1 Lower Columbia River Pile Dike Assessment David Gorman, PE August 2, 2011

2 Credits Hans R. Moritz, US Army Corps of Engineers Portland District Carl Kassebaum, AECOM Project Manager AECOM Coastal and Rivers Section Staff Pete Grace, Megabites Fishing Guide Service Lower Columbia River Estuary Partnership Page 2

3 Columbia River Basin Early 1800 s Lewis and Clark Lewis and Clark Basin Map Page 3

4 Columbia River Basin Basin Map Basin Statistics Basin Area is 258,000 Sq. Miles Drains 7 States and BC 1243 Miles Long Largest River Flowing to Pacific Ocean from North America Supports Many Species of Anadromous Fish Page 4

5 Nineteenth Century Basin Changes Impacting Anadromous Fish Populations Dredging Starting 1864 Canneries Starting 1867 Page 5

6 Twentieth Century Basin Changes Impacting Anadromous Fish Populations Pile Dikes? Dams Page 6

7 Max 6-Jan 14-Jan 22-Jan 30-Jan 7-Feb 15-Feb 23-Feb 3-Mar 11-Mar 19-Mar 27-Mar 4-Apr 12-Apr 20-Apr 28-Apr 6-May 14-May 22-May 30-May 7-Jun 15-Jun 23-Jun 1-Jul 9-Jul 17-Jul 25-Jul 2-Aug 10-Aug 18-Aug 26-Aug 3-Sep 11-Sep 19-Sep 27-Sep 5-Oct 13-Oct 21-Oct 29-Oct 6-Nov 14-Nov 22-Nov 30-Nov 8-Dec 16-Dec 24-Dec Flow at The Dalles (cfs) Columbia River Average Daily Flow at The Dalles, Oregon Pre-Regulation ( ) Post-Regulation ( ) Date Page 7

8 Federal Columbia River Power System USBR and USACE Own and Operate 31 Dams Built and Operated by the Federal Government System Provides: Hydropower Navigation Flood Control Irrigation Has impacted 13 Federally Listed ESA Fish Species Page 8

9 Cumulative Impacts to Columbia River Fish Has Led To Multiple Listings Under the ESA Harvest Dams Migration Obstacle Upstream Passage Downstream Passage Increased predation Flow Regulation Reduced Peak Flows Increased Low Flows Habitat Loss Diking, Draining, Development Hatcheries Page 9

10 Historic Ecosystem Losses in the Lower Columbia River Estuary Last 150 Years 52,000 acres wetland/marsh habitats 3,800 acres of riparian forest habitat 27,000 acres of forested wetland Page 10

11 Percentage Change in Columbia River Estuary Aquatic Habitat Types Habitat Type Change Shallow Tidal Flats +10% Deep Water -7% Medium Depth Water -25% Tidal Marsh -43% Tidal Swamp -77% Page 11

12 FCRPS Biological Opinion FCRPS Action Agencies Include USACE, BPA, and USBR FCRPS Consultation With NOAA Fisheries on ESA Listed Species Biological Opinion Issued by NOAA Fisheries 2008 Action Agencies Concluded That Operation of These Projects Without Further Mitigation, Would Jeopardize Listed Species Mitigation Measures Include 73 Detailed Reasonable and Prudent Alternatives (RPA) RPA 38: Increase access to productive habitat Reduce avian predation of juvenile salmonids Piling and Pile Dike Removal Program Page 12

13 Columbia River Pile Dikes Construction Initiated 1885 Constructed Ended in 1960 s Over 233 Constructed River Mouth to RM 138 Reduce Dredging Protect Dredge Material Provide Bank Protection Stabilize Shipping Channel Page 13

14 Potential Pile Dike Modifications That May Improve Salmonid Habitat In the Estuary (BiOp AMP) Complete or partial removal of pile dikes Reconstruction of pile dikes Remove creosote-containing piles Placement/removal of dredged material Placement of LWD Replacement of lost habitat types Page 14

15 Columbia River Pile Dike and Pile Field Examples Page 15

16 Pile Dike Design and Construction - Elevation Page 16

17 Pile Dike Design and Construction - Section Page 17

18 USACE Portland District Pile Dike Assessment BiOp Obligation and O&M AECOM Assessed Each of 233 Pile Dikes For: Structural Integrity Functional Integrity Potential Impact On Juvenile Salmonids Page 18

19 Suspected Pile Dike Impacts to Juvenile Salmonids Contaminants Leaching From Treated Piling Cover For Piscivorous Fish Perches For Avian Predators Shallow Water Habitat Page 19

20 East Sand Island Lower Columbia River World s Largest Tern and Cormorant Colonies Tern Average Annual Juvenile Salmonid Consumption = 5.3 Million Cormorant Consumption Likely Similar Island Constructed Of Dredge Material Protected By a Pile Dike System Page 20

21 Pile Dike Assessment Reach Locations Page 21

22 Lower Estuary Reach of Assessment Page 22

23 Habitat Components of the Pile Dike Assessment Field Work Presence/Absence of Shallow Water Habitat Presence of Aquatic Vegetation Adjacent Wetland Areas Presence/Absence of Bank Erosion Access to Adjacent Shallow Water Habitat Presence of Avian Predators Page 23

24 Habitat Improvement Opportunities Evaluated Removal of Pile Dike (reduce erosion) Removal of Individual Piles (improve access) Extend Pile Dike (increase shallow water) Remove Creosote Treated Piles (improve water quality) Place Large Woody Debris (increase cover) Place Fill (increase shallow water/decrease bank slopes) Page 24

25 Pile Dike Assessment Habitat Impact Findings Very Few Treated Piling Not a Contaminant Threat Piscivorous Fish Activity Unobservable Impact Inconclusive Avian Perching Observed (Primarily Cormorants) Impact Inconclusive Page 25

26 Pile Dike Assessment Habitat Impact Findings Juvenile Salmonid Rearing Habitat Creation of Shallow Water Habitat (SWH) Protection of 3800 Acres SWH Bed Erosion Not Noted Adjacent Areas Will Support Creation of SWH Addition of LWD Not Warranted In Main Channel Additional Studies Recommended Page 26

27 East Sand Island Lower Columbia River Island Constructed Of Dredge Material Protected By a Pile Dike System Removal of Pile Dikes May Allow Natural Reworking of Dredge Material Role of Large Predators 2011 Bald Eagle Harassment of Nesting Colonies: % Reproductive Loss Page 27

28 Thank You David Gorman, PE Ecosystem Restoration Engineer AECOM Portland, Oregon Page 28

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? John C. Tracy, Director Idaho Water Resources Research Institute

More information

July 1, Jim Ruff -- Manager, Mainstem Passage and River Operations

July 1, Jim Ruff -- Manager, Mainstem Passage and River Operations Bruce A. Measure Chair Montana Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Dick Wallace Vice-Chair Washington Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon July 1,

More information

Fort Clatsop Restoration Project Summary Report

Fort Clatsop Restoration Project Summary Report Fort Clatsop Restoration Project Summary Report Report written by the Columbia River Estuary Study Taskforce October, 2007 Figure 1: Site Map Fort Clatsop Estuarine Restoration Project Columbia River Estuary

More information

Cedar River Watershed Habitat Conservation Plan

Cedar River Watershed Habitat Conservation Plan Cedar River Watershed Habitat Conservation Plan Briefing for the WRIA 8 Salmon Recovery Council November 21, 2013 Cyndy Holtz Seattle Public Utilities cyndy.holtz@seattle.gov What is an HCP? Habitat Conservation

More information

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216) John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216) Wilmington District, Corps of Engineers Stakeholder Update Presentation January 24, 2014 Authorized under Section 216 of Public

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management Spring 2015 Public Meetings April 7 th April 7 th April 8 th April 9 th April 9 th 11:00 a.m. 6:00 p.m. 11:00 a.m. 11:00 a.m. 6:00 p.m. Pierre, SD Bismarck, ND Fort

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management Spring 2011 Public Meetings April 12 th 11:00 a.m. Nebraska City, NE April 12 th 7:00 p.m. Fort Peck, MT April 13 th 1:00 p.m. Bismarck, ND April 13 th 7:00 p.m. Pierre,

More information

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 COLUMBIA RIVER BASIN 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59

More information

LTMS Environmental Work Windows INFORMAL CONSULTATION PREPARATION PACKET. February 2004 Draft Version 1.4

LTMS Environmental Work Windows INFORMAL CONSULTATION PREPARATION PACKET. February 2004 Draft Version 1.4 LTMS Environmental Work Windows INFORMAL CONSULTATION PREPARATION PACKET February 2004 Draft Version 1.4 Table of Contents Section Page Introduction 3 How Consultation Works 3 Herring Waiver Program 5

More information

For Bandon Utilities Commission

For Bandon Utilities Commission For Bandon Utilities Commission July 12, 2017 Profile BPA, a component of the U.S. Department of Energy, is a non-profit and self-funded power marketing administration in the Pacific Northwest. Congress

More information

John Shurts General Counsel

John Shurts General Counsel Henry Lorenzen Chair Oregon Bill Bradbury Oregon Phil Rockefeller Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Pat Smith Montana Jennifer Anders Montana John Shurts

More information

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

CALFED Ecosystem Restoration Program (ERP)

CALFED Ecosystem Restoration Program (ERP) CALFED Ecosystem Restoration Program (ERP) The goal of the Ecosystem Restoration Program is to improve and increase aquatic and terrestrial habitats and improve ecological functions in the Bay-Delta to

More information

Fertility management in organic strawberries

Fertility management in organic strawberries Fertility management in organic strawberries Organic P management : P in composted manure is at least 70% as available as synthetic P fertilizer Using composted manure for N availability often results

More information

Spring Forecast Based Operations, Folsom Dam, California

Spring Forecast Based Operations, Folsom Dam, California Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916)

More information

Lower Columbia River Estuary Plan

Lower Columbia River Estuary Plan Lower Columbia River Estuary Plan Comprehensive Conservation and Management Plan 2011 Update Lower Columbia Estuary Partnership Update of Actions December 2011 i P age Estuary Partnership 2011 Board of

More information

Environmental Assessment Sandy River Delta Section 536 Ecosystem Restoration Project Multnomah County, Oregon

Environmental Assessment Sandy River Delta Section 536 Ecosystem Restoration Project Multnomah County, Oregon Environmental Assessment Sandy River Delta Section 536 Ecosystem Restoration Project Multnomah County, Oregon East Channel Dam under Construction, Sandy River Delta, 1930s February 2013 Table of Contents

More information

Flow-ecology relationships. Flow-ecology relationships Susitna case study

Flow-ecology relationships. Flow-ecology relationships Susitna case study Flow-ecology relationships Flow-ecology relationships Susitna case study Flow regime Ecologically-Relevant Flow Regime Characteristics Seasonal or typical conditions Annual extreme conditions High and

More information

2017 WATER MANAGEMENT PLAN

2017 WATER MANAGEMENT PLAN 2017 WATER MANAGEMENT PLAN Libby Dam Libby, Montana Bonneville Power Administration U.S. Bureau of Reclamation U.S. Army Corps of Engineers Table of Contents 1. Introduction... 1 2. Governing Documents...

More information

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NORTHWEST DIVISION PO BOX2870 PORTLAND OR

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NORTHWEST DIVISION PO BOX2870 PORTLAND OR DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NORTHWEST DIVISION PO BOX2870 PORTLAND OR 97208 2870 RECORD OF DECISION DOUBLE-CRESTED CORMORANT MANAGEMENT PLAN TO REDUCE PREDATION OF JUVENILE SALMONIDS IN

More information

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin Mauricio E. Arias 1 Tom A. Cochrane 1, Thanapon Piman 1,2, Ornanorg Vonnarart 2, Thomas B. Wild 3, Daniel

More information

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016 United Water Conservation District November 216 Hydrologic Conditions Report 217 Water Year December 6, 216 Page Intentionally Left Blank PRECIPITATION (INCHES) PRECIPITATION (INCHES) PRECIPITATION (INCHES)

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

Criteria for Identifying and Prioritizing Habitat Protection and Restoration Projects on the Lower Columbia River and Estuary*

Criteria for Identifying and Prioritizing Habitat Protection and Restoration Projects on the Lower Columbia River and Estuary* Criteria for Identifying and Prioritizing Habitat Protection and Restoration Projects on the Lower Columbia River and Estuary* Ecosystem Criteria 1) Habitat Connectivity (0-10 points) This criterion recognizes

More information

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY 4/3/213 Platte River Recovery Implementation Program 213 ANNUAL SURFACE WATER FLOW SUMMARY DRAFT Prepared by staff of the Platte River Recovery Implementation

More information

Village of Mamaroneck Flood Mitigation Status Report

Village of Mamaroneck Flood Mitigation Status Report Village of Mamaroneck Flood Mitigation Status Report Introduction Flooding is a regional problem that must be addressed with regional solutions; There are no quick-fix answers; This is an ongoing process;

More information

Role of Science and Process for the Expert Regional Technical Group to Assign Survival Benefit Units for Estuary Habitat Restoration Projects

Role of Science and Process for the Expert Regional Technical Group to Assign Survival Benefit Units for Estuary Habitat Restoration Projects DRAFT Do Not Cite or Distribute ERTG Role of Science and Process, version June 18, 2012 Role of Science and Process for the Expert Regional Technical Group to Assign Survival Benefit Units for Estuary

More information

The status of aquatic ecosystems in the Basin

The status of aquatic ecosystems in the Basin AQUATIC SPECIES AND HABITATS The status of aquatic ecosystems in the Basin is influenced by both natural and human processes. The geologic and geomorphic processes described earlier formed and continue

More information

Lower Snake River Programmatic Sediment Management Plan

Lower Snake River Programmatic Sediment Management Plan U.S. Army Corps of Engineers Walla Walla District Lower Snake River Programmatic Sediment Management Plan Final Environmental Impact Statement August 2014 LOWER SNAKE RIVER PROGRAMMATIC SEDIMENTMANAGEMENT

More information

An investment model for large-scale green

An investment model for large-scale green Fargo, ND May 31 2007 An investment model for large-scale green infrastructure: re-mosaicking the prairies 3rd International Sustainable Wetland Plant Management Conference Henry David (Hank) Venema, PhD,

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific

More information

Environmental Flows: State of the Science and Principles of Bes Practice

Environmental Flows: State of the Science and Principles of Bes Practice Environmental Flows: State of the Science and Principles of Bes Practice Insert Image Credit Mark Godfrey Brian Richter Co-Director, Global Freshwater Program Key Factors in River Ecosystem Health Connectivity

More information

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION SCENARIOS Direct withdrawal from surface water (SW): PA MOU w/padep NY MOU w/nysdec MD No

More information

BC Hydro Generation system operation Columbia Basin Regional Advisory Committee

BC Hydro Generation system operation Columbia Basin Regional Advisory Committee BC Hydro Generation system operation Columbia Basin Regional Advisory Committee Renata Kurschner Director, Generation Resource Management 11 September 2014 Generation System Operation Coordination of provincial

More information

Project sponsors provided a brief presentation on their project(s), followed by comments from the Committee.

Project sponsors provided a brief presentation on their project(s), followed by comments from the Committee. WRIA 14 Salmon Habitat Recovery Committee Meeting April 17, 2014 Summary notes Project sponsors provided a brief presentation on their project(s), followed by comments from the Committee. Allyn Shoreline

More information

SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT. APPLICATION NUMBER: Shoreline Substantial Development Application PL

SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT. APPLICATION NUMBER: Shoreline Substantial Development Application PL SKAGIT COUNTY PLANNING AND DEVELOPMENT SERVICES FINDINGS OF FACT HEARING AUTHORITY: Skagit County Hearing Examiner HEARING DATE: April 24, 2013 APPLICATION NUMBER: Shoreline Substantial Development Application

More information

Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations

Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations Cindy Thieman Hood River Watershed Group Ed Salminen & Niklas Christensen

More information

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites Text and illustrations in the following pages include: (1) summary information describing

More information

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference Mark Cook, PE Manager, Hoover Dam Hoover Dam Type of Operation Impacts of Drought Mitigating Drought Impacts through Major

More information

Prescribed Fire on JBLM. John Richardson Joint Base Lewis McChord Fish and Wildlife

Prescribed Fire on JBLM. John Richardson Joint Base Lewis McChord Fish and Wildlife 1 Prescribed Fire on JBLM John Richardson Joint Base Lewis McChord Fish and Wildlife John.f.richardson1.civ@mail.mil Location of JBLM 5/25/2017 PowerPoint Presentation Template 2 2 Fire Dependent Ecosystems

More information

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study Appendix F Section 404(b)(1) APPENDI F. SECTION 404(B)(1) EVALUATION SHORT VERSION Herbert Hoover Dike Dam Safety Modification Study HHD Dam Safety Modification Study EIS June 2016 E i Appendix F Section

More information

Compliance with the USEPAs Section 404(b)(1) Guidelines

Compliance with the USEPAs Section 404(b)(1) Guidelines Compliance with the USEPAs Section 404(b)(1) Guidelines February 13, 2015 Regulatory Program Workshop Lisa Gibson Regulatory Permit Specialist US Army Corps of Engineers, Sacramento District US Army Corps

More information

12/28/2016. Air. Surface Water. Ground Water. Soil. 1. Calculate agronomic rate. 2. Identify optimal fields. 3. Determine when to apply

12/28/2016. Air. Surface Water. Ground Water. Soil. 1. Calculate agronomic rate. 2. Identify optimal fields. 3. Determine when to apply Air Ground Surface Nichole Embertson, Ph.D. Management Specialist Whatcom Conservation District Far West Agribusiness Kennewick, WA December 13, 2016 Soil Manure Agronomics & Balance Soil s in grain, forage

More information

Northwest Hydropower and Columbia Basin River Benefits Fast Facts

Northwest Hydropower and Columbia Basin River Benefits Fast Facts Northwest Hydropower and Columbia Basin River Benefits Fast Facts 2013-14 Northwest RiverPartners is an alliance of farmers, utilities, ports and businesses that promotes: the economic and environmental

More information

Navigating the U.S. Army Corps of Engineers Regulatory Process

Navigating the U.S. Army Corps of Engineers Regulatory Process Navigating the U.S. Army Corps of Engineers Regulatory Process Angela Ryan Biologist Tampa Permits Section May 16, 2012 US Army Corps of Engineers JACKSONVILLE DISTRICT Regulatory Mission To protect the

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

Initial Application of a Landscape Evolution Model to a Louisiana Wetland

Initial Application of a Landscape Evolution Model to a Louisiana Wetland Initial Application of a Landscape Evolution Model to a Louisiana Wetland by Carl F. Cerco PURPOSE: Corps planning projects encompass a wide variety of restoration goals. These include wetland restoration,

More information

Improved Water Supply Forecasts for the Kootenay Basin

Improved Water Supply Forecasts for the Kootenay Basin Improved Water Supply Forecasts for the Kootenay Basin Randal T. Wortman Hydraulic Engineer August 4, 2005 Columbia Basin Water Management Division, U.S. Army Corps PO Box 2870, Portland, OR 97208-2870

More information

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission Mekong Climate Change and Adaptation Initiative of the Mekong River Commission H. E. Mr. Kol Vathana Mekong River Commission; Deputy Secretary General Cambodia National Mekong Committee Mekong is one of

More information

General Instream Flow Methods Overview. Agency Meeting on 2012 Draft Study Descriptions January 24, 2011

General Instream Flow Methods Overview. Agency Meeting on 2012 Draft Study Descriptions January 24, 2011 General Instream Flow Methods Overview Agency Meeting on 2012 Draft Study Descriptions January 24, 2011 1 Susitna River 2 Main Channel and Side Channels 3 Sloughs and Side Channels 4 Turbidity Portage

More information

ECOSYSTEM HEALTH AND SALMON RESTORATION: A BROADER PERSPECTIVE

ECOSYSTEM HEALTH AND SALMON RESTORATION: A BROADER PERSPECTIVE Orr 1 ECOSYSTEM HEALTH AND SALMON RESTORATION: A BROADER PERSPECTIVE BRUCE K. ORR Stillwater Sciences, Berkeley, California, USA ABSTRACT An understanding of healthy, naturally functioning riverine and

More information

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS Interested Parties NOTICE OF PREPARATION

More information

LAW OFFICE OF BRETT VANDENHEUVEL 620 SW MAIN ST., STE 615, PORTLAND, OR OFFICE: , CELL:

LAW OFFICE OF BRETT VANDENHEUVEL 620 SW MAIN ST., STE 615, PORTLAND, OR OFFICE: , CELL: Attorneys At L LAW OFFICE OF BRETT VANDENHEUVEL 620 SW MAIN ST., STE 615, PORTLAND, OR 97205 OFFICE: 503 224 3240, CELL: 503 348 2436 Mr. James D. Green U.S. Army Corps of Engineers Regulatory Branch P.O.

More information

FY16 RSM IPR Portland District, Optimizing Fall Creek Reservoir Flush TMDL s, Stanford Gibson, Chris Nygaard, Jim Crain, Jarod Norton

FY16 RSM IPR Portland District, Optimizing Fall Creek Reservoir Flush TMDL s, Stanford Gibson, Chris Nygaard, Jim Crain, Jarod Norton Fall Creek Reservoir Fall Creek Dam is at river mile 7.2 on Fall Creek, a tributary of the Willamette River, about 20 miles southeast of Eugene, OR. Dam works in coordination with Lookout Point and Hills

More information

Bridge River Water Use Plan

Bridge River Water Use Plan Bridge River Water Use Plan Program and Physical Works Annual Report: 2015 Implementation Period: February 2014 to January 2015 BRGMON-1 Lower Bridge River Aquatic BRGMON-2 Carpenter Reservoir Riparian

More information

Settlement Agreement Report

Settlement Agreement Report Settlement Agreement Report Fourth Quarter October December 2010 Prepared for the Technical Oversight Committee February 15, 2011 Prepared by: Cheol Mo, Violeta Ciuca, and Stuart Van Horn Restoration Sciences

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 1949 INDUSTRIAL PARK ROAD, ROOM 140 CONWAY, SOUTH CAROLINA 29526 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Hydrology and Hydraulic Design Criteria for the Creation and Restoration of Wetlands

Hydrology and Hydraulic Design Criteria for the Creation and Restoration of Wetlands WRP Technical Note HY-RS-3. 1 Hydrology and Hydraulic Design Criteria for the Creation and Restoration of Wetlands PURPOSE: Hydrology is generally accepted as the single most important factor governing

More information

Lower Yuba River Redd Dewatering and Fry Stranding Study 2008 Annual Report

Lower Yuba River Redd Dewatering and Fry Stranding Study 2008 Annual Report Lower Yuba River Redd Dewatering and Fry Stranding Study 2008 Annual Report Prepared for: Yuba County Water Agency 1220 F Street Marysville, CA 95901 Contact: Curt Aikens 530/741-6278 Prepared by: ICF

More information

Overview of the Instream Flow/Fish Habitat Element of the WRIA 1 Watershed Management Project. By Jeremy Freimund, P.H.

Overview of the Instream Flow/Fish Habitat Element of the WRIA 1 Watershed Management Project. By Jeremy Freimund, P.H. Overview of the Instream Flow/Fish Habitat Element of the WRIA 1 Watershed Management Project By Jeremy Freimund, P.H. January 31, 2006 1 Presentation Outline General Overview Instream Flow and Fish Habitat

More information

Los Angeles 3 rd Regional

Los Angeles 3 rd Regional Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan

More information

ANNUAL PROGRESS REPORT FOR 2014 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE

ANNUAL PROGRESS REPORT FOR 2014 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE ANNUAL PROGRESS REPORT FOR 2014 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE INTRODUCTION In September of 2007, the Oregon Fish and

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

THE FALLACY OF UPPER SNAKE FLOW AUGMENTATION THERE IS NO NEED TO DRAIN IDAHO FOR SALMON

THE FALLACY OF UPPER SNAKE FLOW AUGMENTATION THERE IS NO NEED TO DRAIN IDAHO FOR SALMON APPENDIX 1 THE FALLACY OF UPPER SNAKE FLOW AUGMENTATION THERE IS NO NEED TO DRAIN IDAHO FOR SALMON PREPARED BY IDAHO WATER USERS THE IDAHO WATER USERS ARE COMPOSED OF: THE COMMITTEE OF NINE AND THE IDAHO

More information

SRCD s Review of Impacts the Proposed Bay Delta Conservation Plan (BDCP) and Companion EIR/EIS on the Suisun Marsh

SRCD s Review of Impacts the Proposed Bay Delta Conservation Plan (BDCP) and Companion EIR/EIS on the Suisun Marsh SRCD s Review of Impacts the Proposed Bay Delta Conservation Plan (BDCP) and Companion EIR/EIS on the Suisun Marsh By Steve Chappell, Executive Director Suisun RCD BDCP Document is Extremely Challenging

More information

The Impacts of Climate Change on Portland s Water Supply

The Impacts of Climate Change on Portland s Water Supply The Impacts of Climate Change on Portland s Water Supply Richard Palmer and Margaret Hahn University of Washington Department of Civil and Environmental Engineering Joe Dvorak, Dennis Kessler, Azad Mohammadi

More information

AP Environmental Science

AP Environmental Science AP Environmental Science Types of aquatic life zones MARINE Estuaries coral reefs mangrove swamps neritic zone pelagic zone FRESHWATER lakes and ponds streams and rivers wetlands Distribution of aquatic

More information

Moose-vehicle collisions in Massachusetts: the need for speed... reduction

Moose-vehicle collisions in Massachusetts: the need for speed... reduction Wildlife Passage and Crash Reduction Efforts in Maine & Massachusetts Moose-vehicle collisions in Massachusetts: the need for speed.............. reduction Stephen DeStefano & David Wattles U. S. Geological

More information

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis Assessment of the Restoration Activities on Water Balance and Water Quality at Last Chance Creek Watershed Using Watershed Environmental Hydrology (WEHY) Model M.L. Kavvas, Z. Q. Chen, M. Anderson, L.

More information

Department of Energy

Department of Energy Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 ENVIRONMENT, FISH AND WILDLIFE August 27, 2010 In reply refer to: KEWR-4 Mr. Tony Grover, Fish and Wildlife

More information

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09 Water Operations 101 Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09 Water Operations Overview Where Does BDCP Fit Into California Planning Hydrologic Variability

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 J O I N T P U B L I C N O T I C E CHARLESTON AND SAVANNAH DISTRICTS- US ARMY

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior FISH AND WILDLIFE SERVICE Red Bluff Fish & Wildlife Office 10950 Tyler Road, Red Bluff, California 96080 (530) 527-3043, FAX (530) 529-0292 July 20, 2015 To: Guy

More information

SEATTLE DISTRICT CIVIL WORKS PROGRAM

SEATTLE DISTRICT CIVIL WORKS PROGRAM SEATTLE DISTRICT CIVIL WORKS PROGRAM Contents 04 Continuing Authorities Program 05 Section 14 Emergency Streambank Protection Section 103 Beach Protection Section 111 Mitigation of Shore Damage 06 Section

More information

Issues Options and Strategies for Flood Management : Shifts in approaches for flood Management in Bangladesh

Issues Options and Strategies for Flood Management : Shifts in approaches for flood Management in Bangladesh Issues Options and Strategies for Flood Management : Shifts in approaches for flood Management in Bangladesh Ainun Nishat and Raquibul Amin Bangladesh Country Office Flooding: disaster or fact of life?

More information

October 27, Jim Ruff Manager, Mainstem Passage and River Operations

October 27, Jim Ruff Manager, Mainstem Passage and River Operations Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington October 27,

More information

Wenatchee and Icicle Efforts. AWRA Seattle September 26, 2013

Wenatchee and Icicle Efforts. AWRA Seattle September 26, 2013 Wenatchee and Icicle Efforts AWRA Seattle September 26, 2013 Watersheds in WA Yakima/Kittitas Wenatchee Skagit Walla Walla Dungeness Wenatchee Basin 1,370 square miles 85% USFS-managed ~30,000 residents

More information

Oregon Department of State Lands. Protecting Natural and Fiscal Resources to Support Schools

Oregon Department of State Lands. Protecting Natural and Fiscal Resources to Support Schools Oregon Department of State Lands Protecting Natural and Fiscal Resources to Support Schools Heidi Hartman Jefferson, Hood River, Sherman, Wasco, Morrow, Gilliam, Union, Baker, Grant, Wallowa, Umatilla,

More information

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study Stakeholder Partnering Forum Modernizing of the GIWW August 4, 2016 Partnering Under a Systems Approach for Sustaining Commercial

More information

CENTRAL AND SOUTHERN FLORIDA PROJECT COMPREHENSIVE EVERGLADES RESTORATION PLAN SITE 1 IMPOUNDMENT PROJECT FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT

CENTRAL AND SOUTHERN FLORIDA PROJECT COMPREHENSIVE EVERGLADES RESTORATION PLAN SITE 1 IMPOUNDMENT PROJECT FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT CENTRAL AND SOUTHERN FLORIDA PROJECT COMPREHENSIVE EVERGLADES RESTORATION PLAN SITE 1 IMPOUNDMENT PROJECT FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT June 2010 CENTRAL AND SOUTHERN FLORIDA PROJECT SITE

More information

Effects of projected climate change on energy supply and demand in the Pacific Northwest and Washington State

Effects of projected climate change on energy supply and demand in the Pacific Northwest and Washington State Effects of projected climate change on energy supply and demand in the Pacific Northwest and Washington State Alan F. Hamlet Se-Yeun Lee Kristian Mickelson Marketa McGuire Elsner JISAO/CSES Climate Impacts

More information

Small Business Industry Day Project Development Process

Small Business Industry Day Project Development Process Small Business Industry Day Project Development Process T.J. Fichera Project Manager Walla Walla District October 13, 2016 US Army Corps of Engineers BUILDING STRONG Agenda Business Lines Asset Management

More information

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 June 2, 2015 CESAM-RD-C PUBLIC NOTICE NO. SAM-2015-00573-PAH JOINT PUBLIC NOTICE SAM-2015-00573-PAH

More information

The State of Everglades Restoration

The State of Everglades Restoration FCE-LTER All Scientist Meeting The State of Everglades Restoration Fred H. Sklar 14 March 2016 Deering Estate Restoration Update Outline 1. Reservoirs, STAs & FEBs 2. Broward WPA s 3. DPM 4. MFL & Seagrass

More information

2.2 Middle Fork Nooksack River

2.2 Middle Fork Nooksack River 2118 2119 2120 2121 2122 2123 2124 2125 2126 2127 2128 2129 2130 2131 2132 2133 2134 2135 2136 2137 2138 2139 2140 2141 2142 2143 2144 2145 2146 2147 2148 2149 2150 2151 2152 2153 2154 2155 2156 2157 2158

More information

Monitoring, Modeling, and Conservation Planning: USACE Contributions to Recovery of an Endangered Species

Monitoring, Modeling, and Conservation Planning: USACE Contributions to Recovery of an Endangered Species Monitoring, Modeling, and Conservation Planning: USACE Contributions to Recovery of an Endangered Species How USACE R&D is providing science support and using interagency cooperation to delist the Interior

More information

SECTION 11: REGULATORY FLOODWAYS

SECTION 11: REGULATORY FLOODWAYS SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...

More information

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections

More information

The Non Market Value of Water in Oklahoma

The Non Market Value of Water in Oklahoma The Non Market Value of Water in Oklahoma Tracy Boyer, Assistant Professor Department of Agricultural Economics Presentation to NRCS October 20, 2009 Research Funded by a combination of funding sources

More information

Columbia Estuary Ecosystem Restoration Program

Columbia Estuary Ecosystem Restoration Program Columbia Estuary Ecosystem Restoration Program 2012 SYNTHESIS MEMORANDUM DRAFT Prepared by Ronald Thom and Nichole Sather, Pacific Northwest National Laboratory G. Curtis Roegner and Daniel L. Bottom,

More information

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 Draft Feasibility Study Report with Integrated Environmental Assessment St. Paul District U.S. Army Corps of Engineers March 2018

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information

Public Scoping Report for the Columbia River System Operations Environmental Impact Statement

Public Scoping Report for the Columbia River System Operations Environmental Impact Statement Public Scoping Report for the Columbia River System Operations Environmental Impact Statement October 2017 Public Scoping Report for the Columbia River System Operations Environmental Impact Statement

More information

From the thousands of miles of coastal shoreline

From the thousands of miles of coastal shoreline Water Resources VALUE OF OUR NATION S WATER RESOURCES From the thousands of miles of coastal shoreline and rivers to the lakes and wetlands that dot our nation s landscape, America is fortunate to have

More information

Columbia Estuary Ecosystem Restoration Program

Columbia Estuary Ecosystem Restoration Program Columbia Estuary Ecosystem Restoration Program 2013 ACTION PLAN DRAFT Prepared by the Bonneville Power Administration and U.S. Army Corps of Engineers, Portland District July 2012 Preface The 2013 Action

More information

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT WATER QUALITY ASSESSMENT OF Quinsam River NEAR THE MOUTH (1986 24) Prepared by: L. G. Swain, P. Eng. B.C. Ministry of Environment Prepared for:

More information

Valuing ecosystem services linked to river flows in Lower Zambezi basin, Mozambique. Safa Fanaian, Susan Graas, Yong Jiang & Pieter van der Zaag

Valuing ecosystem services linked to river flows in Lower Zambezi basin, Mozambique. Safa Fanaian, Susan Graas, Yong Jiang & Pieter van der Zaag Valuing ecosystem services linked to river flows in Lower Zambezi basin, Mozambique Safa Fanaian, Susan Graas, Yong Jiang & Pieter van der Zaag WaterNet conference Dar es Salaam, 31 Oct 2013 Content Introduction

More information