PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

Size: px
Start display at page:

Download "PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal Power Project Report No.: Region EAST ASIA AND PACIFIC Sector Energy Project ID P Borrower(s) Not Applicable Implementing Agency PT. Perusahaan Listrik Negara (Persero) (PLN), Indonesia Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared October 17, 2007 Date of Appraisal TBD Authorization Date of Approval TBD 1. Country and Sector Background A strong dependence on fossil fuels unlikely to decrease with current development plans 1. Although the Indonesian Archipelago is one of the most volcanic areas in the world, little of its abundant geothermal resources have been developed and the country s current power generation relies heavily on fossil fuel. In 2005, over 89 percent of PLN generation was derived from fossil fuel, 8 percent from hydro, and only 2.3 percent from geothermal energy. 2. With a robust 7-9 percent annual growth forecast, electricity demand is expected to triple between 2005 and 2020 resulting in large quantity of greenhouse gas (GHG) emissions. Already, since 1990, GHG emissions in Indonesia have been growing at a faster pace than in China making Indonesia the third largest GHG emission emitter in among all the developing countries in Asia. 3. In 2005, oil fired power plants produced 39 percent of the total electricity generation of PLN. The cost of oil in these plants accounted for almost 50 percent of the operating expenses and soaring prices are further deteriorating the company s financial standing. The Minahasa system in north Sulawesi Province is highly dependent on costly and polluting diesel power plants. In 2005, diesel power plants contributed up to 42 percent of the total electricity generated by Minahasa system, 260 GWh out of the total 613 GWh. 4. To reduce this dependence on oil products, the Government mandated PLN to undertake an accelerated program of construction of coal-fired power plants totaling about 10,000 MW by 2009, including in North Sulawesi. This program, while reducing the dependence on imported fuels, will increase local pollution through higher emissions of particulates (the coal to be used in these plants is likely to be non-exportable low grade coal) and CO 2 emissions. A commitment to increase renewable energy and access to electricity met with hurdles

2 5. One of the most effective ways to mitigate GHG emissions is to increase the share of renewable energy in the total energy mix. In Indonesia, geothermal resources present the best available option to develop large scale renewable energy. Utilizing the vast and largely untapped geothermal potential can play a critical role in meeting the growing demand for electricity while securing a non-polluting domestic source of supply and mitigating GHG emissions. 6. Yet, the exploitation and utilization of geothermal energy has been slow and currently faces a number of challenges and risks. Over the span of the last 20 years, Indonesia (PLN and private operators) was only able to develop 807 MW of geothermal power, or less than 3 percent of the total estimated potential. The development of geothermal power potential has been impeded by relatively higher development costs (compared with fossil fuel power generation) but also by additional institutional, technical and financial factors such as: (a) the absence of adequate regulations, pricing and fiscal incentives for renewable energy such as geothermal to account for their environmental benefits; (b) inadequate institutional capability to plan geothermal development and engage developers; (c) weak domestic technical capacities; and (d) significant risks related to the development of geothermal fields that limit access to finance. Government early response to meet these challenges 7. The Government of Indonesia (GoI) stated its policy for an environmentally sound national energy development in the Energy Sector Blueprints published by the Ministry of Energy and Mineral Resources. The State Ministry of Environment has also explicitly indicated the actions to be taken towards limiting GHG emissions in the energy sector. Indonesia signed the United Nations Framework Convention on Climate Change (UNFCCC) on June 5, 1992 and its parliament ratified the convention in August 1994 which entered into force on November 21 of the same year. It signed the Kyoto Protocol on July 13, 1998 and its Parliament ratified it on December 4, 2004; the Protocol entered into force on March 3, Indonesia s initial communication to the UNFCC convention included, among other specific actions for the energy sector, the promotion and development of renewable energy, particularly from geothermal resources. 8. In 2003, the GoI passed the Geothermal Law (Law No. 27/2003) to open new opportunities for development of geothermal resources. A road map for geothermal energy development was established to bring geothermal power generation capacity to 6,000 MW by Objectives 9. The development objective of the proposed project is to mitigate global environmental impacts of carbon dioxide (CO 2 ) emissions through purchase of CO 2 emissions avoided by the development of the Lahendong II geothermal project under the clean development mechanism (CDM). The plant has been developed to meet growing power demand in the North Sulawesi area of Indonesia.

3 10. The key project performance indicators are (a) the actual Emissions Reduction (CERs) induced by the geothermal plant and certified by an independent verification entity; and (b) the quantity of electricity generated. 3. Rationale for Bank Involvement 11. The Bank is working with the GoI to promote the development of geothermal resources and has adopted a two-pronged approach. It will assist the GoI in strengthening its regulatory, institutional and technical capabilities through a technical assistance program, the Indonesia Geothermal Sector Reform Project, funded by the Global Environment Facility (GEF). At the same time, the Bank is aiming to directly promote geothermal project development through CDM transactions and possible lending operations. 12. A large portion of Indonesia s geothermal resources are located in the outer islands where approximately 75 percent of Indonesia s poor reside and where access to electricity is low. Lack of access to electricity has been a major hindrance to economic development and poverty alleviation in the outer islands. Harnessing indigenous geothermal resources provides a good opportunity to increase electricity generation capacity at the local level and provide the basis to increase rates of access to electrification in these islands which lag behind the national average. Development of small geothermal production in outer islands complements other ongoing Bank assistance to meet the Government s ambitious rural electrification target. 13. The Bank s activities complement other international agencies programs supporting PLN and GoI to develop geothermal resources. The Asian development Bank (ADB) financed the Lahendong II power generation unit. The Japan Bank for International Cooperation (JBIC) is expected to provide financing for the next extension, Lahendong III. At the same time, the Japan International Cooperation Agency (JICA) is carrying out a technical geothermal assessment across the country that will be used to update the existing sector Road Map. The United Nation Development Program (UNDP) is also supporting a program to address the barriers to widespread application of micro-hydro technology that may have some relevance for smaller scale geothermal development in the country. 4. Description 14. It is proposed that the Bank purchase, on behalf the Netherlands Clean Development Mechanism Facility (NCDMF), the certified emission reductions (CERs) induced by the Lahendong II Geothermal Power Plant from 2008 to 2013, estimated at about 338,000 tons of CO 2e. The exact amounts of CERs eligible for purchase and the price of CERs will be defined in an Emission Reduction Purchase Agreement (ERPA) to be reached through negotiation between PLN and the Bank on behalf of the NCDMF. 15. The Lahendong II Geothermal Power Plant is one subproject of the ADB-financed Renewable Energy Development Sector (REDS) Project which includes twelve subprojects. The Lahendong II Geothermal Power Project includes a single 20 MW geothermal steam turbogenerator plant procured and operated by PLN. The project is designed to deliver up to 158 GWh of electricity annually to PLN s Minahasa system of North Sulawesi. Steam for the project

4 is supplied from an extension of the existing Lahendong geothermal field, under a take-or-pay agreement with the field s owner and developer, Pertamina, the national oil and gas company. The World Bank s role in the Lahendong II Project is limited to purchasing partial emission reduction assets created by the project. 16. The project is located within the existing Lahendong geothermal fields that have been producing since 2001 in the North Sulawesi Province of Indonesia. The geothermal field already supplies an existing power plant of 20 MW owned and operated by the PLN and a third extension of 20 MW is being considered for funding by JBIC. 5. Financing Source: ($m.) BORROWER/RECIPIENT 8.67 International Bank for Reconstruction and Development 0.00 Asian Development Bank 17.5 Total Implementation 17. The Project will be implemented in accordance with the ERPA to be signed between PLN and the Bank, as trustee of the NCDMF. A Monitoring Plan (MP) will be agreed between parties to the ERPA. The ERPA and MP will define the quantity, price and other delivery conditions for CERs to be purchased by NCDMF as well as monitoring and verification systems and methods. Eligibility of ERs for purchase by NCDMF will be verified by an independent third party. Verification and certification of CERs generated annually by the project will be coordinated by the NCDMF which will ultimately purchase the CERs. As per the requirement of the Kyoto Protocol, GoI will operate a registry to manage the transfer of CERs generated by the Project. 18. PLN, the plant owner, will be responsible for implementation of the Project, including the following provisions under the ERPA: Maintain and operate the project in accordance with sound business practices, proper due diligence and high efficiency; Undertake all reasonable efforts, including project documentation, to ensure eligibility of ERs under Art.12 of the Kyoto Protocol; Undertake, satisfactory to the Bank, actions agreed in the Environmental Management Plan to comply with the Bank s safeguard policies; and Notify the Bank of anything that may have an impact on the project or its capacity to deliver ERs, including delays, material adverse changes and force majeure. Specifically, in relation to CERs, PLN will: Monitor the electricity generated and other relevant parameters;

5 Organize periodic auditing of the project and verification that emission reductions have been achieved in compliance with relevant project criteria, including the preparation of required reports; Prepare a brief annual or biannual report that should include: information on overall project performance; emission reductions generated, verified and compared with targets; observations regarding MP baseline scenario indicators; information on adjustment of key MP assumptions, and calculation methods and other amendments of the MP; and Ensure certification of verified emission reductions. 19. Payment and Flow of Funds: The expected flow of funds will be confirmed in the ERPA. After the ERPA becomes effective, NCDMF will only disburse against delivery of certified ERs. The involvement of the NCDMF with the project will expire after CERs up to the total contract amount have been delivered, unless the parties agree to extend the ERPA. In the event that the project sponsors fail to deliver the quantity of CERs for any given calendar year as set forth in the ERPA, they will be required to make-up the shortfall over the course of the following calendar year or another period agreed upon. 7. Sustainability 20. Factors that might affect the sustainability of the Lahendong plant include: (i) a sudden decrease in demand for electricity; (ii) a loss of pressure in the reservoir; and (iii) a decision to develop and aggressively dispatch another, lower cost project for energy that would lead to a low capacity factor for the Project. 21. The demand for electricity to the Project from the Minahasa system is expected to remain high due to the twin effects of increased access to electricity and expected rapid economic growth. Pressure from the reservoir is expected to be stable as demonstrated by a number of feasibility studies and the re-injection of condensed steam back into the reservoir. A swap of plant to generate the electricity is unlikely in part because PLN is very committed to increasing the share of renewable in its energy mix and also because for geothermal, once the physical investment has been done, the operation costs are lower than for other competing fuel sources. 8. Lessons Learned from Past Operations in the Country/Sector 22. Lessons learned from similar projects in the country and experience gained to date by the Bank in other countries is reflected in the project design. They include: Applying approved methodology. The baseline identification of Project emission reductions of this proposed CDM project are based on approved methodologies. This will reduce project credit risks; and Limiting environmental and social risks. The Lahendong II is financed by ADB and ADB has applied safeguards policies that are similar to the Bank. Starting from the project identification stage, the project has been integrated with multiple robust environmental safeguard measures and strategies.

6 9. Safeguard Policies (including public consultation) Safeguard Policies Triggered by the Project Yes No Environmental Assessment (OP/BP/GP 4.01) [X] [ ] Natural Habitats (OP/BP 4.04) [ ] [X] Pest Management (OP 4.09) [ ] [X] Cultural Property (OPN 11.03, being revised as OP 4.11) [ ] [X] Involuntary Resettlement (OP/BP 4.12) [ ] [X] Indigenous Peoples (OD 4.20, being revised as OP 4.10) [ ] [X] Forests (OP/BP 4.36) [ ] [X] Safety of Dams (OP/BP 4.37) [ ] [X] Projects in Disputed Areas (OP/BP/GP 7.60) [ ] [X] Projects on International Waterways (OP/BP/GP 7.50) [ ] [X] 10. List of Factual Technical Documents 11. Contact point Mr. Leiping Wang Senior Energy Specialist The World Bank 1818 H Street, NW Washington, D.C For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) pic@worldbank.org Web:

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CBF Sidi Daoud Wind Farm

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name Indonesia Power Transmission Development Project Region EAST ASIA AND PACIFIC Sector Power (100%) Project ID P117323 Borrower(s)

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Geothermal Clean Energy

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2795 Regional

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation

WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation Construction of the Bengkayang Substation Sohail Hasnie Oil fuels all power generation

More information

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED I Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Date PID Prepared Date of Appraisal Authorization Date of Board Approval PROJECT INFORMATION DOCUMENT (PID)

More information

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004 The World Bank s Carbon Finance Business Options for Thailand September 29, 2004 Climate Change and the World Bank The Bank s mission: poverty alleviation, sustainable development The Bank accepts IPCC

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

CDM Financing for Geothermal Project in Indonesia: Current Status and Post 2012 Prospect

CDM Financing for Geothermal Project in Indonesia: Current Status and Post 2012 Prospect CDM Financing for Geothermal Project in Indonesia: Current Status and Post 212 Prospect Abstract Ratna Etie Puspita Dewi* and Agus Sugiyono Center for Energy Resources Development Technology Agency for

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated

More information

Himachal Pradesh Environmentally Sustainable Development DPL Region

Himachal Pradesh Environmentally Sustainable Development DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE May 30, 2011 Report No.: AB6585 (The

More information

cpf think big The Carbon Partnership Facility a s F l a r i n g

cpf think big The Carbon Partnership Facility a s F l a r i n g The Carbon Partnership Facility a s F l a r i n g cpf think big Larger scale, longer term, and bigger impact e m i s s i o n re d u c t i o n s e n e rg y e f f i c i e n c y l o n g - t e r m i m p a

More information

ENERGIZING THE ECONOMY

ENERGIZING THE ECONOMY Terwatt-hours Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENERGIZING THE ECONOMY Strategic Priorities for the POWER Sector in Indonesia

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

Kyoto Protocol and Carbon Market Drivers

Kyoto Protocol and Carbon Market Drivers Kyoto Protocol and Carbon Market Drivers Dr Venkata R Putti Senior Environmental Specialist Carbon Finance Assist World Bank February 2007 Climate Change The Earth s climate is warming and human activities

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC103763

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC103763 PROJECT INFORMA DOCUMENT (PID) IDENTIFICA/CONCEPT STAGE Report No: PIDC103763 Project Name Region Country Financing Instrument Project ID Borrower Name Implementing Agency Environmental Category Date PID

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original

More information

CDM: Open source for pre-forming a future mechanism Malin Ahlberg

CDM: Open source for pre-forming a future mechanism Malin Ahlberg CDM: Open source for pre-forming a future mechanism Malin Ahlberg 4 th workshop on enhancing the regional distribution of CDM projects in Asia- Pacific Session 4: CDM: The future we want German Emissions

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan

More information

Economic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios

Economic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios Economic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios Yusak Tanoto a, *, Muhammad Ery Wijaya b a Electrical

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) te to Task Teams: The following sections are system generated and can only be edited online in the Portal. Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated:

More information

CDM Developments in India & Challenges Ahead. Pamposh Bhat Head, GTZ CDM - India Indo German Energy Programme Bureau of Energy Efficiency

CDM Developments in India & Challenges Ahead. Pamposh Bhat Head, GTZ CDM - India Indo German Energy Programme Bureau of Energy Efficiency CDM Developments in India & Challenges Ahead Pamposh Bhat Head, GTZ CDM - India Indo German Energy Programme Bureau of Energy Efficiency CDM in India India signed Kyoto Protocol in December, 1997 & ratified

More information

THE ROLE OF GEOTHERMAL ENERGY

THE ROLE OF GEOTHERMAL ENERGY Radja THE ROLE OF GEOTHERMAL ENERGY IN THE CONTEXT OF THE FUTURE ELECTRIC POWER SUPPLY IN INDONESIA Vincent T. Radja State Electricity Carporstion Key words: geothermal power, Indonesia JL. M 12043 Indonesia

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC21537

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC21537 Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No: PIDC21537 Indonesia: Geothermal Energy Upstream Development Project (P155047) EAST ASIA AND PACIFIC Indonesia Sector(s)

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Procedures and Criteria for Screening, Evaluating and Approving CDM Projects: A Case Study in Kazakhstan

Procedures and Criteria for Screening, Evaluating and Approving CDM Projects: A Case Study in Kazakhstan Procedures and Criteria for Screening, Evaluating and Approving CDM Projects: A Case Study in Kazakhstan Matthew S. Mendis Alternative Energy Development Division (AED) International Resources Group, Ltd.

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: 21 March 2005 I. BASIC INFORMATION

More information

Special Section 1: Carbon Trading: An opportunity for Pakistan

Special Section 1: Carbon Trading: An opportunity for Pakistan First Quarterly Report for FY10 Special Section 1: Carbon Trading: An opportunity for Pakistan SS1.1 Background There is an international consensus that global warming has significantly jeopardized the

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized

More information

CCS under UNFCCC and related capacity building needs

CCS under UNFCCC and related capacity building needs CCS under UNFCCC and related capacity building needs CCS capacity building and technology development: needs and opportunities in developing countries 14 September 2009, Washington, USA Dr. Iulian Florin

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

The Austrian JI/CDM Programme

The Austrian JI/CDM Programme Martin Gauss Kommunalkredit Public Consulting GmbH The Austrian JI/CDM Programme UNFCCC/UNIDO Training of trainers workshop on preparing technology transfer projects for financing 1 October 2008 Austrian

More information

Carbon Finance Opportunities for Africa. Maputo, 11 June 2009 Dr Charlotte Streck

Carbon Finance Opportunities for Africa. Maputo, 11 June 2009 Dr Charlotte Streck Carbon Finance Opportunities for Africa Maputo, 11 June 2009 Dr Charlotte Streck 1 Content Climate change and carbon markets Opportunities for Africa: The Clean Development Mechanism Program of Activities

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE West Africa Agricultural

More information

Hà Nội, ngày 09 tháng 10 năm 2009

Hà Nội, ngày 09 tháng 10 năm 2009 BỘ TÀI NGUYÊN VÀ MÔI TRƯỜNG Hà Nội, ngày 09 tháng 10 năm 2009 VIET NAM CLEAN TECHNOLOGY FUND INVESTMENT PLAN PRESENTATION TO CTF TRUST FUND COMMITTEE Tran Thi Minh Ha, Director General of International

More information

Sectoral Approaches in Electricity

Sectoral Approaches in Electricity INTERNATIONAL ENERGY AGENCY Delivering a broader carbon market after Copenhagen Richard Baron Head of climate change unit, IEA Objective: delivering CO 2 mitigation in power generation globally Identifying

More information

People s Republic of China: Fujian Pacific Electric Company Limited

People s Republic of China: Fujian Pacific Electric Company Limited Performance Evaluation Report Project Number: PPE: PRC 29712 Equity Investment Number: 7144 Loan Number: 1610-PRC June 2006 People s Republic of China: Fujian Pacific Electric Company Limited Operations

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

INDONESIAN PARTICIPANTS REVIEW CALIFORNIA S RENEWABLE ENERGY PLANS

INDONESIAN PARTICIPANTS REVIEW CALIFORNIA S RENEWABLE ENERGY PLANS INDONESIAN PARTICIPANTS REVIEW CALIFORNIA S RENEWABLE ENERGY PLANS CLEAN ENERGY DEVELOPMENT EXECUTIVE EXCHANGE San Francisco, California As part of the PT PLN Clean Energy Development Program, the U.S.

More information

The Earth s climate system is warming, and most

The Earth s climate system is warming, and most Implementation of the Clean Development Mechanism in India Laura Fricke Abstract: This paper examines the implementation of the Clean Development Mechanism (CDM) in India, a developing country that is

More information

Tunisia. National Agency for Energy Conservation (ANME)

Tunisia. National Agency for Energy Conservation (ANME) Tunisia National Agency for Energy Conservation (ANME) 14.02.2014 Outline of Template I. Policy context: Domestic mitigation objectives and emissions profile 1. Policy context and objectives II. 2. Overview

More information

The joint Danish-Indonesian cooperation on climate and energy

The joint Danish-Indonesian cooperation on climate and energy The joint Danish-Indonesian cooperation on climate and energy Indonesia and Denmark in an energy partnership Indonesia effectively took to the front stage in promoting the global clean energy revolution

More information

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati Introduction Indonesian power sector is one of the business sectors in Indonesia which is strictly regulated. For the

More information

Japan Fund for Joint Crediting Mechanism and Innovative Low Carbon Technology

Japan Fund for Joint Crediting Mechanism and Innovative Low Carbon Technology Japan Fund for Joint Crediting Mechanism and Innovative Low Carbon Technology Ryuzo Sugimoto, Environment Specialist, ADB Knowledge Partnership Week: Innovative Technology & Solutions For Resilient & Smart

More information

INDONESIA REGIONAL OVERVIEW

INDONESIA REGIONAL OVERVIEW Since the Asian Financial Crisis of the late 1990s, Indonesia s economy has grown at a rapid pace. As one of the leading developing economies, and a member of the G20 of the world s most influential economies,

More information

ECONOMIC AND ENVIRONMENTAL EMISSION ANALYSIS IN INDONESIAN ELECTRICITY EXPANSION PLANNING: LOW-RANK COAL AND GEOTHERMAL ENERGY UTILIZATION SCENARIOS

ECONOMIC AND ENVIRONMENTAL EMISSION ANALYSIS IN INDONESIAN ELECTRICITY EXPANSION PLANNING: LOW-RANK COAL AND GEOTHERMAL ENERGY UTILIZATION SCENARIOS International Journal of Renewable Energy Resources 1 (2011) 61-66 ECONOMIC AND ENVIRONMENTAL EMISSION ANALYSIS IN INDONESIAN ELECTRICITY EXPANSION PLANNING: LOW-RANK COAL AND GEOTHERMAL ENERGY UTILIZATION

More information

CASE STUDY How Uzbekistan is Becoming a Solar Energy Powerhouse

CASE STUDY How Uzbekistan is Becoming a Solar Energy Powerhouse CASE STUDY How Uzbekistan is Becoming a Solar Energy Powerhouse Uzbekistan is capturing solar energy and knowledge with its first large-scale solar power plant and a new solar energy institute. Overview

More information

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi Shimamura, Mitsubishi UFJ Research and Consulting Co.,

More information

Executive Summary of the Report on

Executive Summary of the Report on Feasibility Studies on CDM Projects against Global Warming for the fiscal year 2001 Executive Summary of the Report on A Feasibility Study on Carbonization and Power Generation Projects Utilizing Biomass

More information

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Fordham University School of Law February 22nd, 2010 A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Agostino Re Rebaudengo President arr@asja.biz INDEX KYOTO PROTOCOL AND EMISSION

More information

Chapter 7. Indonesia Country Report. September 2016

Chapter 7. Indonesia Country Report. September 2016 Chapter 7 Indonesia Country Report September 2016 This chapter should be cited as Malik, C. (2016), Indonesia Country Report in Kimura, S. and P. Han (eds.) in Energy Outlook and Energy Saving Potential

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

Lessons Learned from Country-based practical experience on NAMAs in Cambodia

Lessons Learned from Country-based practical experience on NAMAs in Cambodia Japan: Side Event at the COP19 Guidebook on NAMA-based experiences in Asia and the World Lessons Learned from Country-based practical experience on NAMAs in Cambodia Presented by Mr. SUM Thy, Deputy Director,

More information

Non-permanence. 3.1 Introduction

Non-permanence. 3.1 Introduction Non-permanence 3.1 Introduction 3.1 One of the main concerns of the parties to the Kyoto Protocol regarding the inclusion of forestry into the CDM was the potential reversibility of the carbon stored in

More information

Harnessing Power-Africa Projects to Reduce Energy Poverty:

Harnessing Power-Africa Projects to Reduce Energy Poverty: Harnessing Power-Africa Projects to Reduce Energy Poverty: Seven best practices for pro-poor development Oxfam America Power Africa Issue Brief #1, January 2016 This issue brief defines a series of best

More information

INDONESIAN NUCLEAR POWER PROGRAMME HUMAN RESOURCES DEVELOPMENT. Tyn Ispiranto Alihuddin Sitompul Masdin

INDONESIAN NUCLEAR POWER PROGRAMME HUMAN RESOURCES DEVELOPMENT. Tyn Ispiranto Alihuddin Sitompul Masdin INDONESIAN NUCLEAR POWER PROGRAMME HUMAN RESOURCES DEVELOPMENT Tyn Ispiranto Alihuddin Sitompul Masdin 1st Senior Policymakers Course ASEAN+3 HRD Programme Korea, 8-14 July 2012 CONTENT OF PRESENTATION

More information

SECTOR ASSESSMENT (SUMMARY): POWER Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): POWER Sector Performance, Problems, and Opportunities Country Partnership Strategy: Papua New Guinea, 2011 2015 SECTOR ASSESSMENT (SUMMARY): POWER 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. In Papua New Guinea (PNG), less than

More information

PART IV Benefits for Cities in Climate Change Action

PART IV Benefits for Cities in Climate Change Action PART IV Benefits for Cities in Climate Change Action Cities Have Much to Gain from Embracing the Low-carbon Agenda Although climate change is a pressing issue, many local governments are reluctant or unaware

More information

Co-Benefit Approach in JICA

Co-Benefit Approach in JICA Co-Benefit Approach in JICA The 18 th Asia-Pacific Seminar on Climate Change Ha Noi, 3th March 2009 by Akiko URAKAMI, Office for Climate Change Japan International Cooperation Agency (JICA) Table of Contents

More information

CLIMATE FINANCE FOR GLOBAL IMPACT

CLIMATE FINANCE FOR GLOBAL IMPACT CLIMATE FINANCE FOR GLOBAL IMPACT GEF: US$3 BILLION CLIMATE FINANCE FOR GLOBAL IMPACT Climate change is the defining challenge of our time. It is no longer a threat; it is already a reality. Atmospheric

More information

Global Infrastructure Facility

Global Infrastructure Facility Global Infrastructure Facility ------------------------------------------------------------------------------------------------------------------- Partnership Framework As Adopted by the Governing Council

More information

Liberia Development Forestry Sector Management Project

Liberia Development Forestry Sector Management Project Questions & Answers Q1: What has been the World Bank s role in the Liberia forestry sector and what has been the impact of the Liberia Development Forestry Sector Management Project? Since 2004, the Bank

More information

Optimization of Indonesian Geothermal Energy Resources for Future Clean Electricity Supply: A Case of Java-Madura-Bali System

Optimization of Indonesian Geothermal Energy Resources for Future Clean Electricity Supply: A Case of Java-Madura-Bali System Optimization of Indonesian Geothermal Energy Resources for Future Clean Electricity Supply: A Case of Java-Madura-Bali System Muhammad Ery Wijaya 1 and Bundit Limmeechokchai 2,* 1 The Joint Graduate School

More information

Status, Challenges and Forecast of the Philippines Wind Industry

Status, Challenges and Forecast of the Philippines Wind Industry Status, Challenges and Forecast of the Philippines Wind Industry MARIO C. MARASIGAN OIC Assistant Secretary Asian Clean Energy Forum 2016 June 6, 2016 ADB Headquarter, Mandaluyong City Department of Energy

More information

Second Opinion on Québec s Green Bond Framework

Second Opinion on Québec s Green Bond Framework Second Opinion on Québec s Green Bond Framework Page 1 CICERO 1602017 Second Opinion on Québec s Green Bond framework Contents Summary... 3 1. Introduction and background... 3 Expressing concerns with

More information

Bulgarian JI Guidelines. 2006, September

Bulgarian JI Guidelines. 2006, September Bulgarian JI Guidelines 2006, September Table of Contents BULGARIAN JI GUIDELINES... 1 1. International Requirements... 1 2. JI Process in Bulgaria... 3 3. Participants... 4 Step 6: Request for Letter

More information

Energy Perspectives for Asia

Energy Perspectives for Asia Energy Perspectives for Asia By Rajiv Ranjan Mishra Nov 21, 2017 Energy Asia Population Asia 4.06 billion 55% of World 8X of EU Expected to be 8.5 billion by 2030 Source: World Bank, 2016; UN GDP Per Capita

More information

ECUADOR CASE STUDY ENERGY

ECUADOR CASE STUDY ENERGY ECUADOR CASE STUDY ENERGY Ecuador initiated electricity sector reforms in the mid 1990s, with the adoption of new sector legislation and regulations, the creation of regulatory and electricity wholesale

More information

AN ASSESSMENT OF SUCCESS OF CLEAN DEVELOPMENT MECHANISM OF KYOTO PROTOCOL IN CLIMATE CHANGE MITIGATION AND SUSTAINABLE DEVELOPMENT

AN ASSESSMENT OF SUCCESS OF CLEAN DEVELOPMENT MECHANISM OF KYOTO PROTOCOL IN CLIMATE CHANGE MITIGATION AND SUSTAINABLE DEVELOPMENT 42 AN ASSESSMENT OF SUCCESS OF CLEAN DEVELOPMENT MECHANISM OF KYOTO PROTOCOL IN CLIMATE CHANGE MITIGATION AND SUSTAINABLE DEVELOPMENT ABSTRACT ANIL GUPTA* *Additional General Manager, Head of Hydro Mechanical

More information

RENEWABLE ENERGY AS A NATIONAL DEVELOPMENT PRIORITY

RENEWABLE ENERGY AS A NATIONAL DEVELOPMENT PRIORITY RENEWABLE ENERGY AS A NATIONAL DEVELOPMENT PRIORITY Rida Mulyana Director General of New, Renewable Energy and Energy Conservation Climate Change and REDD+ in the National Medium Term Development Plan

More information

ESTABLISHMENT OF CLIMATE CHANGE POLICY IN BOSNIA AND HERZEGOVINA presentation by the UNFCCC Focal point

ESTABLISHMENT OF CLIMATE CHANGE POLICY IN BOSNIA AND HERZEGOVINA presentation by the UNFCCC Focal point ESTABLISHMENT OF CLIMATE CHANGE POLICY IN BOSNIA AND HERZEGOVINA presentation by the UNFCCC Focal point launching programme: Developing GHG reduction projects in the district heating sector in BiH Ozren

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Authors: Majella Clarke, Petra Mikkolainen, Marisa Camargo, Nagmeldin Elhassan

Authors: Majella Clarke, Petra Mikkolainen, Marisa Camargo, Nagmeldin Elhassan The World Bank Second Evaluation of the Forest Carbon Partnership Facility Final Report Authors: Majella Clarke, Petra Mikkolainen, Marisa Camargo, Nagmeldin Elhassan Helsinki, Finland 7580 September 19,

More information

Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10. Status of CCS Development in Indonesia

Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10. Status of CCS Development in Indonesia Energy Procedia 4 (2011) 6152 6156 Energy Procedia 00 (2010) 000 000 Energy Procedia www.elsevier.com/locate/procedia www.elsevier.com/locate/xxx GHGT-10 Status of CCS Development in Indonesia Dennis Best

More information

Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project

Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project Yayasan Pemilahan Sampah Temesi September 17, 2009 Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project Content: 1. The Clean Development Mechanisms (CDM) Page 2 1.1 CDM

More information

Announcements. Homework 8 - due today Midterm Paper 2 - due Tuesday, Nov. 20

Announcements. Homework 8 - due today Midterm Paper 2 - due Tuesday, Nov. 20 Tuesday, November 13th. Announcements. Homework 8 - due today Midterm Paper 2 - due Tuesday, Nov. 20 Lecture #19-1 In the news. More fuel to the legal confrontation between states and the federal government

More information

Executive Summary. xiii

Executive Summary. xiii Executive Summary Growth is good for the poor, but the impact of growth on poverty reduction depends on both the pace and the pattern of growth. A pattern of growth that enhances the ability of poor women

More information

Making NAMAs work for Indonesian provinces

Making NAMAs work for Indonesian provinces Policy Brief Making NAMAs work for Indonesian provinces This policy brief looks at how Nationally Appropriate Mitigation Actions (NAMAs) in Indonesia can be developed with provincial diversity in mind.

More information

Climate Change and Energy Package

Climate Change and Energy Package Climate Change and Energy Package The 4th International Conference NEUF 2008 Warszawa, 6 June 2008 Piotr J. Tulej Head of Unit Energy and Environment Directorate-General Environment European Commission

More information

Thailand s s Response to Climate Change

Thailand s s Response to Climate Change Thailand s s Response to Climate Change Dr. Asdaporn Krairapanond Ministry of Natural Resources and Environment Thailand The 13 th Asia-Pacific Seminar on Climate Change 2-55 September 2003 Miyazaki, Japan

More information

Proposed Results-Based Loan Indonesia: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program

Proposed Results-Based Loan Indonesia: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program Concept Paper Project Number: 50016 June 2016 Proposed Results-Based Loan Indonesia: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program CURRENCY EQUIVALENTS (as of 30 May

More information

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary APPRAISAL REPORT CAO Appraisal for Audit of MIGA CAO Compliance October 3, 2011 PT Weda Bay Nickel Indonesia Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT

More information

Linkages of JCM with NAMAs, MRV and Registry: An Update

Linkages of JCM with NAMAs, MRV and Registry: An Update Linkages of JCM with NAMAs, MRV and Registry: An Update Farhan Helmy Secretary of Mitigation Working Group, DNPI Warsawa, 18 November 2013 1 Outline The Need for Unified RegistrySystem Road to NAMAs: Four

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name Arab World Initiative for Financing Food Security Region MIDDLE EAST AND NORTH AFRICA Sector General agriculture, fishing

More information

HYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY

HYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY HYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY By Elenestina M. Mwelwa (Mrs), Senior Manager, Environmental Unit, ZESCO LIMITED Paper presented at the IUCN Energy, Ecosystems and Livelihoods in

More information

OECD Coal Financing Agreement. Kate DeAngelis International Policy Analyst Friends of the Earth U.S.

OECD Coal Financing Agreement. Kate DeAngelis International Policy Analyst Friends of the Earth U.S. OECD Coal Financing Agreement Kate DeAngelis International Policy Analyst Friends of the Earth U.S. kdeangelis@foe.org The Future of Fossil Fuels A recent Oxford study found that no new fossil fuel electricity

More information

CRITERIA FOR SELECTING COUNTRY AND REGIONAL PILOTS UNDER THE FOREST INVESTMENT PROGRAM

CRITERIA FOR SELECTING COUNTRY AND REGIONAL PILOTS UNDER THE FOREST INVESTMENT PROGRAM FIP/SC.1/5/Rev.1 November 11, 2009 Meeting of the FIP Sub-Committee Washington, D.C. October 29, 2009 CRITERIA FOR SELECTING COUNTRY AND REGIONAL PILOTS UNDER THE FOREST INVESTMENT PROGRAM Proposed Sub-Committee

More information