For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

Size: px
Start display at page:

Download "For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra"

Transcription

1 Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech Park Pvt.Ltd Submitted to State Environment Expert Appraisal Committee III, Maharashtra Prepared by ULTRA-TECH (Environmental Consultancy & Laboratory) (An ISO Company, Accredited by NABET, Lab: Gazetted by MoEF, GoI) (NABET/EIA/1417/RA010) Saudamini Commercial Complex, Building C-3, 2nd Floor, Right Bhusari Colony, Paud Road, Kothrud, Pune pune@ultratech.in Website: Phone: /109 1

2 1.0 INTRODUCTION & PROJECT DESCRIPTION: M/s.Balewadi Tech Park Pvt.Ltd has proposed Commercial development at Survey No 20, Balewadi, Taluka Haveli Pune The project site will be developed into Commercial development. This is a permissible activity under existing rules as the site is in the development zone. 1.1 PROJECT BACKGROUND: Details of proposed development are given as follows: Table 1: Location details Survey No 20, Balewadi, Taluka Haveli Pune Project details Total Plot Area m 2 Deductions m 2 Net Plot m 2 Commercial Development Ground coverage m 2 ( 28 %) R. G. area on ground m 2. Total Proposed Built-up area As per FSI m 2 Total Construction Built- up Area m 2 The total built-up area of the proposed project is more than 1,50,000 m 2 as per the Environment Impact Assessment (EIA) Notification dated 14 th September 2006 and subsequent amendments thereto, the project falls under 'Category B1' with project or activity type number '8', which require preparation of EIA Report. EIA Report shall address the environmental impacts of the project on surrounding 10 km radius and shall propose the mitigation measures for the same. The Report shall be prepared, based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by Ministry of Environment & Forests and Climate Change (MoEF & CC) in April Manual for Building, Construction, townships and area development projects prepared by Administrative Staff College of India, Hyderabad will be followed for preparation of EIA report. Any additional project specific ToR given by SEAC shall also be incorporated in the final EIA report. 2

3 This proposal will be studied for the proposed development: Description of the project site, geology, topography, climate, transport and connectivity, demographic aspects, socio-economic aspects shall be detailed out. Project details Site planning Water Requirement and its source, waste water generation, solid waste generation, debris and excavation soil management, power requirement, other utilities for amended proposal shall be detailed out. Status of environmental amenities Environmental liabilities like energy conservation, green belt development, waste water treatment and recycling, rain water harvesting, solid waste management, energy conservation measures, drainage pattern of the surrounding area shall be explained, runoff from the project site shall be calculated and capacities of the internal and external storm water drains shall be studied. Sewer line in the surrounding area of the project site shall be ascertained with respect to their capacities to take the load of excess treated sewage from the project. Essential Top sheets / Maps: A map of the study area 500 m from the boundary of the project area, delineating the major topographical features such as land use, drainage and locations of habitats, major constructions including roads, railways, Petroleum and Mineral pipelines, and industries if any in the area shall be reported in EIA. Land Use Land Cover maps of the study area covering 10 km radius around the project site are prepared using Remote Sensing and GIS which shall be a part of EIA. Contour map and drainage pattern of the project site and surrounding area shall be studied. Description of the project site, geology, topography, climate, transport and connectivity, demographic aspects, socio, cultural and economic aspects shall be detailed out. 3

4 Water Requirement for the project and its source, waste water generation, solid waste generation, power requirement, other utilities, type of building material to be used shall be detailed out. Detailed layout plan of project development, communication facilities, access/approach roads, landscape, sewage disposal facilities, and waste disposal etc. shall be studied. 2.0 DESCRIPTION OF THE ENVIRONMENT: In order to get an idea about the existing state of the environment, various environmental attributes such as meteorology, air quality, water quality, soil quality, noise level, ecology and socio - economic environment shall be studied /monitored. The methodology for conducting the baseline environmental survey considered shall be as per the guidelines given in the Environmental Impact Assessment Guidance Manual for building construction projects. Baseline data with respect to air quality, noise level, water quality and soil quality in the study area shall be collected by conducting primary sampling / field studies shall be studied and incorporated in EIA. Study Area: The study area is considered to be the area within 500 m radius of the site for Environmental monitoring while for studying the Environmental sensitivity radius of 10 km is considered. Primary Data Collection for study area within 500 m angular distance around project site Ambient air quality Noise Level Groundwater & Surface water quality Soil quality Ground survey Flora & Fauna Socio-Economic conditions Secondary Data Collection for area covering 10 km radius Flora & Fauna Socio-Economic conditions 4

5 Sensitive areas such as forests, Sanctuaries, places of historical, archaeological & tourist importance. Land use/ Land cover Map of the study area clearly delineating the location of various monitoring stations (air/water/soil and noise) superimposed with location of habitats shall be shown. Primary data shall be collected for one season except rainy season. Monitoring of the parameters shall be carried out within the study area. Study area of Proposed Project 10 Km radius around the plot boundary 5

6 Status of study area for environmental sensitive places within 15 km Locations of environmentally sensitive areas within 10 km radius around project site are marked and studies will be conducted accordingly to identify and mitigate the impact of proposed activity. Land Environment (Land-use, Solid Waste Generation and Management) Water Environment (Surface and Groundwater Quality) Air Environment [Meteorology (Secondary data from IMD), ambient air quality and noise levels] 6

7 Biological Environment (Flora& Fauna) Socio-economic environment (Demographic profile, Occupational structure, Educational facilities, Health care facilities, literacy status, etc.) 2.1 Land Environment It is the first feature which influences the development of a new project is the existing land use pattern of the neighborhood of the project. Study of land use pattern employing remote sensing techniques and ground truth and also through secondary data sources shall be studied. Soil analysis of the selected locations in the study area shall be carried out. Solid wastes generation & management shall be categorized into two phases i.e. during construction & during operation phases. Details for the following types of wastes shall be given: Excavation and Construction waste Municipal waste, i.e., biodegradable and non- biodegradable waste Hazardous waste (Mainly during construction phase) E-waste, if any STP sludge 2.2 Water Environment Baseline water quality shall be monitored. Water requirement during construction and operation phase shall be quantified and their source shall be identified. Scheme for rainwater harvesting shall be prepared as per the hydro-geological report of the project site. Water saving practices shall be suggested to reduce the water demand. Quantity of sewage shall be estimated management scheme for sewage shall be framed. 2.3 Air Environment Climatological data shall be obtained from India Meteorological Department (IMD) station for one year. Micro meteorological data consisting of wind speed, wind direction, temperature, humidity, rainfall (peak and average daily rainfall) and wind rose patterns shall be reported in EIA. Baseline data for ambient air parameters namely RSPM, Oxides of Sulphur, Oxides of Nitrogen and Carbon monoxide (CO) at project site and in an area extending 500 meters radius from the 7

8 boundary of project site has been carried out for the period February to April This may please be accepted in the ToR for our EIA studies. Baseline data of noise at the project site and the areas extending 500 meters radius from the boundary of project site shall be ascertained. Hourly reading for 24 hours at each location shall be monitored. Equivalent Noise levels in db (A) for day and night time shall be reported in EIA. 2.4 Biological Environment As per guidelines of MoEF for Environmental Impact Assessment, pertaining to construction projects, total study area shall be up to 9.5 km radius from the project site, of which primary data shall be collected from the area up to 500m radius and remaining area up to 9.5 km shall be represented by secondary data. The data up to 500 m radius will be generated with reference to topography, land use, vegetation pattern, flora, fauna etc. 2.5 Socio Economic Environment Demographic details as per Census shall be reported in the EIA. Following attributes for baseline socio-economic status of the study area shall be studied. Demographic Features and Infrastructure Decadal Growth Rate Settlement Pattern and Growth Population Literacy Education Facilities Historical, religious and tourist centers. 3.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES: The anticipated negative and positive impacts on the land, water, air, ecological and socioeconomic environment during the construction and operation phases shall be predicted. Impact identification for this project shall help to suggest mitigation measures to reduce adverse impacts due to the development. Best environmental practices, conservation of natural resources, environmental management plan, environmental monitoring programme including budgeting for the expenditure proposed, 8

9 corpus funding for long term maintenance of environmental management facilities in future shall be suggested. 4.0 ENVIRONMENTAL MONITORING PROGRAM: Environmental Monitoring Program shall include: Frequency, location, parameters of monitoring Summary matrix of environmental monitoring, during construction and operation stage Requirement of monitoring facilities Compilation and analysis of data and reporting system 5.0 ADDITIONAL STUDIES: Risk Assessment Studies for the construction and operation phase, the safety precautions to be taken during construction phase and the Disaster Management Plan and Emergency Preparedness Plan Onsite and Offsite shall be studied. Traffic Impact Study shall be studied. Hydrogeological & GIS based drainage pattern study to identify impact of development on river. 6.0 PROJECT BENEFITS: Details about the improvements in physical infrastructure, social infrastructure, employment potential and other benefits that are accrued shall be incorporated. Employment potential of this project during construction and operation phases shall be evaluated. 7.0 ENVIRONMENTAL MANAGEMENT PLAN: Adequate environmental management measures will be incorporated during the entire planning, construction and operating stages of the project to minimize any adverse environmental impact and assure sustainable development of the area. The EMP s shall include the following elements: Air Pollution Control and Management Noise Control and Management Water Conservation Wastewater Management Storm water management 9

10 Solid, Hazardous and E Waste Management Energy Conservation and use of Non conventional energy Traffic Management Plantation, Landscaping and Land Management Management of Social Issues Occupational, Safety and Health issues Environmental Monitoring Emergency Response Plans for emergency scenarios Environmental Management System For the effective and consistent functioning, an Environmental Management System (EMS) will be established at the site. The following components will be part of the EMS: Environmental Policy Objectives & Targets Structure and Responsibility Emergency Planning Environmental Monitoring Program Operation and Maintenance of Environmental Management Facilities like STP, rain water Harvesting, solar systems, landscape development, solid waste management system Non-conformance & Corrective and Preventive Action Short term and long term budgetary provisions for the EMP 8.0 DISCLOSURE OF CONSULTANTS ENGAGED: The consultants engaged and nature of consultancy rendered shall be listed in EIA. Enclosures: 1. Location plan 2. Google image 3. Master Layout Category 8(b): STANDARD TERMS OF REFERENCE FOR ONDUCTINGENVIRONMENT IMPACT ASSESSMENT STUDY FOR TOWNSHIP/AREA DEVELOPMENT PROJECTS AND INFORMATION TO BEINCLUDED IN EIA/EMP REPORT, APRIL

11 1) Examine details of land use as per Master Plan and land use around 10 km radius of the project site. Analysis should be made based on latest satellite imagery for land use with raw images. Check on flood plain of any river. 2) Submit details of environmentally sensitive places, land acquisition status, rehabilitation of communities/villages and present status of such activities. 3) Examine baseline environmental quality along with projected incremental load due to the project. 4) Environmental data to be considered in relation to the project development would be (a) land, (b) ground water, (c) surface water, (d) air, (e) bio-diversity, (f) noise and vibrations, (g) socio economic and health. 5) Submit a copy of the contour plan with slopes, drainage pattern of the site and surrounding area. Any obstruction of the same by the project 6) Submit the details of the trees to be felled for the project. 7) Submit the present land use and permission required for any conversion such as forest, agriculture etc. 8) Submit Roles and responsibility of the developer etc for compliance of environmental regulations under the provisions of EP Act. 9) Ground water classification as per the Central Ground Water Authority. 10) Examine the details of Source of water, water requirement, use of treated waste water and prepare a water balance chart. 11) Rain water harvesting proposals should be made with due safeguards for ground water quality. Maximize recycling of water and utilization of rain water. Examine details. 12) Examine soil characteristics and depth of ground water table for rainwater harvesting. 13) Examine details of solid waste generation treatment and its disposal. 11

12 14) Examine and submit details of use of solar energy and alternative source of energy to reduce the fossil energy consumption. Energy conservation and energy efficiency. 15) DG sets are likely to be used during construction and operational phase of the project. Emissions from DG sets must be taken into consideration while estimating the impacts on air environment. Examine and submit details. 16) Examine road/rail connectivity to the project site and impact on the traffic due to the proposed project. Present and future traffic and transport facilities for the region should be analyzed with measures for preventing traffic congestion and providing faster trouble free system to reach different destinations in the city. 17) A detailed traffic and transportation study should be made for existing and projected passenger and cargo traffic. 18) Examine the details of transport of materials for construction which should include source and availability. 19) Examine separately the details for construction and operation phases both for Environmental Management Plan and Environmental Monitoring Plan with cost and parameters. 20) Submit details of a comprehensive Disaster Management Plan including emergency evacuation during natural and man-made disaster. 21) Details of litigation pending against the project, if any, with direction /order passed by any Court of Law against the Project should be given. 22) The cost of the Project (capital cost and recurring cost) as well as the cost towards implementation of EMP should be clearly spelt out. 23) Any further clarification on carrying out the above studies including anticipated impacts due to the project and mitigative measure, project proponent can refer to the model ToR available on Ministry website " 12

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

Greater Mohali Area Development Authority (GMADA) vide its letter dated has applied for obtaining environmental clearance as

Greater Mohali Area Development Authority (GMADA) vide its letter dated has applied for obtaining environmental clearance as Excerpt pertaining to the item no. 142.1.8 from the proceedings of the 142 nd meeting of SEAC held on 11.03.2016 in Committee Room, Punjab Pollution Control Board, Patiala. Item No.142.1.8: Application

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE 1 PROPOSED TOR FOR EIA STUDY Kottmeta Limestone Mine, ML Area 801.171 ha, is located in Village Katamater, Tehsil/District Malkangiri, Odisha. Dalmia Cement (Bharat) Limited,

More information

BRIGADE MIXED USE DEVELOPMENT

BRIGADE MIXED USE DEVELOPMENT BRIGADE MIXED USE DEVELOPMENT Terms of Reference (TOR) At Sy. No. 171/1, 171/2, 171/3, 171/4, 172, 173/1, 173/2, 173/3, 183/2, 183/3, 183/6A, 183/6B, 183/7, 183/8, 183/9, 183/11 and 184/1(P) Varthur Village,

More information

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

TERMS OF REFERENCE. Submitted to Ministry of Environment & Forests New Delhi. August 2014

TERMS OF REFERENCE. Submitted to Ministry of Environment & Forests New Delhi. August 2014 2014 TERMS OF REFERENCE PROPOSED EXPANSION OF PESTICIDE TECHNICAL PROJECT AT SP-9(D-1), RIICO INDUSTRIAL AREA VILLAGE: KHUSHKHERA, DISTRICT-ALWAR (RAJASTHAN) Submitted to Ministry of Environment & Forests

More information

APPENDIX I PROPOSED TERMS OF REFERENCE

APPENDIX I PROPOSED TERMS OF REFERENCE APPENDIX I PROPOSED TERMS OF REFERENCE 1. Environment Impact Assessment/Environment Management Plan document shall be in accordance with the provisions & generic structure stipulated in the EIA Notification

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Proposed TOR Calix Industries

Proposed TOR Calix Industries 1 A tabular with index for point-wise compliance of below mentioned TORs. 2 Executive summary of the project giving a prima facie idea of the objectives of the proposal, use of resources, justification,

More information

meeting held on meeting held on The SEAC observed that:

meeting held on meeting held on The SEAC observed that: Excerpt pertaining to item no. 147.14 of 147 th meeting of SEAC held on 30.06.2016 Item no.147.14: Application for obtaining Environmental Clearance under EIA notification dated 14.09.2006 for area development

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE 5(b):STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR PESTICIDES INDUSTRY AND PESTICIDE SPECIFIC INTERMEDIATES (EXCLUDING FORMULATIONS)AND INFORMATION TO BE INCLUDED IN

More information

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for "Mining of Minerals" as per the EIA Notification, 2006 has been devised to

More information

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups. 1.0 The Need for EIA Every anthropogenic activity has some impact on the environment. More often it is harmful to the environment than benign. However, mankind as it is developed today cannot live without

More information

PROPOSED TERMS OF REFERENCE (TOR)

PROPOSED TERMS OF REFERENCE (TOR) PROPOSED TERMS OF REFERENCE (TOR) 4(a):STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR PETROLEUM REFINING INDUSTRIES PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

TECHNICAL SPECIFICATIONS NTPC LIMITED

TECHNICAL SPECIFICATIONS NTPC LIMITED TECHNICAL SPECIFICATIONS FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) STUDY FOR LARA SUPER THERMAL POWER PROJECT, STAGE-II (2X800MW) NTPC LIMITED (A Government of India Enterprise) Engineering Office Complex

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b):

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b): PROPOSED TERMS OF REFERENCES Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b): ToR Points Details Remarks STANDARAD TERMS OF REFERENCE

More information

KYNSHI-I HEP (270 MW), MEGHALAYA

KYNSHI-I HEP (270 MW), MEGHALAYA ANNEXURE-IV PROPOSED TERMS OF REFERENCE FOR EIA/EMP FOR KYNSHI (270 MW) HYDROELECTRIC PROJECT IN MEGHALAYA AS PER THE MODEL TERMS OF REFERENCE ISSUED BY MOEF & CC FOR NORTH-EAST PROJECTS I. SALIENT FEATURES

More information

No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New Delhi-110003

More information

Terms of reference for Improving the capacity utilization of OR-I & OR-II berths at Visakhapatnam port trust (VPT), Andhra Pradesh, India.

Terms of reference for Improving the capacity utilization of OR-I & OR-II berths at Visakhapatnam port trust (VPT), Andhra Pradesh, India. Proposed Terms of Reference for EIA studies: Terms of reference for Improving the capacity utilization of OR-I & OR-II berths at Visakhapatnam port trust (VPT), Andhra Pradesh, India. 1.0 INTRODUCTION:

More information

No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES Project Category Project Proponent Location Expansion of Lucknow Airport in Respect of Construction of New Integrated Terminal Building at Amausi, Lucknow, Uttar Pradesh. A [7 (a): Development of an Airport]

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PROPOSED TERMS OF REFERENCE FOR PROPOSED RESIDENTIAL DEVELOPMENT

PROPOSED TERMS OF REFERENCE FOR PROPOSED RESIDENTIAL DEVELOPMENT FOR AT SURVEY NOS. 123, 127(P) & 128, K R PURAM HOBLI, BENGALURU EAST TALUK, PROMOTER: M/s. PRESTIGE ESTATES PROJECTS LIMITED, PREPARED BY M. D. SANJAY KUMAR C/o. M/s. A&N TECHNOLOGIES # 855, 3 RD FLOOR,

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

EIA NOTIFICATION

EIA NOTIFICATION EIA NOTIFICATION - 2006 Building Construction projects/ Area Development projects and Townships New Delhi, 12 th August 2010. BHARAT BHUSHAN DIRECTOR, Ministry of Environment & Forests, Government of India,

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

Annexure A. A. Proposed TOR

Annexure A. A. Proposed TOR Annexure A Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in RJ-ONHP-2017/1 Hydro Carbone Block in Barmer District Rajasthan Standard ToR

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

PROPOSED TERMS OF REFERENCE PROPOSED COMMERCIAL OFFICE DEVELOPMENT

PROPOSED TERMS OF REFERENCE PROPOSED COMMERCIAL OFFICE DEVELOPMENT FOR AT SY. NOS. 9/1, 10/1, 2, 3, 4, 11, 12/1, 12/2, 13, 14/1, 14/2, 15, 16/1, 16/2, 17/1A1, 17/1A2, 17/1B1, 17/1B2, 18/1, 19, 20/1, 20/2, 20/3, 20/4, 20/7, 20/8, 20/9, 20/10, 20/11, 20/12, 20/13, 20/14,

More information

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA

CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA (TOR) FOR THE PREPARATION OF ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR CONSTRUCTION OF 6 LANE KUNDLI MANESAR PALWAL EXPRESSWAY IN THE STATE OF HARYANA SUBMITTED

More information

Environmental Impact Assessment

Environmental Impact Assessment Contents Abbreviations... 7 Executive Summary:... 8 1 INTRODUCTION... 11 1.1 PURPOSE OF THE REPORT... 11 1.2 Project Team... 42 1.3 LAND DESCRIPTION... 44 2 PROJECT DETAILS... 46 2.1 LOCATION OF THE PROJECT...

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

PROPOSED TERMS OF REFERENCE HYDERABAD PHARMA CITY EIA STUDY

PROPOSED TERMS OF REFERENCE HYDERABAD PHARMA CITY EIA STUDY PROPOSED TERMS OF REFERENCE FOR HYDERABAD PHARMA CITY EIA STUDY Proposed Terms of Reference General Proposed Terms of Reference (ToR) for conducting EIA study are drawn keeping in view of EIA Notification

More information

No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO

ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO Review Paper (SS-3) ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO S.N. Ranshur*, P.H. Sawant and R.A. Hegde Civil (Env. Engg. Subjects), S.P. College of Engineering, Mumbai (INDIA) *E-mail : sandeepranshur@yahoo.com

More information

Environmental Impact Assessment for Proposed Relocation and Installation of 1 x 100 Ton per day / 30,000 TPA Sponge Iron manufacturing industry from Village Nayapara-Bodri, PO- Chakrabhata Camp, Bilaspur

More information

Mining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI

Mining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI Terms of Reference For Environmental Impact Assessment of Mining of Minerals MINING LEASE of BAUXITE Mining Project for CARBORUNDUM UNIVERSAL LTD. S.No. 146/147 PAIKI At- MEWASA, Taluka- KALYANPUR, Dist.

More information

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private

More information

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands

DESIGN SHEET Wastewater Treatment Plant. Mauritius. Design Sheet. Wastewater Treatment Plant. Revised 08 October Ministry of Housing and Lands Mauritius Design Sheet Wastewater Treatment Plant Revised 08 October 2014 Ministry of Housing and Lands Design Sheet Wastewater Treatment plant Ministry of Housing and Lands Contents: Page 1.0 Introduction

More information

RAPID ENVIRONMENTAL IMPACT ASSESSMENT (REIA) For SPR BINNY PROPOSED CONSTRUCTION OF MIXED USE DEVELOPMENT PROJECT

RAPID ENVIRONMENTAL IMPACT ASSESSMENT (REIA) For SPR BINNY PROPOSED CONSTRUCTION OF MIXED USE DEVELOPMENT PROJECT RAPID ENVIRONMENTAL IMPACT ASSESSMENT (REIA) For SPR BINNY PROPOSED CONSTRUCTION OF MIXED USE DEVELOPMENT PROJECT At PERAMBUR VILLAGE, PURASAWALKAM-PERAMBUR TALUK, CHENNAI DISTRICT, TAMIL NADU August 2016

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Mining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS.

Mining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS. Terms of Reference For Environmental Impact Assessment of Mining of Minerals MINING LEASE of LIME STONE Mining Project for GAYTRI MINERALS. S.No. 160 PAIKI At- RAKKA, Taluka- LALPUR, Dist. JAMNAGAR. (Gujarat)

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference TERMS OF REFERENCE INDUSTRIAL PROJECTS: MANUFACTURING & PROCESSING PAINT, TEXTILES, CEMENT & LIME, DETERGENTS, PESTICIDES & HAZARDOUS SUBSTANCES, PULP, PAPER & WOOD, BOTTLES, AND CANS. DRY CLEANING AND

More information

म झग व ड क शप ब डस ल मट ड (भ रत सरक र क उप म) र क प त नम त ड कय ड र ड, म झग व म बई ४०००१० भ रत

म झग व ड क शप ब डस ल मट ड (भ रत सरक र क उप म) र क प त नम त ड कय ड र ड, म झग व म बई ४०००१० भ रत म झग व ड क शप ब डस ल मट ड (भ रत सरक र क उप म) र क प त नम त ड कय ड र ड, म झग व म बई ४०००१० भ रत MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report. The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco Summary of Environmental and Social Considerations in Detailed Planning Survey on the Project for Elaboration of the National Strategy for Treatment of Household and Similar Waste for the Kingdom of Morocco

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project

More information

STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR RIVER VALLEY PROJECTS.

STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR RIVER VALLEY PROJECTS. Proposed terms of reference for EIA study The scope covers the following:- STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR RIVER VALLEY PROJECTS 1 Scope of EIA Study:

More information

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT (Attach panoramic view of the project

More information

PROPOSED TERMS OF REFERENCE FOR EIA STUDY

PROPOSED TERMS OF REFERENCE FOR EIA STUDY PROPOSED TERMS OF REFERENCE FOR EIA STUDY A. INTRODUCTION: The Ministry of Road Transport and Highways (MoRTH) / National Highways Authority of India (NHAI) has decided to develop Expressway, Inter Corridors

More information

SLAUGHTERHOUSES AND ABATTOIRS

SLAUGHTERHOUSES AND ABATTOIRS TERMS OF REFERENCE SLAUGHTERHOUSES AND ABATTOIRS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to Slaughterhouses and Abattoirs. The TOR outlines the

More information

IX: HAZARDOUS WASTE MANAGEMENT

IX: HAZARDOUS WASTE MANAGEMENT IX: HAZARDOUS WASTE MANAGEMENT 9.0 INTRODUCTION The Government of India has promulgated the Hazardous Waste (Management and Handling) Rules, 1989 and the aegis of Environment (Protection) Act, 1886 through

More information

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/06 Hydro Carbon Block In West Tripura and Sepahijala Districts of Tripura

More information

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to

More information

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63

More information

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO

More information

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas

A. Proposed TOR. April Vedanta Limited- Cairn Oil & Gas Proposed Terms of Reference for EIA Study of the Proposed Onshore Oil and Gas Exploration and Appraisal Project in AA-ONHP-2017/14 Hydro Carbon Block inkarimganj, Hailakandi, Cachar districts of Assam

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

2. The expected cost of the project is Rs.50 crores.

2. The expected cost of the project is Rs.50 crores. Subject Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management System for Pathankot Cluster" by Municipal Council, Pathankot at Village Kalanaur,

More information