1 HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY Fernando Gonzalez, Adel Hagekhalil, Bryan Trussell, City of Los Angeles Bureau of Sanitation Eric Fontenot, Danish Hydraulic Institute, Inc., and Devang Parikh, Map Vision Technologies, Inc. ABSTRACT There are a many difficult challenges when it comes to managing large and complex wastewater collection systems such as the one the City of Los Angeles owns and operates. The City s sewer system serves close to 4 million people in about 550 square miles of service area. The network consists of 6,500 miles of sewers varying in size from 8 inches to 150 inches in diameter. Of those sewers approximately 700 miles make the Primary Sewer System that collect from smaller sewers and discharge to 50 miles of large capacity trunk lines called the Outfall Sewer System. Outfall sewers convey wastewater to two upstream treatment plants and subsequently to the larger Hyperion Wastewater Treatment Plant. Hydrodynamic Modeling is an essential tool to effectively manage the system s operation, especially when emergency conditions arise as a result of excessive wet weather flow, wastewater treatment plant shutdown, and/or pipe structural failure. As part of the ongoing commitment to protect the public health and environment, the City of Los Angeles has taken proactive measures to minimize and mitigate spills from the wastewater collection system network. During the past four years, the City s modeling team, made of City staff working together with DHI, Inc., developed a series of dynamic hydraulic models of the City s sewer Outfall System. The Outfall Model, run under various conditions, allowed City staff to better plan, prepare, and operate the collection system to meet the demands of increased flow due to growth, special operational conditions, or excessive rainfall. Modeling scenarios were created to simulate flow conditions to design system responses in case of severe damage, to meet the operational needs of the system, and to plan the future conveyance needs of the system. Thus, all City operation procedures are oriented towards forecasting, prevention, and total preparedness rather than purely mitigation measures and damage control. Recently, the City s modeling team has extended the existing Outfall Model of the City s sewer to include the Primary Sewer lines. The City s modeling team is responsible for developing and calibrating the City s primary sanitary sewer collection system to both dry and wet weather flow. The model can be broken down into 24 primary sewer collection system basin master planning models. These 24 models can be aggregated into one master model of the entire 700 miles of the City s Primary Sewer and Outfall systems, consisting of over 11,600 links, over 11,400 nodes, and over 600 point source loads. As a result, City staff involved in planning, operation, and maintenance activities related to the collection system have increased their level of efficiency and effectiveness to design responses in case of severe damage to the collection system, meet the operational needs of the system, and plan the future conveyance needs of the collection system service area. The presentation will describe the model as a tool that effectively integrates planning, routine operation, system optimization, and emergency preparedness as well as its fabrication and calibration process showing results that confirms the validity of using fully hydrodynamic models for the simulation of large urban sanitary sewer collection systems. The presentation will also show the results of successful simulations of the City s large and complex system that includes many pipe interconnections, pumping plants, large catchment basins, special hydraulic structures, and reserve flow conditions. KEYWORDS Collection Systems Planning Tools, Dynamic Hydraulic Modeling, Risk Management, MIKE URBAN modeling INTRODUCTION
2 The City of Los Angeles has a large and complex wastewater collection system serving close to 4 million people in about 550 square miles of service area. The network consists of roughly 6,500 miles of sewers varying in size from 8 to 150 inches in diameter. Of those sewers, approximately 700 miles are classified as primary sewers (larger than 16 in diameter) which collect flow from smaller upstream secondary sewers. Primary pipes then route flow to approximately 50 miles of larger trunk lines termed outfall sewers by the City. These outfall sewers then discharge flow to one of the City s wastewater treatment plants, Donald C. Tillman (DCT) and Los Angeles Glendale (LAG) Water Reclamation Plants upstream, and then finally the larger Hyperion Treatment Plant. In addition to the City, the collection system and treatment plants serve about 23 contract agencies. With such a large and complex system, hydrodynamic modeling is an essential tool for effectively managing the collections system s operation. Four years ago, as part of an ongoing commitment to protect the public health and environment, the City of Los Angeles together with DHI, Inc. began developing a series of hydrodynamic models of the City s collection system. The first model developed consisted of the outfall sewers for both dry and wet weather conditions. This model is currently being used as a planning tool, capable of determining the demand for future capacity on a reach by reach or pipe by pipe basis. The model also tests the system s response to severe wet weather conditions, identifying any capacity constraints in the system. The model is being used to optimize the operation of the collection system by the rerouting of flows and the storage of peak flows during extreme conditions. Thus, the City s operational procedures have shifted from a reactionary to a preventative approach. Over the past two years, the model development has continued with the addition of the primary collection system to the model. This further increases the City s ability to analyze the collection system by including all of the main sewers in the system. The next step in the model development is to create and calibrate a wet weather model of the primary system; this step is currently in development. There are future plans to eventually extend the model to include the entire collection system, perhaps on a smaller sub-basin scale for the secondary sewers due to computational concerns. DRY WEATHER CALIBRATION The calibration of the dry weather primary model proceeded in two main phases. First, the primary network was imported into the MIKE URBAN geodatabase from the City s asset database. Several procedures were used to locate and correct errors in the network. Flow splits, diversion structures, inverted siphons and pumping stations were added to the model based on as-built drawings. Once the network was imported and corrected, estimates of sanitary sewer flows were added to the system. The sewer flow estimates were then compared to existing gauging data and adjusted to match historically gauged flow in the system. The import and calibration process was broken down into primary planning basins, making for more manageable sections and allowing a consistent evaluation of the calibration s progress. Figure 1 shows the primary collection system and basins in the model. Figure 1 The Primary Collection System and Basins
3 The network was imported from an existing City GIS shape file which had no interrelation between links (pipes) and nodes (maintenance holes). A customized import bridge was created to import the network information into the MIKE URBAN geodatabase; automatically creating a geometric network and the relationships between links and nodes in the system. Once the initial import was completed, several techniques embedded in MIKE URBAN were used to identify any errors or gaps in the network. The Project Check tool allows for a quick analysis of any errors based on inconsistencies between the network data, including missing data. For example, any manhole invert found to be higher than the associated pipe invert was flagged as an error (See Figure 2a). Longitudinal profiling was also used on a reach by reach basis to identify any significant change in inverts (See Figure 2b). Additional techniques were used to locate errors, such as flow tracing, flow capacity analysis, and network connectivity tools. After identifying and correcting network errors, the model was ready for calibration. Figure 2a Project Check Tool Invert Error Figure 2b Longitudinal Profiling Error
4 The flows for the hydrodynamic model were obtained from the City s existing Sewer Flow Estimating Model (SFEM). The SFEM calculates sewage flows based on a 1997 Southern California Association of Governments (SCAG) model, existing and future land use, and industrial point source discharges, all of which are embedded into the City s sewer network. Average dry weather flows calculated from the SFEM combined with diurnal patterns obtained from gauging data were then imported into the hydrodynamic model. The simulated flows are then compared to gauge data, and the SFEM estimated flow magnitude is adjusted until a good agreement between the simulated and gauged flows is achieved. The gauge data was collected from 2004 to The primary model consists of approximately 11,600 links and 11,400 nodes and contains over 600 point source loads, representing the secondary systems tributary to the associated primary link. The model was calibrated to over 500 gauges in the system, or approximately one gauge per every 1.3 miles of sewer pipe. The dry weather flow model was deemed calibrated when the volumetric error was below 10% and coefficient of correlation (R 2 ) was greater than 0.9. A statistical analysis tool in MIKE VIEW, a data and results viewing program, was used to calculate the volumetric error and the coefficient of correlation between the model results and gauged flow. Meeting the pre-defined calibration criteria ensures that the hydrodynamic model is reliable and can be used with confidence as a planning tool. Figure 3 shows an example of a good fit between the gauge data and the modeled data at a particular location. Additional verification of model results with current collection systems gauging will further increase the confidence of the model. Figure 3 Comparison of Gauge Data and Modeled Data
5 A ( > ) [cfs] [] :00:00 1/1/2005 Model Series Data Series Low er Calc Threshold 06:00:00 09:00:00 12:00:00 15:00:00 18:00:00 21:00:00 R2 = The primary sewer network is a complex system consisting of flow splits, pumping plants, special hydraulic structures, and alternate flow conditions. Special consideration of the operational conditions of the collection system during the gauging period is being considered. Due to the network s immense size, the system is in a constant state of flux. Sewer pipes are constantly being constructed and diversion plates are being added or removed. The calibration of the model was performed with the sewer operational conditions representing Several large sewers were removed during the calibration process and an effort was made to remove any other system changes performed after After the calibration was completed, the network was reconfigured to match the current settings and was verified by comparing to current gauge data. Additional challenges in the calibration effort included in pipe sediment, poor hydraulics, special diversion structures, and the inclusion of dry weather urban runoff. There are several locations in the collection system where low velocities have led to sediment build up in the sewer pipe. This leads to an error with the calculated flow from the gauging data, since the calculation assumes a clean pipe. In order to address this issue, a trustworthy gauge downstream of the sedimentation location was used to determine the total contributing flow. An estimate of the sediment was then determined by a field crew at every gauged location. The lower sections of the circular pipe were then removed in slices, until the water depth matched the gauged depth and the total flow downstream matched the reliable gauge. This created a panhandle type pipe shape illustrated in Figure 4. Figure 4 Circular pipe with debris and associated specifications
6 The calibration of the dry weather primary model is only one step in the development of the City s intended modeling capabilities. Currently, additional flow monitors and rain gauges are in place to capture data from future rains for the calibration of the wet weather primary model. This is an ongoing project that, weather permitting, will be completed within the following two years. Long term plans for the modeling development include the addition of secondary sewer pipes to the City s hydrodynamic model. This will allow for a full analysis of the City s hydraulic needs, including future relief efforts and current optimization procedures. THE RISK MANAGEMENT TOOL The City is using the developed hydrodynamic models as tools to analyze the collection system. The existing outfall model has been in use for several years, allowing an analysis of the major flows throughout the system. With the completion of the primary dry weather model, additional detail of the collection system can be analyzed. City planners are developing primary basin master plans with the aid of the model. Planners use the model as a capacity analysis tool and to develop relief alternatives where capacity constraints are identified. The use of the MIKE URBAN hydrodynamic model has greatly aided the City s planning efforts, allowing for future capacity planning and forecasting, system optimization, special operational conditions, and emergency alternative analyses including extreme weather conditions. The existing wet and dry weather outfall model has been a vital tool for the City s collection system. The model has been used to optimize the systems flow settings, analyzing various flow splits and their effect at a system wide scale. Additionally, the system was analyzed under extreme wet weather conditions. System bottlenecks were identified
7 and flagged as potential future projects. Figure 5 shows depth over diameter of the entire outfall system during one such run. The model calibration was also verified with every model run. As in the field data showed similar results to modeled runs, the confidence of the model s accuracy has continued to grow. Figure 5 Depth over Diameter of the Entire Outfall System Case Studies The outfall model has also been used for several specific projects. An analysis was performed during the pre-design phase of several rehabilitation efforts to determine if the decreased flow capacity would greatly hinder the outfall system as a whole. For example, the modeling results of the Central Outfall Sewer (COS) revealed that the desired circular in pipe alternative would decrease the overall capacity of the collection system and that the existing elliptical shape would need to be maintained for future flows. Another example of the model being used as a planning tool is regarding the system changes at the DCT Water Reclamation Plant. The plant recently upgraded to include a nitrification/denitrification process which resulted in a decrease in the plants overall capacity. The outfall model was run with this decreased plant flow capacity to view the initial impact. It was determined that the system would not be able to handle the decreased flow capacity during wet weather conditions and that some water storage would be needed to attenuate the storm s peak. Further analysis using the outfall model yielded a specific flow and storage volume to prevent any adverse conditions in the
8 downstream collection system. Figure 6 shows the attenuation of the storm just downstream of the DCT wastewater reclamation plant. In the Figure, the curved lines represent the water level downstream of DCT while the straighter lines represent the volume stored onsite at DCT. Figure 6 Real Time Control (blue) and uncontrolled storage (red) Completion of the primary system dry weather model provides an additional planning tool that allows for a more detailed investigation of the collection system. As a part of the City s preparation for the future, the primary collection system has been divided into 24 primary basins. Capacity analysis reports on each primary basin are being performed. This includes a description of the basin s attributes, the age and condition of the existing pipe, the current and future flow demands, and the need for possible capacity increases and possible corresponding relief alternatives. Prior to the dry weather primary model, all capacity analysis was done using a static flow accumulation model, where peak flows were cumulatively added. Since all peak flows do not occur at the same time, this is a very conservative analysis. The application of the MIKE URBAN model allows for an analysis using a dynamic model. Flows are routed throughout the system and peak flows do not necessarily correspond, allowing for a much more accurate representation of the performance of the collection system. From a risk management perspective, the MIKE URBAN model is far less conservative and allows the City to determine, with a greater accuracy, which relief projects are truly needed. In addition, the dynamic nature of the model allows for an understanding of other flow conditions which would not be identified using a static procedure. Backwater conditions or other hydraulic impedances can now be located and analyzed using the hydrodynamic model. Figure 7 shows a profile of a pipe reach with flow from a typical dry weather flow model run. Figure 7 Profile of a Primary Pipe Reach with Dry Weather Flows
9 Future Plans The next steps in the development of the City s modeling efforts are already underway. Additional gauges are being installed prior to this year s winter season in order to collect ample data for the calibration of a wet weather primary model. Upon completion of the wet weather model, the City will have yet another tool in the planning process. The wet weather model can be used to test the primary collection system for extreme wet weather conditions, identifying system constraints and possible problem areas. In addition, the development of the wet weather model will help the City to determine the source of the wet weather contribution. The wet weather flow model will be developed using the Rainfall Dependent Inflow and Infiltration model, a continuous hydrologic model that tracks both the direct inflow and infiltration (I/I) components of wet weather flow separately. By simulating the I/I components separately, it can be determined which wet weather flow component dominates in a particular basin, and how to best mitigate those extraneous flows. The understanding of the I/I potential in each basin will further aid the City s understanding and planning process. Future plans for the City s modeling team include possibly combining the entire collection system into one model, perhaps being divided into sub-basins to decrease the intense computational needs. Inclusion of the entire system would allow for a thorough and detailed investigative review of the collection system. CONCLUSION The City of Los Angeles is constantly striving to improve our capability to protect the public health and environment. The organization of a modeling team with a network of tools to analyze the collection system provides a proactive measure towards preventing sanitary sewer overflows and allows for an understanding of the hydraulics of the system. Anticipating future flows and relative relief dates to the highest degree of accuracy possible decreases the City s fiscal expenditures while increasing the relative safety of the public. The calibration of the existing outfall model began the model development process and has proven to be an essential element in planning and designing on a large scale. With the addition of the newly calibrated dry weather primary model, a further step has been taken toward a detailed future planning of the collection system. With these tools, the City has the ability to forecast any potential problems and switches from a reactive damage control methodology to a preventative total preparedness planning. REFERENCES Southern California Association of Governments. Land use and future growth study Danish Hydraulic Institute, DHI. MIKE URBAN User Manual. Copenhagen, Denmark
10
Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017
Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system
More informationAssessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration
Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration Justin Siegrist, 1 Daniel Anderson, 2 Joseph Koran, 2 Mark Pribak, 3 Uzair M. (Sam) Shamsi 4 and Dave White 1 1 Wade Trim, Inc., Cincinnati,
More informationSystem - Wide Hydraulic Model
System - Wide Hydraulic Model Department of Watershed Management (DWM) Capacity, Management, Operations, and Maintenance (CMOM) Program January 2013 Version 1 Contents DEKALB COUNTY DWM Contents... i Acronyms...
More informationCHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL
CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model
More informationDrainage Servicing Report - Terms of Reference
Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage
More informationRegional Hydraulic Model Plan
APPENDIX 3 Regional Hydraulic Model Plan November 17, 2008 Contents Section 1 Introduction Section 2 Model Objectives and Capabilities 2.1 Model Software Capabilities... 2-1 Section 3 Model Development
More informationTechnical Memorandum No. 1
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment Technical Memorandum No. 1 Multi-Jurisdictional Use Facilities Capital Cost Allocation DRAFT April 17, 2013
More informationReport. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationUsing Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model
15 Using Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model Josh A. Reinicke, Marc A. Lehmann and C. Timothy Fallara Since 1992, the City of Columbus Division of Sewerage and Drainage (DOSD)
More informationSection 8 System Evaluation and Capacity Assurance Plan (SECAP)
System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationThe New Age for Sewer Planning at the City of Los Angeles
The New Age for Sewer Planning at the City of Los Angeles Mario Dimzon 1 * P.E., Fernando Gonzalez 1 P.E., Ali Poosti 1 PE, Adel Hagekhalil 1 PE, Erick Heath 2 P.E., Rajan Ray 2 P.E., Erin Breen 2 P.E.
More informationWEF Collection Systems Conference 2017
Davenport, Iowa 14th District Diversion Study Karol Giokas, P.E., RJN Group Tom Leabhart, P.E., Davenport, IA ABSTRACT The 14 th District sanitary sewer basin in Davenport, Iowa has high levels of inflow
More informationPLANNING FOR THE FUTURE: A REGIONAL MASTER PLAN APPROACH WITH THE OPPORTUNITY TO MINIMIZE FUTURE OPERATION AND MAINTENANCE CONCERNS
PLANNING FOR THE FUTURE: A REGIONAL MASTER PLAN APPROACH WITH THE OPPORTUNITY TO MINIMIZE FUTURE OPERATION AND MAINTENANCE CONCERNS ABSTRACT Robert Skip Notte*, PE, LEED AP, Dewberry, snotte@dewberry.com
More informationGRAVITY CALIBRATION: A SIGNATURE ACCOMPLISHMENT
GRAVITY CALIBRATION: A SIGNATURE ACCOMPLISHMENT Phil Hubbard, P.E., HRSD Paul Wilson, P.E., Brown and Caldwell* Mark Harber, P.E., Brown and Caldwell *301 Bendix Road, Suite 400 ABSTRACT Virginia Beach,
More informationREAL TIME INFLOW AND INFILTRATION ANALYSIS A NEW TOOL TO FOCUS YOUR RENEWAL SPEND
REAL TIME INFLOW AND INFILTRATION ANALYSIS A NEW TOOL TO FOCUS YOUR RENEWAL SPEND Tom Joseph (AWT Water), Peter Stephens (AWT Water) ABSTRACT Rainfall derived inflow and infiltration (RDII) in sewers has
More informationCITY OF LOS ANGELES. Sewer System Management Plan (SSMP) Biennial Self-Audit Report
CITY OF LOS ANGELES Sewer System Management Plan (SSMP) Biennial Self-Audit Report Pursuant to the State General Waste Discharge Requirements (WDRs) Order No. SSS WDRs 2006-0003 February 2017 City of Los
More informationPhase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection
DRAFT Technical Memorandum Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility Hydraulic Modeling Software Selection Prepared for: City of Newport Public Works Department 70 Halsey Street Newport,
More informationReducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto
Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview
More informationModelling a Combined Sewage and Stormwater Flood Detention Basin
Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design
More informationChapter 3: Analytical Methods/Data Sources
3.1 Introduction Chapter 3: Analytical Methods/Data Sources This chapter describes hydrologic and hydraulic models of the conveyance system and defines the range of application of each. This chapter also
More informationDynamic Pump Design of Complex Rising Main Injector Systems
Dynamic Pump Design of Complex Rising Main Injector Systems Morten Just Kjølby 1, Arne Møller 1 1 DHI Denmark. (Presenter: Morten Just Kjølby mjk@dhigroup.com) Abstract In low laying coastal areas sewerage
More informationMaximizing Your Investment
Maximizing Your Investment City of Lorain Collection System Optimization Eliminates SSOs Ohio Water Environment Association June 24, 2015 Mary Garza City of Lorain Laura McGinnis, P.E. ARCADIS Tim Ruggaber,
More informationImproved Inflow & Infiltration (I&I) Monitoring Program
City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring Program Submission For 2009 UBCM Community Excellence Awards Best Practices City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring
More informationUsing SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System
15 Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System Mi Chen, Fang Cheng, Edward Burgess, Gregory Barden, Hunter Kelly and Timothy Fallara The City of Columbus wastewater
More informationChapter 8 Addressing I/I Issues and High Flows
Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of
More information5 CONSULTANT SELECTION FOR INFLOW AND INFILTRATION AUDIT AND FLOW MONITORING PROGRAM
5 CONSULTANT SELECTION FOR INFLOW AND INFILTRATION AUDIT AND FLOW MONITORING PROGRAM The Environmental Services Committee recommends the adoption of the recommendation contained in the following report
More information7.0 GROWTH-INDUCING AND CUMULATIVE IMPACTS
7.0 GROWTH-INDUCING AND CUMULATIVE IMPACTS 7.1 GROWTH-INDUCING IMPACTS Section 15126.2(d) of the CEQA Guidelines requires a discussion of the growth-inducing impacts of proposed projects. Growth-inducing
More informationPreliminary Drainage Analysis
Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue
More informationReview & Design of the Apia Pressure Sewer System. Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions
Review & Design of the Apia Pressure Sewer System Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data Collection Physical
More informationOVERFLOW COMPLIANCE THROUGH REAL TIME CONTROL - SEWERFLEX SEWER NETWORK OPTIMISATION
OVERFLOW COMPLIANCE THROUGH REAL TIME CONTROL - SEWERFLEX SEWER NETWORK OPTIMISATION Hestbæk, T. K. 1, Sørud, M. 1, Poulsen, T. S. 1, Grum, M. 1, Moelbye, N. and Joergensen, A. T. 1 1 Krüger A/S, Denmark
More informationExhibit A. Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas
Exhibit A Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas Intent and Purpose The City of Lawrence has begun a Rapid Inflow and Infiltration (I/I) Reduction Program.
More informationFact-Based Model Validation
Bulletin A4 Fact-Based Model Validation itracking Developing Sewer Models Using Empirically Derived Data Sets Fact-Based Model Validation A model is only as good as the data used to create it. Thomas M.
More informationLa Riereta Catchment Sant Boi de Llobregat
La Riereta Catchment Sant Boi de Llobregat Final Report Team 2 Enrique Amaya (COL) Lilian Yamamoto (BRA) Martín Pez (ARG) Sergio Esquivel (MEX) Instructor: José Macor Summary Contents 1. Introduction...
More informationControl and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand
Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Tawatchai Tingsanchali* School of Civil Engineering, Asian Institute of Technology, P.O.Box
More informationDetention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges
Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental
More informationSewer Modeling of Near- Term Development Technical Memorandum
Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently
More informationBefore 1990, roughly 116 wastewater
F W R J Going Beyond Steady-State Wastewater System Modeling in Sarasota County: A Case for Extended-Period Simulation Christopher C. Baggett, Fatih Gordu, Roberto A. Rosario, and Christopher B. Cole Before
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, WASTEWATER COLLECTION SYSTEM AND STORMWATER MANAGEMENT REPORT
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, 2018 Item 4, Report No. 12, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the
More informationFeatherston Groundwater Infiltration Investigation
South Wairarapa District ouncil TABLE OF ONTENTS 1 BAKGROUND... 1 2 METHODOLOGY... 1 2.1 Defining GWI... 1 2.2 Night Flow Isolation... 1 3 RESULTS... 4 4 REHABILITATION OST ESTIMATES... 7 4.1 Rehabilitation
More informationCity of Ames. Water Pollution Control. Long Range Facility Plan
City of Ames Water Pollution Control Long Range Facility Plan Introduction Over 25 years ago, the City of Ames last completed a Wastewater Facility Plan. That Facility Plan prompted design and construction
More informationSanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River
Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011 Sanitation District No. 1
More informationWater Data Needs and Applications in the Private Sector. Robert Annear, Vice President, Ph.D., P.E. Water is our nature
Water Data Needs and Applications in the Private Sector Robert Annear, Vice President, Ph.D., P.E. Water is our nature GRN Forum: Global Water - 2010 and Beyond Oct 21 2010 - Oct 22 2010 Introduction Our
More informationMilwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by
Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers
More informationRefinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives
Refinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives TO: Roger Coffey, PMT Document Control Center, CH2M Hill COPY: Jim Theiler, City of Omaha Scott Aurit, PMT Tom Heinemann, PMT FROM: Jim
More informationCommunity Open House
Mayor Kasim Reed The Department of Watershed Management & Atlanta Memorial Park Conservancy Community Open House 10/28/2016 1 AGENDA: Meet & Greet Opening Remarks & Introductions District 8 Council Member
More informationStorm Water and Sanitary Sewer
Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements
More informationEnvironmental Protection and Flood Prevention with the Modular h Combined Sewer Overflow Chamber
Environmental Protection and Flood Prevention with the Modular h Combined Sewer Overflow Chamber Rising sea levels, increasingly severe and frequent rainstorms, plus an ever-growing population density
More informationAppendix G Preliminary Hydrology Study
Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014
More informationImpact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour
9th International Conference on Urban Drainage Modelling Belgrade 2012 Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour Marco van Bijnen 1,2, Hans
More informationReview & Design of the Apia Pressure Sewer System
Review & Design of the Apia Pressure Sewer System Presented by Tainau Moefaauo Taputoa Titimaea - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data
More informationMaine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans
Maine State Library Maine State Documents Land and Water Quality Documents Environmental Protection 9-1-1994 Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility
More informationChapter 5: Conveyance Assessment 2020 Baseline Conditions
Chapter 5: Conveyance Assessment 2020 Baseline Conditions 5.1 Introduction The performance of the conveyance system for 2020 Baseline conditions is assessed in this chapter using the hydraulic models.
More informationThe effect of the raingauge distribution on stormwater models
18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 The effect of the raingauge distribution on stormwater models Cooper, M.R. 1 and D.A. K. Fernando 2
More informationThe SuDS Manual Frequently asked questions
The SuDS Manual Frequently asked questions 1. Is source control still a requirement of the new SuDS Manual? Yes. Source control components are fundamental elements of a SuDS scheme. The benefits of source
More informationWastewater Information Management System: Flow Modeling and Sewer Connection Permit Applications
Chapter 22 Wastewater Information Management System: Flow Modeling and Sewer Connection Permit Applications David Crawford and Felix Limtiaco The City and County ofhonolulu, Department of Wastewater Management
More informationCourse: Wastewater Management
Course: Wastewater Management Prof. M. M. Ghangrekar Questions 1 1. Describe advantages and disadvantages offered by the water carriage system. 2. What are the possible adverse effects when untreated or
More information3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationSILVER SPRINGS/RIVER POLLUTION REDUCTION PROJECT IMPROVING THE WATER QUALITY OF THE SILVER SPRINGS ECOSYSTEM
SILVER SPRINGS/RIVER POLLUTION REDUCTION PROJECT IMPROVING THE WATER QUALITY OF THE SILVER SPRINGS ECOSYSTEM Jonathan Steflik, PE JEA (Formerly Black & Veatch) Bruce Phillips, PE PLS, Tom Young, PE City
More informationCity of San Jose Storm Sewer Master Plan
City of San Jose Storm Sewer Master Plan Anne Symonds, PE and Mira Chokshi, PE 2016 Pacific Water Conference AWWA Hawaii Section HWEA February 4, 2016 Agenda Introduction and Goals of the Project Background
More informationEvaluation of Collection System Design Standards
Wastewater Master Plan DWSD Project No. CS-1314 Evaluation of Collection System Design Standards Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: CDM Table of Contents
More informationHYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR
HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed
More informationMunicipal Sanitary Authority of the City of New Kensington
Municipal Sanitary Authority of the City of New Kensington Public Workshop Number 2 Long Term Control Plan Update Presentation to the Cities of New Kensington, Arnold, Lower Burrell and Borough of Plum
More informationDRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:
DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and
More informationChapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall
6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures
More informationWastewater Flow Monitoring Services
Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,
More informationFLOW REGULATING SYSTEM USING WEIR AND ORIFICE IN A MANHOLE
FLOW REGULATING SYSTEM USING WEIR AND ORIFICE IN A MANHOLE Masahiro Maeda and Makoto Akiba * Metropolitan Tokyo Sewage Bureau, Chubu Construction Office Kuramae 2-1-8 Taito-ku KEYWORDS Flow Regulating
More informationPRESSURE SEWER SYSTEMS: NEW DESIGN INNOVATIONS CAN IMPROVE SYSTEM PERFORMANCE
PRESSURE SEWER SYSTEMS: NEW DESIGN INNOVATIONS CAN IMPROVE SYSTEM PERFORMANCE Graeme Salmon GHD Ltd, New Zealand ABSTRACT An innovative approach to dynamic modelling of pressure sewer systems is outlined.
More informationDESIGN OF SEWER SYSTEMS
Wastewater Engineering (MSc program) DESIGN OF SEWER SYSTEMS Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University 1. Sewer Materials
More informationCapacity Assurance in Charlotte s Central Business District
November 2017 Capacity Assurance in Charlotte s Central Business District Micah Burgess, PE Barbara Moranta, PE October 2017 Charlotte Water Facts Provides Water and Sanitary Sewer Service to Mecklenburg
More informationBMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs
BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of
More informationChapter 7 : Conclusions and recommendations
Chapter 7 : Conclusions and recommendations 7.1 Conclusions The main goal of this research was to investigate the modelling and rainfall data requirements for the design of combined sewer systems and the
More informationThe Integrated Resources Plan (IRP) is a planning document prepared under the leadership of the
IV.M.2 WASTEWATER 1. INTRODUCTION This section discusses the wastewater system for the proposed Project site and surrounding area and evaluates potential Project impacts on the existing wastewater system
More informationHandout 5: Stormwater Cost of Service
Handout 5: Stormwater Cost of Service Introduction The purpose of this handout is to describe the current cost allocation methodology for the stormwater program. The existing Stormwater Management Service
More informationTable of Contents. Section 7 Alternatives for Conveyance and Treatment
Table of Contents... 7-1 7.1 Conveyance / Location Alternatives...7-1 7.1.1 Wastewater Facility Locations Alternatives...7-1 7.1.2 Wastewater Treatment Method Alternatives...7-1 7.1.3 Conveyance Alternatives...7-2
More informationSurface Water Management Masterplan. Summary and Actions. September 2016
Surface Water Management Masterplan Summary and Actions September 2016 Contents Section Page 1. MGSDP Area and Partners 1 2. MGSDP Objectives, Vision and Guiding Principles 3 3. Surface Water Management
More informationCapturing Storm Water in Semi-arid Climate
Capturing Storm Water in Semi-arid Climate REBEKA SULTANA, PHD CALIFORNIA STATE UNIVERSITY, LONG BEACH NATHANIEL SUMMERVILLE, PE CALIFORNIA STATE UNIVERSITY LONG BEACH (STUDENT PROJECT MANAGER) AND CH2M
More information3F. Hydrology and Water Quality
This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure
GENERAL INFRASTRUCTURE ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee
More informationNEORSD Member Community Infrastructure Program (MCIP) Opening Remarks
NEORSD Member Community Infrastructure Program (MCIP) Opening Remarks Clean Water Act Issues Clean Water Act issues are more than CSO Sanitary sewer overflows (SSO) including surcharged sewers, basement
More informationA Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.
Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts
More informationEAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria
EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate
More informationFinding Solutions to Sanitary Sewer System Capacity Deficiencies
23 Finding Solutions to Sanitary Sewer System Capacity Deficiencies Derek Wride, Joe Koran, Mi Chen, Ben Gamble and Edward H. Burgess In 2000, the Metropolitan Sewer District of Greater Cincinnati (MSDGC)
More information2010 System Evaluation and Capacity Assurance (SECAP) Update
www.rjn.com November 8, 2010 Mr. Howell Anderson, P.E. Little Rock Wastewater 11 Clearwater Drive Little Rock, AR 72204 Subject: 2010 System Evaluation and Capacity Assurance (SECAP) Update Dear Mr. Anderson:
More informationAPPENDIX 14. Inflow and Infiltration in the CRD
APPENDIX 14 Inflow and Infiltration in the CRD As documented in the CRD-published discussion paper Cost versus Benefit of Reducing Inflow and Infiltration inflow and infiltration refers to rainwater and
More informationI/I Analysis & Water Balance Modelling. Presented by Paul Edwards
I/I Analysis & Water Balance Modelling Presented by Paul Edwards Contents Background Wet Weather Model Calibration Inflow / Infiltration Assessment Flow Containment Options Water Balance Model 20 Year
More informationThe Case for Operational Optimization
The Case for Operational Optimization MSD of Greater Cincinnati s Wet Weather Challenge and Opportunity Southwest Ohio experiences over 40 inches of rain in a typical year, and, as is common in an urban
More informationRainfall Event of September 29, Public Works & Environmental Services
Rainfall Event of September 29, 2016 Rainfall Recorded on Revland Street Rain Gauge 220 mm of rain in 24 hours between 6:00 pm September 28 th and 6:00 am September 29 th 195 mm of rain in 12 hours between
More informationTOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS
TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS Marcus M. Quigley, P.E., Project Engineer, GeoSyntec Consultants Steven P. Roy, Associate, GeoSyntec Consultants Lawrence Gil, North
More informationStreamlining I/I Repairs in Berlin Charter Township
Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results
More informationDesign of Sewerage System for Jaffarpur area in Southwest New Delhi
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for
More informationSimplification of dynamic flow routing models using hybrid modelling approaches two case studies
Simplification of dynamic flow routing models using hybrid modelling approaches two case studies P. Rouault 1 *, A. Fischer 2, K. Schroeder 1, E. Pawlowsky-Reusing 3, J. Van Assel 2 1 KompetenzZentrum
More informationCE 370. Wastewater Characteristics. Quantity. The design of a wastewater treatment plant requires knowledge of: Quantity or flowrate of wastewater.
CE 370 Wastewater Characteristics Quantity 1 Introduction The design of a wastewater treatment plant requires knowledge of: Quantity or flowrate of wastewater. Required to determine the size of the various
More informationAPPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary
APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report
More informationHydraulic Modeling of Deep Tunnel Provides Cost Savings
5 Hydraulic Modeling of Deep Tunnel Provides Cost Savings Taymour El-Hosseiny, Karen Reinhart and M. P. Cherian In 2005, the City of Columbus, Ohio submitted a plan to the Ohio Environmental Protection
More informationSEWERSHED PRIORITIZATION WORK PLAN. Department of Public Works Wastewater Infrastructure Redevelopment Program
SEWERSHED PRIORITIZATION WORK PLAN Department of Public Works Wastewater Infrastructure Redevelopment Program SEPTEMBER 30, 2013 Sewershed Prioritization Work Plan Contents 1.0 Introduction... 1-1 1.1
More informationPre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015
Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What
More informationStormwater Infrastructure Funding Study Public Education Session May 27, :00 9:00 pm City Hall, Multi-Purpose Room Level 100
Stormwater Infrastructure Funding Study Public Education Session May 27, 2015 7:00 9:00 pm City Hall, Multi-Purpose Room Level 100 What is the Stormwater Infrastructure funding study? Purpose of the Stormwater
More information100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals
PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual
More information