1 The potential use of sand replenishment and artificial environments to reverse habitat decline in the Mersey Narrows SSSI New Brighton Seaforth Pools Egremont John Lamb Head of Geography The Blue Coat School Liverpool
2 Abstract Natural England has recently completed a study (as yet unseen) to investigate the declining state of the Mersey Narrows SSSI and propose measures to improve the habitat for wading birds, particularly turnstone. In this parallel study to the Natural England report, it is hoped that provision of new stone habitats and reinstatement of some historical sand beaches can be incorporated into long term plans for the Egremont foreshore. The options are designed to minimise costs and maximise the use of recycled materials in a sustainable manner. The present environment does not offer the optimum conditions for either wildlife or local people. This study is an attempt to find that optimum environment.
3 My background one of promoting the reinstatement of the historical sand beaches that existed up to 60 years ago. New Brighton Sand replenishment 1987.
4 Liverpool Egremont New Brighton At Egremont (south of New Brighton) the natural environment was always sand
5 Historic sand loss ( )
6 Egremont sand loss (1913 and 2013)
7 A declining living environment for local people.
8 Seacombe Egremont Seacombe and Egremont Deprivation Index Living Environment In bottom 10% of areas in England. Victorian planners constructed promenades rather than parkland.
9 Rock and air raid rubble turnstone feeding habitat Sandstone outcrop roosting areas. Peoples loss natures gain designated an SSSI in August 2000.
10 Since the construction of three groynes in 1998 offshore sandbanks have grown and smothered most of the turnstone feeding grounds. A declining living environment for local wildlife.
11 the turnstone habitat for which this unit was designated for is no longer there (Natural England 2012). The sandbank growth continues ( ).
12 May Natural England complete the Mersey Narrows Feasibility Study (as yet unseen) to investigate the decline in turnstone habitat and look at options (if any) to improve that habitat.
13 An opportunity for sand replenishment? Turnstone primary habitat barnacle encrusted rocks and rubble. Secondary habitat seaweed dwelling invertebrates on higher dry sand beach strandlines (Eaton 2006).
14 A ten point plan. To parallel the Natural England Study by proposing a new higher sand pocket beach in juxtaposition to new hard substrate feeding areas. To wherever possible use free and recycled materials that would otherwise end up dumped at sea or sent to landfill.
15 Where can we get free sand, rock and rubble? Peel Group s proposed redevelopment of Liverpool and Wirral Waters Recycled rock and rubble?
16 Recycled Sandstone bedrock? Peel Ports Liverpool 2 terminal gained a 35 million Government dredging grant (May 2013) and will excavate some sandstone bedrock.
17 Egremont Seaforth Recycled Sand? In Peel Ports will undertake 8 million tonnes of capital dredging to deepen the sea channels, 4 million tonnes of sand will fill the triangle behind a new dock wall.
18 Beneficial use of dredged material improving turnstone secondary habitat and roosting (mainly in winter) and community use (mainly summer).
19 The Ten Point Plan
20 1. Smaller scale sand beach.
21 Original proposals would have smothered the remaining strip of mussel beds (U.K BAP habitat in a Site of Special Scientific Interest).
22 A smaller scale sand beach avoids sensitive habitats such as mussel beds (shown in black).
23 The site of the proposed pocket beach. Staged sand on sand replenishment over a small area (250 metres length of coast) allows rapid recolonisation by invertebrate larvae from adjacent areas.
24 2. Improving the Turnstone s Secondary Feeding Habitat. Higher dry sand beaches in juxtaposition to hard rock habitats (points 4 and 5) allows turnstone to migrate up the beach on a high tide (Eaton 2006).
25 Turnstone feeding on tideline invertebrates.
26 u 3. A higher sand beach gives longer lasting roosting areas closer to new rock substrate feeding areas.
27 Artificial sand beach high tide roost, Kakadu beach nr Brisbane.
28 4. Creating New Habitat Reefs from Recycled Stone.
29 A new inter tidal habitat reef for turnstone made from recycled rock / rubble. New habitat reef Existing sea defence groyne
30 The existing small reef would be added to and extended. Large barnacle encrusted pebbles (see above) are well below the surf zone and stable in storms.
31 Recycled Concrete showing rapid barnacle and mussel colonisation (primary turnstone habitat).
32 5. Higher rock feeding areas The Creation of a Habitat Groyne from New and Recycled Rock. Existing sea defence groyne New Habitat groyne.
33 New Habitat groyne. New pocket beach. Habitat reef Existing sea defence groyne The juxtaposition of both turnstone habitats is the determining principle of the scheme.
34 6. Developing Concrete Reef Blocks and New Rock Pools.
35 Inspired by the Urbane Project new or recycled concrete could be modified with groove structures to encourage rapid colonisation by mussels or barnacles.
36 Bioblocks could be included and promoted as an ecological and educational resource.
37 Existing sandstone platforms could be excavated to create artificial rockpools.
38 7. Using Gabions to create Mussel Bed reefs. Gabions have been successfully used in commercial farming of mussels and oysters
39 Old mussel / oyster shells are used as a culch to attract larvae and build new habitat reefs.
40 Isolated rock oyster on an existing groyne at Egremont points to the potential for creating gabion reefs.
41 Mussels, barnacles and honeycombe reef worm growing on gabion type structure (a shopping trolley) at Seacombe opposite Liverpool. Corroding metal has a higher uptake than galvanised gabions. Further opportunities for using recycled materials?
42 The use of Recycled Rope from Peel Ports.
43 Discarded rope (shown here at Peel Ports Victoria Tower) could be recycled and incorporated in the gabions.
44 Barnacles prefer rough bicycle tyres, mussels prefer inner tubes (rapid colonisation of stable surfaces Egremont, Wirral, May 2013). Note wading bird footprints.
45 8. Creating new mussel beds using mussel spat (juvenile mussels)
46 In Holland, the Waddensleutels project has set up artificial mussel beds in the Wadden Sea.
47 9. Mussels as a Water Purifier - The Potential Involvement of the Peel Group. Peel Group s proposed Liverpool and Wirral Waters dockland schemes require clean clear water to help attract investment.
48 Mussels farmed on a rope lattice, filter and clean dockland waters (Smartfarm Norway).
49 Colonisation is rapid on the large surface area.
50 Some mussel mats used to purify Liverpool Waters could be towed across the river and laid on the intertidal zone at Egremont to create instant mussel bed reefs.
51 10. The Relocation of Sensitive Habitats. Some rock habitats in danger of smothering could be relocated a short distance upcoast.
52 Relocation of sensitive habitats for sand replenishment at Morcambe Bay SSSI earned a Green Heroes Award.
53 Small scale relocation of sensitive habitats would be necessary at Egremont to facilitate a pocket beach
54 If the initial pocket beach, habitat reef and groyne scheme improved net habitats, then it is hoped the idea could be extended.
55 Somewhere out there is the optimum environment for both wildlife and local residents? Is there the political will to find it?
56 The Peel Group. The initial plans (larger scale sand replenishment only) were worthy of consideration but challenging environmental and regulatory issues would have to be overcome. Practical issues involved possible migration of material, not all dredgings are golden sand but can contain a proportion of silt. Peel state they are keen to work with local communities as long as it is in an environmentally responsive and sustainable manner. They have not yet responded to the revised 10 point plan.
57 Natural England Report looking into the restoration of turnstone habitat at Egremont is still to be signed off by DEFRA (May 2013). Natural England state that returning sand back on to Egremont foreshore may from an SSSI perspective reduce the habitat for the interest feature (Turnstone) but acknowledges suggested mitigation and ways habitat could be created. Having circulated the revised ten point plan to both Wirral Council and Peel Ports, Natural England feel that the revised ideas will be given due consideration at the appropriate time with on-going developments of the ports. Quote Natural England will be formally consulted by the Council about any future proposals to put the sand back on to the Egremont foreshore through the planning process and this is were we will make our recommendations.
58 Environment Agency Will await the Natural England report prior to any comment or potential involvement.
59 Wirral Council Wirral Council (June 2013) have reservations regarding: a) Justification in coast defence terms b) Dredged material may be unsuitable for sand replenishment c) Concern about smothering sensitive habitats. d) any proposal would require compliance with marine licensing and planning requirements including undertaking a detailed Appropriate Assessment under the EU Habitats regulations. Talks with Wirral Borough Council are on going.
60 Egremont Residents As yet, no formal opinion surveys have been taken of residents views, although presentations to residents have been received very positively. There is a desire (especially amongst older residents) to reinstate the sand beaches that existed here until 60 years ago. The main concerns expressed are environmental and technical.
61 Conclusion Creating a higher drier sand beach at the back of part of Egremont shore could theoretically improve turnstone winter feeding / roosting habitat, but only if connected with a new hard rock reef and habitat groyne. Article 10 of the Habitats Directive emphasises the importance of ecological connectivity amongst habitat patches and species populations; supporting the Habitats Directive and Birds Directive (Naylor et al 2012). Natural England would have to agree with such a positive appraisal, only then could the scheme be examined practically, implemented and if successful extended. The European Convention on Biological Diversity commits signatories to address the underlying causes of biodiversity loss
62 In the U.K. Sustainability Appraisals have a stronger focus on social and economic appraisal. Sand replenishment at Colwyn Bay (May 2013) illustrates the indirect socio-economic benefits associated with coastal protection outside an SSSI. Colwyn Bay Bay June June
63 Could future sand replenishment at Egremont illustrate the indirect socio-economic benefits associated with habitat improvement within a Site of Special Scientific Interest? Somewhere out there is the optimum environment for both wildlife and local residents? Is there the political will to find it?
15. Coastal Defences. Executive Summary: Chapter 15. Coastal Defences
15. Coastal Defences Executive Summary: Chapter 15. Coastal Defences The potential direct and indirect impacts that will arise from the proposed Berth 201/202 works, either through the reconstruction of
More informationIROPI: National politics v environmental decisions
Bruce Munro National Environmental Assessment Service Environment Agency Abstract IROPI: National politics v environmental decisions As a public body responsible for flood risk management in England and
More informationMarine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision
Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision Title: Colwyn Bay Promenade Enhancement and Coastal Defence Works Regulatory Approval:
More informationPlanning for Dredging and the Environment on the Tidal Thames
Planning for Dredging and the Environment on the Tidal Thames 1 INTRODUCTION This Information Note forms the final document in a set of three notes designed to inform berth operators and environmental
More informationLonsdale Bight: consultation, options and actions summary. December 2017
Lonsdale Bight: consultation, options and actions summary Contents 1. Lonsdale Bight Coastal Processes Project... 2 1.1 Conceptual frameworks applied to the project... 2 1.2 Review of investigations and
More informationTHE MERSEA HARBOUR PROTECTION TRUST. EXECUTIVE SUMMARY. Draft 8. Dated 01 DECEMBER 2016.
THE MERSEA HARBOUR PROTECTION TRUST EXECUTIVE SUMMARY. Draft 8. Dated 01 DECEMBER 2016. PROPOSED CLIMATE CHANGE ADAPTION RECHARGE PROJECT Mersea Harbour and Tollesbury Wick Protection to Mersea Harbour
More informationBrooklyn Bridge Park
Tide Pools and Pile Encasements Location Product used Duration Brooklyn Bridge Park Tide Pools and Pile Encasements 2013-2016 In Short As part of the holistic environmental theme of Brooklyn Bridge Park,
More informationAquaculture in Natura 2000
Aquaculture in Natura 2000 Vedran Nikolić DG ENVIRONMENT Nature unit Aquaculture in motion 2015 Integrating Aquaculture Bruxelles, 16 th November 2015 7 th Environment Action Program Living well, within
More informationMARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT
MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.
More informationBerth 9 Quay Extension Environmental Statement Non-Technical Summary
Berth 9 Quay Extension Hutchison Ports UK Ltd July 2013 Final Report 9Y0150 CONTENTS Page 1 PROJECT BACKGROUND 1 2 NEED FOR THE PROPOSED SCHEME 4 3 DESCRIPTION OF THE CONSTRUCTION PHASE 4 4 DESCRIPTION
More informationF2. Coastal General Coastal Marine Zone
F2. Coastal General Coastal Marine Zone [The regional coastal plan [rcp] provisions are not operative until the Minister of Conservation has formally approved the regional coastal plan part of the Auckland
More informationEnvironmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District
Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation U.S. Army Corps of Engineers New York District January 2004 APPENDIX H SECTION 404(b)(1) GUIDELINES EVALUATION SECTION 404(b)(1)
More informationBALANCE. Kick-off Meeting, Copenhagen, Denmark. 31st of August - 1st of September 2005
BALANCE Baltic Sea Management - Nature Conservation and Sustainable Development of the Ecosystem through Spatial Planning Kick-off Meeting, Copenhagen, Denmark 31st of August - 1st of September 2005 Johnny
More informationNEW YORK / NEW JERSEY HARBOR DEEPENING PROJECT
NEW YORK / NEW JERSEY HARBOR DEEPENING PROJECT Using Synergy to Successfully Execute A Mega Water Resource Project Joseph J. Seebode Deputy District Engineer U.S. Army Corps of Engineers New York District
More informationPUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE
DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 REPLY TO ATTENTION OF: JOINT PUBLIC NOTICE U. S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT AND FLORIDA
More informationPoole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Bay Technical Note 1 WITHOUT PREJUDICE
1. Introduction Poole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Bay Technical Note 1 WITHOUT PREJUDICE This technical note reviews the physical data that was collected
More informationSeaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014
Seaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014 CONTENTS INTRODUCTION SEAHAM NORTH PIER THE ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL EFFECTS INTRODUCTION
More informationChapter 8 Natural Resources
Chapter 8 Natural Resources 127-134 8.1 Introduction 8.2 Extractives Industry 8.3 Forestry 8.4 Fishing / Aquaculture 8.1 Introduction Kerry has a number of naturally occurring resources that contribute
More informationClimate proof Oosterschelde
Oosterschelde (NL) The Dutch Oosterschelde estuary is exceptionally rich in birds, but the question is for how long. The sandbars, intertidal flats and salt marshes, which now provide extensive foraging
More informationWater Framework Directive and EIA: our experience. Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012
Water Framework Directive and EIA: our experience Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012 The plan Me: Aims & objectives of the Water Framework Directive
More informationFirth of Tay & Eden Estuary Special Area of Conservation
Firth of Tay & Eden Estuary Special Area of Conservation Advice under Regulation 33(2) of The Conservation (Natural Habitats, &c.) Regulations 1994 (as amended) 30 March 2006 About this Package: Section
More informationProposed Maplewood Marine Restoration Project Discussion guide and feedback form
Vancouver Fraser Port Authority Habitat Enhancement Program Proposed Maplewood Marine Restoration Project Discussion guide and feedback form Public consultation September 24 October 12, 2018 Feedback form
More informationFreshwater ecosystems
Aquatic Ecosystems Aquatic Ecosystems The types of organisms in an aquatic ecosystem are determined by the water s salinity. Salinity - Amount of salt in the water. Freshwater ecosystems do not have any
More informationWESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY
WESTRIDGE MARINE TERMINAL IN WATER EXCAVATION REPORT WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY Trans Mountain Pipeline ULC Kinder Morgan Canada
More informationTable of Contents. List of Tables. 11. Advantages and Disadvantages
Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized
More informationProtect, Accommodate, or Retreat? Integrating Adaptation Strategies and Ecosystem Services into the Cape Cod Coastal Planner
Protect, Accommodate, or Retreat? Integrating Adaptation Strategies and Ecosystem Services into the Cape Cod Coastal Planner Jennifer Clinton Cape Cod Commission April Wobst Association to Preserve Cape
More informationProtecting and Restoring Habitat (Fact Sheet)
University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2014 Protecting and Restoring Habitat (Fact Sheet) Casco Bay Estuary Partnership Follow this and additional
More informationWELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT:
WELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT: FEEDBACK ON THE WELSH GOVERNMENT S DRAFT WELSH NATIONAL MARINE PLAN JUNE 2018 Background
More informationGrimsby Docks Flood Risk Management Scheme. Non-Technical Summary April Grimsby Docks FRMS i
Grimsby Docks Flood Risk Management Scheme Non-Technical Summary April 2013 Grimsby Docks FRMS i We are the Environment Agency. We protect and improve the environment and make it a better place for people
More informationStrategic vision for maritime spatial planning in Romania and Bulgaria - MSP Mangalia - Shabla
Challenges and opportunities for maritime spatial planning of the Black Sea in Romania and Bulgaria Final Conference of the MARSPLAN-BS project Strategic vision for maritime spatial planning in Romania
More informationLSI Toolbox. Heidi Roberts.
LSI Toolbox Heidi Roberts hroberts@abpmer.co.uk Name of presentation Integration of LSI into MSP and associated SEA Practical Toolbox for Practitioners on LSI Easily applied within any admin. or governance
More informationWorking on flood embankments: Essential environmental considerations
Working on flood embankments: Essential environmental considerations Information for project managers, engineers and contractors When undertaking any work on or adjacent to coastal and estuarine flood
More informationAT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.
Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design
More informationThe ecological value of such designs is generally the closest to that of a natural tidal bank.
The designs There are four different categories for designing estuary edges: Bioengineered designs These designs rely entirely on plants for long-term protection from erosion. Bioengineering techniques
More informationNew Jersey Department of Environmental Protection
New Jersey Department of Environmental Protection Assistant Commissioner Marilyn Lennon Land Use Management Division of Land Use Regulation Manager Virginia Kopkash September 16, 2013 Transformation of
More informationVEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES
VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote
More informationPIANC Working With Nature Philosophy
PIANC Working With Nature Philosophy Experiences and Challenges Presentation on behalf of PIANC Environmental Commission by Harald Köthe Belgium CEDA-PIANC Young Professionals Event 17. October 2014, Brussels
More informationImpacts of Dredging and Reclamation to Benthic Primary Producer Habitat (BPPH)
Section 9.2 Impacts of Dredging and Reclamation to Benthic Primary Producer Habitat (BPPH) Section 9.2.1 The management goals for BPPH are to: Management Goals for BPPH Maintain the abundance, diversity,
More informationRequest for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019
Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019 Introduction The Bolsa Chica Land Trust (BCLT) has applied for and been selected to receive
More informationJuly
July 2010 www.agg-net.com 13 for the Marin A Sea Change T he UK marine area covers some 867,000km 2, an area equivalent to some three-and-a-half times the UK s terrestrial extent. Yet, unlike on land,
More information28 December 2010
A Sea Change for the Mari T he UK marine area covers some 867,000km 2, an area equivalent to some three-and-a-half times the UK s terrestrial extent. Yet, unlike on land, until now the marine environment
More informationEstuary Adventures. Background. Objective
Estuary Adventures Objective Students will work in groups to understand the concept of estuaries, their importance, and the role that density plays in the mixing of fresh and salt water. Students will
More informationRenewable energy in the aquatic environment; filling the gaps in energy & our knowledge base. Nicola Teague APEM Chair IFM Welsh Branch
Renewable energy in the aquatic environment; filling the gaps in energy & our knowledge base Nicola Teague APEM Chair IFM Welsh Branch UK decarbonisation targets Climate Change Act target for UK to reduce
More informationFlooding and erosion in the UK
2016 Zandmotor - How Dutch innovation can benefit the UK 18 May 2016 Jaap Flikweert CEng FCIWEM C.WEM Jaap.flikweert@rhdhv.com @JaapJFlikweert Flooding and erosion in the UK We have a problem! Too much
More informationHull Plus - Linking FCERM & Wider Benefits through Innovative Funding Approach
Hull Plus - Linking FCERM & Wider Benefits through Innovative Funding Approach Phil Boyes - Project Manager Environment Agency Flood & Coast 2018 1 Introduction to Hull Plus 95% of the city of Kingston
More informationCOMPARISON OF GEOSYNTHETIC MATERIALS AS SUBSTRATES ON COASTAL STRUCTURES GOLD COAST (AUSTRALIA) AND ARABIAN GULF
COMPARISON OF GEOSYNTHETIC MATERIALS AS SUBSTRATES ON COASTAL STRUCTURES GOLD COAST (AUSTRALIA) AND ARABIAN GULF Bobbie Corbett 1, L. Angus Jackson 1, Timothy Evans 1 and Simon Restall 2 Coastal structures
More informationChapter 6. Aquatic Biodiversity. Chapter Overview Questions
Chapter 6 Aquatic Biodiversity Chapter Overview Questions Ø What are the basic types of aquatic life zones and what factors influence the kinds of life they contain? Ø What are the major types of saltwater
More informationBiodiversity Offsetting in Doncaster. Guidance on the Process
Biodiversity Offsetting in Doncaster Guidance on the Process 1 Contents Chapter 1 - Introduction 1.1 What is biodiversity offsetting? Pg 3 1.2 Doncaster s role in the biodiversity offsetting pilot Pg 3
More informationIntroduction I. Ecosystem & human uses in BA area II. State of the Art on sensitivity mapping
Introduction I. Ecosystem & human uses in BA area II. State of the Art on sensitivity mapping Ronny Schallier MUMM/RBINS (BE) [1] Task F in Brief Towards a common approach on sensitivity mapping Establish
More informationCLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan
CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan EXECUTIVE SUMMARY What is the Purpose and Background to the Implementation Plan? The impact of climate change
More informationIrvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Local authority Main catchment North Ayrshire Council, Ayrshire Monkton to Irv
Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Ayrshire Local authority North Ayrshire Council, South Ayrshire Council Main catchment Monkton to Irvine coastal Summary of flooding
More informationEcological Mitigation and Management Plan
Ecological Mitigation and Management Plan LONDON ARRAY OFFSHORE WIND FARM PROJECT AND ASSOCIATED GRID CONNECTION WORKS Version / Date : Ver 1.00 / October 2007 Prepared by : Tim Proudler / Keith Henson
More informationChapter Four: Overview. Introduction to Environmental Geology, 5e. Case History: Endangered Trout. Ecology and Geology Linkage
Chapter Four: Overview Introduction to Environmental Geology, 5e Chapter 4 Ecology and Geology Jennifer Barson Spokane Falls Community College Linkages between geology with ecology and relationships with
More information6 TH. Most of the Earth Is Covered with Water (2) Most Aquatic Species Live in Top, Middle, or Bottom Layers of Water (1)
A Healthy Coral Reef in the Red Sea MILLER/SPOOLMAN ESSENTIALS OF ECOLOGY 6 TH Chapter 8 Aquatic Biodiversity Fig. 8 1, p. 168 Most of the Earth Is Covered with Water (2) Aquatic life zones Saltwater life
More informationBuilding with Nature
DELTARES, JANUARY 2014 9 DOSSIER Building with Nature Interest in building with nature is on the rise worldwide. That is not surprising. In ever more densely-populated coastal, delta and river areas, demand
More informationWFD-compliant dredging and Article 4(7) A practical methodology with lessons for other sectors
WFD-compliant dredging and Article 4(7) A practical methodology with lessons for other sectors Presentation by Jan Brooke*, Environmental Consultant 13 th June 2013 Prepared with Greg Whitfield, Environment
More informationSEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM
COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION FOR THE IMPROVEMENT DREDGING OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT (NEW HAVEN, CONNECTICUT) SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW
More informationEcodynamic solutions for the protection of intertidal habitats. Anneke Hibma Tom Ysebaert
Ecodynamic solutions for the protection of intertidal habitats Anneke Hibma Tom Ysebaert Coastal erosion: a worldwide problem a serious threat along many coastlines will increase due to human-induced changes
More informationIssues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change
presenter: Shelley Heron Issues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change Western Port Bay Where is it? Ecological character
More informationHow wetlands can help us adapt to rising seas
University of Wollongong Research Online Faculty of Science, Medicine and Health - Papers Faculty of Science, Medicine and Health 2014 How wetlands can help us adapt to rising seas Kerrylee Rogers University
More informationPrestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to M
Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to Monkton coastal Summary of flooding impacts At risk
More informationManagement of biodiversity in disused docks The case study of the Liverpool Docks
Management of biodiversity in disused docks The case study of the Liverpool Docks Urban Research on Biodiversity on Artificial and Natural coastal Environments: Enhancing biodiversity by sensitive design
More informationArmoring Units Polinom Port - Haifa
Armoring Units Polinom Port - Haifa Location Product used Duration Polinom Port Haifa, Israel Bio enhancing armoring units 2013-2016 In Short As part of the construction of a new port in Haifa (Polinom
More informationMatrix of Potential Coastal Adaptation Strategies
Matrix of Potential Coastal Adaptation Strategies The matrix provided on pages 60-76, developed by Lesley Ewing (California Coastal Commission) and Dr. Reinhard Flick, outlines some of the most common
More information1. Introduction The workshop was held at the Town Hall in Kenton-on-Sea with 30 participants.
Coastal Management Programme for the Sarah Baartman District Municipality (SBDM) Report on an Introductory Workshop held at Kenton-on-Sea, 09h00 to 12h30 Venue: Kenton Town Hall 25 May 2018 1. Introduction
More information8. HYDROGRAPHICAL CONDITIONS
64 state of the seas 8. HYDROGRAPHICAL CONDITIONS Key Messages A substantial proportion of the Northern Ireland coastline has been altered by coastal defence structures. This is particularly prevalent
More informationOPERATIONAL GUIDLINES OF BOAD
Coastal and Littoral Management 1. There is no precise definition of coastal areas. All definitions include coastal waters, marine waters and estuaries, and some portions of the land along the coast where
More informationSummary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program
Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program February 2012 Executive Summary Overview This summary report documents concept design and planning
More informationPINELLAS COUNTY RESTORE ACT DIRECT COMPONENT PROJECTS IDEAS SUBMITTED TO PINELLAS COUNTY
RESTORE ACT DIRECT COMPONENT S DATE RECEIVED: 7/7/14 NAME: : Tides Golf Course Acquisition & Restoration Purchase ~90 acre property, retrofit stormwater systems, restore habitat, create trials and boardwalks.
More informationCONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999
(No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation
More informationNATIONAL OCEAN SERVICE
NATIONAL OCEAN SERVICE Jeff Payne, Ph.D., Office for Coastal Management Steve Thur, Ph.D., Acting Director National Centers for Coastal Ocean Science February 23, 2017 NATIONAL OCEAN SERVICE oceanservice.noaa.gov
More informationProject Area: Outfall IJKL
Project Area: Outfall IJKL Outfall IJKL is a stormwater drainage pipe at the west end of Crissy Field. Location of Extended Outfall Restricted Beach Access Work Area Manhole Modification CRISSY FIELD DRAINAGE
More informationNOAA Restoration Center Community-based Restoration Program
NOAA Restoration Center Community-based Restoration Program Applies a grass-roots approach to restoration by actively engaging communities in on-the-ground restoration of fishery habitats around the nation.
More informationAPPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT
APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 This page intentionally blank. SECTION
More informationCLIMATE AND OCEANS. Author: Dr. Judith Weis Sierra Club Marine Team September, 2017
CLIMATE AND OCEANS Author: Dr. Judith Weis Sierra Club Marine Team September, 2017 CLIMATE CHANGE Coral bleaching O2 levels in ocean Migrations and movements Sea Level Rise, Extreme Events Ocean acidification
More informationCh. 7 Aquatic Ecology
Ch. 7 Aquatic Ecology 1.Coral Reefs: the aquatic equal to the tropical rain forests 2.The two major aquatic life zones A. saltwater or marine (estuaries, coastlines, coral reefs, coastal marshes, mangrove
More information( THE M4 CORRIDOR AROUND NEWPORT )
PUBLIC INQUIRY IN THE MATTER OF THE HIGHWAYS ACT 1980 AND THE ACQUISITION OF LAND ACT 1981 AND IN THE MATTER OF: THE M4 MOTORWAY (JUNCTION 23 (EAST OF MAGOR) TO WEST OF JUNCTION 29 (CASTLETON) AND CONNECTING
More informationNew Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement
New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement Public Informational Meeting NEPA Scoping 24 January 2017 Planning Division New England District
More informationE-Island. (Energy, Economy, Environment)
E-Island (Energy, Economy, Environment) Introduction to the project The electrical output of wind turbines is intermittent. Sometimes there is little to no wind and wind turbines only start to deliver
More informationFairwinds Schooner Cove Redevelopment
www.archipelago.ca Habitatt Assessment Report April 2017 Habitatt Assessment Report Fairwinds Schooner Cove Redevelopment May 2017 Prepared for: Prepared by: ICR Projects Inc. Leo Mariotto #300 555 Sixth
More informationPIANC Commission Working Group Report Reviews
PIANC Commission Working Group Report Reviews EnviCom Working Group report details Initial review: conclusion * If identified as potentially sensitive, please highlight the particular areas of potential
More informationPENDER HARBOUR DOCK MANAGEMENT PLAN
PENDER HARBOUR DOCK MANAGEMENT PLAN 1.0 INTENT OF DOCK MANAGEMENT PLAN The Pender Harbour Dock Management Plan (the DMP) is an instrument of policy that provides guidance in relation to docks authorized
More informationWater Quality and Pollution
Chapter 6 Water Quality and Pollution Guiding Principles: Chapter 4 details all the guiding principles relevant to the overall management of the Harbour. Whilst all should be given some consideration the
More informationNorfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary
Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016
More informationLong Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment
Environmental Issues Long Island s Environmental Issues Copyright 2011 AFG 1 agricultural land air pollution aquifers automobile barrier islands biozones fisheries groundwater recharge invasive species
More informationCo-location Meeting. PowerPoint Part 2
Co-location Meeting PowerPoint Part 2 Co-location Case Studies Illustrating the potential for marine space use within Offshore Wind farm footprints (Source: Linley A, Laffont K, Wilson B, Elliott M., Perez-Dominguez
More informationMemorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension
Memorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension Date 31 st October 2017 1 Contents: 1. Foreword... 3 2. Introduction... 4 2.1 Background...
More informationSoilTain Coastal Protection Tubes. Geosynthetic Container System for Coastal and Bank Protection
SoilTain Coastal Protection Tubes Geosynthetic Container System for Coastal and Bank Protection 2 3 Geosynthetic Tube System The All-Rounder for Coastal and Bank Protection The effects of global climate
More informationNOAA s Role in Coastal Zone Management in the Chesapeake Region
NOAA s Role in Coastal Zone Management in the Chesapeake Region John Kuriawa Regional Coastal Management Specialist NOAA s Office of Ocean and Coastal Resource Management Overview Who I am and what do
More informationTampa Port Authority
McKay Bay Restoration (McKay Bay Mitigation Site and McKay Bay Dredge Hole Restoration) Tampa Port Authority 2014 AAPA Environmental Awards Competition June 2014 Contact: Andy Fobes, Director of Public
More informationGood Practice Guide. Technical Guidance: Flood risk activity exemptions Date Published: April GPG 221 Document Owner: Flood Risk Strategy
Good Practice Guide Technical Guidance: Flood risk activity exemptions Date Published: April 2016 GPG 221 Document Owner: Flood Risk Strategy Page 1 of 41 Version History: Document Date Summary of Changes
More informationShoreline Erosion. How Erosion Occurs
How Erosion Occurs Shoreline Erosion When a 3 metre (10 feet) high shoreline bank erodes, it may look as if the entire height of bank is eroding. In reality, it is only the toe of the bank that is, the
More informationD9. Significant Ecological Areas Overlay
D9. Significant Ecological Areas Overlay D9.1. Background Auckland's indigenous biodiversity is unique with a diverse range of ecosystems reflecting the complex physical environment of the region. Natural
More informationRubbish or Resource? Public Consultation
West of England Waste Management & Planning Strategy Rubbish or Resource? Public Consultation Phase 1 Summer 2006 25th September 2006 Report no: 1 West of England Waste Management & Planning Strategy Rubbish
More informationRESEARCH PRIORITIES FOR 2016
National Environmental Science Programme RESEARCH PRIORITIES FOR 2016 Note that bolded dot points are considered high priority. CLEAN AIR AND URBAN LANDSCAPES: RESEARCH PRIORITIES Increasing our understanding
More informationMineral Products in London. Safeguarding London s Wharves and Rail Depots for future Prosperity and Sustainability
Mineral Products in London Safeguarding London s Wharves and Rail Depots for future Prosperity and Sustainability Mineral Products in London Did you know? London s housing, building and infrastructure
More informationRestoring the lost kelp forests of Port Phillip Bay. Steve Swearer
Restoring the lost kelp forests of Port Phillip Bay Steve Swearer Outline National Centre for Coasts and Climate The Reef Ecosystem Evaluation Framework (REEF) Roadmap for restoring kelp forests in PPB
More informationEnhancing Straightened River Channels
.6 Creating a sinuous low flow channel in an over-widened river River Dearne Location - Mexborough, West of Doncaster, South Yorkshire SE484012 Date of construction - Summer 1995 Length - 500m Cost - 4,000
More informationCHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018
CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 PLAN - UPDATE 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92
More informationNon-Technical Summary
Non-Technical Summary Introduction and Background The Environment Agency owns Rye Harbour Farm in East Sussex and has developed a scheme to enhance the nature conservation value of the Farm, which lies