1 Report No.: INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: Dec I. BASIC INFORMATION A. Basic Project Data Country: Morocco I Project ID : P I Additional Project ID (if any): Project Name: Noor-Midelt Solar Power Project Task Team Leader: Sameh Mobarek and Moez Cherif I Estimated Board Date: July 27, 2017 Estimated Appraisal Date: May 22, 2017 Managing Unit: GEE05 I Lending Instrument: IPF Sector: Energy Theme: IBRD Amount (US$400m.): IDA Amount (US$m.): GEF Amount (US$m.): PCF Amount (US$m.): Other financing amounts by source: KfW Amount (US$750m) European Investment Bank Amount (US$200m) Agence Franyaise de Developpement Amount (US$1 OOm) African Development Bank Amount (US$260m) Clean Technology Fund Amount (US$50m) Environmental Category: A Simplified Processing Simple [] Repeater [] Is this a transferred project Yes [] No [X] B. Project Objectives: The PDO is to increase (a) installed capacity (megawatt) and (b) electricity output (megawatt-hour), especially during peak hours, of the Noor-Midelt Solar Comple. C. Project Description: The Project is epected to adopt an innovative hybrid solar CSP/PV plant design to combine the benefits of both technologies to deliver firm power to the grid. The feasibility study indicates that this type of hybridization is an attractive solution as it increases the load factor and reduces intermittency, compared to pure PV solutions. At the same time, it also reduces upfront investment cost and the levelized cost of energy, compared to pure CSP solutions. The Request for Qualification (RFQ) for Phase 1 was issued on July 26, 2016, indicating that the CSP technology could be parabolic trough or tower, similar those used in the Noor-Ouarzazate Solar Comple. The first phase ofnoor-midelt is epected to consist of two separate plants, each with MW CSP capacity and a minimum of 5 hours of thermal storage. The capacity of the PV component, which is epected to provide daytime generation, is left to the bidders' discretion, but cannot eceed night-time net

2 capacity from CSP by more than 20%. Bidders are epected to optimize their design based on epected plant performance criteria that will be provided in the RfP. The actual capacity will depend on the technical specifications MAS EN will develop in the RfP stage, and bidders' proposed technical optimization to meet the RfP requirements. The common and associated infrastructures includes access roads, on site drainage infrastructure, raw water infrastructure (including water intake, treatment, storage tank, pipes), power transmission line and on-site substation, and telecom infrastructure. All common infrastructure will be developed by MASEN, ecept the transmission lines and substation for evacuating power that are considered to be associated infrastructure and will be developed by national power utility ONEE. D. Project location and salient physical characteristics relevant to the analysis of environmental and social risks and impacts (if known): The future Noor-Midelt site is administratively located in the Midelt Province and comprises a total surface of 4141 ha. The site is located on the Haute Moulouya Plateau approimately 20 km Northeast from the town of Midelt. The site is accessible from the Route Nationale RN13, which links Meknes with Midelt ha is communal land and belongs to the two ethnic communities of Ait Oufella and Ait Rahou Ouali, while around 1427 ha of forest land belongs to the Water and Forests Administration. MASEN had planned and started the process of acquisition of the land through willing buyer - willing seller arrangements. Currently (November 2016), the ownership titles of the different plots constituting the site are contested in court, so the acquisition will now be obtained through epropriation. For this, the compensation rates agreed upon during negotiations with the communities will be used. According to MASEN, the court case should be resolved in the first half of the calendar year Should the situation not be clarified prior to the preparation of the involuntary land acquisition planning documents, the different scenarios of legal outcomes will have to be included in the safeguards assessments. The Noor-Midelt site has been selected for the following reasons: i) the site has an ecellent potential for solar power production; ii) the site is close to the Hassan II Reservoir (11 km) for its water needs; iii) there is a nearby electric transmission line; iv) there is easy access via the RN13; v) the site is very flat and favorable for a solar power plant; vi) there are no people living on the site; vii) the vegetation is very sparse so that the site is barely used for livestock grazing; viii) environmental impacts and risks are minimal; i) there are no physical cultural resources within a radius of 3 km; and ) the site is located outside a natural zone and outside any protected tourist area. The project site preparation, project construction and operation will require a total of more than 4000 hectares (ha) of permanent land acquisition. Additional land acquisition will be required for water supply and transmission lines. Access roads to the project site will not require land acquisition, as eisting rightof-way are used, and eisting rural roads are upgraded without enlargement. The sandy and arid terrain allow only for small scrubs to grow. The land acquisition for the project will have limited impacts on the livelihood of local communities: the land is having only very sparse vegetation, and is used only barely for livestock grazing. Transhumance seems to occur mostly along the river crossing the site, along which a corridor will be kept open that can be used for livestock. The importance of the site for livestock rearing will be quantified during a socio-economic assessment during project preparation. Local population confirmed the low intensity of use for temporal pastoralist activities. The area to be acquired covers around 10% of the available land of the communities, but much less in terms of income-generating assets. E. Borrower's Institutional Capacity for Effective SEMS: The Borrower (MASEN) has gained considerable eperience during the implementation of the ESMPs for the Noor-Ouarzazate I, II and III projects. The Noor-Midelt solar power project is epected to be very

3 similar, and MASEN has adequate capacity to implement the project in compliance with World Bank Performance Standards and Environmental, Health and Safety Guidelines. During the construction of the CSP Tower of Noor III in Ouarzazate, there was a lapse in the application of the Health & Safety Procedures, leading to a fatal accident. The Health & Safety System for Noor II and III has since then been significantly strengthened and is now in compliance with international standards. MASEN has prepared and managed land acquisition for similar projects before, in particular for the NOOR Ouarzazate projects, where conditions for land acquisition are similar. No particular issues have been reported regarding land acquisition, which is implemented by a division under the Ministry of Interior. A team of two staff is currently assigned to deal with the land acquisition and E&S management under the Midelt project. Land acquisition will follow initially national procedures. The RAP being prepared will follow WBG and other donors' requirements to ensure implementation is up to international best practices. MASEN followed the same principles for the Ouarzazate projects. The main responsibility for the adequate preparation and implementation of the Framework Environmental arid Social Assessment (FESIA), Construction Environmental and Social Management Plans (CESMPs) and the Health and Safety Plan (H&S Plan) will be with the Developer and the Contractors, which is similar to the 3 Ouarzazate solar power projects. The Developer and the Contractors will have the required capacity for the implementation of the Construction ESMPs (CESMPs) and H&S Plan. During project preparation, attention will be paid to PS2, in particular regarding working conditions, management of labor influ, etc. Requirements for th~ application of PS 1, PS2, PS3, PS4, PS6 and PS8 by the developer and contractor will be managed through bidding documents and contracts, and MASEN will monitor all safeguards plans. MASEN has prepared and shared with the Bank's technical project task team in draft form a FESIA, including the environmental impacts and mitigation for the possible solar technologies, water intake, water pipeline, raw water treatment plant and access roads, a Resettlement Action Plan (RAP) for the project main and etension sites (land acquisition plan 1, LAP 1) for the two phase 1 plants, and a due diligence report for the access road. The RAP for the main project site will be revised by MASEN and resubmitted to the Bank and other borrowers in early No land acquisition will be needed for the access road. A third RAP will be prepared later in and cover land acquisition for the water supply infrastructures for the project operation. The RAP will be prepared after the alignment of these water supply infrastructures is finalized. The ESIA and RAP for the transmission lines to connect the site with the national power grid will be prepared as associated facilities by ONEE, the national energy utility. A separate ESIA and RAP in compliance with the applicable World Bank Safeguard Policies will be prepared for those lines by ONEE and reviewed by the Bank and the other IFis and disclosed in-country and the Bank's website. F. Environmental and Social Safeguards Specialists on the Team: Africa Olojoba, Lead Environmental Specialist Markus Vorpahl, Sr. Social Development Specialist Robert Robelus, Sr. Environmental Consultant

4 II. PERFORMANCE STANDARDS THAT MIGHT APPLY Performance Standards (please eplain why) Yes No TBD PS 1: Assessment and Management of Environmental and Social Risks and Impacts A Draft Framework Environmental and Social Impact Assessment (FESIA) has been prepared for the Midelt Project and was shared with the World Bank for technical review. For each Solar Power Technology that is used, a full ESWCESMP will be prepared, cleared and disclosed in-country and the Bank's website prior to Appraisal and implemented during project construction and operation. For the water intake, the water pipeline, the water treatment plant and the access roads, which all have a very low environmental and social impact and risk, an Environmental and Social Management Plan (ESMP) has been prepared as part of the FESIA. The Developer and Contractor will be required to prepare and implement a Construction ESMP (CESMP) and a Health and Safety Plan (H&S Plan) in compliance with international best practices. PS 2: Labor and Workin2 Conditions Labor conditions and Health and Safety aspects during construction and operation will be managed in compliance with PS2 by all sub-contractors, contractors, developers and MASEN. PS 3: Resource Efficiency and Pollution Prevention Pollution prevention and other environmental management responsibilities will be part of the FESIA, ESMPs and CESMPs and will be implemented by the Developer, the Contractors, sub-contractors and supervised by MASEN. PS 4: Community Health, Safety, and Security Influ of non-local labor into local communities during construction will have to be managed. It is epected that non-local labor will be living off-site in eisting townships and travel daily to the construction site, so social risks to local communities should be moderate and manageable. Recruitment of local labor will be the responsibility of Agence nationale de promotion de l 'emploi et des competences (ANAPEC). The same approach as for the 3 Ouarzazate projects will be followed, which worked well. The nearest village is 7 km from the project site, which means that negative environmental and social impacts on villages will be limited. However, positive environmental and social impacts may be substantial during construction and operation through the implementation of a local development plan by MASEN within the nearby villages, currently being prepared as part of MASEN's Corporate Social Responsibility and the implementation of the RAP. PS 5: Land Acquisition and Involuntary Resettlement Around 4000 hectares of land are to be acquired involuntarily. Local communities have been consulted on the land acquisition for the project site and compensation standards have been agreed upon. At this stage, the ownership of the land is contested between local communities, the public entity managing forest land some of the land, although arid, is classified as forest due to specific vegetation patterns - and individual members of the local communities. While the matter is being settled through the court system, the compensation will be placed in an escrow account. A resettlement plan has been prepared by MASEN and will be revised to be in line with PSS. PS 6: Biodiversity Conservation and Sustainable Management of Living Natural Resources There are very scarce living natural resources at the project site, no endemic or endangered species. The environmental and very limited biodiversity impacts are epected to be mainly only on the project site, which has been assessed and determined in the FESIA. PS 7: Indigenous Peoples Additional information is needed. PS 8: Cultural Heritage No Cultural Heritage has been discovered within a radius of 3 km from the project site. However, a chance finds procedures will be included in all relevant Contracts. OP 7.50 regarding Projects on International Waterways and OP 7.60 regarding Projects in Disputed Areas are not triggered.

5 III. SAFEGUARD PREPARATION PLAN A. Target date for the Quality Enhancement Review (QER), at which time the ESRS would be disclosed and the PAD-stage ISDS would be prepared: March 25, 2017 B. For Category C or Category FI projects that do not require an ESRS, the target date for preparing the PAD-stage ISDS: C. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing 1 should be specified in the PAD-stage ISDS: o FESIA: Launched, draft FESIA has been sent to the World Bank for technical review and has been approved by other IFis for disclosure. The FESIA includes an ESMP for the water intake, water supply pipes, raw water treatment plant, and access roads. The preparation time frame for the ESIA for the transmission line is not known. Also the time frames for the preparation for the ESIAs/ESMPs for each solar energy technology is not yet known, since the developers have not yet been selected. o Resettlement Action Plan for the project site: Launched, to be completed by QIII, FY 17 o Resettlement Action Plan for the water supply lines and water treatment plant: To be launched after alignment and design of the infrastructure has been finalized. o Socio-economic analysis: Ongoing, to be finalized in QIII, FY 17 IV. APPROVALS Si ned and submitted b : Task Team Leader: Nina Chee Comments: Practice Mana er: Comments: 1 Erik Fernstrom Reminder: The Bank's Access to Information Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in-country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons.

6

Environmental and Social Review Summary

Environmental and Social Review Summary Public Disclosure Authorized Environmental and Social Review Summary Country: Morocco Project Name: Noor Solar Power Projects Additional Financing Project Number: P164288; Additional Project ID: P131256

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974 Country: Africa Project ID: P094916 Project Name: WAPP

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Date prepared/updated: January 13, 2017 Report No.:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Date prepared/updated: January 13, 2017 Report No.: INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date prepared/updated: January 13, 2017 Report No.: 112247 I. Basic Information 1. Basic Project Data Country: Republic of Zambia Project ID: P157943 Additional

More information

I Managing Unit: EASRE

I Managing Unit: EASRE Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: 47875 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: February 6, 2008 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project ID: P096337 Additional Project

More information

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components:

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/17/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6530. Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6530. Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042 Country: South Asia Project ID: P115767 Project Name:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3763. Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3763. Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 12-Nov-2014 Report No.: ISDSC9631 Date ISDS Approved/Disclosed: 06-Dec-2014 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Jul-2012

More information

Report No.: ISDSA14479

Report No.: ISDSA14479 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o O Date ISDS Prepared/Updated: 16-Nov-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: September 13, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Mali Project Name: Second Transport Sector Project Estimated

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437. Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437. Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437 Country: Papua New Guinea Project ID: P116521 Project

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 30-May-2013

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/18/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date prepared/updated: l 6~November-2016 ISDSA13271 I. Basic Information INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Report No.: 1 B as1c. P ro.1ec ' td a t a Country: South Africa Project ID: P150008

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 20-Apr-2015

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/05/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 07/13/2009 Report No.: 49497

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 07/13/2009 Report No.: 49497 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 12/02/2014 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Country: Republic of Ghana Project ID: P152670 Project Name: Sankofa Gas

More information

Environmental and Social Data Sheet

Environmental and Social Data Sheet Environmental and Social Data Sheet Luxembourg, 08.09.2014 Overview Project Name: Project Number: 2013-0468 Country: Project Description: OUARZAZATE III (TOWER) Morocco Construction and operation of a

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: November 14, 2003 I. BASIC INFORMATION A. Basic Project Data Country: China Project Name: LIUZHOU ENVIRONMENT MANAGEMENT PROJECT

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: October 21, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Western Africa Project Name: Africa Emergency Locust Project

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Environmental and Social Data Sheet

Environmental and Social Data Sheet Environmental and Social Data Sheet Overview Project Name: Project Number: 2013-0342 OUARZAZATE II (PARABOLIC) Country: MOROCCO Project Description: Construction and operation of a 200 MW CSP Parabolic

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 13-Dec-2012

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832 Country: Uruguay Project ID: P110965 Project Name: Sustainable

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Jul-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 22-Jul-2015 Report.: ISDSC13452 Date ISDS Approved/Disclosed: 06-Aug-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date PreparedlUpdated: July 272009 A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3947. Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3947. Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE Report.: 121880 Date ISDS Prepared/Updated: 4 December 2017 Public Disclosure Authorized Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/15/2015 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/21/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5229. Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5229. Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Noor-Midelt Phase 1 Concentrated Solar Power Project

Noor-Midelt Phase 1 Concentrated Solar Power Project Noor-Midelt Phase 1 Concentrated Solar Power Project Country / Region: MENA Region Project Id: XCTFMB107A Fund Name: CTF MDB : African Development Bank Comment Type Commenter Name Commenter Profile Comment

More information

PROJECT INFORMATION DOCUMENT AND INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT AND INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date prepared/updated: May 3, 2017 I. Basic Information PROJECT INFORMATION DOCUMENT AND INTEGRATED SAFEGUARDS DATA

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 04-Dec-2014

More information

Morocco s experience in CSP projects

Morocco s experience in CSP projects Morocco s experience in CSP projects March 6, 2017 1 TABLE OF CONTENTS 1 Morocco s Energy Strategy 2 Presentation of Masen 3 NOOR Plan achievements and projects 4 Masen s approach: plug & play 5 Masen

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC13230 Date ISDS Prepared/Updated: 13-Jul-2015 Date ISDS Approved/Disclosed: 14-Jul-2015 I. BASIC INFORMATION A. Basic Project Data Country:

More information

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 05-Aug-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/21/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date prepared/updated: 10/09/12 I. Basic Information INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 09/26/2008 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/08/2012 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 04/13/2006 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2194 1. Basic Project Data Country: Burkina Faso Project ID: P098956 Project Name: Post-Primary

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/09/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 19-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 89787 Date prepared/updated: July 28, 2014 I. Basic Information 1. Basic

More information

PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) Date Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 10-Feb-2015 Report No.: ISDSC 141 Date ISDS Approved/Disclosed: 18-Feb-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: July 30, 2013 I. BASIC INFORMATION

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: November 16, 2017 Report No: 121525 Public Disclosure Authorized Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2668. Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2668. Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CHINA ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: August 2, 2003 I. BASIC INFORMATION A. Basic Project Data Country: Peru Project ID: P082625 Project Name: Vilcanota Valley Task

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 12-Feb-2014

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/03/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

1 Project ill: PI16410

1 Project ill: PI16410 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: November 3,2009

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 03/08/2007 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2566 1. Basic Project Data Country: Lesotho Project ID: P088544 Project Name: Private

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 16-October-2012 I. BASIC INFORMATION 1. Basic Project Data

More information

Moroccan Agency for Sustainable Energy

Moroccan Agency for Sustainable Energy Moroccan Agency for Sustainable Energy vembre 23, 2017 1 RENEWABLE ENERGIES, AT THE HEART OF MOROCCO S ENERGY STRATEGY Strong will of increasing renewable energy share within the national mix by 2020 and

More information

Safeguard Requirements And the Framework Process

Safeguard Requirements And the Framework Process Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/14/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 19-Feb-2014

More information

I Lending Instrument: Carbon Finance

I Lending Instrument: Carbon Finance Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. : Date preparedlupdated: October 16,2007 I. Basic Information 1. Basic Project

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC779 Project Name WAPP

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized b Date ISDS Prepared/Updated: 13-Feb-212 1. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 03-Sep-2015 Report No.: ISDSC14552 Date ISDS Approved/Disclosed: 04-Sep-2015 Public Disclosure

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02-Nov-2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I BASIC INFORMATION A Basic Project Data INTEGRATED SAFEGUARDS

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC32071 Project Name 24x7

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 06-Dec-2016

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2501. Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2501. Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Kabeli Transmission Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Kabeli Transmission Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Kabeli Transmission Project Report No.: AB6289 Region SOUTH ASIA Sector Power (50%);Renewable energy (50%) Project ID P112893 Borrower(s)

More information

Report No.: ISDSA1037

Report No.: ISDSA1037 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Prepared/Updated: 07-May-2015

More information

PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Date Prepared/Updated: 02/10/2003 Section I - Basic Information

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Project Name Region EAP

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4319 WAPP APL 3 (1 ST PHASE INTER-ZONAL TRANSMISSION HUB) Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4319 WAPP APL 3 (1 ST PHASE INTER-ZONAL TRANSMISSION HUB) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4319 WAPP

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 16-Dec-2014 Report No.: ISDSC9818 Date ISDS Approved/Disclosed: 16-Jan-2015 Public Disclosure Authorized

More information