PRE-FEASIBILITY REPORT
|
|
- Quentin Martin
- 6 years ago
- Views:
Transcription
1 PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil- Ladpura, Cable Nagar, Kota (Rajasthan) Project Proponent: M/s. Hindustan Petroleum Corporation Limited, Kota Environmental Consultant: January 2017
2 1. EXECUTIVE SUMMARY HPCL is a Government of India Enterprise with a Navratna Status, and a Forbes 2000 and Global Fortune 500 company. It had originally been incorporated as a company under the Indian Companies Act 1913 HPCL owns & operates 2 major refineries producing a wide variety of petroleum fuels & specialties, one in Mumbai (West Coast) of 6.5 Million Metric Tonnes Per Annum (MMTPA) capacity and the other in Visakhapatnam, (East Coast) with a capacity of 8.3 MMTPA. HPCL also owns and operates the largest Lube Refinery in the country producing Lube Base Oils of international standards, with a capacity of 428 TMT. This Lube Refinery accounts for over 40% of the India's total Lube Base Oil production. Presently HPCL produces over 300+ grades of Lubes, Specialities and Greases. HPCL in collaboration with M/s Mittal Energy Investments Pte. Ltd.. is operating a 9 MMTPA capacity Refinery at Bathinda in Punjab and also holds an equity of about 16.95% in the 15 MMTPA Mangalore Refinery and Petrochemicals Ltd. (MRPL). HPCL has the second largest share of product pipelines in India with a pipeline network of more than 2,500 kms for transportation of petroleum products and a vast marketing network consisting of 13 Zonal offices in major cities and 101 Regional Offices facilitated by a Supply & Distribution infrastructure comprising Terminals, Pipeline networks, Aviation Service Stations, LPG Bottling Plants, Inland Relay Depots & Retail Outlets, Lube and LPG Distributorships. This is Storage capacity enhancement project of Existing HPCL LPG bottling Plant from 506 MT to 2006 MT at Plot No.499 Kota-Jhalawar Road (NH-12) Village Mandana, Tehsil- Ladpura, Cable Nagar, Kota (Rajasthan) This project falls under item no. 6 (b): Isolated storage & handling of hazardous chemicals under the category B (general conditions apply) as per the EIA notification 2006 and its amendments. The proposal will increase LPG storage capacity and enhance from 2.5 days cover to 5 days cover. 2. INTRODUCTION OF THE PROJECT 2.1 Identification of the Project and Project Proponent M/s Hindustan Petroleum Corporation Limited, (HPCL), a Government of India Enterprise, is engaged in Refining, Storage and Marketing of Petroleum Products. The kota LPG Bottling Plant of M/s Hindustan Petroleum Corporation Ltd. (HPCL) was commissioned in the year 2002 and located at Manda village on the Kota- Jhalawar Road (National Highway no. 12) on 68 acres of land. The nearest villages are Mandana and Mukundpura situated approximately 1.28 KM and 1.24 KM at south and south-west of the plant respectively. Agriculture land and NH-12 1 P a g e
3 at west, Agriculture land at north side of the plant, railway track at east side of the plant. LPG is received at the plant by Road Tankers of capacity 12 and 18 MT from Ajmer, Jamnagar, Gail Vijaypur & Bhatinda (HMEL). The bulk tankers are unloaded into four Bullets of total 506MT (2 x 159 bullets, 1 x 98 and 1 x 90 bullets.) capacities. Plant is having Tank truck decantation unit with six bays each having unloading arms. HPCL LPG bottling Plant Kota supplies packed LPG domestic & non domestic filled cylinders in five revenue district of Rajasthan and Two district of Madhya Pradesh. 2.2 Brief Description of nature of the Project The proposed LPG storage capacity enhancement of LPG bottling plant from 506 MT to 2006 MT by constructing new 3 X 500 MT Mounded Storage Vessels within existing plant premises. LPG will be coming to the Plant by road in trucks from Ajmer, Jamnagar, Gail Vijaypur & Bhatinda (HMEL). etc. This is being stored in bullets then filled in various capacities of the cylinders within the plant and sold (dispatched) to the distributors and direct customers. 2.3 Need for the Project and its importance Based upon LPG consumption scenario, need is felt to enhance the LPG storage capacity at Kota LPG Bottling plant. To achieve the same, HPCL LPG Bottling Plant proposes to install three new mounded storage vessels of capacity 500 MT each. This will improve the storage capacity of LPG at existing plant with enhanced cover from 2.5 days to 5 days and distribution network. Moreover Mounded Storage Vessel is the safest and proven storage in vogue. 2.4 LPG Import At HPCL LPG Bottling Plant Kota, LPG is being received from Ajmer, Essar, Pali, Jamnagar, Gail Vijaypur & Bhatinda (HMEL). etc., through truck tankers. 2.5 Cylinder Supply HPCL LPG bottling Plant Kota supplies packed LPG domestic & non domestic filled cylinders in five revenue district of Rajasthan ( Jhalwar, Bundi, Sawai Madhopur, Karauli, dholpur) and two revenue district of Madhya Pradesh (ujjain, Gwalior) 2.6 Employment Generation due to the Project The proposed Expansion project will provide indirect employment to about persons during the construction phase and also in transportation during construction phase. 2 P a g e
4 3. PROJECT DESCRIPTION 3.1 Type of the Project This is Storage capacity enhancement project of Existing HPCL LPG bottling Plant from 506 MT to 2006 MT at Plot No.499 Kota-Jhalawar Road (NH-12) Village Mandana, Tehsil- Ladpura, Cable Nagar, Kota (Rajasthan) This project falls under item no. 6 (b): Isolated storage & handling of hazardous chemicals under the category B (general conditions apply) as per the EIA notification 2006 and its amendments. 3.2 Project Location The Project site is located at Plot No.499 Kota-Jhalawar Road (NH-12) Village Mandana, Tehsil- Ladpura, Cable Nagar, Kota (Rajasthan) The distance between project site & Kota city is 35 KM. FIGURE 1: LOCATION MAP OF HPCL LPG BOTTLING KOTA 3 P a g e
5 FIGURE 2: PLANT LAYOUT HPCL, KOTA LPG BOTTLING PLANT 4 P a g e
6 FIGURE 3: AERIAL VIEW HPCL, KOTA LPG BOTTLING PLANT 5 P a g e
7 FIGURE 4: 10 KM STUDY AREA MAP OF KOTA LPG BOTTLING PLANT 6 P a g e
8 3.3 Process Details At Plant LPG is received through Truck Tankers of generally 12 MT and 18 MT capacity. LPG is being received from Ajmer, Essar, Pali, Jamnagar, Gail Vijaypur & Bhatinda (HMEL). etc. There is 6 bay gantry for unloading of LPG. Further it is stored in above ground bullets 2 X 159 MT, 1 X 98 and 1 X 90 MT. Maximum existing inventory of LPG at the plant is 506 MT. Plant operates in one shifts. LPG from Bullets is pumped with the help of LPG pumps to electronic carousel for cylinder filling operation. Domestic and Commercial cylinders of sizes 14.2 kg & 19 kg are filled. HPCL LPG bottling Plant supplies packed LPG domestic & non domestic filled cylinders to the five revenue district of Rajasthan and two district of Madhya Pradesh. Defective cylinders are segregated for correction before dispatch to the market. All standard operating procedures are followed as per OISD and best engineering practices. Receipt of Bulk LPG from Road Tankers Storage of LPG in above ground bullets and Horton Sphere Empty Cylinders Bottling of LPG through electronic Carousal into 5, 14.2,19 kg LPG Cylinders Loading of Filled Cylinders into Packed Trucks Dispatch of Filled Packed Cylinder Trucks to Dealers Figure 5: Process Flow Diagram for HPCL, Kota LPG Bottling plant 7 P a g e
9 3.4 Risk Analysis and ERDMP Since plant is having Hazardous chemical inventory exceeding threshold quantity as per MSIHC Rule-1989, amendment Quantitative Risk Analysis and DMP report has been prepared and updated regularly. Same shall be reviewed and updated with augmented facility. ERDMP report has also been prepared and shall be in compliance with PNGRB regulations Liquid Waste Management There is no manufacturing process as it is only storage and filling plant hence there will be no generation of Effluent. Sewage will be treated through septic tanks and soak pits. Effluent from Cylinder washings and soap solution/lubricant used for conveyor belt will be treated in effluent treatment plant and treated water will be used for gardening purpose. 3.6 Hazardous and solid waste Management There will be no generation of any hazardous waste by the plant. Total Solid Waste Generated from the proposed facility will be disposed through pollution control board approved vendor. 3.7 Fire Fighting Details Fire Fighting System Description as per OISD 144 standard Following are the type of fire protection systems for LPG bottling plant, Automatic Fire Water Pumping System consisting of five Main firefighting Pumps & two jockey pump. External Hydrant & Water Monitor System covering the entire plant area for manual firefighting. Medium Velocity Water Spray System for Cylinder filling shed, Filled storage shed, Tank truck gantry (six bays), LPG Pump /Compressor shed, above ground bullets, Loading/Unloading shed, Cold Repair Shed and Connecting platforms. Fire Detection & Alarm System covering the entire plant area. Portable Fire Extinguishers. Personnel protective equipment. 8 P a g e
10 3.8 Power Supply For the existing project, power is received from Jaipur vidyut vitran nigam limited. The power demand is 11 KV, 250 KVA. The power requirement shall be remain same after the proposed capacity expansion. DG sets are available for emergency Generators Capacity: 380 KVA - 1 No. 125 KVA - 1 No. 3.9 Communication System Communication facility available at plant for internal and external communication purpose is as follows Walkie-talkie - 14 Nos. Telephones/safety mobile - 1 Nos. Page phone - 11 Nos Intercom Telephone - 8 Nos 4. SITE ANALYSIS 4.1 Connectivity The Plant site located around 35 Km away from kota City The connectivity of the site to airport, railway and road is as follows: a. Airport connectivity- The nearest domestic airport is 30 KM and Jaipur international airport is at 183 KM from project site. b. Rail connectivity- The nearest Railway Station is Rawatha which is about 3.5 km from project site c. Road connectivity- Nearest highway is kota-jhalawar highway (NH-12). d. Police Station Rawatha Police Station. e. Hospital- New Hospital Medical College campus 9 P a g e
11 5.0 PROJECT SCHEDULE AND COST ESTIMATES 5.1 Project schedule The company has proposed to enhance the storage capacity of the LPG in the plant by 3 X 500 MT Mounded storage vessels to increase the storage capacity to 2006 MT. This will improve the storage cover from existing 2.5 days to 5 days. However, this increase in storage capacity will in no way increase the filling capacity of LPG cylinders at present. 5.2 Cost estimates The total cost of the project is estimated to be crores. 5.3 Corporate Social Responsibility (CSR) Policy The company is actively involved in CSR related activities, budgetary provisions have been made in the financial year to spend on Corporate Social Responsibility(CSR) by HPCL head office. 10 P a g e
A. INTRODUCTION PREFEASIBILITY REPORT
A. INTRODUCTION a. BRIEF DESCRIPTION OF PROJECT M/s Bharat Petroleum Corporation Limited has set up the Haldia Coastal Installation at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The Depot
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationPROJECT FEASIBILITY REPORT
PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,
More informationM/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.
Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,
More informationSCOPE OF WORK TECHNICAL SPECIFICATIONS
SCOPE OF WORK & TECHNICAL SPECIFICATIONS HAZOP STUDY, DISASTER MANAGEMENT PLAN & RISK ANALYSIS AT AMBALA NEW DEPOT PROJECT SITE BRIEF DESCRIPTION OF JOB: New storage depot is to be constructed near our
More informationPort of Algoma. Focal Point of the Great Lakes Region
Port of Algoma Focal Point of the Great Lakes Region Overview Essar Global Fund Ltd s Investments ENERGY PORTS & INFRASTRUCTURE METALS & MINING SERVICES Oil & Gas #2 largest single location refineries
More informationINDIVIDUAL QUICK FREEZING OF FRUITS AND VEGETABLES
INDIVIDUAL QUICK FREEZING OF FRUITS AND VEGETABLES 1. Introduction Frozen fruits and vegetables are the most common forms of processed fruits and vegetables preferred in the international market today.
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationGuidance statement - Premises notification for the Hazardous Waste Regulations
Guidance statement - Premises notification for the Hazardous Waste Regulations Background In 2009, the Hazardous Waste Regulations 1 (the Regulations) were amended so that all places where hazardous waste
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationVISAKHA VIJAYAWADA SECUNDERABAD PIPELINE GREENCO BEST PRACTICES
VISAKHA VIJAYAWADA SECUNDERABAD PIPELINE GREENCO BEST PRACTICES HPCL VVSPL - BEST PRACTICES MATERIAL CONSERVATION 1. INTRODUCTION OF HPCK IN PIPELINE 2. EX-VIJAYWADA PUMPING FOR CAPACITY UTILIZATION CORPORATE
More informationPRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi
PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is
More informationNaubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited
Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in
More informationPROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.
PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.
More informationPRE FEASIBILITY REPORT
VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,
More informationJAYPEE NIGRIE SUPER THERMAL POWER PROJECT
JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)
More informationMax. building height (m)
Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project
More informationJaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)
Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationRajasthan Distribution Sector
Rajasthan Distribution Sector Feeder Renovation Program Jul, 2012 Jaipur, Ajmer & Jodhpur Vidyut Vitran Nigam Limited A1: INTRODUCTION 1.1 The distribution system of Rajasthan had was suffering from very
More informationDetailed Feasibility Report on Ennore-Trichy-Madurai LPG Pipeline
FOR RESTRICTED CIRCULATION ONLY Detailed Feasibility Report on Ennore-Trichy-Madurai LPG Pipeline Ennore Chengalpet Pondicherry Trichy Madurai Pipelines Division January 2013 CONTENT Chapter No. Executive
More informationSCOPE OF WORK FOR STEEL SHEDS OF FIRE WATER PUMP HOUSE & PRODUCT PUMP HOUSE
Doc No: 254624-400-SW-CIV-015 Rev: Page 1 of 7 SCOPE OF WORK FOR STEEL SHEDS OF FIRE WTER PUMP HOUSE & PRODUCT PUMP HOUSE Hindustan Petroleum Corporation Ltd Visakha Dispatch Station VR-TP rea, Naval Base
More informationRegulating a Deregulated Petroleum Products Market
Regulating a Deregulated Petroleum Products Market (Landmarks and Landmines) By Director, Dept. of Petroleum Resources Presentation Order Deregulation Overview of the Downstream Sector Phases of Deregulation
More informationCOAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India
SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some
More informationPETRONET LNG LIMITED, INDIA Current Activities : Agenda No. 5
PETRONET LNG LIMITED, INDIA Current Activities : Agenda No. 5 44 th MEETING OF GENERAL ASSEMBLY OF THE INTERNATIONAL GROUP OF LIQUEFIED NATURAL IMPORTERS(GIIGNL) VENICE, ITLAY 5-8 October, 2014 OVERVIEW
More informationPRE-FEASIBILITY REPORT. for
PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared
More informationTENDER FOR INTEGRATED FEASIBILITY STUDY AND OBTAINING RAILWAYS APPROVALS FOR THE RAILWAY SIDING AT PROPOSED SITE AT JAMMU
TENDER FOR INTEGRATED FEASIBILITY STUDY AND OBTAINING RAILWAYS APPROVALS FOR THE RAILWAY SIDING AT PROPOSED SITE AT JAMMU 1. PREAMBLE Re-sitement of existing Rail fed Petroleum depots of the PSU oil Companies
More informationINDIAN OIL CORPORATION LIMITED
INDIAN OIL CORPORATION LIMITED Risk Assessment and Disaster Management Plan for Expansion of Oil Terminal At Dist. Deoghar, Jharkhand 6(b) Isolated storage & handling of hazardous chemicals, Category B
More informationPlatforms, Pipelines and Plants: Energy Infrastructure in India
Presentation to Association of International Petroleum Negotiators Reference Presentation for Circulation Platforms, Pipelines and Plants: Energy Infrastructure in India Mr. Rajiv Luthra Managing Partner
More informationAbu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice
Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice CoP 1.0 Hazardous Materials Version 3.0 July 2016 Table of Contents 1. Introduction... 3 2. Training and Competency...
More informationMolvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No
Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease
More informationEffect on Water Quality of Chambal River due to Discharge of Open Drains in Kota City
Effect on Water Quality of Chambal River due to Discharge of Open Drains in Kota City Naveen Kumar 1, Dr. Mahendra Pratap Choudhary 2 1M. Tech. Scholar, Department of Civil Engineering, Rajasthan Technical
More informationWORKPLACE HAZARDOUS MATERIALS INFORMATION SYSTEM (WHMIS)
WORKPLACE HAZARDOUS MATERIALS INFORMATION SYSTEM (WHMIS) NEW BRUNSWICK REGULATION 88-221 under the OCCUPATIONAL HEALTH AND SAFETY ACT (O.C. 88-883) Filed October 7, 1988 Under section 51 of the Occupational
More informationPerformance of Bio-medical Waste Treatment Facilities in Central Zone
BIO-MEDICAL WASTE MANAGEMENT Performance of Bio-medical Waste Treatment Facilities in Central Zone In central zone, eighteen Common Bio-medical Waste Treatment Facilities (CBWTFs) have been established.
More informationFor. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012
Pre-feasibility Report For Coal Washery at Village Tehsil District : Budbud & Kerajharia : Pali : Korba [C.G.] Promoter Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Contents 1.0 Executive
More informationPLACE OF SUPPLY - GST
PLACE OF SUPPLY - GST Place of Supply (POS) in GST In GST, the concept of a place of supply has been made relevant not only for the supply of services but also for the transaction of goods. In this article,
More informationFORM I & PREFEASIBILITY REPORT FOR THE
BHARAT PETROLEUM CORPORATION LIMITED FORM I & PREFEASIBILITY REPORT FOR THE PROPOSED TO SET UP A LPG BOTTLING PLANT AT PLOT NO :12, KHATA NO :109 & 111, REV PLOT NO: 93(P), 902(P) AT IDCO GROWTH CENTRE
More informationNo. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)
1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,
More informationF.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.
20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee
More informationConsultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.
Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized
More informationTransportation and Transfer of Ethanol-Blended Fuels
Instructor Manual Module 3 Transportation and Transfer of Ethanol-Blended Fuels Module Objective Upon the completion of this module, participants will be able to describe how ethanol-blended fuels are
More informationNorth East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial
More informationPRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT
PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,
More informationExcreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India.
Excreta Matters: 7 th Citizens Report on the state of India s Environment An agenda for water-prudent and waste-wise India Need to reinvent Rapid urbanization is creating new water stresses Violence is
More informationPhase II (BIA Phase-II),
PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project
More informationCHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.
CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF
More informationFORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A
(I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private
More informationPre-Feasibility Report. for. Proposed Construction project of Santnagari
Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas
More informationFORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED
FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1 Contents 1 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 PROJECT LOCATION 3 1.3 PROJECT FEATURES
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationCompany Overview. November 2017
Company Overview November 2017 DCC Overview DCC is a leading international sales, marketing and support services group operating across four divisions Profit by division * Profit by geography * 12% 5%
More informationSilvol India Pvt. Ltd Mumbai
Silvol India Pvt. Ltd Mumbai About Us Silvol India Pvt Ltd is a Mumbai based, ISO 9001-2008 Certified Organization established in 2000 Formulates, Manufactures and Market Industrial Oil, Automotive Oil,
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Contamination Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site
More informationPETROLEUM PLATOON LEADER
CHAPTER 3 PETROLEUM PLATOON LEADER REVIEW YOUR RESPONSIBILITIES A fighting force can move and fight only as long as it receives required supplies when and where they are needed. Your platoon supplies the
More informationPollution Prevention Technical Information note
Pollution Prevention Technical Information note Airfield management April 2011 This note gives you pollution prevention advice for the activities and processes that occur at airfields in England and Wales.
More informationGOVERNMENT OF ANDHRA PRADESH ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LTD.
GOVERNMENT OF ANDHRA PRADESH ANDHRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LTD. ANDHRA PRADESH PETROLEUM, CHEMICALS & PETROCHEMICALS INVESTMENT REGION (APPCPIR) LOCATION Hub for Exploration and
More informationPartner energetic growth with India's natural gas leader
Partner energetic growth with India's natural gas leader With a turnover of US $ 8.9 billion approx. (INR 56,742 crore) GAIL (India) Limited is India's largest natural gas company and ranked among the
More informationREPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR
REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of
More informationSCOPE OF WORK TECHNICAL SPECIFICATIONS
SCOPE OF WORK & TECHNICAL SPECIFICATIONS PROJECT DESCRIPTION/ SITE INFORMATION New storage depot is to be constructed at Bokaro in the state of Jharkhand. This tender envisages carrying out HAZOP Study,
More informationDraft Policy Document. Development of Multimodal Logistics Parks
Draft Policy Document Development of Multimodal Logistics Parks 1 1. Introduction Freight movement in India has doubled to ~2,300 Bn Ton Km in FY15, from ~ 1,200 Bn from FY 08. Freight movement in the
More informationPRICE SPREAD AND EFFICIENCY OF MARKETING OF TOMATO IN RAJASTHAN
Indian J. Agric. Res.., 48 (4) 294-300, 2014 doi:10.5958/0976-058x.2014.00663.5 AGRICULTURAL RESEARCH COMMUNICATION CENTRE www.arccjournals.com PRICE SPREAD AND EFFICIENCY OF MARKETING OF TOMATO IN RAJASTHAN
More informationDesign of Sewerage System for Jaffarpur area in Southwest New Delhi
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for
More informationAppendix 4. Standard format for the Procedures and Arrangements Manual. Annex II
Appendix 4 : Regulations for the Control of Pollution by NLS Standard format for the Procedures and Arrangements Manual Note 1: The format consists of a standardized introduction and index of the leading
More informationAN EMPIRICAL ANALYSIS OF INVENTORY EFFICIENCY OF MAJOR REFINERIES IN INDIA
International Journal of Management (IJM) Volume 7, Issue 7, November December 2016, pp.426 432, Article ID: IJM_07_07_047 Available online at http://www.iaeme.com/ijm/issues.asp?jtype=ijm&vtype=7&itype=7
More informationINVITATION OF TENDER FOR TERMINAL AUTOMATION SYSTEM (TLF + TFMS) & SAFETY PLC RELATED AUTOMATION JOB AT SEVEN LOCATIONS (BATHINDA, MUGHALSARAI,
1 INVITATION OF TENDER FOR TERMINAL AUTOMATION SYSTEM (TLF + TFMS) & SAFETY PLC RELATED AUTOMATION JOB AT SEVEN LOCATIONS (BATHINDA, MUGHALSARAI, PANIPAT, JALLANDHAR, KANPUR, BATHINDA & REWARI) Bharat
More informationPerspectives for Pemex Logística in the Mexican Energy Sector
Perspectives for Pemex Logística in the Mexican Energy Sector Ing. José Ignacio Aguilar Álvarez Greaves Pemex Logística September 28, 2017 Pemex Logística In April 2015, as part of the Energy Reform, Pemex
More informationHINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)
HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement
More informationPRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY
PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY Plot No.97/P1, Survey No. 214, 216 and 219 Humnabad Industrial Area, Humnabad Taluk, Bidar At Project Proponents, Plot No.97/P1,
More informationPre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh
1.0 Executive Summary Name of Project: Name of Project Proponent: Location of the Project: Capacity & Unit Configurations: Land Requirement, Current Land Use and Availability: Water Requirement and Availability:
More informationFEASILBLITY REPORT. CONVERSION OF PAPL Facility to produce POLYOLS
FEASILBLITY REPORT CONVERSION OF PAPL Facility to produce POLYOLS Petro Araldite Pvt. Ltd (PAPL) was set up in the year 1996 as joint venture between Ciba India Limited (part of the Swiss Ciba Geigy group
More informationCASE STUDIES EPC NTPC LIMITED. Mandsaur, Madhya Pradesh CASE STUDY
CASE STUDIES NTPC LIMITED Mandsaur, Madhya Pradesh CASE STUDY NTPC LIMITED Mandsaur, Madhya Pradesh PROJECT OVERVIEW R Site Co-ordinates 24.1N, 75.8E R Plant capacity 50 MW R Connection Type & Connected
More informationHazardous Materials: Managing the Incident. CHAPTER 6 Identifying the Problem
Hazardous Materials: Managing the Incident CHAPTER 6 Identifying the Problem Learning Objectives Overview Knowledge Objectives Skills Objectives Introduction (1 of 2) Case study: 1971, railroad derailment
More information4. The ambient air quality monitoring stations We are monitoring the ambient air quality
GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationTorrent Pharmaceuticals Ltd. Indrad EC Compliance Report
Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement
More informationTABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary
TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3
More informationP U B L I C H E A L T H P R O T E C T I O N. Ministry of Health and Ministry Responsible for Seniors
P U B L I C H E A L T H P R O T E C T I O N Ministry of Health and Ministry Responsible for Seniors Canadian Cataloguing in Publication Data Main entry under title: Proper sewage disposal Rev. 1994 ISBA
More informationWaste to Energy. Biogas Production Utilizing Palm Oil Mill Effluent (POME) in Indonesia
Waste to Energy Biogas Production Utilizing Palm Oil Mill Effluent (POME) in Indonesia Background Sundar Bajgain Senior Advisor, SNV Palm oil mills are one of the most important agro-industries in Indonesia
More informationSICAL Logistics Limited. Single Window for Integrated Logistics
SICAL Logistics Limited Single Window for Integrated Logistics 1 Preview Coffee Day Group - Overview About Sical Logistics Limited Sical Business Verticals Key Clients Achievements Accolades 2 Coffee Day
More informationThe Delta Group Of Companies
The Delta Group Of Companies Logistics Management & Consultancy Experience Logistics Handling PROJECT FREIGHT FORWARDING Import / Export Regulation Advice Import / Export Permits Development of Shipping
More informationExpression of Interest
Expression of Interest (Advertisement to be published in the Newspapers) Sub: Expression of Interest ( EOI ) for appointment of Rolling Mills (RM) for Conversion of Billets into CTD/TMT Rebars and Structurals
More informationEnergy East Pipeline. Project Overview. Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014
Energy East Pipeline Project Overview Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014 TransCanada: Leading North American Energy Infrastructure Company ENERGY EAST
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More informationSCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE
SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity
More informationHindustan Petroleum Corporation Limited
Questions Hindustan Petroleum Corporation Limited - M K Surana Mumbai August 30, 2016 1 Disclaimer Questions The information contained in this material have been obtained from sources believed to be reliable,
More informationAPPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE
APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site
More informationCONCEPTUAL PLAN. M/s. APOLLO HOSPITALS ENTERPRISE LTD., (Construction of Oncology Block)
CONCEPTUAL PLAN of M/s. APOLLO HOSPITALS ENTERPRISE LTD., (Construction of Oncology Block) Sy. No. 68P & 76, Health City, Chinagadila (V), Visakhapatnam District Andhra Pradesh Prepared by SV ENVIRO LABS
More informationSAUDI ARAMCO Policy: HSE 008 DRILLING & WORKOVER OPERATIONS Issued: 4/27/2006 HSE PROCEDURE Revised : 4/27/2006
1.0 PURPOSE This procedure illustrates and specifies the sequence, methods, procedures and responsibilities for performing Rig Moves in all Saudi Aramco on-shore rigs. 2.0 SCOPE All SAR & Contractor Rigs
More informationHOLDING TANK PLANNING & INSTALLATION GUIDELINES
HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS
More informationRefinery Sector :National Energy Conservation Awards 2014, EnMS and PAT Scheme. Bureau of Energy Efficiency
Refinery Sector :National Energy Conservation Awards 2014, EnMS and PAT Scheme Bureau of Energy Efficiency 1 Highlights of EC Award 2014 13 units participated in National Energy Conservation Award 2014
More informationECONOMIC IMPACT OF THE TEXAS PORTS ON THE STATE OF TEXAS AND THE UNITED STATES, 2015
ECONOMIC IMPACT OF THE TEXAS PORTS ON THE STATE OF TEXAS AND THE UNITED STATES, 2015 Prepared for: TEXAS PORTS ASSOCIATION 1000 Foust Road Brownsville, TX 78521 www.texasports.org Prepared by: MARTIN ASSOCIATES
More informationWest Virginia Department of Health & Human Resources Department of Health
SS-182A Rev 6/07 West Virginia Department of Health & Human Resources Department of Health Application for a Permit to Install or Modify an Onsite Sewage Disposal System Property Owner Phone (H) (W) Address
More informationPeople Move Our Port! 5th largest Port in the United States in total tonnage Who We Are In the Last Decade The Corpus Christi Region
OPERATIONS FOREMAN OPERATIONS FOREMAN People Move Our Port! Port Corpus Christi (PCC) features two docks capable of loading/unloading petroleum coke, coal, bayrite and other dry bulk commodities directly
More informationLPG MARKET IN SERBIA, 2010 Goran Djurdjevic, General Manager, ARGPL Congress, 2010, Mamaia, Romania
LPG MARKET IN SERBIA, 2010 Goran Djurdjevic, General Manager, ButanGas International doo, Serbia LPG MARKET IN SERBIA, 2010-General considerations GENERAL CONSIDERATIONS Republic of Serbia (Republika Srbija)
More information