1 For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where available. The purpose of an environmental assessment is to determine whether or not the customer s project or activity is or is not likely to cause significant adverse environmental effects. This form will take you through this two step process: 1. Determine the characteristics of the environmental effects before considering mitigation measures. 2. Then determine if the customer s environmental management and mitigation measures will effectively eliminate, reduce or control the risk of the adverse environmental effects. Environmental effect assessment must consider all phases of a project. Where the customer is undertaking a construction project, the environmental assessment must also consider the resulting operation, maintenance of resulting structures and the impact of potential accidents that may cause pollution. 1. Project description (a) Project description The project description helps determine the scope of the environmental assessment. It can include the main components of the project, including any permanent and temporary structures, a description of how the project will be constructed and an explanation of its operation, any notable production processes, and a description of waste materials that are likely to be generated. The level of detail you provide in the project description should be appropriate to the scale and complexity of the customer s project or activity and to the environmental sensitivity of its location. 4917c11( ) Page 1 of 8

2 (b) Natural surroundings description Describe the natural surroundings in which the project will be implemented. This can include the location of the project, any notable environmental features and the use of the customer s and neighbouring land. Include reference to any sensitive environmental components which are likely to be affected. (c) For construction projects Interior construction Exterior construction N/A Square metres (sq ft): Will this building be customer s primary residence? yes no Will this construction require any infrastructure development? (i.e., access roads, utilities/pipeline, transmission lines, grading, paving, boring, lighting, landscaping, compacting, trenching, fencing, excavating, pile driving?) yes no If yes, obtain project plan for loan file 2. Canadian Environmental Assessment Act (CEAA) Do one or more loan purposes trigger CEAA? yes no If no, which exclusion(s) apply and why? 3. Environmental effects and mitigation measures In each section, put a check mark in the most applicable category selection. If you check risk codes 3-6 please provide an explanation of impact or mitigation measures in the space available. The level of detail you provide should be appropriate to the scale and complexity of the environmental effect and the environmental sensitivity of the project location. Code 1: Code 2: Code 3: Code 4: Code 5: Code 6: No impact anticipated, or not applicable Potentially beneficial Potentially adverse mitigation exists or is planned Potentially adverse requires clean up, project modification or approval from Credit Risk Potentially adverse requires more information Likely adverse impact not mitigated or significant public concern 4917c12( ) Page 2 of 8

3 Environmental effect categories Codes 3 to 6 require explanation 1. Information from other sources Funding, permit or licence from federal department or agency Phase 1 or Phase 2 environmental assessment report Review of environmental effect(s) by federal, provincial or municipal body Environmental investigation, law suit, order fine or other sanction 2. Transportation Codes 3 to 6 require explanation Transport of hazardous goods or materials 3. Land use and natural surroundings Past land use Codes 3 to 6 require explanation Current land use Future planned uses Cumulative effects 4. Historic, social and cultural sites Codes 3 to 6 require explanation Site is in or next to an environmentally sensitive site or environmental conservation area Site is in or next to a site or thing that is of historical, archaeological, paleontological or architectural significance Project or activity is in or next to a First Nations reserve or will affect the current use of lands and resources for traditional purposes by Aboriginal Peoples 5. Buildings Codes 3 to 6 require explanation Impact from hazardous materials 4917c13( ) Page 3 of 8

4 6. Soil Codes 3 to 6 require explanation Soil stability/erosion Soil productivity/fertility Land clearing, modifying natural features or landscaping Digging, trenching Operation of gravel pits Harvesting forest resources Site clean up or remediation Contaminated soil Stained soil, areas of sparse, sick or dead vegetation or discoloured runoff 7. (a) Surface water Codes 3 to 6 require explanation Project takes place within 30 metres of surface water Change quantity, direction or flow of surface water Required approvals obtained Discoloured, oily or foamy material on surface water 7. (b) Drinking water Codes 3 to 6 require explanation Site supplied with drinking water Groundwater supply for a rural or urban municipality Water quality Uncapped water well(s) (must be at least a 3) 7. (c) Sewer and septic services Codes 3 to 6 require explanation Septic type (drainage ditch or surface water is automatically a 4 or more) 7. (d) Water inputs Codes 3 to 6 require explanation Surface water quality Ground water quality Enough water for operation 4917c14( ) Page 4 of 8

5 7. (e) Water drainage Codes 3 to 6 require explanation Land drainage system Storm water runoff Irrigation runoff 7. (f) Waste water Codes 3 to 6 require explanation Waste water storage Waste water treatment Waste water disposal Surface water quality Ground water quality Discoloured, oily, foamy material in drainage ditches, on surface water or land Spill and accident management 8. Animal and plant habitat Codes 3 to 6 require explanation Species at risk Migratory birds 9. Air quality Codes 3 to 6 require explanation Odours Dust, smoke, exhaust, particulates Emissions from burning fossil fuels (other than vehicles) 10. Noise Codes 3 to 6 require explanation Community noise levels 11. Light Codes 3 to 6 require explanation Community light levels 12. (a) (b) Waste management Codes 3 to 6 require explanation Landfill, junkyard, disposal or incineration area Solid waste management Liquid waste management Spill and accident management 4917c15( ) Page 5 of 8

6 12. (c) Organic waste management Codes 3 to 6 require explanation Manure management Animal mortalities management Abattoir wastes/offal/specified risk materials management Liquid fats management Fruit and vegetable processing waste management Fish processing waste management Waste grain meal/ seed crushing/ processing waste management Infectious wastes management Other 13. Chemicals and hazardous materials Storage Codes 3 to 6 require explanation Use Disposal Spill and accident management 14. Gasoline, diesel and other petroleum products Underground storage tanks management Above-ground storage tanks management Used oil collection and disposal Codes 3 to 6 require explanation Spill and accident management 15. Oil wells and pumping stations Codes 3 to 6 require explanation Natural gas wells, horizontal drilling or a pumping station on site Wells or pumping stations no longer active (must be at least a 4) Brine or oil spills management Highest Environmental Risk Code entered on form 4917c16( ) Page 6 of 8

7 Environmental Assessment Decision When assessing environmental risks, consider the following: Probability of risk: What is the probability that an adverse environmental effect will occur? Intensity: What is the estimated intensity of environmental stress generated by the adverse environmental effect? Would it be so large that it would challenge the capacity of the environmental components to withstand the impact or recover from it? Is the natural environment likely to be significantly altered? Geographical scope: Over what distance (e.g., locally, regionally or globally) might the effect be felt? Duration: How long is the effect likely to last: short-term basis or long-term? Would the effect be likely to recur? Would it be persistent? Cumulative effect: How would these questions be answered considering the likely impacts of other past and current activities in the area and any planned development? An environmental effect can be considered significant if, for example: it causes permanent damage to a scarce natural resource or one that has ecological or socio-economic importance (e.g., water, soil, forests, fisheries, a traditional way of life) it takes place in a particularly sensitive area (e.g., near a source of drinking water, a protected site or a steep slope that is vulnerable to erosion) or it directly affects the health of the population (e.g., toxic substances released into the ground or directly into water bodies) Environmental Assessment Proceed. The project is unlikely to cause significant, adverse environmental effects, because: (a) the probability, intensity, scope and duration of the environmental effects, including those environmental effects that could be the result of malfunctions or accidents, and any cumulative environmental effects likely to result from the project in combination with other projects or activities that have or will be carried out, show that the likelihood of significant and adverse environmental impacts is not high and (b) the customer has or is setting up mitigation measures that will effectively eliminate, reduce or control the risk of possible adverse environmental effects during all stages (construction, operation, modification, decommissioning and abandonment) Loan may not be disbursed project is likely to cause significant adverse environmental effects, which cannot be mitigated. Loan may not be disbursed insufficient information to assess whether project would cause significant adverse environmental effects. Loan may not be disbursed uncertain whether significant adverse environmental effects could be justified under the circumstances. Loan may not be disbursed public concerns merit public consultation. 4917c17( ) Page 7 of 8

8 Follow up program Will FCC be undertaking a follow up to verify the accuracy of this environmental assessment of a project and assess the effectiveness of measures taken by the customer to mitigate the identified adverse environmental effects? yes no Additional Comments FCC accountability This document has been completed to the best of my knowledge based on information provided from the customer, my own observations during the period of this environmental assessment and my review of any relevant third-party reports on the subject project, activity or real property. Name Title Signature Date Transfer to new Loan Number: I have reviewed the answers on this form and any appendices with the customer. There are no changes to land, buildings, projects or activities that require completion of a new environmental assessment. Questionnaire Appendix type: N/A Relationship Manager signature Date 4917c18( ) Page 8 of 8

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Operational Policy Statement

Operational Policy Statement Operational Policy Statement Determining Whether a Designated Project is Likely to Cause Significant Adverse Environmental Effects under the Canadian Environmental Assessment Act, 2012 November 2015 i

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

ENVIRONMENTAL SCREENING REPORT

ENVIRONMENTAL SCREENING REPORT ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date

More information

WATERSHED. Maitland Valley. Report Card 201

WATERSHED. Maitland Valley. Report Card 201 Maitland Valley WATERSHED Report Card 201 The Maitland Valley Conservation Authority has prepared this report card as a summary on the state of our forests, wetlands, surface water, and ground water resources.

More information

Draft Environmental Assessment Guidelines for (Scope of Project and Assessment)

Draft Environmental Assessment Guidelines for (Scope of Project and Assessment) Draft al Assessment Guidelines for (Scope of Project and Assessment) al Assessment of the Proposal by Cameco Corporation for the Redevelopment of its Port Hope Conversion Facility (Vision 2010)Port Hope,

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

SepticDesign.ca Gunnell Engineering Ltd.

SepticDesign.ca Gunnell Engineering Ltd. SepticDesign.ca Gunnell Engineering Ltd. Presentation Summary Best Practices Code Context Prior to Attending the Site When on Site Site Assessment Assessing Existing Sewage Systems The Septic Test Pit

More information

ENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE

ENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE 100 Broadway Road, Dracut, MA 01826 ENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE TO BE COMPLETED BY THE APPLICANT ADDRESS: 1a. Is the property used for an industrial use? 1b. Is any adjoining property used

More information

KENT BREEZE WIND FARMS

KENT BREEZE WIND FARMS Decommissioning Plan Report MAY 2010 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. DECOMMISSIONING PROCESS DESCRIPTION... 2 3. SITE RESTORATION... 3 4. EXCESS MATERIALS AND WASTE MANAGEMENT... 4 5. MANAGING

More information

Canadian Solar Developers Ltd.

Canadian Solar Developers Ltd. Canadian Solar Developers Ltd. Type of Document Draft Report Project Name Proposed Ground Mount Solar Facility L.P #5 8338 Scotchmere Drive, Strathroy, ON OPA FIT Program: FIT-FL67GB5 Project Number V00002250-00

More information

LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION

LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION MARY L. FLYNN-GUGLIETTI AND ANNIK FORRISTAL THE 2014 PROVINCIAL POLICY STATEMENT & ENVIRONMENTAL

More information

Environmental Guideline for Saskatchewan Asphalt Plants

Environmental Guideline for Saskatchewan Asphalt Plants Environmental Guideline for Saskatchewan Asphalt Plants Ministry of Environment July 2015 saskatchewan.ca/environment For enquiries or reporting, please contact: Government of Saskatchewan Environmental

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum LOUISIANA URBAN STORMWATER COALITION EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum SWPPP NOTIFICATION SIGN Post sign at entrance of site or areas where the public can easily access.

More information

ENVIRONMENTAL BASELINE STUDY ANYWHERE

ENVIRONMENTAL BASELINE STUDY ANYWHERE ENVIRONMENTAL BASELINE STUDY ANYWHERE Location: Site coordinates Area name: Official name or nick name Issued by: Organisation/unit that issue the EBS Surveyor: Organisation/unit that perform the EBS Date:

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0 PROTOCOL 15 FOR CONTAMINATED SITES Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil Version 1.0 Prepared pursuant to Section 64 of the Environmental Management

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

10.0 DISPOSAL OF DEAD ANIMALS AND OTHER FARM WASTES

10.0 DISPOSAL OF DEAD ANIMALS AND OTHER FARM WASTES 10.0 DISPOSAL OF DEAD ANIMALS AND OTHER FARM WASTES Like most business enterprises, every farm produces some type of waste material. Like manure, these waste materials must be disposed of in an environmentally

More information

Species at Risk Act Policies and Guideline Series

Species at Risk Act Policies and Guideline Series Species at Risk Act Policies and Guideline Series Addressing Species at Risk Act Considerations Under the Canadian Environmental Assessment Act for Species Under the Responsibility of the Minister responsible

More information

E7. Taking, using, damming and diversion of water and drilling

E7. Taking, using, damming and diversion of water and drilling E7. Taking, using, damming and diversion of water and drilling E7.1. Introduction Taking, using, damming and diversion of surface water and groundwater provisions in this plan apply in accordance with

More information

SITE DESIGN ENGINEER'S STATEMENT:

SITE DESIGN ENGINEER'S STATEMENT: SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED

More information

#613 Planning Basics Chapter 1: Sewage Facilities Planning

#613 Planning Basics Chapter 1: Sewage Facilities Planning CHAPTER OBJECTIVES: After completing this chapter, you will be able to... Explain the purpose and importance of sewage facilities planning. List the parties who are involved in the planning process. Explain

More information

Trenches combined with living hedges or grass lines Rwanda - Imiringoti

Trenches combined with living hedges or grass lines Rwanda - Imiringoti Trenches combined with living hedges or grass lines Rwanda - Imiringoti Trenches combined with living hedges or grass lines are slow-forming terraces to control soil erosion by changing the length of the

More information

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14 Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

Appendix D. Stormwater Pollution Prevention Plan

Appendix D. Stormwater Pollution Prevention Plan Appendix D Memorandum AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com To Joan Liu, Metro Vancouver Page 1 CC Subject Conveyance for the NSWWTP

More information

ESIAs for Large Scale Infrastructure: Energy

ESIAs for Large Scale Infrastructure: Energy ESIAs for Large Scale Infrastructure: Energy GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 SESSION OBJECTIVES: Understand importance of construction activities

More information

Environmental Impact Statement for the Slave Falls Tramway Conversion Project

Environmental Impact Statement for the Slave Falls Tramway Conversion Project Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

Tackling Non-point Source Water Pollution in British Columbia

Tackling Non-point Source Water Pollution in British Columbia Water Quality Clean Water Tackling Non-point Source Water Pollution in British Columbia Our well-being depends on sustainable supplies of clean water for our physical health and for a healthy environment

More information

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it?

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it? Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it? Britt McMillan, Malcolm Pirnie, Inc. Mercury Venus Mars

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information

More information

Siting Guidelines for Windpower Projects in Kansas

Siting Guidelines for Windpower Projects in Kansas Siting Guidelines for Windpower Projects in Kansas The Kansas Renewable Energy Working Group Environmental and Siting Committee Introduction The Environmental and Siting Committee of the Kansas Renewable

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Generic Guidelines for the Preparation of an Environmental Impact Statement. pursuant to the Canadian Environmental Assessment Act, 2012

Generic Guidelines for the Preparation of an Environmental Impact Statement. pursuant to the Canadian Environmental Assessment Act, 2012 Generic Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian Environmental Assessment Act, 2012 May 2016 Canadian Nuclear Safety Commission (CNSC) 2016 PWGSC catalogue

More information

POINTE DU BOIS MODERNIZATION PROJECT

POINTE DU BOIS MODERNIZATION PROJECT POINTE DU BOIS MODERNIZATION PROJECT CONSTRUCTION OF NEW FACILITIES AT PRESENT SITE AND DECOMMISSIONING OF EXISTING FACILITIES ENVIRONMENTAL ASSESSMENT DRAFT SCOPING DOCUMENT Submitted By Manitoba Hydro

More information

FORM 4340 ENVIRONMENTAL QUESTIONNAIRE

FORM 4340 ENVIRONMENTAL QUESTIONNAIRE FORM 4340 ENVIRONMENTAL QUESTIONNAIRE ENVIRONMENTAL QUESTIONNAIRE Persons to be Questioned The following questions should be asked of the current owner of the property any commercial occupant of the property

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

Northern Frontier Northern Homeland

Northern Frontier Northern Homeland Northern Frontier Northern Homeland THE REPORT OF THE MACKENZIE VALLEY PIPELINE INQUIRY Volume Two Terms and Conditions Mr. Justice THOMAS R. BERGER ii NORTHERN FRONTIER, NORTHERN HOMELAND - Mackenzie

More information

available in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects

available in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects available in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects This document and other Canadian Transportation Agency publications are available on our Web site at

More information

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity

More information

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP) ECSI Number: 1213 Responsible Party: Klamath County QTime Number: 37941 Entry Date: 9/22/04 (VCP) Proposed Remedial Action Staff Report - Addendum Chiloquin Forest Products Chiloquin, Klamath County, Oregon

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

The City of Calgary, Environmental & Safety Management, under the terms of the ECO Plan Framework Memorandum of Understanding (EXT 03 ECO MOU).

The City of Calgary, Environmental & Safety Management, under the terms of the ECO Plan Framework Memorandum of Understanding (EXT 03 ECO MOU). Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

Final Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)

Final Environmental Assessment Guidelines (including the Scope of the Environmental Assessment) Final Environmental Assessment Guidelines (including the Scope of the Environmental Assessment) July 2012 RDIMS: 7401089 Page left intentionally blank I RDIMS: 7401089 II RDIMS: 7401089 Page left intentionally

More information

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Paul Barnes, Manager - Atlantic Canada & Arctic NOTES 2015 St. John s, NL April 27, 2015 Overview Who is CAPP? Oil and Gas Lifecycle

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual Design Specifications & Requirements Manual 10 SEDIMENT AND EROSION CONTROL 10.1 INTRODUCTION... 1 10.2 REFERENCE... 1 10.3 GENERAL INFORMATION REQUIREMENTS... 1 10.3.1 ESC Plan... 1 10.3.2 Servicing Drawings...

More information

Project & Environmental Review. Guidelines Developing Your Stormwater Pollution Prevention Plan. Vancouver Fraser Port Authority

Project & Environmental Review. Guidelines Developing Your Stormwater Pollution Prevention Plan. Vancouver Fraser Port Authority Project & Environmental Review Guidelines Developing Your Stormwater Pollution Prevention Plan Vancouver Fraser Port Authority July 2015 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. OVERVIEW... 3 3. Principles/Objectives...

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

Soil and Site Evaluation for OSS

Soil and Site Evaluation for OSS Please Note: The application for site evaluation is a $275 fee. A complete application and payment is expected prior to service. The Health Department will only accept complete applications for processing.

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) REC & PARK: 210V HYDE STREET 0336/003 Case No. 2017-016267ENV Permit No. Addition/ Alteration

More information

Environmental Aspects, Impacts, and Risk ISO 14001:

Environmental Aspects, Impacts, and Risk ISO 14001: 1. PURPOSE: This document describes the procedure for identification of environmental risks, opportunities, aspects and impacts for the City of Dallas (City) Environmental Management System (EMS) and determining

More information

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY Environmental Health Department 950 MAIDU AVENUE, SUITE 170 NEVADA CITY, CA 95959-8617 (530) 265-1222 FAX (530) 265-9853 http://mynevadacounty.com Amy Irani,

More information

E5. On-site and small scale wastewater treatment and disposal

E5. On-site and small scale wastewater treatment and disposal E5. On-site and small scale wastewater treatment and disposal E5.1. Background On-site wastewater systems are utilised for residential dwellings, commercial and industrial activities and facilities not

More information

Zoning Ordinance Chapter 7

Zoning Ordinance Chapter 7 CHAPTER 7 - HILLSIDE SECTION 7.0 GENERAL A. Purpose: To allow for the reasonable use and development of hillside areas while promoting the public health, safety, and general welfare of the citizens of

More information

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia WE EEN Wizard of the Environment: the Enterprise Europe Network Eurosportello del Veneto Via delle Industrie 19/C Venezia Directive 2008/98/EC on waste (Waste Framework Directive) The Directive introduces

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

Implementing Stormwater Management through Split-Flow Drainage Design

Implementing Stormwater Management through Split-Flow Drainage Design Implementing Stormwater Management through Split-Flow Drainage Design Stuart Patton Echols PhD, ASLA, RLA Assistant Professor - Department of Landscape Architecture 210 Engineering Unit D Center for Watershed

More information

CHAPTER 4. IMPACT ASSESSMENT AND ESTIMATED LEVEL OF TAKE

CHAPTER 4. IMPACT ASSESSMENT AND ESTIMATED LEVEL OF TAKE 0 0 0 CHAPTER. IMPACT ASSESSMENT AND ESTIMATED LEVEL OF TAKE. INTRODUCTION The Butte Regional Conservation Plan (BRCP) impact assessment describes the adverse impacts of implementing the covered activities

More information

For information on water pollution, see our Fact Sheet on Pollution.

For information on water pollution, see our Fact Sheet on Pollution. 1 Water Management Water Management Last updated: 2010 These Fact Sheets are a guide only and are no substitute for legal advice. To request free initial legal advice on an environmental or planning law

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

U.S. Environmental Law Overview

U.S. Environmental Law Overview U.S. Environmental Law Overview Tracy Hester Environmental Enforcement August 28, 2014 U.S. Environmental Requirements for Exploration and Production Background for liability tort laws (nuisance, trespass)

More information

SCHOOL SITE SELECTION GUIDE

SCHOOL SITE SELECTION GUIDE SCHOOL SITE SELECTION GUIDE Ministry of Education Province of British Columbia 7 Preface The Ministry of Education School Site Selection Guide has been developed by the School Finance and Capital Planning

More information

Environmental Regulation & Mine Permitting in Ontario

Environmental Regulation & Mine Permitting in Ontario Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES Project Name: Project Manager: Date Building of Hand Over: Design Consultants: Qualifications, skills, experience: Hazard Identified Risk Level

More information

Code of Practice for Land Treatment of Soil Containing Hydrocarbons

Code of Practice for Land Treatment of Soil Containing Hydrocarbons Code of Practice for Land Treatment of Soil Containing Hydrocarbons September 2008 Made under the Environmental Protection and Enhancement Act RSA 2000, ce-12 Published by Alberta Queen s Printer Alberta

More information

Draft Policy Review. Use of Shipping Containers

Draft Policy Review. Use of Shipping Containers Draft Policy Review Use of Shipping Containers Policy Number: Policy Section: Policy Title: T.01.02 Town Planning Use of Shipping Containers File Reference: OBJECTIVES: 1. To maintain the amenity of the

More information

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE 5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE This section discusses the effect of the Proposed Action on navigable waterways, and the Proposed Action s consistency with coastal zone policies. 5.5.1 Navigable

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Plans Dated Addition/ Demolition Alteration (requires HRER if over 45

More information

Salt may be easy to clean up on a table top, but it s not so easy at an oil and gas site 9/14/2015. Marcellus Shale Water Group, LLC

Salt may be easy to clean up on a table top, but it s not so easy at an oil and gas site 9/14/2015. Marcellus Shale Water Group, LLC Marcellus Shale Water Group, LLC In-Situ Remediation of Salinity-Impacted Soils Salt may be easy to clean up on a table top, but it s not so easy at an oil and gas site 1 Salt Facts All sites can be remediated

More information

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that: 6.0 Comparison of Proposed Project and Alternatives This chapter summarizes the environmental advantages and disadvantages associated with the Proposed Project and the alternatives. Based upon this discussion,

More information

Incident Reporting Requirements

Incident Reporting Requirements Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information