM VARIOUS CHANNEL POWER ARRANGEMENTS IN A TOURISM SUPPLY CHAIN REVENUE SHARING CONTRACT OR WHOLESALE PRICE CONTRACT? ANALYTICAL RESULTS FROM VARIOUS CHANNEL POWER ARRANGEMENTS IN A TOURISM SUPPLY CHAIN n, College of Business, Washington State University, Wilson Road,

More information

EITF ABSTRACTS. To take advantage of new capabilities in electronic commerce and advances in computer

EITF ABSTRACTS. To take advantage of new capabilities in electronic commerce and advances in computer EITF ABSTRACTS Issue No. 97-13 Title: Aounting for Costs Inurred in Connetion with a Consulting Contrat or an Internal Projet That Combines Business Proess Reengineering and Information Tehnology Transformation

More information

Strategic Outsourcing with Technology Transfer under Cournot Competition

Strategic Outsourcing with Technology Transfer under Cournot Competition Disussion Paper ERU/4 4 February, 4 Strategi Outsouring with Tehnology Transfer under Cournot Competition Tarun Kabiraj Indian Statistial Institute and Uday Bhanu Sinha ** Delhi Shool of Eonomis February,

More information

Department of Economics. Strategic Choice of Network Externality

Department of Economics. Strategic Choice of Network Externality Department of Eonomis Working Paper Series Strategi Choie of Network Externality Yuanzhu u & Sougata Poddar 05/03 Strategi Choie of Network Externality Yuanzhu u Sougata Poddar China Eonomis and Management

More information

System Dynamics Optimisation Approach to Irrigation Demand Management

System Dynamics Optimisation Approach to Irrigation Demand Management Bureau of Meteorology From the SeletedWorks of Amgad Elmahdi 2005 System Dynamis Optimisation Approah to Irrigation Demand Management Amgad ELMAHDI Hetor Malano Teri Ethells Shahbaz khan Available at:

More information

No. 20 WORKING PAPER SERIES IN ECONOMICS THE IMPACT OF COMPETITION ON UNILATERAL INCENTIVES TO INNOVATE NADJA TRHAL

No. 20 WORKING PAPER SERIES IN ECONOMICS THE IMPACT OF COMPETITION ON UNILATERAL INCENTIVES TO INNOVATE NADJA TRHAL No. 0 U N I V E R S I T Y O F C O L O G N E WORKING PAPER SERIES IN ECONOMICS THE IMPACT OF COMPETITION ON UNILATERAL INCENTIVES TO INNOVATE NADJA TRHAL Department of Eonomis University of Cologne Albertus-Magnus-Platz

More information

Strategic Choice of Network Externality and its Impact on Digital Piracy

Strategic Choice of Network Externality and its Impact on Digital Piracy From the SeletedWorks of Sougata Poddar Summer 06 Strategi Choie of Network Externality and its Impat on Digital Piray Sougata Poddar, University of Redlands Yuanzhu u, Central University of Finane and

More information

Integrated optimization and multi-agent technology for combined production and transportation planning

Integrated optimization and multi-agent technology for combined production and transportation planning Integrated optimization and multi-agent tehnology for ombined prodution and transportation planning Jan A. Persson 1 and Paul Davidsson 2 1 Blekinge Institute of Tehnology, Department Systems and Software

More information

Dynamics of Costs and Revenue Sharing Schemes in Open Innovation: an Evolutionary Game Approach

Dynamics of Costs and Revenue Sharing Schemes in Open Innovation: an Evolutionary Game Approach Dynamis of Costs and Revenue Sharing Shemes in Open Innovation: an Evolutionary Game Approah Daqing He, Yiding Yue, Ying Wang * Business Shool of Central South University Changsha, Hunan Provine 40083,

More information

Coordinating strategy of supply chain contract based on price discount and quantity buyback

Coordinating strategy of supply chain contract based on price discount and quantity buyback ISSN 1816-6075 (Print), 1818-0523 (Online) Journal of System and Management Sienes Vol. 1 (2011) No. 4, pp. 19-29 Coordinating strategy of supply hain ontrat based on prie disount and quantity buybak Ping

More information

Architecture of an ERP System Supporting Project-Oriented Management

Architecture of an ERP System Supporting Project-Oriented Management Arhiteture of an ERP System Supporting Projet-Oriented Management Willy Piard and Grzegorz Wojiehowski Department of Information Tehnology The Poznań University of Eonomis ul. Mansfelda 4 60-854 Poznań,

More information

Systems & Services Certification SGS 53,000, 1000

Systems & Services Certification SGS 53,000, 1000 CSR July 28, 2009 SGS Systems & Servies Certifiation SGS SGS SGS 1878 SGS 140 53,000, 1000 - Europe, Middle East & Afria: 24 400 employees - Amerias: 12 100 employees - Asia/Paifi: 16 500 employees SGS,

More information

Finite Element Modeling of Pre-Stressed Hollow Core Slabs

Finite Element Modeling of Pre-Stressed Hollow Core Slabs Current Siene International Volume : 04 Issue : 04 Ot.-De. 2015 Pages :596-603 Finite Element Modeling of Pre-Stressed Hollow Core Slabs 1 Ali N. Deeb, 2 M. Abou Zeid Tarkhan and 3 E. M. El-Tehewy 1 Syrian

More information

Proposal for a new shear design method

Proposal for a new shear design method Chapter 6 Proposal for a new shear design method The behaviour of beams failing in shear has been studied in the previous hapters, with speial attention paid to high-strength onrete beams. Some aspets

More information

Coupon Incentive-based Demand Response (CIDR) in Smart Grid

Coupon Incentive-based Demand Response (CIDR) in Smart Grid Coupon Inentive-based Demand Response (CIDR) in Smart Grid Haiwang Zhong, Student Member, IEEE, Le Xie, Member, IEEE, and Qing Xia, Senior Member, IEEE Abstrat--A new type of demand response (DR) program

More information

TRANSLATION OF MEASURED VEHICULAR WEIGHTS INTO DESIGN LOADS TO BE USED FOR BRIDGE ENGINEERING

TRANSLATION OF MEASURED VEHICULAR WEIGHTS INTO DESIGN LOADS TO BE USED FOR BRIDGE ENGINEERING 7th International Symposium on Heavy Vehile Weights & Dimensions Delft. The Netherlands. June 16-2.22 TRANSLATION OF MEASURED VEHICULAR WEIGHTS INTO DESIGN LOADS TO BE USED FOR BRIDGE ENGINEERING ABSTRACT

More information

An Evaluation of Environmental Impacts of Different Truck Sizes in Last Mile Distribution in the city of São Paulo, Brazil

An Evaluation of Environmental Impacts of Different Truck Sizes in Last Mile Distribution in the city of São Paulo, Brazil An Evaluation of Environmental Impats of Different Truk Sizes in Last Mile Distribution in the ity of São Paulo, Brazil Nathalia C. Zambuzi 1, Claudio B. Cunha 1, Edgar Blano 2, Hugo Yoshizaki 1, Carla

More information

Corrosion of reinforcing steel is widely accepted as the

Corrosion of reinforcing steel is widely accepted as the Strength eterioration of Reinfored Conrete Columns Exposed to Chloride Attak R. Greo, G.C. Marano Abstrat This paper fouses on reinfored onrete olumns load arrying apaity degradation over time due to hloride

More information

International Journal of Research (IJR) e-issn: , p- ISSN: X Volume 3, Issue 01, January 2016

International Journal of Research (IJR) e-issn: , p- ISSN: X Volume 3, Issue 01, January 2016 International Journal of Researh (IJR) Available at http://internationaljournalofresearh.org Study of failure probability by deterministi method reliability-strength applied to metal ables intended for

More information

Energy Saving Opportunities through Heat Recovery from Cement Processing Kilns: A Case Study

Energy Saving Opportunities through Heat Recovery from Cement Processing Kilns: A Case Study Energy Saving Opportunities through Heat Reovery from Cement Proessing Kilns: A Case Study I. I. AL-HINTI a, A. AL-GHANDOOR b, A. AL-NAJI, M. ABU-KHASHABEH, M. JOUDEH, M. AL-HATTAB a Department of Mehanial

More information

Production Cost Optimization Model Based on CODP in Mass Customization

Production Cost Optimization Model Based on CODP in Mass Customization IJCSI International Journal of Computer Siene Issues, Vol. 0, Issue, No, January 03 www.ijcsi.org 60 Prodution Cost Optimization Model Based on CODP in Mass Customization Yanhong Qin, Yuanfang Geng Shool

More information

Optimizing Traffic Diversion Around Bottlenecks

Optimizing Traffic Diversion Around Bottlenecks 22 Optimizing Traffi Diversion Around Bottleneks YI-CHIN HU and PAUL SCHONFELD ABSTR.CT A traffi simulation and optimization model has been developed to analyze traffi flow in large networks with severe

More information

Permanent Link:

Permanent Link: Citation: Boswell, Brian and Chandratilleke, Tilak. 2009. Sustainable Metal Cutting, in TIC-STH ommittee (ed), 2009 IEEE Toronto International Conferene Siene and Tehnology for Humanity, Sep 26 2009. Ryerson

More information

AN ADVERTISING OLIGOPOLY

AN ADVERTISING OLIGOPOLY The USV Annals of Eonomis and Publi Administration Volume 3, Issue (8), 03 AN ADVERTISING OLIGOPOLY Ph.D. Student Alina Irina GHIRVU Faulty of Eonomial Sienes and Business Administration Babeş Bolyai University,

More information

Analysis of Wound Rotor Self-Excited Induction Generators

Analysis of Wound Rotor Self-Excited Induction Generators nd WSEAS Int. Conf. on CICUITS, SYSTEMS, SIGNA and TEECOMMUNICATIONS (CISST'8)Aapulo, Mexio, January 5-7, 8 Analysis of Wound otor Self-Exited Indution Generators.S. Sandhu (Professor) & S.P.Jain (Professor)

More information

The influence of pallets on the behaviour and design of steel drive-in storage racks - Part II Design

The influence of pallets on the behaviour and design of steel drive-in storage racks - Part II Design University of Wollongong Researh Online Faulty of Engineering and Information Sienes - Papers: Part A Faulty of Engineering and Information Sienes 2013 The influene of pallets on the behaviour and design

More information

Generating Light from Stoves using a Thermoelectric Generator

Generating Light from Stoves using a Thermoelectric Generator Generating Light from Stoves using a Thermoeletri Generator Dan Mastbergen, dmast@engr.olostate.edu Dr. Bryan Willson, Bryan.Willson@olostate.edu Engines and Energy Conversion Laboratory Department of

More information

Designing 1 kw PEMFC APU for 4 passenger vehicle

Designing 1 kw PEMFC APU for 4 passenger vehicle Projet Report 2008 TRRF05 Fuel Cell Tehnology Deember 7 th, 2008 Designing 1 kw PEMFC APU for 4 passenger vehile Munir Ahmed Khan Department of Energy Sienes, Faulty of Engineering Lund University, Box

More information

~ Early Life

~ Early Life Measurements and reporting systems are established Suessful validation of the deployment triggers the launh of Early Life Support (ELS). 6.0 Deploy & Verify - Q)... E Q) t1 Ol Change.r::: t1 0 t1 (jj Ol

More information

(This is a sample cover image for this issue. The actual cover is not yet available at this time.)

(This is a sample cover image for this issue. The actual cover is not yet available at this time.) (This is a sample over image for this issue. The atual over is not yet available at this time.) This artile appeared in a journal published by Elsevier. The attahed opy is furnished to the author for internal

More information

SIGNALLING GREEN TECHNOLOGY THROUGH PRICE AND ECO- LABEL

SIGNALLING GREEN TECHNOLOGY THROUGH PRICE AND ECO- LABEL Annals of the Constantin rânuşi University of Târgu Jiu, Eonomy Series, Issue 6/2013 SINALLIN REEN TECHNOLOY THROUH PRICE AND ECO- LAEL SLAĐANA PAVLINOVIĆ, PhD University of Split Faulty of Eonomis Cvite

More information

Effect of Variation of Fuel Composition on Gas Turbine Off-Design Performance

Effect of Variation of Fuel Composition on Gas Turbine Off-Design Performance Applied Mehanis and Materials Submitted: 2014-08-28 ISSN: 1662-7482, Vol. 666, pp 194-198 Aepted: 2014-08-28 doi:10.4028/www.sientifi.net/amm.666.194 Online: 2014-10-20 2014 Trans Teh Publiations, Switzerland

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds Proeedings of the 2012 Winter Simulation Conferene C. Laroque, J. Himmelspah, R. Pasupathy, O. Rose, and A.M. Uhrmaher, eds INDUSTRIAL IMPLEMENTATION OF A DYNAMIC SAMPLING ALGORITHM IN SEMICONDUCTOR MANUFACTURING:

More information

Economic Assessment of Intensive Culture

Economic Assessment of Intensive Culture Reprodued from JOURNAL OF FORESTRY, Vol. 76, No. 11, November 1978, by the FOREST SERVICE, U.S. Department of Agriulture, for offiial use. About This File:,. lhis file was reated by sanning the printed

More information

Mechanical Properties of High-Strength Concrete Manish Kumar 1, A.M. ASCE; Zhaoyu Ma 2 ; Moses Matovu 2

Mechanical Properties of High-Strength Concrete Manish Kumar 1, A.M. ASCE; Zhaoyu Ma 2 ; Moses Matovu 2 1.1 Introdution Mehanial Properties of High-Strength Conrete Manish Kumar 1, A.M. ASCE; Zhaoyu Ma 2 ; Moses Matovu 2 Mehanial properties of High-Strength Conrete (HSC) an be divided in two groups as shortterm

More information

Energy Savings from Increased Preventive Maintenance on Indiana Highways

Energy Savings from Increased Preventive Maintenance on Indiana Highways TRANSPORTATION RESEARCH RECORD 112 27 Energy Savings from Inreased Preventive Maintenane on Indiana Highways EssAM A. SHARAF AND KuMARES C. SINHA In this paper are desribed the development of trade-off

More information

Optimizing of a gas turbine cycle by Genetic and PSO algorithms

Optimizing of a gas turbine cycle by Genetic and PSO algorithms ISSN Online): - Issue, August, pp. - Optimizing of a gas turbine yle by Geneti and algorithms Ahmad Khosravi, Mofid Gorji Band-pay, Farivar Fazelpour Abstrat xergoeonomi is one of the best effetive tools

More information

This paper studies a procurement problem with one buyer and multiple potential suppliers who hold private

This paper studies a procurement problem with one buyer and multiple potential suppliers who hold private MANAGEMENT SCIENCE Vol. 53, No. 10, Otober 2007, pp. 1562 1576 issn 0025-1909 eissn 1526-5501 07 5310 1562 informs doi 10.1287/mns.1070.0716 2007 INFORMS Autioning Supply Contrats Fangruo Chen Graduate

More information

Luis Currais University of La Coruña. Abstract

Luis Currais University of La Coruña. Abstract Potential onflits in the fight against ounterfeit drugs Luis Currais University of La Coruña Berta Rivera University of La Coruña Paolo Rungo University of La Coruña Abstrat This analysis looks at the

More information

Flexibility of Strategy in High-Tech Enterprises

Flexibility of Strategy in High-Tech Enterprises Soure: A. Zakrzewska Bielawska, Flexibility of strategy in high-teh enterprises [w:] M. Zhang (red., Eonomis, Business and Management. International Proeedings of Eonomis Development and Researh Vol. Flexibility

More information

We re bottom-line smart.

We re bottom-line smart. Somewhere in the mid-east, a major oil ompany is using our independent, tehnology assessment of projet ativities that will aelerate their time-to-ompletion. We re bottom-line smart. Carmagen Engineering

More information

Experimental and Theoretical Deflections of Hybrid Composite Sandwich Panel under Four-point Bending Load

Experimental and Theoretical Deflections of Hybrid Composite Sandwich Panel under Four-point Bending Load Civil Engineering Dimension, Vol. 19, No. 1, Marh 017, 9-5 ISSN 1410-950 print / ISSN 1979-570X online DOI: 10.9744/CED.19.1.9-5 Experimental and Theoretial Defletions of Hybrid Composite Sandwih Panel

More information

SCANDINAVIAN FOREST ECONOMICS No. 41, 2006

SCANDINAVIAN FOREST ECONOMICS No. 41, 2006 SCANDINAVIAN FORES ECONOMICS No. 41, 26 Proeedings of the Biennial Meeting of the Sandinavian Soiety of Forest Eonomis Uppsala, Sweden, 8 th -11 th May, 26 Lars Lönnstedt and Björn Rosenquist (eds.) Uppsala

More information

Henley Business School at Univ of Reading. Chartered Institute of Personnel and Development (CIPD)

Henley Business School at Univ of Reading. Chartered Institute of Personnel and Development (CIPD) MS in International Human Resoure Management (full-time) For students entering in 2013/4 Awarding Institution: Teahing Institution: Relevant QAA subjet Benhmarking group(s): Faulty: Programme length: Date

More information

Optimized Execution of Business Processes on Crowdsourcing Platforms

Optimized Execution of Business Processes on Crowdsourcing Platforms 8th International Conferene Conferene on Collaborative Computing: Networking, Appliations and Worksharing, Collaborateom 212 Pittsburgh, PA, United States, Otober 14-17, 212 Optimized Exeution of Business

More information

Mining Patterns to Support Software Architecture Evaluation

Mining Patterns to Support Software Architecture Evaluation Mining Patterns to Support Software Arhiteture Evaluation Liming Zhu, Muhammad Ali Babar, oss Jeffery National ICT Australia Ltd. and University of New South Wales, Australia {limingz, malibaba, rossj}@se.unsw.edu.au

More information

Abstract. Technological Changes in Japanese Housing and Its Effects on Carbon Emissions

Abstract. Technological Changes in Japanese Housing and Its Effects on Carbon Emissions Tehnologial Changes in Japanese Housing and Its Effets on Carbon Emissions Gloria P. GERILLA 1 Researh Fellow Department of Civil Engineering, Saga University 1 Honjo, Saga, 840-8502, Japan Phone: +81-952-28-8830

More information

Camber Variability in Prestressed Concrete Bridge Beams

Camber Variability in Prestressed Concrete Bridge Beams CONCRETE BRIDGE TECHNOLOGY Camber Variability in Prestressed Conrete Bridge Beams by Dr. Maher Tadros, econstrut Beams ast with extra amber in storage yard at Conrete Tehnology Corporation; amber shown

More information

TI /3 Tinbergen Institute Discussion Paper Second-best Road Pricing Through Highway Franchising

TI /3 Tinbergen Institute Discussion Paper Second-best Road Pricing Through Highway Franchising I 2005-082/3 inbergen Institute Disussion Paper Seond-best Road Priing hrough Highway Franhising Erik Verhoef Department of Spatial Eonomis, Free niversity Amsterdam, and inbergen Institute. inbergen Institute

More information

Selection of the Best Belt Conveyor using AHP

Selection of the Best Belt Conveyor using AHP Available online www.ejaet.om European Journal of Advanes in Engineering and Tehnology, 207, 4 (2): 29-34 Researh Artile ISSN: 2394-658X Seletion of the Best Belt Conveyor using AHP Abhinendra Singh Dhakar,

More information

Making a Good Impression: Information Revelation Policies in Ad Exchanges

Making a Good Impression: Information Revelation Policies in Ad Exchanges Making a Good Impression: Information Revelation Poliies in Ad Exhanges Completed Researh Paper Zhen Sun Naveen Jindal Shool of Management University of Texas at Dallas Rihardson, TX 75080, USA zhen.sun@utdallas.edu

More information

A flush collector beam end plate is used to allow for the placement of the floor deck on top of the collector beam.

A flush collector beam end plate is used to allow for the placement of the floor deck on top of the collector beam. EARTHQUAKE Eentrially Braed Frames with Removable Links Design Methodology Author: Kevin Cowie a, Alistair Fussell a, Martin Wong a, Charles Clifton b, Dmitry Volynkin b Affiliation: a. Steel Constrution

More information

Continuous temperature measurements on the pouring stand for casting moulds

Continuous temperature measurements on the pouring stand for casting moulds ARCHIVES of FOUNDRY ENGINEERING Published quarterly as the organ of the Foundry Commission of the Polish Aademy of Sienes ISSN (897-330) Volume 8 Issue /008 75 80 5/ Continuous temperature measurements

More information

smart devices in people s daily lives. The ubiquitous sensors embedded in pervasive smart devices incessantly generate

smart devices in people s daily lives. The ubiquitous sensors embedded in pervasive smart devices incessantly generate 486 IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, VOL. 35, NO. 2, FEBRUARY 2017 Trading Data in the Crowd: Profit-Driven Data Aquisition for Mobile Crowdsensing Zhenzhe Zheng, Student Member, IEEE,

More information

FINITE ELEMENT MODELLING OF STEEL-CONCRETE COMPOSITE BEAMS STRENGTHENED WITH PRESTRESSED CFRP PLATE

FINITE ELEMENT MODELLING OF STEEL-CONCRETE COMPOSITE BEAMS STRENGTHENED WITH PRESTRESSED CFRP PLATE FINITE ELEMENT MODELLING OF STEEL-CONCRETE COMPOSITE BEAMS STRENGTHENED WITH PRESTRESSED CFRP PLATE H.Y. Omran 1, P. Zangeneh 2, and R. EL-Haha 3 1 PhD student, Department of Civil Engineering, University

More information

USING REAL-TIME INFORMATION IN PRODUCTION PLANNING AND OPERATIONAL CONTROL

USING REAL-TIME INFORMATION IN PRODUCTION PLANNING AND OPERATIONAL CONTROL 9 th International Conferene on Prodution Researh USING REAL-TIME INFORMATION IN PRODUCTION PLANNING AND OPERATIONAL CONTROL Ronald G. Askin, Detlef Pabst, Mihael Pew, Young Jun Son 2 Department of Industrial

More information

Trade Liberalization and Complementary Domestic Policies: A Rural-Urban General Equilibrium Analysis of Morocco

Trade Liberalization and Complementary Domestic Policies: A Rural-Urban General Equilibrium Analysis of Morocco TMD DISCUSSION PAPER NO. 41 Trade Liberalization and Complementary Domesti Poliies: A Rural-Urban General Equilibrium Analysis of Moroo Hans Löfgren Moataz El-Said Sherman Robinson International Food Poliy

More information

Cost Optimization of Elasticity Cloud Resource Subscription Policy

Cost Optimization of Elasticity Cloud Resource Subscription Policy IEEE TRANSACTIONS ON SERVICES COMPU TING, MANUSCRIPT ID 1 Cost Optimization of Elastiity Cloud Resoure Subsription Poliy Ren-Hung Hwang 1, Chung-Nan Lee 2, Yi-Ru Chen 1, Da-Jing Zhang-Jian 2 1 Dept. of

More information

Experiment Station. Department of Soil and Crop Sciences

Experiment Station. Department of Soil and Crop Sciences Tehnial Bulletin TB06-03 August 2006 Ag riultural Experiment Station College of Agriultural Sienes Department of Soil and Crop Sienes Western Colorado Researh Center Organi Alternatives for Weed Control

More information

Impact of Piracy on Innovation at Software Firms and Implications for Piracy Policy

Impact of Piracy on Innovation at Software Firms and Implications for Piracy Policy Assoiation for nformation Systems AS Eletroni Library (ASeL PACS 007 Proeedings Paifi Asia Conferene on nformation Systems (PACS 007 mpat of Piray on nnovation at Software Firms and mpliations for Piray

More information

Buildup Factors Calculation for a 1-MeV Point Isotropic Source in Iron, Concrete, and. Water. Skyler Butler, Maria Pinilla

Buildup Factors Calculation for a 1-MeV Point Isotropic Source in Iron, Concrete, and. Water. Skyler Butler, Maria Pinilla Buildup Fators Calulation for a 1-MeV Point Isotropi Soure in Iron, Conrete, and Water Skyler Butler, Maria Pinilla Abstrat This experiment alulates the buildup fators for 1-MeV point isotropi soure of

More information

NUMERICAL SIMULATION OF BEHAVIOUR OF REINFORCED CONCRETE STRUCTURES CONSIDERING CORROSION EFFECTS ON BONDING

NUMERICAL SIMULATION OF BEHAVIOUR OF REINFORCED CONCRETE STRUCTURES CONSIDERING CORROSION EFFECTS ON BONDING 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 NUMERICAL SIMULATION OF BEHAVIOUR OF REINFORCED CONCRETE STRUCTURES CONSIDERING CORROSION EFFECTS ON BONDING C.Q. Li 1, S.T. Yang 2 and M. Saafi 3 ABSTRACT

More information

Optimizing the Allocation of Marketing Promotional Contacts

Optimizing the Allocation of Marketing Promotional Contacts Optimizing the Alloation of Marketing Promotional Contats Keith Hermiz, Ph.D., IBM Helene Miller, IBM Dhanesh Padmanabhan, Marketis Tehnologies Abstrat The typial marketing environment in the business-to-business

More information

Keywords: Greenhouse; Thermal performance; Water pipes heating; Infrared radiation; Energy balance; Heating efficiency

Keywords: Greenhouse; Thermal performance; Water pipes heating; Infrared radiation; Energy balance; Heating efficiency International Symposium Greensys 7 "High Tehnology for Greenhouse system Management" Naples Italy, 4-6 Otober 7 Investigation of the Potential of Infrared-radiation (IR) to Redue Energy Consumption in

More information

Sensitivity of Construction Contract Prices to Required Rate of Return and Retainage

Sensitivity of Construction Contract Prices to Required Rate of Return and Retainage TRANSPORTATON RESEARCH RECORD 1126 93 Sensitivity of Constrution Contrat Pries to Required Rate of Return and Retainage f OAD FARD AND HLAL SAAD The fair and reasonable markup (FaRM) is the smallest markup

More information

EXPERIMENTAL INVESTIGATION OF ECCENTRIC REINFORCED CONCRETE BEAM-COLUMN-SLAB CONNECTIONS UNDER EARTHQUAKE LOADING

EXPERIMENTAL INVESTIGATION OF ECCENTRIC REINFORCED CONCRETE BEAM-COLUMN-SLAB CONNECTIONS UNDER EARTHQUAKE LOADING 13 th World Conferene on Earthquake Engineering Vanouver, B.C., Canada August 1-6, 24 Paper No. 215 EXPERIMENTAL INVESTIGATION OF ECCENTRIC REINFORCED CONCRETE BEAM-COLUMN-SLAB CONNECTIONS UNDER EARTHQUAKE

More information

Arch. Metall. Mater. 62 (2017), 1,

Arch. Metall. Mater. 62 (2017), 1, Arh. Metall. Mater. 6 (017), 1, 167-17 DOI: 10.1515/amm-017-003 P.G. KOSSAKOWSKI* # EXPERIMENTAL DETERMINATION OF THE VOID VOLUME FRACTION FOR S35JR STEEL AT FAILURE IN THE RANGE OF HIGH STRESS TRIAXIALITIES

More information

A tradable credits scheme for VMT reduction and environmental effects: a simulation case study for Great Britain

A tradable credits scheme for VMT reduction and environmental effects: a simulation case study for Great Britain A tradable redits sheme for VMT redution and environmental effets: a simulation ase study for Great Britain Meng Xu Institute for Transport Studies University of Leeds 34-40 University Road, LS2 9JT Leeds,

More information

ACI Structural Journal / July-August 1997

ACI Structural Journal / July-August 1997 Shamim A. Sheikh is a professor of ivil engineering at the University of Toronto. He is hairman of joint ACI-ASCE Committee 441, Reinfored Conrete Columns, a member of joint ACI-ASCE Committee 442, Response

More information

Brand Awareness and Price Dispersion in Electronic Markets

Brand Awareness and Price Dispersion in Electronic Markets Assoiation for Information Systems AIS Eletroni Library (AISeL) ICIS 00 Proeedings International Conferene on Information Systems (ICIS) Deember 00 Brand Awareness and Prie Dispersion in Eletroni Markets

More information

Study of Service Models in Cloud Computing Manoj Kumar Dhruw

Study of Service Models in Cloud Computing Manoj Kumar Dhruw International Journal of Researh (IJR) Available at http://internationaljournalofresearh.org Study of Servie Models in Cloud Computing Manoj Kumar Dhruw Student, Bahelor of Engineering in Computer Siene

More information

MARKET STRUCTURE AND PRODUCTIVITY: A CONCRETE EXAMPLE. Chad Syverson. Working Paper 10501

MARKET STRUCTURE AND PRODUCTIVITY: A CONCRETE EXAMPLE. Chad Syverson. Working Paper 10501 MARKET STRUCTURE AND PRODUCTIVITY: A CONCRETE EXAMPLE Chad Syverson Working Paper 10501 NBER WORKING PAPER SERIES MARKET STRUCTURE AND PRODUCTIVITY: A CONCRETE EXAMPLE Chad Syverson Working Paper 10501

More information

PROPOSAL OF A STANDARD FOR SEISMIC DESIGN OF CONFINED MASONRY BUILDINGS

PROPOSAL OF A STANDARD FOR SEISMIC DESIGN OF CONFINED MASONRY BUILDINGS Institute of Industrial Siene, University of Tokyo Bulletin of ERS, No. 37 PROPOSAL OF A STANDARD FOR SEISMIC DESIGN OF CONFINED MASONRY BUILDINGS Angel SAN BARTOLOME 1, Daniel QUIUN 1 and Paola MAYORCA

More information

Dimensions of propulsion shafts and their permissible torsional vibration stresses

Dimensions of propulsion shafts and their permissible torsional vibration stresses (Feb 2005) (orr.1 Mar 2012) (orr.2 Nov 2012) (Rev.1 Aug 2014) (Rev.2 Apr 2015) Dimensions of propulsion shafts and their permissible torsional vibration stresses.1 Sope This UR applies to propulsion shafts

More information

Page 1 of 6 Searh All WHO This site only Home About WHO Countries Health topis Publiations Data and statistis Programmes and projets Food Safety Zoonoses Mirobiologial risks Chemial risks Biotehnology

More information

LOW FREQUENCY BUCKETS FOR INDUSTRIAL STEAM TURBINES by

LOW FREQUENCY BUCKETS FOR INDUSTRIAL STEAM TURBINES by LOW FREQUENCY BUCKETS FOR INDUSTRIAL STEAM TURBINES by Firm L. Weaver Engineering Consultant Sun City Center, Florida Firm L. Weaver graduated from Roanoke Coll ege, in Salem, Virginia, with a B.S. degree

More information

Limit states for the damage assessment of bridges supported on LRB bearings

Limit states for the damage assessment of bridges supported on LRB bearings Journal of Physis: Conferene Series PAPER OPEN ACCESS Limit states for the damage assessment of bridges supported on LRB bearings To ite this artile: M Jara et al 05 J. Phys.: Conf. Ser. 68 0046 View the

More information

20 questions on genetically modified foods

20 questions on genetically modified foods Page 1 of 6 Searh All WHO This site only Home About WHO Countries Health topis Publiations Data and statistis Programmes and projets Food Safety Zoonoses Mirobiologial risks Chemial risks Biotehnology

More information

J. A. Avila Institute of Engineering, National University of Mexico (UNAM), Mexico. Abstract. 1 Introduction

J. A. Avila Institute of Engineering, National University of Mexico (UNAM), Mexico. Abstract. 1 Introduction High Performane Strutures and Materials V 99 Prinipal results of the inelasti seismi performane of a 17-story RC building loated in the soft-soil area in Mexio City with normal-strength onrete and with

More information

Welfare impacts of alternative biofuel and energy policies

Welfare impacts of alternative biofuel and energy policies Eonomis Working Papers (2002 2016) Eonomis 6-9-2010 Welfare impats of alternative biofuel and energy poliies Jingbo Cui Iowa State University, jbui2013@gmail.om Harvey E. Lapan Iowa State University, hlapan@iastate.edu

More information

Pastoral system and herders communities

Pastoral system and herders communities Pastoral system and herders ommunities 16.06.2008 Professor D.Dorligsuren Programme Coordinator Green Gold Pasture Eosystem Management Programme 1. Introdution 2. Setting up of resoure boundaries 3. Resoure

More information

We re like money in the bank.

We re like money in the bank. With our experiene, knowledge, and expertise, we re more than just a great way to measure effetiveness, maintain exellene, and identify opportunities for improvement. We re like money in the bank. Ahieving

More information

3.1 Analysis of Members under Axial Load

3.1 Analysis of Members under Axial Load 3.1 Analysis of Members under Axial Load This setion overs the following topis. Introdution Analysis at Transfer Analysis at Servie Loads Analysis of Ultimate Strength Analysis of Behaviour Notations Geometri

More information

Status Incentives. By TIMOTHY BESLEY AND MAITREESH GHATAK

Status Incentives. By TIMOTHY BESLEY AND MAITREESH GHATAK Status Inentives By TIMOTHY BESLEY AND MAITREESH GHATAK When eonomists study inentives in organizations, the main fous has been on using monetary payments in exhange for performane on spei measurable dimensions.

More information

GROUND WATER/SURFACE WATER INTERACTIONS AWRA SUMMER SPECULLTP CONF~NCR CZ-I PDG- ANALYSIS OF INFILTRATED STREAM WATER TO A PUMPING WELL

GROUND WATER/SURFACE WATER INTERACTIONS AWRA SUMMER SPECULLTP CONF~NCR CZ-I PDG- ANALYSIS OF INFILTRATED STREAM WATER TO A PUMPING WELL JULY 1-3 GROUND WATER/SURFACE WATER NTERACTONS AWRA SUMMER SPECULLTP CONF~NCR 22 32 CZ- PDG- ANALYSS OF NFLTRATED STREAM WATER TO A PUMPNG WELL Xunhong Chen' and Xi Chen' ABSTRACT: Pumping of groundwater

More information

ESTIMATION OF FRACTURE TOUGHNESS OF THE OXIDE SCALES. Jozef HRABOVSKÝ, Petr LOŠÁK, Jaroslav HORSKÝ

ESTIMATION OF FRACTURE TOUGHNESS OF THE OXIDE SCALES. Jozef HRABOVSKÝ, Petr LOŠÁK, Jaroslav HORSKÝ ESTIMATION OF FRACTURE TOUGHNESS OF THE OXIDE SCALES Jozef HRABOVSKÝ, Petr LOŠÁK, Jaroslav HORSKÝ Heat Transfer and Fluid Flow Laboratory, Faulty of Mehanial Engineering, VUT Brno, Tehniká 2, 616 69 Brno,

More information

Comparative Quality And Performance Analysis Of Manual And Motorised Traditional Portable Rice Threshers

Comparative Quality And Performance Analysis Of Manual And Motorised Traditional Portable Rice Threshers Comparative Quality And Performane Analysis Of Manual And Motorised Traditional Portable Rie Threshers Olumuyiwa B. Ajayi 1 Buliaminu Kareem 2 Olanrewaju R. Bodede 3* Oluwasiji F. Adeoye 4 1, 3, 4. Department

More information

CREEP BEHAVIOUR OF GEOMETRICALLY NONLINEAR SOFT CORE SANDWICH PANELS

CREEP BEHAVIOUR OF GEOMETRICALLY NONLINEAR SOFT CORE SANDWICH PANELS 20 th International Conferene on Composite Materials CRP BHAVIOUR OF GOMTRICALLY NONLINAR SOFT COR SANDWICH PANLS hab Hamed 1 and Yeoshua Frostig 2 1 Centre for Infrastruture ngineering and Safety, Shool

More information

Active and Reactive Power Control of a Variable Speed Wind Energy Conversion System based on Cage Generator

Active and Reactive Power Control of a Variable Speed Wind Energy Conversion System based on Cage Generator Vol. 8 No. 9 7 Ative and Reative Power Control of a Variable Speed Wind Energy Conversion System based on Cage Generator Mazhar Hussain Baloh Engineering MUET Khairpur Mir s Campus Pakistan Waqas Ahmed

More information

Citation for published version (APA): Smrkolj, G. (2013). Dynamic models of research and development Amsterdam: Rozenberg

Citation for published version (APA): Smrkolj, G. (2013). Dynamic models of research and development Amsterdam: Rozenberg UvA-DARE (Digital Aademi Repository) Dynami models of researh and development Smrkolj, G. Link to publiation Citation for published version (APA): Smrkolj, G. (23). Dynami models of researh and development

More information

Wind Energy Assessment for Five Locations in Saudi Arabia

Wind Energy Assessment for Five Locations in Saudi Arabia 202 International Conferene on Future Environment and Energy IPCBEE vol.28(202) (202)IACSIT Press, Singapoore Wind Energy Assessment for Five Loations in Saudi Arabia Hassan M. Farh, Ali M. Eltamaly, Mohamed

More information

CA PPM(Formerly CA Clarity PPM) v13.x Business Analyst Exam (CAT-241) Study Guide Version 1.3

CA PPM(Formerly CA Clarity PPM) v13.x Business Analyst Exam (CAT-241) Study Guide Version 1.3 v13.x Business Analyst Exam Study Guide Version 1.3 PROPRIETARY AND CONFIDENTIAL INFORMATION 2016 CA. All rights reserved. CA onfidential & proprietary information. For CA, CA Partner and CA Customer use

More information

Measuring Quality of Bank Services in Jordan: Gap analysis

Measuring Quality of Bank Services in Jordan: Gap analysis International Journal of Business and Soial Siene Vol. 2 No. 1; January 2011 Measuring Quality of Bank Servies in Jordan: Gap analysis Naji D. Mualla Professor New York Institute of Tehnology Amman Jordan

More information

PHASE TRANSFORMATIONS IN STEEL DURING RAPID HEAT TREATMENT

PHASE TRANSFORMATIONS IN STEEL DURING RAPID HEAT TREATMENT PHASE TRANSFORMATONS N STEEL DURNG RAPD HEAT TREATMENT 1. PROHASZKA nstitute of Mehanial Tehnology and Materials Siene, Tehnial University, H-1521 Budapest Reeived April 19, 1987 Abstrat Phase transformations

More information

Supply Chains and Segment Profitability: How Input Pricing Creates a Latent Cross-Segment Subsidy. Anil Arya. Ohio State University.

Supply Chains and Segment Profitability: How Input Pricing Creates a Latent Cross-Segment Subsidy. Anil Arya. Ohio State University. Supply Chains and Segment Profitability: How Input Priing Creates a Latent Cross-Segment Subsidy Anil Arya Ohio State University Brian Mittendorf Yale Shool of Management April 2009 Supply Chains and Segment

More information

Labor Requirements by Country and Good

Labor Requirements by Country and Good Spring 2003 Eon 455 Answers to roblem Set 2 Harvey Lapan 1. Consider the Riardian model, with two ountries, the U.S. and the U.K. Eah ountry has a total labor supply of 2,000 worker hours, and labor requirements

More information

Full Scale Load Testing of Selected RG4 Supporting Beam

Full Scale Load Testing of Selected RG4 Supporting Beam Full Sale Load Testing of Seleted RG4 Supporting Beam BPEX PROJECT Maptaphut, Rayong Final Report by Civil and Environmental Engineering Design and Consulting Servie Mahidol University Applied and Tehnologial

More information

Leadership and Climate Policy

Leadership and Climate Policy Leadership and Climate Poliy Torben K. Mideksa Version: 1.1. (01.12.2016) The latest version is available at https://sites.google.om/site/torbenmideksa/researh Abstrat This paper examines leadership in

More information

A Handbook For Administrators And Managers

A Handbook For Administrators And Managers www.nwi.pdx.edu Wraparound Implementation Guide: A Handbook For Administrators And Managers By Patriia Miles, Neil Brown, and The National Wraparound Initiative Implementation Work Group. Prefae by Janet

More information

DEVELOPMENT AND INVESTIGATION OF A SYMMETRIC INDUCTION HEATING UNIT FOR SPHERICAL SHAPE METAL WARE

DEVELOPMENT AND INVESTIGATION OF A SYMMETRIC INDUCTION HEATING UNIT FOR SPHERICAL SHAPE METAL WARE Journal of Chemial Sergey Tehnology S. Titov, Vitor and Metallurgy, N. Meshheryakov 53, 5, 2018, 1009-1016 DEVELOPMENT AND INVESTIGATION OF A SYMMETRIC INDUCTION HEATING UNIT FOR SPHERICAL SHAPE METAL

More information