Screening, Definition: The unit involved is called a screen.

Size: px
Start display at page:

Download "Screening, Definition: The unit involved is called a screen."

Transcription

1 Screening, Definition: Screening is a unit operation that separates materials in and/or on water (found in different sizes) from water and from entering water treatment facilities and mains. The unit involved is called a screen.

2 Where are Screens Located Within Treatment Plants or Systems

3 Legend Sluice Gate Bar Screen Motor Waste Sludge Pump Belt Filter Press

4 Classification of Screens Opening size [Coarse, Medium and Fine] Configuration [Bar Screens and Mesh Screens] Method used to clean the entrapped materials (manually, mechanically, raked or water-jet cleaned) Fixed or moving screen surface.

5 Coarse Bar Racks Classifications remove coarse debris (twigs, branches, rags, etc) - Spacing coarse 2 6 in medium in Fine Screens - 3/8 to ½ in. (up to 10 mm or less,

6 Types of Screens - hand clean coarse screens - mechanically cleaned bar screens

7 Types of Screens 1. Moving 2. Fixed

8 Types of Screens There are many types of screens that can be used in water and wastewater treatment processes of which: 1 - Bar or rack screens: Bar screens composed of parallel bars. Bars usually vertical or inclined 2 - Band screens: Consists of a perforated belt passes over an upper and lower roller 3 - Perforated plate screen: Consists of a fixed band of perforated screens 4 - Wing screens: It has radial vanes which rotate on a horizontal axis 5 - Disk screens: Circular perforated disk with or without supporting bars 6 - Grating screens: Consists of two sets of parallel bars. 7 - Mesh screens: Mesh screens composed of a fabric with mesh size depend on floating and suspending matter.

9 Bar Screens Design Criteria of a Bar Screen : Approach Velocity Optimum Velocity : 0.6 m/s (through the screen opening) Maximum Velocity : m/s (to prevent entrapped materials being forced through the bars). Minimum Velocity : 0.4 m/s to prevent deposition of solids. Typical Range : m/s Headloss : hl = m for drinking water. hl = m for sewage (wastewater) Cleaning Mechanism: Manual Mechanical Angle of Inclination (10-60 )

10 Band or Belt Screens Flexible woven wire mesh screens normally installed for a river supply. Consists of sections of perforated mild steel plates connected together in a form of a band which is revolved by an electric motor. Water passes inward through the screens and solid matter is washed off by high pressure water jets directed from inside of the screen.

11 Disk Screens and Drum Screens Similar in principle to band screens, differing only in the form of the moving screen. Rotating metallic disc - partially immersed. Solid caught in the screen are taken to the top, where they are scrapped by the moving screen. Diameter: 2 to 5 m Speed 0.05 m/s Hollow drum. One end of the drum is closed. Water enters through the other end and passes out through the perforation. Water jet is used for cleaning

12 Disposal of Screenings Screenings is the waste materials collected from screens. Screenings should be properly disposed. Various methods of screening disposal were used such as: - burning, - burying, - digestion - and shredding and returning it to wastewater collection or treatment system. Inland burying is efficient in small treatment plants, while burning is best for medium and large treatment plants. Other methods cause problems and may need subsequent treatment. Digestion is used for large systems and in combination with the treatment of the organic portion of municipal solid waste.

13 Design of Coarse screens Factors to consider - clear openings between bars: opening needed - typically less than 2 ins., at o incline - location: installed ahead of grit chambers, may also be installed ahead of equalization tanks, if present. - approach velocity: at least 0.4 m/s to prevent deposition of solids, and should not exceed 0.9 m/s at peak flow rate - head loss through screens - limited to 150 mm (6 in.) - screens handling and disposal - quantity of screenings depends on the type of wastewater, geographic location, screen size and weather - screenings - vary from m3/106 m3, about 80% moisture and density of 960 kg/m3 - controls - operation cycle about 15 minutes for mechanically raked screens

14 Fixed Screens: Bar Screens Bar racks (also called bar screens) are composed of larger bars spaced at 25 to 80 mm apart. The arrangement shown in the figure is normally used for shoreline intakes of water by a treatment plant. The rack is used to exclude large objects; the traveling screen following it is used to remove smaller objects such as leaves, twigs, small fish, and other materials that pass through the rack. The arrangement then protects the pumping station that lifts this water to the treatment plant.

15 Bar Screens Coarse screens or bar racks (< 2.5 inch openings) : (1) removes large objects, rags, debris ; (2) protects downstream pumps, valves, pipelines ; (3) cleaning may be accomplished manually or mechanically ; (4) mechanically cleaned bar racks (5/8 inch - 1-3/4 inch) typically used instead of coarse manually cleaned screens; (5) bar rack is inclined to facilitate, cleaning ; (6) approach velocities should ensure self-cleaning, but not dislodge solids; (7) typical design: maximum velocity of 2.5 ft/sec through bar rack opening.

16

17 Microstrainer (Fine Filter) Microstrainer have been used to remove suspended solids from raw water containing high concentrations of algae. It consists of a fine fabric or screen wound around a metal drum

18 HEAD LOSSES IN SCREENS AND BAR RACKS H v V

19 Head loss calculations determine the hydraulic head requirements for screen installation: H H L 2 1 V v C 2g 2 C =0.7 for clean and 0.6 for clogged : empirical discharge coefficient to account for turbulence and eddy losses V : velocity of flow through openings in rack (m/s) v : approach velocity in upstream channel (m/s) g : acceleration due to gravity (m/s2)

20 Applying Bernuli before and after the screen Or V 12 =V g(h2 h1)

21

22 HEAD Loss IN MICROSTRAINERS

23

24 Example A bar screen measuring 2 m by 5 m of surficial flow area is used to protect the pump in a shoreline intake of a water treatment plant. The plant is drawing raw water from the river at a rate of 8 m3/sec. The bar width is 20 mm and the bar spacing is 70 mm. If the screen is 30% clogged, calculate the head loss through the screen. Assume Cd = 0.60.

25 Solution: For screens used in shoreline intakes, the velocity of approach is practically zero. Thus, from the previous figure, the number of spacings is equal to one more than the number of bars. Let x number of bars,

26

27 Example Design a bar screen chamber through which maximum, average, and minimum rates of flow are respectively 15, 7.5, and 3.0 cfs; the screen is such that there is one more space than there are bars; the outlet is controlled by a proportional weir such that depth of flow is directly proportional to rate of flow?

28

29 Solution A schematic diagram of the proposed screen is given in previous slide. A number of assumption need to be made by the designer engineer concerning screen incline angel, a, flow velocity through screen, Vs, number of bars, Nb, bar's diameter, db, and space between bars, Sb. In this case we assume; α = 30o, Vs = 1.0 fps, Nb = 20 db = 0.25 inch, Sb = 1.0 in Width of the screen, Ws, is equal to Ws = Number of Spaces x Space Distance = (20 +1) x 1 = 21 inch = 1.75 ft

30 Width of screen chamber, Wc, is equal to Wc = Width of screen + Bars thickness = 21 + (20 x 0.25) = 26 inch = 2.17 ft Length of the screen, Ls, is equal to Ls = Depth of the screen chamber, dc Sinus on angle α Flow through screen = Area available for flow x flow velocity Q = A x Vc A = Wc x dc Q = Qmax = 15 cfs Vc = 1.5 fps

31 Qmax dc = = 4.61 ft Wc x Vc Maximum depth of the screen chamber, dc, is maximum dc = dc + (0.67 to 1.00) = 5.28 ft Length of the screen Ls = dc/sin α = 9.22 ft Maximum flow velocity through the screen chamber, Vc, is Qmax Maximum Vc = = 1.62 fps Wc x maxdc = acceptable

14. SCREENS. in the Figure 8.1. BARS TROUGH

14. SCREENS. in the Figure 8.1. BARS TROUGH 1 14. SCREENS The primary treatment incorporates unit operations for removal of floating and suspended solids from the wastewater. They are also referred as the physical unit operations. The unit operations

More information

WASTEWATER TREATMENT (1)

WASTEWATER TREATMENT (1) Wastewater Engineering (MSc program) WASTEWATER TREATMENT (1) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

Sanitary and Environmental Engineering I (4 th Year Civil)

Sanitary and Environmental Engineering I (4 th Year Civil) Sanitary and Environmental Engineering I (4 th Year Civil) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

CHAPTER 10 PRELIMINARY TREATMENT

CHAPTER 10 PRELIMINARY TREATMENT CHAPTER 10 PRELIMINARY TREATMENT TM 5-814-3/AFM 88-11, Volume III 10-1. General considerations. Preliminary treatment of wastewater includes screening, grinding, grit removal, flotation, equilization,

More information

INITIAL TREATMENT By Kenny Oyler. Headworks:

INITIAL TREATMENT By Kenny Oyler. Headworks: The headworks of a wastewater treatment plant is the initial stage of a complex process.this process reduces the level of pollutants in the incoming domestic and industrial wastewater to a level that will

More information

6.5 Filtration General

6.5 Filtration General 6.5 Filtration 6.5.1 General Turbidity and algae are removed from raw waters by screens, gravel filters and slow sand or rapid gravity filters. The difference between slow and rapid sand filtration is

More information

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Domestic Waste Water (Sewage): Collection, Treatment & Disposal Domestic Waste Water (Sewage): Collection, Treatment & Disposal Sanitary sewers Storm water sewers Combined sewers Types of sewers: Types of collection system Building sewer/building connections:connected

More information

DEPARTMENT OF CIVIL ENGINEERING CE6403/ APPLIED HYDRAULIC ENGINEERING QUESTION BANK TWO MARKS UNIT I UNIFORM FLOW 1. Differentiate open channel flow from pipe flow. 2. What is specific energy and is the

More information

HUBER Drum Screen LIQUID

HUBER Drum Screen LIQUID WASTE WATER Solutions Reliable fine screening with maximum separation efficiency Maximum retention of fibres and hair Operating reliability for membrane bioreactors Maximum COD / BOD 5 reduction rates

More information

HUBER Drum Screen LIQUID

HUBER Drum Screen LIQUID WASTE WATER Solutions Reliable fine screening with maximum separation efficiency Maximum retention of fibres and hair Operating reliability for membrane bioreactors Maximum COD / BOD 5 reduction rates

More information

Wastewater Plant Tour. There Is Gold In Them There Plants

Wastewater Plant Tour. There Is Gold In Them There Plants Wastewater Plant Tour There Is Gold In Them There Plants Why Should I Be Interested In Wastewater Treatment? Every municipality has at least one treatment facility. Many manufactures will have treatment

More information

Industrial Pretreatment WT - Intakes

Industrial Pretreatment WT - Intakes Preliminary Unit Operations and Processes Preliminary Treatment remove materials that will interfere with further treatment Physical size separation Bar racks Screens Size reduction Grinders Barminutor

More information

Definition separation of unstable and destabilized suspended solids from a suspension by the force of gravity

Definition separation of unstable and destabilized suspended solids from a suspension by the force of gravity SEDIMENTATION-1 TEKNOLOGI PENGOLAHAN LIMBAH Definition separation of unstable and destabilized suspended solids from a suspension by the force of gravity 1 Applications in Wastewater Treatment grit removal

More information

experience and innovations

experience and innovations More than 50 years of development, experience and innovations MECHANICAL SCREENING / HEADWORKS Lackeby Wire bar screen Coarse screen suitable for deep and wide channels Wire-driven with no submerged bearings

More information

CLR Process. Vertical Loop Configuration

CLR Process. Vertical Loop Configuration CLR Process Vertical Loop Configuration Vertical Configuration System Flexibility Parallel Operation Raw wastewater and return activated sludge are introduced at a single point in each standard CLR basin.

More information

CF100 BAND SCREENS REDUCE MAINTENANCE COSTS & DOWNTIME... INCREASE CAPTURE RATIO & EFFICIENCY

CF100 BAND SCREENS REDUCE MAINTENANCE COSTS & DOWNTIME... INCREASE CAPTURE RATIO & EFFICIENCY MUNICIPAL WASTEWATER INLET SCREENS REDUCE MAINTENANCE COSTS & DOWNTIME... INCREASE CAPTURE RATIO & EFFICIENCY Excellent pretreatment for MBR Zero carry over sealing independently proven to remove 90% of

More information

Liquid Stream Fundamentals: Grit Removal

Liquid Stream Fundamentals: Grit Removal FACT SHEET Liquid Stream Fundamentals: Grit Removal Grit removal is an essential component of the wastewater treatment process. Not only does the removal of grit help protect downstream equipment from

More information

Rotary vacuum disc fiber filter in wastewater treatment plant introduction document

Rotary vacuum disc fiber filter in wastewater treatment plant introduction document Rotary vacuum disc fiber filter in wastewater treatment plant introduction document Rotary vacuum fiber disc filter consists of a series of horizontally mounted rotary filter discs, each of which is composed

More information

WATER & WASTE WATER PROCESS EQUIPMENT

WATER & WASTE WATER PROCESS EQUIPMENT WATER & WASTE WATER PROCESS EQUIPMENT AWMA Water Control Solutions design, manufacture and install innovative water control infrastructure for all industry sectors, globally. All products are purposeengineered,

More information

CTB3365x Introduction to Water Treatment

CTB3365x Introduction to Water Treatment CTB3365x Introduction to Water Treatment W2c Primary sedimentation Jules van Lier The screened and de-gritted sewage is further conveyed towards the biological treatment step. Can we remove some part of

More information

BILFINGER WATER TECHNOLOGIES SOLUTIONS FOR INLET WORKS / HEADWORKS OUR BRANDS FOR RELIABLE TECHNOLOGIES: PASSAVANT JOHNSON SCREENS NOGGERATH GEIGER

BILFINGER WATER TECHNOLOGIES SOLUTIONS FOR INLET WORKS / HEADWORKS OUR BRANDS FOR RELIABLE TECHNOLOGIES: PASSAVANT JOHNSON SCREENS NOGGERATH GEIGER BILFINGER WATER TECHNOLOGIES SOLUTIONS FOR INLET WORKS / HEADWORKS OUR BRANDS FOR RELIABLE TECHNOLOGIES: PASSAVANT JOHNSON SCREENS NOGGERATH GEIGER A perfect network of expertise. BILFINGER WATER TECHNOLOGIES

More information

Your Clear Choice for Filtration and Water &Wastewater Treatment equipment

Your Clear Choice for Filtration and Water &Wastewater Treatment equipment Your Clear Choice for Filtration and Water &Wastewater Treatment equipment Anita Gupta, M.Sc., Business Manager Filtration Division Jason Blank, B.Eng. B.A., Technical Sales Specialist Filtration May 03,

More information

UNIT I: UNIFORM FLOW PART B

UNIT I: UNIFORM FLOW PART B UNIT I: UNIFORM FLOW PART-A 1 Define open channel flow with example BT-1-1 2 Distinguish between open channel flow and pipe flow. BT-4-1 3 Compute the hydraulic mean depth of a small channel 1m wide, 0.5m

More information

Practical Hydraulics on a Large Wastewater Treatment Works

Practical Hydraulics on a Large Wastewater Treatment Works Practical Hydraulics on a Large Wastewater Treatment Works Rob Wilson Examples Flow distribution chambers with weirs Flow distribution without weirs Manifold distribution Flow distribution to inlet screens

More information

Water and Wastewater Engineering Prof. C. Venkobacher Department of Civil Engineering Indian Institute of Technology, Madras Lecture-17

Water and Wastewater Engineering Prof. C. Venkobacher Department of Civil Engineering Indian Institute of Technology, Madras Lecture-17 Water and Wastewater Engineering Prof. C. Venkobacher Department of Civil Engineering Indian Institute of Technology, Madras Lecture-17 In the last class we were discussing about the wastewater treatment

More information

(a) the inlet and exit vane angles, (b) work done (c) Efficiency of the system. [16]

(a) the inlet and exit vane angles, (b) work done (c) Efficiency of the system. [16] Code No: R05310302 Set No. 1 III B.Tech I Semester Regular Examinations, November 2007 HYDRAULIC MACHINERY AND SYSTEMS ( Common to Mechanical Engineering and Automobile Engineering) Time: 3 hours Max Marks:

More information

WASTE WATER TREATMENT SYSTEM

WASTE WATER TREATMENT SYSTEM WASTE WATER TREATMENT SYSTEM Manual Coarse and Mechanical Fine Screens: We manufacture high quality screens that are widely used for removing suspended particles from the waste water. These screens are

More information

When confronted with increasing peaking. Managing the deluge

When confronted with increasing peaking. Managing the deluge Located on more than 121 ha (300 ac) of land, the Trinity River Authority (Dallas) Central Regional Wastewater water resource recovery facility is an advanced secondary treatment facility and a winner

More information

Physical water/wastewater treatment processes

Physical water/wastewater treatment processes Physical water/wastewater treatment processes Tentative schedule (I) Week 1: Introduction Week 2: Overview of water/wastewater treatment processes Week 3: Major contaminants (Chemicals and pathogens) Week

More information

Chapter 6 STEP System Force Main Velocity Evaluation

Chapter 6 STEP System Force Main Velocity Evaluation Chapter 6 STEP System Force Main Velocity Evaluation \\7348101\TOC.doc CHAPTER 6 STEP System Force Main Velocity Evaluation 6.1 INTRODUCTION The City s existing STEP (septic tank effluent pump) pumps currently

More information

AU TO M AT I C WA S T E WAT E R S C R E E N I N G E Q U I P M E N T E Q U I P M E N T F O R W A T E R S O L U T I O N S

AU TO M AT I C WA S T E WAT E R S C R E E N I N G E Q U I P M E N T E Q U I P M E N T F O R W A T E R S O L U T I O N S E Q U I P M E N T F O R W A T E R S O L U T I O N S AU TO M AT I C WA S T E WAT E R S C R E E N I N G E Q U I P M E N T C O M P A N Y EQUIPWATER is a company specialized in manufacturing, installation

More information

HUBER Sewerage Program

HUBER Sewerage Program WASTE WATER Solutions HUBER Sewerage Program Machines and system solutions for stormwater treatment and sewer system management Combined and Storm Water Treatment Innovative technology and solutions for

More information

Brackett Green CF100 and CF200 Band Screens

Brackett Green CF100 and CF200 Band Screens Brackett Green CF100 and CF200 Band Screens Advanced water screening Key features & benefits Excellent pretreatment for MBR High performance 2 dimensional screening Patented Propapanel technology prevents

More information

CENTRIFUGE DECANTER AND HOW IT WORKS

CENTRIFUGE DECANTER AND HOW IT WORKS CENTRIFUGE DECANTER AND HOW IT WORKS DECANTER CENTRIFUGE In a decanter there s a continuous mechanical separation of suspended solids from a liquid or liquids You could see a centrifuge decanter like a

More information

General Cooling Water Product Presentation October Energy Group Power & Intakes, Americas

General Cooling Water Product Presentation October Energy Group Power & Intakes, Americas General Cooling Water Product Presentation October 2012 Energy Group Power & Intakes, Americas Overall for Circulating Cooling Water Systems Debris Filter ATCS Ball Strainer Band Screens Raking Machine

More information

Primary: Removal of a portion of the suspended solids and organic matter from the wastewater by gravity

Primary: Removal of a portion of the suspended solids and organic matter from the wastewater by gravity 1 Preliminary: Removal of wastewater constituents such as rags, sticks, floatables, grit, and grease that may cause maintenance or operational problems with the subsequent processes Primary: Removal of

More information

ENVIRONMENTAL ENGINEERING. Chemical Engineering department

ENVIRONMENTAL ENGINEERING. Chemical Engineering department ENVIRONMENTAL ENGINEERING Chemical Engineering department 1- PRELIMINARY AND PRIMARY TREATMENT Screening is the first technique employed in primary treatment, which is the first step in the wastewater

More information

Module 9 : Sewage And Storm water Pumping Stations. Lecture 11 : Sewage And Storm water Pumping Stations

Module 9 : Sewage And Storm water Pumping Stations. Lecture 11 : Sewage And Storm water Pumping Stations 1 P age Module 9 : Sewage And Storm water Pumping Stations Lecture 11 : Sewage And Storm water Pumping Stations 2 P age 9.1 Introduction There are certain locations where it is possible to convey sewage

More information

HAZOP Checklist for Sewage Treatment Plant

HAZOP Checklist for Sewage Treatment Plant HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur

More information

Effluent Conveyance. Paul Trotta, P.E., Ph.D. Justin Ramsey, P.E. Chad Cooper

Effluent Conveyance. Paul Trotta, P.E., Ph.D. Justin Ramsey, P.E. Chad Cooper Effluent Conveyance Paul Trotta, P.E., Ph.D. Justin Ramsey, P.E. Chad Cooper University Curriculum Development for Decentralized Wastewater Management 1 NDWRCDP Disclaimer This work was supported by the

More information

Treating World s Water COMPANY PROFILE

Treating World s Water COMPANY PROFILE Treating World s Water COMPANY PROFILE 2017 About MAKRO MAKRO ENVIRONMENTAL PROTECTION AND INDUSTRIAL PLANTS PRODUCTION AND TRADE CO. LTD. has been founded in Jan1992 and its expertise is all kind of water

More information

HUBER Sewerage Program

HUBER Sewerage Program HUBER Sewerage Program Machines and system solutions for stormwater treatment and sewer system management Equipment and system solutions for application in combined and separated sewer systems Advanced

More information

HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES

HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES THOMAS A. TYLER, PE GREGORY S. BAZYDOLA, PE NEWEA Conference January 22, 2018 Presentation Agenda

More information

Introduction to Preliminary Wastewater Treatment

Introduction to Preliminary Wastewater Treatment Introduction to Preliminary Wastewater Treatment Course No: C02-033 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony

More information

SETTLING REVIEW CHECKLIST

SETTLING REVIEW CHECKLIST SETTLING REVIEW CHECKLIST Water Quality Wastewater Technical Review and Guidance FACILITY NAME CONSULTING ENGINEER DATE Water/Wastewater/#5.73, May 2001 SITE INSPECTION (DATE & INSPECTOR) PLANNING OR DESIGN

More information

Air Lift Pumps (Grit Pump) ST-027

Air Lift Pumps (Grit Pump) ST-027 Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration

More information

Advanced Grit Removal Technology

Advanced Grit Removal Technology Advanced Grit Removal Technology Superior Performance Lowest Total Cost of Ownership Unequalled Experience Since pioneering the first flat-floor vortex grit removal system, S&L Engineering leads the water

More information

AS-H Iso-Disc Cloth Media Filter

AS-H Iso-Disc Cloth Media Filter AS-H Iso-Disc Cloth Media Filter Tertiary filtration and final polishing of wastewaters in municipal and industrial applications Toby.Sedgwick@AlfaLaval.com Slide 2 Typical Performance Range Influent Average

More information

Grit Collection & Classification Case Studies

Grit Collection & Classification Case Studies Grit Collection & Classification Case Studies OWEA 2010 Specialty Biosolids Specialty Workshop Brian F. McNamara, HRSD Definition of Grit Metcalf & Eddy 2 nd Edition 1979 grit, consisting of sand, gravel,

More information

2. (a) How do you classify water turbines? (b) Define and explain different efficiencies of a water turbine. [8+8]

2. (a) How do you classify water turbines? (b) Define and explain different efficiencies of a water turbine. [8+8] Code No: RR310302 Set No. 1 III B.Tech I Semester Supplementary Examinations, February 2007 HYDRAULIC MACHINERY AND SYSTEMS ( Common to Mechanical Engineering and Automobile Engineering) Time: 3 hours

More information

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION 117 Paper No. 738 IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION JAVED MUNIR, SYED ABBAS ALI, IRFAN MAHMOOD 118 Javed Munir,

More information

Surface Water Diversions and Fish Protection

Surface Water Diversions and Fish Protection Surface Water Diversions and Fish Protection The Need Taking Water Out of Its Natural Location The Impact Annika W. Walters, Damon M. Holzer, James R. Faulkner, Charles D. Warren, Patrick D. Murphy & Michelle

More information

Appendix B-1. Design Calculations for Sewage Treatment Plant

Appendix B-1. Design Calculations for Sewage Treatment Plant APPENDIX B SEWERAGE FACILITIES Appendix B-1 Design Calculations for Sewage Treatment Plant Appendix. B.1 CAPACITY CALCULATION OF SEWAGE TREATMENT PLANT 1 BASIC CONDITIONS 1.1 BASIC S (1) Name : Astana

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

Course: Wastewater Management

Course: Wastewater Management Course: Wastewater Management Prof. M. M. Ghangrekar Questions 1 1. Describe advantages and disadvantages offered by the water carriage system. 2. What are the possible adverse effects when untreated or

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

For Heavy-Duty, High-Volume Ferrous Separation

For Heavy-Duty, High-Volume Ferrous Separation For Heavy-Duty, High-Volume Ferrous Separation DEEP DRAW DRUM FOR MATERIAL RECOVERY FACILITY AUTOMOBILE SCRAP C&D RECYCLING MATERIAL RECOVERY FACILITIES COAL PROCESSING PLANTS FOUNDRIES STEEL AND SLAG

More information

13.8 SEWAGE TREATMENT FLOW SHEET

13.8 SEWAGE TREATMENT FLOW SHEET 1 13.7.5 Flow Patterns of Reactors The flow pattern in the reactors depends on mixing conditions in them. This mixing in tern depends upon the shape of the reactor, energy spent per unit volume of the

More information

Quality of Washed and Compacted Screenings

Quality of Washed and Compacted Screenings Quality of Washed and Compacted Screenings Markus Roediger*, Wolfgang Branner** * Dr. Roediger Consult, Stuttgart, Germany (dr.m.roediger@t-online.de) ** Huber SE, Berching, Germany (brw@huber.de) ABSTRACT

More information

SCHOOL OF COMPUTING, ENGINEERING AND MATHEMATICS SEMESTER 1 EXAMINATIONS 2014/2015 ME257. Fluid Dynamics. Answer FOUR out of SIX questions

SCHOOL OF COMPUTING, ENGINEERING AND MATHEMATICS SEMESTER 1 EXAMINATIONS 2014/2015 ME257. Fluid Dynamics. Answer FOUR out of SIX questions s SCHOOL OF COMPUTING, ENGINEERING AND MATHEMATICS SEMESTER 1 EXAMINATIONS 2014/2015 ME257 Fluid Dynamics Time allowed: TWO hours Answer: Answer FOUR out of SIX questions Items permitted: Any approved

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

MOE Guidelines on Surge/Transients

MOE Guidelines on Surge/Transients Corporate Office Hydratek & Associates Inc. 216 Chrislea Road, Suite 501 Woodbridge, Ontario L4L 8S5 Canada www.hydratek.com MOE Guidelines on Surge/Transients Introduction The Ministry of the Environment

More information

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents

More information

Alpha College of Engineering

Alpha College of Engineering Alpha College of Engineering Department of Mechanical Engineering TURBO MACHINE (10ME56) QUESTION BANK PART-A UNIT-1 1. Define a turbomahcine. Write a schematic diagram showing principal parts of a turbo

More information

Code No: R Set No. 1

Code No: R Set No. 1 Code No: R05310302 Set No. 1 III B.Tech I Semester Regular Examinations, November 2008 HYDRAULIC MACHINERY AND SYSTEMS ( Common to Mechanical Engineering and Automobile Engineering) Time: 3 hours Max Marks:

More information

Presentation Outline. Historical Perspective on Wet Wells. Historical Perspective on Wet Well Design. The Trench-Type Self-Cleaning Wet Well

Presentation Outline. Historical Perspective on Wet Wells. Historical Perspective on Wet Well Design. The Trench-Type Self-Cleaning Wet Well Sludge and Scum-Sucking Submersible Sewage Pump Station (A Unique Approach to the Self-Cleaning Wet Well Design) Timothy M. Schneller, P.E. George Butler Associates, Inc. Lenexa, Kansas Presentation Outline

More information

CEE 371 May 14, 2009 Final Exam

CEE 371 May 14, 2009 Final Exam CEE 371 May 14, 2009 Final Exam Closed Book, two sheets of notes allowed Please answer questions 3, 6 and 7. In addition, answer either question 1 or 2, and answer either question 4 or 5. The total potential

More information

Waste Water Treatment Equipment

Waste Water Treatment Equipment APEC PUMP ENTERPRISE CORP. Waste Water Treatment Equipment APEC Separator APEC Separator Compared with a sedimentation basin, the APEC separator offers a 90% saving in terms of surface area. This means

More information

EFFECTIVE AND EASILY MAINTAINED TREATMENT SOLUTIONS

EFFECTIVE AND EASILY MAINTAINED TREATMENT SOLUTIONS EFFECTIVE AND EASILY MAINTAINED TREATMENT SOLUTIONS When it rains, surface runoff carries pollutants, suspended solids and hydrocarbons. Floating debris is swept through collection systems in subsurface

More information

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES DESIGN OF CHANNEL FLOW DIVERSION FACILITIES FOR RIPARIAN HABITAT IRRIGATION BRUCE M. PHILLIPS, M.S., P.E. ABSTRACT Increased awareness and concern regarding environmental degradation has resulted in protection

More information

Siddhipur Water Treatment Plant Lalitpur, Nepal

Siddhipur Water Treatment Plant Lalitpur, Nepal Siddhipur Water Treatment Plant Lalitpur, Nepal 1. Background Information Siddhipur is located 10 km southeast of Kathmandu in Lalitpur district. Siddhipur Water Treatment Plant (SWTP) was started with

More information

Dirty paper take up and filter cake stripper for separation of paper and waste are optional.

Dirty paper take up and filter cake stripper for separation of paper and waste are optional. K 452 World-wide the most flexible filtration system - ully automatic filtration over filter paper ecause of the possibility of using different filter papers, the desired effects can be achieved. irty

More information

Brackett Green Travelling Band Screens Fine Screening for Water Intakes

Brackett Green Travelling Band Screens Fine Screening for Water Intakes Brackett Green Travelling Band Screens Fine Screening for Water Intakes A COMPANY Brackett Green Travelling Band Screens Brackett Green Travelling Band Screens are designed for installation on raw water

More information

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT Paper Presented by : Peter Shanahan Author: Peter Shanahan, Senior Wastewater Operator, Griffith City Council

More information

Enviro Voraxial Technology

Enviro Voraxial Technology Enviro Voraxial Technology 821 NW 57 th Place, Fort Lauderdale, FL 33309 Phone 954.958.9968 Fax: 954.958.8057 sales@evtn.com www.evtn.com EVTN VORAXIAL GRIT SEPARATOR HILLSBOROUGH COUNTY DEMONSTRATION

More information

Types of Hydropower Facilities

Types of Hydropower Facilities Types of Hydropower Facilities 1 Impoundment Hydropower- uses a dam to store water. Water may be released either to meet changing electricity needs or to maintain a constant water level. 2 Run-of-River

More information

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT 75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT Basis of Design Memorandum Design Memo No.: DM-7 (REVISED) Date: February 2005 Project/Task: 124487.001.420 Subject: Prepared by: Reviewed by: Hydraulic

More information

Elmosa Seawater Intake and Outfall Systems Intelligent, Natural, and Simple

Elmosa Seawater Intake and Outfall Systems Intelligent, Natural, and Simple Elmosa Seawater Intake and Outfall Systems Intelligent, Natural, and Simple Super Seawater Intake Technology with Site Recognition Capabilities The low velocity InvisiHead detects pump energy pulses, recognizes

More information

12. Super-High-Speed Fiber Filtration for Untreated Combined Sewage Water Overflow on Rainy Days

12. Super-High-Speed Fiber Filtration for Untreated Combined Sewage Water Overflow on Rainy Days 12.Super-High-Speed Fiber Filtration for Untreated Combined Sewage Water Overflow on Rainy Days N. Horie 1, M.Kabata 2, K.Sano 3, S.Kanamori 4 1. Technology Overview (System overview) This wastewater treatment

More information

3.5 Movable Weirs Movable weir types. Bottom-gate type Figure 3.60 General layout of an offtake weir (Bos 1989).

3.5 Movable Weirs Movable weir types. Bottom-gate type Figure 3.60 General layout of an offtake weir (Bos 1989). 3.5 Movable Weirs Movable weirs have proven their value for over 80 years in irrigated areas where flow over an off-take structure is variable because of changing crop rotations and water requirements

More information

Akiki Engineering Est.

Akiki Engineering Est. Akiki Engineering Est. Water & Steam Experts 3.1. Wastewater Treatment Catalogue October 7, 2010 Contents Rectangular Plant, Extended Aeration......................... 3 Circular Plant, Extended Aeration...........................

More information

6. Band Screen with Perforated Fine Mesh Panels

6. Band Screen with Perforated Fine Mesh Panels 6.Band Screen with Perforated Fine Mesh Panels N. Horie 1, M. Kabata 2, H.Sano 3 and S.Simozeki 4 Director 1, Chief Resercher 2, Senior Resercher 3 and Resercher 4 First Research Department Japan Institute

More information

Crushing. Comminution

Crushing. Comminution Comminution In order to separate the minerals from gangue (the waste minerals), it is necessary to crush and grind the rock to unlock, or liberate, valuable minerals so that they are partially or fully

More information

Biotube EasyPak Design Criteria

Biotube EasyPak Design Criteria Biotube EasyPak Design Criteria System Description Orenco s EasyPak pumping systems are designed for pumping effluent from a dosing tank that is separate from the septic tank. The EasyPak pump vault includes

More information

Starch Dewatering by Hi-Bar Filtration

Starch Dewatering by Hi-Bar Filtration Starch Dewatering by Hi-Bar Dewatering of Starch Suspensions by Continuous Pressure 3 t2 = OO t2 = 6 s t2 = 3 s t2 = s Pressure difference p 2 1 p ce,5 1 2 / 211 e S r Saturation S BOKELA Hi-Bar Oyster

More information

UNIT I FLUID PROPERTIES AND FLUID STATICS

UNIT I FLUID PROPERTIES AND FLUID STATICS SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : FM & HM (16CE112) Year & Sem: II-B.Tech & I-Sem Course & Branch: B.Tech

More information

AERATED POND REVIEW CHECKLIST

AERATED POND REVIEW CHECKLIST Water Quality AERATED POND REVIEW CHECKLIST Wastewater Technical Review and Guidance FACILITY NAME Water/Wastewater/#5.04, May 2001 DATE CONSULTING ENGINEER SITE INSPECTION (DATE & INSPECTOR) PLANNING

More information

DESIGN AND ANALYSIS OF SOLAR POWERED TROMMEL SCREEN PROJECT REFERENCE NO: 38S0965

DESIGN AND ANALYSIS OF SOLAR POWERED TROMMEL SCREEN PROJECT REFERENCE NO: 38S0965 DESIGN AND ANALYSIS OF SOLAR POWERED TROMMEL SCREEN PROJECT REFERENCE NO: 38S0965 COLLEGE : New Horizon College of Engineering BRANCH : MECHANICAL ENGINEERING GUIDE : MR. RAKESH C MS. RHEA NAOMI STUDENTS

More information

SHREE RAMCHANDRA EDUCATION SOCIETY S LONIKAND, PUNE DEPARTMENT OF MECHANICAL ENGINEERING LAB MANUAL

SHREE RAMCHANDRA EDUCATION SOCIETY S LONIKAND, PUNE DEPARTMENT OF MECHANICAL ENGINEERING LAB MANUAL SHREE RAMCHANDRA EDUCATION SOCIETY S SHREE RAMCHANDRA COLLEGE OF ENGINEERING, LONIKAND, PUNE 412 216 DEPARTMENT OF MECHANICAL ENGINEERING LAB MANUAL TURBO MACHINES(TM) TE (ME) Semester-VI Prepared by Prof.

More information

Vortex Separator. May be more cost-effective pre-treatment devices than traditional wet or dry basins.

Vortex Separator. May be more cost-effective pre-treatment devices than traditional wet or dry basins. Description Vortex separators: (alternatively, swirl concentrators) are gravity separators, and in principle are essentially wet vaults. The difference from wet vaults, however, is that the vortex separator

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

JIWET technical report. 1. Brush Screen

JIWET technical report. 1. Brush Screen 1. Brush Screen N. Horie 1, M. Kabata 2, H.Sano 3 and S.Simozeki 4 Director 1, Chief Resercher 2, Senior Resercher 3 and Resercher 4 First Research Department Japan Institute of Wastewater Engineering

More information

Conveyor systems up to 50 kg. 50 kg.

Conveyor systems up to 50 kg. 50 kg. 50 kg Index 1 ROLLER CONVEYOR SYSTEM 3 1.1 ROLLER CONVEYOR 3 1.2 CURVE ROLLER CONVEYOR 4 1.3 ROLLER LIFTING TABLE 5 1.4 GRAVITY ROLLER CONVEYOR WITH ACCUMULATION 6 2 BELT CONVEYOR SYSTEM 7 2.1 HORIZONTAL

More information

Economics, Design, and Operation of Sewage-Treatment Plants W. E. Ross

Economics, Design, and Operation of Sewage-Treatment Plants W. E. Ross Economics, Design, and Operation of Sewage-Treatment Plants W. E. Ross Superintendent, Treatment Plant Richmond, Indiana In view of all the stress placed on post-war planning and construction, it was thought

More information

COOLING TECHNOLOGY INSTITUTE

COOLING TECHNOLOGY INSTITUTE PAPER NO: CATEGORY: TP18-23 TESTING COOLING TECHNOLOGY INSTITUTE COMPARATIVE EVALUATION OF PITOT TUBE DESIGNS FOR WATER FLOW MEASUREMENT DEVICES KENNETH W. HENNON, P.E. DAVID E. WHEELER, P.E. CLEANAIR

More information

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose Purpose Task 5 Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, 2015 For the fifth task of this project we are asked to specify the layout of the piping system, the material type and sizes

More information

Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities

Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities Energy Use Impacts of Flow Conveyance Alternatives for Membrane Bioreactor (MBR) Facilities Thor Young 1* and Kristi Perri 1 1 GHD Inc., Bowie, Maryland * Email: thor.young@ghd.com ABSTRACT Flow conveyance

More information

MICROSCREENING IN SEWAGE TREATMENT

MICROSCREENING IN SEWAGE TREATMENT PERIODICA POLYTECHNICA SER. CIVIL ENG. VOL. 35, NOS. 1-2, PP. 79-89 (J991) MICROSCREENING IN SEWAGE TREATMENT G.0110S Department of "Water Supply and Sewerage Technical University H-1521 Budapest Received:

More information

Deephams STW analysis of mixing chamber, aeration lanes and final settlement tanks

Deephams STW analysis of mixing chamber, aeration lanes and final settlement tanks www.waterprojectsonline.com Deephams STW analysis of mixing chamber, aeration lanes and final settlement tanks by Darrell A Egarr PhD CEng MIMechE D eephams STW, which is located in East London, is the

More information