Exhibit MSD 1 METROPOLITAN ST. LOUIS SEWER DISTRICT RATE CHANGE PROPOSAL FEBRUARY 26, 2015

Size: px
Start display at page:

Download "Exhibit MSD 1 METROPOLITAN ST. LOUIS SEWER DISTRICT RATE CHANGE PROPOSAL FEBRUARY 26, 2015"

Transcription

1 Exhibit MSD 1 METROPOLITAN ST. LOUIS SEWER DISTRICT RATE CHANGE PROPOSAL FEBRUARY 26, 2015

2 INTRODUCTION The Metropolitan St. Louis Sewer District (MSD) was formed on February 9, 1954, when voters approved the Plan of the Districtt to provide a metropolitan-wide system of wastewater treatment and sewerage facilities for the collection, treatment and disposal of sewage. MSD began operations in January 1956 in an area roughly composedd of the City of St. Louis and the portion of St. Louis County located east of Interstate 270. It took over the publicly-owned wastewater and stormwater drainage facilities within its jurisdiction and began the construction of an extensivee system of collector and interceptor sewerss and treatment facilities. Most of the remainder of St. Louis County was annexed by MSD in MSD s Rate Commission was established in The Commission consists of 15 member organizations that represent a broad cross-section of the customers and community MSD serves. The Commission s purpose is to provide public input into how MSD sets its rates. The Commission is required by Charter to review all Rate Change Proposals (Rate Proposal(s) )) and render an opinion before submitting Rate Proposals to the Board of Trustees for approval. The Rate Commission process includes multiple public hearings throughout the St. Louis metropolitan area where MSD customers have an opportunity to provide feedback on the Rate Proposal. The entire Rate Commission proceedings mayy take up to 165 days from the date the District submits a Rate Proposal for consideration. All Rate Commission meetings are open to the public. The date, time and location of Rate Commission meetings are posted on the MSD website. MSD s Rate Proposal is the product of the District andd is based on the strategic and financial implications of its regulatory defined Wastewater (WW) and Stormwater (SW) service obligations to the St. Louis region. The District s development of its Rate Proposal reflects consultative and analytical assistance from Raftelis Financial Consultants, Inc. ( RFC) and Vertex Business Services (Vertex). Raftelis Financial Consultants Inc. (RFC) RFC is a financial consulting firm specializing in rate design, financial planning, bond feasibility studies for water, wastewater and SW utilities. Headquartered in Kansas City, RFC has offices in North Carolina, California, Ohio, Colorado and Texas. RFC conducted a comprehensive analysis of the District s current and projected funding needs. Based on thiss analysis, RFC designed the wastewater rates and SW funding approach contained inn the District s Rate Proposal. RFC will also assist the District in articulating the complexities underlying its proposed rates and analyze alternative rate designs and Rate Proposals as presented during the Commission s review. RFC developed the WW and SW rates contained in the Rate Proposal based on industry standard rate design methods. The Proposed rates were calculated using an RFC rate model customized

3 for the District s unique needs. A flash drive containing this model is included as part of the Rate Proposal. Vertex Business Services (Vertex) Vertex is a consulting and technology solution provider serving water/wastewater, electricc and natural gas utilities across North America. Headquartere ed in Richardson, Texas, Vertex currently hosts the District s billing and collection system and on-site calll center giving them unique access to detailed data on the District s WWW and SW revenues, customer accounts, water usage and customer behaviors and attributes. Vertex s Analytics and Consulting practice assisted the District in bridging its billing and collection data with outside dataa sources as the basis for key assumptions in the District s Rate Proposal. Vertex worked in conjunction with RFC to develop the customer growth and water usage projections used in the rate design; determine the universe of potential ratepayers who may benefit from the District s Customer Assistance Program; provide data to recalibrate the Ccf (centum cubic feet or 100 cubic feet) basis for thee District s unmetered wastewater rate components, and provide detailed taxpayer attributes to assess the customer impact of the District ss WW and SW charges contained in this Rate Proposal. Public Financial Management, Inc (PFM) The PFM Group, ncluding Public Financial Management Inc. (PFM) and its affiliates, is a national leader in providing independent financial advice as well as investment advisory, management and consulting services to local, state, and regional government and nonprofit clients. Headquarter red in Philadelphia, Pennsylvania, ass of December 2014, the PFM Group has 37 locations nationwide. Nine of these offices are located in the Midwest, including an office in St. Louis. PFM has served as the District ss financial advisor since 2000, advising on all aspects of District debt policy development, financial planning, debt transaction management including credit structure development and credit ratings presentations s and on-going debt monitoring. PFM worked with the District to develop a financial plan in considerationn of this Rate Proposal to the Commission. The financial plan recommends senior lien debt issuance levels designed with the objectivee to maintain credit ratings metrics consistent with strong credit ratings and in consideration of the District s operational and capital funding needs..

4 RATE PROPOSAL ORGANIZATION WASTEWATER & STORMWATER RATE CHANGE PROPOSAL RATE PROPOSAL ORGANIZATION The Rate Proposal is organized into 9 Sections outlined below. Rate Proposal Sections: Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Abbreviations and Acronyms Rate Table & Figure Index Executive Summary Proposed Wastewater Rates Proposed Stormwater Funding Customer Impact Appendices Glossary Index Flash Drive A flash drive accompanies the Rate Proposal to provide easier accessibility to this document. It also contains the District s Direct Testimony, RFC rate design model used by the District and supplemental exhibits anticipated to be used during the Commission s review. A summary of each section follows: SECTION 1 Abbreviations and Acronyms This section contains a list of definitions of the abbreviations and acronyms frequently used in the Rate Proposal. SECTION 2 Rate Table & Figure Index This section contains a listing of all the numeric tables and graphs. SECTION 3 -- Executive Summary This section provides an overview of the proposed WW rates and SW funding presented in this Rate Proposal. This section also outlines the basic construct and foundational assumptions underlying the District s rate change request including the impact on its customers. P.O.- 1

5 RATE PROPOSAL ORGANIZATION WASTEWATER & STORMWATER RATE CHANGE PROPOSAL SECTION 4 -- Proposed Wastewater Rates This section provides the details of the District s proposed change in its WW rates. The District proposes the use of a combination of issuing additional revenue bonds and increasing WW user charges to fund its WW operating and maintenance costs (O&M) as well as EPA Consent Decree (CD) requirements. The CD mandates the implementation of a multi-decade Capital Improvement and Replacement Program (CIRP). The Rate Proposal reflects capital projects and related O&M needed over the next 4 years to comply with the CD. The explanation and basis for the proposed WW funding, its underlying assumptions, resulting rates and impact on MSD customers are contained in this Section. This Section also provides a 100% user charge (PAYGO) scenario as an alternative to incurring additional debt. Additional detail supporting the assumptions used to design the proposed change in WW rates may be found in the Appendices in Section 7. SECTION 5 -- Proposed Stormwater Funding This section provides the details of the District s proposed plan to fund SW operations within its boundaries. This proposed funding plan replaces the SW impervious based fee structure, as approved by the Rate Commission in calendar year The SW impervious based fee structure was found by the Missouri Supreme Court to be a tax that required voter approval. MSD proposes the use of a District-wide tax structure to replace the flat rate charge and the multi-layered taxes now assessed on the real estate value of its customers property. This proposed funding is designed to cover the cost of SW maintenance services, limited capital projects and associated O&M. This section provides the basis for the District s SW component of its Rate Proposal, its underlying assumptions, proposed tax structure and impact on MSD customers. Additional details supporting the assumptions can be found in the Appendices in Section 7. SECTION 6 Customer Impact This section provides information on the impacts of the proposed rate adjustments on typical residential, commercial and industrial customers of the District. This section also discusses implications of the proposed rate adjustments relative to customer impacts within the District. SECTION 7 -- Appendices This section contains 7 appendices providing additional detail underlying the key assumptions used in the District s rate design. SECTION 8 Glossary SECTION 9 - Index P.O.- 2

6 SECTION 1 ABBREVIATIONS & ACRONYMS WASTEWATER & STORMWATER RATE CHANGE PROPOSAL ABBREVIATIONS & ACRONYMS The following is a list of abbreviations and acronyms used through the Rate Proposal. Additional definitions are contained in the Rate Proposal Glossary in Section 8. AWWA American Water Works Association AWWARF American Water Works Association Research Foundation Board Metropolitan Sewer District Board of Trustees BOD Biochemical Oxygen Demand Ccf Hundred (100) cubic feet (about 748 gallons) per day CD Consent Decree CIRP Capital Improvement and Replacement Program City City of St. Louis CMOM Capacity, Management, Operation and Maintenance COD Chemical Oxygen Demand County St. Louis County CSO Combined Sewer Overflow CIP Capital Work In Progress District (MSD) EPA Environmental Protection Agency FY Fiscal Year (July 1 June 30) gpd gallons per day HHS Health and Human Services I/I Infiltration/Inflow mg/l milligrams per liter mgd million gallons per day MDNR Missouri Department of Natural Resources MSD (District) Abbreviations and Acronyms- 1

7 SECTION 1 ABBREVIATIONS & ACRONYMS WASTEWATER & STORMWATER RATE CHANGE PROPOSAL MWWC NACWA NPDES O&M OM&R OMCI PAYGO PFM RFC SRF SSO SS SW TSS WEF WW WWTP Missouri Wastewater Coalition National Association of Clean Water Agencies National Pollutant Discharge Elimination System Operation and Maintenance Operation, Maintenance and Replacement Operation, Maintenance and Construction Improvement Pay-As-You-Go Public Financial Management, Inc. Raftelis Financial Consultants Inc. State Revolving Loan Fund Sanitary Sewer Overflow Suspended Solids Stormwater Total Suspended Solids Water Environment Federation Wastewater Wastewater Treatment Plant Abbreviations and Acronyms- 2

8 SECTION 2 RATE TABLE & FIGURE INDEX WASTEWATER & STORMWATER RATE CHANGE PROPOSAL RATE TABLE & FIGURE INDEX The following is a numerical listing of the rate tables and informational figures referenced throughout the table. Rate Tables Page Table Name Table ES-1 ES-4 Wastewater Financial Plan Table ES-2 ES-5 Wastewater User Charges Table ES-3 ES-7 Stormwater Financial Plan Table ES-4 ES-8 Typical Monthly Wastewater Bills Table ES-5 ES-9 Typical Monthly Unmetered Wastewater Bills Table ES-6 ES-9 Stormwater Impacts Table Wastewater Customer Accounts Table Wastewater Customer Accounts Table Wastewater Contributed Volumes Table Wastewater User Charge Revenue Under Approved Rates Table Other Wastewater Operating Revenue Table Historical and Projected Operating Expenses Table Wastewater Capital Improvement and Replacement Prog Table CIRP Financing Plan Table Projected Wastewater Debt Service Requirements Table Wastewater Financial Plan Table Test Year Cost Allocation Results Table Test Year Cost Classification Summary Rate Table & Figure Index- 1

9 SECTION 2 RATE TABLE & FIGURE INDEX WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Rate Tables Page Table Name Table District Cost of Service Summary: Operating v. Capital Table District Cost of Service Summary: Wastewater v. Stormwater Table Wastewater Units of Service Table Development of Wastewater Unit Costs of Service Table Allocation of Wastewater Costs of Service to Customer Classes Table Comparison of Existing Revenue to Wastewater Cost of Service Table Proposed Wastewater User Charges Table CAP Poverty Guidelines Table Comparison of Revenue under Proposed Rates to Cost of Service Table CIRP Financing Plan: No Bonds Alternative Table No Bonds Scenario Financial Plan Table Alternative Wastewater Rates No Bonds Table Typical Wastewater Bills under No Bonds Alternative Table Existing & Proposed Stormwater Charges Table Stormwater Operating Expenses Table Projected Stormwater Revenue Table Projected Stormwater Other Operating Revenue Table Stormwater Financial Plan Table Existing and Proposed Wastewater & Stormwater Charges Table Typical Wastewater Bills Table Typical Unmetered Wastewater Bills Table Stormwater Impacts Rate Table & Figure Index- 2

10 SECTION 2 RATE TABLE & FIGURE INDEX WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Figures Page Figure Name Figure ES-1 ES-2 Current Stormwater Service Level Map of MSD Figure Wastewater Customer Accounts Metered/Unmetered Figure Wastewater Contributed Volumes Figure Projected CIRP Needs Figure Outstanding & Projected Debt Principal Figure Wastewater Operating Reserve Figure Wastewater Financial Plan Figure Cost of Service Process Diagramed Figure Customer Assistance Program Participants Figure Wastewater Bill Comparison: Bonds v/s No Bonds Figure Current Stormwater Service Level Map Figure Stormwater CIRP Needs Figure Purposed Stormwater Service Level Map Figure NACWA Rate Comparison Figure RFC Bill Comparison -- Residential Rate Table & Figure Index- 3

11 SECTION 3 EXECUTIVE SUMMARY EXECUTIVE SUMMARY WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 3.1 Existing WW and SW Billing Structures Wastewater All customers pay a volume charge based on their water usage as provided by their respective water providers. The billing rate structure for customers varies depending on the method used to measure their water usage. Customers fall within two types, metered or unmetered. Single family and multi-family customers may be either metered or unmetered primarily based on where they live in the St. Louis area. For the most part, single family and multi-family customers residing in St. Louis County are metered with usage charged on a per Ccf basis. Single family and multi-family customers in the City of St. Louis are primarily unmetered with water usage charged on a per attribute basis. All non-residential customers are metered and billed monthly. All non-residential customers also pay a tiered compliance charge based on the amount of required environmental monitoring. Some non-residential customers also pay extra-strength charges where applicable Stormwater The SW user charge is assessed to all properties in the MSD service area. Single-family and nonresidential customers are charged a monthly 24 fee. Multi-family accounts are charged 18 per unit per month. In addition a property tax is assessed to each taxable property in the MSD service area. The amount of the tax levy ranges from $.0197 to $.1879 per $100 of assessed value depending where the property is located. Figure ES-1 provides a summary of the various taxing districts: those properties in red pay a levy of $.0197 per $100 of assessed value, those in yellow pay levies of $.0682 and $.0197 per $100 of assessed value while those in the green areas pay levies totaling a minimum of $.0879 to a maximum of $.1879 per $100 of assessed value. ES- 1

12 SECTION 3 EXECUTIVE SUMMARY Figure ES-1 Current Stormwater Service Level Map WASTEWATER & STORMWATER RATE CHANGE PROPOSAL ES- 2

13 SECTION 3 EXECUTIVE SUMMARY 3.2 WW Rate Proposal WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The District s proposed WW rates are based on rate design application and analysis conducted by MSD s rate consultant, RFC in conjunction with District staff. The principal assumptions used in the WW Rate Proposal are as follows: 1. RFC has relied on certain historical, financial and statistical data supplied by District staff. While such data is considered reliable, RFC has not independently verified or audited the detailed accuracy of such data. 2. Billed WW volume will decrease throughout the forecast period, consistent with historic District and industry trends, as analyzed by the Vertex Group and presented in Appendices and The District s WW O&M expense will have inflationary increases over the forecast period as shown in Section 4.5 of this Rate Proposal and discussed in more detail in Appendix The District s estimates of content, scheduling and cost of the four-year WW CIRP totaling approximately $1.50 billion for FY17 through FY20 present a reasonable projection of the future construction program. More details about the District s WW CIRP can be found in Section 4.6 of this Rate Proposal as well as Appendices and The CIRP is primarily funded through a combination of WW service charges, WW revenue bonds and miscellaneous other customer fees. MSD's new rate plan, which runs from July 1, 2016 to June 30, 2020, includes increases in WW charges, as well as $918.6 million in senior revenue bonds to help fund approximately $1.49 billion in needed improvements over the forecast period. MSD does not anticipate receiving financial support from the federal government for this construction program other than the $100 million in federallyfunded and state-administered subordinate series of revenue bonds issued under the Missouri State Revolving Fund (SRF) financing shown in the CIRP financing plan. More details on the CIRP financing plan can be found in Section A Bond election will be held in calendar year 2016 and the District voters will authorize $900 million of additional WW revenue bonds. 7. If the District does not obtain additional revenue bond authority, the Board will approve the alternative WW rates presented in Table 4-24 of this report. 8. Debt service for the senior revenue bonds and SRF financing proposed to be issued during the study period will be approximately $477.2 million, as estimated. 9. The District will maintain a minimum operating reserve balance at all times that is at least equal to 60 days of operating expenditures. ES- 3

14 SECTION 3 EXECUTIVE SUMMARY WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Overall the analyses indicate that the District will require increases in revenues averaging 9.8% each year of the Rate Proposal period. The District s complete financial forecast is presented in Table ES-1 and discussed in Section 4.8 of this Rate Proposal. Table ES-1 Wastewater Financial Plan Projected Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Wastewater Revenue Subtotal Subtotal 1. User Charge Revenue $ 280,817,877 $ 313,591,980 $ 341,628,032 $ 376,598,004 $ 414,941,775 $ 457,442,232 $ 1,590,610,042 $ 2,185,019,899 Other Miscellaneous Revenue 2. Other Operating Revenue $ 4,796,155 $ 2,201,279 $ 2,199,876 $ 1,715,172 $ 1,243,378 $ 730,516 $ 5,888,941 $ 12,886, Non-Operating Revenue 222, , , , , , ,000 1,332, Connection Fee Revenue 683, , , , , ,840 2,828,996 4,201, Subtotal: Other Miscellaneous Revenue $ 5,701,155 $ 3,113,109 $ 3,118,604 $ 2,640,867 $ 2,176,110 $ 1,670,356 $ 9,605,937 $ 18,420, Total: Wastewater Revenue $ 286,519,032 $ 316,705,089 $ 344,746,636 $ 379,238,871 $ 417,117,885 $ 459,112,587 $ 1,600,215,979 $ 2,203,440,100 % Change 8.0% 10.5% 8.9% 10.0% 10.0% 10.1% Wastewater Expenditures 7. Operating Expenses $ (169,363,203) $ (178,481,265) $ (176,389,110) $ (180,102,367) $ (186,374,873) $ (193,091,871) $ (735,958,222) $ (1,083,802,690) 8. Net Revenue Available for Debt & Capital $ 117,155,828 $ 138,223,824 $ 168,357,525 $ 199,136,504 $ 230,743,012 $ 266,020,716 $ 864,257,758 $ 1,119,637,409 Non-Operating Expenses Debt Service and Other Indebtedness Senior Revenue Bond Debt Service (Accrued) 9. Existing $ (39,367,299) $ (44,851,007) $ (46,655,486) $ (46,468,892) $ (46,476,019) $ (46,535,144) $ (186,135,542) $ (270,353,847) 10. Proposed - (4,844,021) (15,547,229) (28,325,958) (43,336,844) (61,212,275) (148,422,306) (153,266,327) 11. Subtotal: Senior Revenue Bond Debt Service $ (39,367,299) $ (49,695,028) $ (62,202,715) $ (74,794,851) $ (89,812,863) $ (107,747,419) $ (334,557,848) $ (423,620,174) SRF & Direct Loan Debt Service (Accrued) 12. Existing $ (25,295,222) $ (27,674,382) $ (27,592,947) $ (27,627,707) $ (27,646,335) $ (27,664,083) $ (110,531,072) $ (163,500,676) 13. Proposed (835,678) (3,029,860) (5,345,304) (7,172,641) (8,922,975) (10,691,793) (32,132,712) (35,998,250) 14. Subtotal: SRF & Direct Loan Debt Service $ (26,130,899) $ (30,704,242) $ (32,938,251) $ (34,800,348) $ (36,569,310) $ (38,355,876) $ (142,663,785) $ (199,498,926) 15. Subtotal: Debt Service & Other Indebtedness $ (65,498,198) $ (80,399,270) $ (95,140,966) $ (109,595,199) $ (126,382,173) $ (146,103,295) $ (477,221,633) $ (623,119,100) 16. Cash-Financed Capital (Paygo) $ (43,771,640) $ (43,884,789) $ (73,958,600) $ (85,033,814) $ (103,114,490) $ (114,196,780) $ (376,303,683) $ (463,960,112) 17. Non-recurring Projects or Studies (4,489,587) (6,322,090) (6,034,848) (5,194,950) (5,101,732) (5,281,442) (21,612,972) (32,424,648) 18. Contributions to Reserves Subtotal: Non-Operating Expenses $ (113,759,425) $ (130,606,149) $ (175,134,414) $ (199,823,962) $ (234,598,395) $ (265,581,516) $ (875,138,288) $ (1,119,503,861) 20. Total: Wastewater Expenditures $ (283,122,628) $ (309,087,414) $ (351,523,525) $ (379,926,329) $ (420,973,268) $ (458,673,387) $ (1,611,096,509) $ (2,203,306,551) % Change 12.7% 9.2% 13.7% 8.1% 10.8% 9.0% 21. Annual Surplus/(Deficit) (1,2) $ 3,396,404 $ 7,617,675 $ (6,776,889) $ (687,458) $ (3,855,383) $ 439,200 $ (10,880,530) $ 133,548 Combined Operating Reserve 22. Beginning Balance (3) $ 40,619,238 $ 44,015,642 $ 51,633,317 $ 44,856,428 $ 44,168,970 $ 40,313, Ending Balance (3) 44,015,642 51,633,317 44,856,428 44,168,970 40,313,587 40,752,786 Actual Debt Service 24. Senior Revenue Bonds $ 38,344,215 $ 48,292,590 $ 61,058,590 $ 73,328,590 $ 88,174,340 $ 105,720, SRF Loans 24,086,811 28,980,783 32,065,103 33,893,000 35,656,179 37,440, Total: Debt Service $ 62,431,026 $ 77,273,373 $ 93,123,693 $ 107,221,590 $ 123,830,519 $ 143,160,871 Debt Service Coverage 27. Senior Revenue Bonds (4) Total Debt (5) (1) Negative number indicates a need to drawdown the operating reserve. (2) Commercial Paper and Line of Credit Payment excluded from cash surplus since payments are made from Construction Fund. (3) Includes funds set aside for a minimum operating reserve equal to 60 days of operating expenses (4) The Bond Ordinance requires net revenue to equal or exceed 1.25x actual senior lien debt service (5) The Bond Ordinance requires net revenue to equal or exceed 1.15x total actual debt service ES- 4

15 SECTION 3 EXECUTIVE SUMMARY WASTEWATER & STORMWATER RATE CHANGE PROPOSAL RFC performed a detailed cost of service analysis using industry standard principles endorsed by the WEF which allows the District to demonstrate that rates have not been set in an arbitrary manner and one class of customer is not subsidizing another to an unjustifiable extent, or in a manner that is not approved and supported by the District. The District s existing, approved, and proposed user charges are shown in Table ES-2. Table ES-2 Wastewater User Charges Historical Approved Proposed # Type of Charge (a) FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Effective Date 7/1/2012 7/1/2013 7/1/2014 7/1/2015 7/1/2016 7/1/2017 7/1/2018 7/1/2019 Base Charge ($/Bill) 1. Billing & Collection Charge $ 3.25 $ 3.45 $ 3.55 $ 3.70 $ 5.47 $ 6.06 $ 6.72 $ System Availability Charge $ 9.90 $ $ $ $ $ $ $ Total: Base Charge (Residential) $ $ $ $ $ $ $ $ Compliance Charge ($/Bill) (b) 4. Tier 1 $ $ $ 9.00 $ 2.15 $ 2.86 $ 2.95 $ 3.05 $ Tier 2 $ $ $ $ $ $ $ $ Tier 3 $ $ $ $ $ $ $ $ Tier 4 $ $ $ $ $ $ $ $ Tier 5 $ $ $ $ $ $ $ $ Total Non-Residential Service Charge (c) $ $ $ $ $ $ $ $ Volume Charge 10. Metered ($/ccf) $ 2.28 $ 2.50 $ 2.82 $ 3.21 $ 3.60 $ 3.99 $ 4.42 $ 4.90 Unmetered ($/Bill per fixture) 11. Per Room $ 1.48 $ 1.63 $ 1.83 $ 2.09 $ 2.13 $ 2.36 $ 2.62 $ Per Water Closet $ 5.56 $ 6.10 $ 6.88 $ 7.83 $ 7.94 $ 8.80 $ 9.75 $ Per Bath $ 4.64 $ 5.08 $ 5.73 $ 6.53 $ 6.62 $ 7.34 $ 8.13 $ Per Separate Shower $ 4.64 $ 5.08 $ 5.73 $ 6.53 $ 6.62 $ 7.34 $ 8.13 $ 9.01 Extra Strength Surcharges ($/ton) (b) 15. Suspended Solids over 300 mg/l $ $ $ $ $ $ $ $ Biochemical Oxygen Demand over 300 mg/l $ $ $ $ $ $ $ $ Chemical Oxygen Demand over 600 mg/l $ $ $ $ $ $ $ $ ccf = hundred cubic feet (approx. 748 gallons) mg/l = milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50% of the general service charge. (b) Applicable only to non-residential customers. (c) Total for base service charge and Tier 1 compliance (line 3 + line 4) These rates will provide the District with the necessary levels of revenue while recovering the District s costs in a fair and equitable manner from its customers. ES- 5

16 SECTION 3 EXECUTIVE SUMMARY 3.3 SW Rate Proposal WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The District s proposed SW rates are based on rate design application and analysis conducted by MSD s rate consultant, RFC, in conjunction with District staff. The principal assumptions used in the SW Rate Proposal are as follows: 1. RFC has relied on certain historical, financial and statistical data supplied by District staff. While such data is considered reliable, RFC has not independently verified or audited the detailed accuracy of such data. 2. Total taxable assessed property value will increase slightly over the forecast period as projected by District staff. 3. The District s SW O&M expense will have inflationary increases over the forecast period as shown in Section of this Rate Proposal and discussed in more detail in Appendix The District s estimates of content, scheduling and cost of the four-year SW CIRP totaling approximately $70.9 million for FY17 through FY20 present a reasonable projection of the future construction program. More details about the District s SW CIRP can be found in Section and Appendix of this Rate Proposal. The SW CIRP is funded without the use of debt to fund SW capital improvements. The funding approach contained in this Rate Proposal for the District s SW operations proposes to simplify the funding structure by replacing the patchwork of various tax levies discussed previously in Section with a uniform levy of the existing $.0197 to recover the cost of providing regulatory compliance services throughout the District s service area as well as a $.10 levy throughout the District s service area (except for properties served by a levee district) to provide a more uniform level of service throughout the District. A more detailed discussion of the service levels to be provided by the District under this proposed funding is contained in Appendix The overall financial plan for the District s SW operations based on these assumptions and proposed revenues is shown in Table ES-3. ES- 6

17 SECTION 3 EXECUTIVE SUMMARY Table ES-3 Stormwater Financial Plan WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Projected Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Stormwater Revenue Subtotal Subtotal Stormwater Tax Revenue Ad Valorem Taxes 1. Regulatory Tax $ 4,918,216 $ 4,942,807 $ 4,967,521 $ 4,992,359 $ 5,017,320 $ 5,042,407 $ 20,019,607 $ 29,880, Stormwater O&M 11,709,375 11,709,375 24,607,840 24,730,879 24,854,534 24,978,806 99,172, ,590, OMCI Districts 8,777,798 8,777, ,555, Stormwater Flat Fee Revenue 1,368,464 1,382, ,750, Subtotal: Tax Revenue $ 26,773,853 $ 26,812,128 $ 29,575,361 $ 29,723,238 $ 29,871,854 $ 30,021,213 $ 119,191,665 $ 172,777, Subtotal: Stormwater Tax Revenue $ 26,773,853 $ 26,812,128 $ 29,575,361 $ 29,723,238 $ 29,871,854 $ 30,021,213 $ 119,191,665 $ 172,777,646 Other Miscellaneous Revenue 7. Other Operating Revenue $ 1,550,493 $ 1,744,009 $ 1,352,667 $ 1,340,895 $ 1,265,886 $ 1,169,879 $ 5,129,326 $ 8,423, Non-Operating Revenue 30,500 30,500 30,500 30,500 30,500 30, , , Connection Fee Revenue Subtotal: Other Miscellaneous Revenue $ 1,580,993 $ 1,774,509 $ 1,383,167 $ 1,371,395 $ 1,296,386 $ 1,200,379 $ 5,251,326 $ 8,606, Total: Stormwater Revenue $ 28,354,846 $ 28,586,638 $ 30,958,528 $ 31,094,632 $ 31,168,240 $ 31,221,592 $ 124,442,991 $ 181,384,475 % Change -16.5% 0.8% 8.3% 0.4% 0.2% 0.2% 0.0% 45.8% Stormwater Expenditures Operating Expenses 12. General Fund Operating Expenses $ (10,712,356) $ (11,523,212) $ (16,215,676) $ (19,134,929) $ (18,111,531) $ (18,724,683) $ (72,186,819) $ (94,422,387) 13. Regulatory Expenses (4,302,072) (4,431,134) (4,515,326) (4,601,117) (4,693,139) (4,787,002) (18,596,584) (27,329,790) 14. Subtotal: Operating Expenses $ (15,014,428) $ (15,954,346) $ (20,731,002) $ (23,736,046) $ (22,804,670) $ (23,511,686) $ (90,783,403) $ (121,752,177) 15. Net Revenue Available for Debt & Capital $ 13,340,417 $ 12,632,292 $ 10,227,526 $ 7,358,587 $ 8,363,570 $ 7,709,906 $ 33,659,588 $ 59,632,298 Non-Operating Expenses 16. Debt Service and Other Indebtedness $ - $ - $ - $ - $ - $ - $ - $ Cash-Financed Capital (Paygo) $ 0 $ 0 $ (8,405,411) $ (6,956,151) $ (18,448,795) $ (13,134,502) $ (46,944,859) $ (46,944,859) 18. OMCI Capital Projects (9,245,471) (17,444,369) (12,226,829) (9,510,463) (2,139,985) (61,378) (23,938,655) (50,628,495) 19. Non-recurring Projects or Studies Contributions to Reserves Subtotal: Non-Operating Expenses $ (9,245,471) $ (17,444,369) $ (20,632,239) $ (16,466,614) $ (20,588,781) $ (13,195,880) $ (70,883,514) $ (97,573,354) 22. Total: Stormwater Expenditures $ (24,259,899) $ (33,398,715) $ (41,363,241) $ (40,202,660) $ (43,393,451) $ (36,707,565) $ (161,666,917) $ (219,325,531) % Change 13.3% 37.7% 23.8% -2.8% 7.9% -15.4% 23. Annual Surplus/(Deficit) (1,2) $ 4,094,947 $ (4,812,077) $ (10,404,713) $ (9,108,028) $ (12,225,211) $ (5,485,974) $ (37,223,926) $ (37,941,056) Combined Operating Reserve 24. Beginning Balance (3) $ 20,859,440 $ 27,850,916 $ 34,330,087 $ 35,700,008 $ 35,711,202 $ 25,301, Ending Balance (3) 27,850,916 34,330,087 35,700,008 35,711,202 25,301,795 19,621,794 (1) Negative number indicates a need to drawdown the operating reserve. (2) Commercial Paper and Line of Credit Payment excluded from cash surplus since payments are made from Construction Fund. (3) Includes funds set aside for a minimum operating reserve equal to 240 days of operating expenses ES- 7

18 SECTION 3 EXECUTIVE SUMMARY 3.4 Total Impact on Customer Bills WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table ES-4 presents a comparison of typical WW service bills under existing rates, rates currently approved through FY16, and under the proposed FY17 through FY20 rates, for various billable WW volumes and customer classes. As indicated by this table, the monthly bill for a typical metered single family residential customer contributing 7 Ccf of WW each month to the sewer system is projected to increase $20.14 from FY16 to FY20 (about 10.6% on average in each year from FY17 through FY20). Table ES-4 Typical Monthly Wastewater Bills Historical Approved Projected FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Wastewater Bills Single Family Residential (Metered) 1. 1 ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ ccf per month (Typical Customer) $ $ $ $ $ $ $ $ % Change 13.1% 9.8% 10.8% 10.8% 10.8% ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ Multi-Family Residential (Metered) ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ Non-Residential (Normal Strength Wastewater) ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ Non-Residential (Excess Strength Wastewater) (1) ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ ccf per month $ $ $ $ $ $ $ $ 1, (1) The 70, 100, and 160 ccf bills assume excess strength of 150, 200, and 250 mg/l, respectively, of suspended solids and BOD. Billable WW volumes for unmetered customers are derived from volumes associated with certain household attributes. Based on a prior study of unmetered customers, the most common or typical unmetered customer was one with five rooms, one water closet and one bath. The volume associated with a customer with these housing attributes is very close to the billable volume of a typical metered residential customer. Table ES-5 presents sample unmetered bill impacts. The WW bill for a typical unmetered residential customer contributing 7.7 Ccf of WW each month would increase by $17.86 or by 9.1% on average each year from FY17 to FY20. ES- 8

19 SECTION 3 EXECUTIVE SUMMARY Table ES-5. Typical Monthly Unmetered Wastewater Bills WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Historical Information Approved Projected FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Unmetered Wastewater Bills 1. 3 Rooms, 1 WC, 1 Bath, 0 Shower $ $ $ $ $ $ $ $ Rooms, 1 WC, 1 Bath, 0 Shower (Typical) $ $ $ $ $ $ $ $ % Change 13.3% 3.9% 10.8% 10.9% 10.9% 4. 6 Rooms, 1 WC, 1 Bath, 1 Shower $ $ $ $ $ $ $ $ Rooms, 2 WC, 2 Bath, 0 Shower $ $ $ $ $ $ $ $ Rooms, 4 WC, 4 Bath, 0 Shower $ $ $ $ $ $ $ $ Table ES-6 presents a comparison of average SW tax burdens under the current and future tax structures. These comparisons are broken down by customer type and further broken down in the subsequent tables by area. Table ES-6. Stormwater Impacts Total District Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 2, $ $ 2, $ Change $ 7.50 $ 7.50 % Change 22.1% 0.3% Low Income $ $ 1, $ $ 1, $ Change $ (2.06) $ (2.06) % Change 11.8% 0.2% Non Residential $ $ 17, $ $ 17, $ Change $ $ % Change 18.0% 0.2% ES- 9

20 SECTION 3 EXECUTIVE SUMMARY City and Near County WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 1, $ $ 1, $ Change $ 3.60 $ 3.60 % Change 28.8% 0.3% Low Income $ 8.39 $ $ $ $ Change $ 2.42 $ 2.42 % Change 28.8% 0.3% Non Residential $ $ 9, $ $ 9, $ Change $ $ % Change 28.8% 0.3% OMCI Districts Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 3, $ $ 3, $ Change $ (19.75) $ (19.75) % Change 32.0% 0.6% Low Income $ $ 1, $ $ 1, $ Change $ (8.04) $ (8.04) % Change 32.0% 0.5% Non Residential $ $ 17, $ $ 17, $ Change $ (117.75) $ (117.75) % Change 33.2% 0.7% ES- 10

21 SECTION 3 EXECUTIVE SUMMARY Annexed Area WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 4, $ $ 4, $ Change $ $ % Change 475.8% 1.2% Low Income $ 5.38 $ 2, $ $ 2, $ Change $ $ % Change 474.8% 1.1% Non Residential $ $ 23, $ $ 23, $ Change $ $ % Change 412.8% 1.0% ES- 11

22 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL PROPOSED WASTEWATER RATES 4.1 Current Wastewater Rate Structure The District s current WW rate structure consists of monthly service charges and volume charges applicable to all MSD customers. All non-residential customers are also assessed a compliance charge and extra strength charges where applicable. The monthly service charges include a billing and collection charge and a system availability charge. A volume charge is assessed to all customers based on their respective water usage. Water usage information is provided by customers respective water provider on either a metered or unmetered basis. Non-residential customers are also assessed one of five tiered compliance charges based on the amount of inspection and testing of WW needed to comply with current regulations. Extra strength surcharges are applied to monitored non-residential customers generating excess biochemical oxygen demand (BOD), chemical oxygen demand (COD) and total suspended solids (TSS). The District s historical and existing WW rates are presented in Table 4-1. The existing rates have been in effect since July 1, 2014 and the approved rates for FY16 will go into effect on July 1,

23 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-1 Historical and Existing Wastewater Rates # Type of Charge FY 1998 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 (c) FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 Ordinance Adopted Date 9/11/1997 7/24/2003 3/11/2004 7/14/ /13/ /7/2008 1/14/2010 Rate Commission Approved Rates for FY13 thru FY16 Effective Date 10/1/1997 8/1/2003 7/1/2004 7/1/2005 1/1/2008 7/1/2009 7/1/2010 7/1/2011 7/1/2012 7/1/2013 7/1/2014 7/1/2015 Base Charge ($/Bill) 1. Billing & Collection Charge $ 0.74 $ 0.85 $ 0.85 $ 0.85 $ 0.85 $ 2.30 $ 2.30 $ 2.30 $ 2.60 $ 2.65 $ 3.25 $ 3.45 $ 3.55 $ System Availability Charge $ 4.83 $ 5.30 $ 6.45 $ 7.05 $ 7.05 $ 8.40 $ 8.40 $ 8.60 $ 8.80 $ 9.20 $ 9.90 $ $ $ Total: Base Charge (Residential) $ 5.57 $ 6.15 $ 7.30 $ 7.90 $ 7.90 $ $ $ $ $ $ $ $ $ Compliance Charge ($/Bill) (b) 4. Tier 1 $ 8.56 $ $ $ $ $ $ $ $ $ $ $ $ 9.00 $ Tier 2 $ 8.56 $ $ $ $ $ $ $ $ $ $ $ $ $ Tier 3 $ 8.56 $ $ $ $ $ $ $ $ $ $ $ $ $ Tier 4 $ 8.56 $ $ $ $ $ $ $ $ $ $ $ $ $ Tier 5 $ 8.56 $ $ $ $ $ $ $ $ $ $ $ $ $ Total Nonresidential Service Charge $ $ $ $ $ $ $ $ $ $ $ $ $ $ Volume Charge 10. Metered ($/ccf) $ 1.05 $ 1.34 $ 1.66 $ 1.81 $ 1.81 $ 1.88 $ 1.88 $ 1.92 $ 2.02 $ 2.11 $ 2.28 $ 2.50 $ 2.82 $ 3.21 Unmetered ($/Bill) 11. Per Room $ 0.69 $ 0.88 $ 1.08 $ 1.18 $ 1.18 $ 1.23 $ 1.23 $ 1.25 $ 1.32 $ 1.38 $ 1.48 $ 1.63 $ 1.83 $ Per Water Closet $ 2.58 $ 3.28 $ 4.04 $ 4.42 $ 4.42 $ 4.59 $ 4.59 $ 4.69 $ 4.93 $ 5.15 $ 5.56 $ 6.10 $ 6.88 $ Per Bath $ 2.15 $ 2.74 $ 3.37 $ 3.69 $ 3.69 $ 3.83 $ 3.83 $ 3.91 $ 4.11 $ 4.30 $ 4.64 $ 5.08 $ 5.73 $ Per Separate Shower $ 2.15 $ 2.74 $ 3.37 $ 3.69 $ 3.69 $ 3.83 $ 3.83 $ 3.91 $ 4.11 $ 4.30 $ 4.64 $ 5.08 $ 5.73 $ 6.53 Extra Strength Surcharges ($/ton) (b) 15. Suspended Solids over 300 mg/l $ $ $ $ $ $ $ $ $ $ $ $ $ $ Biochemical Oxygen Demand over 300 mg/l $ $ $ $ $ $ $ $ $ $ $ $ $ $ Chemical Oxygen Demand over 600 mg/l $ $ $ $ $ $ $ $ $ $ $ $ $ $ ccf = hundred cubic feet (approx. 748 gallons) mg/l = milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50% of the general service charge. (b) Applicable only to non-residential customers. 4-2

24 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 4.2 Customer Account Projections The District s ratepayers are classified into three customer classes for the purpose of designing its WW charges. These classes are single family, multi-family rate components discussedd earlier to each and non-residential. MSD s WW revenue reflects the assessment of the specific customer class as applicable. As a result, fluctuations in the number and class of customers served by the District are a key variable in determining future WW rates. The historical and projected average numbers of WWW customerss served by the District are providedd in Figure 4-1 and Table 4-2 below. The projected change in the number of customers is based on a 10 year average historical trend using a US Census based cohort-component methodology. As indicated in Table 4-2, the number off total customer accounts declined by an average of 0.26% annually between FY 2011 and FY Based on this trend, the number of customer accounts is projected to decline by 0.1% annually throughout the forecast. Additional detail on the development of this assumption can be found in Appendix Figure 4-1 Wastewater Customer Accounts 4-3

25 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-2 Wastewater Customer Accounts Historical Information Projected Projected # Customer Class FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Metered Customers 1. Single Family 301, , , , , , , , , , , , , , , Multi-Family 20,825 20,816 20,824 20,862 20,787 20,800 20,700 20,500 20,300 20,259 20,235 20,211 20,187 20,163 20, Non-Residential 25,712 25,620 25,583 25,387 25,165 25,100 24,600 24,500 24,300 24,251 24,222 24,077 23,933 23,789 23, Subtotal: Metered Customers 347, , , , , , , , , , , , , , ,277 Unmetered Customers 5. Single Family 60,010 59,977 59,733 58,757 58,034 57,400 56,800 57,200 57,600 57,485 57,416 57,347 57,278 57,209 57, Multi-Family 19,757 19,818 19,780 20,437 19,938 20,000 19,700 20,700 20,400 20,359 20,335 20,311 20,287 20,263 20, Non-Residential Subtotal: Unmetered Custome 79,767 79,795 79,513 79,194 77,972 77,400 76,500 77,900 78,000 77,844 77,751 77,658 77,565 77,472 77,379 Total Customer Accounts 9. Single Family 361, , , , , , , , , , , , , , , Multi-Family 40,582 40,634 40,604 41,299 40,725 40,800 40,400 41,200 40,700 40,618 40,570 40,522 40,474 40,426 40, Non-Residential 25,712 25,620 25,583 25,387 25,165 25,100 24,600 24,500 24,300 24,251 24,222 24,077 23,933 23,789 23, Total: Customer Accounts 427, , , , , , , , , , , , , , , % Change 0.32% -0.05% -0.08% -0.30% -0.33% -0.40% -0.19% 0.33% -0.2% -0.1% -0.1% -0.1% -0.1% -0.1% 4-4

26 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 4.3 Contributed Volumes and Wastewater Flows Billed WW volume is the estimated amount of water volume contributed to the sewer system by MSD customers. This volume is measured on either a metered or unmetered basis. The amount of contributed WW volume from metered customers is measured in Ccf s (one hundred (100) cubic feet, which equates to approximately 748 gallons). The volume from unmetered residential customers is determined based upon estimates of indoor water usage per fixture and the number of rooms within these properties, referred to as attributes throughout the Proposal. Billable WW volumes for all metered residential customers are determined based on water used during the period best equated to contributed WW volume. MSD defines its best equated period as a 90 to 92 day period of water usage between November and April of the preceding winter period. This period most closely reflects the water entering the MSD WW system by avoiding spring and summer water usage for activities such as lawn sprinkling and the filling of swimming pools. The District engaged Vertex Business Services to assist in analyzing the relationship of water usage between metered and unmetered residential customers. This analysis was performed by members of Vertex s Analytics and Consulting practice using a combination of actual District data and multivariate analytics. The analysis determined the demographic drivers of water volume among metered customers, then applied those drivers to unmetered customers with identical matching demographic profiles. Based on this analysis, the unit water consumption estimates of gallons per day (gpd) was used to recalibrate billable WW volumes based on property attributes applicable to unmetered single family and multi-family customers. Additional detail regarding this analysis can be found in Appendix Attribute Rooms Water Closet Baths Separate Showers Assumed Volume Contributions 14.5 gpd 54.2 gpd 45.2 gpd 45.2 gpd 4-5

27 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The contributed WWW volume of all non-residential customers is measured on a metered basis and billed based on actual quarterly usage less applicable exemption allowances for any water that does not enter the sewer system. Metered multi-family customers are either billed based on actual annual water usage or the average annual water usage established during the best equated period, depending on the billing method selected by each multi-family customer. The selected billing basis is permanent and cannot be changed. Figure 4-2 and Table 4-3 present a summary of historical and projected contributed, or billed, WW volume. Figure 4-2 Wastewater Contributed Volumes 4-6

28 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-3 Wastewater Contributed Volumes Historical Information Projected Projected # Customer Class (ccf) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Metered Customers 1. Single Family 27,279,412 26,131,078 26,192,807 25,619,466 24,796,692 24,457,671 23,696,217 23,002,156 22,769,661 22,689,967 22,633,242 22,574,396 22,513,445 22,450,407 22,387, Multi-Family 9,763,965 9,625,609 9,419,644 9,160,576 8,904,095 8,619,763 8,557,204 8,389,306 8,071,571 8,394,434 8,373,448 8,351,677 8,329,127 8,305,805 8,282, Non-Residential 34,323,221 33,081,692 32,608,882 29,222,342 26,690,763 25,427,320 24,967,007 24,846,372 21,026,447 23,969,488 23,609,946 23,363,880 23,120,520 22,879,837 22,641, Subtotal: Metered Customers 71,366,598 68,838,379 68,221,333 64,002,384 60,391,550 58,504,754 57,220,428 56,237,834 51,867,679 55,053,889 54,616,636 54,289,953 53,963,092 53,636,049 53,311,897 Unmetered Customers (1) 5. Single Family 6,899,871 7,046,265 7,066,647 7,025,329 7,149,165 7,442,267 6,895,720 6,845,309 6,902,619 6,878,458 6,861,264 6,190,641 6,173,927 6,156,639 6,139, Multi-Family 5,044,805 5,038,213 5,008,880 4,928,578 4,823,684 4,823,681 4,625,501 4,553,820 4,489,957 4,669,555 4,657,882 4,202,551 4,191,204 4,179,468 4,167, Non-Residential Subtotal: Unmetered Customers 11,944,676 12,084,478 12,075,527 11,953,907 11,972,849 12,265,948 11,521,221 11,399,129 11,392,576 11,548,013 11,519,146 10,393,192 10,365,131 10,336,107 10,307,166 Total Wastewater Volume 8. Single Family 34,179,283 33,177,343 33,259,454 32,644,795 31,945,857 31,899,938 30,591,937 29,847,465 29,672,280 29,568,425 29,494,506 28,765,037 28,687,372 28,607,046 28,526, Multi-Family 14,808,770 14,663,822 14,428,524 14,089,154 13,727,779 13,443,444 13,182,705 12,943,126 12,561,528 13,063,989 13,031,330 12,554,228 12,520,331 12,485,273 12,450, Non-Residential 34,323,221 33,081,692 32,608,882 29,222,342 26,690,763 25,427,320 24,967,007 24,846,372 21,026,447 23,969,488 23,609,946 23,363,880 23,120,520 22,879,837 22,641, Total: Wastewater Volume 83,311,274 80,922,857 80,296,860 75,956,291 72,364,399 70,770,702 68,741,649 67,636,963 63,260,255 66,601,902 66,135,782 64,683,145 64,328,223 63,972,156 63,619, % Change -2.9% -0.8% -5.4% -4.7% -2.2% -2.9% -1.6% -6.5% 5.3% -0.7% -2.2% -0.5% -0.6% -0.6% (1) Unmetered WW volume is determined by multiplying the number of fixtures by their respective unit usage values. 4-7

29 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The projections of contributed volumes are based on the historical trends in billed volumes and number of customers per customer class. Since FY06, the District has experienced annual reductions in total billed volumes of approximately 3.0%, which is a cumulative 24% reduction. The decrease in billed WW volume is due in part to conservation measures, increased efficiency of appliances and fixtures and the impact of the national economy. Future billable WW volumes are expected to gradually decrease from FY15 volumes by an overall average of 0.91% annually. Additional information related to this assumption can be found in Appendix The FY14 reduction was partially impacted by discontinuities in data that were experienced by Missouri American Water during implementation of a new customer information system. This has been reconciled and is anticipated to return to typical levels in FY15 and beyond. 4.4 Historical and Projected Wastewater Revenue from Existing Rates WW revenue under the approved rates for the period FY13 through FY20 is presented in Table 4-4 on the next page. Estimated revenues for FY17 through FY20 use FY16 approved rates. The District s historical WW revenue for FY13 and FY14 is based on actual rates, customer account and usage data. Projected revenue from WW user charges are based on projected customer demands and the rates approved through FY16 (revenue in FY17-FY20 assumes no changes in the approved rates for FY16). Projected billed WW revenue does not include allowances for bad debt, refunds or billing adjustments. These billing adjustments are included with other operating revenues in Table 4-5. The WW user charge revenue under existing rates increased from $236.1 million in FY13 to a projected $313.6 million in FY16. This change is due to a combination of key factors: approved rate increases, the impact of economic conditions, projected fluctuations in excess strength WW revenue due to more extensive pre-treatment programs and projected decreases in WW volume consistent with historical trends. As customer volumes continue to decline over the projection period, the revenue would be expected to decline as well. 4-8

30 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-4 Wastewater User Charge Revenue Under Approved Rates (1) Historical Information Projected Projected FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 User Charge Revenue Subtotal Subtotal Base Charge Revenue Metered Accounts $ 54,661,447 $ 61,969,510 $ 67,726,848 $ 76,038,643 $ 76,002,271 $ 75,981,357 $ 75,978,783 $ 75,997,964 $ 303,960,375 $ 447,725,866 Unmetered Accounts 12,424,081 14,026,701 15,350,416 17,261,617 17,291,601 17,331,186 17,382,194 17,446,781 69,451, ,063,795 Subtotal: Base Charges $ 67,085,527 $ 75,996,212 $ 83,077,264 $ 93,300,260 $ 93,293,872 $ 93,312,542 $ 93,360,978 $ 93,444,745 $ 373,412,137 $ 549,789,660 Non-Residential Compliance Charge Revenue $ 7,611,609 $ 5,665,977 $ 3,759,829 $ 1,883,204 $ 1,871,801 $ 1,860,602 $ 1,849,654 $ 1,838,316 $ 7,420,373 $ 13,063,406 Extra Strength Surcharges $ 7,646,317 $ 6,667,008 $ 6,755,989 $ 6,910,690 $ 6,910,690 $ 6,910,690 $ 6,910,690 $ 6,910,690 $ 27,642,761 $ 41,309,440 Metered Volume Charge Revenue Single Family $ 52,444,916 $ 56,924,153 $ 63,985,707 $ 72,652,707 $ 72,463,811 $ 72,268,158 $ 72,065,806 $ 71,864,023 $ 288,661,799 $ 425,300,213 Multi-Family 19,127,618 20,178,928 23,672,304 26,878,768 26,808,883 26,736,498 26,661,634 26,586, ,793, ,345,069 Non-Residential 56,649,728 52,566,118 67,593,956 75,787,927 74,998,055 74,216,869 73,444,277 72,680, ,339, ,721,268 Subtotal: Metered Volume Charges $ 128,222,262 $ 129,669,198 $ 155,251,967 $ 175,319,402 $ 174,270,749 $ 173,221,525 $ 172,171,717 $ 171,131,189 $ 690,795,181 $ 1,021,366,550 Unmetered Charge Revenue $ 25,990,015 $ 28,481,438 $ 32,565,398 $ 36,976,456 $ 36,880,312 $ 36,780,735 $ 36,677,748 $ 36,575,050 $ 146,913,845 $ 216,455,699 Low Income Credits $ (421,993) $ (447,333) $ (592,570) $ (798,032) $ (949,654) $ (1,130,091) $ (1,344,812) $ (1,600,326) $ (5,024,884) $ (6,415,485) Total: User Charge Revenue $ 236,133,737 $ 246,032,499 $ 280,817,877 $ 313,591,980 $ 312,277,771 $ 310,956,003 $ 309,625,974 $ 308,299,664 $ 1,241,159,413 $ 1,835,569, % 4.2% 14.1% 11.7% -0.4% -0.4% -0.4% -0.4% (1) The approved FY16 rates are used to estimate revenue in FY17 through FY

31 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The projection of other WW revenue is presented in Table 4-5. WW billing adjustments are determined based on current budget estimates and projected based on historical trends. These adjustments include late charges, refunds and other adjustments. The provision for bad debt has steadily declined over the last several years and is projected at 1.5% of total WW user charge revenue throughout the forecast. This projection is based on predicting the propensity to pay for all MSD customers with account balances delinquent greater than 30 days. The methodology used in the Rate Proposal matches that used to determine the provision for bad debt in the District s audited statements ending June 30, The change to this calculation resulted in a net revenue, rather than expense, for bad debt in FY14 of $7.2 million as shown in Table 4-5, line 2. Additional detail on this propensity-to-pay analysis may be found in Appendix Revenue from inspection and plan review fees are projected to remain stable throughout the forecast. Waste hauler permit revenue is projected to decline dramatically from FY14 levels when the Bridgeton landfill begins treating and piping leachate rather than trucking it to MSD for treatment. Other non-operating revenue in FY14 is negative $4.9 million due to demolition of assets in the trickling filter and secondary clarifier areas at the Missouri River WWTP. These assets, with a combined book value of $5.1 million, were removed as part of a project to expand the treatment plant and add disinfection facilities. All other miscellaneous revenue is projected to also remain stable at currently budgeted levels. Based on these projections, total other operating WW revenue is forecasted to decline from a budgeted amount of $5.7 million in FY15 to $1.6 million in FY20. The reduction is primarily due to the increases in the bad debt provision as WW user charge revenue increases. 4-10

32 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-5 Other Wastewater Operating Revenue Historical Information Projected Projected FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Actual Actual Budget Projected Projected Projected Projected Projected Subtotal Subtotal Other Operating Revenue 1. Billing Adjustments (1) $ 2,876,364 $ 5,872,438 $ 2,879,850 $ 2,908,649 $ 2,937,735 $ 2,967,112 $ 2,996,783 $ 3,026,751 $ 11,928,382 $ 17,716, Bad Debt Provision (2,636,454) 7,230,389 (4,250,000) (4,855,380) (5,277,435) (5,803,515) (6,380,217) (7,019,285) (24,480,453) (33,585,833) Other Fees 3. Construction Inspection Fees $ 200,655 $ 498,543 $ 355,500 $ 355,500 $ 355,500 $ 355,500 $ 355,500 $ 355,500 $ 1,422,000 $ 2,133, Waste Hauler Permits 660,798 4,360,679 2,500, , , , , ,000 2,700,000 5,875, All Other Fees (2) 667, , , , , , , ,300 1,353,200 2,029, Subtotal: Other Fees $ 1,529,352 $ 5,512,948 $ 3,193,800 $ 1,368,800 $ 1,368,800 $ 1,368,800 $ 1,368,800 $ 1,368,800 $ 5,475,200 $ 10,037, Miscellaneous Revenues (3) $ 4,656,729 $ 4,585,523 $ 2,972,505 $ 2,779,210 $ 3,170,776 $ 3,182,774 $ 3,258,012 $ 3,354,249 $ 12,965,812 $ 18,717, Subtotal: Other Operating Revenue $ 6,425,991 $ 23,201,298 $ 4,796,155 $ 2,201,279 $ 2,199,876 $ 1,715,172 $ 1,243,378 $ 730,516 $ 5,888,941 $ 12,886, Other Non-Operating Revenue (4) $ 23,050 $ (4,900,812) $ 222,000 $ 222,000 $ 222,000 $ 222,000 $ 222,000 $ 222,000 $ 888,000 $ 1,332, Connection Fee Revenue 704, , , , , , , ,840 2,828,996 4,201, Total: Other Miscellaneous Revenue $ 7,153,303 $ 19,268,570 $ 5,701,155 $ 3,113,109 $ 3,118,604 $ 2,640,867 $ 2,176,110 $ 1,670,356 $ 9,605,937 $ 18,420,201 % Change % 169.4% -70.4% -45.4% 0.2% -15.3% -17.6% -23.2% (1) Includes late charges, refunds, adjustments, lien interest and fees, and other adjustments, including revenue from Arnold. (2) Includes plan review fees, submittal fees, monitoring cost fees, pretreatment discharge permits, and all other fees. (3) Includes interest, reimbursements, reimbursable engineering and maintenance, and all other miscellaneous revenue. (4) Includes rental income, clean water surcharge, and sale of fixed assets. 4-11

33 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 4.5 Wastewater Operating Expenses The revenue needed to support the O&M of the District s WW system must be sufficient to meet its cash requirements. MSD s operating revenue requirements consist of the following: 1. Total WW system O&M expenses 2. Expenditures for routine capital improvements 3. Components of the CIRP funded directly from revenues (i.e., PAYGO) 4. WW revenue bond debt service 5. A minimum 60 day operating reserve Wastewater Operation and Maintenance Expense A summary of projected WW O&M for FY15 through FY20 is presented in Table 4-6. These projections are based on the principle financial assumptions listed below. 1. Customer and Water Usage Growth/Decline 2. Customer Impacts 3. Inflation Rates 4. Bad Debt and Collection Efforts 5. Customer Assistance Program 6. Overhead Rates 7. Basis for cost of service indirect/direct cost allocation 8. Average Water/ Wastewater Utility Bill Comparison 9. Salary Projection 10. Wastewater/Stormwater Segmentation 11. Infiltration/Inflow Assumptions These assumptions have been applied to the District s O&M from its FY15 budget estimates through the proposed 4-year rate cycle ending in FY20. Inflation percentages vary by expense type. Salary expenses and other related lines are inflated annually at rates between 3.1% and 3.2% for the years FY17 to FY20. Health Insurance expense is projected to increase annually at rates between 8.1% and 9.6%, while general supplies and contractual services are expected to increase annually between 1.9% and 2.0% over the same four-year period. More detailed information regarding inflation rates is provided in Appendix Incremental and additional one-time O&M costs are presented on line 22 of Table 4-6. Future WW O&M expense is projected to increase from $169.4 million in FY15 to $193.1 in FY Wastewater Routine Capital Improvements Expenditures for routine annual capital improvements include those costs that tend to be routinely incurred each year for normal replacements such as vehicles, office equipment and 4-12

34 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL minor improvement or repairs (Line 25 of Table 4-6). Since the costs of these improvements are a continuing expense to be met each year, the District appropriately finances these expenditures from current WW revenues. These expenses are included in the District s annual budgets as capital outlay costs Wastewater Capital Projects Capital projects funded in the O&M budget typically consist of expenditures that do not result in a new District asset. In general these projects include infrastructure repairs, watershed planning, rainfall data gathering and streamflow sampling which are all required to maintain existing assets. The District also funds capital improvements to computer software and hardware out of the O&M budget. Due to the nature of these projects, they are ineligible for bond or SRF funding; therefore they are budgeted as operating expenses. 4-13

35 SECTION 4 PROPOSED WASTEWATER RATES Table 4-6 Historical and Projected Operating Expenses WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Historical Information Projected Projected Wastewater Revenue Requirements FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 General Fund Operating Expenses Subtotal Subtotal 1. Board of Trustees $ 2,175 $ 2,075 $ 5,466 $ 5,668 $ 5,631 $ 5,668 $ 5,832 $ 5,952 $ 23,083 $ 34, Rate Commission (30,281) (11) 458,926 67, ,290 70, ,960 1,079, Civil Service Commission 1,105 6,189 8,960 9,290 9,231 9,290 9,559 9,757 37,837 56, Secretary - Treasurer 1,379,671 1,407,972 1,473,297 1,530,234 1,528,595 1,547,126 1,599,613 1,641,006 6,316,341 9,319, Executive Director 1,402, ,336 1,151,540 1,193,207 1,191,483 1,205,532 1,245,985 1,277,749 4,920,750 7,265, General Counsel 1,652,666 2,800,898 2,291,230 2,381,524 2,375,177 2,399,988 2,477,811 2,538,127 9,791,102 14,463, Office of Human Resources 8,255,407 9,480,727 8,884,809 9,271,062 9,401,315 9,660,129 10,132,075 10,548,414 39,741,932 57,897, Engineering 21,846,221 22,372,436 21,782,721 22,504,904 23,918,233 24,632,720 25,430,214 26,229, ,210, ,498, Finance 15,882,782 19,548,342 21,658,069 22,578,245 22,990,810 23,465,366 24,048,717 24,614,604 95,119, ,355, Information Systems 10,171,024 11,390,239 11,776,483 12,187,963 12,200,395 12,375,737 12,820,088 13,176,625 50,572,844 74,537,291 Operations 12. Collection System $ 30,423,192 $ 32,047,934 $ 27,401,637 $ 28,346,312 $ 28,099,126 $ 28,969,800 $ 29,849,967 $ 30,764,637 $ 117,683,529 $ 173,431, Pump Stations 8,629,770 10,039,320 9,642,088 10,036,631 10,432,698 10,802,080 11,185,455 11,585,068 44,005,301 63,684, Wastewater Treatment 31,750,236 38,297,954 41,523,547 43,186,784 44,674,098 46,231,357 47,846,910 49,530, ,282, ,993, Support 9,819,302 10,955,060 11,542,192 11,934,220 10,512,805 10,779,984 11,055,933 11,340,030 43,688,752 67,165, Subtotal: Operations $ 80,622,500 $ 91,340,268 $ 90,109,465 $ 93,503,946 $ 93,718,726 $ 96,783,222 $ 99,938,264 $ 103,220,058 $ 393,660,271 $ 577,273, Subtotal: General Fund Operating Expenses $ 141,185,847 $ 159,340,472 $ 159,600,965 $ 165,233,203 $ 167,339,596 $ 172,084,777 $ 178,190,448 $ 183,332,377 $ 700,947,199 $ 1,025,781,367 Other Operating Expenses 18. Water Backup Program $ 3,503,220 $ 2,713,168 $ 3,600,248 $ 3,762,259 $ 3,833,742 $ 3,906,583 $ 3,984,715 $ 4,064,409 $ 15,789,449 $ 23,151, General Insurance Fund 2,908,141 3,934,313 4,050,110 4,234,550 4,310,144 4,443,087 4,675,790 4,883,627 18,312,648 26,597, Capital Funded in O&M Budget ,588,407 10,084,149 7,778,282 8,323,618 8,728,029 9,117,869 33,947,798 55,620, Capitalized Internal Labor - - (11,986,382) (12,465,837) (12,964,471) (13,483,049) (14,022,371) (14,583,266) (55,053,157) (79,505,376) 22. Additional O&M - - 2,509,855 7,632,941 6,091,816 4,827,352 4,818,262 6,276,854 22,014,285 32,157, Subtotal: Other Operating Expenses $ 6,411,361 $ 6,647,481 $ 9,762,239 $ 13,248,062 $ 9,049,514 $ 8,017,590 $ 8,184,425 $ 9,759,494 $ 35,011,023 $ 58,021, Subtotal: General Fund Operating Expenses $ 147,597,208 $ 165,987,954 $ 169,363,203 $ 178,481,265 $ 176,389,110 $ 180,102,367 $ 186,374,873 $ 193,091,871 $ 735,958,222 $ 1,083,802, Routine Annual Capital Improvements $ 179,509 $ (401,814) $ 3,771,640 $ 3,884,789 $ 3,958,600 $ 4,033,814 $ 4,114,490 $ 4,196,780 $ 16,303,683 $ 23,960,112 Total: Operating Expenses & Capital Outlay $ 147,776,717 $ 165,586,139 $ 173,134,843 $ 182,366,054 $ 180,347,711 $ 184,136,181 $ 190,489,363 $ 197,288,651 $ 752,261,905 $ 1,107,762,

36 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 4.6 Wastewater Major Capital Improvement & Replacement Program The primary cost driver for the District s financial plan is the CIRP. The District has agreed to a multi-decade, $4.7 billion (20100 dollars) CD program with the US EPA and Missouri Coalition for the Environment Foundation. This program requiress the District to make investments in the WW system to eliminate sanitary sewer overflows (SSO), combined sewer overflows (CSO) and help reduce the risk of flooding customer properties. The District s Engineering department regularly updates the scheduling of CIRP projects to ensure compliance with the CD. The current estimated CIRP needs are presented in Figure 4-3 and Table 4-7 for FY15 through FY20. The total CIRP project cost for this six-year period is projected to be $1.975 billion. The largest component of the CIRP over the next six years will be capital investments related to mitigating SSOs throughout the WW system. Additional needs include other improvements to comply with regulatory requirements outside of the CD and the rehabilitation and replacement of existing system assets. CSO projects begin to substantially impact the CIRP as this component reaches $158.3 million in FY20. Table 4-7 presents the summary CIRP needs throughout the 4-year proposed rate cycle. Additional detail on the long-term CIRP is presented in Appendix Figure 4-3 Projected CIRP Needs 4-15

37 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-7 Wastewater Capital Improvement and Replacement Program Projected Projected Capital Improvement and Replacement Progam Needs FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Major Capital Improvements Subtotal Subtotal 1. Asset Management - Capacity $ 29,011,500 $ 58,309,720 $ 57,501,982 $ 67,050,796 $ 67,559,237 $ 61,672,657 $ 253,784,672 $ 341,105, Asset Management - Renewal 27,622,000 19,672,680 21,108,335 19,316,419 21,659,802 28,435,997 90,520, ,815, Cityshed 3,700,000 5,148,000 11,042,265 13,138,342 18,109,541 8,863,662 51,153,810 60,001, Combined Sewer Overflow 23,714,333 15,010,900 50,872,235 40,580,166 43,306, ,329, ,088, ,813, Districtwide 7,027,975 4,510,500 5,540,816 5,431,201 5,666,009 5,808,204 22,446,230 33,984, Other - - (40,000) (40,000) (40,000) 7. Sanitary Sewer Overflow 139,874, ,274, ,713, ,194, ,992, ,559, ,459, ,608, Treatment Plants 17,702,612 11,648,940 11,621,550 17,621,799 17,178,284 5,545,102 51,966,734 81,318, Subtotal: Major Capital Improvements $ 248,652,743 $ 241,575,503 $ 333,360,347 $ 347,332,989 $ 373,471,480 $ 439,214,841 $ 1,493,379,657 $ 1,983,607, Less: Capital Funded in O&M Budget (11,588,407) (10,084,149) (7,778,282) (8,323,618) (8,728,029) (9,117,869) $ (33,947,798) $ (55,620,354) 11. Less: Non-Recurring Projects & Studies (4,489,587) (6,322,090) (6,034,848) (5,194,950) (5,101,732) (5,281,442) (21,612,972) (32,424,648) 12. Plus: Capitalized Internal Labor 11,986,382 12,465,837 12,964,471 13,483,049 14,022,371 14,583,266 55,053,157 79,505, Total: CIRP Needs $ 244,561,131 $ 237,635,101 $ 332,511,688 $ 347,297,471 $ 373,664,090 $ 439,398,796 $ 1,492,872,045 $ 1,975,068, Wastewater Capital Program Financing MSD s CIRP projects are primarily funded by the issuance of senior revenue bonds and SRF loans with the smaller remaining work funded by the PAYGO revenue stream. Debt financing of the majority of the CIRP allows the financing burden to be appropriately shared by both present and future users benefiting from the WW system improvements. Capital improvements routinely incurred each year as determined by the District s comprehensive asset management program (Table 4-7, line 10) are more appropriately financed with PAYGO revenue generated from annual WW service revenue. District staff, together with their financial advisor, Public Financial Management, Inc (PFM), has developed a proposed capital improvement financing plan to fund the CIRP. This plan, presented in Table 4-8, anticipates the proposed capital improvements will be financed from a combination of WW user charge revenues, available fund balances, senior revenue bonds, Missouri SRF loans, grants and contributions, and interest income. Table 4-8 Capital Improvement and Replacement Program Financing Plan Projected Projected Wastewater Construction Fund Cashflow FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Subtotal Subtotal 1. Beginning Year Balance (1) $ 233,053,202 $ 91,440,861 $ 98,709,136 $ 56,204,221 $ 52,527,910 $ 56,287,179 Sources of Funds 2. Senior Revenue Bond Proceeds - Par Amount - 150,000, ,055, ,210, ,070, ,310, ,645,000 1,068,645, Senior Revenue Bond Proceeds - Premium - 21,526,268 20,342,700 23,544,232 21,779,440 24,062,250 89,728, ,254, Cash Financing of Construction (PAYGO) 40,000,000 40,000,000 70,000,000 81,000,000 99,000, ,000, ,000, ,000, Capitalized Internal Labor 11,986,382 12,465,837 12,964,471 13,483,049 14,022,371 14,583,266 55,053,157 79,505, State Revolving Loan Proceeds 50,000,000 30,000,000 25,000,000 25,000,000 25,000,000 25,000, ,000, ,000, Grants & Contributions 502, , , , , ,040 2,466,912 3,493, Interest Income 860, , , , , ,000 1,390,000 3,060, Subtotal: Available Funds $ 336,401,991 $ 346,767,587 $ 402,118,863 $ 416,424,421 $ 448,299,119 $ 524,169,735 $ 1,527,283,692 $ 1,885,959,207 Uses of Funds 10. Major Capital Improvements $ (244,561,131) $ (237,635,101) $ (332,511,688) $ (347,297,471) $ (373,664,090) $ (439,398,796) $ (1,492,872,045) $ (1,975,068,276) 11. Issuance Costs (400,000) (1,695,000) (1,907,454) (2,327,291) (2,513,975) (3,099,804) (9,848,523) (11,943,523) 12. Debt Service Reserve Fund Deposits - (8,728,350) (11,495,500) (14,271,750) (15,833,875) (20,036,150) (61,637,275) (70,365,625) 13. Subtotal: Uses of Funds $ (244,961,131) $ (248,058,451) $ (345,914,642) $ (363,896,511) $ (392,011,940) $ (462,534,750) $ (1,564,357,843) $ (2,057,377,424) 14. End of Year Balance $ 91,440,861 $ 98,709,136 $ 56,204,221 $ 52,527,910 $ 56,287,179 $ 61,634,

38 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL New senior revenue bonds totaling par value of $1.07 billion and $180 million in additional SRF loans are expected to be issued between FY15 and FY20 to provide this funding. At the end of FY16, it is estimated the District will have issued approximately 70% of its current debt authorization of $945 million. This will require the District to obtain voter approval for authorization of $900 million of additional debt financing prior to FY18. As indicated by Line 6 of Table 4-8, the District plans to take advantage of the SRF loan program but expects to be limited to $25 million each year from FY17 through FY20. Total senior revenue bonds and SRF loans are expected to finance approximately 69% of the six-year major capital improvement program costs. The amount and timing for each of these issues was developed by PFM taking into consideration the CIRP capital funding needs, current policies, other sources of capital improvement program financing, and debt service coverage requirements. The cash financing of capital improvements from annual revenues is expected to total $440.0 million between FY15 and FY20, as indicated on Line 4 of Table 4-8. A portion of the total CIRP expenditures reflects associated internal labor costs (line 12 in Table 4-7 and line 5 in Table 4-8). This cost is also expected to be covered by annual PAYGO revenues. In total, cash financing is expected to fund 26.3% of the total CIRP between FY15 and FY20. The District anticipates receiving grants and contributions of $3.5 million between FY15 and FY20. These sources are expected to fund various improvement projects scheduled to be constructed during the proposed rate cycle. The majority of Line 7 of Table 4-8 represents a capital contribution from the City of Arnold (Arnold) as repayment of a District loan to fund the share of the capacity provided by the Lower Meramec River Regional Wastewater Treatment Plant which started operation in Interest earnings are projected to yield an average 0.5% in annual interest income from FY15 to FY20. Line 8 of Table 4-8 provides the estimated interest income earned on all available CIRP fund balances. Total revenues obtained from grants, contributions, and interest income along with use of fund balance will provide approximately 4.7% of the total CIRP funding Existing and Projected Wastewater Debt The District issued its first District-wide revenue bonds in April Additional senior revenue bonds have been issued in 2006, 2008, 2010, 2011, 2012, and The principal remaining on all of the District s senior revenue bonds issued to date is $740.7 million as of December 31, The District has also participated in multiple subordinate series of revenue bonds issued under the Missouri SRF loan program. The total amount of principal remaining on all of the District s SRF Loans issued to date is approximately $315.4 million as of December 31,

39 SECTION 4 PROPOSED WASTEWATER RATES Figure 4-4 Outstanding and Projected Debt Principal WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The projected amortization of future revenue bond issues has been determinedd by PFM and is based on current market conditions and certain assumptions regarding future market conditions. Generally, future senior revenuee bonds are assumed to have a 30-year term and annual coupon rates between 5.0% and 5.5%. Future SRF loans issued d to fund the CIRP program are expected to have 20-year terms and a net effective annual interest t and administration cost of about 3% per year. In addition to the interest cost of future debt, the District will incur issuance costs with each senior revenue bond issue and SRF loan, and be requiredd to maintain a debt service reservee fund for the senior revenue bonds. The issuance costs for senior revenue bonds are estimated at 1.0% of the total issuance amount. Issuance costs for SRF loans are expected to be 0.65% of the total SRF loan amount. A Debt Service Reserve Fund is established in an amount equal to the lesser of (1) the maximumm amount of principal of and interest due in any MSD fiscal year on all outstanding senior revenue bonds, (2) 125% of the average annuall debt service on outstanding senior revenue bonds, or (3) an amount not in excess of f 10% of the par value of the outstanding senior revenue bonds. Based on these assumptions, the total annual debt service during the forecast period for existing debt and future proposed debt is expected to increase from $65.55 million in FY15 to $ million in FY20 as indicated by Table

40 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-9 Projected Wastewater Debt Service Requirements Projected Annual Wastewater Debt Service FY 2015 FY 2016 Senior Revenue Bond Debt Service (Accrued) Existing Bonds $ 39,367,299 Proposed Bonds - Subtotal: Senior Revenue Bond Debt Service $ 39,367,299 $ 44,851,007 $ 4,844,021 $ 49,695,028 $ Projected FY 2017 FY 2018 FY 2019 FY ,655,486 $ 46,468,892 $ 46,476,019 $ 46,535,144 15,547,229 28,325,958 43,336, ,212,275 62,202,715 $ 74,794,851 $ 89,812,863 $ 107,747,419 FY 17 - FY 20 FY 15 - FY 20 Subtotal Subtotal $ 186,135,542 $ 270,353, ,422, ,266,327 $ 334,557,848 $ 423,620,174 SRF & Direct Loan Debt Service (Accrued) Existing Bonds Proposed Bonds $ 25,295, ,678 $ 27,674,382 $ 3,029,860 27,592,947 $ 27,627,707 $ 27,646,335 $ 27,664,083 5,345,304 7,172,641 8,922,975 10,691,793 $ 110,531,072 $ 32,132, ,500,676 35,998,250 Subtotal: SRF & Direct Loan Debt Servicee $ 26,130,899 $ 30,704,242 $ 32,938,251 $ 34,800,348 $ 36,569,310 $ 38,355,876 $ 142,663,785 $ 199,498,926 Total: Wastewater Debt Service $ 65,498,198 $ 80,399,270 $ 95,140,966 $ 109,595,199 $ 126,382,1733 $ 146,103,295 $ 477,221,633 $ 623,119, Wastewater Operating Reserve The operating reserve is a balance maintained to accommodate fluctuations in annual revenues and expenditures. The District has a minimumm operating reserve target equal to 60 days of annual operating expenses. The existing revenue bond covenants requiree the District to maintain a minimumm balance equal to 45 days of O& &M expense. The self-imposed 60 day minimum provides a buffer to allow for potential timing issues involved with funding requirements, provide increased operational flexibility, and helps support future bond ratings. The WW operating reserve is projected to exceed the minimum balance throughout the forecast period. Figure 4-5 presents the estimated balance in the WW operating reserve throughout the forecast period. Figure 4-5 Wastewater Operating Reserve 4-19

41 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 4.8 Summary of Wastewat ter Revenue and Revenue Requirements WW revenues must be at least sufficient to finance the WW utility s O&M expense, routine annual capital improvements and debt service costs onn existing and proposed senior revenue bonds and SRF loans while maintaining an adequate operating reserve and complying with all revenue bond debt service coverage requirements. Annual revenues or existing reserve funds can also be used to finance the WW utility s major capital improvement program. Figure 4-6 below presents the estimated financial plan of the WW enterprise which shows that annual WW revenues under existing rates are not sufficient to meet the total revenue requirements of the WW utility during the forecast period without future revenue increases. Figure 4-6 Wastewater Financial Plan 4-20

42 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL A summary of the financial plan showing projected WW revenues and WW revenue requirements for the District during the forecast period is presented in Table Line 1 of Table 4-10 shows projected WW user charge revenue that is required in order to balance the revenue requirements through FY20. The magnitude of the increase shown for each year was selected based on consideration of three principal criteria: (1) Total revenue necessary to meet cash requirements for normal WW operations. This includes consideration of a one-month lag in the receipt of additional user charge revenue from increased rates, (2) Annual increases in WW revenues available to cash finance a portion of the WW utility related major capital improvements, and (3) WW revenue required to meet certain financial metrics, based on comments from the District s rating agencies, including debt service coverage levels and strong liquidity position over the Rate Proposal period. 4-21

43 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-10 Wastewater Financial Plan Projected Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Wastewater Revenue Subtotal Subtotal 1. User Charge Revenue $ 280,817,877 $ 313,591,980 $ 341,628,032 $ 376,598,004 $ 414,941,775 $ 457,442,232 $ 1,590,610,042 $ 2,185,019,899 Other Miscellaneous Revenue 2. Other Operating Revenue $ 4,796,155 $ 2,201,279 $ 2,199,876 $ 1,715,172 $ 1,243,378 $ 730,516 $ 5,888,941 $ 12,886, Non-Operating Revenue 222, , , , , , ,000 1,332, Connection Fee Revenue 683, , , , , ,840 2,828,996 4,201, Subtotal: Other Miscellaneous Revenue $ 5,701,155 $ 3,113,109 $ 3,118,604 $ 2,640,867 $ 2,176,110 $ 1,670,356 $ 9,605,937 $ 18,420, Total: Wastewater Revenue $ 286,519,032 $ 316,705,089 $ 344,746,636 $ 379,238,871 $ 417,117,885 $ 459,112,587 $ 1,600,215,979 $ 2,203,440,100 % Change 8.0% 10.5% 8.9% 10.0% 10.0% 10.1% Wastewater Expenditures 7. Operating Expenses $ (169,363,203) $ (178,481,265) $ (176,389,110) $ (180,102,367) $ (186,374,873) $ (193,091,871) $ (735,958,222) $ (1,083,802,690) 8. Net Revenue Available for Debt & Capital $ 117,155,828 $ 138,223,824 $ 168,357,525 $ 199,136,504 $ 230,743,012 $ 266,020,716 $ 864,257,758 $ 1,119,637,409 Non-Operating Expenses Debt Service and Other Indebtedness Senior Revenue Bond Debt Service (Accrued) 9. Existing $ (39,367,299) $ (44,851,007) $ (46,655,486) $ (46,468,892) $ (46,476,019) $ (46,535,144) $ (186,135,542) $ (270,353,847) 10. Proposed - (4,844,021) (15,547,229) (28,325,958) (43,336,844) (61,212,275) (148,422,306) (153,266,327) 11. Subtotal: Senior Revenue Bond Debt Service $ (39,367,299) $ (49,695,028) $ (62,202,715) $ (74,794,851) $ (89,812,863) $ (107,747,419) $ (334,557,848) $ (423,620,174) SRF & Direct Loan Debt Service (Accrued) 12. Existing $ (25,295,222) $ (27,674,382) $ (27,592,947) $ (27,627,707) $ (27,646,335) $ (27,664,083) $ (110,531,072) $ (163,500,676) 13. Proposed (835,678) (3,029,860) (5,345,304) (7,172,641) (8,922,975) (10,691,793) (32,132,712) (35,998,250) 14. Subtotal: SRF & Direct Loan Debt Service $ (26,130,899) $ (30,704,242) $ (32,938,251) $ (34,800,348) $ (36,569,310) $ (38,355,876) $ (142,663,785) $ (199,498,926) 15. Subtotal: Debt Service & Other Indebtedness $ (65,498,198) $ (80,399,270) $ (95,140,966) $ (109,595,199) $ (126,382,173) $ (146,103,295) $ (477,221,633) $ (623,119,100) 16. Cash-Financed Capital (Paygo) $ (43,771,640) $ (43,884,789) $ (73,958,600) $ (85,033,814) $ (103,114,490) $ (114,196,780) $ (376,303,683) $ (463,960,112) 17. Non-recurring Projects or Studies (4,489,587) (6,322,090) (6,034,848) (5,194,950) (5,101,732) (5,281,442) (21,612,972) (32,424,648) 18. Contributions to Reserves Subtotal: Non-Operating Expenses $ (113,759,425) $ (130,606,149) $ (175,134,414) $ (199,823,962) $ (234,598,395) $ (265,581,516) $ (875,138,288) $ (1,119,503,861) 20. Total: Wastewater Expenditures $ (283,122,628) $ (309,087,414) $ (351,523,525) $ (379,926,329) $ (420,973,268) $ (458,673,387) $ (1,611,096,509) $ (2,203,306,551) % Change 12.7% 9.2% 13.7% 8.1% 10.8% 9.0% 21. Annual Surplus/(Deficit) (1,2) $ 3,396,404 $ 7,617,675 $ (6,776,889) $ (687,458) $ (3,855,383) $ 439,200 $ (10,880,530) $ 133,548 Combined Operating Reserve 22. Beginning Balance (3) $ 40,619,238 $ 44,015,642 $ 51,633,317 $ 44,856,428 $ 44,168,970 $ 40,313, Ending Balance (3) 44,015,642 51,633,317 44,856,428 44,168,970 40,313,587 40,752,786 Actual Debt Service 24. Senior Revenue Bonds $ 38,344,215 $ 48,292,590 $ 61,058,590 $ 73,328,590 $ 88,174,340 $ 105,720, SRF Loans 24,086,811 28,980,783 32,065,103 33,893,000 35,656,179 37,440, Total: Debt Service $ 62,431,026 $ 77,273,373 $ 93,123,693 $ 107,221,590 $ 123,830,519 $ 143,160,871 Debt Service Coverage 27. Senior Revenue Bonds (4) Total Debt (5) (1) Negative number indicates a need to drawdown the operating reserve. (2) Commercial Paper and Line of Credit Payment excluded from cash surplus since payments are made from Construction Fund. (3) Includes funds set aside for a minimum operating reserve equal to 60 days of operating expenses (4) The Bond Ordinance requires net revenue to equal or exceed 1.25x actual senior lien debt service (5) The Bond Ordinance requires net revenue to equal or exceed 1.15x total actual debt service 4-22

44 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL In addition to the WW revenue generated from WW user charges, other revenue identified in line 2 through 4 of Table 4-10 includes other operating revenue, interest earnings, and connection fee revenue (previously presented on Table 4-5). Total revenue is projected to be $286.5 million in FY15 and increase to $459.1 million in FY20, as shown by line 6 of Table This represents an overall annual compound increase of 9.6% during this time period. The WW utility s O&M expenses, previously introduced in Table 4-6, are shown on line 7 of Table Line 8 of Table 4-10 shows the estimated net revenue remaining after deducting WW O&M expenses from total WW revenues (line 6 minus line 7). Anticipated debt service requirements on senior revenue bonds and SRF loans are presented on lines 9 through 15, as presented previously on Table 4-9. These projected debt obligations will require the District to obtain additional revenue bond authorization in the amount of $900 million before the start of FY18. Sewer service charge revenue used to finance a portion of the major capital improvement program are reported as a cost on line 16. Line 17 shows the non-recurring projects and studies, as previously presented on Table 4-7, line 11, which are completely financed by annual revenues. Operating reserve deposits required to maintain the minimum balance in the WW operating reserve are shown in line 18. Since the balance is projected to exceed the minimum, no planned contributions to the fund are included. The total annual surplus or deficit is presented in line 21. Positive balances indicate a projected increase in the operating reserves, while negative balances indicate the need to draw down available fund balances. The beginning and ending balance of the operating reserve is shown on lines 22 and 23. An additional consideration in measuring the adequacy of revenues is the provision of sufficient debt service coverage to meet the actual debt service paid to the bondholders on the senior revenue bonds and on the SRF loans as previously presented in Table 4-9. Line 27 shows the debt service coverage of the senior revenue bond debt service, i.e., the ratio of net revenue (line 8) to total senior revenue bond debt service (line 24) for each year of the study period. Line 28 shows the debt service coverage of the combined senior revenue bond and SRF debt service, i.e., the ratio of net revenue (line 8) to total debt service (line 26) for each year of the study period. Current WW revenue bond covenants require the District to provide debt service coverage equal to at least 125% (>1.25x) of the annual principal and interest payment on all senior revenue bonds and 115% (>1.15x) of the combined annual principal and interest payment on all WW senior revenue bonds and all SRF loans. Further, the rating agencies have all noted that the District s current credit rating could be compromised if projected senior debt service coverage fell below the 2.4x to 2.9x range and projected total debt coverage fell below the 1.6x to 1.8x range. The Rate Proposal is designed to maintain a senior debt service coverage ratio of at least 2.50x over the Rate Proposal period. 4-23

45 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 4.9 Cost of Service Analysis The basic principle in the establishment of cost of service rates is to achieve general fairness in the recovery of costs from various classes of customers. The approach used in this Study is based on the principles endorsed by the Water Environment Federation (WEF); which allows the District to demonstrate rates have not been set in an arbitrary manner and one class of customer is not subsidizing another to an unjustifiable extent, or in a manner that is not approved and supported by the District. It is common for utilities to use a test year when performing a cost of service study. FY17 is being used as the cost of service test year for all subsequent tables presented in this report. Test year refers to the year used to design rates. For FY18 through FY20, across-the-board rate increases have been applied to the base service and volume charges with the understanding that the test year is representative of operating conditions for the next few years. Compliance charges and high strength surcharges are projected to increase consistent with future operating cost increases. The cost of service process begins with the total District expenditures for the test year, and these costs are allocated between the two distinct services provided by the District: WW and SW. As is necessary, the SW costs are presented throughout this section but have been segregated and are kept off to the side while performing the cost allocations for the WW system. Once separated from the SW costs, the WW system costs have been allocated between customer classes based on their estimated demand requirements and recognizing the different costs associated with serving different customer classes. Factors considered in determining service requirements include the volume of WW contributed, peak WW contributions, WW strength, number of accounts and the relative responsibility for infiltration/inflow entering the WW sewer system. Figure 4-7 presents a schematic of the general steps involved in a cost of service process. As seen in Figure 4-7, the cost of service process takes the total District costs and allocates a portion of them to SW services. The allocation of costs to functions and customer classes primarily centers around the WW system and the SW cost recovery is discussed in greater detail in Section

46 SECTION 4 PROPOSED WASTEWATER RATES Figure 4-7 Cost of Service Process Cost of Service Process Net Revenue Requirements WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Wastewater Stormwater Allocation of Costs to Functions Treatment Collection Conveyance Compliance Meters Customers Admin/ General Allocation to Cost Components Volume Capacity TSS BOD/COD Compliance Billing & Collections Admin Allocate to Categories of Service Service Costs Customer Classes Billing Meter R&R System Availability Residential Non Residential High Strength 4-25

47 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Cost Allocations As mentioned previously, the test year for performing the cost of service analysis is FY17. Revenue requirements identified as part of the Rate Proposal were used as the basis for the cost of service allocations, and were shown in Table The cost of service methodology necessitated that the revenue requirements be allocated into functional categories presented in Figure 4-7. The revenue requirements were allocated to the functional categories based on allocation factors developed by District staff using available data, and generally accepted industry practices, and were then reviewed to ensure the appropriate allocation factors were applied. For example, operating costs for the customer service center were allocated to customer service and billing; costs for operating the treatment plants were allocated to treatment; and collection costs were allocated between collection and conveyance. General and administrative cost elements are allocated based on the weighted average allocation of the direct costs. Capital costs (debt service requirements and rate-funded capital) were allocated based on the allocation of the District s fixed assets, and not on the allocation of specific debt issuances. The estimated test year FY17 plant investment consists of assets in service as of June 30, 2016, and the estimated costs of proposed capital improvements to be placed in service through the FY17 test year. Total plant investment, on an original cost less accumulated depreciation basis, was allocated to functional cost components. For example, the investment in the sanitary sewer system, consisting of mains and pumping stations, is related to maximum rates of flow and is allocated to the capacity cost component. Test year plant investment in WW facilities on an original cost less depreciation value basis is projected to total $2.84 billion in FY17. The allocation of total plant investment is used as the basis to allocate total routine capital improvements, cash-financed capital, and annual debt service requirements. The test year cost of service to be recovered by the District is equal to $373.9 million with operating expenses equal to $197.1 million and capital costs equal to $176.8 million, as shown in Table The allocations of these costs to each functional category are also shown in Table These costs are offset by miscellaneous revenue sources to arrive at the net functional category costs that are used to develop unit costs of service. The detailed allocations and calculations performed can be followed in the electronic rate model. 4-26

48 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-11 FY17 Test Year Cost Allocation Results Functional Categories Operating Capital Total % of Total Collection $ 45,199,746 $ 74,132,692 $ 119,332, % Conveyance 18,571,537 33,756,624 52,328, % Treatment 55,524,295 34,302,922 89,827, % Compliance 5,647,663-5,647, % Customer 19,145,563-19,145, % WW General & Admin (12,126,569) 3,127,420 (8,999,149) -2.4% Stormwater 15,913,118 30,165,539 46,078, % General & Admin 49,244,760 1,277,740 50,522, % Subtotal: Functional Categories $ 197,120,112 $ 176,762,936 $ 373,883, % Less: Miscellaneous Revenue Offsets (2,890,043) (1,611,728) (4,501,771) Total: Net Functional Category Costs $ 194,230,070 $ 175,151,208 $ 369,381, Cost Classification The functionalized costs are next allocated to their cost components in accordance with how the facilities are designed. In this step of the cost of service process, costs are apportioned to the functional cost drivers of volume, capacity, compliance, WW strength, and customer and billing. The separation of costs into functional cost components provides a means for distributing such costs to the various cost drivers on the basis of respective responsibilities for each particular type of service. The following are the principal functional cost components: - Volume Costs are those which vary directly with the quantity of WW contributed and include capital costs related to investment in system facilities sized on the basis of WW volume and O&M expense related to those facilities. - Capacity Costs are related to facilities that are designed to meet the maximum or peak rates of WW flow. - Compliance Costs are those incurred running the commercial monitoring and compliance program. - Customer & Billing Costs are related to the costs of customer service functions, such as billing and support, collections, etc. - WW Strength Costs (TSS/BOD/COD) consist of the O&M and capital costs related to system facilities that are designed principally on the basis of the quantity of pollutants in the WW. Strength costs are further separated into biochemical oxygen demand (BOD) and total suspended solids (TSS) related costs. The District also monitors chemical oxygen demand (COD) at the treatment plant and for certain high strength 4-27

49 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL customers. Since historic data has consistently indicated a stable relationship between BOD and COD loadings, the COD and BOD surcharge units of service are combined as equivalent BOD units and presented as a single functional cost component. - SW Costs are those operating and capital costs that will be incurred to deliver the increased service level for the SW utility beginning in FY17. Other operating and non-operating revenues are used to offset the allocated costs of service and are therefore deducted from total test year revenue requirements at this point. The net results of the cost classification are presented in Table Additional detail behind specific allocation factors and support can be found in the electronic rate model. Table 4-12 FY17 Test Year Cost Classification Summary Costs of Service Volume Capacity Compliance Customer & Billing TSS BOD Stormwater Total Operating Costs Collection (1) $ 4,541,797 $ 36,334,379 $ - $ 4,184,398 $ - $ - $ - $ 45,060,575 Conveyance (1) 3,732,240 14,928, ,661,202 Treatment 25,323,537 2,944, ,786,525 16,594,012-55,648,672 Compliance 1,191, ,245 2,033, , , ,752-5,593,013 Billing & Customer ,724, ,724,141 WW General & Admin (2,927,882) (4,595,593) (171,111) (1,909,834) (957,947) (1,446,276) - (12,008,643) Stormwater ,028,344 15,028,344 General & Admin 10,610,344 16,653, ,090 6,921,044 3,471,500 5,241,158 5,004,669 48,522,766 Subtotal: Operating Costs $ 42,471,773 $ 66,663,550 $ 2,482,137 $ 27,704,003 $ 13,895,947 $ 20,979,645 $ 20,033,013 $ 194,230,070 Capital Costs Collection (1) $ 16,873,800 $ 67,495,200 $ - $ - $ - $ - $ - $ 84,369,000 Conveyance (1) 7,683,554 30,734, ,417,769 Treatment 17,719,595 2,060, ,547,637 11,818,399-39,146,049 Compliance Billing & Customer WW General & Admin 929,852 2,205, , ,937-3,561,600 Stormwater ,201,661 8,201,661 General & Admin 379, , , ,200-1,455,129 Subtotal: Capital Costs $ 43,586,702 $ 103,396,843 $ - $ - $ 7,781,465 $ 12,184,537 $ 8,201,661 $ 175,151,208 Total: Costs of Service $ 86,058,475 $ 170,060,394 $ 2,482,137 $ 27,704,003 $ 21,677,411 $ 33,164,182 $ 28,234,674 $ 369,381,277 % of Total Costs 23.3% 46.0% 0.7% 7.5% 5.9% 9.0% 7.6% 100.0% (1) Collection v. Conveyance is based on the ratio of 18" and larger pipe (conveyance) v. 15" and smaller (collection) District-wide Cost of Service Summary The subsequent step in the cost of service process is using customer class units of service to allocate the classified costs (Table 4-12) to specific customer classes. Before discussing these steps, the District-wide cost of service results are presented. Table 4-13 presents the allocation of total District costs and revenue offsets into operating and capital components. For the test year FY17, approximately 53% of total annual revenue needs are related to operating expenses and the remaining 47% is due to capital expenditures. 4-28

50 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-13 District Cost of Service Summary: Operating v. Capital District-wide Cost of Service Test Year: 2017 Operating Capital Total Revenue Requirements Operating Expenses $ 197,120,112 $ - $ 197,120,112 Annual Debt Service - 95,140,966 95,140,966 Routine Annual Capital Improvements - 3,958,600 3,958,600 Cash Financing of Major Capital Improvements - 78,405,411 78,405,411 Non-Recurring Projects & Studies - 6,034,848 6,034,848 Contributions to Operating Reserve - (6,776,889) (6,776,889) Subtotal: Revenue Requirements $ 197,120,112 $ 176,762,936 $ 373,883,048 Less Revenue Requirements met from Other Sources Billing Adjustment $ 2,317,105 $ - $ 2,317,105 Other Fees (758,000) (815,000) (1,573,000) Miscellaneous Revenue (4,296,648) - (4,296,648) Non-Operating Revenue (152,500) (100,000) (252,500) Connection Fee Revenue - (696,728) (696,728) Subtotal: Revenue Requirements met from Other Sources $ (2,890,043) $ (1,611,728) $ (4,501,771) Total: Net Costs to be Recovered from Charges $ 194,230,070 $ 175,151,208 $ 369,381,277 Considering the overall District costs as they are allocated between the WW and SW utilities is an important component of this Rate Proposal. District operations and engineering staff have developed an estimated level of service that has been used in preparing the allocations. The supporting information is presented in Appendix A summary of the costs of service is shown in Table 4-14 which shows approximately 92% of total costs are allocable to the WW utility. The multiple step, base-extra capacity COS allocation methodology that is used to develop these cost allocations is built on and consistent with industry-accepted standards. The allocation of costs used to develop the financial plan (Table 4-10) is performed more holistically as general cost sharing between utility services. While the financial plan has been linked to the cost of service results, these different processes may result in slightly different costs recovered from each utility. The recommended rates comply with cost of service principles and equitably recover revenues as outlined in the cost of service. 4-29

51 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-14 District Cost of Service Summary: Wastewater v. Stormwater District-Wide Cost of Service Test Year: 2017 Wastewater Stormwater Total Revenue Requirements Operating Expenses $ 175,907,682 $ 21,212,431 $ 197,120,112 Annual Debt Service 95,140,966-95,140,966 Routine Annual Capital Improvements 3,958,600-3,958,600 Cash Financing of Major Capital Improvements 70,000,000 8,405,411 78,405,411 Non-Recurring Projects & Studies 6,034,848-6,034,848 Contributions to Operating Reserve (6,776,889) - (6,776,889) Subtotal: Revenue Requirements $ 344,265,207 $ 29,617,841 $ 373,883,048 Less Revenue Requirements met from Other Sources Billing Adjustment $ 2,339,700 $ (22,595) $ 2,317,105 Other Fees (1,368,800) (204,200) (1,573,000) Miscellaneous Revenue (3,170,776) (1,125,872) (4,296,648) Non-Operating Revenue (222,000) (30,500) (252,500) Connection Fee Revenue (696,728) - (696,728) Subtotal: Revenue Requirements met from Other Sources $ (3,118,604) $ (1,383,167) $ (4,501,771) Total: Net Costs to be Recovered from Charges $ 341,146,603 $ 28,234,674 $ 369,381, Development of Customer Class Units of Service The total cost responsibility for each customer class is determined by developing WW system unit costs of service for each cost component and applying these unit costs to the respective service requirements of each customer class. In accomplishing this, each customer class is allocated a share of volume, capacity, strength and customer costs for which it is responsible. Customers are divided into customer classes that represent a particular type of service requirement or load on the system. The residential customer class includes residents living in single family and multi-family dwellings. The non-residential class includes all customers not included in the residential class such as commercial, government, industrial etc. WW strengths in excess of the normal WW strength thresholds, which are contributed by a portion of the nonresidential class, are segregated into a separate surcharge customer group. The determination of customer class responsibility for costs of service requires that the customer classes be allocated a portion of the volume, capacity, strength and customer costs of service according to their respective service requirements. Service requirements or units of service for the respective customer classes are developed in Table 4-15 for FY17. Annual contributed WW 4-30

52 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL volume and number of bills are based on the projected number of WW customers served by the District according to the growth assumptions identified in Section 4.2. As previously discussed, billable WW volume for unmetered residential customers is based on indoor water usage attributes. Billable WW volume for metered residential customers is based on water usage during the best equated period, and billable WW volume for all non-residential customers is based on actual water usage less exemption allowances for water not contributed to the sewer system. Infiltration/inflow (I/I) includes flow entering the sewer system from illegal roof and foundation drains, groundwater infiltration through sewer service pipe and main joints and SW runoff or inflow from the combined sewer system. District-wide I/I is approximately 50% of the total WW flow reaching the treatment plants on an annual basis. Each customer class should bear its proportionate share of the costs associated with I/I, as the WW system must be adequate to convey and process the total WW flow. The amount of I/I to be recovered directly from WW service charges is assigned to customer classes on the premise that 40% of the total is distributed on the basis of the number of customers within each class, with the remaining 60% allocated on the basis of contributed WW volume. These percentages are based on independent engineering studies completed in January 2005 by CDM and presented in the February 2007 WW and SW Rate Proposal. The results of this study were reviewed and are still considered reasonable. The responsibility for collection system capacity related costs varies with the peak flow of both contributed WW and infiltration/inflow attributable to each customer class. Contributed flows are estimated to have a peak to average flow ratio of 1.21 times, while the I/I is estimated to have a peak to average flow ratio of 3.72 times the average flow for I/I. The BOD and TSS responsibility of each customer class is based on average strength concentrations and contributed WW volume for each class. Recent operational statistics for the existing WW treatment plants indicate that the average influent strength of WW is 100 milligrams per liter (mg/l) for BOD and 170 mg/l for suspended solids. Deducting allowances for I/I and excess strength units subject to surcharge from the total WW strength units, results in an average contributed WW strength of approximately 275 mg/l for BOD and 200 mg/l for suspended solids. Average contributed WW strengths are estimated to be the same for all customer classes recognizing that the type of residential and non-residential development in the District suggests that differences in average WW strengths among the classes are not likely to be significant. 4-31

53 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Customer billing and collection costs are distributed to customer classes on the basis of the number of bills for each customer class. Environmental compliance costs are based on a five-tier system to recover costs more equitably from non-residential customers. To allocate costs for this proposed rate structure, non-residential customers must be expressed in terms of equivalent bills. Equivalent bills are used to equate relative cost responsibility of higher tier customers to those of Tier 1 customers. For example, one Tier 5 customer pays the equivalent compliance charge of eighty-five Tier 1 customers. The units of service are presented in Table Table 4-15 Wastewater Units of Service COS Units of Service Development Contributed Contributed Contributed Loadings Test Year: FY 2017 Volume Capacity TSS BOD No. of Bills ccf ccf lbs lbs Annual Compliance Eq Metered Customers 1. Single Family 22,574,396 27,315,019 38,754,989 28,185,447 3,606, Multi-Family 8,351,677 10,105,529 14,337,888 10,427, , Non-Residential Customers 23,363,880 28,270,295 54,190,350 45,419, , , Subtotal: Metered Customers 54,289,953 65,690, ,283,226 84,032,165 4,137, ,679 Unmetered Customers (1) 5. Single Family 6,190,641 7,490,676 10,627,891 7,729, , Multi-Family 4,202,551 5,085,087 7,214,803 5,247, , Non-Residential Subtotal: Unmetered Customers 10,393,192 12,575,762 17,842,694 12,976, ,192 - Infiltration & Inflow 9. Local Collection System 53,428, ,753,193 33,354,157 3,335, Conveyance Interceptors 11,254,867 41,868,106 7,026, , Subtotal: Infiltration & Inflow 64,683, ,621,299 40,380,335 4,038, Total Wastewater Volume 12. Single Family 28,765,037 34,805,695 49,382,880 35,914,822 4,293, Multi-Family 12,554,228 15,190,616 21,552,691 15,674, , Non-Residential 23,363,880 28,270,295 54,190,350 45,419, , , Infiltration & Inflow 64,683, ,621,299 40,380,335 4,038, Total: Wastewater Volume 129,366, ,887, ,506, ,046,703 5,067, , Distribution of Costs to Customer Classes The costs of service to be recovered from WW charges include net O&M costs and total net capital costs from Table These costs are distributed to the various customer classes by application of the unit costs of service to respective service requirements as shown in Table Unit costs of service for each functional cost component are based on the total cost divided by the total applicable units of service (line 1 in Table 4-16). Applying these common unit costs of service to the respective service requirements of each customer class determines the total allocated cost of service for each class. 4-32

54 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-16 Development of Wastewater Unit Costs of Service Development of Unit Costs of Service Volume Capacity Compliance Customer & Billing TSS BOD Stormwater Total 1. Units of Service 129,366, ,887, ,679 5,067, ,506, ,046,703 - Units ccf ccf Compl Eq Bills Total Bills lbs TSS lbs BOD Assessed Value - Operating Costs 2. Collection $ 4,541,797 $ 36,334,379 $ - $ 4,184,398 $ - $ - $ - $ 45,060, Conveyance 3,732,240 14,928, ,661, Treatment 25,323,537 2,944, ,786,525 16,594,012-55,648, Compliance 1,191, ,245 2,033, , , ,752-5,593, Billing & Customer ,724, ,724, WW General & Admin (2,927,882) (4,595,593) (171,111) (1,909,834) (957,947) (1,446,276) - (12,008,643) 8. Stormwater ,028,344 15,028, General & Admin 10,610,344 16,653, ,090 6,921,044 3,471,500 5,241,158 5,004,669 48,522, Subtotal: Operating Costs $ 42,471,773 $ 66,663,550 $ 2,482,137 $ 27,704,003 $ 13,895,947 $ 20,979,645 $ 20,033,013 $ 194,230,070 Capital Costs 11. Collection $ 16,873,800 $ 67,495,200 $ - $ - $ - $ - $ - $ 84,369, Conveyance 7,683,554 30,734, ,417, Treatment 17,719,595 2,060, ,547,637 11,818,399-39,146, Compliance Billing & Customer WW General & Admin 929,852 2,205, , ,937-3,561, Stormwater ,201,661 8,201, General & Admin 379, , , ,200-1,455, Subtotal: Capital Costs $ 43,586,702 $ 103,396,843 $ - $ - $ 7,781,465 $ 12,184,537 $ 8,201,661 $ 175,151, Total: Costs of Service $ 86,058,475 $ 170,060,394 $ 2,482,137 $ 27,704,003 $ 21,677,411 $ 33,164,182 $ 28,234,674 $ 369,381,277 % of Total Costs 23.3% 46.0% 0.7% 7.5% 5.9% 9.0% 7.6% 100.0% Unit Costs ($/unit) 21. Operating Unit Costs $ $ $ $ $ $ $ Capital Unit Costs $ $ $ $ $ $ $ Total: Unit Costs $ $ $ $ $ $ $ After identifying the unit costs of service for each of the system functions, the costs are allocated to specific customer classes based on the proportionate demand each places on the system. The development of costs allocable to each customer class is presented in Table In developing this allocation, the I/I costs have been redistributed to each customer class based on the proportional share of the system (both on an account and volumetric basis). 4-33

55 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-17 Allocation of Wastewater Costs of Service to Customer Classes Volume Capacity Compliance Customer & Billing TSS BOD Total 1. Calculated Unit Costs $ $ $ $ $ $ Units ccf ccf Compl Eq Bills Total Bills lbs TSS lbs BOD Single Family Metered Units of Service 2. Sanitary Contributions 22,574,396 27,315,019-3,606,290 38,754,989 28,185, Infiltration/Inflow Allocation 31,958, ,883, ,950,729 1,995, Subtotal: Metered Units of Service 54,532, ,198,886-3,606,290 58,705,718 30,180, Allocated Costs $ 36,276,663 $ 77,966,708 $ - $ 19,716,290 $ 7,689,063 $ 9,905,442 $ 151,554,166 Unmetered Units of Service 6. Sanitary Contributions 6,190,641 7,490, ,108 10,627,891 7,729, Infiltration/Inflow Allocation 7,222,696 26,868, ,508, , Subtotal: Unmetered Units of Service 13,413,337 34,359, ,108 15,136,869 8,180, Allocated Costs $ 8,922,969 $ 18,323,438 $ - $ 3,756,553 $ 1,982,572 $ 2,684,819 $ 35,670,351 Multi-Family Metered Units of Service 10. Sanitary Contributions 8,351,677 10,105, ,442 14,337,888 10,427, Infiltration/Inflow Allocation 6,248,893 23,245, ,901, , Subtotal: Metered Units of Service 14,600,570 33,351, ,442 18,238,941 10,817, Allocated Costs $ 9,712,753 $ 17,786,044 $ - $ 1,325,478 $ 2,388,871 $ 3,550,426 $ 34,763,571 Unmetered Units of Service 14. Sanitary Contributions 4,202,551 5,085, ,084 7,214,803 5,247, Infiltration/Inflow Allocation 3,762,696 13,997, ,348, , Subtotal: Unmetered Units of Service 7,965,247 19,082, ,084 9,563,775 5,482, Allocated Costs $ 5,298,729 $ 10,176,447 $ - $ 1,328,988 $ 1,252,629 $ 1,799,237 $ 19,856,029 Non-Residential Metered Units of Service 18. Sanitary Contributions 23,363,880 28,270, , ,392 54,190,350 45,419, Infiltration/Inflow Allocation 15,490,832 57,625, ,670, , Subtotal: Metered Units of Service 38,854,712 85,896, , ,392 63,860,952 46,386, Allocated Costs $ 25,847,361 $ 45,807,757 $ 2,482,137 $ 1,576,695 $ 8,364,277 $ 15,224,259 $ 99,302,486 Once the costs have been allocated to each customer class, the allocated costs are compared to the level of revenue recovery under the approved rates for FY16 to determine the magnitude of indicated revenue increases for each customer class that provides equitable and sufficient revenue recovery. The comparison presented in Table 4-18 shows that an overall revenue increase of 9.24% is needed to meet the revenue requirements in FY17. These increases are projected with slight variations to each customer class based on the cost of service results. The specific rates recommended to meet the cost of service results are presented in section

56 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-18 Comparison of Existing Revenue to Wastewater Cost of Service Test Year: 2017 Total Revenue Under Indicated % Cost of Service Approved FY16 Rates Change Req'd Metered Customers Single Family $ 151,554,166 $ 138,279, % Multi-Family 34,763,571 31,233, % Non-Residential 99,302,486 89,043, % Subtotal: Metered Customers $ 285,620,222 $ 258,556, % Unmetered Customers Single Family $ 35,670,351 34,372, % Multi-Family 19,856,029 19,349, % Subtotal: Unmetered Customers $ 55,526,381 $ 53,721, % Total System Single Family $ 187,224,517 $ 172,651, % Multi-Family 54,619,600 50,582, % Non-Residential 99,302,486 89,043, % Infiltration & Inflow Subtotal: Total System $ 341,146,603 $ 312,277, % 4.10 Wastewater Rate Adjustments The principal consideration in designing WW rate schedules is to establish charges to customers that are reasonably commensurate with the cost of providing WW service. Theoretically, the only method of assessing entirely equitable charges for WW service would be determination of each customer s bill based upon the customer s particular service requirements. Since this is impractical for the thousands of customers served by the District, schedules of rates are normally designed to meet average conditions for groups of customers having similar service requirements. Practicality also requires that rates be reasonably simple to apply, recover costs proportionately from all classes and be subject to as few misinterpretations as possible Existing Wastewater Rates The existing schedule of rates for WW service shown in Table 4-1 became effective on July 1, The rates consist of monthly service charges, a uniform volume charge, and extra strength surcharges for BOD in excess of 300 mg/l or COD in excess of 600 mg/l and suspended solids in excess of 300 mg/l. The service charges include a billing and collection component and a system availability component that are applicable to all customer classes and a tiered compliance charge that is only applicable to non-residential customers. The uniform volume charge for metered 4-35

57 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL customers is also applied to the attribute based WW volumes recognized for billing unmetered customers Impact on Customer Classes with Proposed Wastewater Rates The proposed WW rates presented in Table 4-19 were developed using a rate model and are based on cost of service and policy considerations. These rates are assumed to be effective on July 1, 2016 (upon commencement of the District s FY17). Table 4-19 shows a comparison between existing FY15 rates, rates approved for FY16, proposed test year FY17, and WW rates proposed for FY18 through FY20. Table 4-19 Proposed Wastewater User Charges Approved Proposed # Type of Charge (a) FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Effective Date 7/1/2014 7/1/2015 7/1/2016 7/1/2017 7/1/2018 7/1/2019 Base Charge ($/Bill) 1. Billing & Collection Charge $ 3.55 $ 3.70 $ 5.47 $ 6.06 $ 6.72 $ System Availability Charge $ $ $ $ $ $ Total: Base Charge (Residential) $ $ $ $ $ $ Compliance Charge ($/Bill) (b) 4. Tier 1 $ 9.00 $ 2.15 $ 2.86 $ 2.95 $ 3.05 $ Tier 2 $ $ $ $ $ $ Tier 3 $ $ $ $ $ $ Tier 4 $ $ $ $ $ $ Tier 5 $ $ $ $ $ $ Total Non-Residential Service Charge (c) $ $ $ $ $ $ Volume Charge 10. Metered ($/ccf) $ 2.82 $ 3.21 $ 3.60 $ 3.99 $ 4.42 $ 4.90 Unmetered ($/Bill per fixture) 11. Per Room $ 1.83 $ 2.09 $ 2.13 $ 2.36 $ 2.62 $ Per Water Closet $ 6.88 $ 7.83 $ 7.94 $ 8.80 $ 9.75 $ Per Bath $ 5.73 $ 6.53 $ 6.62 $ 7.34 $ 8.13 $ Per Separate Shower $ 5.73 $ 6.53 $ 6.62 $ 7.34 $ 8.13 $ 9.01 Extra Strength Surcharges ($/ton) (b) 15. Suspended Solids over 300 mg/l $ $ $ $ $ $ Biochemical Oxygen Demand over 300 mg/l $ $ $ $ $ $ Chemical Oxygen Demand over 600 mg/l $ $ $ $ $ $ ccf = hundred cubic feet (approx. 748 gallons) mg/l = milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50% of the general service charge. (b) Applicable only to non-residential customers. (c) Total for base service charge and Tier 1 compliance (line 3 + line 4) 4-36

58 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Customer Assistance Charges The District provides a 50% discount on WW service charges for low-income residential customers participating in the MSD Customer Assistance Program (CAP) based on established District policy. The current customer participation is approximately 2,200 customer accounts or 0.61% of the District s total number of single family andd multi-family (up to 6 units) ratepayers. Figure 4-8 shows the historical 5-year trend in the program, and the program guidelines are presented in Table Figure 4-8 Customer Assistance Program Participants Table 4-20 CAP Poverty Guidelines Persons in Family HHS Poverty Guidelines 1 $ 11,670 2 $ 15,730 3 $ 19,790 4 $ 23,850 5 $ 27,910 6 $ 31,970 7 $ 36,030 8 $ 40,090 For each additional $ 4,060 person, add Annual 200% (CAP Eligible) $ 23,340 $ 31,460 $ 39,580 $ 47,700 $ 55,820 $ 63,940 $ 72,060 $ 80,180 $ 8,120 Annual 250% (CAP Eligible Elderly) $ 29,175 $ 39,325 $ 49,475 $ 59,625 $ 69,775 $ 79,925 $ 90,075 $ 100,225 $ 10,

59 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The first CAP rate was adopted by the Board of Trustees in 1993 by Ordinance Since that time numerous changes have been made to the program to remain current with the changing demographics of MSD ratepayers. Current policy defines CAP eligibility as residential customers with household income for the previous year less than 200% of the most recent Health and Human Services (HHS) poverty guidelines by household size and less than 250% for disabled individuals or those ages 65 or older. Table 4-20 shows household income limits by family size used to check a customer s eligibility to participate in the CAP as of the date of this report. The District recently expanded the eligibility criteria to include Multi-Family residential customers residing in Multi-Family housing consisting of six units or less. In November 2014 the MSD Board approved a one-time 50% reduction in any outstanding service charges for those accepted into the program. These changes were made to assist the District s continuing efforts to increase the number of customers participating in the program. Considerable focused outreach efforts are also a significant component of promoting the CAP. Examples of these efforts can be found in Appendix The cost impact of the District s current CAP program on a typical single family residential customer not eligible for assistance and discharging 7 Ccf per month of WW is expected to be about $0.18, or 0.42% per month of the District s FY16 WW service charge revenue. This impact is calculated by dividing the revenue reduction associated by the CAP proposed WW rates by the general WW service volume. The impact of the change in eligibility requirements is expected to increase participation in subsequent years as the District continues to actively promote this program and increase the number of qualified low-income customers Excess Strength Wastewater Surcharges The proposed WW volume charges shown in Table 4-19 are designed to recover costs for volume associated with normal strength contributed WW. To provide for the recovery of costs associated with above average strength contributions, an extra strength surcharge rate is applied to WW loadings that exceed normal strength limits of 300 mg/l for suspended solids and 300 mg/l for BOD or 600 mg/l for COD. Cost of service based rates for excess strength WW are equal to the unit costs shown on lines 15-17, of Table 4-19 and are expressed on a cost per ton basis Compliance Charge Costs incurred by the District to monitor the quality of WW volume from non-residential customers had historically been recovered by a single monthly compliance charge applied uniformly to all non-residential customers. To provide greater cost recovery equity, a 5-tier structure of compliance charges was implemented as part of the last Rate Commission and 4-38

60 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL adopted by the Board in This tiered system allocates costs to customers in proportion to the number of inspections and sophistication of monitoring required. The total cost to monitor customers in this regulatory required compliance program is based on estimates by District environmental compliance program staff. Tier 1 Non-Residential Customers Not Subject to Inspections with no Sample Point. Tier 2 Non-Residential Customers Subject to Inspections with No Sample Point Tier 3 Non-Residential Customers Subject to Inspections with One Sample Point Tier 4 Non-Residential Customers Subject to Inspections with Two Sample Points. Tier 5 Non-Residential Customers Subject to Inspections with Three or More Sample Points 95% of the District s non-residential customers are classified as Tier 1. For rate design purposes, customers in the other 4 tiers are based on an equivalent basis with Tier 1 customers by dividing their respective unit costs by the unit cost indicated for Tier 1 customers. Multiplying these cost ratios by the Tier 1 rate derives the proposed compliance rates shown in lines 4-8 of Table Tier 1 non-residential customers currently pay $9.00 per month, and the approved charge for FY16 is $2.15 per month. Under the Proposed rates this charge increases to $2.86 per month in FY Wastewater Revenue under Proposed Rates A comparison of allocated cost of service results for FY17 with WW revenue under the existing rates is shown in Table As indicated, revenues under the previously approved rates are inadequate to meet the total revenue requirements. The recommended rates presented in Table 4-18 adequately recover the total cost of service, and equitably recover the allocated cost of service from each customer class. The allocation of these costs was adjusted to reflect current volume and costs. The District has not changed its rate structure in determining this re-allocation. In addition to the recovery of cost of service, the proposed rates have been designed to support the financial requirements of the system as identified throughout this Section. Table 4-21 presents a comparison under the recommended rates to the allocated costs of service. 4-39

61 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-21 Comparison of Revenue under Proposed Rates to Cost of Service Test Year: 2017 Total Revenue Under Difference Under Cost of Service Proposed Rates Proposed Rates Metered Customers Single Family $ 151,554,166 $ 151,650, % Multi-Family 34,763,571 34,798, % Non-Residential 99,302,486 99,413, % Subtotal: Metered Customers $ 285,620,222 $ 285,862, % Unmetered Customers Single Family $ 35,670,351 $ 35,576, % Multi-Family 19,856,029 19,899, % Subtotal: Unmetered Customers $ 55,526,381 $ 55,475, % Total System Single Family $ 187,224,517 $ 187,227, % Multi-Family 54,619,600 54,697, % Non-Residential 99,302,486 99,413, % Infiltration & Inflow Subtotal: Total System $ 341,146,603 $ 341,338, % 4.11 Alternative Proposed Wastewater Rates (without new authorization) The financial planning and rate design analyses presented in this report are contingent upon the authorization of $900 million of revenue bonds by District voters. If voters reject the District s proposed revenue bond authorization, the District will be forced to finance its major capital improvement program on a 100% PAYGO basis. In recognition of this possibility, financial analyses identical to those presented earlier in this section were used to reflect the impact of rates without the benefits of additional bond authorization. This is a worst-case scenario and has only been developed for comparison purposes. The alternative rates also finance the entire CIRP previously presented by Table 4-7. The resulting rate components change to those shown in Table This change results in an 9.8% increase in the FY17 average single family residential monthly bill, a 65.0% increase in FY18, a 13.1% increases in FY19 and a 15.0% increase in FY20. The typical single family customer bill throughout the Rate Proposal timeframe is presented in Figure 4-9 and shows the impact of not using debt financing for the CIRP beyond what has already been authorized. 4-40

62 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Figure 4-9 Wastewater Bill Comparison: Bondss v. No Bonds Table 4-22 CIRP Financing Plan: No Bonds Alternative Projected Projected Wastewater Construction Fund Cashflow FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Subtotal Subtotal 1. Beginning Year Balance (1) Sources of Funds $ 233,053,202 $ 91,440,861 $ 98,709,136 $ 56,204,221 $ - $ - 2. Senior Revenue Bond Proceeds - Par Amount - 150,000, ,055, ,055, ,055, Senior Revenue Bond Proceeds - Premium - 21,526,268 20,342, ,342,700 41,868, Cash Financing of Constructionn (PAYGO) 40,000,000 40,000,000 70,000, ,789, ,034, ,320,990 1,055,145,593 1,135,145, Capita alized Internal Labor 11,986,382 12,465,837 12,964,471 13,483,049 14,022,371 14,583,266 55,053,157 79,505, State Revolving Loan Proceeds 50,000,000 30,000,000 25,000,000 25,000,000 25,000,000 25,000, ,000, ,000, Grants & Contributions 502, , , , , ,040 2,466,912 3,493, Interest Income 860, , , , , ,000 2,660, Subtotal: Available Funds Uses of Funds $ 336,401,991 $ 346,767,587 $ 402,118,863 $ 347,459,971 $ 373,826,590 $ 439,561,296 $ 1,408,053,362 $ 1,766,728, Major Capital Improvements $ (244,5 561,131) $ (237,635,101) $ (332,511,688) $ (347,297,471) $ (373,664,090) $ (439,398,796) $ (1,492,872,045) $ (1,975,068,276) 11. Issuance Costs (400,000) (1,695,000) (1,907,454) (162,500) (162,500) (162,500) (2,394,954) (4,489,954) 12. Debt Service Reserve Fund Deposits - (8,728,350) (11,495,500) (11,495,500) (20,223,850) 13. Subtotal: Uses of Funds $ (244,9 961,131) $ (248,058,451) $ (345,914,642) $ (347,459,971) $ (373,826,590) $ (439,561,296) $ (1,506,762,498) $ (1,999,782,080) 14. End of Year Balance $ 91,440,861 $ 98,709,136 $ 56,204,221 $ - $ - $

63 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-23 No Bonds Scenario Financial Plan Projected Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Wastewater Revenue Subtotal Subtotal 1. User Charge Revenue $ 280,817,877 $ 313,591,980 $ 341,628,032 $ 556,111,003 $ 625,199,890 $ 714,857,536 $ 2,237,796,461 $ 2,832,206,318 Other Miscellaneous Revenue 2. Other Operating Revenue $ 4,796,155 $ 2,201,279 $ 2,199,876 $ (977,523) $ (1,790,503) $ (3,067,564) $ (3,635,715) $ 3,361, Non-Operating Revenue 222, , , , , , ,000 1,332, Connection Fee Revenue 683, , , , , ,840 2,828,996 4,201, Subtotal: Other Miscellaneous Revenue $ 5,701,155 $ 3,113,109 $ 3,118,604 $ (51,828) $ (857,771) $ (2,127,724) $ 81,281 $ 8,895, Total: Wastewater Revenue $ 286,519,032 $ 316,705,089 $ 344,746,636 $ 556,059,175 $ 624,342,120 $ 712,729,812 $ 2,237,877,742 $ 2,841,101,863 % Change 8.0% 10.5% 8.9% 61.3% 12.3% 14.2% Wastewater Expenditures 7. Operating Expenses $ (169,363,203) $ (178,481,265) $ (176,389,110) $ (180,102,367) $ (186,374,873) $ (193,091,871) $ (735,958,222) $ (1,083,802,690) 8. Net Revenue Available for Debt & Capital $ 117,155,828 $ 138,223,824 $ 168,357,525 $ 375,956,808 $ 437,967,246 $ 519,637,941 $ 1,501,919,521 $ 1,757,299,173 Non-Operating Expenses Debt Service and Other Indebtedness Senior Revenue Bond Debt Service (Accrued) 9. Existing $ (39,367,299) $ (44,851,007) $ (46,655,486) $ (46,468,892) $ (46,476,019) $ (46,535,144) $ (186,135,542) $ (270,353,847) 10. Proposed - (4,844,021) (15,547,229) (21,454,000) (21,460,917) (21,465,917) (79,928,063) (84,772,083) 11. Subtotal: Senior Revenue Bond Debt Service $ (39,367,299) $ (49,695,028) $ (62,202,715) $ (67,922,892) $ (67,936,936) $ (68,001,061) $ (266,063,604) $ (355,125,931) SRF & Direct Loan Debt Service (Accrued) 12. Existing $ (25,295,222) $ (27,674,382) $ (27,592,947) $ (27,627,707) $ (27,646,335) $ (27,664,083) $ (110,531,072) $ (163,500,676) 13. Proposed (835,678) (3,029,860) (5,345,304) (7,646,393) (9,913,255) (11,752,968) (34,657,919) (38,523,457) 14. Subtotal: SRF & Direct Loan Debt Service $ (26,130,899) $ (30,704,242) $ (32,938,251) $ (35,274,101) $ (37,559,590) $ (39,417,050) $ (145,188,992) $ (202,024,133) 15. Subtotal: Debt Service & Other Indebtedness $ (65,498,198) $ (80,399,270) $ (95,140,966) $ (103,196,993) $ (105,496,526) $ (107,418,111) $ (411,252,596) $ (557,150,063) 16. Cash-Financed Capital (Paygo) $ (43,771,640) $ (43,884,789) $ (73,958,600) $ (255,823,595) $ (338,149,312) $ (403,517,769) $ (1,071,449,276) $ (1,159,105,705) 17. Non-recurring Projects or Studies (4,489,587) (6,322,090) (6,034,848) (5,194,950) (5,101,732) (5,281,442) (21,612,972) (32,424,648) 18. Contributions to Reserves Subtotal: Non-Operating Expenses $ (113,759,425) $ (130,606,149) $ (175,134,414) $ (364,215,538) $ (448,747,570) $ (516,217,322) $ (1,504,314,844) $ (1,748,680,417) 20. Total: Wastewater Expenditures $ (283,122,628) $ (309,087,414) $ (351,523,525) $ (544,317,905) $ (635,122,443) $ (709,309,193) $ (2,240,273,066) $ (2,832,483,108) % Change 12.7% 9.2% 13.7% 54.8% 16.7% 11.7% 21. Annual Surplus/(Deficit) (1,2) $ 3,396,404 $ 7,617,675 $ (6,776,889) $ 11,741,270 $ (10,780,323) $ 3,420,619 $ (2,395,323) $ 8,618,755 Combined Operating Reserve 22. Beginning Balance (3) $ 40,619,238 $ 44,015,642 $ 51,633,317 $ 44,856,428 $ 56,597,698 $ 45,817, Ending Balance (3) 44,015,642 51,633,317 44,856,428 56,597,698 45,817,375 49,237,993 Actual Debt Service 24. Senior Revenue Bonds $ 38,344,215 $ 48,292,590 $ 61,058,590 $ 67,923,340 $ 67,920,653 $ 68,018, SRF Loans 24,086,811 28,980,783 32,065,103 33,893,000 36,603,684 38,473, Total: Debt Service $ 62,431,026 $ 77,273,373 $ 93,123,693 $ 101,816,340 $ 104,524,337 $ 106,492,100 Debt Service Coverage 27. Senior Revenue Bonds (4) Total Debt (5) (1) Negative number indicates a need to drawdown the operating reserve. (2) Commercial Paper and Line of Credit Payment excluded from cash surplus since payments are made from Construction Fund. (3) Includes funds set aside for a minimum operating reserve equal to 60 days of operating expenses (4) The Bond Ordinance requires net revenue to equal or exceed 1.25x actual senior lien debt service (5) The Bond Ordinance requires net revenue to equal or exceed 1.15x total actual debt service 4-42

64 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-24 Alternative Wastewater Rates No Bonds Historical Approved Proposed # Type of Charge (a) FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Effective Date 7/1/2012 7/1/2013 7/1/2014 7/1/2015 7/1/2016 7/1/2017 7/1/2018 7/1/2019 Base Charge ($/Bill) 1. Billing & Collection Charge $ 3.25 $ 3.45 $ 3.55 $ 3.70 $ 5.47 $ 9.03 $ $ System Availability Charge $ 9.90 $ $ $ $ $ $ $ Total: Base Charge (Residential) $ $ $ $ $ $ $ $ Compliance Charge ($/Bill) (b) 4. Tier 1 $ $ $ 9.00 $ 2.15 $ 2.86 $ 2.95 $ 3.05 $ Tier 2 $ $ $ $ $ $ $ $ Tier 3 $ $ $ $ $ $ $ $ Tier 4 $ $ $ $ $ $ $ $ Tier 5 $ $ $ $ $ $ $ $ Total Non-Residential Service Charge (c) $ $ $ $ $ $ $ $ Volume Charge 10. Metered ($/ccf) $ 2.28 $ 2.50 $ 2.82 $ 3.21 $ 3.60 $ 5.94 $ 6.72 $ 7.73 Unmetered ($/Bill per fixture) 11. Per Room $ 1.48 $ 1.63 $ 1.83 $ 2.09 $ 2.13 $ 3.52 $ 3.98 $ Per Water Closet $ 5.56 $ 6.10 $ 6.88 $ 7.83 $ 7.94 $ $ $ Per Bath $ 4.64 $ 5.08 $ 5.73 $ 6.53 $ 6.62 $ $ $ Per Separate Shower $ 4.64 $ 5.08 $ 5.73 $ 6.53 $ 6.62 $ $ $ Extra Strength Surcharges ($/ton) (b) 15. Suspended Solids over 300 mg/l $ $ $ $ $ $ $ $ Biochemical Oxygen Demand over 300 mg/l $ $ $ $ $ $ $ $ Chemical Oxygen Demand over 600 mg/l $ $ $ $ $ $ $ $ ccf = hundred cubic feet (approx. 748 gallons) mg/l = milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50% of the general service charge. (b) Applicable only to non-residential customers. (c) Total for base service charge and Tier 1 compliance (line 3 + line 4) 4-43

65 SECTION 4 PROPOSED WASTEWATER RATES WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 4-25 Typical Wastewater Bills under No Bonds Alternative Approved Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Wastewater Bills Single Family Residential (Metered) 1. 1 ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month (Typical Customer) $ $ $ $ $ $ % Change 13.1% 9.8% 65.0% 13.1% 15.0% ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ Multi-Family Residential (Metered) ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ Non-Residential (Normal Strength Wastewater) ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ 1, $ 1, Non-Residential (Excess Strength Wastewater) (1) ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ 1, ccf per month $ $ $ $ 1, $ 1, $ 1, (1) The 70, 100, and 160 ccf bills assume excess strength of 150, 200, and 250 mg/l, respectively, of suspended solids and BOD. 4-44

66 SECTION 5 Proposed Stormwater Funding WASTEWATER & STORMWATER RATE CHANGE PROPOSAL PROPOSED STORMWATER FUNDING MSD proposes the use of a District-wide tax structure to replace the multi-layered taxes now assessed on the real estate value of its customers property. This proposed funding is designed to cover the cost of SW maintenance services, capital projects and associated O&M. This section provides the basis for the District s SW component of its Rate Proposal, its underlying assumptions, proposed tax structure and impact on MSD customers. Additional details supporting the assumptions may be found in Appendices 7.5 and History SW is generated when rain or snowmelt is not able to be absorbed into the ground because it falls on a hard or impervious surface, the ground is already saturated or it rains faster than the water can be absorbed. This excess water flows over the ground and then into SW inlets, sewers or directly to local ponds and streams. Unlike WW or combined sewers, SW sewers do not connect to the WW treatment plants (WWTP). Anything that is picked up by SW including trash, pesticides, pet waste, etc., as it flows over yards, streets, and parking lots will make its way into nearby lakes, creeks, and rivers. As of 2013, MSD owns and maintains approximately 3,028 miles of SW sewers and force mains, but does not own or maintain lakes and creeks. MSD is involved in helping the St. Louis region to curb water pollution by partnering with 58 municipalities (co-permittees) and St. Louis County to comply with SW permit requirements for the St. Louis Metropolitan Small Municipal Separate Storm Sewer System (MS4). Likewise, MSD actively works to reduce pollutants that SW picks up and carries into local bodies of water through the St. Louis County Phase II SW Management Plan. MSD maintains public storm sewers, plans and designs improvements to SW infrastructure, regulates SW drainage and floodplain impact related to development projects, and helps coordinate regional efforts to address pollution carried in or caused by SW runoff. 5.2 Existing Stormwater Rates and Taxes District SW revenue is now derived principally from ad valorem taxes. Other sources of income include a flat fee, interest earnings, late charges and other operating income. Existing SW rates and taxes levied by the District are presented in Table 5-1. On March 8, 1988 a majority of the voters approved SW service charges To be collected only in those areas within the boundaries of The where the District has assumed or may in the future assume responsibility for O&M of stormwater and drainage facilities, which election was called pursuant to Ordinance No. 7358, adopted December 23, In addition, flat rate charges of

67 SECTION 5 Proposed Stormwater Funding WASTEWATER & STORMWATER RATE CHANGE PROPOSAL cents per month for residential and non-residential properties and.18 cents per unit for multiresidential were also approved. The outcome of William Zweig et al. v. MSD, appeal No. ED96110 (consolidated with Nos. ED96165 and ED96393) has resulted in the District reverting to a system of flat rate SW user charges, which have not increased since their implementation in 1988, and a system of ad valorem taxes that can only support basic SW operations. The current SW charges and taxes provide significantly less revenue than the former impervious area based user charges. The lower revenue levels postpone needed improvements and contribute to a deterioration of the SW system resulting from inadequate maintenance and delayed improvements. Table 5.1 Existing & Proposed Stormwater Charges Type of Charge Current Rate Proposed Rate Regulatory Tax (District-wide per $100 Assessed Value) Stormwater O&M Tax (City and Near County per $100 Assessed Value) $.0197 $.0197 $.0682 $0 OMCI Specific Subdistrict Taxes (per $100 Assessed Value) $ $0.10 $0 Fixed Monthly Charge Multi-Family Residential ($/unit) Fixed Monthly Charge Single Family & Non-Res ($/account) District-wide Stormwater Tax (proposed) (per $100 Assessed Value) $0.18 $0 $0.24 $0 N/A $.1000 SW revenues consist of monthly flat rate user charges and ad valorem taxes for District-wide, SW operating costs as well as other sub-district specific taxes which fund capital projects and O&M work specific to each sub-district s geographic area. The application of SW ad valorem taxes varies by SW service area. All WW customers are charged the flat rate user charges. All property in the MSD service area is charged $ per $100 of assessed value District-wide tax, but only customers within the District s original service area are charged the additional $ SW O&M tax. OMCI taxes are levied for specific areas within the original service area. These dedicated sub-district taxes range from $0.05 to $0.10 per $100 of assessed property value. 5-2

68 SECTION 5 Proposed Stormwater Funding WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The subdivided funding results in varying levels of SW services across the District. Customers paying just the District-wide tax receive only the minimal SW service needed to comply with regulatory requirements. Customers paying both the District-wide and SW O&M tax receive regulatory services and a level of maintenance up to the limits of the revenue generated by these SW taxes. Those customers paying specific OMCI taxes in addition to the District-wide and SW O&M taxes receive the highest level of SW services. This is, however, still substantially below the level needed to provide a comprehensive SW program as previously funded by the impervious area based SW charge that the State Supreme Court determined was in violation of the Hancock Amendment. 5-3

69 SECTION 5 Proposed Stormwater Funding Figure 5-1 Current Stormwater Service Level Map WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 5-4

70 SECTION 5 Proposed Stormwater Funding 5.3 Stormwater Revenue Requirements WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The revenue required to provide for the continued, and expanding operations of the District s SW utility must be sufficient to meet its cash requirements for system operation. Revenue requirements include (1) total SW system O&M expenses, including regulatory; (2) expenditures for routine and any major capital improvements; and (3) provision for an adequate operating reserve Stormwater Operation and Maintenance Expense Revenue collected from the existing SW user charge and ad valorem taxes are available to fund SW related O&M expenditures. However, these revenue sources are not sufficient to fund the District s SW operations. Therefore, the majority of SW O&M activities are the result of failures in the existing collection and conveyance system or as a reaction to customer complaints. These activities include removing blockages, open channel cleaning, repair of storm sewer line failures, and limited inlet inspections and cleanings. The specific operating divisions that provide direct service to the SW system are as follows: Collection System Mintert, Sulphur, and Grand Glaize services Facilities, Garages and Shops Operation Support Services (includes Materials Management, Customer Care and Administration) SW Pump Stations The FY15 adopted budget is the basis for projecting existing SW O&M expenses and is adjusted for the same inflation and growth factors as WW. Table 5-2 shows FY15 SW O&M expenses to be $15.0 million. In FY17, the District plans to expand SW service levels in order to meet the needs of the community. District staff from the engineering and operations divisions have developed a comprehensive estimate for what this level of service will be, including estimated number of maintenance and field crews, capital and construction needs, personnel additions, etc. The total costs also include an appropriate portion of District services that are shared between WW and SW. These costs include things such as the administration, human resources, and finance department costs. Additionally, as part of accounting for SW O&M, a charge for materials and vehicle use is passed on to the SW utility from the WW utility to offset the cost of supplies and routine capital expenditures made by the WW system. The costs just described appear in Table 5-2, line 12. A comprehensive discussion of this level of service is provided in Appendix

71 SECTION 5 Proposed Stormwater Funding WASTEWATER & STORMWATER RATE CHANGE PROPOSAL The total operating costs in FY17 are estimated to be approximately $20.7 million. A projection of the SW O&M costs is presented in Table 5-2 below. Table 5-2 Stormwater Operating Expenses Projected Projected Stormwater Revenue Requirements FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 General Fund Operating Expenses Subtotal Subtotal 1. Board of Trustees $ 485 $ 508 $ 663 $ 748 $ 715 $ 726 $ 2,853 $ 3, Rate Commission 40,759 6, ,117 8,622 67, , Civil Service Commission ,087 1,227 1,172 1,190 4,676 6, Secretary - Treasurer 130, , , , , , ,570 1,048, Executive Director 102, , , , , , , , General Counsel 203, , , , , ,643 1,209,972 1,626, Office of Human Resources 789, ,614 1,107,040 1,275,651 1,241,936 1,286,871 4,911,498 6,531, Engineering 1,700,989 1,761,672 1,109,198 1,193,616 1,197,389 1,232,937 4,733,140 8,195, Finance 327, , , , , ,335 1,981,110 2,651, Information Systems 1,045,914 1,091,946 1,436,642 1,634,256 1,571,418 1,607,504 6,249,820 8,387,680 Operations 12. Collection System $ 7,086,854 $ 7,330,402 $ 8,663,922 $ 8,929,117 $ 9,196,611 $ 9,475,978 $ 36,265,628 $ 50,682, Pump Stations 564, , , , , ,060 2,375,169 3,528, Wastewater Treatment Support 176, ,250 1,909,235 1,957,111 2,006,463 2,057,543 7,930,352 8,291, Subtotal: Operations $ 7,828,323 $ 8,102,811 $ 11,136,512 $ 11,469,357 $ 11,806,699 $ 12,158,582 $ 46,571,149 $ 62,502, Stormwater Regulatory $ 4,302,072 $ 4,431,134 $ 4,515,326 $ 4,601,117 $ 4,693,139 $ 4,787,002 $ 18,596,584 $ 27,329, Subtotal: General Fund Operating Expenses $ 16,472,786 $ 17,025,743 $ 20,359,246 $ 21,373,437 $ 21,723,040 $ 22,261,489 $ 85,717,212 $ 119,215,742 Other Operating Expenses 19. Water Backup Program $ - $ - $ - $ - $ - $ - $ - $ General Insurance Fund 350, , , , , ,266 2,203,242 2,922, Capital Funded in O&M Budget Capitalized Internal Labor (2,025,507) (2,106,527) (2,190,788) (2,278,420) (2,369,557) (2,464,339) (9,303,104) (13,435,138) 23. Additional O&M 216, ,775 2,068,617 4,070,052 2,893,114 3,134,270 12,166,053 13,048, Subtotal: Other Operating Expenses $ (1,458,358) $ (1,071,398) $ 371,756 $ 2,362,608 $ 1,081,630 $ 1,250,196 $ 5,066,191 $ 2,536,435 Total: Operating Expenses $ 15,014,428 $ 15,954,346 $ 20,731,002 $ 23,736,046 $ 22,804,670 $ 23,511,686 $ 90,783,403 $ 121,752, Stormwater Major Capital Improvement Program The proposed SW CIRP is comprised of two major components. The first are capital projects within the OMCI sub-districts to complete the investments that those customers have supported through their specific taxes. The second are infrastructure rehabilitation projects that will be performed throughout the District and will be funded with a new, proposed District-wide tax for SW (this is discussed in Section 5.4). The estimated level of SW CIRP needs is presented in Figure 5-2, and a list of SW CIRP is in Appendix

72 SECTION 5 Proposed Stormwater Funding Figure 5-2 Stormwater CIRP Needs WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Stormwater Regulatory Services MSD has certain regulatory obligations it must comply with to meet stormwater quality requirements outlined by Missouri Department of Natural Resources. The District is a co-permittee in a State-issued Municipal Separate Storm Sewer System (MS4) permit. Under this permit, MSD must implement Best Management Practicies to address stormwater quality issues. MSD is required to have a public education and outreach program, an illicit discharge detection and elimination program, and a stormwater pollution prevention program. MSD and the co-permittees are also required to regulate and enforce the construction and continued maintenance of water quality features (Stormwater BMP) to control pollutants in stormwater runoff from development projects both during and afterr construction is complete. The District- funding to meet our current regulatory obligations. Under the new tax structure and Rate wide ad valorem tax of $.0197 per $100 Assessed Valuee levied by the District provides adequate Proposal, this tax will remain in place to maintain these services Operating Reserve The SW operating reserve is designed to addd a layer of protection for unplanned expenses. Under the proposed funding mechanism, SW revenues will be collected from Ad Valorem Taxes which are collected annually in the City and County. Due to this annual revenue collection schedule, it is necessary for the SW fund to maintain a reserve balance that provides sufficient working capital to meet the regular operating and capital expenses in the first 6 months of a fiscal year 5-7

73 SECTION 5 Proposed Stormwater Funding WASTEWATER & STORMWATER RATE CHANGE PROPOSAL after which a new year s revenues will be collected. An operating reserve equal to 240 days of SW O&M expense is reflected in this Rate Proposal. Figure 5-3 Proposed Stormwater Service Level Map 5-8

74 SECTION 5 Proposed Stormwater Funding 5.4 Proposed Funding Methods WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Meeting the proposed increased level of SW service beginning in FY17 requires that the District develop a more equitable and consolidated SW charge. The District is proposing, and will seek voter approval, to assess a District-wide SW tax to replace the current SW O&M Tax and flat rate charges. The proposed District-wide tax rate is $0.10 per $100 of assessed property value. The subdistrict specific OMCI taxes will be eliminated as part of this Rate Proposal as well; however, the regulatory tax will remain in place. Charging this new SW District-wide Tax will provide the District with the necessary funding to meet the operating requirements of the expanded service levels. Additionally, this proposed structure will eliminate the disjointed revenue sources and provide a funding source that allows for a cohesive plan across the entire District. A summary of SW revenues under existing and proposed rates and taxes is presented in Table 5-3 for the period FY15 through FY20. The SW tax revenues shown in Table 5-3 are developed from detailed records provided by District staff. Projected SW tax revenues shown in Table 5-3 through FY16 are based on staff projections developed for the District s FY15 budget. This budget was approved on June 11, Table 5-1 also presents the proposed new SW Tax which will be assessed to all customers of the District. Table 5-3 Projected Stormwater Revenue Projected Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Stormwater Revenues Budget Projected Projected Projected Projected Projected Subtotal Subtotal Regulatory Tax $ 4,918,216 $ 4,942,807 $ 4,967,521 $ 4,992,359 $ 5,017,320 $ 5,042,407 $ 20,019,607 $ 29,880,629 Stormwater Operating (Current) 11,709,375 11,709, ,418,750 Stormwater Operating (Proposed) ,607,840 24,730,879 24,854,534 24,978,806 99,172,059 99,172,059 OMCI Districts 8,777,798 8,777, ,555,595 Stormwater Flat Fee Revenue 1,368,464 1,382, ,750,613 Subtotal: Stormwater Revenue $ 26,773,853 $ 26,812,128 $ 29,575,361 $ 29,723,238 $ 29,871,854 $ 30,021,213 $ 119,191,665 $ 172,777, Other Stormwater Revenue Historical and projected other SW operating revenue is presented in Table 5-4. Included in the other operating revenues are SW billing adjustments, such as late charges, refunds and other adjustments. Late charge revenue is projected to increase only slightly in upcoming years. Revenue from inspection plan review fees and submittal fees are expected to remain flat during the projection period. Miscellaneous revenue for reimbursable items and other revenue are projected to remain stable throughout the forecast period. 5-9

75 SECTION 5 Proposed Stormwater Funding WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 5-4 Projected Stormwater Other Operating Revenue Projected Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Subtotal Subtotal Other Operating Revenue 1. Billing Adjustments (1) $ 22,150 $ 22,372 $ 22,595 $ 22,821 $ 23,049 $ 23,280 $ 91,746 $ 136, Bad Debt Provision Other Fees 3. Construction Inspection Fees $ 118,500 $ 118,500 $ 118,500 $ 118,500 $ 118,500 $ 118,500 $ 474,000 $ 711, Waste Hauler Permits All Other Fees (2) 85,700 85,700 85,700 85,700 85,700 85, , , Subtotal: Other Fees $ 204,200 $ 204,200 $ 204,200 $ 204,200 $ 204,200 $ 204,200 $ 816,800 $ 1,225, Miscellaneous Revenues (3) $ 1,324,143 $ 1,517,438 $ 1,125,872 $ 1,113,874 $ 1,038,636 $ 942,399 $ 4,220,780 $ 7,062, Subtotal: Other Operating Revenue $ 1,550,493 $ 1,744,009 $ 1,352,667 $ 1,340,895 $ 1,265,886 $ 1,169,879 $ 5,129,326 $ 8,423, Other Non-Operating Revenue (4) $ 30,500 $ 30,500 $ 30,500 $ 30,500 $ 30,500 $ 30,500 $ 122,000 $ 183, Connection Fee Revenue Total: Other Miscellaneous Revenue $ 1,580,993 $ 1,774,509 $ 1,383,167 $ 1,371,395 $ 1,296,386 $ 1,200,379 $ 5,251,326 $ 8,606,829 % Change -77.1% 12.2% -22.1% -0.9% -5.5% -7.4% (1) Includes late charges, refunds, adjustments, lien interest and fees, and other adjustments, including revenue from Arnold. (2) Includes plan review fees, submittal fees, monitoring cost fees, pretreatment discharge permits, and all other fees. (3) Includes interest, reimbursements, reimbursable engineering and maintenance, and all other miscellaneous revenue. (4) Includes rental income, clean water surcharge, and sale of fixed assets. 5.6 Summary of Stormwater Revenue and Revenue Requirements Table 5-5 presents a summary comparison of all existing and proposed SW revenues under existing rates and taxes with projected revenue requirements for FY15 through FY20. Lines 1 through 4 show projected tax revenues available for general operations. Other SW revenue is also included, and the total SW Other Miscellaneous revenue is shown in line 10. The increased level of service can be seen from the increased revenue in FY17 O&M expense (line 14), is a summary of the detailed amounts presented in Table 5-2 and shows the portion of operations that are tied directly to regulatory requirements. Line 15 is the amount of cash financing available for major SW capital improvements which are planned to begin in FY17. The OMCI Capital Projects on line 18 have been identified by the engineering department for each of the subdistricts and will be completed to fully utilize the investments made by each jurisdiction. Line 23 presents the net annual surplus or deficit by the SW operating revenues. The negative balance in FY16 through FY20 represent use of existing fund balances to cash finance the OMCI and District capital needs. Capital spending in the OMCI funds will be $23.9 million from FY17 through FY20. During this same time period, capital spending in the SW O&M Fund and the proposed District-wide SW Fund is projected to be $46.9 million. Capital funding in the District-wide SW fund is made up of $.012 of the proposed $.10 per $100 assessed value tax levy. The declining operating reserve balance is presented in lines and this is being reduced to fund SW activities while maintaining the District s 240 day target balance for the SW operating reserve. Appendix provides additional detail regarding these service levels. 5-10

76 SECTION 5 Proposed Stormwater Funding WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 5-5 Stormwater Financial Plan Projected Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 17 - FY 20 FY 15 - FY 20 Stormwater Revenue Subtotal Subtotal Stormwater Tax Revenue Ad Valorem Taxes 1. Regulatory Tax $ 4,918,216 $ 4,942,807 $ 4,967,521 $ 4,992,359 $ 5,017,320 $ 5,042,407 $ 20,019,607 $ 29,880, Stormwater O&M 11,709,375 11,709,375 24,607,840 24,730,879 24,854,534 24,978,806 99,172, ,590, OMCI Districts 8,777,798 8,777, ,555, Stormwater Flat Fee Revenue 1,368,464 1,382, ,750, Subtotal: Tax Revenue $ 26,773,853 $ 26,812,128 $ 29,575,361 $ 29,723,238 $ 29,871,854 $ 30,021,213 $ 119,191,665 $ 172,777, Subtotal: Stormwater Tax Revenue $ 26,773,853 $ 26,812,128 $ 29,575,361 $ 29,723,238 $ 29,871,854 $ 30,021,213 $ 119,191,665 $ 172,777,646 Other Miscellaneous Revenue 7. Other Operating Revenue $ 1,550,493 $ 1,744,009 $ 1,352,667 $ 1,340,895 $ 1,265,886 $ 1,169,879 $ 5,129,326 $ 8,423, Non-Operating Revenue 30,500 30,500 30,500 30,500 30,500 30, , , Connection Fee Revenue Subtotal: Other Miscellaneous Revenue $ 1,580,993 $ 1,774,509 $ 1,383,167 $ 1,371,395 $ 1,296,386 $ 1,200,379 $ 5,251,326 $ 8,606, Total: Stormwater Revenue $ 28,354,846 $ 28,586,638 $ 30,958,528 $ 31,094,632 $ 31,168,240 $ 31,221,592 $ 124,442,991 $ 181,384,475 % Change -16.5% 0.8% 8.3% 0.4% 0.2% 0.2% 0.0% 45.8% Stormwater Expenditures Operating Expenses 12. General Fund Operating Expenses $ (10,712,356) $ (11,523,212) $ (16,215,676) $ (19,134,929) $ (18,111,531) $ (18,724,683) $ (72,186,819) $ (94,422,387) 13. Regulatory Expenses (4,302,072) (4,431,134) (4,515,326) (4,601,117) (4,693,139) (4,787,002) (18,596,584) (27,329,790) 14. Subtotal: Operating Expenses $ (15,014,428) $ (15,954,346) $ (20,731,002) $ (23,736,046) $ (22,804,670) $ (23,511,686) $ (90,783,403) $ (121,752,177) 15. Net Revenue Available for Debt & Capital $ 13,340,417 $ 12,632,292 $ 10,227,526 $ 7,358,587 $ 8,363,570 $ 7,709,906 $ 33,659,588 $ 59,632,298 Non-Operating Expenses 16. Debt Service and Other Indebtedness $ - $ - $ - $ - $ - $ - $ - $ Cash-Financed Capital (Paygo) $ 0 $ 0 $ (8,405,411) $ (6,956,151) $ (18,448,795) $ (13,134,502) $ (46,944,859) $ (46,944,859) 18. OMCI Capital Projects (9,245,471) (17,444,369) (12,226,829) (9,510,463) (2,139,985) (61,378) (23,938,655) (50,628,495) 19. Non-recurring Projects or Studies Contributions to Reserves Subtotal: Non-Operating Expenses $ (9,245,471) $ (17,444,369) $ (20,632,239) $ (16,466,614) $ (20,588,781) $ (13,195,880) $ (70,883,514) $ (97,573,354) 22. Total: Stormwater Expenditures $ (24,259,899) $ (33,398,715) $ (41,363,241) $ (40,202,660) $ (43,393,451) $ (36,707,565) $ (161,666,917) $ (219,325,531) % Change 13.3% 37.7% 23.8% -2.8% 7.9% -15.4% 23. Annual Surplus/(Deficit) (1,2) $ 4,094,947 $ (4,812,077) $ (10,404,713) $ (9,108,028) $ (12,225,211) $ (5,485,974) $ (37,223,926) $ (37,941,056) Combined Operating Reserve 24. Beginning Balance (3) $ 20,859,440 $ 27,850,916 $ 34,330,087 $ 35,700,008 $ 35,711,202 $ 25,301, Ending Balance (3) 27,850,916 34,330,087 35,700,008 35,711,202 25,301,795 19,621,794 (1) Negative number indicates a need to drawdown the operating reserve. (2) Commercial Paper and Line of Credit Payment excluded from cash surplus since payments are made from Construction Fund. (3) Includes funds set aside for a minimum operating reserve equal to 240 days of operating expenses 5-11

77 SECTION 6 Customer Rate Impacts WASTEWATER & STORMWATER RATE CHANGE PROPOSAL OVERALL CUSTOMER IMPACTS The District must generate annual revenues that are sufficient to meet the current operating, capital, and financial policy requirements to support the WW and SW service levels. Sections 4 and 5 have identified the individual Rate Proposals for WW rates and charges and SW ad valorem taxes that are sufficient to meet their separate needs. District customers will be asked to support both utilities and it is important to understand the potential impacts to District customers from both the WW and SW utilities. 6.1 Proposed Rate Schedules Table 6-1 presents the proposed WW rate schedule for FY13 through FY20 as well as the existing and proposed schedule of SW rates. The rate structure has been confirmed to equitably recover the costs for the District s WW and SW activities. 6-1

78 SECTION 6 Customer Rate Impacts WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 6-1 Existing and Proposed Wastewater & Stormwater Charges Historical Approved Proposed # Type of Charge (a) FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Effective Date 7/1/2012 7/1/2013 7/1/2014 7/1/2015 7/1/2016 7/1/2017 7/1/2018 7/1/2019 Base Charge ($/Bill) 1. Billing & Collection Charge $ 3.25 $ 3.45 $ 3.55 $ 3.70 $ 5.47 $ 6.06 $ 6.72 $ System Availability Charge $ 9.90 $ $ $ $ $ $ $ Total: Base Charge (Residential) $ $ $ $ $ $ $ $ Compliance Charge ($/Bill) (b) 4. Tier 1 $ $ $ 9.00 $ 2.15 $ 2.86 $ 2.95 $ 3.05 $ Tier 2 $ $ $ $ $ $ $ $ Tier 3 $ $ $ $ $ $ $ $ Tier 4 $ $ $ $ $ $ $ $ Tier 5 $ $ $ $ $ $ $ $ Total Non-Residential Service Charge (c) $ $ $ $ $ $ $ $ Volume Charge 10. Metered ($/ccf) $ 2.28 $ 2.50 $ 2.82 $ 3.21 $ 3.60 $ 3.99 $ 4.42 $ 4.90 Unmetered ($/Bill per fixture) 11. Per Room $ 1.48 $ 1.63 $ 1.83 $ 2.09 $ 2.13 $ 2.36 $ 2.62 $ Per Water Closet $ 5.56 $ 6.10 $ 6.88 $ 7.83 $ 7.94 $ 8.80 $ 9.75 $ Per Bath $ 4.64 $ 5.08 $ 5.73 $ 6.53 $ 6.62 $ 7.34 $ 8.13 $ Per Separate Shower $ 4.64 $ 5.08 $ 5.73 $ 6.53 $ 6.62 $ 7.34 $ 8.13 $ 9.01 Extra Strength Surcharges ($/ton) (b) 15. Suspended Solids over 300 mg/l $ $ $ $ $ $ $ $ Biochemical Oxygen Demand over 300 mg/l $ $ $ $ $ $ $ $ Chemical Oxygen Demand over 600 mg/l $ $ $ $ $ $ $ $ Stormwater Monthly Flat Rates 18. Multi-Family - $/Unit $ 0.18 $ 0.18 $ 0.18 $ 0.18 $ 0.00 $ 0.00 $ 0.00 $ Single Family & Non-Res - $/Account $ 0.24 $ 0.24 $ 0.24 $ 0.24 $ 0.00 $ 0.00 $ 0.00 $ 0.00 Stormwater Tax-Based Charges (Annually per $100 Assessed Taxable Value) 20. Regulatory Tax $ $ $ $ $ $ $ $ Stormwater O&M Tax $ $ $ $ $ $ $ $ ccf = hundred cubic feet (approx. 748 gallons) mg/l = milligram per liter (a) These rates were judged by courts to be user charges that are not subject to the requirements of the Hancock Amendment. Rates for qualified low-income customers were established at 50% of the general service charge. (b) Applicable only to non-residential customers. (c) Total for base service charge and Tier 1 compliance (line 3 + line 4) 6-2

79 SECTION 6 Customer Rate Impacts 6.2 Typical Wastewater Bills by Customer Class WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Table 6-2 presents a comparison of typical WW service bills under existing rates, rates currently approved through FY16, and under the proposed FY17 through FY20 rates, for various billable WW volumes and customer classes. As indicated by this table, the monthly bill for a typical single family residential customer contributing 7 Ccf of WW each month to the sewer system is projected to increase by $20.14 from FY16 to FY20 (about 10.6% in each year from FY17 through FY20). Table 6-2 Typical Wastewater Bills Approved Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Wastewater Bills Single Family Residential (Metered) 1. 1 ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month (Typical Customer) $ $ $ $ $ $ % Change 13.1% 9.8% 10.8% 10.8% 10.8% ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ Multi-Family Residential (Metered) ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ Non-Residential (Normal Strength Wastewater) ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ Non-Residential (Excess Strength Wastewater) (1) ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ ccf per month $ $ $ $ $ $ 1, (1) The 70, 100, and 160 ccf bills assume excess strength of 150, 200, and 250 mg/l, respectively, of suspended solids and BOD. Billable WW volumes for unmetered customers are derived from volumes attributed to household attributes. Based on a prior study of unmetered customers, the most common or typical unmetered customer was one with five rooms, one water closet and one bath. The volume associated with a customer with these housing attributes is very close to the billable volume of a typical metered residential customer. Table 6-3 presents sample unmetered bill impacts. The WW bill for a typical unmetered residential customer contributing 7.7 Ccf of WW each month would increase by $17.86 from FY16 to FY20, or by approximately 9.1% each year. 6-3

80 SECTION 6 Customer Rate Impacts Table 6-3. Typical Unmetered Wastewater Bills WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Approved Projected FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 Unmetered Wastewater Bills 1. 3 Rooms, 1 WC, 1 Bath, 0 Shower $ $ $ $ $ $ Rooms, 1 WC, 1 Bath, 0 Shower (Typical) $ $ $ $ $ $ % Change 13.3% 3.9% 10.8% 10.9% 10.9% 4. 6 Rooms, 1 WC, 1 Bath, 1 Shower $ $ $ $ $ $ Rooms, 2 WC, 2 Bath, 0 Shower $ $ $ $ $ $ Rooms, 4 WC, 4 Bath, 0 Shower $ $ $ $ $ $ Figure 6-1 shows historic and projected WW bills for residential customers using 10 Ccf per month compared to the national average for respondents to the National Association of Clean Water Agencies (NACWA) annual surveys through 2014 with their projection through As indicated in Figure 6-1, the residential bills for District customers have closely tracked the NACWA national average historically. The need to increase revenue to support the capital program and other needs identified in this Rate Proposal are expected to increase this variance between a District bill and the projected NACWA average. Figure 6-1 NACWA Rate Comparison Figure 6-2 presents the average single family WW bills for the largest 50 U.S. cities surveyed by AWWA/RFC in The typical bills of District customers are close to the median of the 50 largest cities. 6-4

81 SECTION 6 Customer Rate Impacts Figure 6-2 RFC Bill Comparison Residential WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 6-5

82 SECTION 6 Customer Rate Impacts WASTEWATER & STORMWATER RATE CHANGE PROPOSAL 6.3 Stormwater Impacts by Location and Customer Class Table 6-4 below presents a comparison of the current and proposed tax burden by location and by customer class. The impact to customers varies by location due to the varied tax rates described previously in Section 5.2. District-wide, the average single/multi-family annual tax burden would increase $7.50, while the average low income customer participating in our CAP would see an annual decrease of $2.06 and the average non-residential customer would see an annual increase of $ Customers in the City of St. Louis and near St. Louis County (the original boundary area) would see an increase to their overall tax bill of 0.3% on average. Customers in the OMCI area would see a decrease in their total annual tax bill of approximately 0.6% from the changes proposed in this document, while those customers in the Annexed area would see a 1.0% to 1.2% increase on average in their total annual tax burden. The analysis in Appendix is the basis for Table 6-4. Table 6-4 Stormwater Impacts Total District Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 2, $ $ 2, $ Change $ 7.50 $ 7.50 % Change 22.1% 0.3% Low Income $ $ 1, $ $ 1, $ Change $ (2.06) $ (2.06) % Change 11.8% 0.2% Non Residential $ $ 17, $ $ 17, $ Change $ $ % Change 18.0% 0.2% 6-6

83 SECTION 6 Customer Rate Impacts City and Near County WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 1, $ $ 1, $ Change $ 3.60 $ 3.60 % Change 28.8% 0.3% Low Income $ 8.39 $ $ $ $ Change $ 2.42 $ 2.42 % Change 28.8% 0.3% Non Residential $ $ 9, $ $ 9, $ Change $ $ % Change 28.8% 0.3% OMCI Districts Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 3, $ $ 3, $ Change $ (19.75) $ (19.75) % Change 32.0% 0.6% Low Income $ $ 1, $ $ 1, $ Change $ (8.04) $ (8.04) % Change 32.0% 0.5% Non Residential $ $ 17, $ $ 17, $ Change $ (117.75) $ (117.75) % Change 33.2% 0.7% 6-7

84 SECTION 6 Customer Rate Impacts Annexed Area WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Average Annual Stormwater Burden Current Tax Burden Proposed Tax Burden MSD Total MSD (10 ) Total Single/Multi Family $ $ 4, $ $ 4, $ Change $ $ % Change 475.8% 1.2% Low Income $ 5.38 $ 2, $ $ 2, $ Change $ $ % Change 474.8% 1.1% Non Residential $ $ 23, $ $ 23, $ Change $ $ % Change 412.8% 1.0% 6-8

85 SECTION 7 - APPENDIX WASTEWATER & STORMWATER RATE PROPOSAL APPENDIX SECTION 7.1 Key Proposal Assumptions This section contains supporting documents for the key assumptions used in projecting revenues and expenses throughout the rate model Inflation Customer Account Trend Water Usage Trend Unmetered Recalibration CIRP Appropriation Adjustments APPENDIX SECTION 7.2 CIRP and Consent Decree This section contains updated information regarding the District s compliance with the CD. This includes a CIRP project list and the Operation s Department Performance Metrics which represent two major components required to execute the CD Consent Decree Status Detailed WW CIRP Project List Operational Performance Metrics APPENDIX SECTION 7.3 Revenue Collection Efforts This section contains information regarding the steps put into place to enhance the District s collections strategy. Included is a brief overview of the strategy and some reports that present its progress Revenue Collection Efforts APPENDIX SECTION 7.4 Customer Assistance Program This section contains historical, current and projected data regarding the Customer Assistance Program. This also comprises information regarding the methods the District has applied to promote the program Customer Assistance Program

86 SECTION 7 - APPENDIX WASTEWATER & STORMWATER RATE PROPOSAL APPENDIX SECTION 7.5 Stormwater Funding This section contains supplemental information for the proposed Stormwater Funding. It includes the preliminary work done to decide the funding source as well as the current and proposed revenues and expenses Service Levels Detailed SW CIRP Project List APPENDIX SECTION 7.6 Customer Rate Impact Analysis This section contains some additional analyses done to determine the proposed average Stormwater tax burden and the forecasted outcome of the Wastewater rates beyond the four years in the rate proposal Rate Impact Analysis Impervious Fee Due Diligence Eight Year Rate Projections APPENDIX SECTION 7.7 Prior Rate Report Comparison This section compares the FY13 to FY16 Rate Change Proposal to Actuals in FY13 and FY14, Forecasts in FY15, and Budget in FY Year Comparison to Rate Report

87 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.1: Key Proposal Assumptions Research and Methodology Title: Inflation Supports: Inflation rates for Salaries, Benefits and Operations & Maintenance

88 Inflation Assumptions Inflation assumptions are used in the rate model as a way to account for anticipated price increases for the goods and services acquired by the District in fulfillment of its mission. The rate model uses inflation rates for operating and maintenance expenses as well as the construction, improvement, and replacement program (CIRP) expenses. William T. Gavin, Vice President and Review Editor, at the Federal Reserve Bank of St. Louis was consulted in determining what inflation assumptions to use in the rate model. Mr. Gavin reviewed a sample of the District s historical pricing data and determined that analysis of District specific information was unnecessary. Mr. Gavin stated that, in general, a 2% inflation rate for goods and services was a reasonable assumption. In support of this statement, he referred the District to multiple indices published by Federal Reserve Banks, the Social Security Administration, and the Congressional Budget Office to name a few. After performing a review of the recommended sources, the District chose to use The Budget and Economic Outlook: 2014 to 2024 published by the Congressional Budget Office of the Congress of The United States (CBO) as a source for inflation rates related to operations and maintenance expenses. Published in February of 2014, this document provided a 10 year forecast that best matched the District s rate model time horizon. Additionally, Table G 1 in this publication presented the Core PCE Price Index (excluding food and energy) which closely matched the 2% inflation rate recommended by Mr. Gavin. It is that index which was used in the model for most expenses. In that same table, a Consumer Price Index reported numbers slightly higher than 2%. This index is computed differently, but most importantly it includes food and energy which were excluded from the Core PCE Price Index. Since the index which includes energy forecasts a higher inflation rate, a higher rate was used for utilities in the rate model. Also on Table G 1, was an Employment Cost Index. This index was used as the basis for projected salary increases ranging from 2.9% to 3.2% over the 8 year period ending June 30, Adjustments were made to the CBO projections to account for regional differences, State and local government differences to private industry, and to remove benefits. Each of these adjustments served to lower the projected rate increases published by the CBO. Group insurance was inflated at rates ranging from 8% to 10% based on projections provided by the District s insurance consultant, Arthur J. Gallagher & Company.

89

90

91 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.1: Key Proposal Assumptions Research and Methodology Title: Customer Account Trend Supports: Projected number of billable customers

92 Customer Growth Overall, the MSD Customer base is projected to experience a decline over the coming years in the Residential and Commercial sectors (1.35% by 2025). Based upon the general population movement within the City and County of St. Louis, the Residential sector is projected to experience a larger decline for Residential and Multi Family Metered customers (1.23%) than their unmetered counterparts (0.24%). The Commercial sector is projected to experience the greatest decline of any account type by 2025 (6.41%) as the downward trend experienced within the past few years is expected to continue. This overall movement of the customer base is projected to have a direct impact on the projected usage as would with any shift in usage patterns occurring within the customer base. Analysis Summary Data Used Calculation Basis (Approach) Customer Growth Overall, the MSD Customer Base is projected to experience a small decline of 1.35% by 2025 (Graph 1.1). Analysis of customer growth in the Residential sector was rooted within the projected population movement data of the entire City and County of St. Louis as provided by State and National Governments. Leveraging the general movement of the population within the City and County, a proportionate movement factor was applied to the MSD customer base to create projections. To provide greater accuracy, projections were calculated based upon the specific account types and appropriate mathematical factors were applied. Specifically, Residential and Multi Family metered accounts are projected to decline by 1.23%, Residential and Multi Family unmetered accounts are projected to decline by 0.24%. Commercial accounts were projected using recent trends within the commercial sector and are projected to decrease by 6.41% by Missouri Department of Corrections, 1994, Institutional Admission and Release Reports. Missouri Department of Health and Senior Services, 1987, 1993, 1994, Total Fertility Rates and Age Specific Birth Rates: , , ; Abridged Life Tables by Sex, , , ; Live Births by Sex: April 1, and ; Resident Deaths by 1990 Age and Sex Cohort: April 1, U.S. Census Bureau, Census of Population and Housing: Summary File 4, Missouri. U.S. Census Bureau, Census of Population and Housing: Public Use Microdata Sample, 5%, Missouri. U.S. Census Bureau, Census of Population and Housing: Summary File 1, Missouri. U.S. Census Bureau, Census of Population and Housing: Summary File 3, Missouri. U.S. Census Bureau, Census of Population and Housing: Public Use Microdata Sample, 5%, Missouri. U.S. Census Bureau, Census of Population and Housing: Notes and Errata, Missouri. U.S. Census Bureau, Missouri Office of Administration, Cumulative Estimates of the Components of Population Change for the United States, Regions, and States: April 1, 2000 to July 1, 2007; Cumulative Estimates of the Components of Population Change for Counties of Missouri: April 1, 2000 to July 1, ECIS customer account data (account #, premise #, address, lat/long etc.) Voss, Paul R., McNiven, Hammer, Johnson, Fuguitt, County Specific Net Migration by Five Year Age Groups, Hispanic Origin, Race and Sex The calculation for projected customer base was created by leveraging the Census Bureau data to create yearover year projections of population movement for both the City and County of St. Louis. The data provided by the Government was structured in 5 year increments and by age groupings. The 5 year data was mathematically split into a year over year increments and then used to create a year over year movement factor which was applied to the entire MSD customer base (using yearend FY14 account numbers from the ecis system) based upon the specific account types to create customer projections through Specifically, metered Residential and Multi Family customer projections were calculated using the population movement factor within the City and County combined. Unmetered Residential and Multi Family customer projections were calculated using the population movement within the city. The unmetered accounts used the city movement factor due to the fact nearly all unmetered customers reside within the City of St. Louis. Commercial account projections were calculated using historical values across all tiers of Commercial accounts (COM1 COM5) for FY11 FY13. The year over year change in accounts was averaged across the 3 year timeframe to create a commercial movement factor. The movement factor was applied to the yearend FY13 commercial accounts data to create projections through 2025.

93 Graph 1.1 MSD Projected Number of Accounts 424, , , , , ,000 Projected # of Accounts 412, Projected # of Accounts Log. (Projected # of Accounts)

94 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.1: Key Proposal Assumptions Research and Methodology Title: Water Usage Trend Supports: Projected usage for metered customers

95 Customer Usage Two primary drivers of customer usage were accounted for and analyzed, the overall movement of the MSD customer base (calculated within the Customer Growth appendix) and shifts in usage patterns occurring within the customer base. To quantify shifts in usage within the customer base, changes in usage patterns within the customer population were analyzed to create a complete picture for the usage projections. Results showed the makeup of the non commercial customer base is projected to shift in the coming years as a larger proportion of customers will be comprised of younger generations who show to be more conscientious about their water conservation efforts. With a greater percentage of the customer base conserving more and projected slight reduction in the overall number of MSD customers, overall usage is expected to decline 6.68% by Specifically, the Residential sector is expected to decline by 2.91% and similar to the Commercial sector Customer Growth, Commercial usage is projected to continue a steady decline of 11.46% by Analysis Summary Data Used Calculation Basis (Approach) Customer Usage Across all MSD metered accounts the projected usage is expected to decline by 6.68% by the year 2025 (Graph 1.1) based upon several factors. For Residential and Multi Family metered accounts usage projections were created through a two step process. The first step of the usage analysis leveraged the customer growth analysis data to see how the MSD customer base movement would impact usage (i.e. fewer customers leading to decreased usage or more customers leading to increased usage). The second step of the analysis projected consumption by means of usage profiles as determined by Generational segmentation. Accounts were tagged as a specific Generation (Gen X, Gen Y, Baby Boomers, etc.) and an associated average consumption by generational group was created (Graph 1.2). Yearover year movement within each generational group was calculated (i.e. to what extent each Generational group is growing/shrinking), applied to the group average consumption and summed to determine overall projected usage. Combining these two factors (customer base movement and generational grouping consumption movement) was used to determine the overall change in consumption by identifying to what extent the overall MSD customer base numbers would grow/shrink and how usage patterns within the customer base will change. The overall Customer Usage projections, like the Customer Growth projections, were broken down and calculated based upon account type. Results showed a projected Missouri Department of Corrections, 1994, Institutional Admission and Release Reports. Missouri Department of Health and Senior Services, 1987, 1993, 1994, Total Fertility Rates and Age Specific Birth Rates: , , ; Abridged Life Tables by Sex, , , ; Live Births by Sex: April 1, and ; Resident Deaths by 1990 Age and Sex Cohort: April 1, U.S. Census Bureau, Census of Population and Housing: Summary File 4, Missouri. U.S. Census Bureau, Census of Population and Housing: Public Use Microdata Sample, 5%, Missouri. U.S. Census Bureau, Census of Population and Housing: Summary File 1, Missouri. U.S. Census Bureau, Census of Population and Housing: Summary File 3, Missouri. U.S. Census Bureau, Census of Population and Housing: Public Use Microdata Sample, 5%, Missouri. U.S. Census Bureau, Census of Population and Housing: Notes and Errata, Missouri. U.S. Census Bureau, Missouri Office of Administration, Cumulative Estimates of the Components of Population Change for the United States, Regions, and States: April 1, 2000 to July 1, 2007; Cumulative Estimates of the Components of Population Change for Counties of Missouri: April 1, 2000 to July 1, Voss, Paul R., McNiven, Hammer, Johnson, Fuguitt, County Specific Net Migration by Five Year Age Groups, Hispanic Origin, Race and Sex Experian Enrichment Summary report including a wide variety of demographic The first piece of the usage analysis was calculated using the same analytical method as the Customer Growth appendix, by population movement for the Residential sector and historical values for the Commercial sector. The generational usage segmentation piece of the analysis started with customer account tagging. Each customer account was tagged through the process of adjoining the Experian demographic data with the ecis customer account data to identify the age of the head of the household per account, allowing each account to be segmented into Generational groupings. Once generationally grouped, the average consumption for each Generation was calculated using the billing data from the ecis system. Next, the population movement by age data from the Census Bureau was overlaid on the generational groupings to identify the amount of growth/shrinkage occurring within each of the generation groupings for each year (subset shown in Graph 1.3). The percentage of the population represented by each generation was applied to their associated average consumption to create an overall weighted average consumption each year for all customers. The year to year movement provided a consumption movement factor based upon how consumption is projected to change within the population. The overall customer base movement factor along with the generational based consumption movement factor were combined and applied to yearend 2014 usage numbers from the ecis system to create the overall usage projections for

96 decline in usage of 2.91% for Residential and Multi Family metered accounts and a projected decline of 1.93% in usage for Residential and Multi Family unmetered accounts by Commercial usage projections were calculated in the same manner as the Commercial Accounts projections, using historical values, and results showed a projected decrease in usage of 11.46% by Graph 1.1 MSD Projected Usage variables (the INSOURCE Database contains coverage on approximately 235 million consumers in 113 million living units with more than 2,500 data elements, INSOURCE encompasses a wide range of consumer information). ecis customer account data (account #, premise #, address, lat/long etc.) ecis customer billing data (usage, bill amount etc.) Generational Data ( ving/infographic.boomer/) Residential and Multi Family metered customers. Commercial usage projections were calculated using historical usage across all tiers of Commercial accounts (COM1 COM5) for FY11 FY13. The year over year change in usage was averaged across the 3 year timeframe to create a commercial usage movement factor. The movement factor was applied to the yearend FY13 commercial usage data to create projections through Projected Usage (CCFs) 58,000,000 56,000,000 54,000,000 52,000,000 50,000,000 48,000, Projected Usage (CCFs) Log. (Projected Usage (CCFs)) Graph 1.2 MSD Residential Customer Generational Breakdown

97 Graph 1.3 MSD High Usage Residential Customer Population 25.0% High Usage Customer Base Projected Movement (% of Residential Customers) 20.0% 15.0% 10.0% Baby Boomers Gen X

98 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.1: Key Proposal Assumptions Research and Methodology Title: Unmetered Recalibration Supports: Rate change for unmetered customers

99 Metered/Unmetered Customer Comparison To be able to correctly compare metered to unmetered customers required calculation of an unknown variable, unmetered customer usage. To try and provide a usage estimate for these unmetered customers, a mathematical decomposition of the current basis for rates formula, which calculates billing based upon rooms, baths, etc., was completed to provide such an estimate for these customers based upon how they are currently being billed. Using this approach it was estimated the average usage for unmetered customers was 7.7 CCFs, which is higher than the known usage for metered customers at 6.3 CCFs. Understanding unmetered usage could easily be higher than, but not necessarily as high, as the estimated billed usage of 7.7, a second analysis was completed to estimate usage for unmetered customers. The second analysis was based upon demographic attributes of the customer account and leveraged attributes of the customer such as age, # of people in the household, region, etc. to determine an estimated average usage. Results of this analysis showed an average usage of 6.9 CCFs, roughly 10% higher than metered customer usage and nearly 10% lower than estimated unmetered usage by billing. Analysis Summary Data Used Calculation Basis (Approach) Metered vs. Unmetered The metered vs. unmetered analysis targeted the identification of estimated usage for unmetered customers to see how it compared with the known usage of the metered customers. Since usage is known for metered customers, the average CCFs was pulled from the billing system data (6.3 CCFs) to create a baseline for comparison against the unmetered customers. In order to create the comparison there had to be a CCF estimate calculated for their unmetered counterparts. To do this, estimated usage for unmetered customers was calculated through a reverse engineering approach to the current basis of rates for unmetered customers formula (based upon # of rooms, water closets, bath/showers) in tandem with account information data that provided the # of rooms, baths, etc. for unmetered accounts. The billing based analysis estimated usage for unmetered customers at 7.7CCFs. Understanding the above estimate is based upon billing and that it s unlikely the unmetered customer s usage is exactly the same as the metered customer s at 6.3 CCFs, an additional analysis was completed based upon demographic attributes of each customer to determine an estimated usage. This analysis targeted the various demographic characteristics of the people within the property to determine their estimated usage. The results from the analysis estimated an average usage of 6.9 CCFs for unmetered customers, roughly 10% lower than the Current Basis of Rates estimated usage (7.7 CCFs) and 11% above known metered customer average usage of 6.3 CCFs (Graph 1.1). While the imputed usage is only slightly higher, the variance between billed amounts shows a greater discrepancy, approximately 29% higher for Unmetered customers (Graph 1.2). ecis customer account data (account #, premise #, address, lat/long etc.) ecis customer billing data (usage, bill amount etc.) Experian Enrichment Summary report including a wide variety of demographic variables (the INSOURCE Database contains coverage on approximately 235 million consumers in 113 million living units with more than 2,500 data elements, INSOURCE encompasses a wide range of consumer information). A data pull from the ecis billing system was used to sum then average the usage for metered customers. The estimated usage analyses completed for the unmetered customers had two different approaches. The first analysis leveraged the current MSD Basis of Rates for the unmetered customers formula (Image 1.1), which calculates usage based upon the number of rooms ( CCFs per), water closets ( CCFs per), and baths/showers ( CCFs per). The total number of rooms, water closets, and bath/showers were summed for all unmetered customers from the ecis system and multiplied by their corresponding CCF rate calculation to create a total estimated usage for all unmetered customers. This aggregate usage was then divided amongst the total number of unmetered customers to create a per unmetered customer estimated average usage. The second analysis calculated estimated usage for unmetered accounts using a statistical method referred to as Multiple Imputation of Chained Equations (MICE). Whereas most statistical procedures exclude observations with any missing values from the analysis, the MICE algorithm replaces each missing value (usage) with a set of plausible values that represent the uncertainty about the right value to impute. The multiple imputed data sets are then analyzed by using standard procedures for complete data and combining the results from these analyses. The result in this analysis being the known variables (various

100 In addition to the usage comparison analyses, typical customer profiles were also completed for metered and unmetered customers (Table 1.1). demographic attributes for each customer) were used to impute a value for the unknown variable of estimated average usage for unmetered customers. Table 1.1 Metered vs. Unmetered Customer Profiles Metered Unmetered Number of Persons in Household Two One Estimated Household Income $50,000 $74,999 $50,000 $74,999 Education Level Bachelor Degree High School Diploma/ Some College Region 60% in OMCI 99.75% in City Predominate Generational Group 45% in Baby Boomers 41% in Baby Boomers Graph 1.1 Metered vs. Unmetered Usage Comparison Metered vs. Unmetered Usage (Avg. CCFs Monthly) Metered Avg. Usage Unmetered IMPUTED Avg. Usage Graph 1.2 Metered vs. Unmetered Billed Amount Comparison Metered vs. Unmetered Billing (Avg. Monthly Bill) $27.76 $35.94 Metered Avg. Monthly Bill Unmetered Avg. Monthly Bill

101 Image 1.1 MSD Current Basis of Rates for Non Metered Customers

102 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.1: Key Proposal Assumptions Research and Methodology Title: Capital Improvement and Replacement Program (CIRP) Appropriation Adjustments Supports: Adjustments to CIRP project list

103 Capital Improvement and Replacement Program (CIRP) Appropriation Adjustments The project list that makes up the CIRP budget over this period consists of projects needed to meet the region s obligations under the consent decree. These include: 1. Projects identified in the SSO Master Plan to ensure system capacity and enable the removal of sanitary sewer overflows 2. Projects to meet compliance with the CSO Long Term Control Plan 3. Projects to renew the wastewater system to meet consent decree goals 4. Projects to meet consent decree targets for Cityshed and Green Infrastructure investment These consent decree specific projects are supported by numerous other capital program budget items which are needed to deliver the program. As well, projects include reinvestment in the area s wastewater treatment and pump station facilities to ensure operating permit compliance, sustainability, and the continued, proper operation of these industrial facilities. Where economically beneficial, a number of sustainability projects are included to keep MSD cost competitive and efficient. A minimal amount of stormwater projects are included, as well, located in those areas where taxing districts exist to pay for such work. Projects are scheduled to build the highest priority projects first, while still meeting consent decree deadlines. Many projects must be built in a specific sequence due to their size, the interaction between various sections of the wastewater system, and to prevent any increase in environmental pollution while the projects are being constructed. The cost estimates that the CIRP budget is based on are conceptual in nature and are in fiscal year dollars. At this stage, there is typically limited information on public and private inflow and infiltration sources, and, for sewer and tunnel projects, a minimal amount of detailed information available regarding geotechnical conditions, utility relocation requirements, easement requirements, and other site specific issues that have the potential to significantly affect the project s eventual construction cost. As projects proceed through design, these issues are fully evaluated and their impacts are incorporated into final design cost estimates, which are reflected annually in the District s budget supplement, which details the capital program anticipated for the next fiscal year. For large or multi year projects, budgeting incorporate a phasing approach, such that the annual appropriation amount for a given project in a given year, equals the anticipated spending need in that year. For example, a tunnel project which is expected to take six years to construct will have its budget spread out over those six years. This phasing is evaluated and implemented on a project by project basis, and lessens the annual amount of appropriations requested, to better match anticipated needs.

104 To initiate the CIRP budget preparation, Engineering provides Finance with a project list, including estimated budget costs, as well as cost summary schedules that group projects in multiple ways. The first grouping is by wastewater or stormwater. Wastewater projects are additionally grouped by type, such as treatment plant, combined sewer overflow, or asset management. The estimated costs are further broken down depending on whether they are for engineering or construction services. These summary numbers are then adjusted for three different factors. The first adjustment involves inflating estimated costs to account for price increases between now and the time the project starts. The Engineering News Record 1 was the source for inflation assumptions related to the CIRP. They provide, on their website, a city construction cost index for their subscribers. The average annual construction inflation rate for the 12 months ended August 31, 2014, in the St. Louis area is 2.5%. That rate was employed in the rate modeling process to annually inflate project cost estimates from fiscal year dollars. The second adjustment performed on the CIRP estimates accounts for delays in appropriation timing that can occur, due to such factors as the easement acquisition process or condemnation. Capital program appropriations are spread throughout the fiscal year, as it is impractical to deliver the entire annual program immediately at the start of the fiscal year. When delays occur, some appropriations will shift from one fiscal year to the next. Appropriations during the two most recent years averaged 86% of the annual budgeted appropriations. Using this 86% factor, an appropriation delay was introduced into the numbers. The inflated costs for any given year were reduced by 14%, and that 14% was shifted into the next fiscal year, thus reducing the total expected appropriations slightly over the course of the 4 year rate cycle. Finally, it is common for projects to finish with some of the appropriation left unspent. We refer to these dollars which are returned to fund balance as liquidations. Liquidations occur if projects do not need to utilize their full utility relocation allowance, if the full budget contingency for change orders is unused, or if final in place quantities of constructed items are less than bid estimates. An analysis of completed projects revealed that on average, 8% of a project s appropriation is liquidated at the end of the project. While the timing of these liquidations vary from project to project, it is common for these liquidations to occur approximately three years after the appropriation. Therefore, projected appropriations in each year were decreased by 8% of appropriations three years prior. After inflation, appropriation delays, and liquidations, the resulting wastewater program is valued at $1,493,379,657 over four years. This number is lower than the base projection of $1,505,144,000 by 0.8%. 1

105

106 Summary Schedule of Adjustments to WW CIRP Projections Total Engineering Numbers $ 350,426,000 $ 351,620,000 $ 369,560,000 $ 433,538,000 $ 391,829,000 $ 429,030,000 $ 421,790,000 $ 326,790,000 $ 3,074,583,000 1 Inflation Rates (2.5% 2013 Base Cost) % % % % % % % % Inflated Values $ 359,186,650 $ 369,420,763 $ 397,975,699 $ 478,544,833 $ 443,318,549 $ 497,543,267 $ 501,375,764 $ 398,161,883 $ 3,445,527,408 % Change from Engineering Numbers 2.5% 5.1% 7.7% 10.4% 13.1% 16.0% 18.9% 21.8% 12.1% 2 Appropriation Delay (86%/14%) $ 350,628,919 $ 367,987,987 $ 393,978,008 $ 467,265,154 $ 448,250,228 $ 489,951,807 $ 500,839,214 $ 412,611,826 $ 3,431,513,144 % Change from Inflated Numbers 2.4% 0.4% 1.0% 2.4% 1.1% 1.5% 0.1% 3.6% 0.4% Example: $359,186,650 x 14% + $369,420,763 x 84% = $367,987,987 3 Liquidation (8% 3 years delayed) $ 333,360,347 $ 347,332,989 $ 373,471,480 $ 439,214,841 $ 418,811,190 $ 458,433,566 $ 463,458,002 $ 376,751,808 $ 3,210,834,223 % Change from Appropriation Delay Numbers 4.9% 5.6% 5.2% 6.0% 6.6% 6.4% 7.5% 8.7% 6.4% Example: $467,265,154 8% x $350,628,919 = $439,214,841 Net Change from Original $ (17,065,653) $ (4,287,011) $ 3,911,480 $ 5,676,841 $ 26,982,190 $ 29,403,566 $ 41,668,002 $ 49,961,808 $ 136,251,223 % Change from Engineering Numbers 4.9% 1.2% 1.1% 1.3% 6.9% 6.9% 9.9% 15.3% 4.4% Assumption Notes: 1 Inflation rates were taken from the St. Louis index published by the Engineering News Record. An average rate for the 12 months ended September 30, 2014 according to this index was 2.5%. 2 The key performance measure, construction budget performance, from the FY14 and FY15 budget books showed 84% and 88%, respectively. 3 A sample of over 250 completed projects of various types and sizes were analyzed, and the overall liquidation percentage from that sample was 8%.

107 Summary Schedule of Adjustments to SW CIRP Projections Total Engineering Numbers $ 16,370,200 $ 10,422,000 $ 16,112,000 $ 6,999,000 $ 4,235,000 $ 3,980,000 $ 1,525,000 $ $ 59,643,200 1 Inflation Rates (2.5% 2016 Base Cost) % % % % % % % % Inflated Values $ 16,779,455 $ 10,949,614 $ 17,350,862 $ 7,725,586 $ 4,791,514 $ 4,615,580 $ 1,812,746 $ $ 64,025,356 % Change from Engineering Numbers 2.5% 5.1% 7.7% 10.4% 13.1% 16.0% 18.9% N/A 7.3% 2 Appropriation Delay (86%/14%) $ 16,769,801 $ 11,765,792 $ 16,454,687 $ 9,073,125 $ 5,202,284 $ 4,640,211 $ 2,205,143 $ 253,784 $ 66,364,826 % Change from Inflated Numbers 0.1% 7.5% 5.2% 17.4% 8.6% 0.5% 21.6% N/A 3.7% Example: $16,779,455 x 14% + $10,949,614 x 84% = $11,765,792 3 Liquidation (8% 3 years delayed) $ 18,441,451 $ 14,188,194 $ 18,219,224 $ 10,731,541 $ 4,261,021 $ 3,323,836 $ 1,479,293 $ (162,398) $ 70,482,161 % Change from Appropriation Delay Numbers 10.0% 20.6% 10.7% 18.3% 18.1% 28.4% 32.9% 164.0% 6.2% Example: $9,073,125 8% x $16,769,801 = $10,731,541 Net Change from Original $ 2,071,251 $ 3,766,194 $ 2,107,224 $ 3,732,541 $ 26,021 $ (656,164) $ (45,707) $ (162,398) $ 10,838,961 % Change from Engineering Numbers 12.7% 36.1% 13.1% 53.3% 0.6% 16.5% 3.0% N/A 18.2% Assumption Notes: 1 Inflation rates were taken from the St. Louis index published by the Engineering News Record. An average rate for the 12 months ended September 30, 2014 according to this index was 2.5%. 2 The key performance measure, construction budget performance, from the FY14 and FY15 budget books showed 84% and 88%, respectively. 3 A sample of over 250 completed projects of various types and sizes were analyzed, and the overall liquidation percentage from that sample was 8%.

108 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.2: Consent Decree CIRP Impact Title: Consent Decree Status Supports: Overview of Consent Decree with Environmental Protection Agency and the Missouri Coalition for the Environment

109 MSD Major Consent Decree Components - Update Document 1 2 Major Federal Consent Decree Components Status (Spetember 2014) Schedule and Estimated Cost - The Consent Decree will have an implementation schedule of 23 years after the Combined Sewer Overflow ("CSO") Long Term Control Plan is approved by the State of Missouri. The District estimates the cost to comply with the Consent Decree to The Consent Decree Program is currently tracking on schedule and within estimated be $4.7 billion in 2010 dollars. costs. Early Elimination Projects - Requires the completion of sanitary sewer projects that will eliminate 50 specific constructed Sanitary Sewer Overflow ("SSO") Outfalls by December 31, MSD completed the sanitary sewer projects necessary and achieved the performance milestone of eliminating all fifty (50) constructed Sanitary Sewer Overflow ("SSO") Outfalls by December 31, SSO Master Plan- Requires the submission of an SSO Master Plan that includes an extensive sewer system evaluation survey, hydraulic modeling,.and capacity analysis of the sanitary sewer system. The SSO Master Plan will identify remedial measures and projects aimed at eliminating all constructed SSO Outfalls, known SSOs, treatment plant bypassing within the sanitary sewer system, and reducing building backups. This plan must be submitted by the District no later than December 31, MSD submitted a Master Plan to the United States Environmental Protection Agency ("EPA") and the Missouri Department of Natural Resources ("MDNR") for review and EPA approval with a copy to the Coalition for the Environment by the required deadline of December 31, The SSO Master Plan provides the remedial measures and the associated remedial requirements (elimination dates) for the remaining Constructed SSO Outfalls. MSD received approval of the Master Plan with conditions on May 5, 2014, with clarification on June 24, Remedial Measures - Requires the completion of the remedial measures and elimination projects identified in the SSO Master Plan in accordance with the schedule provided therein, which includes the removal of 85 percent of the constructed SSO Outfalls, and a goal of eliminating all other known SSOs by no later than December 31, 2023, and all remaining constructed SSO Outfalls by December 31, The completion of remedial measures and elimination projects identified in the SSO Master Plan are proceeding in accordance with approved schedule provided. 5 6 CMOM Program-Requires the District to continue its development and implementation of a Capacity, Management, Operations, and Maintenance (CMOM) program that includes detailed performance goals for the prioritization, cleaning, inspection, and rehabilitation of the entire sewer system. This program also includes continued implementation of the District's Fats, Oils, and Grease (FOG) program, the development and implementation of a Private Inflow and Infiltration Reduction Program, Building Backup Response Plan, and a Non-Capacity Related SSO Response Plan. Cityshed Mitigation Program - Requires the commitment of a regular annual program to mitigate the effects of wet weather surcharging and overland flooding of the combined sewer system, with an anticipated expenditure of $230 million over the life of the Consent Decree. MSD is currently implementing the CMOM program requirements submitted to US EPA and MDNR on October 27, 2012 with approval on January 10, Additionally MSD continues to implement it's FOG program, Building Backup Response Plan, and Non-Capacity Related SSO Response Plans submitted to US EPA and MDNR on July 25, 2012 and subsequesntly approved on December 18, MSD continues to implement the Private Inflow and Infiltration Reduction Program as submitted to US EPA and MDNR on October 27, The District has implemented annual projects to mitigate the effects of wet weather surcharging and overland flooding in the combined sewer system. The program is currently tracking on schedule. This work has been primarily consisted of buyouts of floodprone areas, basement protection for homes, and combined relief sewer systems. 09/19/2014

110 MSD Major Consent Decree Components - Update Document 7 CSO Long Term Control Plan (LTCP) -Requires the construction and implementation of CSO control measures in accordance with the requirements and schedule set forth in the approved LTCP and Consent Decree. The projects in the LTCP will be completed 23 years after the LTCP is approved by the State of Missouri. MSD is progressing with meeting the requirements for construction and implementation of the CSO control measures set forth in the CD and CSO Long Term Control Plan. As of this time MSD has started construction on the Lemay Redundanct Forcemain project, and the Lemay WWTP Capacity Improvement projects. Both projects will allow the Leamy WWTP to receive and treat additional wet weather flow through its processes. The District is on schedule to meet all milestones of the CD. 8 CSO Post Construction Monitoring Program - Requires the implementation of a Post Construction Monitoring Program to validate performance of completed CSO control measures as set forth in the approved LTCP and Consent Decree. Upon completion of CSO control measures MSD will implement this program. MSD submitted and received approval for the Quality Assurance Project Plan as part of the CSO Post Construction Monitoring Program on January 31, MSD also submitted the Post-Construction Monitoring Program Plan on April 27, 2013 and implemented the plan on June 20, Detailed monitoring plans will be developed and submitted for approval as control measures are designed and constructed. 9 CSO Green Infrastructure Program-Includes the commitment of $100 million to implement a Green Infrastructure Program. This will include a five-year pilot program aimed at using green infrastructure to reduce stormwater and resulting CSO volumes. MSD has completed the design and construction of the CSO Green Infrastructure (GI) Pilot project. MSD has met the CD financial requirements and initiated preparation of the Pilot Program report required by the CD for submittal by December 31, In addition, as allowed by the CD, MSD has implemented an Early Action GI program to provide CSO GI Improvements prior to approval of the pilot program report. This program allows for construction of CSO reducing GI with EPA approval. MSD has appropriated approximatly $13.7 million toward the EA program. Both programs progress MSD to the $100 million committment Consent Decree Reporting -Requires significant and continuous detailed reporting and transparency on all activities identified above, as well as reporting progress in achieving the overall goals of the Consent Decree to eliminate and reduce sewer system overflows. The annual reports will be made available on the District's website. Supplemental Environmental Project (SEP) - To offset civil penalties, the District will spend $1.6 million dollars for a SEP program that will implement a sewer connection and septic tank closure program for low-income residents. This program must be completed within five years of the effective date of the Consent Decree. MSD has met all reporting requirements for the consent decree. Reports identify all componenets for measuring progress on CD compliance. All required reporting has been posted on the MSD website. MSD is progressing with the completion of this program. The program has been slowed by the inabilty to find the necessary low income homeowners meeting the qualifications of the program. MSD has requested approval for an alternative SEP on September 9, This alternative has received verbal approval and is pending formal approval. MSD is seeking an extension of the completion date currently in the CD. 09/19/2014

111 MSD Major Consent Decree Components - Update Document Civil Penalty - Within 30 days of the effective date of the Consent Decree, the District will pay the United States $1,200,000 as a civil penalty. This penalty is consistent with public entities of similar size that have begun the process of addressing overflow issues. Stipulated Penalties - The District will be subject to stipulated penalties if it fails to meet certain specified requirements outlined in the Consent Decree. Coalition for the Environment-In settlement of the Coalition's claim for costs of litigation, including attorneys' fees, the District will pay $116,050 to be used to fund projects as determined by joint agreement between the District and the Coalition. The Consent Decree also requires the District to provide a copy of various documents and reports to the Coalition. MSD complied with the required payment of Civil Penalties to the United States. MSD has met this requirement of the CD. There have been no stipulated penalties. MSD complied with the required payment of claims to Missouri Coalition for the Environment. 09/19/2014

112 Appendix WASTEWATER & STORMWATER RATE PROPOSAL Appendix Section 7.2: Consent Decree CIRP Impact Title: Detailed CIRP Project List Supports: CIRP expenses

113 Wastewater CIRP Project List Project Number Long Name BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017) CCTV INSPECTION OF SEWERS (2017) CORPS OF ENGINEERS LOWER RIVER DES PERES FEASIBILITY STUDY CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT A GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT B GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT C GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2015) CONTRACT D INFRASTRUCTURE REPAIRS (WASTEWATER) (2017) LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA (2017) RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) STREAM FLOW WATER QUALITY SAMPLING (2017) ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND DOUGHERTY FERRY RD) ASHBROOK I/I REDUCTION (ASHBROOK DR AND CHAMBERS RD) Description Budget Amount Financial Year Project Type Desc Problem Description PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY17 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 2,000,000 FY17 Wastewater PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 1,000,000 FY17 Wastewater PROVIDE THE REQUIRED LOCAL MATCH FOR A FEDERAL FEASIBILITY STUDY TO DEFINE A FEDERAL PROJECT FOR WATER QUALITY AND OTHER IMPROVEMENTS IN THE LOWER RIVER DES PERES AREA. 500,000 FY17 Unallocated INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY17 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY17 Wastewater PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 70,000 FY17 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 70,000 FY17 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 70,000 FY17 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 70,000 FY17 Unallocated AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 1,500,000 FY17 Wastewater FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. THE CORPS OF ENGINEERS REQUIRES A LOCAL MATCH FOR A FEASIBLITY STUDY TO DEFINE A FEDERAL ENVIRONMENTAL PROJECT IN THE LOWER RIVER DES PERES AREA. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY17 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION. DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY17 Wastewater INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 135,000 FY17 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY17 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND DESIGN EFFORTS. 560,000 FY17 Unallocated PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 650,000 FY17 Unallocated CONSTRUCT 460 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 11,000 FEET OF 8-INCH TO 24-INCH SEWER. 60,000 FY17 Wastewater DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR WATER QUANTITY & QUALITY EVALUATION OF STREAMS. STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS. EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS IN THE ADAMS STUDY AREA. CONSTRUCT 400 FEET OF 10-INCH SANITARY SEWER. REHABILITATE 5,900 FEET OF 8-INCH TO 15-INCH SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 105,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SEWERS BADEN CREEK EXTENSION (BP-001) - I/I REDUCTION REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWER, AND REMOVE CONSTRUCTED SSO BP ,250,000 FY17 Wastewater BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. 60,000 FY17 Wastewater EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. EXCESSIVE INFLOW AND INFILTRATION CAUSING BUILDING BACKUPS, OVERCHARGING SANITARY SEWERS, AND ACTIVATING A CONSTRUCTED SSO BISCHOFF - EDWARDS TO MARCONI COMBINED SEWER RELIEF CONSTRUCT SEPARATE SANITARY SYSTEM AND A WET WEATHER PUMP STATION. 600,000 FY17 Wastewater BUILDING BACKUPS DUE TO OVERCHARGED MAINS BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT B BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT C REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 3,540,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 4,675,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 4,250,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT F REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACE METHOD. 4,000,000 FY17 Wastewater BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2018) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2018) CONTRACT B DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 280,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 210,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.

114 Wastewater CIRP Project List Project Number Long Name BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Description Budget Amount Financial Year Project Type Desc Problem Description PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 345,000 FY17 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. BISSELL POINT WWTF SOUTH ASH LAGOON FLOOR REPLACEMENT REPAIR AND REPLACE AS NEEDED 160,000 SQUARE FEET OF FLOOR. 800,000 FY17 Wastewater REMOVE EXCESSIVE I/I FROM THE PUBLIC SEWER BY CONSTRUCTING 1,100 FEET OF 8-INCH SANITARY SEWER AND BY REMOVING PRIVATE DEFECTS. 320,000 FY17 Wastewater ASH LAGOON FLOORING IS DAMAGED AND REQUIRES REPAIR AND/OR REPLACEMENT. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS BLACK CREEK SANITARY SEWER AND I/I REDUCTION BRIDGEVALE I/I REDUCTION (BRIDGEVALE AVE AND LAKEVIEW AVE) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 80,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS CALVARY CEMETERY STORAGE BASIN CONSTRUCT STORAGE BASIN FOR FLOWS FROM OVERCHARGED SOUTH BADEN TRUNK SEWER. 500,000 FY17 Wastewater OVERCHAGED TRUNK SEWER CAULKS CREEK FORCEMAIN (RIVER VALLEY RD TO L-52) CONSTRUCT 17,000 FEET OF 30-INCH FORCEMAIN AND 1,000 FEET OF 36-INCH SANITARY SEWER 7,400,000 FY17 Wastewater EXISTING FORCE MAIN IS UNDERSIZED AND 30 YEARS OLD CAULKS CREEK FORCEMAIN REHABILITATION LINE 10,000 FEET OF 20 AND 24-INCH FORCE MAIN FROM PUMP STATION A TO 36-INCH FORCE MAIN. 2,400,000 FY17 Wastewater FORCE MAIN CONVERSION TO REDUNDANT FORCE MAIN REQUIRES LINING DUE TO AGE AND CONDITION CAULKS CREEK TRUNK SEWER (SKME-011) PHASE I CONSTRUCT 13,580 FEET OF 8-INCH TO 36-INCH DIAMETER SANITARY RELIEF SEWERS. 3,270,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS CELLA - ROLLING ROCK - GLEN CREEK SANITARY SEWER AND PUBLIC I/I REDUCTION CONSTRUCT 8-INCH SANITARY SEWER LINES TO REPLACE DEFICIENT 6-INCH SANITARY SEWER LINES. 510,000 FY17 Wastewater CHAPEL HILL I/I REDUCTION (MATTIS RD AND VENARDE DR) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 140,000 FY17 Wastewater COLDWATER UPSTREAM PUMP STATION (P-180) STORAGE CONCORDIA I/I REDUCTION (NE QUAD CLAYTON RD AND BIG BEND BLVD) CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS CONSTRUCT 530 FEET OF 96-INCH PIPE IN ORDER TO PROVIDE 170,000 GALLONS OF TEMPORARY STORAGE. 170,000 FY17 Wastewater CONSTRUCT 435 FEET OF 8-INCH SANITARY SEWER AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 520,000 FY17 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS. 9,300,000 FY17 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNEL SYSTEM AND UPPER RDP TUNNEL SYSTEM. 3,100,000 FY17 Wastewater DEFICIENT NON-STANDARD 6-INCH SEWER LINES CONTRIBUTING TO BUILDING BACKUPS AND SANITARY SEWER OVERFLOWS. INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS IN SOME SEGMENTS OF SEWER. PUMP STATION HAS INSUFFICIENT CAPACITY FOR THE 5-YR STORM, AND DOES NOT HAVE PROVISIONS FOR EMERGENCY STORAGE. EXCESSIVE INFLOW AND INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT. 2,944,000 FY17 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA THE CONSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OR OTHER FACILITIES CREVE COEUR CREEK PUBLIC I/I REDUCTION SOUTH REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACE PIPE METHOD. 5,900,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE VI (SKME-021) DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551) DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE I DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT A DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT B DEER CREEK PUBLIC I/I REDUCTION (2018) CONTRACT A DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) SIXTH PHASE OF TRUNK SEWER RELIEF PROJECT. CONSTRUCT 4,400 FEET OF 18-INCH TO 24-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP-036 AND BP ,000 FY17 Wastewater OVERCHARGED TRUNK SEWER. CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-515 AND BP ,000,000 FY17 Wastewater TWO SSOS AND A PUMP STATION REQUIRE ELIMINATION. CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATE SURCHARGING. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-155, BP-170, BP-198, BP-348, BP-349, BP-545, AND BP ,000,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 6,620,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 5,050,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 210,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 515,000 FY17 Wastewater CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF. 1,500,000 FY17 Wastewater DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 50,000,000 FY17 Wastewater DELCREST SANITARY RELIEF (SKME-565) I/I REDUCTION EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2017) ELINOR AVE. TEMPORARY SANITARY STORAGE FACILITY FF-04 QUIET VILLAGE SANITARY RELIEF (THAMES COURT TO FIESTA CIRCLE) CONSTRUCT 440 FEET OF 12-INCH STORM SEWERS AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 200,000 FY17 Wastewater PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 2,000,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES. CONSTRUCT 600 FEET OF 84-INCH SEWER IN ORDER TO PROVIDE 150,000 GALLONS OF TEMPORARY STORAGE. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY17 Wastewater ELIMINATION OF CONSTRUCTED SSO OUTFALL REQUIRED. CONSTRUCT 2,160 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,100,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF CONSTRUCT 9,940 FEET OF 27-INCH TO 36-INCH SANITARY RELIEF SEWERS FROM SCHUETZ ROAD NEAR MEADOWSIDE DRIVE NORTHWEST TO ADIE ROAD. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS FORDER SANITARY INTERCONNECTION (FORDER RD TO RINGER RD) CONSTRUCT 400 FEET OF 20-INCH SANITARY SEWER. 40,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.

115 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 200 FEET OF 72-INCH PIPE IN ORDER TO PROVIDE 44,000 GALLONS OF ADDITIONAL WET FOREST VIEW PUMP STATION (P-483) IMPROVEMENTS WEATHER STORAGE AT PUMP STATION P ,000 FY17 Wastewater FREDERICK STREET COMBINED SEWER RELIEF CONSTRUCT GREEN INFRASTRUCTURE SOLUTIONS TO ALLEVIATE SYSTEM PROBLEMS. 500,000 FY17 Wastewater OVERCHARGED MAINS, BUILDING BACKUPS AND FLOODING FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I REDUCTION (S QUAD I-64 AND CLAYTON RD) REHABILITATE 15,300 FEET OF 8-INCH TO 15-INCH SEWER. REHABILITATE 85 MANHOLES. 200,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS GASLIGHT SQUARE SEWER IMPROVEMENTS GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2016) GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2016) GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2017) CONTRACT A GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2017) CONTRACT B GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2017) CONTRACT C GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT A GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT B GENERAL SERVICES AGREEMENT - SEWER DESIGN (FY2013) CONTRACT C GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT A GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT B GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT C GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT D IMPROVEMENTS IN GASLIGHT SQUARE AREA TO REDUCE BUILDING BACKUPS, TO INCLUDE STRAPPED PLUMBING RETROFITS FOR 95 BUILDINGS, OR PRIVATE PUMP STATION. 4,000,000 FY17 Wastewater RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 250,000 FY17 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 300,000 FY17 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2018 BASED ON PERFORMANCE. 50,000 FY17 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2018 BASED ON PERFORMANCE. 50,000 FY17 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2018 BASED ON PERFORMANCE. 50,000 FY17 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. 90,000 FY17 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. 90,000 FY17 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2015 BASED ON PERFORMANCE. 90,000 FY17 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 50,000 FY17 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 50,000 FY17 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 50,000 FY17 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 50,000 FY17 Wastewater GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT E GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2016) CONTRACT E 50,000 FY17 Wastewater GEYER SANITARY RELIEF AND WINDSOR SPRINGS P-521 STORAGE (BIG BEND BLVD TO WINDSOR SPRINGS DR) GLENDALE SECTION D SANITARY RELIEF PHASE V (SKME-624) I/I REDUCTION GRAND GLAIZE WWTF BUILDING, SWITCHGEAR, TANK AND SCREEN REPAIRS GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V (SKME -521) GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III, IV AND V COLLECTOR/CONNECTOR SEWERS GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VI (SKME-521) GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) OVERCHARGED COMBINED SEWERS CAUSING WET WEATHER BUILDING BACKUPS. CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. CONSTRUCT 5,300 FEET OF 6-INCH FORCEMAIN. CONSTRUCT 500 FEET OF 96-INCH PIPE IN ORDER TO PROVIDE 188,000 GALLONS OF TEMPORARY STORAGE. 420,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT STORM SEWERS IN ORDER TO FACILITATE REMOVAL OF AREA DRAINS FOR 50 PROPERTIES. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,335,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. CONSTRUCT REPAIRS TO ADDRESS BUILDING SETTLING, TANK DETERIORATION, SWITCHGEAR PROBLEMS, AND INFLUENT PUMPING STATION SCREEN ISSUES. 1,000,000 FY17 Wastewater BUILDING AND TANK DETERIORATION, AND SWITCHGEAR AND SCREEN RELIABILITY ISSUES. CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH SANITARY TRUNK SEWER. PROJECT INCLUDES REMOVAL AND REPLACEMENT OF A UNION PACIFIC RAILROAD TRACK SPUR. 244,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 5,400 FEET OF 8-INCH TO 21-INCH SANITARY SEWER. ABANDON 8,500 FEET OF 60-INCH TO 72-INCH EXISTING SEWER. 300,000 FY17 Wastewater COLLECTION SEWERS NEED TO BE CONNECTED TO THE NEW GRAVOIS TRUNK. OLD TRUNK SEWER NEEDS TO BE ABANDONED. SIXTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE CONSTRUCTION OF 11,000 FEET OF 8-INCH TO 72-INCH DIAMETER SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT SANITARY STORAGE FACILITY TO STORE WET WEATHER SANITARY FLOW, TO MITIGATE SURCHARGING AND ELIMINATE TWO CONSTRUCTED SSOS. 3,000,000 FY17 Wastewater WET WEATHER I/I CAUSING SYSTEM SURCHARGING AND CONSTRUCTED SSO ACTIVATION. GREEN PARK AND LAKESHIRE I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) PERFORM PRIVATE I/I REDUCTION AT 35 PROPERTIES. 550,000 FY17 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS. GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) REHABILITATE 44,000 FEET OF 8-INCH TO 15-INCH PUBLIC SEWER. 135,000 FY17 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS. HARLEM - BADEN RELIEF PHASE IV (HEBERT) (IMPROVEMENTS FROM BASIN TO HAMILTON TRUNK) HARLEM BADEN RELIEF PHASE IV (HEBERT) - DARVER TO 69TH STREET TRUNK SEWER DESIGN AND CONSTRUCTION OF A DETENTION BASIN TO RELIEVE BASEMENT BACKUPS AND FLOODING IN A LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNK SEWERS. IMPROVEMENTS ARE PLANNED TO BE CONSTRUCTED BY CORPS OF ENGINEERS CSO REDUCTION EFFORTS IN THE CITY OF ST 3,900,000 FY17 Wastewater CONSTRUCT 8,550 OF 8-INCH TO 48-INCH TRUNK SEWER, 70 FEET OF PIPE IN TUNNEL, AND 3,000 FEET OF SEWER LINING. 670,000 FY17 Wastewater STREET FLOODING AND BASEMENT BACKUPS DUE TO OVERCHARGED COMBINED SEWERS. BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK SEWER REHABILITATION CONSTRUCT 109,900 FEET OF SHOTCRETE LINER, 1,240 FEET OF CIPP LINING, AND 6,400 SQUARE FEET OF SPOT REPAIRS. 440,000 FY17 Wastewater BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS HARMANN ESTATES PUMP STATION (P-709) REPLACEMENT REPLACE PUMP STATION P ,000 FY17 Wastewater PUMP STATION P-709 NEEDS TO BE REPLACED HARRISON SANITARY RELIEF (GRAND AVE TO W ROSE HILL AVE) CONSTRUCT 700 FEET OF 18-INCH SANITARY SEWER. 63,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.

116 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 3,850 FEET OF 15-INCH SANITARY SEWER AND I/I REDUCTION. ELIMINATE CONSTRUCTED HERMITAGE SANITARY RELIEF (SKME-615) SSO OUTFALLS BP-181, BP-333, BP-343, AND BP ,000 FY17 Wastewater HOLLENBERG PUMP STATION (P-713) REPLACEMENT REPLACE PUMP STATION P ,000 FY17 Wastewater PUMP STATION P-713 NEEDS TO BE REPLACED INFRASTRUCTURE REPAIRS (REHABILITATION) (2017) CONTRACT A INFRASTRUCTURE REPAIRS (REHABILITATION) (2017) CONTRACT B INFRASTRUCTURE REPAIRS (WASTEWATER) (2017) JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 2,500,000 FY17 Wastewater AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 2,500,000 FY17 Wastewater AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 5,500,000 FY17 Wastewater CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS. 130,000 FY17 Wastewater JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 6,195,000 FY17 Wastewater OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS JENNINGS STATION ROAD / NORTH BADEN BASIN CONSTRUCT DETENTION BASIN IN AREA OF NORTH BADEN TRUNK SEWER. 300,000 FY17 Wastewater OVERCHARGED MAINS, BUILDING BACKUPS, AND FLOODING LADUE ESTATES SANITARY RELIEF REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 30,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 1,250 FEET OF STORM SEWER AND REMOVE PRIVATE I/I SOURCES FROM SANITARY LADUE SUBTRUNK SANITARY RELIEF (SKME-654) SEWERS. 1,000,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS LANDMARK OFFICE PUMP STATION (P-411) REPLACEMENT REPLACE PUMP STATION P ,000 FY17 Wastewater LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND LAY RD) REHABILITATE 720 FEET OF 10-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 200,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS LEMAY PUBLIC I/I REDUCTION (2016) REHABILITATE 52,100 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE PIPE METHOD. 2,800,000 FY17 Wastewater LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT D LEMAY PUBLIC I/I REDUCTION (2018) CONTRACT A LEMAY PUMP STATIONS 1 AND 2 IMPROVEMENTS DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 4,520,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 5,600,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 4,420,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 4,225,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 45,000 FY17 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. CONSTRUCT UPGRADE OF ELECTRICAL SYSTEMS AND SWITCH GEAR, AND MECHANICAL GATE REPLACEMENT. 3,500,000 FY17 Wastewater AGING AND FAILING SYSTEMS IN NEED OF REPLACEMENT. LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN CONSULTANT) SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 1,315,000 FY17 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION LEMAY WATERSHED I/I REMOVAL - NORTH HAMPTON CREEK REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 5,900,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS LEMAY WATERSHED PUBLIC I/I REMOVAL - NORTH HAMPTON CREEK REHABILITATE 49,600 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE PIPE METHOD. 5,500,000 FY17 Wastewater LEMAY WWTF CONCRETE PRESERVATION LMRDP CSO STORAGE TUNNEL NORTH DRIVE CONSOLIDATION SEWERS REPAIR DETERIORATED CONCRETE DECKS IN ALL OUTSIDE PROCESS AREAS AND FINAL SETTLING TANK EFFLUENT CHANNEL, AND SEAL CHANNEL SURFACE 1,250,000 FY17 Wastewater CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THE NORTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM. 270,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS ACROSS THE SERVICE AREA. CONCRETE DECKS AND EFFLUENT CHANNEL ARE IN VARIOUS STATES OF DETERIORATION, WITH ALGAE GROWTH IN EFFLUENT CHANNEL AN ADDITIONAL CONCERN MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIRED BY CONSENT DECREE. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 4,000,000 FY17 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 6,220,000 FY17 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE CONSOLIDATION SEWERS CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOWS TO THE SOUTHERN PORTION OF THE DEEP STORAGE TUNNEL SYSTEM. 645,000 FY17 Wastewater MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIRED BY CONSENT DECREE LMRDP TUNNEL DEWATERING PUMP STATION CONSTRUCT PUMP STATION TO PUMP STORED COMBINED SEWERAGE TO LEMAY TREATMENT PLANT. 2,415,000 FY17 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LOWELL STREET - GIMBLIN TO DODDRIDGE COMBINED SEWER IMPROVEMENT REPLACE 710 FEET OF 27-INCH COMBINED SEWER WITH 42-INCH COMBINED SEWER. 100,000 FY17 Wastewater BUILDING BACKUPS DUE TO OVERCHARGED MAINS. LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL LOWER MERAMEC WWTF EXPANSION PHASE II LOWER MERAMEC WWTF HVAC, LIGHTING, AND HUMIDITY CONTROL IMPROVEMENTS DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 770,000 FY17 Wastewater CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT AT THE LOWER MERAMEC WWTF. 6,200,000 FY17 Wastewater EXPAND AND UPGRADE EXISTING LOWER MERAMEC WWTF TO ACCOMODATE FUTURE FLOWS AND FUTURE NUTRIENT REMOVAL PERMIT REQUIREMENTS. 3,000,000 FY17 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. NUTRIENT REMOVAL PERMIT REQUIREMENTS AND ADDITIONAL FLOWS AT THE LOWER MERAMEC WWTF. CONSTRUCT IMPROVEMENTS TO THE HVAC SYSTEMS TO IMPROVE EFFICIENCY, REDUCE HUMIDITY, AND MODIFY LIGHTING CONTROL SYSTEMS. 200,000 FY17 Wastewater INEFFICIENT HVAC SYSTEMS AND EXCESSIVE HUMIDITY IN SOME AREAS.

117 Wastewater CIRP Project List Project Number Long Name MACKENZIE I/I REDUCTION Description Budget Amount Financial Year Project Type Desc REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS AND CONSTRUCT 1,100 FEET OF 12-INCH TO 18-INCH SEWER. 2,400,000 FY17 Wastewater Problem Description EXCESSIVE INFLOW / INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS MACKENZIE I/I REDUCTION (CHIPPEWA AND MACKENZIE HILLS) PERFORM PUBLIC AND PRIVATE I/I REDUCTION. 270,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS MACKENZIE I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) PERFORM PRIVATE I/I REDUCTION. 780,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) REHABILITATE PUBLIC SEWERS. 110,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) CONSTRUCT COMBINED SEWAGE STORAGE TUNNEL, ASSOCIATED PUMP STATION, AND SEWERS. 21,315,000 FY17 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 485,000 FY17 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS MARTIGNEY PUBLIC I/I REDUCTION REHABILITATE 27,000 FEET OF PUBLIC SEWERS WITH CURED-IN-PLACE PIPE METHOD. 5,425,000 FY17 Wastewater MCNULTY - PALLARDY I/I REDUCTION REHABILITATION OF SEWERS TO REMOVE EXCESSIVE INFLOW AND INFILTRATION. 100,000 FY17 Wastewater MIDLAND - OLIVE SEWER SEPARATION EXCESSIVE I/I ENTERING SECTIONS OF THE PUBLIC SANITARY SEWER SYSTEM THAT ARE DEFECTIVE. EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 15,000 FEET OF 12-INCH TO 108-INCH STORM SEWER AND 3,500 FEET OF 18-INCH TO 72- INCH COMBINED SEWER. 2,770,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED COMBINED SEWERS. MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 1,000,000 FY17 Wastewater MISSOURI RIVER WWTF POWER FEEDER REPLACEMENT FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. REPLACE POWER FEEDER CABLES THAT CONNECT THE PRIMARY CLARIFIER BUILDING AND EFFLUENT PUMP STATION TO THE MOTOR CONTROL CENTER. 750,000 FY17 Wastewater DETERIORATED POWER FEED CABLES. NATURAL BRIDGE RD - DARBY TO CHEVROLET COMBINED SEWER RELIEF REPLACE 1,100 FEET OF 36-INCH TO 42-INCH COMBINED SEWER WITH 54-INCH COMBINED SEWER. 1,200,000 FY17 Wastewater NEW ENGLAND TOWN QUARRY PUMP STATION (P-307) (SKME- 544) IMPROVEMENTS NORTH FEE FEE CREEK I/I REDUCTION (I-270 AND CREVE COEUR MILL RD) NORTH FOREST AND BROOKSIDE I/I REDUCTION (SUMMIT AVE AND MARSHALL AVE) NORTH WEBSTER CC, POCAHONTAS, SOUTH BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD AND MANCHESTER) PARDEE - BLACKTHORN - HOLLY I/I REDUCTION (WATSON RD AND S ROCK HILL RD) PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM PROSPECT HILL LANDFILL VERTICAL EXPANSION CONSTRUCT 8,900 FEET OF 8-INCH TO 18-INCH SANITARY SEWER AND ELIMINATE TWO PUMP STATIONS (P-307 AND P-323). 3,100,000 FY17 Wastewater OVERCHARGED MAINS RESULTING IN FIRST FLOOR AND BASEMENT FLOODING. TWO LIFT STATIONS ARE AT THE END OF THEIR LIFE CYCLE, AND ONE IS RECEIVING ADDITIONAL FLOWS DUE TO ELIMINATION OF THE OTHER PUMP STATION. REHABILITATE 13 MANHOLES AND ASSOCIATED SEWERS. PERFORM PRIVATE I/I REDUCTION AT 30 PROPERTIES. 150,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. REHABILITATE 49 MANHOLES AND ASSOCIATED SEWERS. PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 220,000 FY17 Wastewater REHABILITATE 35 MANHOLES AND ASSOCIATED SEWERS. PERFORM PRIVATE I/I REDUCTION AT 25 PROPERTIES. 430,000 FY17 Wastewater REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,050,000 FY17 Wastewater CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE SANITARY SYSTEM. 500,000 FY17 Wastewater CONSTRUCT NEW ENTRANCE, WATER LINE AND HYDRANTS, AND LEACHATE FIELD IN PREPARATION FOR VERTICAL EXPANSION OF EXISTING LANDFILL. 4,500,000 FY17 Wastewater CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 3,500,000 FY17 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SURCHARGING BROUGHT ABOUT BY EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. WET WEATHER FLOWS FROM PUBLIC AND PRIVATE SOURCES REDUCE THE CAPACITY OF THE SYSTEM. PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING SANITARY SEWERS. LANDFILL THAT MSD UTILIZES TO DISPOSE OF INCINERATOR ASH IS NEARING END OF USEFUL LIFE. COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL REHABILITATE 10,000 FEET OF 8-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT ROBYN I/I REDUCTION (S LINDBERGH BLVD AND ROBYN RD) PROPERTIES. 170,000 FY17 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS AND STRUCTURAL ISSUES ROCK HILL SANITARY RELIEF (SKME-618) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 180,000 FY17 Wastewater SANITARY SEWER OVERFLOWS AND BUILDING BACKUPS ROLENS AND TELEGRAPH SANITARY STORAGE ROSEMARY, PHILO, & KATHLEEN SEWER SEPARATION CONSTRUCT 420 FEET OF 60-INCH SANITARY SEWER FOR STORAGE, AND 220 FEET OF 8-INCH TO 10- INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-222 AND BP ,000 FY17 Wastewater REMOVAL REQUIRED OF SSO BP-222 AND SSO BP-516. DISCONNECT DRIVEWAY DRAINS AND DOWNSPOUTS. CONSTRUCT 350 FEET OF 10-INCH SANITARY SEWER AND 2,000 FEET OF 12-INCH TO 18-INCH INCH STORM SEWER AND PUBLIC AND PRIVATE I/I REDUCTION. 330,000 FY17 Wastewater SAPPINGTON CREEK I/I REDUCTION (GRAVOIS RD AND SAPPINGTON RD) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 280,000 FY17 Wastewater SENECA PRIVATE I/I REDUCTION CONSTRUCT 5,700 FEET OF 12-INCH TO 24-INCH STORM SEWER AND REMOVE PRIVATE SOURCES OF INFLOW AND INFILTRATION FROM 156 PROPERTIES. 1,300,000 FY17 Wastewater APPROXIMATELY 115 RESIDENCES HAVE DOWNSPOUTS AND DRIVEWAY DRAINS CONNECTED TO THE SANITARY SEWER. WET WEATHER FLOWS FROM PUBLIC AND PRIVATE SOURCES REDUCE THE CAPACITY OF THE EXISTING SYSTEM. INFLOW AND INFILTRATION FROM PRIVATE SOURCES CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SOUTH COUNTY SANITARY RELIEF (P-419 TO CRIPPLE CREEK DR) CONSTRUCT 11,000 FEET OF 12-INCH TO 21-INCH SANITARY SEWER. 1,000,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS STERLING PLACE SEPARATE SEWER I/I REMOVAL REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 1,820,000 FY17 Wastewater SUBURBAN I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSO. REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS AND CONSTRUCT 360 FEET OF 12-INCH STORM SEWER. 820,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. SUBURBAN PUBLIC I/I REDUCTION (HARRISON DR AND SUBURBAN AVE) REHABILITATE PUBLIC SEWERS USING THE CURED-IN-PLACE METHOD. 3,550,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND COUCH AVE) REHABILITATE 4,600 FEET OF 8-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 370,000 FY17 Wastewater OVERCHARGED SANITARY SEWERS TILLIE BADEN NEWBY SEWER IMPROVEMENTS CONSTRUCT DETENTION BASIN AND/OR GREEN INFRASTRUCTURE SOLUTIONS TO ALLEVIATE ISSUES. 500,000 FY17 Wastewater OVERCHARGED MAINS, BUILDING BACKUPS, AND FLOODING IN AREA OF NORTH BADEN SEWER.

118 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description TOWNE SOUTH AND BRUNSTON I/I REDUCTION (AMBS RD AND TOWNE CENTRE DR) PERFORM PRIVATE I/I REDUCTION AT 10 PROPERTIES. 20,000 FY17 Wastewater OVERCHARGED SANITARY SEWERS. TRAMPE (PARTIAL) I/I REDUCTION (CASTILON AVE AND TRAMPE AVE) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 50,000 FY17 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. UNIVERSITY CITY I/I REDUCTION - EAST (HANLEY HILLS AND BEL- NOR) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 1,600,000 FY17 Wastewater EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION REDUCING CAPACITY OF EXISTING SEWER SYSTEM UNIVERSITY CITY I/I REDUCTION - EAST (UR-08 AND UR-09) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 3,600,000 FY17 Wastewater EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION UNIVERSITY CITY I/I REDUCTION - EAST (UR-10) REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 190,000 FY17 Wastewater EXCESSIVE PUBLIC AND PRIVATE INFLOW AND INFILTRATION UNIVERSITY CITY I/I REDUCTION - EAST (WC-01, WC-02, & WC- 03) REMOVAL OF PRIVATE I/I SOURCES FROM SANITARY SEWERS. 1,100,000 FY17 Wastewater UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-08 AND UR- 09) REHABILITATE 70,800 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE PIPE METHOD. 6,400,000 FY17 Wastewater UNIVERSITY CITY PUBLIC I/I REDUCTION - EAST (UR-10) REHABILITATE 32,000 FEET OF PUBLIC SEWERS USING THE CURED-IN-PLACE PIPE METHOD. 2,415,000 FY17 Wastewater UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) CONSTRUCT 6.5 MILLION GALLON UNDERGROUND STORAGE FACILITY. 3,700,000 FY17 Wastewater UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION A UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. DAMAGED AND DETERIORATED SEWERS CAUSING EXCESSIVE I/I, BUILDING BACKUPS, AND SANITARY SEWER OVERFLOWS. SANITARY STORAGE IS NECESSARY IN UNIVERSITY CITY WATERSHED FOR FLOW ALLOCATION TO THE LEMAY TREATMENT FACILITY DURING WET WEATHER EVENTS. CONSTRUCT 7,300 FEET OF 42-INCH TO 48-INCH SANITARY SEWER, INCLUDING PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 6,900 FEET OF 8-INCH TO 48-INCH SANITARY SEWERS, INCLUDING PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY17 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B 5,000,000 FY17 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS. COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 600,000 FY17 Wastewater UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY UR-11 BALSON AVENUE SANITARY RELIEF CONSTRUCT 4,300 FEET OF 18-INCH TO 21-INCH SANITARY SEWERS. 330,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 1,400 FEET OF 8-INCH SANITARY SEWER. PERFORM PRIVATE I/I REDUCTION AT 30 EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED VALLEY I/I REDUCTION (CLARKSON RD AND KEHRS MILL RD) PROPERTIES. 160,000 FY17 Wastewater SANITARY SEWERS VIRGINIA I/I REDUCTION (CLARKSON RD AND MARSH AVE) CONSTRUCT 2,100 FEET OF 8-INCH SEWER. REHABILITATE 2,100 FEET OF 8-INCH SEWER. 140,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS WATKINS CREEK PUMP STATION (P-101) UPGRADES WEST WISE I/I REDUCTION (NW QUAD I-64 AND BIG BEND BLVD) CONSTRUCT UPGRADE OF ELECTRICAL AND MECHANICAL EQUIPMENT, AND SECONDARY CONTAINMENT FOR CHEMICALS STORAGE. 450,000 FY17 Wastewater CONSTRUCT 960 FEET OF 12-INCH STORM SEWER AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 2,110,000 FY17 Wastewater AGING MECHANICAL AND ELECTRICAL SYSTEMS IN NEED OF UPGRADE TO CURRENT STANDARDS, AND SECONDARY CONTAINMENT FOR ONSITE CHEMICALS NEEDED. EXCESSIVE INFLOW AND INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. WESTBOROUGH - LUTHER - MERMOD PLACE I/I REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY RD) PERFORM PUBLIC AND PRIVATE I/I. 420,000 FY17 Wastewater BUILDING BACKUPS AND OVERCHARGED SEWERS. WILLIAMS CREEK PUMP STATION (P-523) STORAGE REHABILITATION REHABILITATE 420 FEET OF 96-INCH STORAGE PIPE. 20,000 FY17 Wastewater PUMP STATION P-523 STORAGE NEEDS REHABILITATION TO REDUCE EXCESSIVE I/I EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED WOODHOLLOW I/I REDUCTION (I-270 AND PAGE) REHABILITATE 1,000 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 30,000 FY17 Wastewater SANITARY SEWERS WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN) CONSTRUCT 1,800 FEET OF 12-INCH SANITARY SEWER. 120,000 FY17 Wastewater OVERCHARGED SANITARY SEWERS BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017) CCTV INSPECTION OF SEWERS (2017) CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT A GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT D INFRASTRUCTURE REPAIRS (WASTEWATER) (2018) LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY18 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 2,000,000 FY18 Wastewater PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 1,000,000 FY18 Wastewater INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY18 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY18 Wastewater PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY18 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY18 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY18 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY18 Unallocated AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 1,500,000 FY18 Wastewater FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY18 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION.

119 Wastewater CIRP Project List Project Number Long Name LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA (2017) RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) STREAM FLOW WATER QUALITY SAMPLING (2017) Description Budget Amount Financial Year Project Type Desc DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY18 Wastewater INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 140,000 FY18 Wastewater Problem Description COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY18 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND DESIGN EFFORTS. 575,000 FY18 Unallocated PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 650,000 FY18 Unallocated APPLE ORCHARD - SINGERSON - BAYLESS PLACE I/I REDUCTION REHABILITATE 23,000 FEET OF 8-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 90 (LEMAY FERRY RD AND BAYLESS AVE) PROPERTIES. 210,000 FY18 Wastewater BELLERIVE SANITARY RELIEF (LADUE RD TO CONWAY RD) CONSTRUCT 2,400 FEET OF 12-INCH SANITARY SEWER. 170,000 FY18 Wastewater BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2018) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2018) CONTRACT B BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT B BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR WATER QUANTITY & QUALITY EVALUATION OF STREAMS. STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS. EXCESSIVE I/I ENTERING THE SYSTEM AND STRUCTURAL ISSUES CAUSING BUILDING ACKUPS. EXISTING SEWER DOES NOT HAVE CAPACITY TO CONVEY DESIGN STORM. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 9,250,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 7,000,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 210,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 215,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY18 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. BISSELL POINT WWTF MAIN SUBSTATION SWITCHGEAR REPLACEMENT CONSTRUCT REPLACEMENT OF MAIN SUBSTATION SWITCHGEAR. 550,000 FY18 Wastewater EXISTING SWITCHGEAR IS OBSOLETE AND REPLACEMENT IS REQUIRED TO MINIMIZE POWER SERVICE INTERRUPTIONS BRADFORD WOODS PUMP STATION (P-429) REPLACEMENT REPLACE PUMP STATION P ,000 FY18 Wastewater PUMP STATION B-429 CURRENTLY HAS NO STORAGE BRENTMORE PUMP STATION (P-773) REPLACEMENT REPLACE PUMPSTATION P ,000 FY18 Wastewater PUMP STATION P-773 NEEDS TO BE REPLACED BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX I/I REDUCTION (I- REHABILITATE 1,800 FEET OF 12-INCH TO 21-INCH SEWER. REHABILITATE 87 MANHOLES. PERFORM 64 AND LAY RD) PRIVATE I/I REDUCTION AT 45 PROPERTIES. 210,000 FY18 Wastewater REDUCTION OF I/I ACROSS THE TRIBUTARY AREA REQUIRED BRIDGEPORT AVE & BRENTWOOD BLVD SEWER SEPARATION CONSTRUCT 540 FEET OF 12-INCH STORM SEWERS AND APPUTENANCES, REMOVING CROSS CONNECTIONS TO COMBINED SYSTEM. 200,000 FY18 Wastewater WATER BACKUPS DUE TO STORM SYSTEM CROSS CONNECTIONS WITH COMBINED SEWERS. BROOKSHIRE SANITARY RELIEF (BROOKSHIRE DR TO COUGAR DR) CONSTRUCT 4,700 FEET OF 21-INCH TO 27-INCH SANITARY SEWER 420,000 FY18 Wastewater BUILDING BACKUP AND OVERCHARGED SANITARY SEWERS CAPILIA SANITARY RELIEF (GRANT RD TO CAPILIA DR) CONSTRUCT 2,900 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. ABANDON 1,900 FEET OF 8-INCH SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-370 AND BP ,000 FY18 Wastewater REHABILITATE 6,900 FEET OF 8-INCH TO 12-INCH SEWER. REHABILITATE 50 MANHOLES. PERFORM CARSON VILLA I/I REDUCTION (MARCELLA AVE AND WALES AVE) PRIVATE I/I REDUCTION AT 45 PROPERTIES. 370,000 FY18 Wastewater CAULKS CREEK FORCEMAIN REHABILITATION PHASE II REHABILITY 25,000 FEET OF 24-INCH FORCEMAN. 700,000 FY18 Wastewater CAULKS CREEK TRUNK SEWER (SKME-011) PHASE II CONSTRUCT 5,600 FEET OF 27-INCH SANITARY SEWER. 530,000 FY18 Wastewater CEDARCREST PRIVATE I/I REDUCTION (SKME-561) REMOVE PRIVATE I/I FROM PUBLIC SEWER BY CORRECTING IMPROPER CONNECTIONS ON 300 PROPERTIES. 210,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO BP-370 AND BP-581 REQUIRE REMOVAL. EXISTING FORCEMAIN IS BEING REPLACED. A NEW FORCEMAIN IN PUT INTO SERVICE, THE EXISTING FORCEMAIN MUST BE REHABILITATED TO PROVIDE REDUNDANCY. EXISTING SEWER DOES NOT HAVE CAPACITY TO CONVEY DESIGN STORM. CHESTERFIELD VALLEY BUSINESS PUMP STATION (P-729) REPLACEMENT REHABILITATE OR REPLACE PUMP STATION P ,000 FY18 Wastewater WET WELL IN POOR CONDITION COLDWATER CREEK WWTF FINAL CLARIFIERS REPLACEMENT DEMOLISH EXISTING FOUR SQUARE CLARIFIERS AND CONSTRUCT NEW FOURTH CIRCULAR CLARIFIER. ENLARGE FEED CHANNEL AND PIPING TO THE EXISTING THREE CIRCULAR CLARIFIERS. 5,000,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. EXISTING FOUR SQUARE FINAL CLARIFIERS ARE 50 YEARS OLD, AND PAST THEIR USEFUL LIFE COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B REHABILITATION CONSTRUCT REHABILITATION OF SECTION B OF THE COLDWATER TRUNK SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-091, BP-115, BP-119, BP-141, BP-144, BP-473, BP-526, AND BP ,025,000 FY18 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING OVERCHARGED SANITARY SEWER. COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES ROCK RD AND ASHBY RD) PERFORM PRIVATE I/I REDUCTION AT 25 PROPERTIES. 3,330,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. CONCORD I/I REDUCTION (TESSON FERRY RD AND E CONCORD RD) REHABILITATE 33 MANHOLES AND ASSOCIATES SEWERS. PERFORM PRIVATE I/I REDUCTION. 185,000 FY18 Wastewater INSUFFICIENT CAPACITY FOR WET WEATHER FLOW. CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS. 1,200,000 FY18 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNEL SYSTEM AND UPPER RDP TUNNEL SYSTEM. 4,850,000 FY18 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION.

120 Wastewater CIRP Project List Project Number Long Name CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES Description Budget Amount Financial Year Project Type Desc PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT. 4,286,000 FY18 Wastewater CONWAY VILLAGE SANITARY RELIEF (CONWAY RD TO I-64) CONSTRUCT 4,700 FEET OF 12-INCH SANITARY SEWER. 370,000 FY18 Wastewater CROSSROADS, HANLEY INDUSTRIAL, LITZSINGER EAST I/I REDUCTION (SW I-64 AND S HANLEY RD) CSO - MCKNIGHT ROAD #2737 CSO INTERCEPTOR (I- 298)/OUTFALL (L-161) Problem Description SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA THE CONSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OR OTHER FACILITIES. EXISTING SEWER DOES NOT HAVE THE CAPACITY TO CONVEY THE DESIGN STORM CAUSING BUILDING BACKUPS. REHABILITATE 2,900 FEET OF 8-INCH TO 48-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 160,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. CONSTRUCT 2,300 OF 8-INCH TO 18-INCH SANITARY SEWER, AND REMOVE INTERCEPTOR I-298 AND CSO OVERFLOW L-160. REMOVE PRIVATE INFLOW AND INFILTRATION. 2,050,000 FY18 Wastewater IMPLEMENTATION OF THE DISTRICT'S LONG-TERM CSO CONTROL PLAN TO ADDRESS COMBINED SEWER OVERFLOWS IS REQUIRED DAMMERT AND BROADWAY SANITARY RELIEF (SKME-551) CONSTRUCT 10,000 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, AND REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-515 AND BP ,150,000 FY18 Wastewater TWO SSOS AND A PUMP STATION REQUIRE ELIMINATION DARTMOUTH AVENUE SEWER SEPARATION CONSTRUCT 1,100 FEET OF 12-INCH TO 36-INCH STORM SEWER. 140,000 FY18 Wastewater DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II DC-09 WEST I/I REDUCTION (S LINDBERGH BLVD AND LADUE RD) DEER CREEK PUBLIC I/I REDUCTION (2018) CONTRACT A DEER CREEK PUBLIC I/I REDUCTION (2019) CONTRACT A DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) COMBINED SEWER SURCHARGING AND BUILDING BACKUPS ALONG DARTMOUTH AVENUE AND YALE AVENUE. CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATE SURCHARGING AND ELIMINATE CONSTRUCTED SSOS. 15,000,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER. CONSTRUCT CIPP PUBLIC SEWER REHABILITATION OF 30,000 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, 200 MANHOLES, AND REMOVE PRIVATE DEFECTS. 380,000 FY18 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWER SURCHARGING AND BUILDING BACKUPS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 7,000,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 330,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 470,000 FY18 Wastewater CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF. 1,500,000 FY18 Wastewater DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 75,400,000 FY18 Wastewater EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2018) EDNA-THURSBY I/I REDUCTION (HIGHLAND AVE TO BIG BEND BLVD) ENGELHOLM AND PARK SANITARY RELIEF (SPENCER PL TO LEADALE DR) ESSEX I/I REDUCTION (W. ADAMS AVE AND SUGAR CREEK RIDGE DR) PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 2,000,000 FY18 Wastewater REHABILITATE 13,000 FEET OF 8-INCH TO 24-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 10 PROPERTIES. 140,000 FY18 Wastewater CONSTRUCT 12,700 FEET OF 12-INCH TO 36-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-451 AND BP ,410,000 FY18 Wastewater REHABILITATE 4,200 FEET OF 8-INCH TO 18-INCH SEWER. REHABILITATE 59 MANHOLES. PERFORM PRIVATE I/I REDUCTION AT 10 PROPERITES. 230,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES. EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. ELIMINATION OF CONSTRUCTED SSO OUTFALLS REQUIRED. EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS IN THE ESSEX STUDY AREA ESSEX PLACE COMBINED SEWER RELIEF BUYOUT OF 14 PROPERTIES ON ESSEX PLACE. 500,000 FY18 Wastewater REOCCURRING OVERCHARGED MAINS AND BUILDING BACKUPS FARMERS MILL PUMP STATION (P-774) REPLACEMENT REMOVE AND REPLACE EXISTING PUMP STATION. 500,000 FY18 Wastewater DETERIORATING PUMP STATION FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I REDUCTION (MANCHESTER RD W OF N GEYER RD) CONSTRUCT CIPP PUBLIC SEWER REHABILITATION OF 8,000 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 90 MANHOLES, AND REMOVE PRIVATE DEFECTS. 205,000 FY18 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWER SURCHARGING, BUILDING BACKUPS, AND CONSTRUCTED SSO ACTIVATION. FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) CONSTRUCT 6,500 FEET OF 30-INCH TO 42-INCH SANITARY SEWER. 10,000,000 FY18 Wastewater OVERCHARGED MAINS, SANITARY OVERFLOWS, AND BUILDING BACKUPS. FF-07 FEE FEE CREEK SANITARY RELIEF (MEADOWSIDE DR TO WILLOW BROOK DR) FF-16 SCHUETZ - MEADOWSIDE TO PAGE SANITARY RELIEF FF-18 VILLA DORADO - LACKLAND - PAGE SANITARY RELIEF (ADIE RD TO VILLA DORADO DR) GASLIGHT SQUARE SEWER IMPROVEMENTS GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2018) GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2017) CONTRACT A GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2017) CONTRACT B GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2017) CONTRACT C CONSTRUCT 4,950 FEET OF 15-INCH RELIEF SEWER NEAR SCHUETZ ROAD. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY18 Wastewater BASEMENT BACKUPS AND OVERLOADED SANITARY SEWERS. CONSTRUCT 9,940 FEET OF 27-INCH TO 36-INCH SANITARY RELIEF SEWERS FROM SCHUETZ ROAD NEAR MEADOWSIDE DRIVE NORTHWEST TO ADIE ROAD. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,500,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 5,230 FEET OF 30-INCH SANITARY RELIEF SEWER WEST OF SCHUETZ ROAD FROM ADIE ROAD SOUTH TO VILLA DORADO DRIVE. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000,000 FY18 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS. IMPROVEMENTS IN GASLIGHT SQUARE AREA TO REDUCE BUILDING BACKUPS, TO INCLUDE STRAPPED PLUMBING RETROFITS FOR 95 BUILDINGS, OR PRIVATE PUMP STATION. 3,500,000 FY18 Wastewater RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 250,000 FY18 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 300,000 FY18 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2018 BASED ON PERFORMANCE. 50,000 FY18 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2018 BASED ON PERFORMANCE. 50,000 FY18 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2018 BASED ON PERFORMANCE. 50,000 FY18 Wastewater OVERCHARGED COMBINED SEWERS CAUSING WET WEATHER BUILDING BACKUPS. CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.

121 Wastewater CIRP Project List Project Number Long Name GENERAL SERVICES AGREEMENT - SEWER DESIGN (2018) CONTRACT A GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT A GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT B GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT C GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT D GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT E GRAND GLAIZE WWTF BUILDING, SWITCHGEAR, TANK AND SCREEN REPAIRS GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III IV & V (SKME -521) GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) Description Budget Financial Project Type Amount Year Desc RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 150,000 FY18 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY18 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY18 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY18 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY18 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY18 Wastewater CONSTRUCT REPAIRS TO ADDRESS BUILDING SETTLING, TANK DETERIORATION, SWITCHGEAR PROBLEMS, AND INFLUENT PUMPING STATION SCREEN ISSUES. 3,000,000 FY18 Wastewater Problem Description SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. BUILDING AND TANK DETERIORATION, AND SWITCHGEAR AND SCREEN RELIABILITY ISSUES. CONSTRUCT 3,740 FEET OF 84-INCH TO 90-INCH SANITARY TRUNK SEWER. PROJECT INCLUDES REMOVAL AND REPLACEMENT OF A UNION PACIFIC RAILROAD TRACK SPUR. 1,584,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT SANITARY STORAGE FACILITY TO STORE WET WEATHER SANITARY FLOW, TO MITIGATE SURCHARGING AND ELIMINATE TWO CONSTRUCTED SSOS. 10,000,000 FY18 Wastewater GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) 500,000 FY18 Wastewater WET WEATHER I/I CAUSING SYSTEM SURCHARGING AND CONSTRUCTED SSO ACTIVATION. WET WEATHER I/I CAUSING SYSTEM SURCHARGING AND CONSTRUCTED SSO ACTIVATION. GREEN PARK AND LAKESHIRE PUBLIC I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) REHABILITATE 44,000 FEET OF 8-INCH TO 15-INCH PUBLIC SEWER. 4,475,000 FY18 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS. HAMBURG AVE TO AL CLAIRE DR TO WEBMORE DR CSO L-181 (i- 032) ELIMINATION HARLEM - BADEN RELIEF PHASE IV (HEBERT) (GOODFELLOW TO HAMILTON) PERFORM PIR REMOVAL AT 139 PROPERTIES, REHABILITATE 6,500 FEET OF SANITARY AND STORM SEWERS, AND REMOVE CSO L ,000,000 FY18 Wastewater ELIMINATION OF CSO L-181 REQUIRED. DESIGN AND CONSTRUCTION OF A DETENTION BASIN TO RELIEVE BASEMENT BACKUPS AND FLOODING IN A LOW ELEVATION AREA CONTAINING TWO MAJOR TRUNK SEWERS. IMPROVEMENTS ARE PLANNED TO BE CONSTRUCTED BY CORPS OF ENGINEERS CSO REDUCTION EFFORTS IN THE CITY OF ST 3,300,000 FY18 Wastewater HARLEM BADEN RELIEF PHASE IV (HEBERT) - HAMILTON TO DARVER TRUNK SEWER CONSTRUCT 2,800 FEET OF 12-INCH TO 108-INCH SEWERS, AND 190 FEET OF PIPE IN TUNNEL. 4,000,000 FY18 Wastewater HARLEM BADEN RELIEF PHASE IV (HEBERT) - HODIAMONT TO CHERRY TRUNK SEWER B HELTA, SAPPINGTON, AND GREGORY COURT I/I REDUCTION (SAPPINGTON RD AND I-270) CONSTRUCT 5,540 FEET OF 8-INCH TO 84-INCH SEWER, 330 FEET OF PIPE IN TUNNEL, AND 1,500 FEET OF SEWER LINING. 800,000 FY18 Wastewater STREET FLOODING AND BASEMENT BACKUPS DUE TO OVERCHARGED COMBINED SEWERS. BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS. BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS. CONSTRUCT 7,900 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 35,000 FEET OF 8-INCH TO 10- INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 25 PROPERTIES. 280,000 FY18 Wastewater INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS HUNTLEIGH MANOR, OLD WARSON, TIMBERWYK I/I REDUCTION (S LINDBERGH BLVD SOUTH OF LITZSINGER RD) INFRASTRUCTURE REPAIRS (REHABILITATION) (2018) CONTRACT A INFRASTRUCTURE REPAIRS (REHABILITATION) (2018) CONTRACT B INFRASTRUCTURE REPAIRS (WASTEWATER) (2018) JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) CONSTRUCT CIPP PUBLIC SEWER REHABILITATION OF 10,500 FEET OF 8-INCH TO 21-INCH SANITARY SEWER, 100 MANHOLES, AND REMOVE PRIVATE DEFECTS. 370,000 FY18 Wastewater AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 2,500,000 FY18 Wastewater AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 2,500,000 FY18 Wastewater AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 5,500,000 FY18 Wastewater CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS. 29,925,000 FY18 Wastewater JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 615,000 FY18 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWER SURCHARGING, BUILDING BACKUPS, AND CONSTRUCTED SSO ACTIVATION. OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS. KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR AND GLEN OWEN DR) REHABILITATE 1,300 FEET OF 8-INCH SEWER. 195,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS KINGSTON STUDY AREA I/I REDUCTION KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND S KIRKWOOD RD) CONSTRUCT 1,200 FEET OF 8-INCH TO 10-INCH SANITARY SEWER. REHABILITATE 7,000 FEET OF 8-INCH TO 36-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 210 PROPERTIES. 400,000 FY18 Wastewater EXCESSIVE I/I RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REHABILITATE 38,000 FEET OF 8-INCH TO 18-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 110 PROPERTIES. 860,000 FY18 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS. KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON, W SARAH I/I CONSTRUCT CIPP PUBLIC SEWER REHABILITATION OF 16,000 FEET OF 8-INCH TO 12-INCH SANITARY EXCESSIVE INFLOW AND INFILTRATION CAUSING SEWER SURCHARGING, REDUCTION (MANCHESTER RD AND KIRKWOOD RD) SEWER, 140 MANHOLES, AND REMOVE PRIVATE DEFECTS. 455,000 FY18 Wastewater BUILDING BACKUPS, AND CONSTRUCTED SSO ACTIVATION LADUE FARMS PUMP STATION (P-733) REPLACEMENT REPLACE PUMP STATION P ,000 FY18 Wastewater PUMP STATION P-733 NEEDS TO BE REPLACED LAFAYETTE SANITARY RELIEF (STRECKER RD TO DURANGO PASS CT) CONSTRUCT 2,000 FEET OF 12-INCH SANITARY SEWER. 160,000 FY18 Wastewater EXISTING 8-INCH PIPE DOES NOT HAVE ADEQUATE CAPACITY LAKE FOREST DR SEWER SEPARATION CONSTRUCT 1,300 FEET OF 15-INCH TO 21-INCH STORM SEWER. 140,000 FY18 Wastewater SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED SANITARY SEWERS LEMAY PUBLIC I/I REDUCTION (2018) CONTRACT A REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 1,450,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.

122 Wastewater CIRP Project List Project Number Long Name LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT A Description Budget Amount Financial Year Project Type Desc Problem Description REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 80,000 FY18 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN CONSULTANT) SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 390,000 FY18 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION LEMAY WWTF ROADWAY REPAIRS PHASE I REPLACE 30,000 SQUARE FEET OF DETERIORATED PAVEMENT. 480,000 FY18 Wastewater DETERIORATING CONCRETE PAVEMENT LINDBERGH PARK COMBINED SEWER RELIEF (BREDELL AVE TO PRINCETON PL) CONSTRUCT 3,800 FEET OF 30-INCH TO 60-INCH STORM SEWER. 650,000 FY18 Wastewater LINDLEY DRIVE SANITARY RELIEF (I-170 TO ASHMONT DR) (UR- 07) CONSTRUCT 7,500 FEET OF 12-INCH TO 21-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, AND BP ,000 FY18 Wastewater SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED COMBINED SEWERS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. FOUR SSO OUTFALLS BP-416, BP-417, BP-433, AND BP-476 REQUIRE REMOVAL. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 500,000 FY18 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 720,000 FY18 Wastewater CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT AT THE LOWER MERAMEC WWTF. 1,000,000 FY18 Wastewater LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 5,000,000 FY18 Wastewater LOWER MERAMEC WWTF EXPANSION PHASE II LOWER MERAMEC WWTF HVAC, LIGHTING, AND HUMIDITY CONTROL IMPROVEMENTS EXPAND AND UPGRADE EXISTING LOWER MERAMEC WWTF TO ACCOMODATE FUTURE FLOWS AND FUTURE NUTRIENT REMOVAL PERMIT REQUIREMENTS. 10,000,000 FY18 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. NUTRIENT REMOVAL PERMIT REQUIREMENTS AND ADDITIONAL FLOWS AT THE LOWER MERAMEC WWTF. CONSTRUCT IMPROVEMENTS TO THE HVAC SYSTEMS TO IMPROVE EFFICIENCY, REDUCE HUMIDITY, AND MODIFY LIGHTING CONTROL SYSTEMS. 800,000 FY18 Wastewater INEFFICIENT HVAC SYSTEMS AND EXCESSIVE HUMIDITY IN SOME AREAS. MACKENZIE PUBLIC I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) REHABILITATE PUBLIC SEWERS. 3,650,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) CONSTRUCT COMBINED SEWAGE STORAGE TUNNEL, ASSOCIATED PUMP STATION, AND SEWERS. 21,420,000 FY18 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 485,000 FY18 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS. MARK TWAIN I/I REDUCTION (MANCHESTER RD AND BOMPART AVE) CONSTRUCT 1,000 FEET OF 8-INCH TO 12-INCH SANITARY SEWER. REHABILITATE 5,100 FEET OF 8-INCH TO 18-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT FIVE PROPERTIES. 190,000 FY18 Wastewater OVERCHARGED SANITARY SEWERS. MEACHAM AND SPELLMAN I/I REDUCTION (I-44 AND S KIRKWOOD RD) REHABILITATE 20,000 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 240,000 FY18 Wastewater MEAD SANITARY RELIEF (LANDWEHR LN TO HEMLOCK DR) CONSTRUCT 690 FEET OF 10-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY18 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,500,000 FY18 Wastewater PARTRIDGE AVENUE 8500 BLOCK COMBINED SEWER RELIEF PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-289 REQUIRES REMOVAL. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. BUYOUT 10 PROPERTIES IN THE 8500 BLOCK OF PARTRIDGE, SOFT SEPARATION AND CONSTRUCTION OF STORMWATER DETENTION BASIN. 750,000 FY18 Wastewater OVERCHAGED MAINS AND BUILDING BACKUPS. CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE SANITARY SYSTEM. 500,000 FY18 Wastewater CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 3,500,000 FY18 Wastewater PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING SANITARY SEWERS. COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY. REAVSDALE I/I REDUCTION (MACKENZIE RD AND REAVIS BARRACKS RD) REHABILITATE 34 MANHOLES AND ASSOCIATED SEWERS. PERFORM I/I REDUCTION AT 20 PROPERTIES. 130,000 FY18 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS RIVERPORT 6 PUMP STATION (P-781) REPLACEMENT REPLACE PUMP STATION P ,000 FY18 Wastewater ROSARY LANE SANITARY RELIEF (CLAUDINE DRIVE TO MAKIN AVE) CONSTRUCT 2,100 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALSL BP-640 AND BP ,000 FY18 Wastewater ROXBURY I/I REDUCTION REMOVE PRIVATE I/I SOURCES FROM SANITARY SEWERS. 583,000 FY18 Wastewater ROYAL PINES PUMP STATION (P-739) REPLACEMENT REPLACE PUMP STATION P ,000 FY18 Wastewater PUMP STATION P-781 NEEDS REPLACEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS. REMOVAL OF CONSTRUCTED SANITARY SEWER OVERFLOWS IS REQUIRED. EXCESSIVE INFLOW/INFILTRATION RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. PUMP STATION P-739 NEEDS REPLACEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS. CONSTRUCT 100 FEET OF 18-INCH COMBINED SEWER, ABANDON 20 FEET OF SEWER, AND REPLACE DETERIORATED INFRASTRUCTURE AND IMPROPER CONNECTION S 2ND STREET 1200 CSO SEWER SEPARATION DEFICIENT INTERCEPTOR SLUICE GATE. 135,000 FY18 Wastewater REQUIRE CORRECTION SPRINGDALE I/I REDUCTION (ROLLING DR AND SMITHFIELD PL) PERFORM PRIVATE I/I REDUCTION AT 5 PROPERTIES. 82,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS STONINGTON PLACE SANITARY RELIEF (CLAYTON RD TO GEORGIAN ACRES ST) CONSTRUCT 2,200 FEET OF 12-INCH SANITARY SEWER. 170,000 FY18 Wastewater OVERCHARGED SANITARY SEWERS TAPAWINGO PUMP STATION (P-440) STORAGE REHABILITATION REHABILITATE 150 FEET OF 96-INCH STORAGE PIPE. 35,000 FY18 Wastewater PUMP STATION P-440 STORAGE NEEDS REHABILITATION TO REDUCE EXCESSIVE I/I. TESSON CREEK I/I REDUCTION (TESSON FERRY RD AND TIFFANY SQUARE PKY) PERFORM PUBLIC AND PRIVATE I/I REDUCTION AT 1434 TESSON CREEK STUDY AREA. 250,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS THURSTON I/I REDUCTION (CHURCH ST AND N FLORISSANT RD) PERFORM PRIVATE I/I REDUCTION AT 10 PROPERTIES. 170,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.

123 Wastewater CIRP Project List Project Number Long Name TILLES PARK, LITZSINGER AND PARKRIDGE I/I REDUCTION (LITZSINGER RD AND S MCKNIGHT RD) TREASURE COVE I/I REDUCTION (RIES RD AND BROOKSIDE LN) Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 310 FEET OF 10-INCH SANITARY SEWER. REHABILITATE 2,900 FEET OF 8-INCH TO 42-INCH SEWER. 150,000 FY18 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. CONSTRUCT 2,900 FEET OF 8-INCH TO 10-INCH SANITARY SEWER. REHABILITATE 15,800 FEET OF 8- INCH TO 24-INCH SEWER. REHABILITATE 123 MANHOLES AND ASSOCIATED SEWERS. 200,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) CONSTRUCT 6.5 MILLION GALLON UNDERGROUND STORAGE FACILITY. 20,000,000 FY18 Wastewater UPPER JESKE PARK SANITARY RELIEF (SCOTT DR TO CARDIGAN DR) UPPER LADUE CREEK I/I REDUCTION (NE QUAD OF S WARSON RD AND LADUE RD) UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION B UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL WATKINS CREEK PUMP STATION (P-101) UPGRADES WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE IV WHITE AND ROSALIE STORM SEWER IMPROVEMENTS CONSTRUCT 1,200 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY18 Wastewater SANITARY STORAGE IS NECESSARY IN UNIVERSITY CITY WATERSHED FOR FLOW ALLOCATION TO THE LEMAY TREATMENT FACILITY DURING WET WEATHER EVENTS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-315 REQUIRES REMOVAL. REHABILITATE 2,400 FEET OF 8-INCH TO 10-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 210,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 6,900 FEET OF 8-INCH TO 48-INCH SANITARY SEWERS, INCLUDING PIPE IN TUNNEL. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000,000 FY18 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 600,000 FY18 Wastewater CONSTRUCT UPGRADE OF ELECTRICAL AND MECHANICAL EQUIPMENT, AND SECONDARY CONTAINMENT FOR CHEMICALS STORAGE. 3,000,000 FY18 Wastewater REMOVE EXCESSIVE I/I FROM PUBLIC AND PRIVATE SOURCES THROUGH SEWER REHABILITATION AND OTHER METHODS. 1,700,000 FY18 Wastewater CONSTRUCT 1,366 FEET OF 12-INCH TO 27-INCH STORM SEWERS FROM SOUTH OF ROSALIE AVE. TO WHITE AVE. 140,000 FY18 Wastewater COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY. AGING MECHANICAL AND ELECTRICAL SYSTEMS IN NEED OF UPGRADE TO CURRENT STANDARDS, AND SECONDARY CONTAINMENT FOR ONSITE CHEMICALS NEEDED. BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATED SANITARY SEWERS. STREET FLOODING AND WATER BACKUPS DUE TO INADEQUATE COMBINED SEWERS. WHITE BURCH PUMP STATION (P-725) REHABILITATION OR ELIMINATION ELIMINATE PUMP STATION BY CONSTRUCTING GRAVITY MAIN TO RIVERWOOD PUMP STATION. 150,000 FY18 Wastewater ELIMINATION OF PUMP STATION POSSIBLE YARNELL CREEK WEST I/I REDUCTION (BOWLES AVE AND 141) REHABILITATE 8,100 FEET OF 8-INCH TO 12-INCH SEWER. 20,000 FY18 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2017) CCTV INSPECTION OF SEWERS (2017) CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT A GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT D INFRASTRUCTURE REPAIRS (WASTEWATER) (2019) LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA (2017) RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) STREAM FLOW WATER QUALITY SAMPLING (2017) PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY19 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 2,000,000 FY19 Wastewater PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 1,000,000 FY19 Wastewater INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY19 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY19 Wastewater PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY19 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY19 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY19 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY19 Unallocated AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 1,500,000 FY19 Wastewater FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY19 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION. DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY19 Wastewater INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 145,000 FY19 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY19 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND DESIGN EFFORTS. 575,000 FY19 Unallocated PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 650,000 FY19 Unallocated DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR WATER QUANTITY & QUALITY EVALUATION OF STREAMS. STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS.

124 Wastewater CIRP Project List Project Number Long Name ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09) ADAMS I/I REDUCTION (SOUTHEAST OF I-270 AND DOUGHERTY FERRY RD) AFFTON I/I REDUCTION (HANOVER, HILDESHEIM-WEBER RD, SEIBERT, AND HAMBURG) ASHLAND AVENUE - CLARA TO BELT COMBINED SEWER RELIEF ASHLAND AVENUE - SEMPLE TO UNION COMBINED SEWER RELIEF BELLEFONTAINE #2 SANITARY RELIEF (CHAMBERS RD TO COBURG LANDS DR) Description Budget Amount Financial Year Project Type Desc CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH DIAMETER SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000,000 FY19 Wastewater CONSTRUCT 460 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 11,000 FEET OF 8-INCH TO 24-INCH SEWER. 230,000 FY19 Wastewater Problem Description REPLACE UNDERSIZED SEWER, ELIMINATE CONSTRUCTED SSO BP-421, PREDECESSOR PROJECT FOR FUTURE SSO REMOVALS. EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS IN THE ADAMS STUDY AREA. CONSTRUCT 1,400 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. REHABILITATE 10,000 FEET OF 8- INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 370 PROPERTIES. 510,000 FY19 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. BUYOUT OF 31 PROPERTIES IN THE 5500 BLOCK OF ASHLAND, WHICH ARE ADJACENT TO THE SOUTH HARLEM TRUNK SEWER, SOFT SEPARATION AND CONSTRUCTION OF STORMWATER DETENTION BASIN. 500,000 FY19 Wastewater RECURRING OVERCHARGED MAINS AND BUILDING BACKUPS. BUYOUT OF 55 PROPERTIES ALONG THE SOUTH HARLEM TRUNK SEWER, SOFT SEPARATION AND CONSTRUCTION OF STORMWATER DETENTION BASIN. 500,000 FY19 Wastewater RECURRING OVERCHARGED MAINS AND BUILDING BACKUPS. CONSTRUCT 1,200 FEET OF 12-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-287 REQUIRED REMOVAL BISCHOFF - EDWARDS TO MARCONI COMBINED SEWER RELIEF CONSTRUCT SEPARATE SANITARY SYSTEM AND A WET WEATHER PUMP STATION. 2,000,000 FY19 Wastewater BUILDING BACKUPS DUE TO OVERCHARGED MAINS BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2019) CONTRACT B BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT A REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 7,000,000 FY19 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 7,050,000 FY19 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 55,000 FY19 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. BISSELL HILLS SANITARY REHAB PHASE III (SERVICE LATERAL CONNECTIONS) (CHAMBERS RD AND COBURG LANDS DR) CONSTRUCT 1,490 SERVICE LATERAL CONNECTION REPAIRS. 960,000 FY19 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS BISSELL HILLS SANITARY RELIEF (ST CYR RD TO LEETON AVE) CONSTRUCT 2,300 FEET OF 24-INCH TO 30-INCH SANITARY SEWER. 280,000 FY19 Wastewater BISSELL POINT WWTF BELT FILTER PRESS CONVEYOR REPLACEMENT CONSTRUCT REPLACEMENT OF BELT CONVEYOR SYSTEMS. 600,000 FY19 Wastewater BISSELL POINT WWTF MAIN SUBSTATION SWITCHGEAR REPLACEMENT CONSTRUCT REPLACEMENT OF MAIN SUBSTATION SWITCHGEAR. 2,750,000 FY19 Wastewater BISSELL POINT WWTF SOUTH ASH LAGOON FLOOR REPLACEMENT REPAIR AND REPLACE AS NEEDED 160,000 SQUARE FEET OF FLOOR. 3,200,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-317 REQUIRES REMOVAL. EXISTING BELT CONVEYOR EQUIPMENT IS DETERIORATING AND REQUIRES REPLACEMENT. EXISTING SWITCHGEAR IS OBSOLETE AND REPLACEMENT IS REQUIRED TO MINIMIZE POWER SERVICE INTERRUPTIONS. ASH LAGOON FLOORING IS DAMAGED AND REQUIRES REPAIR AND/OR REPLACEMENT. CONSTRUCT 9,260 FEET OF 8-INCH TO 42-INCH SANITARY RELIEF SEWERS. ELIMINATE CONSTRUCTED WET WEATHER BUILDING BACKUPS, OVERCHARGED SEWERS, AND BLACK CREEK - HADDINGTON COURT RELIEF SEWERS SSO OUTFALLS BP-013, BP-017, BP-018, BP-151, AND BP ,950,000 FY19 Wastewater SEWER OVERFLOWS CALVARY CEMETERY STORAGE BASIN CONSTRUCT STORAGE BASIN FOR FLOWS FROM OVERCHARGED SOUTH BADEN TRUNK SEWER. 1,200,000 FY19 Wastewater OVERCHAGED TRUNK SEWER CAULKS CREEK A PUMP STATION (P-750) REPLACEMENT REPLACE PUMP STATION P ,770,000 FY19 Wastewater CAULKS CREEK FORCEMAIN REHABILITATION PHASE II REHABILITY 25,000 FEET OF 24-INCH FORCEMAN. 4,500,000 FY19 Wastewater CELLA - ROLLING ROCK - GLEN CREEK SANITARY SEWER AND PUBLIC I/I REDUCTION CONSTRUCT 8-INCH SANITARY SEWER LINES TO REPLACE DEFICIENT 6-INCH SANITARY SEWER LINES. 2,020,000 FY19 Wastewater COLDWATER UPSTREAM PUMP STATION (P-180) STORAGE CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES CREVE COEUR CREEK SANITARY TRUNK SEWER RELIEF PHASE VI (SKME-021) DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR TO PRIOR DR) DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE II DEER CREEK PUBLIC I/I REDUCTION (2019) CONTRACT A DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) CONSTRUCT 530 FEET OF 96-INCH PIPE IN ORDER TO PROVIDE 170,000 GALLONS OF TEMPORARY STORAGE. 680,000 FY19 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS. 8,200,000 FY19 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNEL SYSTEM AND UPPER RDP TUNNEL SYSTEM. 4,220,000 FY19 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT. 3,520,000 FY19 Wastewater EXISTING PUMP STATION IS DETERIORATING AND REQUIRES REPLACEMENT. SIXTH PHASE OF TRUNK SEWER RELIEF PROJECT. CONSTRUCT 4,400 FEET OF 18-INCH TO 24-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP-036 AND BP ,200,000 FY19 Wastewater OVERCHARGED TRUNK SEWER. CONSTRUCT 4,600 FEET 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater EXISTING FORCEMAIN IS BEING REPLACED. A NEW FORCEMAIN IN PUT INTO SERVICE, THE EXISTING FORCEMAIN MUST BE REHABILITATED TO PROVIDE REDUNDANCY. DEFICIENT NON-STANDARD 6-INCH SEWER LINES CONTRIBUTING TO BUILDING BACKUPS AND SANITARY SEWER OVERFLOWS. PUMP STATION HAS INSUFFICIENT CAPACITY FOR THE 5-YR STORM, AND DOES NOT HAVE PROVISIONS FOR EMERGENCY STORAGE. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA THE CONSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OR OTHER FACILITIES. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-313 REQUIRES REMOVAL. CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATE SURCHARGING AND ELIMINATE CONSTRUCTED SSOS. 10,000,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 11,000,000 FY19 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF. 1,500,000 FY19 Wastewater DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 75,400,000 FY19 Wastewater DEGIVERVILLE COMBINED SEWER RELOCATION RELOCATE 3,800 FEET OF COMBINED SEWER NEAR AREA OF METROLINK ROW. 2,700,000 FY19 Wastewater DELCREST SANITARY RELIEF CONSTRUCT SANITARY SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-015 AND BP ,000 FY19 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. EXISTING SEWER HAS HISTORY OF HEAVY SILTRATION CAUSING BLOCKAGES AND OVERCHARGED MAINS. BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS.

125 Wastewater CIRP Project List Project Number Long Name E. WATSON SANITARY RELIEF (RUDSON LN TO RICHVIEW DR) Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 4,000 FEET OF 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER. EARTH CITY LAKE FRONT NORTH PUMP STATION (P-711) REPLACEMENT REPLACE PUMP STATION P ,000 FY19 Wastewater EARTH CITY SHORELINE PUMP STATION (P-704) REPLACEMENT REPLACE PUMP STATION P ,000 FY19 Wastewater EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2019) PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 1,000,000 FY19 Wastewater ED LOU LANE I/I REDUCTION (BROOKTON WAY AND GREENTON WAY) REHABILITATE 8,200 FEET OF 8-INCH TO 10-INCH SEWER. 20,000 FY19 Wastewater PUMP STATION P-711 NEEDS REPLACEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS. PUMP STATION B-704 NEEDS REPLACEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS. IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES. EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS. FERGUSON SANITARY SEWER (OLIVE TO PAGE) (DIAMOND PARK) CONSTRUCT 6,500 FEET OF 30-INCH TO 42-INCH SANITARY SEWER. 8,000,000 FY19 Wastewater OVERCHARGED MAINS, SANITARY OVERFLOWS, AND BUILDING BACKUPS. FLORLAND SANITARY RELIEF PHASE II (N. LINDBERGH BLVD TO MANRESA LN) CONSTRUCT 2,000 FEET OF 18-INCH TO 24-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-116 AND BP ,000 FY19 Wastewater EXCESSIVE I/I RESULTING IN OVERCHARGED SANITARY SEWERS FORDER SANITARY INTERCONNECTION (FORDER RD TO RINGER RD) CONSTRUCT 400 FEET OF 20-INCH SANITARY SEWER. 160,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 200 FEET OF 72-INCH PIPE IN ORDER TO PROVIDE 44,000 GALLONS OF ADDITIONAL WET FOREST VIEW PUMP STATION (P-483) IMPROVEMENTS WEATHER STORAGE AT PUMP STATION P ,000 FY19 Wastewater FREDERICK STREET COMBINED SEWER RELIEF CONSTRUCT GREEN INFRASTRUCTURE SOLUTIONS TO ALLEVIATE SYSTEM PROBLEMS. 3,000,000 FY19 Wastewater OVERCHARGED MAINS, BUILDING BACKUPS AND FLOODING FRONTENAC, WINDING RIDGE, DEER CREEK HILL I/I REDUCTION (S QUAD I-64 AND CLAYTON RD) REHABILITATE 15,300 FEET OF 8-INCH TO 15-INCH SEWER. REHABILITATE 85 MANHOLES. 260,000 FY19 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2018) GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018) GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2019) CONTRACT A GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2019) CONTRACT B GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2019) CONTRACT C GENERAL SERVICES AGREEMENT - SEWER DESIGN (2018) CONTRACT A GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT A GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT B GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT C GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT D GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2018) CONTRACT E GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE III, IV AND V COLLECTOR/CONNECTOR SEWERS GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VI (SKME-521) GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 250,000 FY19 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 300,000 FY19 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 50,000 FY19 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 50,000 FY19 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 50,000 FY19 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 150,000 FY19 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY19 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY19 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY19 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY19 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2019 BASED ON PERFORMANCE. 50,000 FY19 Wastewater CONSTRUCT 5,400 FEET OF 8-INCH TO 21-INCH SANITARY SEWER. ABANDON 8,500 FEET OF 60-INCH TO 72-INCH EXISTING SEWER. 1,300,000 FY19 Wastewater CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. COLLECTION SEWERS NEED TO BE CONNECTED TO THE NEW GRAVOIS TRUNK. OLD TRUNK SEWER NEEDS TO BE ABANDONED. SIXTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE CONSTRUCTION OF 11,000 FEET OF 8-INCH TO 72-INCH DIAMETER SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,870,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT SANITARY STORAGE FACILITY TO STORE WET WEATHER SANITARY FLOW, TO MITIGATE SURCHARGING AND ELIMINATE TWO CONSTRUCTED SSOS. 36,500,000 FY19 Wastewater GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) 500,000 FY19 Wastewater WET WEATHER I/I CAUSING SYSTEM SURCHARGING AND CONSTRUCTED SSO ACTIVATION. WET WEATHER I/I CAUSING SYSTEM SURCHARGING AND CONSTRUCTED SSO ACTIVATION. GREEN PARK AND LAKESHIRE I/I REDUCTION (TESSON FERRY RD AND GREEN PARK RD) PERFORM PRIVATE I/I REDUCTION AT 35 PROPERTIES. 320,000 FY19 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS. HARLEM BADEN RELIEF PHASE IV (HEBERT) - HAMILTON TO DARVER TRUNK SEWER CONSTRUCT 2,800 FEET OF 12-INCH TO 108-INCH SEWERS, AND 190 FEET OF PIPE IN TUNNEL. 2,000,000 FY19 Wastewater HARLEM BADEN RELIEF PHASE IV (HEBERT) - TRUNK SEWER REHABILITATION CONSTRUCT 109,900 FEET OF SHOTCRETE LINER, 1,240 FEET OF CIPP LINING, AND 6,400 SQUARE FEET OF SPOT REPAIRS. 4,000,000 FY19 Wastewater BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS. BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS HARRISON SANITARY RELIEF (GRAND AVE TO W ROSE HILL AVE) CONSTRUCT 700 FEET OF 18-INCH SANITARY SEWER. 250,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS HERMITAGE SANITARY RELIEF (SKME-615) CONSTRUCT 3,850 FEET OF 15-INCH SANITARY SEWER AND I/I REDUCTION. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-181, BP-333, BP-343, AND BP ,000 FY19 Wastewater

126 Wastewater CIRP Project List Project Number Long Name INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT A INFRASTRUCTURE REPAIRS (REHABILITATION) (2019) CONTRACT B INFRASTRUCTURE REPAIRS (WASTEWATER) (2019) JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) Description Budget Amount Financial Year Project Type Desc AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 2,500,000 FY19 Wastewater AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 2,500,000 FY19 Wastewater AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 5,500,000 FY19 Wastewater CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS. 29,925,000 FY19 Wastewater Problem Description OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 615,000 FY19 Wastewater CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS JENNINGS STATION ROAD / NORTH BADEN BASIN CONSTRUCT DETENTION BASIN IN AREA OF NORTH BADEN TRUNK SEWER. 1,500,000 FY19 Wastewater OVERCHARGED MAINS, BUILDING BACKUPS, AND FLOODING LANG ROYCE SANITARY RELIEF (FARGO DR TO FLORIDALE CT) LAY RD - GALLERIA I/I REDUCTION (CLAYTON RD AND LAY RD) LEMAY PUBLIC I/I REDUCTION (2019) CONTRACT A LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CONSTRUCT 1,000 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SS0 OUTFALL BP ,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-291 REQUIRES REMOVAL. REHABILITATE 720 FEET OF 10-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 250,000 FY19 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 2,660,000 FY19 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 155,000 FY19 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 160,000 FY19 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION. LEMAY WWTF RETURN ACTIVATED SLUDGE PUMP DRIVE MODIFICATIONS REBUILD PUMPS AND INSTALL VARIABLE FREQUENCY DRIVES. 50,000 FY19 Wastewater AGING PUMPS NEARING THE END OF THEIR USEFUL LIFE OPERATE INEFFICIENTLY, CAUSING EXCESSIVE UTILITY COSTS. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 300,000 FY19 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LOWELL STREET - GIMBLIN TO DODDRIDGE COMBINED SEWER IMPROVEMENT REPLACE 710 FEET OF 27-INCH COMBINED SEWER WITH 42-INCH COMBINED SEWER. 510,000 FY19 Wastewater BUILDING BACKUPS DUE TO OVERCHARGED MAINS. LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER MERAMEC WWTF EXPANSION PHASE II DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 520,000 FY19 Wastewater EXPAND AND UPGRADE EXISTING LOWER MERAMEC WWTF TO ACCOMODATE FUTURE FLOWS AND FUTURE NUTRIENT REMOVAL PERMIT REQUIREMENTS. 10,000,000 FY19 Wastewater MACKLIND PUMP STATION (P-304) IMPROVEMENTS CONSTRUCT REPLACEMENT OF THE MACKLIND PUMP STATION. 450,000 FY19 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. NUTRIENT REMOVAL PERMIT REQUIREMENTS AND ADDITIONAL FLOWS AT THE LOWER MERAMEC WWTF. PUMP STATION DESIGN LIFE CYCLE EXCEEDED, AND COLLECTION SYSTEM IMPROVEMENTS REQUIRE CHANGES IN PUMP STATION. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) CONSTRUCT COMBINED SEWAGE STORAGE TUNNEL, ASSOCIATED PUMP STATION, AND SEWERS. 21,525,000 FY19 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 485,000 FY19 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS MARIETTA SANITARY RELIEF (CIRCLE DR TO FLORISSANT RD) CONSTRUCT 770 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 1,000,000 FY19 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE II REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,500,000 FY19 Wastewater NORTH FOREST AND BROOKSIDE I/I REDUCTION (SUMMIT AVE AND MARSHALL AVE) NORTH WEBSTER CC, POCAHONTAS, SOUTH BRENTWOOD I/I REDUCTION (S BRENTWOOD BLVD AND MANCHESTER) PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL ROBYN I/I REDUCTION (S LINDBERGH BLVD AND ROBYN RD) SCHUETZ ROAD SANITARY RELIEF (FOREST BROOK LN TO SUNNY WOOD CT) SHREWSBURY SANITARY RELIEF SEWER AND I/I REDUCTION (WEIL AVE AND I-44) SOUTH BROADWAY AT MERAMEC COMBINED SEWER REPLACEMENT REHABILITATE 49 MANHOLES AND ASSOCIATED SEWERS. PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 500,000 FY19 Wastewater REHABILITATE 35 MANHOLES AND ASSOCIATED SEWERS. PERFORM PRIVATE I/I REDUCTION AT 25 PROPERTIES. 650,000 FY19 Wastewater CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE SANITARY SYSTEM. 500,000 FY19 Wastewater CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 5,000,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-292 REQUIRES REMOVAL. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SURCHARGING BROUGHT ABOUT BY EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING SANITARY SEWERS. COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY. REHABILITATE 10,000 FEET OF 8-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 150,000 FY19 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS AND STRUCTURAL ISSUES. CONSTRUCTION OF APPROXIMATELY 1,980 FEET OF 12-INCH TO 18-INCH DIAMETER SANITARY SEWERS AND APPURTENANCES. 70,000 FY19 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 5,100 FEET OF 8-INCH TO 27-INCH SANITARY SEWER. PERFORM PRIVATE I/I REDUCTION AT 260 PROPERTIES. 1,300,000 FY19 Wastewater OVERCHARGED SAITARY SEWERS. CONSTRUCT 525 FEET OF 15-INCH COMBINED SEWER UNDER SOUTH BROADWAY, IN TUNNEL OR USING OTHER METHODS. 150,000 FY19 Wastewater EXISTING 15 INCH COMBINED SEWER IS DETERIORATED WITH NUMEROUS GRADE CHANGES AND BELLIES. LINE HOLDS DEBRIS AND BLOCKS EASILY CAUSING STREET FLOODING.

127 Wastewater CIRP Project List Project Number Long Name SPRING AVE SANITARY RELIEF (YEATMAN AVE TO DALE AVE) ST. JACQUES SANITARY RELIEF (ST. JACQUES ST TO N LAFAYETTE ST) Description Budget Amount Financial Year Project Type Desc CONSTRUCT 2,300 FEET OF 15-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater Problem Description OVERCHARGED SANITARY SEWERS. ELIMINATION OF CONSTRUCTED SSO OUTFALL REQUIRED. CONSTRUCT 1,300 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater OVERCHARGED SANITARY SEWERS. ELIMINATE SSO BP-110. CONSTRUCT 3,500 FEET OF 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT TO COVE LN) CONSTRUCTED SSO OUTFALLS BP-210, BP-211 AND BP ,000 FY19 Wastewater SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN) SUGAR CREEK I/I REDUCTION (W ADAMS AVE AND COUCH AVE) REPLACE 4,500 FEET OF 10-INCH TO 15-INCH SANITARY SEWER WITH 18-INCH SANITARY SEWER, AND REPLACE 1,150 FEET OF 10-INCH SANITARY SEWER WITH 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP-210, BP-211 AND BP-213 REQUIRE REMOVAL. BUILDING BACKUPS & OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-214 REQUIRES REMOVAL. REHABILITATE 4,600 FEET OF 8-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 30,000 FY19 Wastewater OVERCHARGED SANITARY SEWERS. TOWNE SOUTH AND BRUNSTON I/I REDUCTION (AMBS RD AND TOWNE CENTRE DR) PERFORM PRIVATE I/I REDUCTION AT 10 PROPERTIES. 60,000 FY19 Wastewater OVERCHARGED SANITARY SEWERS. TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO HILDESHEIM AVE) CONSTRUCT 4,400 FEET OF 18-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY19 Wastewater UNION CREEK I/I REDUCTION (I-55 BETWEEN S LINDBERGH BLVD AND BUCKLEY RD) REHABILITATE 16,000 FEET OF SEWER. PERFORM PRIVATE I/I REDUCTION AT 40 PROPERTIES. 240,000 FY19 Wastewater UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) CONSTRUCT 6.5 MILLION GALLON UNDERGROUND STORAGE FACILITY. 20,000,000 FY19 Wastewater OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-618 REQUIRES REMOVAL. EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SANITARY STORAGE IS NECESSARY IN UNIVERSITY CITY WATERSHED FOR FLOW ALLOCATION TO THE LEMAY TREATMENT FACILITY DURING WET WEATHER EVENTS. UPPER MALINE TRUNK SANITARY RELIEF PHASE IV SECTION C PUBLIC I/I REDUCTION REHABILITATE 20,000 FEET OF 8-INCH TO 42-INCH SEWER. 4,100,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. UPPER MATTESE TRUNK SANITARY RELIEF (THEISS RD TO LIBERTY TRAIL RD) CONSTRUCT 14,000 FEET OF 18-INCH TO 36-INCH SANITARY SEWER. 1,433,000 FY19 Wastewater OVERCHARGED SANITARY SEWERS. COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 300,000 FY19 Wastewater UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY UR-11 BALSON AVENUE SANITARY RELIEF CONSTRUCT 4,300 FEET OF 18-INCH TO 21-INCH SANITARY SEWERS. 1,310,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION (VALCOUR RD AND WATSON RD) VALLEY I/I REDUCTION (CLARKSON RD AND KEHRS MILL RD) CONSTRUCT 3,900 FEET OF 10-INCH TO 12-INCH SANITARY SEWER. REHABILITATE 800 FEET OF 10-INCH SEWER. 1,425,000 FY19 Wastewater CONSTRUCT 1,400 FEET OF 8-INCH SANITARY SEWER. PERFORM PRIVATE I/I REDUCTION AT 30 PROPERTIES. 480,000 FY19 Wastewater EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT UPGRADE OF ELECTRICAL AND MECHANICAL SYSTEMS TO CURRENT STANDARDS, AND SYSTEMS ARE AGING AND IN NEED OF REPLACEMENT, AND CANNOT BE VANCE RD PUMP STATION (P-472) UPGRADES ELEVATE SYSTEMS TO AVOID DAMAGE FROM HIGH WATER. 1,000,000 FY19 Wastewater OPERATED DURING HIGH WATER VIRGINIA I/I REDUCTION (CLARKSON RD AND MARSH AVE) CONSTRUCT 2,100 FEET OF 8-INCH SEWER. REHABILITATE 2,100 FEET OF 8-INCH SEWER. 540,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS WATKINS-SPANISH SANITARY RELIEF (MALAGA ST TO TRAMPE AVE) CONSTRUCT 2,500 FEET OF 24-INCH TO 27-INCH SANITARY SEWER. 290,000 FY19 Wastewater OVERCHARGE SANITARY SEWERS. WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE III REMOVAL OF PUBLIC I/I. 1,000,000 FY19 Wastewater CONSTRUCT NEW SEWERS TO ALLEVIATE BACKUPS. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-187 AND BP ,000 FY19 Wastewater BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATED SANITARY SEWERS. BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS WEST LOCKWOOD SANITARY RELIEF WESTBOROUGH - LUTHER - MERMOD PLACE I/I REDUCTION (N KIRKWOOD RD TO I-44 AND BERRY RD) PERFORM PUBLIC AND PRIVATE I/I. 540,000 FY19 Wastewater BUILDING BACKUPS AND OVERCHARGED SEWERS. WILLIAMS CREEK PUMP STATION (P-523) STORAGE PUMP STATION P-523 STORAGE NEEDS REHABILITATION TO REDUCE REHABILITATION REHABILITATE 420 FEET OF 96-INCH STORAGE PIPE. 30,000 FY19 Wastewater EXCESSIVE I/I. EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED WOODHOLLOW I/I REDUCTION (I-270 AND PAGE) REHABILITATE 1,000 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 110,000 FY19 Wastewater SANITARY SEWERS WOODS MILL SANITARY RELIEF (I-64 TO BROOK MILL LN) CONSTRUCT 1,800 FEET OF 12-INCH SANITARY SEWER. 480,000 FY19 Wastewater OVERCHARGED SANITARY SEWERS BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2020) CCTV INSPECTION OF SEWERS (2020) CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT A GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT B GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT C PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY20 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 2,000,000 FY20 Wastewater PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 1,000,000 FY20 Wastewater INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY20 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY20 Wastewater PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY20 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY20 Unallocated PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY20 Unallocated FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM.

128 Wastewater CIRP Project List Project Number Long Name GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2018) CONTRACT D INFRASTRUCTURE REPAIRS (WASTEWATER) (2020) LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA (2020) RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) STREAM FLOW WATER QUALITY SAMPLING (2020) ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09) Description Budget Amount Financial Year Project Type Desc PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 60,000 FY20 Unallocated AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 1,500,000 FY20 Wastewater Problem Description APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY20 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION. DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY20 Wastewater INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 150,000 FY20 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY20 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND DESIGN EFFORTS. 585,000 FY20 Unallocated PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 650,000 FY20 Unallocated CONSTRUCT 5,800 FEET OF 15-INCH TO 30-INCH DIAMETER SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,050,000 FY20 Wastewater BELLERIVE SANITARY RELIEF (LADUE RD TO CONWAY RD) CONSTRUCT 2,400 FEET OF 12-INCH SANITARY SEWER. 1,000,000 FY20 Wastewater BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2020) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021) CONTRACT B BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR WATER QUANTITY & QUALITY EVALUATION OF STREAMS. STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS. REPLACE UNDERSIZED SEWER, ELIMINATE CONSTRUCTED SSO BP-421, PREDECESSOR PROJECT FOR FUTURE SSO REMOVALS. EXISTING SEWER DOES NOT HAVE CAPACITY TO CONVEY DESIGN STORM. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 1,815,000 FY20 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 190,000 FY20 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 340,000 FY20 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 1,040,000 FY20 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. BISSELL POINT WWTF BELT FILTER PRESS CONVEYOR REPLACEMENT CONSTRUCT REPLACEMENT OF BELT CONVEYOR SYSTEMS. 3,400,000 FY20 Wastewater EXISTING BELT CONVEYOR EQUIPMENT IS DETERIORATING AND REQUIRES REPLACEMENT. BRENTWOOD FOREST, FAIR OAKS, MIDDLESEX I/I REDUCTION (I- REHABILITATE 1,800 FEET OF 12-INCH TO 21-INCH SEWER. REHABILITATE 87 MANHOLES. PERFORM 64 AND LAY RD) PRIVATE I/I REDUCTION AT 45 PROPERTIES. 500,000 FY20 Wastewater REDUCTION OF I/I ACROSS THE TRIBUTARY AREA REQUIRED BRIDGEPORT AVE & BRENTWOOD BLVD SEWER SEPARATION CONSTRUCT 540 FEET OF 12-INCH STORM SEWERS AND APPUTENANCES, REMOVING CROSS CONNECTIONS TO COMBINED SYSTEM. 720,000 FY20 Wastewater WATER BACKUPS DUE TO STORM SYSTEM CROSS CONNECTIONS WITH COMBINED SEWERS. BRINWOOD SANITARY RELIEF (SHARON DR TO CORTEZ DR AND SHACKELFORD RD TO DANNELLE DR) CONSTRUCT 4,800 FEET OF 15-INCH TO 27-INCH SANITARY SEWER. 500,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. BROOKSHIRE SANITARY RELIEF (BROOKSHIRE DR TO COUGAR DR) CONSTRUCT 4,700 FEET OF 21-INCH TO 27-INCH SANITARY SEWER 1,670,000 FY20 Wastewater BUILDING BACKUP AND OVERCHARGED SANITARY SEWERS. CANTERBURY DRIVE LATERAL SANITARY RELIEF (NELSON DR TO CANTERBURY DR) CONSTRUCT 3,700 FEET OF 10-INCH TO 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater CAPILIA SANITARY RELIEF (GRANT RD TO CAPILIA DR) CONSTRUCT 2,900 FEET OF 8-INCH TO 15-INCH SANITARY SEWER. ABANDON 1,900 FEET OF 8-INCH SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-370 AND BP ,000 FY20 Wastewater REHABILITATE 6,900 FEET OF 8-INCH TO 12-INCH SEWER. REHABILITATE 50 MANHOLES. PERFORM CARSON VILLA I/I REDUCTION (MARCELLA AVE AND WALES AVE) PRIVATE I/I REDUCTION AT 45 PROPERTIES. 130,000 FY20 Wastewater CAULKS CREEK FORCEMAIN REHABILITATION PHASE II REHABILITY 25,000 FEET OF 24-INCH FORCEMAN. 2,500,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-612 REQUIRES REMOVAL. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO BP-370 AND BP-581 REQUIRE REMOVAL. CHESTERFIELD VALLEY BUSINESS PUMP STATION (P-729) REPLACEMENT REHABILITATE OR REPLACE PUMP STATION P ,000 FY20 Wastewater WET WELL IN POOR CONDITION. EXISTING FORCEMAIN IS BEING REPLACED. A NEW FORCEMAIN IN PUT INTO SERVICE, THE EXISTING FORCEMAIN MUST BE REHABILITATED TO PROVIDE REDUNDANCY. CHRISTOPHER DR I/I REDUCTION (ENGLAND TOWN RD TO BECKER RD) REHABILITATE 4,600 FEET OF 8-INCH SEWER. 20,000 FY20 Wastewater EXCESSIVE WET WEATHER FLOWS IN THE TRUNK SEWER COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B REHABILITATION CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES CONSTRUCT REHABILITATION OF SECTION B OF THE COLDWATER TRUNK SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-091, BP-115, BP-119, BP-141, BP-144, BP-473, BP-526, AND BP ,000,000 FY20 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TUNNEL CONSTRUCTION PROJECTS IN THE LOWER AND MIDDLE RDP AREAS. 16,540,000 FY20 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR PROJECTS ASSOCIATED WITH THE LOWER MERAMEC TUNNEL SYSTEM AND UPPER RDP TUNNEL SYSTEM. 5,600,000 FY20 Wastewater PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUT THE DISTRICT. 3,923,000 FY20 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING OVERCHARGED SANITARY SEWER. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA TUNNEL CONSTRUCTION. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA THE CONSTRUCTION OF STORAGE TANK, PUMP STATIONS AND/OR OTHER FACILITIES.

129 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc CONWAY VILLAGE SANITARY RELIEF (CONWAY RD TO I-64) CONSTRUCT 4,700 FEET OF 12-INCH SANITARY SEWER. 2,000,000 FY20 Wastewater CROSSROADS, HANLEY INDUSTRIAL, LITZSINGER EAST I/I REDUCTION (SW I-64 AND S HANLEY RD) CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I- 118)/OUTFALL (L-111) ELIMINATION AND SEWER SEPARATION Problem Description EXISTING SEWER DOES NOT HAVE THE CAPACITY TO CONVEY THE DESIGN STORM CAUSING BUILDING BACKUPS. REHABILITATE 2,900 FEET OF 8-INCH TO 48-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 300,000 FY20 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. PERFORM PUBLIC AND PRIVATE I/I REDUCTION IN 1247 MERAMEC STUDY AREA WHICH WILL ALSO INCLUDE SEWER SEPARATION. REMOVE INTERCEPTOR I-118 AND CSO OUTFALL L ,000,000 FY20 Wastewater DARTMOUTH AVENUE SEWER SEPARATION CONSTRUCT 1,100 FEET OF 12-INCH TO 36-INCH STORM SEWER. 540,000 FY20 Wastewater DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III DEER CREEK PUBLIC I/I REDUCTION (2021) CONTRACT A DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) EXCESSIVE INFLOW THROUGH COMBINED SEWERS CONNECTED PUBLIC AND PRIVATE DEFECTS. COMBINED SEWER SURCHARGING AND BUILDING BACKUPS ALONG DARTMOUTH AVENUE AND YALE AVENUE. CONSTRUCT 5,400 FEET OF 78-INCH SANITARY SEWER TO ALLEVIATE SURCHARGING AND ELIMINATE CONSTRUCTED SSOS. 10,000,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWER. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 30,000 FY20 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF. 1,000,000 FY20 Wastewater DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) 75,400,000 FY20 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. DENNIS HILLS I/I REDUCTION (MAY VALLEY LN AND GREENMAR REHABILITATE 9,300 FEET OF 8-INCH SEWER. REHABILITATE 55 MANHOLES. PERFORM PRIVATE I/I OVERCHARGED SANITARY SEWERS IN THE GREEN KNOLL DR AREA AND DR) REDUCTION. 20,000 FY20 Wastewater EXCESSIVE I/I DIX SANITARY RELIEF (DIX AVE TO AIRWAY AVE) CONSTRUCT 2,700 FEET OF 18-INCH TO 21-INCH SANITARY SEWER. 290,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2020) EDNA-THURSBY I/I REDUCTION (HIGHLAND AVE TO BIG BEND BLVD) PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 1,000,000 FY20 Wastewater REHABILITATE 13,000 FEET OF 8-INCH TO 24-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 10 PROPERTIES. 30,000 FY20 Wastewater IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES. EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS ELINOR AVE. TEMPORARY SANITARY STORAGE FACILITY ESSEX I/I REDUCTION (W. ADAMS AVE AND SUGAR CREEK RIDGE DR) CONSTRUCT 600 FEET OF 84-INCH SEWER IN ORDER TO PROVIDE 150,000 GALLONS OF TEMPORARY STORAGE. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater ELIMINATION OF CONSTRUCTED SSO OUTFALL REQUIRED. REHABILITATE 4,200 FEET OF 8-INCH TO 18-INCH SEWER. REHABILITATE 59 MANHOLES. PERFORM PRIVATE I/I REDUCTION AT 10 PROPERITES. 20,000 FY20 Wastewater EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS IN THE ESSEX STUDY AREA ESSEX PLACE COMBINED SEWER RELIEF BUYOUT OF 14 PROPERTIES ON ESSEX PLACE. 3,000,000 FY20 Wastewater REOCCURRING OVERCHARGED MAINS AND BUILDING BACKUPS EVA WABASH I/I REDUCTION (I-170 AND FROST AVE) PERFORM PRIVATE I/I REDUCTION AT 103 PRIVATE PROPERTIES. 1,140,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS FENTON CREEK PUMP STATION (P-425) ELIMINATION FISHPOT TRUNK WEST I/I REDUCTION (SMITH DR AND VLASIS DR) CONSTRUCT 1,400 FEET OF 10-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-425 AND ASSOCIATED FORCEMAIN. 200,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 1,700 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 12,400 FEET OF 8-INCH SEWER. REHABILITATE 71 MANHOLES. 110,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS, AND EXCESSIVE I/I FLOWS AT THE VANCE ROAD PUMP STATION AND GRAND GLAIZE WWTF. FOX CREEK SANITARY RELIEF (HOLLOWAY RD TO CLAYMONT DR) CONSTRUCT 2,900 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 270,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS IN THE FOX CREEK AREA. FRANCES I/I REDUCTION (NORTHEAST OF I-270 AND DOUGHERTY FERRY RD) REHABILITATE 5,500 FEET OF 8-INCH TO 12-INCH SEWER. REHABILITATE 30 MANHOLES. 30,000 FY20 Wastewater GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2020) GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2020) GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2019) CONTRACT A GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2019) CONTRACT B GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2019) CONTRACT C GENERAL SERVICES AGREEMENT - SEWER DESIGN (2020) CONTRACT A GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT A GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT B GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT C GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT D GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) CONTRACT E RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 250,000 FY20 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 300,000 FY20 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 50,000 FY20 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 50,000 FY20 Wastewater RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2020 BASED ON PERFORMANCE. 50,000 FY20 Wastewater RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 150,000 FY20 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2017 BASED ON PERFORMANCE. 50,000 FY20 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 50,000 FY20 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 50,000 FY20 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 50,000 FY20 Wastewater RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 50,000 FY20 Wastewater EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS IN THE FRANCES STUDY AREA. CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.

130 Wastewater CIRP Project List Project Number Long Name GEYER SANITARY RELIEF AND WINDSOR SPRINGS P-521 STORAGE (BIG BEND BLVD TO WINDSOR SPRINGS DR) Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 5,300 FEET OF 6-INCH FORCEMAIN. CONSTRUCT 500 FEET OF 96-INCH PIPE IN ORDER TO PROVIDE 188,000 GALLONS OF TEMPORARY STORAGE. 1,500,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. GRAND GLAIZE TRUNK SANITARY RELIEF (BALLWIN GOLF CLUB TO CLAYMONT COVE CT) CONSTRUCT 1,600 FEET OF 15-INCH SANITARY SEWER. 140,000 FY20 Wastewater GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) CONSTRUCT SANITARY STORAGE FACILITY TO STORE WET WEATHER SANITARY FLOW, TO MITIGATE SURCHARGING AND ELIMINATE TWO CONSTRUCTED SSOS. 26,500,000 FY20 Wastewater GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) 500,000 FY20 Wastewater HAMPTON AND CLAYTONIA CREEK SANITARY RELIEF - PRE- DESIGN (DEER CREEK TRUNK SEWER TO CLAYTON RD) HARLEM BADEN RELIEF PHASE IV (HEBERT) - DARVER TO 69TH STREET TRUNK SEWER OVERCHARGED SANITARY SEWERS IN THE GRAND GLAIZE TRUNK SEWER. WET WEATHER I/I CAUSING SYSTEM SURCHARGING AND CONSTRUCTED SSO ACTIVATION. WET WEATHER I/I CAUSING SYSTEM SURCHARGING AND CONSTRUCTED SSO ACTIVATION. CONSTRUCT SANITARY RELIEF PROJECTS ALONG HAMPTON AND CLAYTONIA CREEKS, WITH CONSIDERATION FOR THE ALIGNMENT OF RDP TRIBUTARIES CSO TUNNEL AND CSO CONVEYANCE SEWER. 680,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS. CONSTRUCT 8,550 OF 8-INCH TO 48-INCH TRUNK SEWER, 70 FEET OF PIPE IN TUNNEL, AND 3,000 FEET OF SEWER LINING. 4,100,000 FY20 Wastewater BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS. HARLEM BADEN RELIEF PHASE IV (HEBERT) - SEWER BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEPARATION CHERRY TO 68TH STREET CONSTRUCT 6,000 FEET OF 8-INCH TO 42-INCH SEWERS, AND 2,840 FEET OF LINING. 400,000 FY20 Wastewater SEWERS HEIMOS PUMP STATION (P-503) FORCEMAIN REPLACEMENT CONSTRUCT 4,900 FEET OF 3-INCH FORCEMAIN. 130,000 FY20 Wastewater FORCEMAIN REPLACEMENT REQUIRED HUNTERS FIELD I/I REDUCTION (DOUGHERTY FERRY RD. TO MANCHESTER RD. NEAR I-270) REHABILITATE 5,200 FEET OF 8-INCH TO 12-INCH SEWER. 150,000 FY20 Wastewater INFRASTRUCTURE REPAIRS (REHABILITATION) (2020) CONTRACT A INFRASTRUCTURE REPAIRS (REHABILITATION) (2020) CONTRACT B INFRASTRUCTURE REPAIRS (WASTEWATER) (2020) JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 5,000,000 FY20 Wastewater AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 5,000,000 FY20 Wastewater AS REPAIR OR REPLACEMENT NEEDS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONSTRUCTION CONTRACTS WILL BE BID AND AWARDED. 5,500,000 FY20 Wastewater CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL, ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS (P-305) PUMP STATIONS. 27,405,000 FY20 Wastewater JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 560,000 FY20 Wastewater KINGSTON STUDY AREA I/I REDUCTION LADUE ESTATES SANITARY RELIEF (DEER CREEK TRUNK SEWER TO S LADUE ESTATES DR) CONSTRUCT 1,200 FEET OF 8-INCH TO 10-INCH SANITARY SEWER. REHABILITATE 7,000 FEET OF 8-INCH TO 36-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 210 PROPERTIES. 800,000 FY20 Wastewater CONSTRUCT 720 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS. OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. OLD, DETERIORATED, AND DAMAGED SEWER LINES (8-INCH TO 36-INCH IN DIAMETER) ARE CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE ARE IN NEED OF REPAIR OR REPLACEMENT. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS. EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENT CONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TO DAMAGE IN HIGH RIVER CONDITIONS. EXCESSIVE I/I RESULTING IN BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTION OF A NEW SEWER MAY BE REQUIRED IF I/I REDUCTION UNDER PROJECT IS INSUFFICIENT TO ELIMINATE OVERCHARGED SANITARY SEWERS. LAFAYETTE SANITARY RELIEF (STRECKER RD TO DURANGO PASS CT) CONSTRUCT 2,000 FEET OF 12-INCH SANITARY SEWER. 620,000 FY20 Wastewater EXISTING 8-INCH PIPE DOES NOT HAVE ADEQUATE CAPACITY LAKE FOREST DR SEWER SEPARATION CONSTRUCT 1,300 FEET OF 15-INCH TO 21-INCH STORM SEWER. 530,000 FY20 Wastewater LEMAY NO. 3 PUMP STATION AND FORCE MAIN CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE MAIN. DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMP STATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305). 205,000 FY20 Wastewater LEMAY NO. 3 PUMP STATION AND FORCE MAIN 3,250,000 FY20 Wastewater LEMAY NO. 3 PUMP STATION AND FORCE MAIN 7,214,000 FY20 Wastewater LEMAY PUBLIC I/I REDUCTION (2020) CONTRACT A LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED SANITARY SEWERS. JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT. JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT. JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 5,050,000 FY20 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 126,000 FY20 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS LEMAY WWTF ODOR CONTROLS CONSTRUCT IMPROVEMENTS TO ODOR CONTROL SYSTEM AT LEMAY WWTF. 500,000 FY20 Wastewater LEMAY WWTF RETURN ACTIVATED SLUDGE PUMP DRIVE MODIFICATIONS REBUILD PUMPS AND INSTALL VARIABLE FREQUENCY DRIVES. 350,000 FY20 Wastewater LINDBERGH PARK COMBINED SEWER RELIEF (BREDELL AVE TO PRINCETON PL) CONSTRUCT 3,800 FEET OF 30-INCH TO 60-INCH STORM SEWER. 2,600,000 FY20 Wastewater FACILITY IMPROVEMENTS AND ADDITIONAL FLOWS REQUIRE ENHANCED ODOR CONTROL. AGING PUMPS NEARING THE END OF THEIR USEFUL LIFE OPERATE INEFFICIENTLY, CAUSING EXCESSIVE UTILITY COSTS. SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED COMBINED SEWERS. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 1,890,000 FY20 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 250,000 FY20 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 95,495,000 FY20 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LOHMEYER COMBINED SEWER RELIEF (BENTLEY DR TO BREDELL AVE) CONSTRUCT 1,200 FEET OF 42-INCH STORM SEWER. 170,000 FY20 Wastewater SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED COMBINED SEWERS.

131 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description LOUISA AND ARSENAL PUMP STATIONS (P-112 AND P-113) UPGRADES CONSTRUCT UPGRADE OF VALVING AND PIPING SYSTEMS. 1,000,000 FY20 Wastewater MECHANICAL SYSTEMS AGING AND IN NEED OF REPLACEMENT. LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 470,000 FY20 Wastewater CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT AT THE LOWER MERAMEC WWTF. 1,000,000 FY20 Wastewater LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 10,000,000 FY20 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN MACKENZIE I/I REDUCTION (CHIPPEWA AND MACKENZIE HILLS) PERFORM PUBLIC AND PRIVATE I/I REDUCTION. 470,000 FY20 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS MACKENZIE I/I REDUCTION (RESURRECTION CEMETERY, WEHNER PARK, KENRICK SEMINARY, AND NERINX HALL) PERFORM PRIVATE I/I REDUCTION. 2,000,000 FY20 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS MACKLIND PUMP STATION (P-304) IMPROVEMENTS CONSTRUCT REPLACEMENT OF THE MACKLIND PUMP STATION. 2,000,000 FY20 Wastewater PUMP STATION DESIGN LIFE CYCLE EXCEEDED, AND COLLECTION SYSTEM IMPROVEMENTS REQUIRE CHANGES IN PUMP STATION. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) CONSTRUCT COMBINED SEWAGE STORAGE TUNNEL, ASSOCIATED PUMP STATION, AND SEWERS. 19,950,000 FY20 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS. MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) 485,000 FY20 Wastewater CONTROL OF COMBINED SEWER OVERFLOWS. MANCHESTER RD AND S BIG BEND BLVD COMBINED SEWER RELIEF (HAMPTON CREEK TO LYNDOVER PL) CONSTRUCT 5,500 FEET OF 30-INCH TO 60-INCH STORM SEWER. 930,000 FY20 Wastewater MARK TWAIN I/I REDUCTION (MANCHESTER RD AND BOMPART AVE) MC-02 WATSON TO EDGAR RD SANITARY RELIEF (SKME-580A) SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED COMBINED SEWERS. CONSTRUCT 1,000 FEET OF 8-INCH TO 12-INCH SANITARY SEWER. REHABILITATE 5,100 FEET OF 8-INCH TO 18-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT FIVE PROPERTIES. 550,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS. CONSTRUCT 5,325 FEET OF 18-INCH TO 36-INCH SANITARY RELIEF SEWER FROM RESURRECTION CEMETERY TO EDGAR ROAD. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,100,000 FY20 Wastewater MEACHAM AND SPELLMAN I/I REDUCTION (I-44 AND S KIRKWOOD RD) REHABILITATE 20,000 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 150,000 FY20 Wastewater MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS AVE) CONSTRUCT 2,800 FEET OF 21-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP- 095 AND BP ,000 FY20 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE III REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,500,000 FY20 Wastewater NORTH FEE FEE CREEK I/I REDUCTION (I-270 AND CREVE COEUR MILL RD) OAKWOOD FARMS PUMP STATION (P-470) ELIMINATION PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS AND CREEK EROSION. EXCESSIVE I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP-095 AND BP-145 REQUIRE REMOVAL. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. REHABILITATE 13 MANHOLES AND ASSOCIATED SEWERS. PERFORM PRIVATE I/I REDUCTION AT 30 PROPERTIES. 670,000 FY20 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. CONSTRUCT 915 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-470 AND ASSOCIATED FORCEMAIN. 60,000 FY20 Wastewater PUMP STATION P-470 NEEDS TO BE REPLACED. CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE SANITARY SYSTEM. 500,000 FY20 Wastewater CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 5,000,000 FY20 Wastewater RIVERPORT 6 PUMP STATION (P-781) REPLACEMENT REPLACE PUMP STATION P ,000 FY20 Wastewater ROSARY LANE SANITARY RELIEF (CLAUDINE DRIVE TO MAKIN AVE) CONSTRUCT 2,100 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALSL BP-640 AND BP ,200,000 FY20 Wastewater PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING SANITARY SEWERS. COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY. PUMP STATION P-781 NEEDS REPLACEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS. REMOVAL OF CONSTRUCTED SANITARY SEWER OVERFLOWS IS REQUIRED ROSEDALE AVE SANITARY RELIEF (NEWPORT AVE TO ARBOR LN) CONSTRUCT 310 FEET OF 12-INCH SANITARY SEWER. 30,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS S GORE AVE SANITARY RELIEF (GRAY AVE TO OAK TERR) CONSTRUCT 1,700 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 140,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DR TO S GREENTRAILS DR) CONSTRUCT 4,000 FEET OF 15-INCH SANITARY SEWER. 430,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS SOUTH COUNTY SANITARY RELIEF (P-419 TO CRIPPLE CREEK DR) CONSTRUCT 11,000 FEET OF 12-INCH TO 21-INCH SANITARY SEWER. 4,000,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. ST. GEORGE CREEK SANITARY RELIEF (DAISY LN TO GRAVOIS RD TO NEW HAMPSHIRE AVE) CONSTRUCT 4,500 FEET OF 18-INCH TO 21-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER. ELIMINATE SSO BP-404. STONINGTON PLACE SANITARY RELIEF (CLAYTON RD TO GEORGIAN ACRES ST) CONSTRUCT 2,200 FEET OF 12-INCH SANITARY SEWER. 650,000 FY20 Wastewater OVERCHARGED SANITARY SEWERS TAPAWINGO PUMP STATION (P-440) STORAGE REHABILITATION REHABILITATE 150 FEET OF 96-INCH STORAGE PIPE. 310,000 FY20 Wastewater PUMP STATION P-440 STORAGE NEEDS REHABILITATION TO REDUCE EXCESSIVE I/I. TESSON CREEK I/I REDUCTION (TESSON FERRY RD AND TIFFANY SQUARE PKY) PERFORM PUBLIC AND PRIVATE I/I REDUCTION AT 1434 TESSON CREEK STUDY AREA. 250,000 FY20 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS THURSTON I/I REDUCTION (CHURCH ST AND N FLORISSANT RD) PERFORM PRIVATE I/I REDUCTION AT 10 PROPERTIES. 30,000 FY20 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS TILLES PARK, LITZSINGER AND PARKRIDGE I/I REDUCTION (LITZSINGER RD AND S MCKNIGHT RD) TM-03 TWO MILE CREEK SANITARY RELIEF (TWO MILE TRUNK TO FIRETHORN DR) CONSTRUCT 310 FEET OF 10-INCH SANITARY SEWER. REHABILITATE 2,900 FEET OF 8-INCH TO 42-INCH SEWER. 400,000 FY20 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. CONSTRUCT 300 FEET OF 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater CONSTRUCTED SSO OUTFALL BP-556 REQUIRES REMOVAL.

132 Wastewater CIRP Project List Project Number Long Name TREASURE COVE I/I REDUCTION (RIES RD AND BROOKSIDE LN) UPPER JESKE PARK SANITARY RELIEF (SCOTT DR TO CARDIGAN DR) UPPER LADUE CREEK I/I REDUCTION (NE QUAD OF S WARSON RD AND LADUE RD) UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 2,900 FEET OF 8-INCH TO 10-INCH SANITARY SEWER. REHABILITATE 15,800 FEET OF 8- INCH TO 24-INCH SEWER. REHABILITATE 123 MANHOLES AND ASSOCIATED SEWERS. 790,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 1,200 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-315 REQUIRES REMOVAL. REHABILITATE 2,400 FEET OF 8-INCH TO 10-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 15 PROPERTIES. 230,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 3,000,000 FY20 Wastewater VALLEY PUBLIC I/I REDUCTION (CLARKSON RD AND KEHRS MILL RD) REHABILITATE 11,000 FEET OF 8-INCH SEWER. 170,000 FY20 Wastewater VANCE RD PUMP STATION (P-472) UPGRADES VILLA COUBLAY SANITARY RELIEF WEBSTER GROVES TRUNK E SANITARY RELIEF (SKME-628) WHITE AND ROSALIE STORM SEWER IMPROVEMENTS CONSTRUCT UPGRADE OF ELECTRICAL AND MECHANICAL SYSTEMS TO CURRENT STANDARDS, AND ELEVATE SYSTEMS TO AVOID DAMAGE FROM HIGH WATER. 4,000,000 FY20 Wastewater CONSTRUCT 400 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater CONSTRUCT 10,500 FEET OF 12-INCH TO 54-INCH DIAMETER SANITARY SEWER FROM SAPPINGTON ROAD, NORTH OF EAST ESSEX TO MARSHALL ROAD. 1,000,000 FY20 Wastewater CONSTRUCT 1,366 FEET OF 12-INCH TO 27-INCH STORM SEWERS FROM SOUTH OF ROSALIE AVE. TO WHITE AVE. 570,000 FY20 Wastewater COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY. EXCESSIVE PUBLIC I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SYSTEMS ARE AGING AND IN NEED OF REPLACEMENT, AND CANNOT BE OPERATED DURING HIGH WATER. BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATED SANITARY SEWERS. STREET FLOODING AND WATER BACKUPS DUE TO INADEQUATE COMBINED SEWERS. WHITE BURCH PUMP STATION (P-725) REHABILITATION OR ELIMINATION ELIMINATE PUMP STATION BY CONSTRUCTING GRAVITY MAIN TO RIVERWOOD PUMP STATION. 615,000 FY20 Wastewater ELIMINATION OF PUMP STATION POSSIBLE. WINCHESTER DRIVE LATERAL SANITARY RELIEF (ROLAND BLVD TO COLONIAL AVE) WW-2 AND WW-3 WARSON WOODS SANITARY RELIEF CONSTRUCT 1,300 FEET OF 10-INCH TO 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY20 Wastewater CONSTRUCT 9,600 FEET OF 12-INCH TO 27-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-156, BP-340, AND BP ,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-532 REQUIRES REMOVAL. OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP- 156, BP-340 AND BP-501 REQUIRE REMOVAL YARNELL CREEK WEST I/I REDUCTION (BOWLES AVE AND 141) REHABILITATE 8,100 FEET OF 8-INCH TO 12-INCH SEWER. 30,000 FY20 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2020) CCTV INSPECTION OF SEWERS (2020) CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY21 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 2,000,000 FY21 Wastewater PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 1,000,000 FY21 Wastewater INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY21 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL 2021 PLUS BUDGET PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. 240,000 FY21 Unallocated INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA (2020) RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 2,000,000 FY21 Wastewater FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY21 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION. DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY21 Wastewater INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 150,000 FY21 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY21 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND DESIGN EFFORTS. 585,000 FY21 Unallocated STREAM FLOW WATER QUALITY SAMPLING (2020) PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 650,000 FY21 Unallocated AMBLEWOOD SANITARY RELIEF (WATERFORD DR TO BIRCHBARK DR) CONSTRUCT 4,400 FEET OF 21-INCH TO 24-INCH SANITARY SEWER. 513,000 FY21 Wastewater ASHLAND AVENUE - CLARA TO BELT COMBINED SEWER RELIEF ASHLAND AVENUE - SEMPLE TO UNION COMBINED SEWER RELIEF DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR WATER QUANTITY & QUALITY EVALUATION OF STREAMS. STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS. BUILDING BACKUPS ALONG THE PADDOCK CREEK LATERAL IN THE VICINITY OF AMBLEWOOD DRIVE. BUYOUT OF 31 PROPERTIES IN THE 5500 BLOCK OF ASHLAND, WHICH ARE ADJACENT TO THE SOUTH HARLEM TRUNK SEWER, SOFT SEPARATION AND CONSTRUCTION OF STORMWATER DETENTION BASIN. 750,000 FY21 Wastewater RECURRING OVERCHARGED MAINS AND BUILDING BACKUPS. BUYOUT OF 55 PROPERTIES ALONG THE SOUTH HARLEM TRUNK SEWER, SOFT SEPARATION AND CONSTRUCTION OF STORMWATER DETENTION BASIN. 750,000 FY21 Wastewater RECURRING OVERCHARGED MAINS AND BUILDING BACKUPS.

133 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description BALLAS MEADOWS PUMP STATION (P-712) ELIMINATION CONSTRUCT 590 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-712 AND ASSOCIATED FORCEMAIN. 44,000 FY21 Wastewater BUILDING BACKUPS AND POSSIBLE PUMP STATION OVERFLOW EVENTS BANFF SANITARY RELIEF (CAITHNESS RD TO LANARK RD) CONSTRUCT 320 FEET OF 10-INCH SANITARY SEWER. 25,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BEGG SANITARY RELIEF (KENWOOD TO BEGG RD) CONSTRUCT 680 FEET OF 10-INCH TO 12-INCH SANITARY SEWER. 61,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BELLEFONTAINE #2 SANITARY RELIEF (CHAMBERS RD TO COBURG LANDS DR) CONSTRUCT 1,200 FEET OF 12-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-287 REQUIRED REMOVAL BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2021) CONTRACT B BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 6,250,000 FY21 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 11,250,000 FY21 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 300,000 FY21 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 441,000 FY21 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION BISSELL POINT WWTF CONCRETE AND GATE IMPROVEMENTS REPAIR SLUICE GATES AND COMPONENTS, AND CONCRETE. 600,000 FY21 Wastewater BISSELL POINT WWTF PRELIMINARY AND PRIMARY TREATMENT MCC REPLACEMENT REPLACE MOTOR CONTROL CENTERS. 400,000 FY21 Wastewater BISSELL POINT WWTF STORM DRAINAGE IMPROVEMENTS REROUTE STORM DRAINAGE TO THE HEAD END OF THE PLANT. 1,200,000 FY21 Wastewater CAULKS CREEK A PUMP STATION (P-750) REPLACEMENT REPLACE PUMP STATION P ,500,000 FY21 Wastewater CAULKS CREEK TRUNK SEWER (SKME-011) PHASE II CONSTRUCT 5,600 FEET OF 27-INCH SANITARY SEWER. 2,100,000 FY21 Wastewater CONCRETE AND SLUICE GATE DETERIORATION DUE TO AGING INFRASTRUCTURE. NUMEROUS SMALL MOTOR CONTROL CENTERS IN FACILITY ARE OBSOLETE AND IN NEED OF REPLACEMENT. THREE PERMITTED STORM OUTFALLS WITH EFFLUENT LIMITATIONS AND OTHER OPERATING REQUIREMENTS THAT REQUIRE ELIMINATION OR BMPS. EXISTING PUMP STATION IS DETERIORATING AND REQUIRES REPLACEMENT. EXISTING SEWER DOES NOT HAVE CAPACITY TO CONVEY DESIGN STORM COLDWATER CREEK WWTF REDUNDANT SLUDGE FORCE MAIN CONSTRUCT 17,500 FEET OF 8-INCH REDUNDANT PARALLEL SLUDGE FORCE MAIN. 1,080,000 FY21 Wastewater NO BACKUP SYSTEM FOR EXISTING SLUDGE FORCE MAIN COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B REHABILITATION CONSTRUCT REHABILITATION OF SECTION B OF THE COLDWATER TRUNK SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-091, BP-115, BP-119, BP-141, BP-144, BP-473, BP-526, AND BP ,000,000 FY21 Wastewater CONSTRUCTION MANAGEMENT SERVICES MAJOR PROJECTS 2021 PLUS BUDGET PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR MAJOR PROJECTS. 20,650,000 FY21 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING OVERCHARGED SANITARY SEWER. SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA MAJOR CONSTRUCTION CONWAY ROAD SANITARY RELIEF (CONWAY LN TO DWYER AVE) CONSTRUCT 3,300 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 352,000 FY21 Wastewater OVERCHARGED SANITARY SEWERS. CREVE COEUR CREEK (L-52) FORCEMAIN REHABILITATION (P TO MO RIVER WWTF) REHABILITATION OF 1,000 FEET OF THE EXISTING 42-INCH FORCEMAIN. 76,000 FY21 Wastewater DETERIORATION OF EXISTING FORCEMAIN CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I- 118)/OUTFALL (L-111) ELIMINATION AND SEWER SEPARATION DACEY BRANCH SANITARY RELIEF (BELLA CLARE DR TO PRIOR DR) DEER CREEK PUBLIC I/I REDUCTION (2021) CONTRACT A DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) E. WATSON SANITARY RELIEF (RUDSON LN TO RICHVIEW DR) EASEMENT ACQUISITION FOR WASTEWATER PROJECTS 2021 PLUS BUDGET PERFORM PUBLIC AND PRIVATE I/I REDUCTION IN 1247 MERAMEC STUDY AREA WHICH WILL ALSO INCLUDE SEWER SEPARATION. REMOVE INTERCEPTOR I-118 AND CSO OUTFALL L ,000,000 FY21 Wastewater CONSTRUCT 4,600 FEET 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,610,000 FY21 Wastewater EXCESSIVE INFLOW THROUGH COMBINED SEWERS CONNECTED PUBLIC AND PRIVATE DEFECTS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-313 REQUIRES REMOVAL. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 940,000 FY21 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. CONSTRUCT SANITARY TUNNEL AND ASSOCIATED STRUCTURES, PUMPING STATIONS AND SEWERS AS PART OF AN OVERALL WATERSHED PLAN FOR SANITARY RELIEF. 24,100,000 FY21 Wastewater EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING IN EXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS. CONSTRUCT 4,000 FEET OF 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER. PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 2,000,000 FY21 Wastewater ED LOU LANE I/I REDUCTION (BROOKTON WAY AND GREENTON WAY) REHABILITATE 8,200 FEET OF 8-INCH TO 10-INCH SEWER. 30,000 FY21 Wastewater IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND LAND PURCH EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS EDMUNDSON SANITARY RELIEF (EDMUND AVE TO BATAAN DR) CONSTRUCT 2,200 FEET OF 15-INCH TO 18-INCH SANITARY SEWER. 180,000 FY21 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS FENTON WASTEWATER TREATMENT FACILITY ELIMINATION DECOMMISSION AND ABANDON EXISTING FENTON WWTF. 2,324,000 FY21 Wastewater FF-07 FEE FEE CREEK SANITARY RELIEF (MEADOWSIDE DR TO WILLOW BROOK DR) COMPLETION OF THE LOWER MERAMEC WWTF EXPANSION PH III AND EXT OF THE CONVEYENCE TUNNEL, FLOWS FROM THE FENTON WWTF WILL BE DIVERTED TO L MERAMEC WWTF. CONSTRUCT 4,950 FEET OF 15-INCH RELIEF SEWER NEAR SCHUETZ ROAD. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,650,000 FY21 Wastewater BASEMENT BACKUPS AND OVERLOADED SANITARY SEWERS. FLORISSANT/DUNN SANITARY RELIEF (ST. ANTHONY LN TO I- 270) CONSTRUCT 5,600 FEET OF 15-INCH TO 21-INCH SANITARY SEWER. 511,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OF ROCKS DR AND FONTAINE PL) GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF PHASE II CONSTRUCT 1,900 FEET OF 12-INCH STORM SEWER. PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 220,000 FY21 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. CONSTRUCT 4,700 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY21 Wastewater REMOVAL OF CONSTRUCTED SSO BP-382 REQUIRED.

134 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OF INTERNAL STAFF. GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2020) RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDED SERVICES. SERVICES MAY BE RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 250,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES. SERVICES MAY BE (2020) RENEWED THROUGH FY2021 BASED ON PERFORMANCE. 300,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - SEWER DESIGN (2020) RETAIN DESIGN FIRM FOR AS NEEDED SEWER DESIGN. SERVICES MAY BE RENEWED THROUGH FY2021 CONTRACT A BASED ON PERFORMANCE. 150,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH CONTRACT A FY2017 BASED ON PERFORMANCE. 50,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH CONTRACT B FY2021 BASED ON PERFORMANCE. 50,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH CONTRACT C FY2021 BASED ON PERFORMANCE. 50,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH CONTRACT D FY2021 BASED ON PERFORMANCE. 50,000 FY21 Wastewater GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2020) RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICES MAY BE RENEWED THROUGH CONTRACT E FY2021 BASED ON PERFORMANCE. 50,000 FY21 Wastewater GENERAL SERVICES AGREEMENT ENGINEERING SERVICES RETAIN FIRMS FOR AS NEEDED SURVEY, GEOTECHNICAL, CONSTRUCTION MANAGEMENT, FACILITY 2022 PLUS BUDGET AND SEWER DESIGN SERVICES. 150,000 FY21 Wastewater GLENFIELD SANITARY RELIEF (WATSON WOODS CT TO S LINDBERGH BLVD) CONSTRUCT 2,700 FEET OF 15-INCH SANITARY SEWER. 258,000 FY21 Wastewater OVERCHARGED SANITARY SEWERS GRAND GLAIZE WET WEATHER PUMP STATION GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE IV & V (SKME-521) GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE IX GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VI (SKME-521) GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VII (SKME-521) GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VIII (SKME-521) HARLEM BADEN RELIEF PHASE IV (HEBERT) - HODIAMONT TO CHERRY TRUNK SEWER B HORTON PUMP STATION (P-814) ELIMINATION CONSTRUCT NEW PUMP STATION WITH DESIGN PEAK FLOW RATE OF 5 MGD, AND 500 FEET OF 16- INCH FORCEMAIN, TO LAGOONS. 671,000 FY21 Wastewater FOURTH AND FIFTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE PREPARATION OF PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 3,220 FEET OF 12-INCH TO 84-INCH DIAMETER SEWER 1,307,000 FY21 Wastewater CONSTRUCT 4,800 FEET OF 8-INCH TO 54-INCH SANITARY SEWER. ABANDON 4,700 FEET OF EXISTING 36-INCH TO 42-INCH SEWER. ELIMINATE CONSTRUCTED SS0 OUTFALL BP ,000 FY21 Wastewater DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SEWER DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. ENGINEERING NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. WET WEATHER FLOWS AT THE GRAND GLAIZE PLANT EXCEED HEADWORKS CAPACITY, BACKING UP FLOWS INTO VALLEY PARK SEWERS. BYPASSES, BASEMENT BACKUPS, AND OVERCHARGED SANITARY SEWERS. OVERCHARGED SEWERS CAUSING BUILDING BACKUPS AND SANITARY SEWER OVERFLOWS. SIXTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE CONSTRUCTION OF 11,000 FEET OF 8-INCH TO 72-INCH DIAMETER SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. SEVENTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE PREPARATION OF PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 3,300 FEET OF 66 INCH DIAMETER SEWER FROM BUCKLEY TO UNION (STATION TO ). PROJECT ALSO INC 1,637,000 FY21 Wastewater BASEMENT BACKUPS AND OVERLOADED SANITARY SEWERS. CONSTRUCT 9,900 FEET OF 8-INCH TO 60-INCH SANITARY SEWER. ABANDON 7,500 FEET OF EXISTING 42-INCH SEWER. 916,000 FY21 Wastewater CONSTRUCT 5,540 FEET OF 8-INCH TO 84-INCH SEWER, 330 FEET OF PIPE IN TUNNEL, AND 1,500 FEET OF SEWER LINING. 4,750,000 FY21 Wastewater OVERCHARGED SEWERS CAUSING BUILDING BACKUPS AND SANITARY SEWER OVERFLOWS. BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS. CONSTRUCT 1,700 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-814 AND ASSOCIATED FORCEMAIN. 90,000 FY21 Wastewater PUMP STATION P-814 NEEDS TO BE REPLACED. HUNTLEIGH TRAILS LN SANITARY RELIEF (TWO MILE CREEK TRUNK SEWER TO N GEYER RD) CONSTRUCT 3,500 FEET OF 15-INCH TO 24-INCH SANITARY SEWER. 240,000 FY21 Wastewater OVERCHARGED SANITARY SEWERS. INFRASTRUCTURE REPAIRS (REHABILITATION) 2021 PLUS BUDGET INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 10,000,000 FY21 Wastewater AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 6,000,000 FY21 Wastewater CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOW TO THE NEW JEFFERSON BARRACKS TUNNEL. 3,045,000 FY21 Wastewater JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS 95,000 FY21 Wastewater CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE MAIN. DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMP STATION (P-306), AND LEMAY NO. 3 PUMP STATION AND FORCE MAIN JEFFERSON BARRACKS PUMP STATION (P-305). 11,130,000 FY21 Wastewater LEMAY NO. 3 PUMP STATION AND FORCE MAIN 340,000 FY21 Wastewater OLD, DETERIORATED, AND DAMAGED SEWER LINES CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THE MARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT. INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THE MARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT. JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT. JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT LEMAY PUBLIC I/I REDUCTION (2021) CONTRACT A REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 4,200,000 FY21 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS LEMAY WWTF AERATION TANK IMPROVEMENTS - CONCRETE AND GATE REPAIRS REPAIR CONCRETE, GATES AND VALVES. 500,000 FY21 Wastewater AERATION TANKS CONCRETE DETERIORATION LEMAY WWTF ODOR CONTROLS CONSTRUCT IMPROVEMENTS TO ODOR CONTROL SYSTEM AT LEMAY WWTF. 3,000,000 FY21 Wastewater FACILITY IMPROVEMENTS AND ADDITIONAL FLOWS REQUIRE ENHANCED ODOR CONTROL LINDLEY DRIVE SANITARY RELIEF (I-170 TO ASHMONT DR) (UR- 07) CONSTRUCT 7,500 FEET OF 12-INCH TO 21-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-416, BP-417, BP-433, AND BP ,200,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. FOUR SSO OUTFALLS BP-416, BP-417, BP-433, AND BP-476 REQUIRE REMOVAL.

135 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description LINDY I/I REDUCTION (CABALLERO DR AND CHAMBERLAIN DR) PERFORM PRIVATE I/I REDUCTION AT ONE PROPERTY AND REHABILITATE FIVE MANHOLES AND ASSOCIATED SANITARY SEWERS. 20,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 1,890,000 FY21 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 91,005,000 FY21 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED LOUISA AND ARSENAL PUMP STATIONS (P-112 AND P-113) UPGRADES CONSTRUCT UPGRADE OF VALVING AND PIPING SYSTEMS. 4,000,000 FY21 Wastewater MECHANICAL SYSTEMS AGING AND IN NEED OF REPLACEMENT LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 270,000 FY21 Wastewater CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT AT THE LOWER MERAMEC WWTF. 1,500,000 FY21 Wastewater LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 46,000,000 FY21 Wastewater EXPAND AND UPGRADE EXISTING LOWER MERAMEC WWTF TO ACCOMODATE FUTURE FLOWS AND LOWER MERAMEC WWTF EXPANSION PHASE II FUTURE NUTRIENT REMOVAL PERMIT REQUIREMENTS. 2,000,000 FY21 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. NUTRIENT REMOVAL PERMIT REQUIREMENTS AND ADDITIONAL FLOWS AT THE LOWER MERAMEC WWTF LOWER MERAMEC WWTF EXPANSION PHASE II 27,700,000 FY21 Wastewater NUTRIENT REMOVAL PERMIT REQUIREMENTS AND ADDITIONAL FLOWS AT THE LOWER MERAMEC WWTF MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET UPGRADES OF MAJOR PUMP STATIONS REQUIRED TO MAINTAIN LEVEL OF SERVICE AND PREVENT FLOW RELEASES TO THE ENVIRONMENT. 1,000,000 FY21 Wastewater AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR REPLACEMENT MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET 4,000,000 FY21 Wastewater AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR REPLACEMENT MARCO PUMP STATION (P-406) REPLACEMENT REPLACE PUMP STATION P ,000 FY21 Wastewater PUMP STATION P-406 NEEDS TO BE REPLACED MEAD SANITARY RELIEF (LANDWEHR LN TO HEMLOCK DR) CONSTRUCT 690 FEET OF 10-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-289 REQUIRES REMOVAL MERAMEC BOTTOMS PUMP STATION (P-489) INTERCEPTOR SEWER CONSTRUCT 1,700 FEET OF 18-INCH TO 30-INCH SANITARY SEWER, AND DECOMMISSION EXISTING PUMP STATION AND FORCEMAIN. 380,000 FY21 Wastewater PUMP STATION FAILURES, PUMP STATION REQUIRES OVERHAUL. ORIGINAL DESIGN CRITERIA MAY NOT STILL BE VALID MIDLAND - OLIVE SEWER SEPARATION CONSTRUCT 15,000 FEET OF 12-INCH TO 108-INCH STORM SEWER AND 3,500 FEET OF 18-INCH TO 72- INCH COMBINED SEWER. 5,540,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED COMBINED SEWERS MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 1,000,000 FY21 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE IV REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,500,000 FY21 Wastewater REPLACE EXISTING ENGINE GENERATORS AND ADD ADDITIONAL DIGESTER GAS UTILIZATION CAPACITY. 1,200,000 FY21 Wastewater FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. FUTURE GAS PRODUCTION AT PLANT IS PROJECTED TO EXCEED GAS UTILIZATION CAPACITY, AND ENGINE GENERATORS ARE REACHING THE END OF THEIR USEFUL LIFE MISSOURI RIVER WWTF ENGINE GENERATOR REPLACEMENT CONSTRUCT 1,300 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP NEWPORT LANDING PUMP STATION (P-480) ELIMINATION STATION P-480 AND ASSOCIATED FORCEMAIN. 132,000 FY21 Wastewater PUMP STATION P-480 NEEDS TO BE REPLACED NORTH FEE FEE CREEK PUBLIC I/I REDUCTION REHABILITATE PUBLIC SEWERS, MANHOLES, AND LATERAL SERVICE CONNECTIONS. 170,000 FY21 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. SANITARY SEWER SURCHARGING AND BUILDING BACKUPS IN COMBINED OLIVETTA STREET SEWER SEPARATION CONSTRUCT 2,800 FEET OF 12-INCH TO 36-INCH STORM SEWER. 290,000 FY21 Wastewater SEWER AREA PARTRIDGE AVENUE 8500 BLOCK COMBINED SEWER RELIEF BUYOUT 10 PROPERTIES IN THE 8500 BLOCK OF PARTRIDGE, SOFT SEPARATION AND CONSTRUCTION OF STORMWATER DETENTION BASIN. 3,000,000 FY21 Wastewater OVERCHAGED MAINS AND BUILDING BACKUPS PRICE TO PIONEER SANITARY RELIEF CONSTRUCT 4,700 FEET OF 24-INCH SANITARY SEWER. 387,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM 2021 PLUS BUDGET CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE SANITARY SYSTEM. 500,000 FY21 Wastewater PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING SANITARY SEWERS. CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 5,000,000 FY21 Wastewater COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL REINKE I/I REDUCTION (MANCHESTER RD AND NEW BALLWIN RD) CONSTRUCT 1,200 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 7,000 FEET OF 8-INCH SEWER. 88,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. PUMP STATION P-417 NEEDS REPLACEMENT TO MEET CURRENT SERVICE ROBYN HILLS NUMBER 1 PUMP STATION (P-417) REPLACEMENT REPLACE PUMP STATION P ,000 FY21 Wastewater LEVEL DEMANDS ROLAND SANITARY RELIEF (NELSON DR TO ROLAND BLVD) CONSTRUCT 470 FEET OF 10-INCH SANITARY SEWER. 39,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. S BRENTWOOD BLVD SANITARY RELIEF (DAYTONA DR TO CONSTRUCT 1,400 FEET OF 12-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP WALINCA TERRACE) ,000 FY21 Wastewater OVERCHARGED SANITARY SEWERS. SCHUETZ ROAD SANITARY RELIEF (FOREST BROOK LN TO CONSTRUCTION OF APPROXIMATELY 1,980 FEET OF 12-INCH TO 18-INCH DIAMETER SANITARY SEWERS SUNNY WOOD CT) AND APPURTENANCES. 270,000 FY21 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS SMOKETREE DR TO WHITE BIRCH CT SANITARY RELIEF CONSTRUCT 970 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 81,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS SOUTH BROADWAY AT MERAMEC COMBINED SEWER REPLACEMENT EXISTING 15 INCH COMBINED SEWER IS DETERIORATED WITH CONSTRUCT 525 FEET OF 15-INCH COMBINED SEWER UNDER SOUTH BROADWAY, IN TUNNEL OR USING OTHER METHODS. 500,000 FY21 Wastewater NUMEROUS GRADE CHANGES AND BELLIES. LINE HOLDS DEBRIS AND BLOCKS EASILY CAUSING STREET FLOODING. CONSTRUCT 4,560 FEET OF 12-INCH FORCEMAIN PARALLEL TO THE EXISTING FORCEMAIN, AND REHABILITATE THE EXISTING FORCEMAIN. 145,000 FY21 Wastewater LACK OF CAPACITY AND REDUNDANCY FOR EXISTING FORCE MAIN SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-736 TO P-809) SPIRIT OF ST. LOUIS 1 PUMP STATION (P-735) REPLACEMENT REPLACE PUMP STATION P ,000 FY21 Wastewater DETERIORATED PUMP STATION REPAIR REPLACMENT SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736) REPLACEMENT DETERIORATED PUMP STATION REPAIR REPLACEMENT. 195,000 FY21 Wastewater DETERIORATED PUMP STATION REQUIRES REPLACEMENT.

136 Wastewater CIRP Project List Project Number Long Name ST. ALBERT I/I REDUCTION (WASHINGTON ST AND ST. FERDINAND ST) Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 1,200 FEET OF 8-INCH TO 12-INCH SANITARY SEWER. REHABILITATE 8,700 FEET 8-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 5 PROPERTIES. 537,000 FY21 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. ST. ANTHONY SANITARY RELIEF (S NEW FLORISSANT RD TO ST. BERNADETTE LN) CONSTRUCT 1,400 FEET OF 15-INCH SANITARY SEWER. 152,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. ST. JACQUES SANITARY RELIEF (ST. JACQUES ST TO N LAFAYETTE ST) SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN) CONSTRUCT 1,300 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY21 Wastewater OVERCHARGED SANITARY SEWERS. ELIMINATE SSO BP-110. REPLACE 4,500 FEET OF 10-INCH TO 15-INCH SANITARY SEWER WITH 18-INCH SANITARY SEWER, AND REPLACE 1,150 FEET OF 10-INCH SANITARY SEWER WITH 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,830,000 FY21 Wastewater TILLIE BADEN NEWBY SEWER IMPROVEMENTS CONSTRUCT DETENTION BASIN AND/OR GREEN INFRASTRUCTURE SOLUTIONS TO ALLEVIATE ISSUES. 3,500,000 FY21 Wastewater UPPER BADEN SANITARY RELIEF (JENNINGS STATION RD TO CONSTRUCT 2,700 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO OAKRIDGE BLVD) ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY21 Wastewater BUILDING BACKUPS & OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-214 REQUIRES REMOVAL. OVERCHARGED MAINS, BUILDING BACKUPS, AND FLOODING IN AREA OF NORTH BADEN SEWER. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-001 REQUIRES REMOVAL. UPPER FISHPOT EAST SANITARY RELIEF (FIELD AVE TO WOLFF LN) CONSTRUCT 3,400 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 303,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 3,000,000 FY21 Wastewater VALLEY PUBLIC I/I REDUCTION (CLARKSON RD AND KEHRS MILL RD) REHABILITATE 11,000 FEET OF 8-INCH SEWER. 5,510,000 FY21 Wastewater COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY. EXCESSIVE PUBLIC I/I CAUSING BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS VALLEY VIEW PUMP STATION (P-734) REPLACEMENT REPLACE PUMP STATION P ,000 FY21 Wastewater PUMP STATION P-734 NEEDS REPLACEMENT TO MEET SERVICE LEVEL DEMANDS WATERFORD SANITARY RELIEF (N WATERFORD DR TO DURWOOD DR) CONSTRUCT 4,200 FEET OF 15-INCH TO 24-INCH SANITARY SEWER 372,000 FY21 Wastewater OVERCHARGED SANITARY SEWERS WEST LOCKWOOD SANITARY RELIEF CONSTRUCT NEW SEWERS TO ALLEVIATE BACKUPS. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-187 AND BP ,000 FY21 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS WHITE PLAINS SANITARY RELIEF (SALTBOX DR TO CEDAR CREEK RD) CONSTRUCT 2,500 FEET OF 15-INCH SANITARY SEWER. 191,000 FY21 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS WINDMOOR PUMP STATION (P-710) ELIMINATION BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2020) CCTV INSPECTION OF SEWERS (2020) CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CONSTRUCT 1,300 FEET OF 10-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-710 AND ASSOCIATED FORCEMAN. 100,000 FY21 Wastewater PUMP STATION MAY REQUIRE EVENTUAL ELIMINATION. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY22 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CLEANING, CCTV, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 2,000,000 FY22 Wastewater PERFORM AS NEEDED CCTV INSPECTION AND CLEANING OF SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 1,000,000 FY22 Wastewater INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY22 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY22 Wastewater GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL 2021 PLUS BUDGET PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. 240,000 FY22 Unallocated INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA (2020) RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS) AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 2,000,000 FY22 Wastewater FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED REPAIRS/IMPROVEMENTS. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY22 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION. DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY22 Wastewater INTERGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 150,000 FY22 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY22 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM IN CONJUNCTION WITH WATERSHED AND STORMWATER PLANNING AND DESIGN EFFORTS. 585,000 FY22 Unallocated PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGH FY2022 BASED ON PERFORMANCE. 650,000 FY22 Unallocated DATA IS REQUIRED TO DETERMINE URBAN STORMWATER RAINFALL/RUNOFF RESPONSE OF WATERSHEDS AND UTILIZED FOR WATER QUANTITY & QUALITY EVALUATION OF STREAMS. STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS STREAM FLOW WATER QUALITY SAMPLING (2020) ARV ELLEN SANITARY RELIEF (TESSON CREEK ESTATES DR TO MADAFORD LN) CONSTRUCT 730 FEET OF 12-INCH SANITARY SEWER. 46,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS BADEN CREEK SANITARY RELIEF (KENAWAH AVE TO EDGEWOOD BLVD) CONSTRUCT 250 FEET OF 24-INCH SANITARY SEWER. ABANDON AND FILL 270 FEET OF 21-INCH SEWER. 38,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.

137 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc BARRETT STATION I/I REDUCTION (DOUGHERTY FERRY RD AND BARRETT STATION RD) REHABILITATE 3,700 FEET OF 8-INCH TO 30-INCH SEWER. 185,000 FY22 Wastewater BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023) CONTRACT A BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) Problem Description EXCESSIVE WET WEATHER FLOWS, BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 9,900,000 FY22 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 600,000 FY22 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 786,000 FY22 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION BISSELL HILLS SANITARY REHAB PHASE III (SERVICE LATERAL CONNECTIONS) (CHAMBERS RD AND COBURG LANDS DR) CONSTRUCT 1,490 SERVICE LATERAL CONNECTION REPAIRS. 3,200,000 FY22 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS BISSELL HILLS SANITARY RELIEF (ST CYR RD TO LEETON AVE) CONSTRUCT 2,300 FEET OF 24-INCH TO 30-INCH SANITARY SEWER. 1,030,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-317 REQUIRES REMOVAL BISSELL POINT WWTF CONCRETE AND GATE IMPROVEMENTS REPAIR SLUICE GATES AND COMPONENTS, AND CONCRETE. 2,400,000 FY22 Wastewater CONCRETE AND SLUICE GATE DETERIORATION DUE TO AGING INFRASTRUCTURE BISSELL POINT WWTF PRELIMINARY AND PRIMARY TREATMENT MCC REPLACEMENT REPLACE MOTOR CONTROL CENTERS. 1,600,000 FY22 Wastewater NUMEROUS SMALL MOTOR CONTROL CENTERS IN FACILITY ARE OBSOLETE AND IN NEED OF REPLACEMENT BRINWOOD SANITARY RELIEF (SHARON DR TO CORTEZ DR AND SHACKELFORD RD TO DANNELLE DR) CONSTRUCT 4,800 FEET OF 15-INCH TO 27-INCH SANITARY SEWER. 2,000,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BUCKLEY SANITARY RELIEF (DACE LN TO POPLAR DR) CONSTRUCT 1,90 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 143,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BURNING TREE INFRASTRUCTURE REPAIR (N. WATERFORD DR TO FOX RUN DR) CONSTRUCT 600 FEET OF 15-INCH SANITARY SEWER. 62,000 FY22 Wastewater DEFICIENT SEWER CAUSING OVERCHARGING CANTERBURY DRIVE LATERAL SANITARY RELIEF (NELSON DR TO CANTERBURY DR) CONSTRUCT 3,700 FEET OF 10-INCH TO 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,450,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-612 REQUIRES REMOVAL CAULKS CREEK A PUMP STATION (P-750) REPLACEMENT REPLACE PUMP STATION P ,500,000 FY22 Wastewater EXISTING PUMP STATION IS DETERIORATING AND REQUIRES REPLACEMENT CAULKS CREEK PUMP STATION B (P-751) STORAGE CONSTRUCT 270 FEET OF 96-INCH SEWER TO PROVIDE 100,000 GALLONS OF TEMPORARY STORAGE. 83,000 FY22 Wastewater STORAGE NEEDED AT STATION. CHRISTOPHER DR I/I REDUCTION (ENGLAND TOWN RD TO BECKER RD) REHABILITATE 4,600 FEET OF 8-INCH SEWER. 30,000 FY22 Wastewater EXCESSIVE WET WEATHER FLOWS IN THE TRUNK SEWER CITYSHED 2022 TO 2033 PROJECTS BUDGET PLACEHOLDER BUDGET FOR FUTURE CITYSHED PROJECTS REQUIRED UNDER THE CONSENT DECREE. 9,300,000 FY22 Wastewater CITYSHED PROJECTS ARE REQUIRED UNDER THE CONSENT DECREE. CLARK AVE SANITARY RELIEF (LACLEDE STA RD TO YEATMAN AVE) CONSTRUCT 1,200 FEET OF 18-INCH SANITARY SEWER. 117,000 FY22 Wastewater EXCESSIVE I/I BUILDING BACKUP AND STRUCTURAL PROBLEMS COLDWATER CREEK WWTF REDUNDANT SLUDGE FORCE MAIN CONSTRUCT 17,500 FEET OF 8-INCH REDUNDANT PARALLEL SLUDGE FORCE MAIN. 4,320,000 FY22 Wastewater NO BACKUP SYSTEM FOR EXISTING SLUDGE FORCE MAIN CONSTRUCTION MANAGEMENT SERVICES MAJOR PROJECTS 2021 PLUS BUDGET PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR MAJOR PROJECTS. 15,185,000 FY22 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA MAJOR CONSTRUCTION CONWOOD LN SANITARY RELIEF (CONWAY RD TO WESTWOOD CT) CONSTRUCT 400 FEET OF 12-INCH SANITARY SEWER. 30,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS COWMIRE CREEK SANITARY REPLACEMENT I-70 CROSSING (ST. CHARLES ROCK RD TO MARK TWAIN LN) CONSTRUCT 620 FEET OF 10-INCH SANITARY SEWER. 115,000 FY22 Wastewater DETERIORATED SANITARY SEWER DANIEL BOONE I/I REDUCTION (SHACKELFORD RD AND MULLANPHY LN) CONSTRUCT 40 FEET OF 8-INCH TO 18-INCH SANITARY SEWER. REHABILITATE 9,100 FEET OF 8-INCH TO 21-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 2 PROPERTIES. 340,000 FY22 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. DC-04 DEER CREEK SANITARY RELIEF PHASE III (LAKESHORE DR TO NEW BALLAS RD) CONSTRUCT 2,400 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 182,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. DENNIS HILLS I/I REDUCTION (MAY VALLEY LN AND GREENMAR DR) REHABILITATE 9,300 FEET OF 8-INCH SEWER. REHABILITATE 55 MANHOLES. PERFORM PRIVATE I/I REDUCTION. 30,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS IN THE GREEN KNOLL DR AREA AND EXCESSIVE I/I EASEMENT ACQUISITION FOR WASTEWATER PROJECTS 2021 PLUS BUDGET PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 2,000,000 FY22 Wastewater IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND LAND PURCH ENGELHOLM AND PARK SANITARY RELIEF (SPENCER PL TO LEADALE DR) CONSTRUCT 12,700 FEET OF 12-INCH TO 36-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-451 AND BP ,520,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. ELIMINATION OF CONSTRUCTED SSO OUTFALLS REQUIRED EVA WABASH I/I REDUCTION (I-170 AND FROST AVE) PERFORM PRIVATE I/I REDUCTION AT 103 PRIVATE PROPERTIES. 1,280,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS FABICK PUMP STATION (P-444) IMPROVEMENTS (SKME-404E) MODIFICATIONS TO PUMP STATION TO MEET CURRENT STANDARDS. 750,000 FY22 Wastewater NO PUMP OR POWER REDUNDANCY AT PUMP STATION FAIRVIEW I/I REDUCTION (FAIRVIEW DR TO MANCHESTER RD) CONSTRUCT 300 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 3,700 FEET OF 8-INCH SEWER. 20,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS FENTON CREEK EAST I/I REDUCTION (OLD TOWN FENTON) REHABILITATE 9 MANHOLES AND ASSOCIATED SEWERS, PERFORM PRIVATE I/I REDUCTION AT 13 PROPERTIES. 26,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS, AND EXCESSIVE I/I FLOWS FENTON CREEK PUMP STATION (P-425) ELIMINATION CONSTRUCT 1,400 FEET OF 10-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-425 AND ASSOCIATED FORCEMAIN. 670,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS FISHPOT TRUNK WEST I/I REDUCTION (SMITH DR AND VLASIS DR) FLORLAND SANITARY RELIEF PHASE II (N. LINDBERGH BLVD TO MANRESA LN) BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS, AND CONSTRUCT 1,700 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 12,400 FEET OF 8-INCH SEWER. REHABILITATE 71 MANHOLES. 430,000 FY22 Wastewater EXCESSIVE I/I FLOWS AT THE VANCE ROAD PUMP STATION AND GRAND GLAIZE WWTF. CONSTRUCT 2,000 FEET OF 18-INCH TO 24-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-116 AND BP ,000 FY22 Wastewater EXCESSIVE I/I RESULTING IN OVERCHARGED SANITARY SEWERS.

138 Wastewater CIRP Project List Project Number Long Name FOX BRIDGE PUMP STATION (P-484) STORAGE Description Budget Amount Financial Year Project Type Desc Problem Description CONSTRUCT 150 FEET OF 72-INCH PIPE IN ORDER TO PROVIDE 31,000 GALLONS OF TEMPORARY STORAGE. 30,000 FY22 Wastewater PUMP STATION OVERCHARGES DURING RAIN EVENTS. FOX CREEK SANITARY RELIEF (HOLLOWAY RD TO CLAYMONT DR) CONSTRUCT 2,900 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 1,070,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS IN THE FOX CREEK AREA. FRANCES I/I REDUCTION (NORTHEAST OF I-270 AND DOUGHERTY FERRY RD) REHABILITATE 5,500 FEET OF 8-INCH TO 12-INCH SEWER. REHABILITATE 30 MANHOLES. 100,000 FY22 Wastewater GENERAL SERVICES AGREEMENT ENGINEERING SERVICES 2022 PLUS BUDGET RETAIN FIRMS FOR AS NEEDED SURVEY, GEOTECHNICAL, CONSTRUCTION MANAGEMENT, FACILITY AND SEWER DESIGN SERVICES. 1,250,000 FY22 Wastewater GRAND GLAIZE TRUNK SANITARY RELIEF (BALLWIN GOLF CLUB TO CLAYMONT COVE CT) CONSTRUCT 1,600 FEET OF 15-INCH SANITARY SEWER. 530,000 FY22 Wastewater GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE IV & V (SKME-521) GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE IX GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VII (SKME-521) GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VIII (SKME-521) FOURTH AND FIFTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE PREPARATION OF PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 3,220 FEET OF 12-INCH TO 84-INCH DIAMETER SEWER 8,472,000 FY22 Wastewater CONSTRUCT 4,800 FEET OF 8-INCH TO 54-INCH SANITARY SEWER. ABANDON 4,700 FEET OF EXISTING 36-INCH TO 42-INCH SEWER. ELIMINATE CONSTRUCTED SS0 OUTFALL BP ,721,000 FY22 Wastewater EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS IN THE FRANCES STUDY AREA. ENGINEERING NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. OVERCHARGED SANITARY SEWERS IN THE GRAND GLAIZE TRUNK SEWER. BYPASSES, BASEMENT BACKUPS, AND OVERCHARGED SANITARY SEWERS. OVERCHARGED SEWERS CAUSING BUILDING BACKUPS AND SANITARY SEWER OVERFLOWS. SEVENTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE PREPARATION OF PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF APPROXIMATELY 3,300 FEET OF 66 INCH DIAMETER SEWER FROM BUCKLEY TO UNION (STATION TO ). PROJECT ALSO INC 10,610,000 FY22 Wastewater BASEMENT BACKUPS AND OVERLOADED SANITARY SEWERS. CONSTRUCT 9,900 FEET OF 8-INCH TO 60-INCH SANITARY SEWER. ABANDON 7,500 FEET OF EXISTING 42-INCH SEWER. 5,938,000 FY22 Wastewater OVERCHARGED SEWERS CAUSING BUILDING BACKUPS AND SANITARY SEWER OVERFLOWS. HAWTHORNE ESTATES SANITARY RELIEF (RANCH LN TO CLAYTON HILLS LN) CONSTRUCT 1,300 FEET OF 12-INCH SANITARY SEWER. 87,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. HUNTERS FIELD I/I REDUCTION (DOUGHERTY FERRY RD. TO MANCHESTER RD. NEAR I-270) REHABILITATE 5,200 FEET OF 8-INCH TO 12-INCH SEWER. 150,000 FY22 Wastewater INFRASTRUCTURE REPAIRS (REHABILITATION) 2021 PLUS BUDGET INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 10,000,000 FY22 Wastewater AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 6,000,000 FY22 Wastewater CONSTRUCT CONSOLIDATION SEWERS TO DELIVER FLOW TO THE NEW JEFFERSON BARRACKS TUNNEL. 2,415,000 FY22 Wastewater JEFFERSON BARRACKS TUNNEL CONSOLIDATION SEWERS 75,000 FY22 Wastewater KEHRS MILL PUMP STATIONS NO. 1 AND 2 (P-752 AND P-770) ELIMINATION EXCESSIVE WET WEATHER FLOWS AND OVERCHARGED SANITARY SEWERS. OLD, DETERIORATED, AND DAMAGED SEWER LINES CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THE MARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT. INADEQUATE CAPACITY TO TRANSPORT SANITARY FLOWS FROM THE MARTIGNEY CREEK SERVICE AREA TO THE TREATMENT PLANT. CONSTRUCT 3,500 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATIONS P-752 AND P-770 AND ASSOCIATED FORCEMAINS. 183,000 FY22 Wastewater PUMP STATIONS P-752 AND P-770 NEED TO BE ELIMINATED. CONSTRUCT 1,000 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS LANG ROYCE SANITARY RELIEF (FARGO DR TO FLORIDALE CT) CONSTRUCTED SS0 OUTFALL BP ,000 FY22 Wastewater CONSTRUCTED SSO OUTFALL BP-291 REQUIRES REMOVAL LAUMEIER PARK (P-469) STORAGE CONSTRUCT STORAGE FACILITY AT PUMP STATION. 20,000 FY22 Wastewater PUMP STATION REQUIRES ADDITIONAL STORAGE. CONSTRUCT REPLACEMENT FOR THE EXISTING LEMAY NO. 3 PUMP STATION AND FORCE MAIN. DEMOLISH EXISTING LEMAY PUMP STATION (P-303), MARTIGNEY PUMP STATION (P-306), AND JEFFERSON BARRACKS PUMP STATION (P-305). 135,000 FY22 Wastewater JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT LEMAY NO. 3 PUMP STATION AND FORCE MAIN JEFFERSON BARRACKS TUNNEL PROJECT REQUIRES A NEW PUMP LEMAY NO. 3 PUMP STATION AND FORCE MAIN 4,410,000 FY22 Wastewater STATION TO CONVEY FLOWS TO THE LEMAY TREATMENT PLANT. FACILITY IMPROVEMENTS AND ADDITIONAL FLOWS REQUIRE ENHANCED LEMAY WWTF ODOR CONTROLS CONSTRUCT IMPROVEMENTS TO ODOR CONTROL SYSTEM AT LEMAY WWTF. 8,500,000 FY22 Wastewater ODOR CONTROL. LEMAY WWTF PRELIMINARY AND PRIMARY SETTLING TANK STRUCTURAL REHABILITATION REPAIR CONCRETE, GATES, AND HARDWARE, AND REBUILD SLUDGE COLLECTORS. 200,000 FY22 Wastewater DETERIORATING TANKS LEMAY WWTF ROADWAY REPAIRS PHASE II REPLACE 30,000 SQUARE FEET OF DETERIORATED PAVEMENT. 480,000 FY22 Wastewater DETERIORATING CONCRETE PAVEMENT. LINDBERGH SANITARY RELIEF (MEADOWSIDE DR TO N REPLACE 3,150 FEET OF 8-INCH TO 15-INCH SANITARY SEWER WITH 12-INCH TO 18-INCH SANITARY SANITARY SEWER IS EXPOSED AT CREEK CROSSINGS, INADEQUATE LINDBERGH BLVD) SEWER. 241,000 FY22 Wastewater CAPACITY, AND SEWER BACKUPS LITTLETON CT. SANITARY RELIEF (OLD SMIZER MILL RD AND 141 TO LA PALMA DR) CONSTRUCT 2,600 FEET OF 12-INCH SANITARY SEWER. 192,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 143,020,000 FY22 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 2,730,000 FY22 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED LMRDP TUNNEL DEWATERING PUMP STATION CONSTRUCT PUMP STATION TO PUMP STORED COMBINED SEWERAGE TO LEMAY TREATMENT PLANT. 165,000 FY22 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LMRDP TUNNEL DEWATERING PUMP STATION 5,250,000 FY22 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LOHMEYER COMBINED SEWER RELIEF (BENTLEY DR TO BREDELL AVE) CONSTRUCT 1,200 FEET OF 42-INCH STORM SEWER. 660,000 FY22 Wastewater SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED COMBINED SEWERS LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 270,000 FY22 Wastewater CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT AT THE LOWER MERAMEC WWTF. 1,000,000 FY22 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN.

139 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 36,000,000 FY22 Wastewater EXPAND AND UPGRADE EXISTING LOWER MERAMEC WWTF TO ACCOMODATE FUTURE FLOWS AND LOWER MERAMEC WWTF EXPANSION PHASE II FUTURE NUTRIENT REMOVAL PERMIT REQUIREMENTS. 27,700,000 FY22 Wastewater Problem Description FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. NUTRIENT REMOVAL PERMIT REQUIREMENTS AND ADDITIONAL FLOWS AT THE LOWER MERAMEC WWTF MAIN SANITARY RELIEF (VANCE RD TO INEZ AVE) CONSTRUCT 2,200 FEET OF 15-INCH SANITARY SEWER. 208,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET UPGRADES OF MAJOR PUMP STATIONS REQUIRED TO MAINTAIN LEVEL OF SERVICE AND PREVENT FLOW RELEASES TO THE ENVIRONMENT. 1,000,000 FY22 Wastewater AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR REPLACEMENT MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET 4,000,000 FY22 Wastewater AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR REPLACEMENT MANCHESTER RD AND S BIG BEND BLVD COMBINED SEWER RELIEF (HAMPTON CREEK TO LYNDOVER PL) CONSTRUCT 5,500 FEET OF 30-INCH TO 60-INCH STORM SEWER. 3,700,000 FY22 Wastewater CONSTRUCT 770 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE MARIETTA SANITARY RELIEF (CIRCLE DR TO FLORISSANT RD) CONSTRUCTED SSO OUTFALL BP ,000 FY22 Wastewater SEWER SEPARATION TO MITIGATE BUILDING BACKUPS DUE TO OVERCHARGED COMBINED SEWERS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-292 REQUIRES REMOVAL MARK TWAIN I/I REDUCTION (PATTERSON RD AND MYRTLE DR) REHABILITATE 200 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT ONE PROPERTY. 20,000 FY22 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS MARTIGNEY SANITARY RELIEF (KOCH RD TO WOOD HILL DR) CONSTRUCT 10,000 FEET OF 15-INCH TO 36-INCH SANITARY SEWER. 1,550,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. MASON VALLEY I/I REDUCTION (MANCHESTER RD AND BARRETT CONSTRUCT 230 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 8,100 FEET OF 8-INCH TO 18-INCH PKWY) SEWER. 170,000 FY22 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS MCCUTCHEON RD AND THORNDELL SANITARY RELIEF CONSTRUCT 640 FEET OF 15-INCH SANITARY SEWER. 49,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS MIDLAND - OLIVE SEWER SEPARATION CONSTRUCT 15,000 FEET OF 12-INCH TO 108-INCH STORM SEWER AND 3,500 FEET OF 18-INCH TO 72- INCH COMBINED SEWER. 5,540,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED COMBINED SEWERS MIDLAND SANITARY RELIEF (MIDLAND BLVD TO SIMS AVE) CONSTRUCT 2,800 FEET OF 21-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP- 095 AND BP ,280,000 FY22 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE V REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,500,000 FY22 Wastewater MISSOURI RIVER BONFILS SANITARY SEWER REHABILITATION PHASE IV ABANDON AND FILL 62,000 FEET OF EXISTING SEWERS. 143,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP-095 AND BP-145 REQUIRE REMOVAL. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. SEWERS ARE NO LONGER IN USE AND ARE ALLOWING I/I TO ENTER THE SYSTEM MULBERRY CREEK SANITARY RELIEF (HARWICH DR TO S LINDBERGH BLVD) CONSTRUCT 4,300 FEET OF 15-INCH TO 18-INCH SANITARY SEWER. 326,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS NORTH FEE FEE CREEK PUBLIC I/I REDUCTION REHABILITATE PUBLIC SEWERS, MANHOLES, AND LATERAL SERVICE CONNECTIONS. 5,400,000 FY22 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS OAKWOOD FARMS PUMP STATION (P-470) ELIMINATION CONSTRUCT 915 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-470 AND ASSOCIATED FORCEMAIN. 210,000 FY22 Wastewater PUMP STATION P-470 NEEDS TO BE REPLACED PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM 2021 PLUS BUDGET CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE SANITARY SYSTEM. 500,000 FY22 Wastewater PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING SANITARY SEWERS RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 5,000,000 FY22 Wastewater COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY. ROSEDALE AVE SANITARY RELIEF (NEWPORT AVE TO ARBOR LN) CONSTRUCT 310 FEET OF 12-INCH SANITARY SEWER. 120,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. RUSSELL AVE SANITARY RELIEF (DEER CREEK TRUNK TO MANCHESTER RD) CONSTRUCT 2,900 FEET OF 15-INCH TO 18-INCH SANITARY SEWER. 278,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. SAYLESVILLE SANITARY RELIEF (SAYLESVILLE DR TO S GREENTRAILS DR) CONSTRUCT 4,000 FEET OF 15-INCH SANITARY SEWER. 1,720,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS SHREWSBURY SANITARY RELIEF SEWER AND I/I REDUCTION (WEIL AVE AND I-44) CONSTRUCT 5,100 FEET OF 8-INCH TO 27-INCH SANITARY SEWER. PERFORM PRIVATE I/I REDUCTION AT 260 PROPERTIES. 3,800,000 FY22 Wastewater OVERCHARGED SAITARY SEWERS. SMITH CREEK LADUE ROAD SANITARY RELIEF (ROYAL MANOR DR TO HEWLETT CT) CONSTRUCT 5,200 FEET OF 15-INCH SANITARY SEWER. 360,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SEWERS. CONSTRUCT 2,300 FEET OF 15-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. ELIMINATION OF CONSTRUCTED SSO OUTFALL REQUIRED SPRING AVE SANITARY RELIEF (YEATMAN AVE TO DALE AVE) ST. JOACHIM'S SANITARY RELIEF (ST. GENEVIEVE LN TO LYNROS DR) CONSTRUCT 3,600 FEET OF 15-INCH SANITARY SEWER. 295,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS ST. JOACHIM'S SANITARY RELIEF (ST. GENEVIEVE LN TO MARMARY DR) CONSTRUCT 2,800 FEET OF 21-INCH SANITARY SEWER. 261,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. ST. MATTHIAS SANITARY RELIEF (ST. SHAWN LN TO STONEHARD DR) CONSTRUCT 2,100 FEET OF 30-INCH SANITARY SEWER. 211,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS CONSTRUCT 3,500 FEET OF 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT TO COVE LN) CONSTRUCTED SSO OUTFALLS BP-210, BP-211 AND BP ,030,000 FY22 Wastewater CONSTRUCT 150 FEET OF 72-INCH PIPE IN ORDER TO PROVIDE 31,000 GALLONS OF TEMPORARY SUNSET COUNTRY CLUB PUMP STATION (P-408) STORAGE STORAGE 40,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP-210, BP-211 AND BP-213 REQUIRE REMOVAL. PUMP STATION P-408 NEEDS IMPROVEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS TM-01 TWO MILE CREEK OUTFALL SANITARY RELIEF CONSTRUCT 9,700 FEET OF 36-INCH TO 48-INCH SANITARY SEWER. 1,075,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS TM-03 TWO MILE CREEK SANITARY RELIEF (TWO MILE TRUNK TO FIRETHORN DR) CONSTRUCT 300 FEET OF 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY22 Wastewater CONSTRUCTED SSO OUTFALL BP-556 REQUIRES REMOVAL TM-04 TWO MILE SANITARY RELIEF PHASE II (LOCKETT RD TO MEIER RD) OVERCHARGED SANITARY SEWERS. 51,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS.

140 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description TOPPING I/I REDUCTION (MANCHESTER RD AND TOPPING RD) REHABILITATE 1,400 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION IN THE TOPPING STUDY AREA. 20,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS TULANE-WILBUR OUTFALL SANITARY RELIEF SEWER (WEBER RD TO HILDESHEIM AVE) CONSTRUCT 4,400 FEET OF 18-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,600,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-618 REQUIRES REMOVAL UPPER LAWNVIEW CREEK SANITARY RELIEF (RHAPSODY LN TO MILLVALLEY DR) CONSTRUCT 4,200 FEET OF 12-INCH SANITARY SEWER. 418,000 FY22 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS UPPER MATTESE TRUNK SANITARY RELIEF (THEISS RD TO LIBERTY TRAIL RD) CONSTRUCT 14,000 FEET OF 18-INCH TO 36-INCH SANITARY SEWER. 5,575,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 4,000,000 FY22 Wastewater COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY VALLEY PARK I/I REDUCTION (HWY 141 TO SIMPSON PARK) DISCONNECT 4 CATCH BASINS FROM SANITARY SEWER. PERFORM PRIVATE I/I REDUCTION AT 3 PROPERTIES. 286,000 FY22 Wastewater BUILDING BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS WATKINS-SPANISH SANITARY RELIEF (MALAGA ST TO TRAMPE AVE) CONSTRUCT 2,500 FEET OF 24-INCH TO 27-INCH SANITARY SEWER. 1,150,000 FY22 Wastewater OVERCHARGE SANITARY SEWERS WEIDMAN I/I REDUCTION (HWY 141 AND DUTCH MILL DR) PERFORM PUBLIC AND PRIVATE I/I REDUCTION. 59,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS. CONSTRUCT 170 FEET OF 84-INCH PIPE IN ORDER TO PROVIDE 50,000 GALLONS OF TEMPORARY STORAGE. 69,000 FY22 Wastewater PUMPSTATION P-771 NEEDS IMPROVEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS WESTON PLACE PUMP STATION (P-771) IMPROVEMENTS WILSON AVE SANITARY RELIEF (HARRISON AVE TO CLEVELAND AVE) CONSTRUCT 700 FEET OF 12-INCH SANITARY SEWER. 68,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS WILSON SANITARY RELIEF (WILD HORSE CREEK RD TO CLARKSON RD) CONSTRUCT 9,200 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 751,000 FY22 Wastewater OVERCHARGED SANITARY SEWERS WILTON PUMP STATION (P-412) STORAGE CONSTRUCT 30 FEET OF 60-INCH PIPE TO PROVIDE 3,700 GALLONS OF TEMPORARY STORAGE. 20,000 FY22 Wastewater WINCHESTER DRIVE LATERAL SANITARY RELIEF (ROLAND BLVD CONSTRUCT 1,300 FEET OF 10-INCH TO 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO TO COLONIAL AVE) ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY22 Wastewater WOODSON SANITARY RELIEF (FLORA AVE TO LACKLAND RD) WW-2 AND WW-3 WARSON WOODS SANITARY RELIEF WWTF SCADA HARDWARE AND SOFTWARE UPGRADES BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS 2023 PLUS BUDGET CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CONSTRUCT 3,800 FEET OF 15-INCH TO 24-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-024, BP-533, AND BP ,000 FY22 Wastewater CONSTRUCT 9,600 FEET OF 12-INCH TO 27-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-156, BP-340, AND BP ,000,000 FY22 Wastewater UPGRADE SCADA SOFTWARE AND HARDWARE AT THE BISSELL, COLDWATER, MISSOURI, MERAMEC, AND GRAND GLAIZE PLANTS. 1,000,000 FY22 Wastewater PUMP STATION P-412 NEEDS IMPROVEMENTS TO MEET CURRENT SERVICE LEVEL DEMANDS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-532 REQUIRES REMOVAL. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP-024, BP-533 AND BP-534 REQUIRE REMOVAL. OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP- 156, BP-340 AND BP-501 REQUIRE REMOVAL. PLANT SCADA SOFTWARE AND HARDWARE ARE UNDER NEEDED CAPACITY AND OBSOLETE. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY23 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CCTV, CLEANING, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. 3,000,000 FY23 Wastewater INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY23 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY23 Wastewater GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL 2021 PLUS BUDGET PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. 240,000 FY23 Unallocated INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET LEMAY SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA 2023 PLUS BUDGET RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW WATER QUALITY SAMPLING AND GAUGE OPERATION 2023 PLUS BUDGET AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 2,000,000 FY23 Wastewater FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE LEMAY WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY23 Wastewater SYSTEM DEFICIENCIES NEEDING CORRECTION. DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY23 Wastewater INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. 150,000 FY23 Unallocated COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY23 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN THE MSD SERVICE AREA. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM. 1,235,000 FY23 Unallocated AMBLEWOOD SANITARY RELIEF (WATERFORD DR TO BIRCHBARK DR) CONSTRUCT 4,400 FEET OF 21-INCH TO 24-INCH SANITARY SEWER. 2,050,000 FY23 Wastewater STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS. BUILDING BACKUPS ALONG THE PADDOCK CREEK LATERAL IN THE VICINITY OF AMBLEWOOD DRIVE CONSTRUCT 590 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP BALLAS MEADOWS PUMP STATION (P-712) ELIMINATION STATION P-712 AND ASSOCIATED FORCEMAIN. 169,000 FY23 Wastewater BUILDING BACKUPS AND POSSIBLE PUMP STATION OVERFLOW EVENTS BANFF SANITARY RELIEF (CAITHNESS RD TO LANARK RD) CONSTRUCT 320 FEET OF 10-INCH SANITARY SEWER. 101,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCTION (2023) CONTRACT A REDUCE PUBLIC I/I. 19,900,000 FY23 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.

141 Wastewater CIRP Project List Project Budget Financial Project Type Long Name Description Number Amount Year Desc Problem Description BISSELL POINT WWTF DEMOLITION OF SLIGO BUILDING DEMOLISH BUILDING AND RESTORE SITE. 800,000 FY23 Wastewater DETERIORATED STRUCTURE IN NEED OF DEMOLITION BISSELL POINT WWTF STORM DRAINAGE IMPROVEMENTS REROUTE STORM DRAINAGE TO THE HEAD END OF THE PLANT. 5,000,000 FY23 Wastewater THREE PERMITTED STORM OUTFALLS WITH EFFLUENT LIMITATIONS AND OTHER OPERATING REQUIREMENTS THAT REQUIRE ELIMINATION OR BMPS BRUNSTON SANITARY RELIEF (BRUNSTON DR TO MATTESE VILLA DR) CONSTRUCT 1,700 FEET OF 12-INCH SANITARY SEWER. 112,000 FY23 Wastewater INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS CITYSHED 2022 TO 2033 PROJECTS BUDGET PLACEHOLDER BUDGET FOR FUTURE CITYSHED PROJECTS REQUIRED UNDER THE CONSENT DECREE. 11,700,000 FY23 Wastewater CITYSHED PROJECTS ARE REQUIRED UNDER THE CONSENT DECREE COLDWATER CREEK WWTF DEMOLITION ABANDONED GRIT AND PRIMARY CLARIFIERS TANKS DEMOLISH GRIT TANKS, COMMINUTOR CHANNELS, GRIT BUILDING, PRIMARY SLUDGE PUMP STATION, AND PRIMARY CLARIFIER TANKS AND BUILDINGS. 200,000 FY23 Wastewater ABANDONED STRUCTURES NO LONGER IN SERVICE NEED TO BE DEMOLISHED TO FREE UP SPACE FOR FUTURE PLANT WORK COLDWATER CREEK WWTF WAREHOUSE STORAGE PROJECT CONSTRUCT 5,000 SQUARE FOOT BUILDING ADDITION. 175,000 FY23 Wastewater STORAGE SPACE NEEDED TO ACCOMODATE PALLETS CONSTRUCTION MANAGEMENT SERVICES MAJOR PROJECTS 2021 PLUS BUDGET PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR MAJOR PROJECTS. 19,630,000 FY23 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA MAJOR CONSTRUCTION CREVE COEUR CREEK (L-52) FORCEMAIN REHABILITATION (P- 718 TO MO RIVER WWTF) REHABILITATION OF 1,000 FEET OF THE EXISTING 42-INCH FORCEMAIN. 418,000 FY23 Wastewater DETERIORATION OF EXISTING FORCEMAIN CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I- 118)/OUTFALL (L-111) ELIMINATION AND SEWER SEPARATION PERFORM PUBLIC AND PRIVATE I/I REDUCTION IN 1247 MERAMEC STUDY AREA WHICH WILL ALSO INCLUDE SEWER SEPARATION. REMOVE INTERCEPTOR I-118 AND CSO OUTFALL L ,500,000 FY23 Wastewater CSO - LACLEDE STATION RD AND RANKEN AVE (I-181/L-131) CSO ELIMINATION CONSTRUCT 850 FEET OF 8-INCH SEWER AND PRIVATE I/I REDUCTION, AND ELIMINATE CSO L ,000 FY23 Wastewater EXCESSIVE INFLOW THROUGH COMBINED SEWERS CONNECTED PUBLIC AND PRIVATE DEFECTS. WET WEATHER BACKUPS AND A SMALL REACH OF COMBINED SEWERS IN A SEPARATE SEWER AREA DIX SANITARY RELIEF (DIX AVE TO AIRWAY AVE) CONSTRUCT 2,700 FEET OF 18-INCH TO 21-INCH SANITARY SEWER. 1,150,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS DUBRAY SANITARY RELIEF (S. BALLAS RD TO DUBOIS CT) CONSTRUCT 4,700 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 312,000 FY23 Wastewater OVERCHARGED SANITARY SEWERS IN THE DUBRAY AREA EASEMENT ACQUISITION FOR WASTEWATER PROJECTS 2021 PLUS BUDGET PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 2,000,000 FY23 Wastewater IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND LAND PURCH EDMUNDSON SANITARY RELIEF (EDMUND AVE TO BATAAN DR) CONSTRUCT 2,200 FEET OF 15-INCH TO 18-INCH SANITARY SEWER. 720,000 FY23 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS FLORISSANT/DUNN SANITARY RELIEF (ST. ANTHONY LN TO I- 270) CONSTRUCT 5,600 FEET OF 15-INCH TO 21-INCH SANITARY SEWER. 2,045,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN OF ROCKS DR AND FONTAINE PL) CONSTRUCT 1,900 FEET OF 12-INCH STORM SEWER. PERFORM PRIVATE I/I REDUCTION AT 20 PROPERTIES. 800,000 FY23 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS GC-06 GRAVOIS CREEK TO BRIARSTONE AND GATES SANITARY RELIEF PHASE II GENERAL SERVICES AGREEMENT ENGINEERING SERVICES 2022 PLUS BUDGET CONSTRUCT 4,700 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,535,000 FY23 Wastewater REMOVAL OF CONSTRUCTED SSO BP-382 REQUIRED. RETAIN FIRMS FOR AS NEEDED SURVEY, GEOTECHNICAL, CONSTRUCTION MANAGEMENT, FACILITY AND SEWER DESIGN SERVICES. 1,250,000 FY23 Wastewater ENGINEERING NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF GEYER SANITARY RELIEF (W. MONROE AVE TO W. ESSEX AVE) CONSTRUCT 4,000 FEET OF 18-INCH SANITARY SEWER. 515,000 FY23 Wastewater OVERCHARGED SANITARY SEWERS IN THE GEYER LATERAL. GLENFIELD SANITARY RELIEF (WATSON WOODS CT TO S LINDBERGH BLVD) CONSTRUCT 2,700 FEET OF 15-INCH SANITARY SEWER. 1,033,000 FY23 Wastewater OVERCHARGED SANITARY SEWERS GRAND GLAIZE WET WEATHER PUMP STATION CONSTRUCT NEW PUMP STATION WITH DESIGN PEAK FLOW RATE OF 5 MGD, AND 500 FEET OF 16- INCH FORCEMAIN, TO LAGOONS. 2,235,000 FY23 Wastewater WET WEATHER FLOWS AT THE GRAND GLAIZE PLANT EXCEED HEADWORKS CAPACITY, BACKING UP FLOWS INTO VALLEY PARK SEWERS. GRAND NATIONAL SANITARY RELIEF (GRAND NATIONAL DR TO KNEELAND RD) CONSTRUCT 2,000 FEET OF 12-INCH SANITARY SEWER. 136,000 FY23 Wastewater UNDERSIZED SANITARY SEWERS. GRAVOIS TRUNK (WHITECLIFF TO RDP) SANITARY RELIEF PHASE VI (SKME-521) SIXTH PHASE OF A MULTI-PHASE PROJECT. THIS PHASE CONSISTS OF THE CONSTRUCTION OF 11,000 FEET OF 8-INCH TO 72-INCH DIAMETER SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,703,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. GREGORY COURT SANITARY RELIEF (TESSON FERRY RD TO SAPPINGTON RD) CONSTRUCT 3,500 FEET OF 18-INCH TO 24-INCH SANITARY SEWER. 410,000 FY23 Wastewater INSUFFICIENT CAPACITY FOR WET WEATHER FLOWS HARLEM BADEN RELIEF PHASE IV (HEBERT) - SEWER SEPARATION CHERRY TO 68TH STREET CONSTRUCT 6,000 FEET OF 8-INCH TO 42-INCH SEWERS, AND 2,840 FEET OF LINING. 2,400,000 FY23 Wastewater BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGED COMBINED SEWERS HEIMOS PUMP STATION (P-503) FORCEMAIN REPLACEMENT CONSTRUCT 4,900 FEET OF 3-INCH FORCEMAIN. 430,000 FY23 Wastewater FORCEMAIN REPLACEMENT REQUIRED HORTON PUMP STATION (P-814) ELIMINATION CONSTRUCT 1,700 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-814 AND ASSOCIATED FORCEMAIN. 354,000 FY23 Wastewater PUMP STATION P-814 NEEDS TO BE REPLACED INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET LADUE ESTATES SANITARY RELIEF (DEER CREEK TRUNK SEWER TO S LADUE ESTATES DR) AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 6,000,000 FY23 Wastewater CONSTRUCT 720 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY23 Wastewater DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. CONSTRUCTION OF A NEW SEWER MAY BE REQUIRED IF I/I REDUCTION UNDER PROJECT IS INSUFFICIENT TO ELIMINATE OVERCHARGED SANITARY SEWERS. LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) CONSTRUCT 100 MGD ENHANCED HIGH RATE CLARIFICATION FACILITY WITH DISINFECTION. 2,415,000 FY23 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS. LEMAY WWTF AERATION TANK IMPROVEMENTS - CONCRETE AND GATE REPAIRS REPAIR CONCRETE, GATES AND VALVES. 2,500,000 FY23 Wastewater AERATION TANKS CONCRETE DETERIORATION LEMAY WWTF ODOR CONTROLS CONSTRUCT IMPROVEMENTS TO ODOR CONTROL SYSTEM AT LEMAY WWTF. 8,500,000 FY23 Wastewater FACILITY IMPROVEMENTS AND ADDITIONAL FLOWS REQUIRE ENHANCED ODOR CONTROL LEMAY WWTF PRELIMINARY AND PRIMARY SETTLING TANK STRUCTURAL REHABILITATION REPAIR CONCRETE, GATES, AND HARDWARE, AND REBUILD SLUDGE COLLECTORS. 800,000 FY23 Wastewater DETERIORATING TANKS.

142 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description LINDY I/I REDUCTION (CABALLERO DR AND CHAMBERLAIN DR) PERFORM PRIVATE I/I REDUCTION AT ONE PROPERTY AND REHABILITATE FIVE MANHOLES AND ASSOCIATED SANITARY SEWERS. 30,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 138,725,000 FY23 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 2,730,000 FY23 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED LMRDP TUNNEL DEWATERING PUMP STATION CONSTRUCT PUMP STATION TO PUMP STORED COMBINED SEWERAGE TO LEMAY TREATMENT PLANT. 21,000,000 FY23 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LMRDP TUNNEL DEWATERING PUMP STATION 645,000 FY23 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 270,000 FY23 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. LOWER AND MIDDLE RDP FOULWATER INTERCEPTOR SEWER IMPROVEMENTS CONSTRUCT IMPROVEMENTS TO THE INTERCEPTOR SEWERS. 2,470,000 FY23 Wastewater IMPROVEMENTS NEEDED TO ENHANCE ACCEESS FOR MAINTENANCE, REPAIR AND REHABILITATION OF THE INTERCEPTORS. LOWER BLACK CREEK AND HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR.) PHASE I CONSTRUCT 5,690 FEET OF 60-INCH TO 72-INCH SANITARY SEWER. 1,413,000 FY23 Wastewater ELIMINATION OF BP-008 AND BP-634 IS REQUIRED. LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL LOWER MERAMEC WWTF EXPANSION PHASE II CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THE FENTON WWTF TO THE BAUMGARTNER TUNNEL, FOR TREATMENT AT THE LOWER MERAMEC WWTF. 46,000,000 FY23 Wastewater EXPAND AND UPGRADE EXISTING LOWER MERAMEC WWTF TO ACCOMODATE FUTURE FLOWS AND FUTURE NUTRIENT REMOVAL PERMIT REQUIREMENTS. 27,700,000 FY23 Wastewater UPGRADES OF MAJOR PUMP STATIONS REQUIRED TO MAINTAIN LEVEL OF SERVICE AND PREVENT FLOW RELEASES TO THE ENVIRONMENT. 1,000,000 FY23 Wastewater FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE REGIONAL LOWER MERAMEC FACILITY PLAN. NUTRIENT REMOVAL PERMIT REQUIREMENTS AND ADDITIONAL FLOWS AT THE LOWER MERAMEC WWTF. AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR REPLACEMENT MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET 4,000,000 FY23 Wastewater REPLACEMENT MARCO PUMP STATION (P-406) REPLACEMENT REPLACE PUMP STATION P ,000 FY23 Wastewater PUMP STATION P-406 NEEDS TO BE REPLACED MARK TWAIN I/I REDUCTION (PATTERSON RD AND MYRTLE DR) REHABILITATE 200 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT ONE PROPERTY. 30,000 FY23 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS MC-02 WATSON TO EDGAR RD SANITARY RELIEF (SKME-580A) CONSTRUCT 5,325 FEET OF 18-INCH TO 36-INCH SANITARY RELIEF SEWER FROM RESURRECTION CEMETERY TO EDGAR ROAD. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,400,000 FY23 Wastewater MERAMEC BOTTOMS PUMP STATION (P-489) INTERCEPTOR CONSTRUCT 1,700 FEET OF 18-INCH TO 30-INCH SANITARY SEWER, AND DECOMMISSION EXISTING SEWER PUMP STATION AND FORCEMAIN. 1,370,000 FY23 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 1,000,000 FY23 Wastewater MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE V REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,500,000 FY23 Wastewater MISSOURI RIVER WWTF ENGINE GENERATOR REPLACEMENT NEWPORT LANDING PUMP STATION (P-480) ELIMINATION NORMANDIE SANITARY RELIEF (PAGE AVE TO SAINT CHARLES ROCK ROAD) REPLACE EXISTING ENGINE GENERATORS AND ADD ADDITIONAL DIGESTER GAS UTILIZATION CAPACITY. 5,867,000 FY23 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS AND CREEK EROSION. PUMP STATION FAILURES, PUMP STATION REQUIRES OVERHAUL. ORIGINAL DESIGN CRITERIA MAY NOT STILL BE VALID. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. FUTURE GAS PRODUCTION AT PLANT IS PROJECTED TO EXCEED GAS UTILIZATION CAPACITY, AND ENGINE GENERATORS ARE REACHING THE END OF THEIR USEFUL LIFE. CONSTRUCT 1,300 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-480 AND ASSOCIATED FORCEMAIN. 487,000 FY23 Wastewater PUMP STATION P-480 NEEDS TO BE REPLACED. CONSTRUCT 8,600 FEET OF 24-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-454, BP-457, AND BP ,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP-454, BP-457, AND BP-458 REQUIRE REMOVAL SANITARY SEWER SURCHARGING AND BUILDING BACKUPS IN COMBINED OLIVETTA STREET SEWER SEPARATION CONSTRUCT 2,800 FEET OF 12-INCH TO 36-INCH STORM SEWER. 1,158,000 FY23 Wastewater SEWER AREA PRICE TO PIONEER SANITARY RELIEF CONSTRUCT 4,700 FEET OF 24-INCH SANITARY SEWER. 1,548,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING PLUS BUDGET SANITARY SYSTEM. 500,000 FY23 Wastewater SANITARY SEWERS RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 5,000,000 FY23 Wastewater COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY. REINKE I/I REDUCTION (MANCHESTER RD AND NEW BALLWIN RD) CONSTRUCT 1,200 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 7,000 FEET OF 8-INCH SEWER. 353,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ROBYN HILLS NUMBER 1 PUMP STATION (P-417) REPLACEMENT REPLACE PUMP STATION P ,000 FY23 Wastewater PUMP STATION P-417 NEEDS REPLACEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS S BRENTWOOD BLVD SANITARY RELIEF (DAYTONA DR TO WALINCA TERRACE) CONSTRUCT 1,400 FEET OF 12-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALL BP ,000 FY23 Wastewater OVERCHARGED SANITARY SEWERS S GORE AVE SANITARY RELIEF (GRAY AVE TO OAK TERR) CONSTRUCT 1,700 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 550,000 FY23 Wastewater OVERCHARGED SANITARY SEWERS SMOKETREE DR TO WHITE BIRCH CT SANITARY RELIEF CONSTRUCT 970 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 325,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-736 TO P-809) CONSTRUCT 4,560 FEET OF 12-INCH FORCEMAIN PARALLEL TO THE EXISTING FORCEMAIN, AND REHABILITATE THE EXISTING FORCEMAIN. 785,000 FY23 Wastewater LACK OF CAPACITY AND REDUNDANCY FOR EXISTING FORCE MAIN SPIRIT OF ST. LOUIS 1 PUMP STATION (P-735) REPLACEMENT REPLACE PUMP STATION P ,000 FY23 Wastewater DETERIORATED PUMP STATION REPAIR REPLACMENT SPIRIT OF ST. LOUIS 2 PUMP STATION (P-736) REPLACEMENT DETERIORATED PUMP STATION REPAIR REPLACEMENT. 650,000 FY23 Wastewater DETERIORATED PUMP STATION REQUIRES REPLACEMENT ST. ALBERT I/I REDUCTION (WASHINGTON ST AND ST. FERDINAND ST) CONSTRUCT 1,200 FEET OF 8-INCH TO 12-INCH SANITARY SEWER. REHABILITATE 8,700 FEET 8-INCH TO 15-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 5 PROPERTIES. 453,000 FY23 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.

143 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description ST. ANTHONY SANITARY RELIEF (S NEW FLORISSANT RD TO ST. BERNADETTE LN) CONSTRUCT 1,400 FEET OF 15-INCH SANITARY SEWER. 609,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. ST. GEORGE CREEK SANITARY RELIEF (DAISY LN TO GRAVOIS RD TO NEW HAMPSHIRE AVE) CONSTRUCT 4,500 FEET OF 18-INCH TO 21-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,300,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWER. ELIMINATE SSO BP-404. TOWNE SOUTH SANITARY RELIEF (BROAD OAK DR TO TESSON FERRY RD) CONSTRUCTION 2,700 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 245,000 FY23 Wastewater OVERCHARGED SANITARY SEWERS UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 4,690,000 FY23 Wastewater COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY. PUMP STATION P-734 NEEDS REPLACEMENT TO MEET SERVICE LEVEL DEMANDS VALLEY VIEW PUMP STATION (P-734) REPLACEMENT REPLACE PUMP STATION P ,000 FY23 Wastewater CONSTRUCT 400 FEET OF 12-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE VILLA COUBLAY SANITARY RELIEF CONSTRUCTED SSO OUTFALL BP ,000 FY23 Wastewater WATERFORD SANITARY RELIEF (N WATERFORD DR TO DURWOOD DR) CONSTRUCT 4,200 FEET OF 15-INCH TO 24-INCH SANITARY SEWER 1,486,000 FY23 Wastewater OVERCHARGED SANITARY SEWERS. CONSTRUCT 10,500 FEET OF 12-INCH TO 54-INCH DIAMETER SANITARY SEWER FROM SAPPINGTON ROAD, NORTH OF EAST ESSEX TO MARSHALL ROAD. 3,500,000 FY23 Wastewater CONSTRUCT 7,000 FEET OF 8-INCH TO 42-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-194 AND BP ,000 FY23 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS BUILDING BACKUPS DUE TO OVERCHARGED AND DETERIORATED SANITARY SEWERS WEBSTER GROVES TRUNK E SANITARY RELIEF (SKME-628) WEBSTER GROVES TRUNK E SANITARY RELIEF (SKME-628) OVERCHARGED SANITARY SEWERS AND ELIMINATION OF SSO BP PHASE 2 AND BP-578 REQUIRED. WHITE PLAINS SANITARY RELIEF (SALTBOX DR TO CEDAR CREEK RD) CONSTRUCT 2,500 FEET OF 15-INCH SANITARY SEWER. 762,000 FY23 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS WINDMOOR PUMP STATION (P-710) ELIMINATION WWTF SCADA HARDWARE AND SOFTWARE UPGRADES INFRASTRUCTURE REPAIRS (REHABILITATION) 2021 PLUS BUDGET BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS 2023 PLUS BUDGET CSO VOLUME REDUCTION GREEN INFRASTRUCTURE DEER CREEK SANITARY SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) CONSTRUCT 1,300 FEET OF 10-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATION P-710 AND ASSOCIATED FORCEMAN. 390,000 FY23 Wastewater PUMP STATION MAY REQUIRE EVENTUAL ELIMINATION. UPGRADE SCADA SOFTWARE AND HARDWARE AT THE BISSELL, COLDWATER, MISSOURI, MERAMEC, AND GRAND GLAIZE PLANTS. 4,000,000 FY23 Wastewater AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 10,000,000 FY24 Wastewater PLANT SCADA SOFTWARE AND HARDWARE ARE UNDER NEEDED CAPACITY AND OBSOLETE. OLD, DETERIORATED, AND DAMAGED SEWER LINES CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS AND DESIGN SERVICES THROUGHOUT THE BISSELL, COLDWATER, MISSOURI AND MERAMEC WATERSHEDS, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY24 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM CCTV, CLEANING, PHYSICAL INSPECTION, AND DEBRIS VOLUME ESTIMATION OF SELECTED SEWERS. 3,000,000 FY24 Wastewater INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCE STORMWATER VOLUMES TO THE COMBINED SEWER SYSTEM. 5,000,000 FY24 Wastewater PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES IN THE DEER CREEK WATERSHED, TO MEET CONSENT DECREE REQUIREMENTS. 650,000 FY24 Wastewater GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL 2021 PLUS BUDGET PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THE DISTRICT'S PROGRAM. 240,000 FY24 Unallocated INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) RADAR RAINFALL DATA 2023 PLUS BUDGET RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) STREAM FLOW WATER QUALITY SAMPLING AND GAUGE OPERATION 2023 PLUS BUDGET AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 2,000,000 FY24 Wastewater DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 540,000 FY24 Wastewater INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING, FOR USE IN CONJUNCTION WITH FLOW METERING, INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODEL CALIBRATIONS. 150,000 FY24 Unallocated FIELD INVESTIGATION OF PRIMARILY LARGE DIAMETER SEWERS IS NEEDED TO IDENTIFY PROBLEMS AND QUANTIFY NEEDED CLEANING AND REPAIRS/IMPROVEMENTS. CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS REQUIRED. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'S CAPITAL PROGRAM. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT. COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY. PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTS ARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS. PERFORM AS NEEDED PROGRAM MANAGEMENT SERVICES, PLANNING, ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEM CONTROLS, TO MEET CONSENT DECREE REQUIREMENTS. 600,000 FY24 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION. PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITY WITHIN THE MSD SERVICE AREA. CONTINUE STREAM GAUGING DATA COLLECTION PROGRAM. 1,235,000 FY24 Unallocated STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITY CHANGES FROM IMPLEMENTATION OF CSO LTCP, SSO ELIMINATION, & STORMWATER MANAGEMENT PROGRAMS. ARV ELLEN SANITARY RELIEF (TESSON CREEK ESTATES DR TO MADAFORD LN) CONSTRUCT 730 FEET OF 12-INCH SANITARY SEWER. 183,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. BADEN CREEK SANITARY RELIEF (KENAWAH AVE TO EDGEWOOD BLVD) CONSTRUCT 250 FEET OF 24-INCH SANITARY SEWER. ABANDON AND FILL 270 FEET OF 21-INCH SEWER. 150,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. BARRETT STATION I/I REDUCTION (DOUGHERTY FERRY RD AND BARRETT STATION RD) REHABILITATE 3,700 FEET OF 8-INCH TO 30-INCH SEWER. 160,000 FY24 Wastewater EXCESSIVE WET WEATHER FLOWS, BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BAXTER I/I REDUCTION (BAXTER RD NEAR COUNTY CREEK CT) REHABILITATE 10 MANHOLES AND ASSOCIATED SEWER, PERFORM PRIVATE I/I REDUCTION. 20,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS IN THE BAXTER STUDY AREA. BC-01 PHASE III AND BC-02 PHASE II SANITARY RELIEF (I-170 TO CONSTRUCT 13,000 FEET OF 8-INCH TO 36-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO HEATHERWOOD DR) OUTFALLS BP-003, BP-004, BP-014, AND BP-016 1,175,000 FY24 Wastewater ELIMINATION OF CONSTRUCTED SSO OUTFALLS REQUIRED BEGG SANITARY RELIEF (KENWOOD TO BEGG RD) CONSTRUCT 680 FEET OF 10-INCH TO 12-INCH SANITARY SEWER. 246,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2025) CONTRACT A REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I. 340,000 FY24 Wastewater INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS BISSELL POINT WWTF DEMOLITION OF SLIGO BUILDING DEMOLISH BUILDING AND RESTORE SITE. 3,200,000 FY24 Wastewater DETERIORATED STRUCTURE IN NEED OF DEMOLITION.

144 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc CONSTRUCT 9,260 FEET OF 8-INCH TO 42-INCH SANITARY RELIEF SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-013, BP-017, BP-018, BP-151, AND BP ,400,000 FY24 Wastewater Problem Description WET WEATHER BUILDING BACKUPS, OVERCHARGED SEWERS, AND SEWER OVERFLOWS BLACK CREEK - HADDINGTON COURT RELIEF SEWERS BOMPART AVE SANITARY RELIEF (DEER CREEK TRUNK TO MANCHESTER RD) CONSTRUCT 1,400 FEE OF 18-INCH SANITARY SEWER. 157,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS BUCKHURST DR TO OAK HILL DR SANITARY RELIEF CONSTRUCT 2,850 FEET OF 12-INCH SANITARY SEWER. 181,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS DUE TO WET WEATHER FLOWS BUCKLEY SANITARY RELIEF (DACE LN TO POPLAR DR) CONSTRUCT 1,90 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 572,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. BURNING TREE INFRASTRUCTURE REPAIR (N. WATERFORD DR TO FOX RUN DR) CONSTRUCT 600 FEET OF 15-INCH SANITARY SEWER. 247,000 FY24 Wastewater DEFICIENT SEWER CAUSING OVERCHARGING CAULKS CREEK PUMP STATION B (P-751) STORAGE CONSTRUCT 270 FEET OF 96-INCH SEWER TO PROVIDE 100,000 GALLONS OF TEMPORARY STORAGE. 332,000 FY24 Wastewater STORAGE NEEDED AT STATION CAULKS CREEK TRUNK SEWER (SKME-011) PHASE III CONSTRUCT 3,800 FEET OF 24-INCH TO 27-INCH SANITARY SEWER. 360,000 FY24 Wastewater EXISTING SEWER DOES NOT HAVE ACPACITY TO CONVEY DESIGN STORM CITYSHED 2022 TO 2033 PROJECTS BUDGET PLACEHOLDER BUDGET FOR FUTURE CITYSHED PROJECTS REQUIRED UNDER THE CONSENT DECREE. 11,700,000 FY24 Wastewater CITYSHED PROJECTS ARE REQUIRED UNDER THE CONSENT DECREE CLARK AVE SANITARY RELIEF (LACLEDE STA RD TO YEATMAN AVE) CONSTRUCT 1,200 FEET OF 18-INCH SANITARY SEWER. 469,000 FY24 Wastewater EXCESSIVE I/I BUILDING BACKUP AND STRUCTURAL PROBLEMS COLDWATER CREEK WWTF DEMOLITION ABANDONED GRIT AND PRIMARY CLARIFIERS TANKS DEMOLISH GRIT TANKS, COMMINUTOR CHANNELS, GRIT BUILDING, PRIMARY SLUDGE PUMP STATION, AND PRIMARY CLARIFIER TANKS AND BUILDINGS. 800,000 FY24 Wastewater ABANDONED STRUCTURES NO LONGER IN SERVICE NEED TO BE DEMOLISHED TO FREE UP SPACE FOR FUTURE PLANT WORK COLDWATER CREEK WWTF WAREHOUSE STORAGE PROJECT CONSTRUCT 5,000 SQUARE FOOT BUILDING ADDITION. 925,000 FY24 Wastewater STORAGE SPACE NEEDED TO ACCOMODATE PALLETS CONSTRUCTION MANAGEMENT SERVICES MAJOR PROJECTS 2021 PLUS BUDGET PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR MAJOR PROJECTS. 22,650,000 FY24 Wastewater SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIA MAJOR CONSTRUCTION CONWAY MEADOWS SANITARY RELIEF (CONWAY RD TO I-64) CONSTRUCT 1,500 FEET OF 18-INCH SANITARY SEWER. 111,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGE SANITARY SEWERS CONWAY ROAD SANITARY RELIEF (CONWAY LN TO DWYER AVE) CONSTRUCT 3,300 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 1,410,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. CONWOOD LN SANITARY RELIEF (CONWAY RD TO WESTWOOD CT) CONSTRUCT 400 FEET OF 12-INCH SANITARY SEWER. 120,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS COUNTRY HOME DR SANITARY RELIEF (SUMMITT TREE CT TO AUTUMN PEAK DR) CONSTRUCT 3,500 FEET OF 15-INCH SANITARY SEWER. 343,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS COWMIRE CREEK SANITARY REPLACEMENT I-70 CROSSING (ST. CHARLES ROCK RD TO MARK TWAIN LN) CONSTRUCT 620 FEET OF 10-INCH SANITARY SEWER. 426,000 FY24 Wastewater DETERIORATED SANITARY SEWER CSO - BRENTWOOD AND RED BUD AVE CSO INTERCEPTOR (I- 118)/OUTFALL (L-111) ELIMINATION AND SEWER SEPARATION CSO - MARY AVENUE SOUTH OF MANCHESTER. CSO INTERCEPTOR (I-132)/OUTFALL (L-106) ELIMINATION DANIEL BOONE I/I REDUCTION (SHACKELFORD RD AND MULLANPHY LN) PERFORM PUBLIC AND PRIVATE I/I REDUCTION IN 1247 MERAMEC STUDY AREA WHICH WILL ALSO INCLUDE SEWER SEPARATION. REMOVE INTERCEPTOR I-118 AND CSO OUTFALL L ,500,000 FY24 Wastewater EXCESSIVE INFLOW THROUGH COMBINED SEWERS CONNECTED PUBLIC AND PRIVATE DEFECTS. CONSTRUCT 5,200 FEET OF 15-INCH TO 30-INCH SANITARY SEWERS. 4,100 FEET OF 15-INCH TO 27-INCH STORM SEWER. PERFORM PUBLIC AND PRIVATE I/I REDUCTION. REMOVE INTERCEPTOR I-132 AND CSO OUTFALL L-106 1,230,000 FY24 Wastewater AREA EXPERIENCES EXCESSIVE INFLOW THROUGH COMBINED SEWERS. CONSTRUCT 40 FEET OF 8-INCH TO 18-INCH SANITARY SEWER. REHABILITATE 9,100 FEET OF 8-INCH TO 21-INCH SEWER. PERFORM PRIVATE I/I REDUCTION AT 2 PROPERTIES. 41,000 FY24 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. DC-04 DEER CREEK SANITARY RELIEF PHASE III (LAKESHORE DR TO NEW BALLAS RD) CONSTRUCT 2,400 FEET OF 12-INCH TO 18-INCH SANITARY SEWER. 730,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS DELCREST SANITARY RELIEF CONSTRUCT SANITARY SEWERS. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-015 AND BP ,065,000 FY24 Wastewater CONSTRUCT 60 FEET OF 54-INCH PIPE IN ORDER TO PROVIDE 2,700 GALLONS OF TEMPORARY DIETRICH GLEN PUMP STATION (P-525) IMPROVEMENTS STORAGE. 20,000 FY24 Wastewater BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS ACTIVATING CONSTRUCTED SSOS. PUMP STATION DOES NOT HAVE CAPACITY FOR THE 5-YEAR DESIGN STORM EASEMENT ACQUISITION FOR WASTEWATER PROJECTS 2021 PLUS BUDGET PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATER PROJECTS. 2,000,000 FY24 Wastewater IMPLEMENTATION OF THE CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTY RIGHTS ACQUISITION FOR EASEMENTS AND LAND PURCH FAIRVIEW I/I REDUCTION (FAIRVIEW DR TO MANCHESTER RD) CONSTRUCT 300 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 3,700 FEET OF 8-INCH SEWER. 59,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS FENTON CREEK EAST I/I REDUCTION (OLD TOWN FENTON) REHABILITATE 9 MANHOLES AND ASSOCIATED SEWERS, PERFORM PRIVATE I/I REDUCTION AT 13 PROPERTIES. 35,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS, AND EXCESSIVE I/I FLOWS FENTON WASTEWATER TREATMENT FACILITY ELIMINATION DECOMMISSION AND ABANDON EXISTING FENTON WWTF. 7,138,000 FY24 Wastewater COMPLETION OF THE LOWER MERAMEC WWTF EXPANSION PH III AND EXT OF THE CONVEYENCE TUNNEL, FLOWS FROM THE FENTON WWTF WILL BE DIVERTED TO L MERAMEC WWTF. CONSTRUCT 150 FEET OF 72-INCH PIPE IN ORDER TO PROVIDE 31,000 GALLONS OF TEMPORARY STORAGE. 120,000 FY24 Wastewater PUMP STATION OVERCHARGES DURING RAIN EVENTS FOX BRIDGE PUMP STATION (P-484) STORAGE GENERAL SERVICES AGREEMENT ENGINEERING SERVICES RETAIN FIRMS FOR AS NEEDED SURVEY, GEOTECHNICAL, CONSTRUCTION MANAGEMENT, FACILITY PLUS BUDGET AND SEWER DESIGN SERVICES. 1,250,000 FY24 Wastewater HAWTHORNE ESTATES SANITARY RELIEF (RANCH LN TO CLAYTON HILLS LN) CONSTRUCT 1,300 FEET OF 12-INCH SANITARY SEWER. 350,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS ENGINEERING NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF. HUNTLEIGH TRAILS LN SANITARY RELIEF (TWO MILE CREEK TRUNK SEWER TO N GEYER RD) CONSTRUCT 3,500 FEET OF 15-INCH TO 24-INCH SANITARY SEWER. 960,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. INFRASTRUCTURE REPAIRS (REHABILITATION) 2021 PLUS BUDGET INFRASTRUCTURE REPAIRS (WASTEWATER) 2021 PLUS BUDGET AS REPAIR OR REHABILITATION NEEDS ARE IDENTIFIED BY SEWER CLEANING AND INSPECTIONS, RENEWAL OF THE SYSTEM BY CURED-IN-PLACE PIPE INSTALLATION WILL OCCUR VIA REHABILITATION CONTRACTS. 10,000,000 FY24 Wastewater AS REPAIR OR REPLACEMENT PROBLEMS ARE IDENTIFIED THROUGHOUT THE DISTRICT, CONTRACTS WILL BE PROMPTLY ISSUED FOR NEEDED CONSTRUCTION. 6,000,000 FY24 Wastewater OLD, DETERIORATED, AND DAMAGED SEWER LINES CAUSING PIPE COLLAPSES, BLOCKED MAINS, AND BUILDING BACKUPS. DAMAGED AND DETERIORATED INLETS, MANHOLES, SEWERS OR OTHER INFRASTRUCTURE IN NEED OF REPAIR OR REPLACEMENT.

145 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc Problem Description JEFFERSON BARRACKS CREEK SANITARY RELIEF (N. KINSWOOD LN TO S. FRANRU LN) CONSTRUCT 6,700 FEET OF 10-INCH TO 18-INCH SANITARY SEWER. 575,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS KEHRS MILL PUMP STATIONS NO. 1 AND 2 (P-752 AND P-770) ELIMINATION CONSTRUCT 3,500 FEET OF 8-INCH SANITARY SEWER. DECOMMISSION AND ABANDON EXISTING PUMP STATIONS P-752 AND P-770 AND ASSOCIATED FORCEMAINS. 729,000 FY24 Wastewater PUMP STATIONS P-752 AND P-770 NEED TO BE ELIMINATED LAUMEIER PARK (P-469) STORAGE CONSTRUCT STORAGE FACILITY AT PUMP STATION. 51,000 FY24 Wastewater PUMP STATION REQUIRES ADDITIONAL STORAGE LEMAY CSO HIGH RATE CLARIFICATION FACILITY (BROADWAY & LEMAY WWTF) CONSTRUCT 100 MGD ENHANCED HIGH RATE CLARIFICATION FACILITY WITH DISINFECTION. 2,415,000 FY24 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LINDBERGH SANITARY RELIEF (MEADOWSIDE DR TO N LINDBERGH BLVD) LINDSAY I/I REDUCTION (CHARBONIER RD AND N. LINDBERGH BLVD) REPLACE 3,150 FEET OF 8-INCH TO 15-INCH SANITARY SEWER WITH 12-INCH TO 18-INCH SANITARY SEWER. 960,000 FY24 Wastewater SANITARY SEWER IS EXPOSED AT CREEK CROSSINGS, INADEQUATE CAPACITY, AND SEWER BACKUPS. PERFORM PRIVATE I/I REDUCTION AT ONE PROPERTY AND REHABILITATE ASSOCIATED SANITARY SEWER. 20,000 FY24 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS. LITTLETON CT. SANITARY RELIEF (OLD SMIZER MILL RD AND 141 TO LA PALMA DR) CONSTRUCT 2,600 FEET OF 12-INCH SANITARY SEWER. 770,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) CONSTRUCT SOUTHERN PORTION OF DEEP STORAGE TUNNEL SYSTEM FOR THE LEMAY WATERSHED. 1,260,000 FY24 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED. LMRDP CSO STORAGE TUNNEL SOUTH DRIVE (BROADWAY TO RDP PARK) 63,575,000 FY24 Wastewater IMPLEMENTATION OF CONSENT DECREE REQUIREMENTS NEEDED LMRDP TUNNEL DEWATERING PUMP STATION CONSTRUCT PUMP STATION TO PUMP STORED COMBINED SEWERAGE TO LEMAY TREATMENT PLANT. 10,500,000 FY24 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LMRDP TUNNEL DEWATERING PUMP STATION 325,000 FY24 Wastewater IMPLEMENTATION NEEDED OF CONSENT DECREE COMPONENTS LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATION SEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSO INCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS AND PRELIMINARY STUDIES. 270,000 FY24 Wastewater COMBINED SEWER OVERFLOWS INTO THE LOWER AND MIDDLE RIVER DES PERES POTENTIALLY IMPACTING WATER QUALITY LOWER AND MIDDLE RDP FOULWATER INTERCEPTOR SEWER IMPROVEMENTS CONSTRUCT IMPROVEMENTS TO THE INTERCEPTOR SEWERS. 2,470,000 FY24 Wastewater IMPROVEMENTS NEEDED TO ENHANCE ACCEESS FOR MAINTENANCE, REPAIR AND REHABILITATION OF THE INTERCEPTORS. LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - CONSTRUCT DEEP TUNNEL TO CONVEY WASTEWATER FROM THE FENTON WWTF TO THE FENTON WWTF IS AN INTERIM FACILITY AND REMOVAL IS PART OF THE BAUMGARTNER TO FENTON WWTF TUNNEL BAUMGARTNER TUNNEL, FOR TREATMENT AT THE LOWER MERAMEC WWTF. 34,500,000 FY24 Wastewater REGIONAL LOWER MERAMEC FACILITY PLAN MAIN SANITARY RELIEF (VANCE RD TO INEZ AVE) CONSTRUCT 2,200 FEET OF 15-INCH SANITARY SEWER. 832,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET UPGRADES OF MAJOR PUMP STATIONS REQUIRED TO MAINTAIN LEVEL OF SERVICE AND PREVENT FLOW RELEASES TO THE ENVIRONMENT. 1,000,000 FY24 Wastewater AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR REPLACEMENT MAJOR PUMP STATION UPGRADES 2021 TO 2035 BUDGET 4,000,000 FY24 Wastewater AGING AND DETERIORATED PUMP STATIONS IN NEED OF REPAIR OR REPLACEMENT MANCHESTER I/I REDUCTION (MANCHESTER RD AND HIGHWAY 141) PERFORM PUBLIC AND PRIVATE I/I REDUCTION. 51,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. MASON VALLEY I/I REDUCTION (MANCHESTER RD AND BARRETT CONSTRUCT 230 FEET OF 8-INCH SANITARY SEWER. REHABILITATE 8,100 FEET OF 8-INCH TO 18-INCH PKWY) SEWER. 253,000 FY24 Wastewater EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS MCCUTCHEON RD AND THORNDELL SANITARY RELIEF CONSTRUCT 640 FEET OF 15-INCH SANITARY SEWER. 195,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS MISSISSIPPI FLOODWALL ORS PUMP STATIONS REHABILITATION PHASE V REHABILITATE FLOODWALL PUMP STATIONS, GATES, AND STRUCTURES. 2,500,000 FY24 Wastewater MISSOURI RIVER BONFILS SANITARY SEWER REHABILITATION PHASE IV ABANDON AND FILL 62,000 FEET OF EXISTING SEWERS. 476,000 FY24 Wastewater REPLACE EXISTING ENGINE GENERATORS AND ADD ADDITIONAL DIGESTER GAS UTILIZATION CAPACITY. 2,933,000 FY24 Wastewater FLOODWALL ORS PUMP STATIONS, GATES, AND STRUCTURES ARE OVER 40 YEARS OLD, AND NEED REHABILITATION. SEWERS ARE NO LONGER IN USE AND ARE ALLOWING I/I TO ENTER THE SYSTEM. FUTURE GAS PRODUCTION AT PLANT IS PROJECTED TO EXCEED GAS UTILIZATION CAPACITY, AND ENGINE GENERATORS ARE REACHING THE END OF THEIR USEFUL LIFE MISSOURI RIVER WWTF ENGINE GENERATOR REPLACEMENT NEW ENGLAND VILLAGE 2 PUMP STATION (P-496) IMPROVEMENTS REPLACE EXISTING PUMP STATION P ,000 FY24 Wastewater PUMP STATION P-496 NEEDS TO BE REPLACED NOONING TREE PARK SANITARY RELIEF (WHITREE LN TO BRIGHTFIELD MANOR DR) CONSTRUCT 3,600 FEET OF 12-INCH SANITARY SEWER. 300,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. PRIVATE INFLOW AND INFILTRATION REDUCTION PROGRAM 2021 PLUS BUDGET CONTINUE PROGRAM TO REDUCE PRIVATE INFLOW AND INFILTRATION SOURCES OF FLOW INTO THE SANITARY SYSTEM. 500,000 FY24 Wastewater PRIVATE SOURCES OF INFLOW AND INFILTRATION ARE OVERCHARGING SANITARY SEWERS. COMBINED SEWER OVERFLOWS IN THE DEER, BLACK, HAMPTON, AND RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL CONSTRUCT 12,000 FEET OF 20-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 28 MILLION GALLONS. 53,450,000 FY24 Wastewater CLAYTONIA CREEK WATERSHEDS POTENTIALLY IMPACTING WATER QUALITY ROLAND SANITARY RELIEF (NELSON DR TO ROLAND BLVD) CONSTRUCT 470 FEET OF 10-INCH SANITARY SEWER. 156,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCT 700 FEET OF 84-INCH PIPE IN ORDER TO PROVIDE 200,000 GALLONS OF TEMPORARY STORAGE. 173,000 FY24 Wastewater PUMP STATION P-419 NEED IMPROVEMENTS TO MEET CURRENT SERVICE LEVEL DEMANDS SOUTH COUNTY RELIEF PUMP STATION (P-419) IMPROVEMENTS ST. JOACHIM'S SANITARY RELIEF (ST. GENEVIEVE LN TO LYNROS DR) CONSTRUCT 3,600 FEET OF 15-INCH SANITARY SEWER. 1,181,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS ST. JOACHIM'S SANITARY RELIEF (ST. GENEVIEVE LN TO MARMARY DR) CONSTRUCT 2,800 FEET OF 21-INCH SANITARY SEWER. 1,046,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. ST. MATTHIAS SANITARY RELIEF (ST. SHAWN LN TO STONEHARD DR) CONSTRUCT 2,100 FEET OF 30-INCH SANITARY SEWER. 842,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. STRASSNER AVE SANITARY RELIEF (BLACK CREEK TRUNK TO SWALLOW DR) CONSTRUCT 4,000 FEET OF 21-INCH TO 30-INCH SANITARY SEWER. 667,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. SUB-TRUNK #11 SANITARY RELIEF (BELGROVE DR TO LOTHIAN CIR) CONSTRUCT 1,100 FEET OF 12-INCH SANITARY SEWER. 78,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.

146 Wastewater CIRP Project List Project Number Long Name Description Budget Amount Financial Year Project Type Desc CONSTRUCT 150 FEET OF 72-INCH PIPE IN ORDER TO PROVIDE 31,000 GALLONS OF TEMPORARY STORAGE 155,000 FY24 Wastewater Problem Description PUMP STATION P-408 NEEDS IMPROVEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS SUNSET COUNTRY CLUB PUMP STATION (P-408) STORAGE TM-04 TWO MILE SANITARY RELIEF PHASE II (LOCKETT RD TO MEIER RD) OVERCHARGED SANITARY SEWERS. 204,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS TOPPING I/I REDUCTION (MANCHESTER RD AND TOPPING RD) REHABILITATE 1,400 FEET OF 8-INCH SEWER. PERFORM PRIVATE I/I REDUCTION IN THE TOPPING STUDY AREA. 67,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS UPPER BADEN SANITARY RELIEF (JENNINGS STATION RD TO OAKRIDGE BLVD) CONSTRUCT 2,700 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALL BP ,123,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALL BP-001 REQUIRES REMOVAL UPPER FISHPOT EAST SANITARY RELIEF (FIELD AVE TO WOLFF LN) CONSTRUCT 3,400 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 1,213,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS UPPER LAWNVIEW CREEK SANITARY RELIEF (RHAPSODY LN TO MILLVALLEY DR) CONSTRUCT 4,200 FEET OF 12-INCH SANITARY SEWER. 1,672,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS UPPER RDP (UNIVERSITY CITY) CSO STORAGE TUNNEL CONSTRUCT 9,000 FEET OF 24-FOOT DIAMETER TUNNEL, DEWATERING PUMP STATION, AND CONSOLIDATION PIPING, TO PROVIDE A STORAGE VOLUME OF 30 MILLION GALLONS. 4,690,000 FY24 Wastewater COMBINED SEWER OVERFLOWS INTO UPPER RIVER DES PERES AND UNIVERSITY CITY WATERSHED POTENTIALLY IMPACTING WATER QUALITY VALLEY PARK I/I REDUCTION (HWY 141 TO SIMPSON PARK) DISCONNECT 4 CATCH BASINS FROM SANITARY SEWER. PERFORM PRIVATE I/I REDUCTION AT 3 PROPERTIES. 269,000 FY24 Wastewater BUILDING BASEMENT BACKUPS AND OVERCHARGED SANITARY SEWERS VILLE PATRICIA SANITARY RELIEF (VILLE ROSA LN TO CAMPUS PARKWAY DR) CONSTRUCT 2,400 FEET OF 12-INCH SANITARY SEWER. 305,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS WATKINS CREEK SANITARY RELIEF (KENRAN INDUSTRIAL BLVD TO FARM POND CT) CONSTRUCT 18,000 FEET OF 15-INCH TO 36-INCH SANITARY SEWER. 2,080,000 FY24 Wastewater BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS WEIDMAN I/I REDUCTION (HWY 141 AND DUTCH MILL DR) PERFORM PUBLIC AND PRIVATE I/I REDUCTION. 237,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS. CONSTRUCT 170 FEET OF 84-INCH PIPE IN ORDER TO PROVIDE 50,000 GALLONS OF TEMPORARY STORAGE. 276,000 FY24 Wastewater PUMPSTATION P-771 NEEDS IMPROVEMENT TO MEET CURRENT SERVICE LEVEL DEMANDS WESTON PLACE PUMP STATION (P-771) IMPROVEMENTS WILSON AVE SANITARY RELIEF (HARRISON AVE TO CLEVELAND AVE) CONSTRUCT 700 FEET OF 12-INCH SANITARY SEWER. 271,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS WILSON SANITARY RELIEF (WILD HORSE CREEK RD TO CLARKSON RD) CONSTRUCT 9,200 FEET OF 12-INCH TO 15-INCH SANITARY SEWER. 3,010,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS WILTON PUMP STATION (P-412) STORAGE CONSTRUCT 30 FEET OF 60-INCH PIPE TO PROVIDE 3,700 GALLONS OF TEMPORARY STORAGE. 30,000 FY24 Wastewater WOODSON SANITARY RELIEF (FLORA AVE TO LACKLAND RD) CONSTRUCT 3,800 FEET OF 15-INCH TO 24-INCH SANITARY SEWER. CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLS BP-024, BP-533, AND BP ,680,000 FY24 Wastewater PUMP STATION P-412 NEEDS IMPROVEMENTS TO MEET CURRENT SERVICE LEVEL DEMANDS. BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLS BP-024, BP-533 AND BP-534 REQUIRE REMOVAL. YARNELL CREEK EAST I/I REDUCTION (LARKIN-WILLIAMS RD AND RUDDER RD) PERFORM PUBLIC AND PRIVATE I/I REDUCTION. 20,000 FY24 Wastewater OVERCHARGED SANITARY SEWERS.

147 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.2: Consent Decree CIRP Impact Title: Operational Performance Metrics Supports: Operations and Maintenance projections

148 Benchmark Metrics from 2013 Water Environment Research Foundation (WERF) Survey of Wastwater Utilities WERF Survey Data MSD Data BENCHMARK DEFINITION UNIT MAX MIN AVERAGE MEDIAN MSD SIGNIFICANCE EMPLOYEE METRICS Employees per 1,000 PE served Employee per mgal of wastewater treated Higher management employees REGULATORY COMPLIANCE Total number of exployees/total population equivelent (PE) served x 1,000 Employees/1, Total number of employees/mgal of wastewater treated daily Employees/mgal Number of full time equivalent employees dedicated to directors, central administation, strategic planning, marketing and communications, legal affairs, environmental management, business development/total number of employees x 100 % Current number of PE served by WWTP Compliance with discharge consents - last complying with discharge consents/total PE calendar year served x 100 % % UTILIZATION AND EFFICIENCY Treatment plant utilization - secondary treatment Energy consumption Population coverage SEWER MAINTENANCE Sewer inspection Sewer cleaning Manhole chamber inspection Average daily volume of wastewater which received secondary treatment/total daily capacity for secondary treatment x 100 % Monthly energy used by the utility/mgal of wastewater treated every month Kwh/mgal 2,614 1,396 2,037 1, Total Population served/total population of the service area x 100 % Length of sewer inspected (miles) last calendar year/total length of sewer (miles) x 100 % Length of sewer (miles) cleaned last calendar year/total length of sewer (miles) x 100 % Total number of manhole chambers inspected last calendar year/total number of manhole chambers x 100 % MSD is leaner than the average or median comparable sewer utility. MSD has only 985 employees where the average utility with a population our size would have over 1300 employees. MSD is also leaner the the average or median comparible sewer utility based on wastewater treated, with an average daily flow of 330 millon gallons a day and 985 employees. The average comparable utility would have over 1600 employees treating flows this large. This measure shows that MSD is not top heavy, with 23 directors, assistant directors, legal and communication and enviornmental management staff. The median utility would employee 33 staff in such positions. MSD has 99.9% compliance with regulatory compliance of treatment plant permits. This is above the industry average and is the expectation of the District. With plant capacity utilization of nearly 75% MSD is not overbuilt and amoung industry leaders. Regulations do not allow utilzation over 80% without expanding. MSD electrical consumption per million gallons shows that usage is among the lowest, or our efficeincy is among the highest(159million kw/yr /292mgd) MSD provides service to nearly all homes within its service area. This helps improve utilization and effiecency MSD inspected 511 miles of the total 6350 miles pipe this is slightly better than average but not excessive MSD cleaned 1371 miles of pipe(928 miles non plastic and 443 miles of plastic) of the 6350 miles of pipe. This meets the Districts goal of cleaning sewers approximately every 5 years. This proactive approach has led to a 70 % reduction in basement backups and 50% reduction in overflows. MSD inspected manholes out of 162,000 or 10.5%. This is in line with the average utility and meets our regulatory requirements. Sewer replaced/rehabilitated last calendar year Length of sewer (miles) replaced or rehabilitated last calendar year/total length of sewer (miles) x 100 % MSD rehabilitated miles of the 6340 miles of pipe. This is nearly 2% of the system and above the goal of 90 miles/yr. The 2% is driven by overflow reduction and removal needs and is not excessive, 1.5% is needed just to rehab sewers on a 67 year cycle.. Sewer blockage last calendar year CUSTOMER CALL Total number of sewer blocks last calendar year/total length of sewer x 100 Number/100 mile MSD had 326 sewer blockages that caused basement backups and/or sewer overflows. This is down from historical levels of 1000/yr. Due to our continued maintenacne efforts our rate of 5 blockages/100 miles of pipe is much lower than the average.

149 Total service inquiries per 1,000 PE served SAFETY Working accidents: Percentage of employees injured last calendar year Total number of inquiries last calendar year/ttotal PE served x 1,000 Number/1000 PE served Number of employees injured on the job last calendar year/total number of employees x 100 % MSD aveages about customer calls per year. This equates to 10 calls per 1000 persons served. This puts us among the higher surveyed, but it is hard to to interpret this number. We don't know if it translates to more problems or better communications. We take both wastewater and stormwater calls Being lean on management does not translate to poor safety. MSD averaged 3.75 lost time injuries per 100 employees in This is about half the average.

150 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.3: Revenue Collection Efforts Title: Revenue Collection Efforts Supports: Significant improvements in revenue collections Includes: Bad Debt Memo Explains the recalculation for the provision Collection Efforts Describes the steps taken to implement a new collection strategy Historical Delinquency Graphical representation of declining delinquencies Post Contact Survey Customer service survey results

151 Date: August 27, 2014 To: From: Janice Zimmerman Audit File Pamela Reid, Interim Accounting Manager Subject: Accounts Receivable Allowance Bad Debt Change During fiscal year 2014, the accounting personnel completed an analysis on the wastewater sewer service charges collection patterns using a new analytical tool. The analysis was based on billings as far back as 1981; however, the account detail moved into the analytical tool was 2006 to present. The collections for wastewater sewer service charges were consistently collected 98% of the time by the fifth year after billed. The billing and collection data was verified to ensure that the information used with the analytical tool was valid. Using a random sample of customer accounts, accounting personnel verified the accuracy. No issues were found in the data. Prior to fiscal year 2015, the allowance for bad debt was calculated using aging buckets and percentages associated with the aging. The aging buckets and their percentages are as follows: Unbilled 2% 1 90 DAYS 5% DAYS 10% DAYS 20% 360+ DAYS 100% Based on the analysis completed, it appeared that recording the allowance at 100% for the wastewater sewer service charges receivable balance for accounts aged at 360 or more was excessive. As of June 30, 2014, MSD will no longer use the buckets to determine the reserve. The new calculation will now use the billed revenue to record the reserve. MSD changed the allowance calculation using 2.15% of the wastewater sewer service billed revenue to correlate with the analytics completed. The data went as far back as 1981 which was included in the database; however, the information relating to 1997 and

152 prior was limited information. The collection trend proved that 98% of the billings were collected within five years. The accounting department reviewed several periods of collections data using numerous combined years. Some examples of the results to make the determination on the rate to use are as follows: Years Billings Collections Rate 1981 to 2014 $2,390,617, % 2.80% 2009 (5 years ago only one year) 222,679, % 2.10% 2008, 2009, ,508, % 2.10% 2006, 2007, 2008, 2009, ,059,434, % 1.70% Based on the above, the District chose to make the adjustment for years 2006 thru June 2014 billing cycle using 2.15% (conservative approach) for the billings on wastewater sewer service charges. In addition, for the years 1981 to 2005, the District chose to record the uncollected balance which was less than the 2.15%. The adjustment of $9,765, was recorded at the end of FY14. This adjustment represents an accumulated estimate recorded in prior years. The revised process to be used starting in FY15 is as follows: 1. Determine the new uncollectible rate for years 2006 thru 5 years from the fiscal year end. 2. Apply the new percentage to billings in the current year. 3. In addition, any items collected relating to 1981 to 2005 will be reduced from the reserve balance. 4. During the months of May and June, the prior year reserve balance would be reviewed and adjusted to ensure the reserve reflects the current collection period. In FY15, the storm service charge will be adjusted using the same process to calculate the reserve balance described above for wastewater sewer charge. This adjustment is planned to be made in December FY15. Metropolitan St Louis Sewer District 2350 Market Street St. Louis, MO (fax)

153 Service Charge Collection Efforts Introduction: Using Predictive Analytics, the District has pursued innovative self-service options including IVR, website design, paperless billing, multi-channels PreCollect The Approach: Partnered with Vertex to build 2 predictive data models (commercial and residential) which predicted the likelihood of customers to pay back debt Designed a strategy to engage our customers with targeted, tailored contacts driven off of their likelihood to payback debt Added an automated SkipTrace process to update bad contact information Tested strategy in champion/challenger approach Implemented pre-collect program in September of 2011 and measure results quarterly The Results: On average 17,040 fewer customers entering arrears each month (14.4% reduction) On average 620 fewer accounts assigned to agencies monthly (Sept 11 Sept 12) Decreased number of accounts assigned to collection agencies by 79% Recognized 3,530% ROI on pre-collect program Increased collections by 30% from FY2011 to FY2013 Decreased collection agency commissions by 57% Decreased bad debt provision by 69% Interactive Voice Response (IVR) IVR Options: Check balance; make payments; set up payment arrangements The Results: Total calls reduced from call center: 190,274 (averaging 8,273 per month) Total dollars collected by payment module: $12,935,894 (averaging $562,430 per month) Reduced 1 Time Payment call volume has sustained since IVR Go-Live 42% reduction in 1Pay volume compared to average from one year prior to the IVR Total calls reduced from call center: 254,016 (averaging 4,289 per month) Average reduced call volume has sustained since IVR Go-Live 13% reduction in call volume compared to average from one year prior to the IVR go-live

154 Historical Delinquency Amounts

155 MSD Post Contact Survey Trends ( ) BLUE (RATINGS ABOVE 90%) RED (RATING BELOW 80%) Question/Category Item Rated Area Assessed Change from Customer service center open when needed Billing 91% 93% 96% 98% 97% 97% 95% 96% 95% 96% 95% 97% 6% Easy to determine appropriate phone number Billing 90% 92% 95% 97% 93% 94% 94% 94% 93% 93% 90% 93% 3% Customer Experience by Phone for BILLING (percentages show the percentage of customers who answered "YES") Employee resolved question or concern Billing 63% 70% 78% 84% 82% 88% 84% 84% 86% 86% 82% 89% 26% Employee told requirements to add. concerns and time Billing Not asked Not asked Not asked 90% 85% 90% 85% 85% 85% 88% 85% 88% NA Employee treated me with respect Billing 75% 84% 95% 96% 94% 96% 94% 94% 96% 95% 95% 98% 23% Employee was courteous Billing 79% 86% 95% 96% 94% 96% 94% 94% 96% 95% 95% 97% 18% Employee was technically competent Billing 69% 76% 90% 95% 90% 94% 91% 93% 93% 93% 92% 95% 26% Length of wait to speak w/ employee acceptable Billing 84% 86% 93% 95% 92% 94% 92% 95% 93% 93% 92% 95% 11% AVERAGE RATING FOR BILLING SERVICES PROVIDED BY PHONE 79% 84% 92% 94% 91% 94% 91% 92% 92% 92% 91% 94% 15% Customer Experience by Phone for FIELD (percentages show the percentage of customers who answered "YES") Customer Experience with Service Calls at Home (FIELD ONLY, percentages show the percentage of customers who answered "YES") Customer service center open when needed Field 87% 90% 95% 99% 98% 97% 95% 95% 96% 96% 95% 98% 11% Easy to determine appropriate phone number Field 89% 90% 93% 98% 95% 96% 94% 94% 95% 94% 91% 95% 6% Employee resolved question or concern Field 66% 72% 91% 95% 89% 85% 82% 85% 89% 90% 86% 94% 28% Employee told requirements to add. concerns and time Field Not asked Not asked Not asked 92% 86% 87% 80% 81% 84% 85% 76% 85% NA Employee treated me with respect Field 78% 86% 94% 97% 94% 95% 97% 96% 96% 96% 95% 96% 18% Employee was courteous Field 73% 85% 93% 97% 94% 94% 96% 96% 96% 96% 95% 97% 24% Employee was technically competent Field 65% 81% 93% 96% 93% 93% 95% 94% 94% 93% 94% 97% 32% Length of wait to speak w/ employee acceptable Field 80% 84% 94% 98% 95% 95% 94% 96% 95% 96% 96% 98% 18% AVERAGE RATING FOR FIELD SERVICES PROVIDED BY PHONE 77% 84% 93% 97% 93% 93% 92% 92% 93% 93% 91% 95% 18% Employee arrived at expected time Field 62% 80% 90% 96% 94% 92% 93% 94% 95% 96% 96% 99% 37% Employee had professional appearance Field 68% 78% 94% 99% 97% 95% 98% 99% 98% 99% 100% 100% 32% Employee resolved question or concern Field 58% 63% 69% 80% 83% 76% 74% 88% 87% 85% 81% 88% 30% Employee told requirements to additional concerns & time Field Not asked Not asked Not asked 89% 84% 81% 75% 85% 86% 88% 84% 88% NA Employee was courteous Field 74% 88% 94% 99% 96% 94% 96% 98% 97% 98% 98% 99% 25% Employee was technically competent Field 76% 85% 93% 98% 95% 94% 96% 98% 97% 98% 98% 97% 21% Repairs were made in a timely manner Field 59% 64% 75% 85% 85% 81% 79% 92% 90% 92% 87% 96% 37% AVERAGE RATING FOR FIELD SERVICE CALLS PROVIDED AT HOME 66% 76% 86% 92% 91% 88% 87% 93% 93% 94% 92% 95% 29% Overall Satisfaction with MSD Overall Rating on a Scale of 1 10, where 10=Best Billing Overall Satisfaction with MSD Overall Rating on a Scale of 1 10, where 10=Best Field Service

156 Appendix WASTEWATER & STORMWATER RATE CHANGE PROPOSAL Appendix Section 7.4: Customer Assistance Program Title: Customer Assistance Program (CAP) Supports: CAP eligibility and future projections Includes: Analysis supports the growth projection for the program Eligibility Estimates eligible customer base using new requirements Promotional History Provides the programs promotion methods Promotional Handout Sample of a printed handout for the program

157 Customer Assistance Program (CAP) Analysis The Customer Assistance Program analysis focused on identifying current MSD customers who qualify for the CAP program based upon predefined eligibility requirements (for both 2014 and 2012) and where these customers are located geographically. Analysis showed that 12.2% of Residential customers qualify for the CAP program based upon the 2014 criteria and only 4.2% would qualify using the 2012 eligibility criteria. The expansion of the income requirements from 2012 to 2014 nearly tripled the amount of qualified customers for CAP program enrollment. When analyzed geographically, the majority of CAP qualified customers reside within the OMCI Region (61%), compared to 32% which live within the City. A geographical overlay of 2014 CAP qualified customers aggregates and maps account location by the premise zip code (Image 1.1) to provide high level geographical view of eligible customers. Analysis Summary Data Used Calculation Basis (Approach) Customer The purpose of the CAP analysis was to use the Experian variables were merged with Assistance predefined criteria to identify Residential MSD ecis customer data based on account, customers who qualify for the CAP Program. The customer, and premise numbers. These Program analysis looked at results for both the 2012 CAP variables included data such as income, (CAP) criteria as well as the current 2014 CAP criteria education, number of persons in (see Tables 1.1 and 1.2 below). household, region, age, gender and many others. Results of this analysis showed that using 2014 CAP criteria, 38,982 customers (12.2%) met either CAP Eligible or CAP Eligible Elderly requirements. More specifically, 30,719 (9.6%) qualified by CAP Eligible requirements and 18,382 (5.7%) qualified by CAP Eligible Elderly requirements. Using 2012 CAP criteria, 13,423 customers (4.2%) met either CAP Eligible or CAP Eligible Elderly requirements. More specifically, 11,193 (3.5%) qualified by CAP Eligible requirements and 5,664 (1.8%) qualified by CAP Eligible Elderly requirements. Regionally it was discovered that 26% of the City region included CAP Eligible, CAP Eligible Elderly, or customers already enrolled in the CAP Program (EA customers). 15% of the OMCI region included CAP Eligible, CAP Eligible Elderly, or EA customers. 3% of the Extension region included CAP Eligible, CAP Eligible Elderly, or EA customers. It was also determined that CAP Eligible, CAP Eligible Elderly, and EA customer head of households are more likely to have a high school diploma as the highest level of education and are likely to have 4 5 persons living in the household. It was noted that as the number of people in the household increased a greater percentage of that customer group were qualified for the CAP program (Graph 1.1). Overall, the Customer Assistance Program analysis helped to identify CAP Eligible or CAP Eligible Elderly customers, understand regionally where they tend to reside, and provide additional demographic information on the characteristics of this group of customers. ecis customer account data (account #, premise #, address, lat/long etc.) ecis customer billing data (usage, bill amount etc.) Experian Enrichment Summary report including a wide variety of demographic variables (the INSOURCE Database contains coverage on approximately 235 million consumers in 113 million living units with more than 2,500 data elements, INSOURCE encompasses a wide range of consumer information). Generational Data ( /2011/05/living/infographic.boom er/) 2012 and 2014 CAP eligibility requirements (see Tables 1.1 and 1.2 below) were utilized to create customer account flags to identify customers who fell into each of the CAP Eligible or CAP Eligible Elderly categories. These identifiers were merged with ecis and Experian customer data. The variables used to create customer account flags included Number of Persons (in household), Median Family Household Income, and Age. Based on the number of persons in the household, if the median family household income is at or below the CAP Eligible criteria, these customers were flagged as CAP Eligible. Based on the number of persons in the household, if the median family household income is at or below the CAP Eligible Elderly criteria AND the age of the head of household was 62 or greater, these customers were flagged as CAP Eligible Elderly. Once these CAP Eligibility identifiers were merged with the overall data, the findings included in the analysis summary were discovered by slicing the data by the various data elements available from the Experian data such as region, household size, etc.

158 Table MSD s Eligibility Guidelines for MSD CAP Program Persons in Family Annual Income Annual 150% (CAP Eligible) Annual 175% (CAP Eligible Elderly) 1 $11,170 $16,755 $19,548 2 $15,130 $22,695 $26,478 3 $19,090 $28,635 $33,408 4 $23,050 $34,575 $40,338 5 $27,010 $40,515 $47,268 6 $30,970 $46,455 $54,198 7 $34,930 $52,395 $61,128 8 $38,890 $58,335 $68,058 For each additional person, add $3,960 $5,940 $6,930 Table Eligibility Guidelines for MSD CAP Program Persons in Family Annual Income Annual 200% (CAP Eligible) Annual 250% (CAP Eligible Elderly) 1 $11,670 $23,340 $29,175 2 $15,730 $31,460 $39,325 3 $19,790 $39,580 $49,475 4 $23,850 $47,700 $59,625 5 $27,910 $55,820 $69,775 6 $31,970 $63,940 $79,925 7 $36,030 $72,060 $90,075 8 $40,090 $80,180 $100,225 For each additional person, add $4,060 $8,120 $10,150 Graph 1.1 Percentage of Population CAP Qualified by Household Size 2014 CAP Qualified Populations (by Household Size) 50% 40% 30% 20% 10% 0% # of Persons in Household $100,000 $80,000 $60,000 $40,000 $20,000 $0 % Customer Group Eligible for CAP 2014 CAP Threshold

159 Cap Qualification Summary Stats CAP Qualified Customers RM & RU Customers ONLY (NO EA Accounts) # Customers % of Population 320,677 Total Population (RM,RU Customers w/ Matched Experian Data) 2014 Criteria 38, % 2012 Criteria 13, % 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 CAP Qualified Customers 12.2% of population 4.2% of population 2014 Criteria 2012 Criteria CAP Summary Stats and Breakdown Low Income Customers RM & RU Customers ONLY (NO EA Accounts) # Customers % of Population 320,677 Total Population (RM,RU Customers w/ Matched Experian Data) 2014 Criteria 30, % 2012 Criteria 11, % Low Income Elderly Customers # Customers % of Population 2014 Criteria 18, % 2012 Criteria 5, %

160 CAP Eligible Customers 35,000 30, % of population 25,000 20,000 15,000 10, % of population 5, Criteria 2012 Criteria Elderly CAP Eligible Customers 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2, % of population 1.8% of population 2014 Criteria 2012 Criteria

161 Customer Assistance Program Program Promotional Activities Fiscal Year Annual Insert to all Customers Annual Insert to all Customers Annual Insert to all Customers Radio Advertising (Clear Channel Radio) Radio Advertising (Clear Channel & Radio One) Radio Advertising (Clear Channel & Radio One) Internet Information/Application availabe on line Internet Information/Application availabe on line Internet Information/Application availabe on line Newspaper advertising (North/South Journals STL American) Energy Conservation Fair Overland Community Ctr. International Festival Tower Grove Park Betty Jean Kerr Community Health Fair Energy Conservation Fair Overland Community Ctr. Community Action Agency Energy Forum Missouri Black Expo Urban League of STL Energy Assistance Fair North County Meeting of Social Services Betty Jean Kerr Community Health Fair Winterizing Utility Forum 2013 Northern Missionary Baptist Church Open House International Festival Tower Grove Park Webster/Rock Hill Energy Forum Sista Strut Cancer Walk SLACO Regional Neighborhood Conference Mid East Area Agency on Aging (Health Fair/Open House) Health & Home Fest in Berkley North County Meeting of Social Services Missouri Black Expo Webster/Rock Hill Energy Forum SLACO Regional Neighborhood Conference Sista Strut Cancer Walk Emergency Fund Network Qtrly Harris Stowe Various Block Unit Meetings (February July) Ward 27 Chris Carter Neighborhood Meeting Earth Day Komen Race St. Louis Betty Jean Kerr Community Health Fair Ferguson Community Ctr. Grand Opening Ameren Winterizing Utility Forum Jennings Family Fall Festival Home Depot Ladies Night Out Senior Adult Resource Fair St. Ann Community Center Energy Fair MSD Twitter Handle

162

Metropolitan St. Louis Sewer District. Rate Proposal Overview

Metropolitan St. Louis Sewer District. Rate Proposal Overview Metropolitan St. Louis Sewer District Rate Proposal Overview MSD Rate Commission First sewers built in the 850s in response to the 849 cholera outbreak Prior to 954, the area was covered by 79 separate

More information

SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES. Comprehensive Water, Sewer, and Stormwater Rate Study

SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES. Comprehensive Water, Sewer, and Stormwater Rate Study SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES Comprehensive Water, Sewer, and Stormwater Rate Study Draft-Final Report / July 17, 2018 5619 DTC Parkway Suite 850 Greenwood Village, CO 80111 Phone 303.305.1135

More information

COMMISSION ADOPTED POLICY Revenue Policy

COMMISSION ADOPTED POLICY Revenue Policy Adopted: May 23, 2017 Revised: N/A Page 1 of 7 1.0 Purpose and Need The purpose of this revenue policy is to ensure that there is sufficient revenue to support direct and indirect operating, capital, reserves

More information

health for the purpose of providing adequate sewer and drainage facilities in the City of Louisville and

health for the purpose of providing adequate sewer and drainage facilities in the City of Louisville and PRELIMINARY RESOLUTION BY THE BOARD OF THE LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT AMENDING ITS 2016 SCHEDULE OF RATES, RENTALS AND CHARGES FOR WASTEWATER AND DRAINAGE SERVICES PURSUANT

More information

WATER AND WASTEWATER RATE STUDY

WATER AND WASTEWATER RATE STUDY WATER AND WASTEWATER RATE STUDY B&V PROJECT NO. 176244.0100 PREPARED FOR Camrosa Water District MARCH 20, 2013 Black & Veatch Holding Company 2011. All rights reserved. Camrosa Water District WATER AND

More information

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014

Final Report Rate, Charge, and Cost of Service Study. For: Parker Water and Sanitation District. December 2014 Final Report Rate, Charge, and Cost of Service Study For: December December 29, Steve Hellman Chief Financial Officer 18100 E. Woodman Drive Parker, Colorado 80134 On behalf of MWH Global, I d like to

More information

NOTICE OF PUBLIC HEARING ON PROPOSED REVISIONS TO ORDINANCES WATER ORDINANCES:

NOTICE OF PUBLIC HEARING ON PROPOSED REVISIONS TO ORDINANCES WATER ORDINANCES: November 7, 2018 NOTICE OF PUBLIC HEARING ON PROPOSED REVISIONS TO ORDINANCES The Metropolitan District 555 Main Street Hartford, Connecticut Pursuant to Special Act 01-3, as adopted by the General Assembly

More information

REVENUE REQUIREMENTS AND COST OF SERVICE RATES

REVENUE REQUIREMENTS AND COST OF SERVICE RATES REVENUE REQUIREMENTS AND COST OF SERVICE RATES BLACK & VEATCH PROJECT NO. 195753 & 195754 PREPARED FOR City of St. Joseph, Missouri Water Protection Division JUNE 2017 Black & Veatch Holding Company 2011.

More information

Handout 5: Stormwater Cost of Service

Handout 5: Stormwater Cost of Service Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service

More information

THE SANITARY SEWER SYSTEM

THE SANITARY SEWER SYSTEM THE SANITARY SEWER SYSTEM The Water Services Department is responsible for the planning and construction of wastewater collection system piping, pump stations, and treatment facilities serving Kansas City

More information

BUENA SANITATION DISTRICT

BUENA SANITATION DISTRICT BUENA SANITATION DISTRICT Sewer Rate Study Report / Aug 26, 2017 445 S. Figueroa Street Suite 2270 Los Angeles, 90071 Phone 213.262.9304 Fax 626.583.1411 www.raftelis.com Aug 26, 2017 Mr. Elmer Alex Principal

More information

SEWER RATE AND FEE STUDY

SEWER RATE AND FEE STUDY SEWER RATE AND FEE STUDY Final Report January 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653 3399 2016

More information

WASTEWATER ORDINANCE NO AN ORDINANCE repealing and superseding Ordinance Nos adopted

WASTEWATER ORDINANCE NO AN ORDINANCE repealing and superseding Ordinance Nos adopted WASTEWATER ORDINANCE NO. 14395 AN ORDINANCE repealing and superseding Ordinance Nos. 13937 adopted August 5, 2014 and 13758 adopted December 12, 2013, and enacting a new ordinance in lieu thereof for purposes

More information

YOUR DC WATER BILL WHAT S NEW? WHAT CHANGES CAN YOU EXPECT IN THE FUTURE? AOBA UTILITY COMMITTEE PRESENTATION APRIL 20, By:

YOUR DC WATER BILL WHAT S NEW? WHAT CHANGES CAN YOU EXPECT IN THE FUTURE? AOBA UTILITY COMMITTEE PRESENTATION APRIL 20, By: YOUR DC WATER BILL WHAT S NEW? WHAT CHANGES CAN YOU EXPECT IN THE FUTURE? AOBA UTILITY COMMITTEE PRESENTATION APRIL 20, 2011 By: Nicola Y. Whiteman, Esq. Vice President of Government Affairs, DC Apartment

More information

Council Minutes November 23, Minute No. 63 Report - Standing Policy Committee on Infrastructure Renewal and Public Works - November 8, 2005

Council Minutes November 23, Minute No. 63 Report - Standing Policy Committee on Infrastructure Renewal and Public Works - November 8, 2005 Council Minutes November 23, 2005 1 Minute No. 63 Report - Standing Policy Committee on Infrastructure Renewal and Public Works - November 8, 2005 Item No. 1 2006 Water and Sewer Utility Rates File WW-2.3

More information

O R D I N A N C E NO AN ORDINANCE, establishing a schedule of surcharges to. be collected from all real property, whether public or private,

O R D I N A N C E NO AN ORDINANCE, establishing a schedule of surcharges to. be collected from all real property, whether public or private, O R D I N A N C E NO. 3925 AN ORDINANCE, establishing a schedule of surcharges to be collected from all real property, whether public or private, served directly or indirectly, by the public sewer systems

More information

Water Pollution Control Utility Financial Planning Study

Water Pollution Control Utility Financial Planning Study City of Pocatello 911 North 7th Avenue P.O. Box 4169 Pocatello, ID 83205-4169 Water Pollution Control Utility Financial Planning Study June 16, 2014 Report Prepared By: 12835 E Arapahoe Rd. Tower II, Suite

More information

SEWER USER RATE CHARGE STUDY

SEWER USER RATE CHARGE STUDY SEWER USER RATE CHARGE STUDY CITY OF PRESCOTT SEWER DEPARTMENT JULY 2018 604 WILSON AVENUE MENOMONIE, WI 54751 CONTENTS CONTENTS...i 1 INTRODUCTION...3 1.1 PURPOSE...3 1.2 EXISTING SEWER USER CHARGE BASIS...3

More information

DRAFT. Recycled Water Cost of Service and Rate Study Report. Napa Sanitation District

DRAFT. Recycled Water Cost of Service and Rate Study Report. Napa Sanitation District DRAFT Recycled Water Cost of Service and Rate Study Report Napa Sanitation District December 2011 DRAFT Executive Summary Recycled Water Cost of Service and Rate Study Report 2 The Napa Sanitation District

More information

Update to Facility Capacity Charges Methodology and Schedule. A study for El Dorado Irrigation District. prepared by. Bartle Wells Associates

Update to Facility Capacity Charges Methodology and Schedule. A study for El Dorado Irrigation District. prepared by. Bartle Wells Associates APPENDIX A Update to Facility Capacity Charges Methodology and Schedule A study for El Dorado Irrigation District prepared by Bartle Wells Associates Principal Consultants Doug Dove, President Catherine

More information

Water Rate Study 2015

Water Rate Study 2015 Water Rate Study 2015 Final Report May 20, 2015 BART LE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399 TABLE

More information

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY DRAFT Report ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Navajo Tribal Utility Authority August 2007 DRAFT NAVAJO TRIBAL UTILITY AUTHORITY ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY Table of Contents

More information

DRAFT REPORT City of Tracy Water Rate Study August 2017

DRAFT REPORT City of Tracy Water Rate Study August 2017 DRAFT REPORT City of Tracy Water Rate Study August 2017 August 23, 2017 Mr. Kuldeep Sharma Director of Utilities City of Tracy 3900 Holly Drive Tracy, CA 95304 Subject: Comprehensive Water Rate Study Draft

More information

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 March 13, 2018 Ms. Courtney Driver Utilities Director Winston-Salem/Forsyth County Utilities PO

More information

F I N A L Water and Wastewater Charges Study

F I N A L Water and Wastewater Charges Study F I N A L Water and Wastewater Charges Study Prepared for San Lorenzo Valley Water District, California March 2013 871 Coronado Center Drive, Suite 200 Henderson, Nevada 89052 This Page Intentionally Blank.

More information

M A R C H 7, KC Water Cost of Service Task Force Meeting #10

M A R C H 7, KC Water Cost of Service Task Force Meeting #10 M A R C H 7, 2 0 1 7 KC Water Cost of Service Task Force Meeting #10 Agenda Findings and Recommendations Recap Customer Assistance System Development Charges Adjusting Rates to Cover Costs Irrigation Charge

More information

Final Report and Recommendations on Wastewater Rates, Fees, and Charges

Final Report and Recommendations on Wastewater Rates, Fees, and Charges Orange County Sanitation District Cost of Service Rate Study and Financial Analysis Final Report and Recommendations on Wastewater Rates, Fees, and Charges December 2017 Contents 1 Introduction 1-1 1.1

More information

Metropolitan St. Louis Sewer District. Strategic Business and Operating Plan Fiscal Years

Metropolitan St. Louis Sewer District. Strategic Business and Operating Plan Fiscal Years Metropolitan St. Louis Sewer District Strategic Business and Operating Plan Fiscal Years 2013 2017 VISION STATEMENT Quality Service Always MISSION STATEMENT To protect the public s health, safety, and

More information

April 19, Dear Ms. Haskins

April 19, Dear Ms. Haskins 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 April 19, 2018 Ms. Rhonda Haskins, CPA Director of Financial Planning Fayetteville Public Works

More information

CENTRAL DAVIS SEWER DISTRICT

CENTRAL DAVIS SEWER DISTRICT CENTRAL DAVIS SEWER DISTRICT January 5, 2015 Brandon Green, City Manager Fruit Heights City 910 South Mountain Road Fruit Heights, Utah 84037 Re: Revised Sewer District Rate Structure Dear Mr. Green: Enclosed

More information

Overview of Local Facilities. Integrated Resource Planning Advisory Committee

Overview of Local Facilities. Integrated Resource Planning Advisory Committee Overview of Local Facilities Integrated Resource Planning Advisory Committee City of Henderson Utility Services System Overview 2 CITY OF HENDERSON Department of Utility Services The Department of Utility

More information

NEW Water, the brand of the Green Bay Metropolitan Sewerage District Wastewater Fixed Charge Alternatives Support

NEW Water, the brand of the Green Bay Metropolitan Sewerage District Wastewater Fixed Charge Alternatives Support NEW Water, the brand of the Green Bay Metropolitan Sewerage District Wastewater Fixed Charge Alternatives Support Customer Advisory Group Workshop #2 Minutes Date: March 27, 2018 Time: 9:00-11:00 AM CST

More information

INSTRUCTIONS FOR FILING A LONG FORM WASTEWATER TREATMENT SURCHARGE STATEMENT

INSTRUCTIONS FOR FILING A LONG FORM WASTEWATER TREATMENT SURCHARGE STATEMENT COUNTY SANITATION DISTRICTS OF LOS ANGELES COUNTY Grace Robinson Hyde, Chief Engineer and General Manager INSTRUCTIONS FOR FILING A LONG FORM WASTEWATER TREATMENT SURCHARGE STATEMENT TABLE OF CONTENTS

More information

CITY OF ST. HELENA AD HOC REVENUE SOURCE TASK FORCE WATER & WASTEWATER RATE STUDY MEETING 2

CITY OF ST. HELENA AD HOC REVENUE SOURCE TASK FORCE WATER & WASTEWATER RATE STUDY MEETING 2 CITY OF ST. HELENA AD HOC REVENUE SOURCE TASK FORCE WATER & WASTEWATER RATE STUDY MEETING 2 September 13, 2016 NOTE: Until the rate study is completed and approved by City Council, all information presented

More information

Comprehensive Cost of Service and Rate Design Study

Comprehensive Cost of Service and Rate Design Study Comprehensive Cost of Service and Rate Design Study December 2009 TABLE OF CONTENTS Executive Summary.. ES -1 I. Introduction A. Scope of Study Page 2 B. RAC Involvement Page 3 II. Overview of the Rate

More information

WATER AND WASTEWATER CAPACITY FEES REPORT PROPOSED

WATER AND WASTEWATER CAPACITY FEES REPORT PROPOSED WATER AND WASTEWATER CAPACITY FEES REPORT PROPOSED B&V PROJECT NO. 197551 Black & Veatch Holding Company 2015. All rights reserved. PREPARED FOR Town of Clayton, North Carolina 4 MAY 2018 Table of Contents

More information

Boone County Regional Sewer District User Rate Regulations Revised April 21, 2015

Boone County Regional Sewer District User Rate Regulations Revised April 21, 2015 Boone County Regional Sewer District User Rate Regulations Revised April 21, 2015 3.1 Title - This regulation including appendixes and tables shall be known, referred to and cited as the User Rate Regulation.

More information

ORDINANCE # AN ORDINANCE ESTABLISHING A SEWER SERVICE CHARGE SYSTEM FOR THE CITY OF HEWITT

ORDINANCE # AN ORDINANCE ESTABLISHING A SEWER SERVICE CHARGE SYSTEM FOR THE CITY OF HEWITT ORDINANCE # 300-004 AN ORDINANCE ESTABLISHING A SEWER SERVICE CHARGE SYSTEM FOR THE CITY OF HEWITT The City Council of the City of Hewitt does ordain as follows: SECTION 1: Purpose: The purpose of this

More information

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver

More information

City of Stockton. Final Report Delta Water Supply Project: Water Rate and Financing Study. HDR Engineering, Inc. June 2009.

City of Stockton. Final Report Delta Water Supply Project: Water Rate and Financing Study. HDR Engineering, Inc. June 2009. City of Stockton Final Report Delta Water Supply Project: Water Rate and Financing Study June 2009 Prepared by HDR Engineering, Inc. June 8, 2009 Ms. Melissa Price Program Manager III City of Stockton

More information

Guide to Industrial Waste Fees for Commercial and Industrial Users

Guide to Industrial Waste Fees for Commercial and Industrial Users Industrial Waste Discharge Permit Application Fee Guide to Industrial Waste Fees for Commercial and Industrial Users All industries and certain commercial facilities discharging other than domestic sewage

More information

COMRS MIN '1 VOL 336 DEC Item 6

COMRS MIN '1 VOL 336 DEC Item 6 Item 6 COMRS MIN '1 Dave Meyer explained Items 6, 7 & 8...Commissioner Portune provided an explanati -107GE 0t e(c 2 clean water act and the consent decree which drives the cost of rates and explained

More information

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202

227 West Trade Street Phone Suite 1400 Fax Charlotte, NC 28202 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 March 12, 2018 Mr. Don Chamblee Public Works Director Lincoln County 115 W Main St Lincolnton,

More information

TASK IV: ANALYSIS OF MILLBROOK SEWER AND WATER SYSTEM CONSUMPTION CHARGES AND SEWER CAPITAL ASSESSMENTS

TASK IV: ANALYSIS OF MILLBROOK SEWER AND WATER SYSTEM CONSUMPTION CHARGES AND SEWER CAPITAL ASSESSMENTS TASK IV: ANALYSIS OF MILLBROOK SEWER AND WATER SYSTEM CONSUMPTION CHARGES AND SEWER CAPITAL ASSESSMENTS PREPARED FOR: VILLAGE OF MILLBROOK, NY PREPARED BY: This document was prepared with funds provided

More information

AGENDA DOCKET FORM. RECOMMENDED ACTION: Receive update on the rate structure analysis and provide direction.

AGENDA DOCKET FORM. RECOMMENDED ACTION: Receive update on the rate structure analysis and provide direction. AGENDA DOCKET FORM SUBJECT: RATE STRUCTURE ANALYSIS UPDATE Agenda Item No. Revised 11 Meeting Date: July 11, 2018 Resolution: No SUMMARY: Contra Costa Water District (District) is conducting a comprehensive

More information

Redevelopment Project Financial Feasibility Study. For the Oread Project Within the 12 th and Oread Redevelopment District. City of Lawrence, Kansas

Redevelopment Project Financial Feasibility Study. For the Oread Project Within the 12 th and Oread Redevelopment District. City of Lawrence, Kansas Redevelopment Project Financial Feasibility Study For the Oread Project Within the 12 th and Oread Redevelopment District City of Lawrence, Kansas Final Draft: February 7, 2008 Table of Contents 1 OVERVIEW...

More information

LAKEHAVEN UTILITY DISTRICT King County, Washington. Resolution No

LAKEHAVEN UTILITY DISTRICT King County, Washington. Resolution No LAKEHAVEN UTILITY DISTRICT King County, Washington Resolution No. 2011-1189 A RESOLUTION of the Board of Commissioners of the Lakehaven Utihty District, King County, Washington, adopting water, sewer and

More information

City of Anacortes Utility Rates & Information January 2016

City of Anacortes Utility Rates & Information January 2016 The City of Anacortes provides water, storm drain, sewer, and solid waste services. City of Anacortes Utility rates are established by ordinance. The City of Anacortes bills monthly minimum charges (base

More information

San Francisco PUC Clean Water Enterprise Wastewater Rate Study

San Francisco PUC Clean Water Enterprise Wastewater Rate Study San Francisco PUC Clean Water Enterprise Wastewater Rate Study October 2003 201 South Lake Avenue, Suite 803 Black & Veatch Corporation Pasadena, CA 91101 Tel: (626) 583-1881 Fax: (626) 583-1411 Ms. Patricia

More information

City of Flushing. Water and Sewer Rates

City of Flushing. Water and Sewer Rates City of Flushing Water and Sewer Rates Current Water Rates $10.00 per month readiness to serve fee (billed on a quarterly basis at $30.00) 5.40 per 1,000 gallons used The City of Flushing s last water

More information

Date: July 5, 2016 To: Public Works Commission From: Jon Williams, Revenue Officer Subject: Cost of Service Study

Date: July 5, 2016 To: Public Works Commission From: Jon Williams, Revenue Officer Subject: Cost of Service Study Date: July 5, 2016 To: Public Works Commission From: Jon Williams, Revenue Officer Subject: Cost of Service Study Issue The City engaged CH2M Hill to review the methodology and assumptions behind the Cost

More information

March 11, Mr. Dan Brown Chief Executive Officer Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC Dear Mr.

March 11, Mr. Dan Brown Chief Executive Officer Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC Dear Mr. March 11, 2019 Mr. Dan Brown Chief Executive Officer Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC 27870 Dear Mr. Brown, Raftelis has completed an evaluation to develop cost-justified

More information

City Council Public Input Session Water / Sewer Rate Study. March 19, 2014

City Council Public Input Session Water / Sewer Rate Study. March 19, 2014 City Council Public Input Session Water / Sewer Rate Study March 19, 2014 Overview of Meeting Introduction of the Study Overview of Water and Sewer Systems FY14 Rate Study Work Accomplished and Presentations

More information

THE IMPACT OF CATSKILL/DELAWARE FILTRATION ON RESIDENTIAL WATER AND SEWER CHARGES IN NEW YORK CITY

THE IMPACT OF CATSKILL/DELAWARE FILTRATION ON RESIDENTIAL WATER AND SEWER CHARGES IN NEW YORK CITY New York City Independent Budget Office THE IMPACT OF CATSKILL/DELAWARE FILTRATION ON RESIDENTIAL WATER AND SEWER CHARGES IN NEW YORK CITY New York City's drinking water supply is one of the few remaining

More information

Cost Recovery Procedures Manual

Cost Recovery Procedures Manual ---=---- MM SD PARTNERS FOR A CLEANER ENVIRONMENT Milwaukee Metropolitan Sewerage District Cost Recovery Procedures Manual January 2018 17-161 Section: 1 Title: Equivalent Residential Unit Reference:

More information

UTILITIES DEPARTMENT DIVISION OF WATER & WASTEWATER TREATMENT CITY OF DANVILLE, VIRGINIA WATER & WASTEWATER RATE SCHEDULES & RIDERS

UTILITIES DEPARTMENT DIVISION OF WATER & WASTEWATER TREATMENT CITY OF DANVILLE, VIRGINIA WATER & WASTEWATER RATE SCHEDULES & RIDERS UTILITIES DEPARTMENT DIVISION OF WATER & WASTEWATER TREATMENT CITY OF DANVILLE, VIRGINIA WATER & WASTEWATER RATE SCHEDULES & RIDERS Rate Making Authority... 2 Definitions... 3 Water & Wastewater Service...

More information

SAN ANTONIO WASTEWATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 8

SAN ANTONIO WASTEWATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 8 21 October, 2014 SAN ANTONIO WASTEWATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 8 Richard Campbell Robert Chambers Jeff Dykstra Blair Wisdom RATE SETTING PROCESS PURPOSE COST OF SERVICE ANALYSIS

More information

NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES

NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES The Metropolitan District 555 Main Street Hartford, Connecticut Pursuant to

More information

November 7, 2018 NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES

November 7, 2018 NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER RATES AND REVISIONS TO WATER ORDINANCES November 7, 2018 NOTICE OF PUBLIC HEARING WATER BUREAU OF THE METROPOLITAN DISTRICT PROPOSED 2019 WATER S AND REVISIONS TO WATER ORDINANCES The Metropolitan District 555 Main Street Hartford, Connecticut

More information

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM October 27, 2012 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROPOSED REMEDIAL ACTION PLAN... 1 3.0 IDENTIFICATION AND CORRECTION OF PRIVATE LATERAL SOURCES...

More information

Evaluation of Nonresidential Wastewater Discharge presentation of Findings and Recommendations

Evaluation of Nonresidential Wastewater Discharge presentation of Findings and Recommendations AGENDA ITEM 7.B Presentation by Municipal Financial Services Distributed 8/12/16 Evaluation of Nonresidential Wastewater Discharge presentation of Findings and Recommendations August 18, 2016 Town of Los

More information

WHAT ARE MY THORNTON WATER, SEWER AND SOLID WASTE RATES?

WHAT ARE MY THORNTON WATER, SEWER AND SOLID WASTE RATES? Effective January 1, 2015 WHAT ARE MY THORNTON WATER, SEWER AND SOLID WASTE RATES? Listed below are the water, sewer and solid waste rate as outline in the current Rate Ordinance. Please call 303-538-7370

More information

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay Wastewater System Financial Plan For the Corporation of the City of Thunder Bay Prepared January 2015 City of Thunder Bay 500 Donald Street East PO Box 800 Thunder Bay, Ontario, Canada P7C 5K4 Contents

More information

3. Water Conservation Program

3. Water Conservation Program 3. Water Conservation Program The City of Tumwater s conservation program consists of both independent and regional cooperative efforts. Tumwater partners with the LOTT Alliance, the regional wastewater

More information

This page is blank to facilitate double-sided printing.

This page is blank to facilitate double-sided printing. Supplement No. 2 September 2013 This page is blank to facilitate double-sided printing. Introduction and Purpose The Metropolitan St. Louis Sewer District (MSD) prepared an update to its Combined Sewer

More information

RESOLUTION NO. 96-S-03

RESOLUTION NO. 96-S-03 RESOLUTION NO. 96-S-03 A RESOLUTION ADOPTING A REVISED ORANGE COUNTY WASTEWATER AND POLLUTION CONTROL CHARGE SCHEDULE; PROVIDING FOR AN AUTOMATIC ANNUAL RATE INCREASE; PROVIDING FOR PERIODIC RATE REVIEW;

More information

DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE

DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE I. INSPECTION FEES A. For Laterals - $100 DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE B. For Building Sewers 150 feet or less in length - $100. Fees for longer Building Sewers may be charged based

More information

Public Utilities Director. Public Utilities Assistant Director. Administrative Analyst. Laboratory. Laboratory Manager. Sr. Utilities.

Public Utilities Director. Public Utilities Assistant Director. Administrative Analyst. Laboratory. Laboratory Manager. Sr. Utilities. Director Administrative Support Manager Assistant Director Controller Senior Staff Assistant Personnel/ Payroll Technician (2) Administrative Analyst Accountant Storeskeeper Accounting Tech Infrastructure

More information

ATTACHMENT B. FEES AND CHARGES OF RENEWABLE WATER RESOURCES (ReWa) (Effective January 1, 2019) RESIDENTIAL CHARGES (1)(7)(9)

ATTACHMENT B. FEES AND CHARGES OF RENEWABLE WATER RESOURCES (ReWa) (Effective January 1, 2019) RESIDENTIAL CHARGES (1)(7)(9) ATTACHMENT B FEES AND CHARGES OF RENEWABLE WATER RESOURCES (ReWa) (Effective January 1, 2019) RESIDENTIAL CHARGES (1)(7)(9) Volume Charge Base Charge $5.86 per 1,000 gallons of metered water $12.00 per

More information

CLERK OF THE CIRCUIT COURT

CLERK OF THE CIRCUIT COURT Collier County Clerk of the Circuit Court Internal Audit Department Audit Report 2003 8 Water & Sewer Revenue Audit Collier County CLERK OF THE CIRCUIT COURT Collier County Clerk of the Circuit Court

More information

BOROUGH OF FOX CHAPEL ORDINANCE NO. 698

BOROUGH OF FOX CHAPEL ORDINANCE NO. 698 BOROUGH OF FOX CHAPEL ORDINANCE NO. 698 AN ORDINANCE OF THE BOROUGH OF FOX CHAPEL SETTING ALCOSAN RATES AND RESTATING BOROUGH, HARMAR AND AVJSA SEWAGE RATES WHEREAS, the Borough of Fox Chapel imposes certain

More information

Water and Wastewater Rates and Rate Structures in North Carolina

Water and Wastewater Rates and Rate Structures in North Carolina Water and Wastewater Rates and Rate Structures in North Carolina Shadi Eskaf, David Tucker, Dayne Batten and Amy Patel: Environmental Finance Center Chris Nida: North Carolina League of Municipalities

More information

VILLAGE OF CHANNAHON, ILLINOIS TAX INCREMENT FINANCING DISTRICT FUND FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR S AND ACCOUNTANT S REPORTS

VILLAGE OF CHANNAHON, ILLINOIS TAX INCREMENT FINANCING DISTRICT FUND FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR S AND ACCOUNTANT S REPORTS VILLAGE OF CHANNAHON, ILLINOIS TAX INCREMENT FINANCING DISTRICT FUND FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR S AND ACCOUNTANT S REPORTS FOR THE YEAR ENDED APRIL 30, 2016 This Page Intentionally Left

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview Green Evaluation D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds Transaction Overview In January 2017, the District of Columbia Water & Sewer Authority issued $100 million in series

More information

Milwaukee Metropolitan Sewerage District. User Charges. Chapter 17, MMSD Rules

Milwaukee Metropolitan Sewerage District. User Charges. Chapter 17, MMSD Rules Milwaukee Metropolitan Sewerage District User Charges Chapter 17, MMSD Rules Created August 18, 1982 Amended June 20, 1985 Repealed and recreated September 26, 1994 Amended January 25, 2010 Chapter 17

More information

PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS

PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS To: Interested Stakeholders From: Patti Cale-Finnegan, SRF Coordinator Iowa Department of Natural Resources Date: November 5, 2012 PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS You are invited to attend

More information

CITY OF PITTSBURG DEVELOPMENT OF WATER AND SEWER FACILITY RESERVE CHARGES

CITY OF PITTSBURG DEVELOPMENT OF WATER AND SEWER FACILITY RESERVE CHARGES FINAL ADMINISTRATIVE DRAFT CITY OF PITTSBURG DEVELOPMENT OF WATER AND SEWER FACILITY RESERVE CHARGES April 2005 Prepared by: 201 North Civic Drive, Suite 115 Walnut Creek, California 94596-3864 March 28,

More information

RICHMOND CITY CORPORATION ORDINANCE

RICHMOND CITY CORPORATION ORDINANCE RICHMOND CITY CORPORATION ORDINANCE 2015-6 WHEREAS the City of Richmond is responsible for ensuring that its citizens are provided as safe and clean of an atmosphere as possible; and WHEREAS a Sanitary

More information

SEWER SERVICES AGREEMENT. the Effective Date ) by and between GOJO Industries, Inc., One GOJO Plaza, Suite 500,

SEWER SERVICES AGREEMENT. the Effective Date ) by and between GOJO Industries, Inc., One GOJO Plaza, Suite 500, SUBSTITUTE SEWER SERVICES AGREEMENT EXHIBIT A This Sewer Services Agreement is entered into this day of April, 2013 (hereinafter the Effective Date ) by and between GOJO Industries, Inc., One GOJO Plaza,

More information

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS Florida Department of Environmental Regulation July 1992 TABLE OF CONTENTS PURPOSE AND APPLICABILITY................... 1 Purpose............................

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

Deep Dive: Water Treatment. Greg Heitzman, Louisville Metro Sewer District

Deep Dive: Water Treatment. Greg Heitzman, Louisville Metro Sewer District Deep Dive: Water Treatment Greg Heitzman, Louisville Metro Sewer District October 1, 2014 Title 2 of 20 ENERGY FOUNDA Ohio River: 981 Miles Pittsburgh to Cairo Watershed: 204,000 Square Miles 25 Million

More information

WHEELING, WEST VIRGINIA. at Wheeling and its environs, Ohio County, West Virginia. Filed with THE PUBLIC SERVICE COMMISSION of WEST VIRGINIA

WHEELING, WEST VIRGINIA. at Wheeling and its environs, Ohio County, West Virginia. Filed with THE PUBLIC SERVICE COMMISSION of WEST VIRGINIA ~ P.S.C. W. VA. No. 19 Canceling P.S.C. W. Va. No. 18 CITY OF WHEELING, a municipal utility OF WHEELING, WEST VIRGINIA RATES, RULES AND REGULATIONS FOR FURNISHING SEWERAGE AND SEWAGE DISPOSAL SERVICE at

More information

North Beach Water District

North Beach Water District North Beach Water District Commissioners Brian Sheldon Gwen Brake Glenn Ripley 2019 Operations Budget Table of Contents MISSION STATEMENT... 2 INTRODUCTION... 3 OBJECTIVES... 4 ASSUMPTIONS... 4 OPERATIONS

More information

Sanitary Sewer Rates Now and in the Future

Sanitary Sewer Rates Now and in the Future Sanitary Sewer Rates Now and in the Future December 2008 Steve Nielsen, Chief Engineer/Deputy Director Indianapolis Department of Public Works Mark C. Jacob, Program Manager Indianapolis Clean Stream Team

More information

SEWER SERVICE CHARGES

SEWER SERVICE CHARGES 99.01 Purpose 99.09 Surcharges for Certain Wastewater Customers 99.02 Generation of Revenues by User Charge 99.10 Payment of Increased Costs 99.03 Operation, Maintenance and Replacement Fund 99.11 Payment

More information

HIGHLANDS RANCH METROPOLITAN DISTRICTS RULES AND REGULATIONS EXHIBIT A Rates, Charges and Restrictions

HIGHLANDS RANCH METROPOLITAN DISTRICTS RULES AND REGULATIONS EXHIBIT A Rates, Charges and Restrictions IT IS THE RESPONSIBILITY OF THE BUILDER/DEVELOPER TO CONTACT OUR OFFICES FOR CHANGES. FEES ARE TYPICALLY ADJUSTED IN JANUARY (Rates) and OCTOBER (Tap fees) OF EACH YEAR. HIGHLANDS RANCH METROPOLITAN DISTRICTS

More information

Department of Water and Power City of Los Angeles. Los Angeles 2 nd Regional Investors Conference February 26-27, 2014

Department of Water and Power City of Los Angeles. Los Angeles 2 nd Regional Investors Conference February 26-27, 2014 Department of Water and Power City of Los Angeles Los Angeles 2 nd Regional Investors Conference February 26-27, 2014 Overview Established more than 100 years ago and is the largest municipal utility in

More information

Debt Service Funds. Debt Service Funds 323

Debt Service Funds. Debt Service Funds 323 Debt Service Funds Debt Service Funds 323 DEBT SERVICE FUNDS The city utilizes three funds to record the receipt and disbursement of monies used to repay principal and interest charges on city issued debt.

More information

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE I SEWER USE CODE

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE I SEWER USE CODE CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE I SEWER USE CODE Revised: June 16, 2016 NORTHEAST OHIO REGIONAL SEWER DISTRICT CODE OF REGULATIONS TITLE I - SEWER USE CODE TABLE

More information

Water & Wastewater Billing Exemptions Study. October 2, 2017 Infrastructure, Development and Enterprise Committee of the Whole Meeting

Water & Wastewater Billing Exemptions Study. October 2, 2017 Infrastructure, Development and Enterprise Committee of the Whole Meeting Water & Wastewater Billing Exemptions Study October 2, 2017 Infrastructure, Development and Enterprise Committee of the Whole Meeting 1 Background Late 2015, Water and Wastewater began a multi- phase Water

More information

Department of Legislative Services

Department of Legislative Services Department of Legislative Services Maryland General Assembly 2008 Session HB 377 FISCAL AND POLICY NOTE Revised House Bill 377 (The Speaker, et al.) (By Request Administration) Economic Matters and Ways

More information

April, dale, Illinois. Prepared By: Fehr-Graham Associates, and Ehlers

April, dale, Illinois. Prepared By: Fehr-Graham Associates, and Ehlers April, 2011 Water and Sewer Utility Rate Study City of Carbon dale, Illinois Prepared By: Fehr-Graham & Associates, and Ehlers Table of Contents EXECUTIVE SUMMARY... 1 INTRODUCTION... 2 WATER SYSTEM...

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION REQUEST FOR COUNCIL ACTION Date: June 22, 2015 Item No.: 15.a Department Approval City Manager Approval Item Description: Tax Increment Financing (TIF) District Overview 1 2 3 4 5 6 7 8 9 10 11 12 13 14

More information

M A N I T O B A ) Order No. 64/12 ) THE PUBLIC UTILITIES BOARD ACT ) May 16, 2012

M A N I T O B A ) Order No. 64/12 ) THE PUBLIC UTILITIES BOARD ACT ) May 16, 2012 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) REVISED SEPTEMBER 4, 2012 BEFORE: Susan Proven, P.H.Ec., Acting Chair Raymond Lafond, CA, Member RURAL MUNICIPALITY OF GIMLI WATER AND SEWER RATES 2012,

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-6-4 RESOLUTION OF THE BOARD OF DIRECTORS OF THE INLAND EMPIRE UTILITIES AGENCY*, SAN BERNARDINO COUNTY, CALIFORNIA, ESTABLISHING INITIAL AND MONTHLY CAPACITY CHARGES, VOLUMETRIC CHARGES,

More information

SSMP ELEMENT 3 - Legal Authority APPENDIX 3.2. Sanitary Sewer Fees

SSMP ELEMENT 3 - Legal Authority APPENDIX 3.2. Sanitary Sewer Fees SSMP ELEMENT 3 - Legal Authority APPENDIX 3.2 Sanitary Sewer Fees Appendix 3.2 Index 1. How to Calculate Your Sewer Service Fee - current (http://www.cityofsanmateo.org/index.aspx?nid=1085) 2. Chapter

More information

Informational Public Meeting

Informational Public Meeting Lake Whatcom Stormwater Utility Informational Public Meeting Whatcom County Public Works April 18, 2018 Agenda for Today s Meeting Background Current Costs & Funding Sources Lake Whatcom Stormwater Utility

More information