1 Port of Anacortes Stormwater Management Program Western Washington Phase II Municipal Stormwater Permit # WAR Commercial Ave Anacortes, WA December 2016 Port of Anacortes Stormwater Management Program

2 Table of Contents Introduction Public Education and Outreach Public Involvement and Participation Illicit Discharge Detection and Elimination Construction Site Stormwater Runoff Control Post-Construction Stormwater Management for New Development and Redevelopment Pollution Prevention and Good Housekeeping for Municipal Operations Record Keeping and Reporting... 9 Attachments: A Illicit Discharge Detection and Elimination Program and Policy B Spill Response Plans C Operation & Maintenance Plan Port of Anacortes Stormwater Management Program

3 Introduction This Stormwater Management Program (SWMP) describes the actions the Port of Anacortes (Port) will take to reduce discharges of polluted stormwater to Fidalgo Bay, Burrows Bay, and Guemes Channel to protect water quality in Puget Sound. The Port obtained required permit coverage under the Washington State Department of Ecology s Western Washington Phase II Municipal Stormwater Permit which was reissued on August 1, The Port is a secondary permittee under the Phase II Permit, which is defined as an operator of a regulated small municipal separate storm sewer system which is not a city, town, or county. The purpose of the permit is to help municipalities reduce the discharge of pollutants to the maximum extent practicable and to protect water quality. The Port will coordinate with the City of Anacortes as necessary to implement the permit requirements and to limit redundancies. The Phase II Permit applies to Port-owned properties, all of which are located within the City of Anacortes. These properties include the Cap Sante Marina (a certified Clean Marina), the former Scott Paper Mill clean-up site that has been restored to its former use as a park, Ship Harbor (leased by the Washington State Ferry System for the Anacortes Ferry Terminal), Pier 1 (leased primarily by Dakota Creek Industries as a shipyard), Pier 2 (a bulk loading marine terminal), the Anacortes Airport and the former Wyman s Marina area (now a habitat mitigation site with a restored commercial boat ramp). This SWMP will be updated at least annually and submitted to the Department of Ecology along with the required Phase II Annual Report, which is due by March 31 of each year. The Port s Environmental Specialist will oversee the development and the implementation of the SWMP. The Port of Anacortes has a variety of tenants and/or companies with month-to-month space rental agreements as described below: Industrial (4) shipyard, bulk loading marine terminal, marine float making company Seafood (4) commercial crab off-loading and storage Ferry Operation (1) State Ferry Terminal Warehouse (1) rope manufacturing Airport (5) aircraft related indoor businesses Office (19) yacht brokers, U.S. Customs and others Educational Facility (1) Northwest Career and Technical Academy Marine Technology Facility Restaurant (3) Retail (5) commercial related retail businesses Port of Anacortes Stormwater Management Program 1

4 The Stormwater Management Program is organized according to the required secondary permittee components as follows: 1. Public Education and Outreach 2. Public Involvement and Participation 3. Illicit Discharge Detection and Elimination 4. Construction Site Stormwater Runoff Control 5. Post-Construction Stormwater Management for New Development and Redevelopment 6. Pollution Prevention and Good Housekeeping for Municipal Operations 7. Record Keeping and Reporting Port of Anacortes Stormwater Management Program 2

5 1. Public Education and Outreach Task: Label storm drain inlets located in maintenance yards, in parking lots, along sidewalks and at pedestrian access points with a message similar to Dump no waste Drains to water body. Status: Catch basins and storm-drain inlets have been labeled with metal discs stating No Dumping, Drains to Sound as of August Task for 2017: Conduct visual inspection of storm drain inlets and have any inlet having a label that is no longer clearly visible and/or easily readable be re-labeled within 90 days. Task: Distribute educational information to tenants on the impact of stormwater discharges on receiving waters and steps that can be taken to reduce pollutants in stormwater runoff. Distribution may be by hard copy or electronic means. Status: Brochures entitled Marina Pollution Prevention have been distributed to all boaters via mail June 2016 and are located at the Main Port Office, Harbor Master Office, Boat Launch and Fuel Dock. A brochure entitled Stormwater Pollution Prevention has been mailed and ed to all tenants in November 2016 and is also located at the Main Port Office. The brochure includes general information about contaminated stormwater runoff and how it can impact Puget Sound waters, good housekeeping, spill response, waste management and the Port s Illicit Discharge Detection and Elimination Stormwater Policy. A new Airport pollution prevention brochure has been created specifically for the Anacortes Airport tenants and users and has been mailed to all tenants in September All brochures have been distributed to various groups such as the Skagit Marine Resources Committee and the Fidalgo Bay Aquatic Reserve Citizen Stewardship Committee. Task for 2017: Marina pollution prevention brochures will be redistributed during the summer busy season. Airport pollution prevention brochures will be redistributed in the fall. Portwide stormwater pollution prevention brochures will be redistributed in November Public Involvement and Participation Task: Post the annual report on the Port website. Status: The 2015 annual report has been posted on the Port website. Task for 2017: Post the 2016 annual report on the Port website. Port of Anacortes Stormwater Management Program 3

6 Task: Post the latest updated version of the SWMP on the Port website. Status: The SWMP (updated in 2016) has been posted on the Port website. An ad was placed in the local paper inviting public review and comment of the previous year s SWMP. Task for 2017: After next update, post the latest version of the SWMP on the Port website. 3. Illicit Discharge Detection and Elimination Task: Comply with all relevant ordinances, rules and regulation of the local jurisdictions that govern non-stormwater discharges. Status: The Port of Anacortes is currently in compliance with all relevant ordinances, rules and regulations of the City of Anacortes for non-stormwater discharges. Task for 2017: Continue working with the City on remaining compliant with all local relevant ordinances, rules and regulations. Task: Implement appropriate policies prohibiting illicit discharges and an enforcement plan to ensure compliance with illicit discharge policies. Status: In 2008, the Port developed an Illicit Discharge Detection and Elimination Program, and the Port Commission adopted an Illicit Discharge Stormwater Policy, which includes enforcement mechanisms prohibiting illicit discharges (Attachment A). Task for 2017: Continue implementing the Illicit Discharge Detection and Elimination Program and Policy, and update as needed. Task: Maintain a storm sewer system map showing locations of all known outfalls and discharge points, labeling the receiving waters, and delineating areas contributing runoff to each outfall and discharge point. Status: Port consultants mapped all stormwater systems on Port-owned property, and maps were updated in Task for 2017: Update maps to include new Port properties. Consultants will be hired to further update property maps. Task: Conduct field inspections, and visually inspect for illicit discharges at all known outfalls and discharge points. Visually inspect at least one third of all known outfalls and discharge points each year. Port of Anacortes Stormwater Management Program 4

7 Status: Outfalls and discharge points were inspected for illicit discharges in December Task for 2017: Continue annual field inspections of outfalls and discharge points for illicit discharges. Remove any illicit discharges if any are identified. Task: Implement a spill response plan that includes coordination with a qualified spill responder. Status: The Spill Response Plans are updated and included as Attachment B. Task for 2017: Continue implementing Spill Response Plans, and update the plans as needed. Task: Provide staff training or coordinate with existing training efforts to educate staff on proper BMPs for preventing illicit discharges, including spills. Train all staff who, as a part of their normal job responsibilities, have a role in preventing such illicit discharges. Status: Training on stormwater pollution prevention, proper BMPs and illicit discharge identification procedures was provided to all Port of Anacortes staff in October Task for 2017: Continue annual training of all Port staff, and update training materials as needed. 4. Construction Site Stormwater Runoff Control Task: Comply with all relevant ordinances, rules and regulations of local jurisdictions that govern construction phase stormwater pollution prevention measures. Status: The Port complies with all construction ordinances, rules and regulations of the City of Anacortes and is required to obtain building permits on most projects. Task for 2017: Continue working with the City on remaining compliant with all local relevant ordinances, rules and regulations. Task: Obtain NPDES general permit for stormwater discharges associated with construction activities prior to discharging construction related stormwater. Status: The Port obtains construction stormwater general permits from the Department of Ecology for any project that is likely to disturb one acre or more of land, and will obtain, or have tenants obtain, NPDES permits for any new industrial or construction project. The Port follows the City of Anacortes permitting process for construction projects. The Port s 2016 Airport Fencing Improvements and Obstruction Removal project required a construction stormwater general permit. Port of Anacortes Stormwater Management Program 5

8 Task for 2017: Continue obtaining construction stormwater general permits as needed for all internal projects. Ensure all tenants with external projects obtain a construction stormwater general permit as needed. Task: If other entities discharge to Port systems, assist them to achieve compliance with all relevant ordinances, rules and regulations. Status: The Port is currently in compliance. Port tenants discharge stormwater into Port catch basins that drain to Fidalgo Bay or the Guemes Channel. The City of Anacortes discharges some stormwater through Port outfalls into the Port s Cap Sante Marina. The City and tenants immediately notify the Port of any noncompliant discharges. Task for 2017: Continue maintaining lines of communication with tenants and the City about illicit discharge detection and elimination measures and how to respond to spills. Task: Provide training to relevant staff in erosion & sediment control BMPs and requirements. Status: Construction projects are implemented by qualified contractors who are trained in erosion and sediment control BMPs and requirements. Port project managers, environmental specialist, and facilities staff (four staff members in total) took an Ecology-approved Construction Site Erosion and Sediment Control Lead training course offsite and will maintain their CESCL certifications by taking the required refresher course in Task for 2017: Ensure all contractors have obtained CESCL certification, and provide any new relevant staff with CESCL training. Task: Provide Ecology and the City access of construction sites or other land disturbances which are under the Port s functional control during land disturbing activities and/or construction period. Status: All construction sites on Port property are accessible for inspection by Ecology and the City at any time. In addition, access to the piers can be obtained with a Port escort that holds a Transportation Worker s Identification Card. Access to Dakota Creek Industries, a working shipyard, must be coordinated ahead of time for safety reasons. Task for 2017: Continue providing Ecology and the City access of construction sites. Port of Anacortes Stormwater Management Program 6

9 5. Post-Construction Stormwater Management for New Development and Redevelopment Task: Comply with all relevant ordinances, rules and regulations of local jurisdictions that govern post-construction stormwater pollution prevention measures. Status: The Port complies with all City of Anacortes post-construction ordinances, rules and regulations regarding new development and redevelopment on Port property. Task for 2017: Continue working with the City on remaining compliant with all local relevant ordinances, rules and regulations. Task: If other entities discharge to Port systems, assist them to achieve compliance with all relevant ordinances, rules and regulations regarding post-construction stormwater management for new development and redevelopment. Status: The Port is currently in compliance. Port tenants discharge stormwater into Port catch basins that drain to Fidalgo Bay or the Guemes Channel. The City of Anacortes discharges some stormwater through Port outfalls into the Port s Cap Sante Marina. The City and tenants immediately notify the Port of any noncompliant discharges. Task for 2017: Continue maintaining lines of communication with tenants and the City about illicit discharge detection and elimination measures and how to respond to spills. 6. Pollution Prevention and Good Housekeeping for Municipal Operations Task: Develop & implement a municipal operation and maintenance (O & M) plan to minimize stormwater pollution from activities conducted. The following areas should be highlighted in the plan: 1. Stormwater collection and conveyance systems 2. Roads, highways and parking lots 3. Vehicle fleets 4. External building maintenance 5. Parks and open space 6. Material storage facilities and heavy equipment maintenance or storage yards Port of Anacortes Stormwater Management Program 7

10 Status: The Operations & Maintenance Plan has been updated and is included as Attachment C. Task for 2017: Make relevant updates to the O & M Plan as necessary. Task: Obtain permit coverage for all facilities owned or operated that are required to be covered under the General NPDES Permit for stormwater discharges associated with industrial activities. Status: The Port is currently in compliance with the NPDES Industrial Stormwater General Permit (ISGP) for the Anacortes Airport and the State Waste Discharge permit for Pier 2. Dakota Creek Industries and Washington State Ferry s Anacortes Ferry Terminal lease property from the Port and have ISGPs. Additionally, Port tenant lease agreements contain a section spelling out tenant environmental responsibilities. Task for 2017: Continue compliance with the Anacortes Airport s ISGP and State Waste Discharge permit for Pier 2. Review permit compliance updates for Dakota Creek Industries and Washington State Ferry. Update tenant lease and boater agreements to reflect compliance with all stormwater permits. Task: The O & M Plan must include sufficient documentation and records as necessary to demonstrate compliance with the requirements above. Status: Port facilities staff regularly documents compliance with the requirements of the O & M Plan through the facilities M-Pet system. Task for 2017: Begin compiling and documenting pollution prevention and good housekeeping activities onto a separate O & M plan spreadsheet. Consultants will be hired to further improve this process. Task: Implement a program designed to train all employees whose primary construction, operations or maintenance job functions may impact stormwater quality. Training shall include: 1. The importance of protecting water quality 2. Requirements of the municipal permit 3. Operation and maintenance requirements 4. Inspection procedures 5. Ways to prevent or minimize impacts to water quality 6. Procedures for reporting water quality concerns, including potential illicit discharges Status: Training was provided to all Port staff in November Port of Anacortes Stormwater Management Program 8

11 Task for 2017: Continue providing annual training to Port staff regarding stormwater pollution prevention, illicit discharge detection and best management practices. 7. Record Keeping and Reporting Task: The Port of Anacortes will complete annual reports on the effectiveness of the SWMP. The SWMP will be updated as necessary and sent to Ecology with the annual report. The Port will make all records related to the SWMP available to the public during business hours. Status: Annual reports have been completed and sent to Ecology by March 31 st for the years 2008 through 2012 and The Annual Report was not required for Task for 2017: Complete the annual report for 2016, and submit it to Ecology by March 31 st. Port of Anacortes Stormwater Management Program 9

12 Attachment A Illicit Discharge Detection and Elimination Program and Policy

13

14

15

16

17

18

19

20

21 Attachment B Spill Response Plans

22 Port of Anacortes Anacortes Airport SPILL RESPONSE PLAN Anacortes Airport Location: 4000 Airport Road, Anacortes, WA Facility s Responsible Person(s): Name: Josh Beaner Name: Sarah Tchang Title: Director of Operations Title: Environmental Specialist Office Phone: (360) Office Phone: (360) Cell Phone: (360) Cell Phone: (901) The Facility s Responsible Person(s) has the primary responsibility for coordinating the response to emergencies, including chemical spills. After notifying Port staff members, one person shall be designated to make emergency notifications. Depending on the circumstances of the spill, the following notifications shall be made, as appropriate. Emergency Contact Numbers: Spill Response Contractors NRC Environmental Services (800) Police, Fire Department and Ambulance Services 911 National Response Center (800) Washington State Emergency Management (800) Washington State Department of Ecology (Northwest Region) (425) City of Anacortes Stormwater Program (360) Environmental Protection Agency (Regional Office) (206) Skagit County Emergency Management (360) Island Hospital (360) Poison Control Center (800) OSHA Area Office (206)

23 Port of Anacortes Anacortes Airport SPILL RESPONSE PLAN Reporting Spills: All chemical spills, regardless of size, should be reported as soon as possible to the Facility s Responsible Person(s). The process of making these notifications for larger scale spills can take considerable time. The person making these calls should be someone knowledgeable about communicating with these agencies, such as the Port s Environmental Specialist, but should also be someone that is not needed to assist with first responder activities. Detailed information about the spill incident may be unknown at the time of making the appropriate notifications. The types of spill information that will be asked by the agencies may include: 1. Name and Phone Number of the Reporting Party 2. Name and Phone Number of the Responsible Party 3. Location of Spill 4. Type of Material Released 5. Quantity Spilled and the Affected Media (Air, Soil and/or Water) 6. Concentration 7. Cleanup Status 8. Resource Damage Information (ie. Dead Fish or Oiled Birds) The Facility s Responsible Person(s) will determine whether the spill has the potential to affect the environment outside of the facility. Examples of spills that could affect the outside environment include spills that are accompanied by fire or explosion and spills that could reach nearby water bodies. Depending on the type and quantity of spill, the Facility s Responsible Person(s) will make the determination if the spill must be reported to one or all of the local, state or federal agencies listed: 1. National Response Center: WA State Emergency Management: WA State Department of Ecology (Northwest Region): If spills enter state waters (marine waters, estuaries, rivers, lakes, streams, creeks, ponds, springs, wetlands, underground water resources, sewers, storm drains, beaches, ditches and snow banks), all three agencies must be notified. 2

24 Port of Anacortes Anacortes Airport SPILL RESPONSE PLAN Spill Kit Inventory: Two spill kits are available at the fuel island and next to the used oil shed. Fuel Island Absorbent Socks Absorbent Booms Absorbent Pillows Absorbent Pads Goggles Gloves Disposal Bags Non-Metallic Shovel 5 Gallon Buckets with Lids 3 Used Oil Shed Absorbent Socks Absorbent Booms Absorbent Pads Goggles Gloves Disposal Bags Non-Metallic Shovel 5 Gallon Buckets with Lids Storm Drain Cover Spill Response Clean-Up Procedures: Only willing employees that have 24-hr HAZWOPER certification shall effectively and quickly contain and clean up spilled chemicals. Fuel station operators should clean up spills themselves only if properly trained and protected. Operators who are not trained in spill clean-up procedures should report the spill to the Facility s Responsible Person(s) listed above, warn other employees and leave the area. It is important to prevent spills on land from getting into drains and catch basins, so they do not get into the City storm sewer system. Drains and catch basins are considered waters of the state; therefore, no amount of spilled materials is permitted to enter these systems. After spills reach the storm sewer system, they can quickly spread and even reach surface waters around Fidalgo Island. Once a spill reaches water, it can become much more difficult to contain and recover. Similarly, recovery efforts on land should be prompt to as to minimize the amount of contaminated material from spreading. The following general guidelines should be followed for evacuation, spill control, notification of proper authorities and general emergency procedures in the event of a chemical incident in which there is potential for a significant release of hazardous materials. I. Evacuation Persons in the immediate vicinity of a spill should immediately evacuate the premises (except for employees with training in spill response in circumstances described below). If the spill is of medium or large size, or if the spill seems hazardous, immediately notify emergency response personnel.

25 Port of Anacortes Anacortes Airport SPILL RESPONSE PLAN II. Spill Control Techniques Once a spill has occurred, the responding employee needs to decide whether the spill is small enough to handle without outside assistance. Only employees with training in spill response should attempt to contain or clean up a spill. NOTE: If you are cleaning up a spill yourself, make sure you are aware of the hazards associated with the materials spilled, have adequate ventilation and proper personal protective equipment. Handle all residual chemical and clean-up materials as if it is hazardous waste until it can be properly tested. III. Spill Response and Clean-up Chemical spills are divided into three categories: Small, Medium and Large. Response and clean-up procedures vary depending on the size of the spill. A. Small Spills: Any spill where the major dimension is less than 18 inches in diameter. Small spills are generally handled by trained internal personnel and usually do not require an emergency response by police or fire department HAZMAT teams. i. Quickly control the spill by stopping or securing the spill source. This could be as simple as up righting a container and using floor-dry or absorbent pads to soak up spilled material. Wear gloves and protective clothing, if necessary. ii. Put spilled material and absorbents in secure containers. iii. Consult with the Facility s Responsible Person(s) and safety data sheet (SDS) for spill and waste disposal procedures. iv. In some instances, the area of the spill should not be washed with water. Use dry clean-up methods, and never wash spills down the drain, onto a storm drain or onto the driveway or parking lot. v. Both the spilled material and the absorbent may be considered hazardous waste and must be handled and disposed of in compliance with state and federal environmental regulations. A used oil waste container is located at the Port s maintenance shop. B. Medium Spills: Spills where the major dimension exceeds 18 inches but is less than 6 feet. Outside emergency response personnel (response contractor and police and fire department HAZMAT teams) should usually be called for 4

26 Port of Anacortes Anacortes Airport SPILL RESPONSE PLAN medium spills. Use common sense to determine when it is necessary to call them. i. If properly certified, immediately try to help contain the spill at its source by simple measures only. This means quickly up righting a container or putting a lid on a container, if possible. Do not use absorbents unless they are immediately available. Once you have made a quick attempt to contain the spill or once you have quickly determined you cannot take any brief containment measures, leave the area, and alert Emergency Responders at 911. Closing doors behind you while leaving helps contain fumes from spills. Give Emergency Responders accurate information as to the location, chemical and estimated amount of the spill. ii. Evaluate the area outside the spill. Engines and electrical equipment near the spill area must be turned off. This eliminates various sources of ignition in the area. Advise Emergency Responders on how to turn off engines or electrical sources. Do not go back into the spill area once you have left. iii. After Emergency Responders have contained the spill, be prepared to assist them with any other information that may be necessary, such as SDSs and questions about the facility. Emergency Responders or trained personnel with proper personal protective equipment will then clean up the spill residue. Do not re-enter the area until the responder in charge gives the all clear. Be prepared to assist these responders from outside the spill area with SDSs, absorbents and containers. iv. Both the spilled material and the absorbent may be considered hazardous waste and must be handled and disposed of in compliance with state and federal environmental regulations. A used oil waste container is located at the Port s maintenance shop. v. Reports must be filed with proper authorities. It is the responsibility of the spiller to inform both his/her supervisor and the Emergency Responders as to what caused the spill. C. Large Spills: Any spill involving flammable liquid where the major dimension exceeds 6 feet in diameter and any running spill where the source of the spill has not been contained or flow has not been stopped. The response for large spills is similar to the procedures for medium spills, except that the exposure danger is greater. i. Leave the area, and notify Emergency Responders (911). Give the operator the spill location, chemical spilled and approximate amount. 5

27 Port of Anacortes Anacortes Airport SPILL RESPONSE PLAN ii. From a safe area, attempt to get SDS information for the spilled chemical for the Emergency Responders to use. Also, be prepared to advise Emergency Responders as to any ignition sources, engines, electrical power or other spark producing systems that may need to be shut off. Advise Emergency Responders of any absorbents, containers or spill control equipment that may be available. This may need to be done from a remote area, because an evacuation that would place the spiller far from the scene may be needed. Use radio or phone to assist from a distance, if necessary. iii. Only emergency response personnel, in accordance with their own established procedures, should handle spills greater than 6 feet in any dimension. Remember, once the Emergency Responders or HAZMAT team are on the job cleaning up spills or putting out fires, the area is under their control, and no one may re-enter the area until the responder in charge gives the all clear. iv. Both the spilled material and the absorbent may be considered hazardous waste and must be handled and disposed of in compliance with state and federal environmental regulations. A used oil waste container is located at the Port s maintenance shop. v. Provide information for reports to supervisors and responders, as in medium spills. 6

28 Port of Anacortes Cap Sante Marina SPILL RESPONSE PLAN Cap Sante Marina (CSM) Location: 1019 Q Avenue, Anacortes, Washington Name: Brad Johnson Title: Harbormaster Facility s Responsible Person(s): Name: Sarah Tchang Title: Environmental Specialist Office Phone: (360) Office Phone: (360) Cell Phone: (360) Cell Phone: (901) The Facility s Responsible Person(s) has the primary responsibility for coordinating the response to emergencies, including chemical spills. After notifying Port staff members, one person shall be designated to make emergency notifications. Depending on the circumstances of the spill, the following notifications shall be made, as appropriate. Emergency Contact Numbers: Spill Response Contractors NRC Environmental Services (800) Spill Response Contractors Global Diving and Salvage (800) Police, Fire Department and Ambulance Services 911 National Response Center (800) Washington State Emergency Management (800) Washington State Department of Ecology (Northwest Region) (425) City of Anacortes Stormwater Program (360) Environmental Protection Agency (Regional Office) (206) Skagit County Emergency Management (360) Island Hospital (360) Poison Control Center (800) OSHA Area Office (206)

29 Port of Anacortes Cap Sante Marina SPILL RESPONSE PLAN Reporting Spills: All chemical spills, regardless of size, should be reported as soon as possible to the Facility s Responsible Person(s). The process of making these notifications for larger scale spills can take considerable time. The person making these calls should be someone knowledgeable about communicating with these agencies, such as the Port s Environmental Specialist, but should also be someone that is not needed to assist with first responder activities. Detailed information about the spill incident may be unknown at the time of making the appropriate notifications. The types of spill information that will be asked by the agencies may include: 1. Name and Phone Number of the Reporting Party 2. Name and Phone Number of the Responsible Party 3. Location of Spill 4. Type of Material Released 5. Quantity Spilled and the Affected Media (Air, Soil and/or Water) 6. Concentration 7. Cleanup Status 8. Resource Damage Information (ie. Dead Fish or Oiled Birds) The Facility s Responsible Person(s) will determine whether the spill has the potential to affect the environment outside of the facility. Examples of spills that could affect the outside environment include spills that are accompanied by fire or explosion and spills that could reach nearby water bodies. Depending on the type and quantity of spill, the Facility s Responsible Person(s) will make the determination if the spill must be reported to one or all of the local, state or federal agencies listed: 1. National Response Center: WA State Emergency Management: WA State Department of Ecology (Northwest Region): If spills enter state waters (marine waters, estuaries, rivers, lakes, streams, creeks, ponds, springs, wetlands, underground water resources, sewers, storm drains, beaches, ditches and snow banks), all three agencies must be notified. 2

30 Port of Anacortes Cap Sante Marina SPILL RESPONSE PLAN Facility Map: Location of Spill Response Materials 3

31 Port of Anacortes Cap Sante Marina SPILL RESPONSE PLAN Spill Kit Inventory: A map of CSM is attached showing the locations of spill kits and spill response materials. Spill response materials are located at the Port s web locker, cargo trailer, fuel dock, boat launch, Harbormaster Office breezeway and pier entries for A-dock and docks J-Q. Web Locker Cargo Trailer Fuel Dock Absorbent Pads Absorbent Booms Anchor System Boom Tool Box PPE Gear Bag Decontamination Kit Loose Absorbents First Aid Kit Navigational Boom Lights Fire Extinguisher Absorbent Pads Absorbent Booms Loose Absorbents Non-Metallic Shovels 5 Gallon Buckets with Lids Disposal Bags Goggles Gloves Masks Full Body Aprons Boots Absorbent Pads Absorbent Booms Googles Gloves Disposal Bags Large Waste Receptacles Non-Metallic Shovel Tyvek Suits Boat Launch Absorbent Pads Spill Response Boat HMO Breezeway Absorbent Pads Gloves Disposal Bags Pier Entries for A-Dock and Docks J-Q Absorbent Pads Absorbent Booms Gloves Disposal Bags Spill Response Clean-Up Procedures: Only willing employees that have 24-hr HAZWOPER certification shall effectively and quickly contain and clean up spilled chemicals. Employees should clean up spills themselves only if properly trained and protected. Employees who are not trained in spill clean-up procedures should report the spill to the Facility s Responsible Person(s) listed above, warn other employees and leave the area. It is important to prevent spills on land from getting into drains and catch basins, so they do not get into the City storm sewer system. Drains and catch basins are considered waters of the state; therefore, no amount of spilled materials is permitted to enter these systems. After spills reach the storm sewer system, they can quickly spread and even reach surface waters around Fidalgo Island. Once a spill reaches water, it can become much more difficult to contain and recover. Similarly, recovery 4

32 Port of Anacortes Cap Sante Marina SPILL RESPONSE PLAN efforts on land should be prompt to as to minimize the amount of contaminated material from spreading. The following general guidelines should be followed for evacuation, spill control, notification of proper authorities and general emergency procedures in the event of a chemical incident in which there is potential for a significant release of hazardous materials. I. Evacuation Persons in the immediate vicinity of a spill should immediately evacuate the premises (except for employees with training in spill response in circumstances described below). If the spill is of medium or large size, or if the spill seems hazardous, immediately notify emergency response personnel. II. Spill Control Techniques Once a spill has occurred, the responding employee needs to decide whether the spill is small enough to handle without outside assistance. Only employees with training in spill response should attempt to contain or clean up a spill. NOTE: If you are cleaning up a spill yourself, make sure you are aware of the hazards associated with the materials spilled, have adequate ventilation and proper personal protective equipment. Handle all residual chemical and clean-up materials as if it is hazardous waste until it can be properly tested. III. Spill Response and Clean-up Chemical spills are divided into three categories: Small, Medium and Large. Response and clean-up procedures vary depending on the size of the spill. A. Small Spills: Any spill where the major dimension is less than 18 inches in diameter. Small spills are generally handled by trained internal personnel and usually do not require an emergency response by police or fire department HAZMAT teams. i. Quickly control the spill by stopping or securing the spill source. This could be as simple as up righting a container and using floor-dry or absorbent pads to soak up spilled material. Wear gloves and protective clothing, if necessary. ii. Put spilled material and absorbents in secure containers. iii. Consult with the Facility s Responsible Person(s) and safety data sheet (SDS) for spill and waste disposal procedures. 5

33 Port of Anacortes Cap Sante Marina SPILL RESPONSE PLAN iv. In some instances, the area of the spill should not be washed with water. Use dry clean-up methods, and never wash spills down the drain, onto a storm drain or onto the driveway or parking lot. v. Both the spilled material and the absorbent may be considered hazardous waste and must be handled and disposed of in compliance with state and federal environmental regulations. A used oil waste container is located at the Port s web locker. B. Medium Spills: Spills where the major dimension exceeds 18 inches but is less than 6 feet. Outside emergency response personnel (response contractor and police and fire department HAZMAT teams) should usually be called for medium spills. Use common sense to determine when it is necessary to call them. i. If properly certified, immediately try to help contain the spill at its source by simple measures only. This means quickly up righting a container or putting a lid on a container, if possible. Do not use absorbents unless they are immediately available. Once you have made a quick attempt to contain the spill or once you have quickly determined you cannot take any brief containment measures, leave the area, and alert Emergency Responders at 911. Closing doors behind you while leaving helps contain fumes from spills. Give Emergency Responders accurate information as to the location, chemical and estimated amount of the spill. ii. Evaluate the area outside the spill. Engines and electrical equipment near the spill area must be turned off. This eliminates various sources of ignition in the area. Advise Emergency Responders on how to turn off engines or electrical sources. Do not go back into the spill area once you have left. iii. After Emergency Responders have contained the spill, be prepared to assist them with any other information that may be necessary, such as SDSs and questions about the facility. Emergency Responders or trained personnel with proper personal protective equipment will then clean up the spill residue. Do not re-enter the area until the responder in charge gives the all clear. Be prepared to assist these responders from outside the spill area with SDSs, absorbents and containers. iv. Both the spilled material and the absorbent may be considered hazardous waste and must be handled and disposed of in compliance with state and federal environmental regulations. A used oil waste container is located at the Port s web locker. 6

34 Port of Anacortes Cap Sante Marina SPILL RESPONSE PLAN v. Reports must be filed with proper authorities. It is the responsibility of the spiller to inform both his/her supervisor and the Emergency Responders as to what caused the spill. C. Large Spills: Any spill involving flammable liquid where the major dimension exceeds 6 feet in diameter and any running spill where the source of the spill has not been contained or flow has not been stopped. The response for large spills is similar to the procedures for medium spills, except that the exposure danger is greater. i. Leave the area, and notify Emergency Responders (911). Give the operator the spill location, chemical spilled and approximate amount. ii. From a safe area, attempt to get SDS information for the spilled chemical for the Emergency Responders to use. Also, be prepared to advise Emergency Responders as to any ignition sources, engines, electrical power or other spark producing systems that may need to be shut off. Advise Emergency Responders of any absorbents, containers or spill control equipment that may be available. This may need to be done from a remote area, because an evacuation that would place the spiller far from the scene may be needed. Use radio or phone to assist from a distance, if necessary. iii. Only emergency response personnel, in accordance with their own established procedures, should handle spills greater than 6 feet in any dimension. Remember, once the Emergency Responders or HAZMAT team are on the job cleaning up spills or putting out fires, the area is under their control, and no one may re-enter the area until the responder in charge gives the all clear. iv. Both the spilled material and the absorbent may be considered hazardous waste and must be handled and disposed of in compliance with state and federal environmental regulations. A used oil waste container is located at the Port s web locker. v. Provide information for reports to supervisors and responders, as in medium spills. 7

35 Port of Anacortes Pier 1 SPILL RESPONSE PLAN Pier 1 Location: 3 rd Street between Commercial and R Avenues, Anacortes, Washington Pier 1 is occupied with the Port's current tenant Dakota Creek Industries, Inc (DCI) located on a portion of the Guemes Channel waterfront. Currently, DCI has spill response materials stored on-site and has a spill response plan (SRP). In case of a spill at the facility, DCI will be responsible for implementing the SRP and contacting the appropriate parties. The SRP for DCI s operations is included with this document. Facility s Responsible Person(s): Name: Marie Piper Title: Environmental Compliance Manager, DCI Office Phone: (360) Cell Phone: (360) The Facility s Responsible Person(s) has the primary responsibility for coordinating the response to emergencies and spills. Depending on the circumstances of the spill, the following notifications shall be made, as appropriate. Emergency Contact Numbers: Spill Response Contractors NRC Environmental Services (800) Spill Response Contractors Global Diving and Salvage (800) Police, Fire Department and Ambulance Services 911 National Response Center (800) Washington State Emergency Management (800) Washington State Department of Ecology (Northwest Region) (425) City of Anacortes Stormwater Program (360) Environmental Protection Agency (Regional Office) (206) Skagit County Emergency Management (360) Island Hospital (360) Poison Control Center (800) OSHA Area Office (206)

36 Port of Anacortes Anacortes Ferry Terminal SPILL RESPONSE PLAN Anacortes Ferry Terminal Location: 2100 Ferry Terminal Road, Suite A, Anacortes, Washington The Anacortes Ferry Terminal is operated and maintained by the Washington State Department of Transportation Ferries Division (WSF). The WSF has developed and implemented a spill response plan (SRP) at the Anacortes Ferry Terminal. In the case of a spill at the facility, WSF will be responsible for implementing the SRP and contacting the appropriate parties. The developed SRP for the area is included with this document. Facility s Responsible Person(s): Name: Washington State Department of Transportation Ferries Division Office Phone: Operations Center Phone: Terminal Agent Anacortes Phone: The Facility s Responsible Person(s) has the primary responsibility for coordinating the response to emergencies, including chemical spills. Depending on the circumstances of the spill, the following notifications shall be made, as appropriate. Emergency Contact Numbers: Spill Response Contractors NRC Environmental Services (800) Spill Response Contractors Global Diving and Salvage (800) Police, Fire Department and Ambulance Services 911 National Response Center (800) Washington State Emergency Management (800) Washington State Department of Ecology (Northwest Region) (425) City of Anacortes Stormwater Program (360) Environmental Protection Agency (Regional Office) (206) Skagit County Emergency Management (360) Island Hospital (360) Poison Control Center (800) OSHA Area Office (206)

37 Port of Anacortes Pier 2 SPILL RESPONSE PLAN Pier 2 Location: 4 th Street between R and T Avenues, Anacortes, Washington Name: Josh Beaner Title: Director of Operations Facility s Responsible Person(s): Name: Sarah Tchang Title: Environmental Specialist Office Phone: (360) Office Phone: (360) Cell Phone: (360) Cell Phone: (901) The Facility s Responsible Person(s) has the primary responsibility for coordinating the response to emergencies, including chemical spills. After notifying Port staff members, one person shall be designated to make emergency notifications. Depending on the circumstances of the spill, the following notifications shall be made, as appropriate. Emergency Contact Numbers: Spill Response Contractors NRC Environmental Services (800) Police, Fire Department and Ambulance Services 911 National Response Center (800) Washington State Emergency Management (800) Washington State Department of Ecology (Northwest Region) (425) City of Anacortes Stormwater Program (360) Environmental Protection Agency (Regional Office) (206) Skagit County Emergency Management (360) Island Hospital (360) Poison Control Center (800) OSHA Area Office (206)

38 Port of Anacortes Pier 2 SPILL RESPONSE PLAN Facility Information: The Port of Anacortes has petroleum coke and prilled sulfur loading operations at its Pier 2 facility located at 4 th Street and R Avenue. Metropolitan Stevedore Company (Metro) is under contract with the Port to manage the operations. Also located on Pier 2 is the Port s maintenance building. Currently there are no maintenance activities that take place outside of the building. This spill response plan will cover all actions that take place on Pier 2. Reporting Spills: All chemical spills, regardless of size, should be reported as soon as possible to the Facility s Responsible Person(s). The process of making these notifications for larger scale spills can take considerable time. The person making these calls should be someone knowledgeable about communicating with these agencies, such as the Port s Environmental Specialist, but should also be someone that is not needed to assist with first responder activities. Detailed information about the spill incident may be unknown at the time of making the appropriate notifications. The types of spill information that will be asked by the agencies may include: 1. Name and Phone Number of the Reporting Party 2. Name and Phone Number of the Responsible Party 3. Location of Spill 4. Type of Material Released 5. Quantity Spilled and the Affected Media (Air, Soil and/or Water) 6. Concentration 7. Cleanup Status 8. Resource Damage Information (ie. Dead Fish or Oiled Birds) The Facility s Responsible Person(s) will determine whether the spill has the potential to affect the environment outside of the facility. Examples of spills that could affect the outside environment include spills that are accompanied by fire or explosion and spills that could reach nearby water bodies. Depending on the type and quantity of spill, the Facility s Responsible Person(s) will make the determination if the spill must be reported to one or all of the local, state or federal agencies listed: 1. National Response Center: WA State Emergency Management: WA State Department of Ecology (Northwest Region):

39 Port of Anacortes Pier 2 SPILL RESPONSE PLAN If spills enter state waters (marine waters, estuaries, rivers, lakes, streams, creeks, ponds, springs, wetlands, underground water resources, sewers, storm drains, beaches, ditches and snow banks), all three agencies must be notified. Spill Kit Inventory: Three spill kits are located at the maintenance shed, outside the longshoreman building and inside of the truck wash shed. Maintenance Shed Longshoreman Building Truck Wash Shed Absorbent Socks Absorbent Booms Absorbent Pads Loose Absorbents Goggles Gloves Disposal Bags Non-Metallic Shovel 5 Gallon Buckets with Lids Absorbent Socks Absorbent Booms Absorbent Pads Goggles Gloves Disposal Bags Non-Metallic Shovel 5 Gallon Buckets with Lids Absorbent Pads Absorbent Pillows Loose Absorbents Spill Response Clean-Up Procedures: Only willing employees that have 24-hr HAZWOPER certification shall effectively and quickly contain and clean up spilled chemicals. Fuel station operators should clean up spills themselves only if properly trained and protected. Operators who are not trained in spill clean-up procedures should report the spill to the Facility s Responsible Person(s) listed above, warn other employees and leave the area. It is important to prevent spills on land from getting into drains and catch basins, so they do not get into the City storm sewer system. Drains and catch basins are considered waters of the state; therefore, no amount of spilled materials is permitted to enter these systems. After spills reach the storm sewer system, they can quickly spread and even reach surface waters around Fidalgo Island. Once a spill reaches water, it can become much more difficult to contain and recover. Similarly, recovery efforts on land should be prompt to as to minimize the amount of contaminated material from spreading. The following general guidelines should be followed for evacuation, spill control, notification of proper authorities and general emergency procedures in the event of a chemical incident in which there is potential for a significant release of hazardous materials. 3

40 Port of Anacortes Pier 2 SPILL RESPONSE PLAN I. Evacuation Persons in the immediate vicinity of a spill should immediately evacuate the premises (except for employees with training in spill response in circumstances described below). If the spill is of medium or large size, or if the spill seems hazardous, immediately notify emergency response personnel. II. Spill Control Techniques Once a spill has occurred, the responding employee needs to decide whether the spill is small enough to handle without outside assistance. Only employees with training in spill response should attempt to contain or clean up a spill. NOTE: If you are cleaning up a spill yourself, make sure you are aware of the hazards associated with the materials spilled, have adequate ventilation and proper personal protective equipment. Handle all residual chemical and clean-up materials as if it is hazardous waste until it can be properly tested. III. Spill Response and Clean-up Chemical spills are divided into three categories: Small, Medium and Large. Response and clean-up procedures vary depending on the size of the spill. A. Small Spills: Any spill where the major dimension is less than 18 inches in diameter. Small spills are generally handled by trained internal personnel and usually do not require an emergency response by police or fire department HAZMAT teams. i. Quickly control the spill by stopping or securing the spill source. This could be as simple as up righting a container and using floor-dry or absorbent pads to soak up spilled material. Wear gloves and protective clothing, if necessary. ii. Put spilled material and absorbents in secure containers. iii. Consult with the Facility s Responsible Person(s) and safety data sheet (SDS) for spill and waste disposal procedures. iv. In some instances, the area of the spill should not be washed with water. Use dry clean-up methods, and never wash spills down the drain, onto a storm drain or onto the driveway or parking lot. v. Both the spilled material and the absorbent may be considered hazardous waste and must be handled and disposed of in compliance with state and federal environmental regulations. A used oil waste container is located at the Port s maintenance shop. 4

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

Washington State University Pullman Stormwater Management Program Plan 2017

Washington State University Pullman Stormwater Management Program Plan 2017 Washington State University Pullman Stormwater Management Program Plan 2017 The Washington State University (WSU) Pullman Stormwater Management Program (SWMP) Plan has six elements derived from the Eastern

More information

Spill Prevention & Response Plan. For

Spill Prevention & Response Plan. For Spill Prevention & Response Plan For (enter facility name and address) Certifiably Green Denver recommends auto repair facilities develop and implement a spill prevention and response plan that includes

More information

Spill Response Procedures

Spill Response Procedures Spill Response Procedures [your municipality] Purpose: The purpose of this Standard Operating Procedure (SOP) is to provide guidance for the proper response and corrective actions to be followed in the

More information

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN May, 2017 CITY OF MERCER ISLAND 2017 S T O R M W A T E R M A N A G E M E N T P R O G R A M ( S W M P ) P L A N May 2017 City of Mercer

More information

CITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE

CITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE CITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE PREPARED BY Public Works Department CITY OF BLACK DIAMOND PO BOX 599 BLACK DIAMOND, WA 98010 (360) 886-5700 City of Black

More information

FOR PHASE I PROPERTIES

FOR PHASE I PROPERTIES FOR PHASE I PROPERTIES Updated March 2012 Port of Seattle Stormwater Management Program for Phase I Properties Table of Contents Introduction... 1 Port Overview... 1 Permit Overview... 2 Key Implementation

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Stormwater Management Program

Stormwater Management Program Stormwater Management Program Revised March 2012 For Use In NPDES Phase II Implementation for Secondary Permittees. Stormwater Management Program Table of Contents Introduction... 3 CDID #1 Background...

More information

TRAVIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT 17 STORMWATER MANAGEMENT PROGRAM TPDES PHASE II MS4 GENERAL PERMIT (TXR040000)

TRAVIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT 17 STORMWATER MANAGEMENT PROGRAM TPDES PHASE II MS4 GENERAL PERMIT (TXR040000) TRAVIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT 17 STORMWATER MANAGEMENT PROGRAM TPDES PHASE II MS4 GENERAL PERMIT (TXR040000) Prepared for Travis County Water Control and Improvement District 17

More information

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018 City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting June 11, 2018 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history,

More information

S5.C.1 Public Education and Outreach

S5.C.1 Public Education and Outreach City of Ferndale 2018 Stormwater Management Program This document is formatted as a response to specific special conditions within the Western Washington Phase II Municipal Stormwater Permit (Permit) that

More information

EDMONDS COMMUNITY COLLEGE STORMWATER MANAGEMENT PROGRAM

EDMONDS COMMUNITY COLLEGE STORMWATER MANAGEMENT PROGRAM Update: 3-13-2017 Original Document: Sept 2009 EDMONDS COMMUNITY COLLEGE STORMWATER MANAGEMENT PROGRAM Western Washington Phase II Municipal Stormwater Permit Number (WAR04-5715) Table of Contents Introduction...

More information

EDMONDS COMMUNITY COLLEGE STORMWATER MANAGEMENT PROGRAM

EDMONDS COMMUNITY COLLEGE STORMWATER MANAGEMENT PROGRAM EDMONDS COMMUNITY COLLEGE STORMWATER MANAGEMENT PROGRAM Western Washington Phase II Municipal Stormwater Permit Number (WAR04-5715) Table of Contents Public Education and Outreach 3 Public Participation

More information

CHAPTER 5. NPDES PHASE II EVALUATION

CHAPTER 5. NPDES PHASE II EVALUATION CHAPTER 5. NPDES PHASE II EVALUATION A Stormwater Management Program for Medford was developed and submitted to the DEQ to meet requirements of the NPDES Phase II program. Phase II regulations require

More information

STORMWATER MANAGEMENT PROGRAM

STORMWATER MANAGEMENT PROGRAM STORMWATER MANAGEMENT PROGRAM PHASE II MUNICIPAL STORMWATER PERMIT SECONDARY PERMITTEE PERMIT NO. WAR045700 PO Box 348 15400 Airport Drive Burlington, WA 98233 (360) 757-0011 August 2012 TABLE OF CONTENTS

More information

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts. City of Watertown, South Dakota Storm Water Management Program for compliance with Federal Clean Water Act National Pollutant Discharge Elimination System Phase II Storm Water Program Revision Approved

More information

Stormwater Management - Basic Overview for Municipal Employees

Stormwater Management - Basic Overview for Municipal Employees Stormwater Management - Basic Overview for Municipal Employees October 13 th, 2011 Scott D. Cook Environmental Program Specialist 2 NYSDEC - Region 7 Syracuse Division of Water 315-426-7502 sdcook@gw.dec.state.ny.us

More information

The Stormwater Management Plan

The Stormwater Management Plan Introduction The University of Alabama has been issued a National Pollutant Discharge Elimination System (NPDES) permit for stormwater discharges from regulated small municipal separate storm sewer systems

More information

Regional Stormwater Program 2013 Stormwater Management Plan

Regional Stormwater Program 2013 Stormwater Management Plan Regional Stormwater Program 2013 Stormwater Management Plan This 2013 SWMP is an attachment to the 2012 Annual Report to the Department of Ecology for its Phase II NPDES Permit Prepared for: Asotin County

More information

Storm Water Management Plan (SWMP)

Storm Water Management Plan (SWMP) Storm Water Management Plan (SWMP) Nebraska Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Authorization Number NER300010 Issued: January 1, 2006 Plan Contact Information Scott A.

More information

Best Management Practices

Best Management Practices Best Management Practices The following is a listing of all Best Management Practices (BMPs) that all tenants covered by this SWPPP should implement. These constitute the minimum requirements that each

More information

Stormwater Management Plan (SWMP)

Stormwater Management Plan (SWMP) Stormwater Management Plan (SWMP) - NPDES Stormwater Discharge Authorization Number NER300008 Issued: January 1, 2006 Plan Amended: March 5, 2009 - Plan Contact Information Andy L. Harter Engineering Assistant

More information

Stormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities. Olmsted County Environmental Resources Department

Stormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities. Olmsted County Environmental Resources Department Stormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities Olmsted County Environmental Resources Department October 2011 Why? This stormwater training program was developed to

More information

CITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES

CITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES Public education Publish an article that addresses stormwater issues such as recycling, yard waste collection, hazardous waste handling, and illegal discharges Publish at least 2 articles a year in a local

More information

NPDES Phase II Municipal Stormwater Permit Guidance

NPDES Phase II Municipal Stormwater Permit Guidance NPDES Phase II Municipal Stormwater Permit Guidance June 2009 SUMMARY The intent of this Notebook is to provide the City with a quick reference document for Phase 2 stormwater compliance. This notebook

More information

Sec NPDES Municipal Separate Storm Sewer System (MS4) Program. (Ord HR; )

Sec NPDES Municipal Separate Storm Sewer System (MS4) Program. (Ord HR; ) Sec. 26-203. NPDES Municipal Separate Storm Sewer System (MS4) Program. (Ord. 006-10HR; 1-19-10) (a) Purpose and applicability. (Ord. 006-10HR; 1-19-10) (1) Purpose. The primary intent of this section

More information

MCM#6 Pollution Prevention/Good Housekeeping for Municipal Operations. Licking County MS

MCM#6 Pollution Prevention/Good Housekeeping for Municipal Operations. Licking County MS MCM#6 Pollution Prevention/Good Housekeeping for Municipal Operations Licking County MS4 12 14 2016 1 Why are we here? Heath is an MS4 Community MS4 = Municipal Separate Storm Sewer System SWMP Storm Water

More information

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING

More information

Kathleen Bertuch, Central New York Regional Planning and Development Board

Kathleen Bertuch, Central New York Regional Planning and Development Board Kathleen Bertuch, Central New York Regional Planning and Development Board Presentation Outline Brief Introduction to Stormwater Background and History of Phase II Stormwater Regulations Regulated MS4s

More information

City of Evanston STORMWATER MANAGEMENT PLAN February 2018

City of Evanston STORMWATER MANAGEMENT PLAN February 2018 City of Evanston STORMWATER MANAGEMENT PLAN February 2018 1 1.0 Table of Contents 2.0 INTRODUCTION...3 2.1 SMP STRUCTURE... 3 2.2 AREA SUBJECT TO THE PLAN... 3 2.3 SMP DEVELOPMENT... 3 2.4 ANNUAL REPORTING...

More information

CHAPTER 9. Emergency Response. Chapter 9. National Pesticide Applicator Certification Core Manual

CHAPTER 9. Emergency Response. Chapter 9. National Pesticide Applicator Certification Core Manual CHAPTER 9 Emergency Response Chapter 9 National Pesticide Applicator Certification Core Manual CHAPTER 9 Emergency Response This module will help you: Know how to implement and execute an emergency response

More information

Stormwater Management Regulation & Implementation Overview

Stormwater Management Regulation & Implementation Overview Stormwater Management Regulation & Implementation Overview Green/Duwamish Watershed Stormwater Strategy Workshop May 4, 2016 Rachel McCrea, Water Quality Program Brief Regulatory Context: Foundation concepts

More information

The Village of Wellington NPDES Guidance/Reference Document

The Village of Wellington NPDES Guidance/Reference Document The Village of Wellington NPDES Guidance/Reference Document The following Permit Compliance Guidance/Reference Document has been compiled to assist the copermittee in fulfilling the requirements of the

More information

EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations

EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations Green Country Stormwater Alliance Employee Training Workshop September 10, 2013 Tulsa Technology Center, Broken Arrow 1 NPDES Program Overview

More information

STORMWATER POLLUTION PREVENTION PLAN

STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN TOWN OF WHITE BEAR, MINNESOTA Date: May 31, 2006 Project No. 13597.000 White Bear Township Storm Water Pollution Prevention Plan BMPS Following are the BMPs included

More information

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE 62-621.300(7)(b), F.A.C.) For FDEP Internal Use Only Permit : FLR INSTRUCTIONS:

More information

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index.

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index. Stormwater: General Inspection Checklist Department: Environmental Protection Program: Stormwater This inspection checklist can be used by Stormwater Division or Environmental Services Coordinator to Conduct

More information

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018 ES-301-4.08 Inspection and Maintenance of MS4 Structural Controls* Document Identification Number ES-301-4.08 Date: March 14, 2018 Document Owner: Kim Ohlson 1) Activity Description: MS4 Maintenance and

More information

2016 Stormwater Management Program for. City of Lake Forest Park

2016 Stormwater Management Program for. City of Lake Forest Park This 2016 SWMP is required by the Department of Ecology for its Phase II NPDES Permit Compliance for City of Lake Forest Park March 31, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1 Overview and Background...

More information

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater

More information

8. BMP SUMMARY TABLE

8. BMP SUMMARY TABLE 8. BMP SUMMARY TABLE 8.1 BMPs and Measurable Goals for Public Education and Outreach 1 Prepare an education plan Prepare education plan in the first two years of the permit. Include in Plan the BMPs, schedule,

More information

2014 Whatcom County Stormwater Management Program

2014 Whatcom County Stormwater Management Program 2014 2014 Whatcom County Stormwater Management Program A component of the Western Washington Phase II Municipal Stormwater Permit Whatcom County Public Works Department Stormwater Division THIS PAGE INTENTIONALLY

More information

WATER QUALITY BASED REQUIREMENTS...1 REQUIREMENTS TO MEET WATER QUALITY STANDARDS...1 DISCHARGES TO IMPAIRED WATERS...2

WATER QUALITY BASED REQUIREMENTS...1 REQUIREMENTS TO MEET WATER QUALITY STANDARDS...1 DISCHARGES TO IMPAIRED WATERS...2 St. Albans Town Stormwater Management Program 2013 Table of Contents WATER QUALITY BASED REQUIREMENTS...1 REQUIREMENTS TO MEET WATER QUALITY STANDARDS...1 DISCHARGES TO IMPAIRED WATERS...2 DISCHARGES TO

More information

Storm Water Run-off. Applicability. Background Storm water run-off from paved parking areas, Existing Federal and State Laws

Storm Water Run-off. Applicability. Background Storm water run-off from paved parking areas, Existing Federal and State Laws Applicability This section applies to new, expanding, or existing marinas. Background Storm water run-off from paved parking areas, maintenance buildings, hull maintenance areas, and other impermeable

More information

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION Community Development Department 949 E 2 nd Ave Durango, CO 81301 (970) 375-4810 fax (970) 375-4848 Contact Information City of Durango

More information

8/11/2011. First public institution of higher education in Texas. Seventh largest university in the United States. Home of the Fightin Texas Aggies

8/11/2011. First public institution of higher education in Texas. Seventh largest university in the United States. Home of the Fightin Texas Aggies Phase II Municipal Separate Storm Sewer System First public institution of higher education in Texas Seventh largest university in the United States Home of the Fightin Texas Aggies Fightin Texas Aggie

More information

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management Standard Operating Guidance (SOGs) For Storm Drain System Management Phase II MS4 Creating a Clean Water Future. Standard Operating Guidance (SOGs) For Storm Drain System Management The City of Daphne

More information

Part 2.0 Non-Numeric Effluent Limitations

Part 2.0 Non-Numeric Effluent Limitations 2017 NH Small MS4 General Permit Page 50 of 67 report on its findings and progress towards making the practices allowable. (Information available at: http://www.epa.gov/region1/npdes/stormwater/assets/pdfs/addressingbarrier2lid.pdf

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) STORMWATER MANAGEMENT PROGRAM

MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) STORMWATER MANAGEMENT PROGRAM MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) STORMWATER MANAGEMENT PROGRAM Last Update February 2018 Table of Contents Table of Contents... 2 I. PUBLIC EDUCATION AND OUTREACH PROGRAM... 3... 3 Educational

More information

City of Waukegan, Illinois

City of Waukegan, Illinois City of Waukegan, Illinois NPDES Phase II Stormwater Program Stormwater Pollution Prevention Plan Public Works Facility July 2011 City of Waukegan, Illinois Stormwater Pollution Prevention Plan for the

More information

Stormwater Management Practices and Design Manual. Clemson University

Stormwater Management Practices and Design Manual. Clemson University Stormwater Management Practices and Design Manual Clemson University Clemson University Facilities February 2017 This Stormwater Management Practices and Design Manual (Manual) is issued by Clemson University

More information

Checklist for 2013 Draft NH Small MS4 General Permit Requirements

Checklist for 2013 Draft NH Small MS4 General Permit Requirements Checklist for 2013 Draft NH Small MS4 General Permit Requirements TASK DEADLINE (in relation to permit effective date) OVERLAPS WITH AOC REQUIREMENTS ASSISTANCE FROM WISE PROJECT 1. Submit Notice of Intent

More information

Mn/DOT Outstate District SWPPP

Mn/DOT Outstate District SWPPP SWPPP Table of Contents Introduction......4 PUBLIC EDUCATION AND OUTREACH...5 Distribute Educational Materials...5 Implement an Education Program...6 Education Program: Public Education and Outreach...7

More information

POLLUTION PREVENTION AFTER CONSTRUCTION

POLLUTION PREVENTION AFTER CONSTRUCTION POLLUTION PREVENTION AFTER CONSTRUCTION..CHAPTER.. 10 This chapter describes the pollution prevention measures to be taken once the site has been permanently and finally stabilized and no additional construction

More information

STORM WATER MANAGEMENT PLAN

STORM WATER MANAGEMENT PLAN STORM WATER MANAGEMENT PLAN Table of Contents Executive Summary ES.1 Overview of pg. ES-1 ES.2 Program Management pg. ES-1 ES.3 Program Development and Implementation pg. ES-1 ES.4 Proposed Strom Water

More information

Measure #6. MS4 Program. Minimum Control. 3 Required BMPs: Pollution Prevention & Good Housekeeping

Measure #6. MS4 Program. Minimum Control. 3 Required BMPs: Pollution Prevention & Good Housekeeping Minimum Control Measure #6 Pollution Prevention & Good Housekeeping 3 Required BMPs: BMP #1 Identify and document all facilities and activities that are owned or operated by the permittee and have the

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer. CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION Presented by: Michael J Moffitt, PE (Keck & Wood, Inc) City Engineer May, 2016 What is Stormwater? Stormwater is rain or snowmelt that falls on streets,

More information

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts SPCC PLAN Raytheon Company Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts 6 November 2002 143.65 Environmental Resources Management

More information

KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM

KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM Storm Water Pollution Prevention, Control, Reduction and Minimization In Compliance with Kansas City, MO Municipal Separate Storm Sewer System

More information

Port of Long Beach Port Master Plan Overview December 22, 2008

Port of Long Beach Port Master Plan Overview December 22, 2008 Port of Long Beach Port Master Plan Overview December 22, 2008 PORT OF LONG BEACH PORT MASTER PLAN OVERVIEW INTRODUCTION In 1978 the California Coastal Commission certified the Port of Long Beach Port

More information

The Clean Water Act: Phase I

The Clean Water Act: Phase I Nearly 40 percent of all surveyed bodies of water in the U.S. do not meet the Environmental Protection Agency s (EPA s) water quality standards because of untreated polluted runoff that is often discharged

More information

AMERICAN FORK CITY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION

AMERICAN FORK CITY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION SWPPP INSPECTION OF CITY OWNED FACILITIES Facility Name: Date: City Inspector Contact Information Name: Aaron Brems, RSI Email: ABrems@afcity.net Name: Harlan Nielson. RSI Email: HNielson@afcity.net Name:

More information

HAZARD COMMUNICATION PROGRAM YOUR-RIGHT-KNOW CFR

HAZARD COMMUNICATION PROGRAM YOUR-RIGHT-KNOW CFR HAZARD COMMUNICATION PROGRAM YOUR-RIGHT-KNOW CFR 29 1910.1200 0 TABLE OF CONTENTS OUR COMMITMENT...1 PURPOSE...2 INTRODUCTION...2 RESPONSIBILITIES...2 Management, Shipping / Receiving, Safety Representative,

More information

MS4 NPDES Permit Stormwater Management Plan for Clackamas County Service District No. 1 and the City of Happy Valley.

MS4 NPDES Permit Stormwater Management Plan for Clackamas County Service District No. 1 and the City of Happy Valley. MS4 NPDES Permit Stormwater Management Plan for Clackamas County Service District No. 1 and the City of Happy Valley April 27, 2012 1 SWMP Overview Component #1 Illicit Discharge Detection and Elimination

More information

DANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN

DANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN DANVILLE COMMUNITY COLLEGE MS4 PROGRAM PROGRAM PLAN EFFECTIVE JULY 1, 2016 TABLE OF CONTENTS TAB TITLE 1 DCC MS4 PROGRAM PLAN MCM 1: PUBLIC EDUCATION AND OUTREACH ON STORMWATER IMPACTS BMP 1.1: Implement

More information

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity

More information

Police Department Public Safety Building

Police Department Public Safety Building Page 1 POINTS OF CONTACT (POC) Stormwater Management Operation & Maintenance Procedures Primary POC Police Chief First Last (207) XXX - XXXX Police Department Public Safety Building Secondary POC Assistant

More information

Whitewater River Region SWMP Appendix L

Whitewater River Region SWMP Appendix L Whitewater River Region SWMP Appendix L BMPs for Firefighting Agency Activities January 2015 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies

More information

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Storm Water Pollution Prevention Training 2016

Storm Water Pollution Prevention Training 2016 Storm Water Pollution Prevention Training 2016 For the Employees of the City of Lynn Haven Fl. Presented by Lisa Fowler ECO Consulting Group, LLC What is Storm Water? Storm water is water flowing over

More information

STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) STORM WATER POLLUTION PREVENTION PLAN (SWPPP) Name of Tenant and Facility Date: Emergency Contact: Title: Phone: INSTRUCTIONS FOR MERRILL FIELD TENANTS TO OBTAIN COVERAGE UNDER THE NPDES STORM WATER DISCHARGE

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

City of Clarkston 2009 Stormwater Management Plan

City of Clarkston 2009 Stormwater Management Plan City of Clarkston 2009 Stormwater Management Plan This 2009 SWMP is an attachment to City of Clarkston s 2008 Annual Report to the Department of Ecology for its Phase II NPDES Permit Prepared for City

More information

APPENDIX A EXCERPTS FROM THE PERMIT

APPENDIX A EXCERPTS FROM THE PERMIT APPENDIX A EXCERPTS FROM THE PERMIT NPDES CAS004001-45 - Order No. 01-182 F. PUBLIC AGENCY ACTIVITIES PROGRAM Each Permittee shall implement a Public Agency program to minimize storm water pollution impacts

More information

Stormwater Pollution Prevention Training Arlington Public Schools August 8, 2014

Stormwater Pollution Prevention Training Arlington Public Schools August 8, 2014 Stormwater Pollution Prevention Training Arlington Public Schools August 8, 2014 Diana Handy AC DES OSEM Overview Stormwater 101 Regulations / Permits Stormwater Pollution Illicit Discharges Pollution

More information

SECTION STORMWATER POLLUTION PREVENTION

SECTION STORMWATER POLLUTION PREVENTION PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02133 STORMWATER POLLUTION PREVENTION A. Prohibit illicit discharge (non-rainwater) into the storm drain system. B. Construct any and all necessary systems to

More information

1. INSPECTOR NAME/ TITLE 2. CONTACT PHONE NUMBER 3. CONTACT ADDRESS 4. DATE/TIME OF INSPECTION 5. OTHER ATTENDANTS ACCOMPANYING INSPECTOR

1. INSPECTOR NAME/ TITLE 2. CONTACT PHONE NUMBER 3. CONTACT  ADDRESS 4. DATE/TIME OF INSPECTION 5. OTHER ATTENDANTS ACCOMPANYING INSPECTOR : The Best Management Practices Plan (BMPP) shall be completed annually by the Port Authority, tenants or contractors for all activities that potentially impact stormwater at JFK airport. The will be used

More information

CHAPTER 6 - How to Prepare a SWPPP

CHAPTER 6 - How to Prepare a SWPPP All construction sites which disturb an area of 1 acre or more, currently need a UPDES permit from the State of Utah. As a condition of the permit, a Stormwater Pollution Prevention Plan (SWPPP) must be

More information

SNOW REMOVAL & DISPOSAL POLICY

SNOW REMOVAL & DISPOSAL POLICY PHILIP D. MURPHY Governor SHEILA Y. OLIVER Lt. Governor DEPARTMENT OF ENVIRONMENTAL PROTECTION Mail Code 401-02B Division of Water Quality 401 E State St P.O. Box 420 Trenton, NJ 08625-0420 CATHERINE R.

More information

Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit

Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit Outline Regulatory Context and MS4 Permit Status 2016 MS4 Permit Requirements NOI, SWMP, Annual Reports Minimum Control Measures

More information

Virginia Department of Transportation Pollutant Discharge Elimination System

Virginia Department of Transportation Pollutant Discharge Elimination System Virginia Department of Transportation Pollutant Discharge Elimination System General Permit for Stormwater Discharges from Small Municipal Separate Storm Sewer Systems Serving the Urbanized Areas of Virginia

More information

City of Tacoma Stormwater Management Program Assessment. Attachment B3

City of Tacoma Stormwater Management Program Assessment. Attachment B3 City of Tacoma Stormwater Management Program Assessment Attachment B3 Attachment B3. City of Tacoma Stormwater Management Program Assessment The following discussion includes an assessment of the appropriateness

More information

Appendix G: Source Control Mitigation Measures Intentionally Left Blank

Appendix G: Source Control Mitigation Measures Intentionally Left Blank Appendix G: Source Control Mitigation Measures Intentionally Left Blank PLANNING AND LAND DEVELOPMENT HANDBOOK Part B: PLANNING ACTIVITIES, 5 TH ED. Source Control Measures S-1: Storm Drain Message and

More information

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY 1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations

More information

MS4 NPDES Permit Stormwater Management Plan for Surface Water Management Agency of Clackamas County and the City of Rivergrove.

MS4 NPDES Permit Stormwater Management Plan for Surface Water Management Agency of Clackamas County and the City of Rivergrove. MS4 NPDES Permit Stormwater Management Plan for Surface Water Management Agency of Clackamas County and the City of Rivergrove April 27, 2012 1 SWMP Overview Component #1 Illicit Discharge Detection and

More information

Water Quality Regulatory Programs and Our Citywide EPA / DEQ Stormwater Permit. Public Works Engineering City Council Briefing June 7, 2016

Water Quality Regulatory Programs and Our Citywide EPA / DEQ Stormwater Permit. Public Works Engineering City Council Briefing June 7, 2016 Water Quality Regulatory s and Our Citywide EPA / DEQ Stormwater Permit Public Works Engineering City Council Briefing June 7, 2016 Briefing Topics Introduction: Regulatory Overview Elements of the MS4

More information

Police: 911 WorkSafeBC: ,after hrs Joint Rescue Coordination Centre: or cell #727

Police: 911 WorkSafeBC: ,after hrs Joint Rescue Coordination Centre: or cell #727 Environmental Emergency Contact Information Forest Fire Reporting : 1-800-663-5555 or * 5555 on the Cantel and Telus networks Spill Reporting and other Environmental Emergencies to Land & Water: 1-800-663-3456

More information

Whitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities

Whitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities Whitewater River Region SWMP APPENDIX L June 2009 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies for management of Urban Runoff in the Whitewater

More information

Non-Priority Projects WQMP Preparation Guidance Manual

Non-Priority Projects WQMP Preparation Guidance Manual Non-Priority Projects WQMP Preparation Guidance Manual December 2005 Table of Contents 1.0 Introduction... 1 2.0 Requirements for Development Projects...1 3.0 WQMP Preparation... 2 3.1 Cover Page... 2

More information

BCTS Babine STAFF EMERGENCY RESPONSE PLAN. Environmental Emergency Contact Information. General Contact Information

BCTS Babine STAFF EMERGENCY RESPONSE PLAN. Environmental Emergency Contact Information. General Contact Information Environmental Emergency Contact Information Forest Fire Reporting : 1-800-663-5555 or * 5555 on the Cantel and Telus networks Spill Reporting and other Environmental Emergencies to Land & Water: 1-800-663-3456

More information

City of Richmond Municipal Separate Storm Sewer System Annual Report

City of Richmond Municipal Separate Storm Sewer System Annual Report City of Richmond Municipal Separate Storm Sewer System 2013-2014 Annual Report Introduction This annual report covers the reporting cycle July 1, 2013 through June 30, 2014 - Permit Year 1. The report

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

Stormwater Pollution Prevention Best Management Practices (BMP s)

Stormwater Pollution Prevention Best Management Practices (BMP s) PHONE 931-648-5718 BUILDING AND CODES DEPARTMENT 350 PAGEANT LANE, SUITE 309 CLARKSVILLE, TN 37040 FAX 931-553-5121 Stormwater Pollution Prevention Best Management Practices (BMP s) Preface Since the passage

More information

City of Duluth, the New UDC and Stormwater

City of Duluth, the New UDC and Stormwater City of Duluth, the New UDC and Stormwater Tom Johnson, PE City of Duluth - Public Works Project Engineer, Utilities - Stormwater Stormwater Challenges Topography (proximity to lake) High Quality Streams

More information

(Total Maximum Daily Load) What Does the Federal Government Require for Storm Water Management Under Phase II?

(Total Maximum Daily Load) What Does the Federal Government Require for Storm Water Management Under Phase II? Who is Regulated Under Phase II? Automatically Included Owners/operators of Small Municipal Separate Storm Sewer Systems located in urbanized areas including military facilities, large hospitals, prisons,

More information