1 The potential use of sand replenishment and artificial environments to reverse habitat decline in the Mersey Narrows SSSI New Brighton Seaforth Pools Egremont John Lamb Head of Geography The Blue Coat School Liverpool

2 Abstract Natural England has recently completed a study (as yet unseen) to investigate the declining state of the Mersey Narrows SSSI and propose measures to improve the habitat for wading birds, particularly turnstone. In this parallel study to the Natural England report, it is hoped that provision of new stone habitats and reinstatement of some historical sand beaches can be incorporated into long term plans for the Egremont foreshore. The options are designed to minimise costs and maximise the use of recycled materials in a sustainable manner. The present environment does not offer the optimum conditions for either wildlife or local people. This study is an attempt to find that optimum environment.

3 My background one of promoting the reinstatement of the historical sand beaches that existed up to 60 years ago. New Brighton Sand replenishment 1987.

4 Liverpool Egremont New Brighton At Egremont (south of New Brighton) the natural environment was always sand

5 Historic sand loss ( )

6 Egremont sand loss (1913 and 2013)

7 A declining living environment for local people.

8 Seacombe Egremont Seacombe and Egremont Deprivation Index Living Environment In bottom 10% of areas in England. Victorian planners constructed promenades rather than parkland.

9 Rock and air raid rubble turnstone feeding habitat Sandstone outcrop roosting areas. Peoples loss natures gain designated an SSSI in August 2000.

10 Since the construction of three groynes in 1998 offshore sandbanks have grown and smothered most of the turnstone feeding grounds. A declining living environment for local wildlife.

11 the turnstone habitat for which this unit was designated for is no longer there (Natural England 2012). The sandbank growth continues ( ).

12 May Natural England complete the Mersey Narrows Feasibility Study (as yet unseen) to investigate the decline in turnstone habitat and look at options (if any) to improve that habitat.

13 An opportunity for sand replenishment? Turnstone primary habitat barnacle encrusted rocks and rubble. Secondary habitat seaweed dwelling invertebrates on higher dry sand beach strandlines (Eaton 2006).

14 A ten point plan. To parallel the Natural England Study by proposing a new higher sand pocket beach in juxtaposition to new hard substrate feeding areas. To wherever possible use free and recycled materials that would otherwise end up dumped at sea or sent to landfill.

15 Where can we get free sand, rock and rubble? Peel Group s proposed redevelopment of Liverpool and Wirral Waters Recycled rock and rubble?

16 Recycled Sandstone bedrock? Peel Ports Liverpool 2 terminal gained a 35 million Government dredging grant (May 2013) and will excavate some sandstone bedrock.

17 Egremont Seaforth Recycled Sand? In Peel Ports will undertake 8 million tonnes of capital dredging to deepen the sea channels, 4 million tonnes of sand will fill the triangle behind a new dock wall.

18 Beneficial use of dredged material improving turnstone secondary habitat and roosting (mainly in winter) and community use (mainly summer).

19 The Ten Point Plan

20 1. Smaller scale sand beach.

21 Original proposals would have smothered the remaining strip of mussel beds (U.K BAP habitat in a Site of Special Scientific Interest).

22 A smaller scale sand beach avoids sensitive habitats such as mussel beds (shown in black).

23 The site of the proposed pocket beach. Staged sand on sand replenishment over a small area (250 metres length of coast) allows rapid recolonisation by invertebrate larvae from adjacent areas.

24 2. Improving the Turnstone s Secondary Feeding Habitat. Higher dry sand beaches in juxtaposition to hard rock habitats (points 4 and 5) allows turnstone to migrate up the beach on a high tide (Eaton 2006).

25 Turnstone feeding on tideline invertebrates.

26 u 3. A higher sand beach gives longer lasting roosting areas closer to new rock substrate feeding areas.

27 Artificial sand beach high tide roost, Kakadu beach nr Brisbane.

28 4. Creating New Habitat Reefs from Recycled Stone.

29 A new inter tidal habitat reef for turnstone made from recycled rock / rubble. New habitat reef Existing sea defence groyne

30 The existing small reef would be added to and extended. Large barnacle encrusted pebbles (see above) are well below the surf zone and stable in storms.

31 Recycled Concrete showing rapid barnacle and mussel colonisation (primary turnstone habitat).

32 5. Higher rock feeding areas The Creation of a Habitat Groyne from New and Recycled Rock. Existing sea defence groyne New Habitat groyne.

33 New Habitat groyne. New pocket beach. Habitat reef Existing sea defence groyne The juxtaposition of both turnstone habitats is the determining principle of the scheme.

34 6. Developing Concrete Reef Blocks and New Rock Pools.

35 Inspired by the Urbane Project new or recycled concrete could be modified with groove structures to encourage rapid colonisation by mussels or barnacles.

36 Bioblocks could be included and promoted as an ecological and educational resource.

37 Existing sandstone platforms could be excavated to create artificial rockpools.

38 7. Using Gabions to create Mussel Bed reefs. Gabions have been successfully used in commercial farming of mussels and oysters

39 Old mussel / oyster shells are used as a culch to attract larvae and build new habitat reefs.

40 Isolated rock oyster on an existing groyne at Egremont points to the potential for creating gabion reefs.

41 Mussels, barnacles and honeycombe reef worm growing on gabion type structure (a shopping trolley) at Seacombe opposite Liverpool. Corroding metal has a higher uptake than galvanised gabions. Further opportunities for using recycled materials?

42 The use of Recycled Rope from Peel Ports.

43 Discarded rope (shown here at Peel Ports Victoria Tower) could be recycled and incorporated in the gabions.

44 Barnacles prefer rough bicycle tyres, mussels prefer inner tubes (rapid colonisation of stable surfaces Egremont, Wirral, May 2013). Note wading bird footprints.

45 8. Creating new mussel beds using mussel spat (juvenile mussels)

46 In Holland, the Waddensleutels project has set up artificial mussel beds in the Wadden Sea.

47 9. Mussels as a Water Purifier - The Potential Involvement of the Peel Group. Peel Group s proposed Liverpool and Wirral Waters dockland schemes require clean clear water to help attract investment.

48 Mussels farmed on a rope lattice, filter and clean dockland waters (Smartfarm Norway).

49 Colonisation is rapid on the large surface area.

50 Some mussel mats used to purify Liverpool Waters could be towed across the river and laid on the intertidal zone at Egremont to create instant mussel bed reefs.

51 10. The Relocation of Sensitive Habitats. Some rock habitats in danger of smothering could be relocated a short distance upcoast.

52 Relocation of sensitive habitats for sand replenishment at Morcambe Bay SSSI earned a Green Heroes Award.

53 Small scale relocation of sensitive habitats would be necessary at Egremont to facilitate a pocket beach

54 If the initial pocket beach, habitat reef and groyne scheme improved net habitats, then it is hoped the idea could be extended.

55 Somewhere out there is the optimum environment for both wildlife and local residents? Is there the political will to find it?

56 The Peel Group. The initial plans (larger scale sand replenishment only) were worthy of consideration but challenging environmental and regulatory issues would have to be overcome. Practical issues involved possible migration of material, not all dredgings are golden sand but can contain a proportion of silt. Peel state they are keen to work with local communities as long as it is in an environmentally responsive and sustainable manner. They have not yet responded to the revised 10 point plan.

57 Natural England Report looking into the restoration of turnstone habitat at Egremont is still to be signed off by DEFRA (May 2013). Natural England state that returning sand back on to Egremont foreshore may from an SSSI perspective reduce the habitat for the interest feature (Turnstone) but acknowledges suggested mitigation and ways habitat could be created. Having circulated the revised ten point plan to both Wirral Council and Peel Ports, Natural England feel that the revised ideas will be given due consideration at the appropriate time with on-going developments of the ports. Quote Natural England will be formally consulted by the Council about any future proposals to put the sand back on to the Egremont foreshore through the planning process and this is were we will make our recommendations.

58 Environment Agency Will await the Natural England report prior to any comment or potential involvement.

59 Wirral Council Wirral Council (June 2013) have reservations regarding: a) Justification in coast defence terms b) Dredged material may be unsuitable for sand replenishment c) Concern about smothering sensitive habitats. d) any proposal would require compliance with marine licensing and planning requirements including undertaking a detailed Appropriate Assessment under the EU Habitats regulations. Talks with Wirral Borough Council are on going.

60 Egremont Residents As yet, no formal opinion surveys have been taken of residents views, although presentations to residents have been received very positively. There is a desire (especially amongst older residents) to reinstate the sand beaches that existed here until 60 years ago. The main concerns expressed are environmental and technical.

61 Conclusion Creating a higher drier sand beach at the back of part of Egremont shore could theoretically improve turnstone winter feeding / roosting habitat, but only if connected with a new hard rock reef and habitat groyne. Article 10 of the Habitats Directive emphasises the importance of ecological connectivity amongst habitat patches and species populations; supporting the Habitats Directive and Birds Directive (Naylor et al 2012). Natural England would have to agree with such a positive appraisal, only then could the scheme be examined practically, implemented and if successful extended. The European Convention on Biological Diversity commits signatories to address the underlying causes of biodiversity loss

62 In the U.K. Sustainability Appraisals have a stronger focus on social and economic appraisal. Sand replenishment at Colwyn Bay (May 2013) illustrates the indirect socio-economic benefits associated with coastal protection outside an SSSI. Colwyn Bay Bay June June

63 Could future sand replenishment at Egremont illustrate the indirect socio-economic benefits associated with habitat improvement within a Site of Special Scientific Interest? Somewhere out there is the optimum environment for both wildlife and local residents? Is there the political will to find it?

15. Coastal Defences. Executive Summary: Chapter 15. Coastal Defences

15. Coastal Defences. Executive Summary: Chapter 15. Coastal Defences 15. Coastal Defences Executive Summary: Chapter 15. Coastal Defences The potential direct and indirect impacts that will arise from the proposed Berth 201/202 works, either through the reconstruction of

More information

IROPI: National politics v environmental decisions

IROPI: National politics v environmental decisions Bruce Munro National Environmental Assessment Service Environment Agency Abstract IROPI: National politics v environmental decisions As a public body responsible for flood risk management in England and

More information

Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision

Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision Title: Colwyn Bay Promenade Enhancement and Coastal Defence Works Regulatory Approval:

More information

Planning for Dredging and the Environment on the Tidal Thames

Planning for Dredging and the Environment on the Tidal Thames Planning for Dredging and the Environment on the Tidal Thames 1 INTRODUCTION This Information Note forms the final document in a set of three notes designed to inform berth operators and environmental

More information

Lonsdale Bight: consultation, options and actions summary. December 2017

Lonsdale Bight: consultation, options and actions summary. December 2017 Lonsdale Bight: consultation, options and actions summary Contents 1. Lonsdale Bight Coastal Processes Project... 2 1.1 Conceptual frameworks applied to the project... 2 1.2 Review of investigations and

More information

THE MERSEA HARBOUR PROTECTION TRUST. EXECUTIVE SUMMARY. Draft 8. Dated 01 DECEMBER 2016.

THE MERSEA HARBOUR PROTECTION TRUST. EXECUTIVE SUMMARY. Draft 8. Dated 01 DECEMBER 2016. THE MERSEA HARBOUR PROTECTION TRUST EXECUTIVE SUMMARY. Draft 8. Dated 01 DECEMBER 2016. PROPOSED CLIMATE CHANGE ADAPTION RECHARGE PROJECT Mersea Harbour and Tollesbury Wick Protection to Mersea Harbour

More information

Brooklyn Bridge Park

Brooklyn Bridge Park Tide Pools and Pile Encasements Location Product used Duration Brooklyn Bridge Park Tide Pools and Pile Encasements 2013-2016 In Short As part of the holistic environmental theme of Brooklyn Bridge Park,

More information

Aquaculture in Natura 2000

Aquaculture in Natura 2000 Aquaculture in Natura 2000 Vedran Nikolić DG ENVIRONMENT Nature unit Aquaculture in motion 2015 Integrating Aquaculture Bruxelles, 16 th November 2015 7 th Environment Action Program Living well, within

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

Berth 9 Quay Extension Environmental Statement Non-Technical Summary Berth 9 Quay Extension Hutchison Ports UK Ltd July 2013 Final Report 9Y0150 CONTENTS Page 1 PROJECT BACKGROUND 1 2 NEED FOR THE PROPOSED SCHEME 4 3 DESCRIPTION OF THE CONSTRUCTION PHASE 4 4 DESCRIPTION

More information

F2. Coastal General Coastal Marine Zone

F2. Coastal General Coastal Marine Zone F2. Coastal General Coastal Marine Zone [The regional coastal plan [rcp] provisions are not operative until the Minister of Conservation has formally approved the regional coastal plan part of the Auckland

More information

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation U.S. Army Corps of Engineers New York District January 2004 APPENDIX H SECTION 404(b)(1) GUIDELINES EVALUATION SECTION 404(b)(1)

More information

BALANCE. Kick-off Meeting, Copenhagen, Denmark. 31st of August - 1st of September 2005

BALANCE. Kick-off Meeting, Copenhagen, Denmark. 31st of August - 1st of September 2005 BALANCE Baltic Sea Management - Nature Conservation and Sustainable Development of the Ecosystem through Spatial Planning Kick-off Meeting, Copenhagen, Denmark 31st of August - 1st of September 2005 Johnny

More information

NEW YORK / NEW JERSEY HARBOR DEEPENING PROJECT

NEW YORK / NEW JERSEY HARBOR DEEPENING PROJECT NEW YORK / NEW JERSEY HARBOR DEEPENING PROJECT Using Synergy to Successfully Execute A Mega Water Resource Project Joseph J. Seebode Deputy District Engineer U.S. Army Corps of Engineers New York District

More information

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 REPLY TO ATTENTION OF: JOINT PUBLIC NOTICE U. S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT AND FLORIDA

More information

Poole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Bay Technical Note 1 WITHOUT PREJUDICE

Poole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Bay Technical Note 1 WITHOUT PREJUDICE 1. Introduction Poole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Bay Technical Note 1 WITHOUT PREJUDICE This technical note reviews the physical data that was collected

More information

Seaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014

Seaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014 Seaham North Pier Environmental Impact Assessment Volume 1: Non-Technical Summary January 2014 CONTENTS INTRODUCTION SEAHAM NORTH PIER THE ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL EFFECTS INTRODUCTION

More information

Chapter 8 Natural Resources

Chapter 8 Natural Resources Chapter 8 Natural Resources 127-134 8.1 Introduction 8.2 Extractives Industry 8.3 Forestry 8.4 Fishing / Aquaculture 8.1 Introduction Kerry has a number of naturally occurring resources that contribute

More information

Climate proof Oosterschelde

Climate proof Oosterschelde Oosterschelde (NL) The Dutch Oosterschelde estuary is exceptionally rich in birds, but the question is for how long. The sandbars, intertidal flats and salt marshes, which now provide extensive foraging

More information

Water Framework Directive and EIA: our experience. Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012

Water Framework Directive and EIA: our experience. Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012 Water Framework Directive and EIA: our experience Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012 The plan Me: Aims & objectives of the Water Framework Directive

More information

Firth of Tay & Eden Estuary Special Area of Conservation

Firth of Tay & Eden Estuary Special Area of Conservation Firth of Tay & Eden Estuary Special Area of Conservation Advice under Regulation 33(2) of The Conservation (Natural Habitats, &c.) Regulations 1994 (as amended) 30 March 2006 About this Package: Section

More information

Proposed Maplewood Marine Restoration Project Discussion guide and feedback form

Proposed Maplewood Marine Restoration Project Discussion guide and feedback form Vancouver Fraser Port Authority Habitat Enhancement Program Proposed Maplewood Marine Restoration Project Discussion guide and feedback form Public consultation September 24 October 12, 2018 Feedback form

More information

Freshwater ecosystems

Freshwater ecosystems Aquatic Ecosystems Aquatic Ecosystems The types of organisms in an aquatic ecosystem are determined by the water s salinity. Salinity - Amount of salt in the water. Freshwater ecosystems do not have any

More information

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY WESTRIDGE MARINE TERMINAL IN WATER EXCAVATION REPORT WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY Trans Mountain Pipeline ULC Kinder Morgan Canada

More information

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Table of Contents. List of Tables. 11. Advantages and Disadvantages Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized

More information

Protect, Accommodate, or Retreat? Integrating Adaptation Strategies and Ecosystem Services into the Cape Cod Coastal Planner

Protect, Accommodate, or Retreat? Integrating Adaptation Strategies and Ecosystem Services into the Cape Cod Coastal Planner Protect, Accommodate, or Retreat? Integrating Adaptation Strategies and Ecosystem Services into the Cape Cod Coastal Planner Jennifer Clinton Cape Cod Commission April Wobst Association to Preserve Cape

More information

Protecting and Restoring Habitat (Fact Sheet)

Protecting and Restoring Habitat (Fact Sheet) University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2014 Protecting and Restoring Habitat (Fact Sheet) Casco Bay Estuary Partnership Follow this and additional

More information

WELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT:

WELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT: WELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT: FEEDBACK ON THE WELSH GOVERNMENT S DRAFT WELSH NATIONAL MARINE PLAN JUNE 2018 Background

More information

Grimsby Docks Flood Risk Management Scheme. Non-Technical Summary April Grimsby Docks FRMS i

Grimsby Docks Flood Risk Management Scheme. Non-Technical Summary April Grimsby Docks FRMS i Grimsby Docks Flood Risk Management Scheme Non-Technical Summary April 2013 Grimsby Docks FRMS i We are the Environment Agency. We protect and improve the environment and make it a better place for people

More information

Strategic vision for maritime spatial planning in Romania and Bulgaria - MSP Mangalia - Shabla

Strategic vision for maritime spatial planning in Romania and Bulgaria - MSP Mangalia - Shabla Challenges and opportunities for maritime spatial planning of the Black Sea in Romania and Bulgaria Final Conference of the MARSPLAN-BS project Strategic vision for maritime spatial planning in Romania

More information

LSI Toolbox. Heidi Roberts.

LSI Toolbox. Heidi Roberts. LSI Toolbox Heidi Roberts hroberts@abpmer.co.uk Name of presentation Integration of LSI into MSP and associated SEA Practical Toolbox for Practitioners on LSI Easily applied within any admin. or governance

More information

Working on flood embankments: Essential environmental considerations

Working on flood embankments: Essential environmental considerations Working on flood embankments: Essential environmental considerations Information for project managers, engineers and contractors When undertaking any work on or adjacent to coastal and estuarine flood

More information

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017. Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design

More information

The ecological value of such designs is generally the closest to that of a natural tidal bank.

The ecological value of such designs is generally the closest to that of a natural tidal bank. The designs There are four different categories for designing estuary edges: Bioengineered designs These designs rely entirely on plants for long-term protection from erosion. Bioengineering techniques

More information

New Jersey Department of Environmental Protection

New Jersey Department of Environmental Protection New Jersey Department of Environmental Protection Assistant Commissioner Marilyn Lennon Land Use Management Division of Land Use Regulation Manager Virginia Kopkash September 16, 2013 Transformation of

More information

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote

More information

PIANC Working With Nature Philosophy

PIANC Working With Nature Philosophy PIANC Working With Nature Philosophy Experiences and Challenges Presentation on behalf of PIANC Environmental Commission by Harald Köthe Belgium CEDA-PIANC Young Professionals Event 17. October 2014, Brussels

More information

Impacts of Dredging and Reclamation to Benthic Primary Producer Habitat (BPPH)

Impacts of Dredging and Reclamation to Benthic Primary Producer Habitat (BPPH) Section 9.2 Impacts of Dredging and Reclamation to Benthic Primary Producer Habitat (BPPH) Section 9.2.1 The management goals for BPPH are to: Management Goals for BPPH Maintain the abundance, diversity,

More information

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019 Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019 Introduction The Bolsa Chica Land Trust (BCLT) has applied for and been selected to receive

More information

July

July July 2010 www.agg-net.com 13 for the Marin A Sea Change T he UK marine area covers some 867,000km 2, an area equivalent to some three-and-a-half times the UK s terrestrial extent. Yet, unlike on land,

More information

28 December 2010

28   December 2010 A Sea Change for the Mari T he UK marine area covers some 867,000km 2, an area equivalent to some three-and-a-half times the UK s terrestrial extent. Yet, unlike on land, until now the marine environment

More information

Estuary Adventures. Background. Objective

Estuary Adventures. Background. Objective Estuary Adventures Objective Students will work in groups to understand the concept of estuaries, their importance, and the role that density plays in the mixing of fresh and salt water. Students will

More information

Renewable energy in the aquatic environment; filling the gaps in energy & our knowledge base. Nicola Teague APEM Chair IFM Welsh Branch

Renewable energy in the aquatic environment; filling the gaps in energy & our knowledge base. Nicola Teague APEM Chair IFM Welsh Branch Renewable energy in the aquatic environment; filling the gaps in energy & our knowledge base Nicola Teague APEM Chair IFM Welsh Branch UK decarbonisation targets Climate Change Act target for UK to reduce

More information

Flooding and erosion in the UK

Flooding and erosion in the UK 2016 Zandmotor - How Dutch innovation can benefit the UK 18 May 2016 Jaap Flikweert CEng FCIWEM C.WEM Jaap.flikweert@rhdhv.com @JaapJFlikweert Flooding and erosion in the UK We have a problem! Too much

More information

Hull Plus - Linking FCERM & Wider Benefits through Innovative Funding Approach

Hull Plus - Linking FCERM & Wider Benefits through Innovative Funding Approach Hull Plus - Linking FCERM & Wider Benefits through Innovative Funding Approach Phil Boyes - Project Manager Environment Agency Flood & Coast 2018 1 Introduction to Hull Plus 95% of the city of Kingston

More information

COMPARISON OF GEOSYNTHETIC MATERIALS AS SUBSTRATES ON COASTAL STRUCTURES GOLD COAST (AUSTRALIA) AND ARABIAN GULF

COMPARISON OF GEOSYNTHETIC MATERIALS AS SUBSTRATES ON COASTAL STRUCTURES GOLD COAST (AUSTRALIA) AND ARABIAN GULF COMPARISON OF GEOSYNTHETIC MATERIALS AS SUBSTRATES ON COASTAL STRUCTURES GOLD COAST (AUSTRALIA) AND ARABIAN GULF Bobbie Corbett 1, L. Angus Jackson 1, Timothy Evans 1 and Simon Restall 2 Coastal structures

More information

Chapter 6. Aquatic Biodiversity. Chapter Overview Questions

Chapter 6. Aquatic Biodiversity. Chapter Overview Questions Chapter 6 Aquatic Biodiversity Chapter Overview Questions Ø What are the basic types of aquatic life zones and what factors influence the kinds of life they contain? Ø What are the major types of saltwater

More information

Biodiversity Offsetting in Doncaster. Guidance on the Process

Biodiversity Offsetting in Doncaster. Guidance on the Process Biodiversity Offsetting in Doncaster Guidance on the Process 1 Contents Chapter 1 - Introduction 1.1 What is biodiversity offsetting? Pg 3 1.2 Doncaster s role in the biodiversity offsetting pilot Pg 3

More information

Introduction I. Ecosystem & human uses in BA area II. State of the Art on sensitivity mapping

Introduction I. Ecosystem & human uses in BA area II. State of the Art on sensitivity mapping Introduction I. Ecosystem & human uses in BA area II. State of the Art on sensitivity mapping Ronny Schallier MUMM/RBINS (BE) [1] Task F in Brief Towards a common approach on sensitivity mapping Establish

More information

CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan

CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan EXECUTIVE SUMMARY What is the Purpose and Background to the Implementation Plan? The impact of climate change

More information

Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Local authority Main catchment North Ayrshire Council, Ayrshire Monkton to Irv

Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Local authority Main catchment North Ayrshire Council, Ayrshire Monkton to Irv Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Ayrshire Local authority North Ayrshire Council, South Ayrshire Council Main catchment Monkton to Irvine coastal Summary of flooding

More information

Ecological Mitigation and Management Plan

Ecological Mitigation and Management Plan Ecological Mitigation and Management Plan LONDON ARRAY OFFSHORE WIND FARM PROJECT AND ASSOCIATED GRID CONNECTION WORKS Version / Date : Ver 1.00 / October 2007 Prepared by : Tim Proudler / Keith Henson

More information

Chapter Four: Overview. Introduction to Environmental Geology, 5e. Case History: Endangered Trout. Ecology and Geology Linkage

Chapter Four: Overview. Introduction to Environmental Geology, 5e. Case History: Endangered Trout. Ecology and Geology Linkage Chapter Four: Overview Introduction to Environmental Geology, 5e Chapter 4 Ecology and Geology Jennifer Barson Spokane Falls Community College Linkages between geology with ecology and relationships with

More information

6 TH. Most of the Earth Is Covered with Water (2) Most Aquatic Species Live in Top, Middle, or Bottom Layers of Water (1)

6 TH. Most of the Earth Is Covered with Water (2) Most Aquatic Species Live in Top, Middle, or Bottom Layers of Water (1) A Healthy Coral Reef in the Red Sea MILLER/SPOOLMAN ESSENTIALS OF ECOLOGY 6 TH Chapter 8 Aquatic Biodiversity Fig. 8 1, p. 168 Most of the Earth Is Covered with Water (2) Aquatic life zones Saltwater life

More information

Building with Nature

Building with Nature DELTARES, JANUARY 2014 9 DOSSIER Building with Nature Interest in building with nature is on the rise worldwide. That is not surprising. In ever more densely-populated coastal, delta and river areas, demand

More information

WFD-compliant dredging and Article 4(7) A practical methodology with lessons for other sectors

WFD-compliant dredging and Article 4(7) A practical methodology with lessons for other sectors WFD-compliant dredging and Article 4(7) A practical methodology with lessons for other sectors Presentation by Jan Brooke*, Environmental Consultant 13 th June 2013 Prepared with Greg Whitfield, Environment

More information

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION FOR THE IMPROVEMENT DREDGING OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT (NEW HAVEN, CONNECTICUT) SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW

More information

Ecodynamic solutions for the protection of intertidal habitats. Anneke Hibma Tom Ysebaert

Ecodynamic solutions for the protection of intertidal habitats. Anneke Hibma Tom Ysebaert Ecodynamic solutions for the protection of intertidal habitats Anneke Hibma Tom Ysebaert Coastal erosion: a worldwide problem a serious threat along many coastlines will increase due to human-induced changes

More information

Issues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change

Issues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change presenter: Shelley Heron Issues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change Western Port Bay Where is it? Ecological character

More information

How wetlands can help us adapt to rising seas

How wetlands can help us adapt to rising seas University of Wollongong Research Online Faculty of Science, Medicine and Health - Papers Faculty of Science, Medicine and Health 2014 How wetlands can help us adapt to rising seas Kerrylee Rogers University

More information

Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to M

Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to M Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to Monkton coastal Summary of flooding impacts At risk

More information

Management of biodiversity in disused docks The case study of the Liverpool Docks

Management of biodiversity in disused docks The case study of the Liverpool Docks Management of biodiversity in disused docks The case study of the Liverpool Docks Urban Research on Biodiversity on Artificial and Natural coastal Environments: Enhancing biodiversity by sensitive design

More information

Armoring Units Polinom Port - Haifa

Armoring Units Polinom Port - Haifa Armoring Units Polinom Port - Haifa Location Product used Duration Polinom Port Haifa, Israel Bio enhancing armoring units 2013-2016 In Short As part of the construction of a new port in Haifa (Polinom

More information

Matrix of Potential Coastal Adaptation Strategies

Matrix of Potential Coastal Adaptation Strategies Matrix of Potential Coastal Adaptation Strategies The matrix provided on pages 60-76, developed by Lesley Ewing (California Coastal Commission) and Dr. Reinhard Flick, outlines some of the most common

More information

1. Introduction The workshop was held at the Town Hall in Kenton-on-Sea with 30 participants.

1. Introduction The workshop was held at the Town Hall in Kenton-on-Sea with 30 participants. Coastal Management Programme for the Sarah Baartman District Municipality (SBDM) Report on an Introductory Workshop held at Kenton-on-Sea, 09h00 to 12h30 Venue: Kenton Town Hall 25 May 2018 1. Introduction

More information

8. HYDROGRAPHICAL CONDITIONS

8. HYDROGRAPHICAL CONDITIONS 64 state of the seas 8. HYDROGRAPHICAL CONDITIONS Key Messages A substantial proportion of the Northern Ireland coastline has been altered by coastal defence structures. This is particularly prevalent

More information

OPERATIONAL GUIDLINES OF BOAD

OPERATIONAL GUIDLINES OF BOAD Coastal and Littoral Management 1. There is no precise definition of coastal areas. All definitions include coastal waters, marine waters and estuaries, and some portions of the land along the coast where

More information

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program February 2012 Executive Summary Overview This summary report documents concept design and planning

More information

PINELLAS COUNTY RESTORE ACT DIRECT COMPONENT PROJECTS IDEAS SUBMITTED TO PINELLAS COUNTY

PINELLAS COUNTY RESTORE ACT DIRECT COMPONENT PROJECTS IDEAS SUBMITTED TO PINELLAS COUNTY RESTORE ACT DIRECT COMPONENT S DATE RECEIVED: 7/7/14 NAME: : Tides Golf Course Acquisition & Restoration Purchase ~90 acre property, retrofit stormwater systems, restore habitat, create trials and boardwalks.

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

NATIONAL OCEAN SERVICE

NATIONAL OCEAN SERVICE NATIONAL OCEAN SERVICE Jeff Payne, Ph.D., Office for Coastal Management Steve Thur, Ph.D., Acting Director National Centers for Coastal Ocean Science February 23, 2017 NATIONAL OCEAN SERVICE oceanservice.noaa.gov

More information

Project Area: Outfall IJKL

Project Area: Outfall IJKL Project Area: Outfall IJKL Outfall IJKL is a stormwater drainage pipe at the west end of Crissy Field. Location of Extended Outfall Restricted Beach Access Work Area Manhole Modification CRISSY FIELD DRAINAGE

More information

NOAA Restoration Center Community-based Restoration Program

NOAA Restoration Center Community-based Restoration Program NOAA Restoration Center Community-based Restoration Program Applies a grass-roots approach to restoration by actively engaging communities in on-the-ground restoration of fishery habitats around the nation.

More information

APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT

APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 This page intentionally blank. SECTION

More information

CLIMATE AND OCEANS. Author: Dr. Judith Weis Sierra Club Marine Team September, 2017

CLIMATE AND OCEANS. Author: Dr. Judith Weis Sierra Club Marine Team September, 2017 CLIMATE AND OCEANS Author: Dr. Judith Weis Sierra Club Marine Team September, 2017 CLIMATE CHANGE Coral bleaching O2 levels in ocean Migrations and movements Sea Level Rise, Extreme Events Ocean acidification

More information

Ch. 7 Aquatic Ecology

Ch. 7 Aquatic Ecology Ch. 7 Aquatic Ecology 1.Coral Reefs: the aquatic equal to the tropical rain forests 2.The two major aquatic life zones A. saltwater or marine (estuaries, coastlines, coral reefs, coastal marshes, mangrove

More information

( THE M4 CORRIDOR AROUND NEWPORT )

( THE M4 CORRIDOR AROUND NEWPORT ) PUBLIC INQUIRY IN THE MATTER OF THE HIGHWAYS ACT 1980 AND THE ACQUISITION OF LAND ACT 1981 AND IN THE MATTER OF: THE M4 MOTORWAY (JUNCTION 23 (EAST OF MAGOR) TO WEST OF JUNCTION 29 (CASTLETON) AND CONNECTING

More information

New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement

New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement Public Informational Meeting NEPA Scoping 24 January 2017 Planning Division New England District

More information

E-Island. (Energy, Economy, Environment)

E-Island. (Energy, Economy, Environment) E-Island (Energy, Economy, Environment) Introduction to the project The electrical output of wind turbines is intermittent. Sometimes there is little to no wind and wind turbines only start to deliver

More information

Fairwinds Schooner Cove Redevelopment

Fairwinds Schooner Cove Redevelopment www.archipelago.ca Habitatt Assessment Report April 2017 Habitatt Assessment Report Fairwinds Schooner Cove Redevelopment May 2017 Prepared for: Prepared by: ICR Projects Inc. Leo Mariotto #300 555 Sixth

More information

PIANC Commission Working Group Report Reviews

PIANC Commission Working Group Report Reviews PIANC Commission Working Group Report Reviews EnviCom Working Group report details Initial review: conclusion * If identified as potentially sensitive, please highlight the particular areas of potential

More information

PENDER HARBOUR DOCK MANAGEMENT PLAN

PENDER HARBOUR DOCK MANAGEMENT PLAN PENDER HARBOUR DOCK MANAGEMENT PLAN 1.0 INTENT OF DOCK MANAGEMENT PLAN The Pender Harbour Dock Management Plan (the DMP) is an instrument of policy that provides guidance in relation to docks authorized

More information

Water Quality and Pollution

Water Quality and Pollution Chapter 6 Water Quality and Pollution Guiding Principles: Chapter 4 details all the guiding principles relevant to the overall management of the Harbour. Whilst all should be given some consideration the

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016

More information

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment Environmental Issues Long Island s Environmental Issues Copyright 2011 AFG 1 agricultural land air pollution aquifers automobile barrier islands biozones fisheries groundwater recharge invasive species

More information

Co-location Meeting. PowerPoint Part 2

Co-location Meeting. PowerPoint Part 2 Co-location Meeting PowerPoint Part 2 Co-location Case Studies Illustrating the potential for marine space use within Offshore Wind farm footprints (Source: Linley A, Laffont K, Wilson B, Elliott M., Perez-Dominguez

More information

Memorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension

Memorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension Memorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension Date 31 st October 2017 1 Contents: 1. Foreword... 3 2. Introduction... 4 2.1 Background...

More information

SoilTain Coastal Protection Tubes. Geosynthetic Container System for Coastal and Bank Protection

SoilTain Coastal Protection Tubes. Geosynthetic Container System for Coastal and Bank Protection SoilTain Coastal Protection Tubes Geosynthetic Container System for Coastal and Bank Protection 2 3 Geosynthetic Tube System The All-Rounder for Coastal and Bank Protection The effects of global climate

More information

NOAA s Role in Coastal Zone Management in the Chesapeake Region

NOAA s Role in Coastal Zone Management in the Chesapeake Region NOAA s Role in Coastal Zone Management in the Chesapeake Region John Kuriawa Regional Coastal Management Specialist NOAA s Office of Ocean and Coastal Resource Management Overview Who I am and what do

More information

Tampa Port Authority

Tampa Port Authority McKay Bay Restoration (McKay Bay Mitigation Site and McKay Bay Dredge Hole Restoration) Tampa Port Authority 2014 AAPA Environmental Awards Competition June 2014 Contact: Andy Fobes, Director of Public

More information

Good Practice Guide. Technical Guidance: Flood risk activity exemptions Date Published: April GPG 221 Document Owner: Flood Risk Strategy

Good Practice Guide. Technical Guidance: Flood risk activity exemptions Date Published: April GPG 221 Document Owner: Flood Risk Strategy Good Practice Guide Technical Guidance: Flood risk activity exemptions Date Published: April 2016 GPG 221 Document Owner: Flood Risk Strategy Page 1 of 41 Version History: Document Date Summary of Changes

More information

Shoreline Erosion. How Erosion Occurs

Shoreline Erosion. How Erosion Occurs How Erosion Occurs Shoreline Erosion When a 3 metre (10 feet) high shoreline bank erodes, it may look as if the entire height of bank is eroding. In reality, it is only the toe of the bank that is, the

More information

D9. Significant Ecological Areas Overlay

D9. Significant Ecological Areas Overlay D9. Significant Ecological Areas Overlay D9.1. Background Auckland's indigenous biodiversity is unique with a diverse range of ecosystems reflecting the complex physical environment of the region. Natural

More information

Rubbish or Resource? Public Consultation

Rubbish or Resource? Public Consultation West of England Waste Management & Planning Strategy Rubbish or Resource? Public Consultation Phase 1 Summer 2006 25th September 2006 Report no: 1 West of England Waste Management & Planning Strategy Rubbish

More information

RESEARCH PRIORITIES FOR 2016

RESEARCH PRIORITIES FOR 2016 National Environmental Science Programme RESEARCH PRIORITIES FOR 2016 Note that bolded dot points are considered high priority. CLEAN AIR AND URBAN LANDSCAPES: RESEARCH PRIORITIES Increasing our understanding

More information

Mineral Products in London. Safeguarding London s Wharves and Rail Depots for future Prosperity and Sustainability

Mineral Products in London. Safeguarding London s Wharves and Rail Depots for future Prosperity and Sustainability Mineral Products in London Safeguarding London s Wharves and Rail Depots for future Prosperity and Sustainability Mineral Products in London Did you know? London s housing, building and infrastructure

More information

Restoring the lost kelp forests of Port Phillip Bay. Steve Swearer

Restoring the lost kelp forests of Port Phillip Bay. Steve Swearer Restoring the lost kelp forests of Port Phillip Bay Steve Swearer Outline National Centre for Coasts and Climate The Reef Ecosystem Evaluation Framework (REEF) Roadmap for restoring kelp forests in PPB

More information

Enhancing Straightened River Channels

Enhancing Straightened River Channels .6 Creating a sinuous low flow channel in an over-widened river River Dearne Location - Mexborough, West of Doncaster, South Yorkshire SE484012 Date of construction - Summer 1995 Length - 500m Cost - 4,000

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 PLAN - UPDATE 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary Introduction and Background The Environment Agency owns Rye Harbour Farm in East Sussex and has developed a scheme to enhance the nature conservation value of the Farm, which lies