1 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate existing and projected 2035 conditions. In order to position the District to address growth-related capacity issues, the aggressive growth projections described in Chapter 2 were used for hydraulic model runs for the 2035 Model Scenarios. Appendix F contains the wastewater collection system modeling results. 4.1 EVALUATION CRITERIA The wastewater collection system was evaluated based on its ability to convey wastewater flow under dry weather and wet weather conditions, for both existing and projected 2035 flow conditions. Gravity sewer pipeline capacity was assessed based on the maximum depth of flow to diameter of pipe ratio (d/d) simulated in the model run. Siphon pipeline capacity was assessed based on maximum velocity and confirmation that siphons were not causing back-ups in the upstream pipelines. Capacity issues were identified in the wastewater collection system if a pipeline segment met or exceeded any of the criteria presented in Table 4-1. Table 4-1 Capacity Evaluation d/d Criteria PIPELINES EVALUATED CONDITION CRITERIA Gravity Pipelines Diameter 12 inches Peak Dry Weather d/d = 0.5 Diameter> 12 inches Peak Dry Weather d/d = 0.75 All Gravity Sewer Pipelines Peak Wet Weather d/d = 1.0 (Surcharge) Siphon Pipelines All Siphon Pipelines Peak Dry Weather Maximum Velocity < 8 feet per second All Siphon Pipelines Peak Wet Weather Limited Headloss New replacement or parallel pipelines, recommended in the capacity improvement projects discussed in Section 4-4, are sized to convey peak wet weather flow at a d/d ratio of EXISTING SYSTEM CAPACITY EVALUATION The hydraulic model was initially run on the existing wastewater collection system to identify any existing pipelines that exceeded or were above capacity under both dry weather and wet weather conditions. Model results are summarized in Table 4-2. The term Regional refers to the East Trunk Sewer. BLACK & VEATCH Capacity Analysis 4-1

2 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan Table 4-2 Summary of Existing System Model Results PARAMETER DRY WEATHER ( ¹ ) WET WEATHER ( ² ) District Regional District Regional Pipe 12 inches, d/d > 0.5 (ft) Pipe > 12 inches, d/d > 0.75 (ft) Surcharged Pipe (ft) ,481 Siphons Exceeding Criteria (ft) Total Pipe Exceeding Criteria (ft) ,481 (1) Peak dry weather flow at = 19.5 mgd. (2) Peak wet weather flow at = 40.6 mgd. Identified lengths of wet weather capacity deficiencies are inclusive of dry weather. Only Surcharged pipeline lengths were shown for Wet Weather per evaluation criteria Dry Weather The existing system model was run under dry weather conditions to identify any current capacity constraints in the wastewater collection system. Figure 4-1 shows the District pipelines maximum d/d ratio during the existing system dry weather hydraulic model run. Figure 4-2 shows the Regional pipelines maximum d/d ratio during the existing system dry weather hydraulic model run. The model results identify a section of the East Trunk Sewer which exceeds the evaluation criteria; however, the deficiency is considered as minor and thus not considered for immediate improvement. No capacity constraints were identified in District trunk sewers Regional Facilities A 227-foot section of the East Trunk Sewer, 24-inch diameter, was identified in the model as surcharged under peak dry flow conditions. These pipelines are part of the East Trunk Sewer along Tippecanoe Avenue between Baseline Street and 9th Street. The pipelines in this location cross underneath Warm Creek, and as-built drawings suggest that the pipelines were designed to surcharge due to the drop manhole and flat sloped pipeline crossing underneath the Warm Creek channel. The pipeline was likely designed to surcharge and thus was not considered for immediate improvement. BLACK & VEATCH Capacity Analysis 4-2

3 Electric Ave N S ier ra Way S S ierra Way N Waterman Ave Valencia Ave Tippecanoe Ave Del Ro sa Av e Mountain View Ave Arden Ave Alabama St Victoria Ave Sterling Ave Church Ave Oran ge St Palm Ave Wabash Ave Schenk Creek 40Th St 18 E 40 T h S t Canal E 39 T h S t 330 Fredalba Creek Wastewater Collection System Master Plan N Mountain View Ave E 30 T h S t East Twin Creek E Highland Ave Har ri so n St E Lynw oo d Dr Foothill Dr Little Sand Creek E Foothill Dr Highland Canal Lynwood Dr Sand Creek Highland Ave City Creek Little Mill Creek Creek Plunge LEGEND Max d/d, Existing Dry Weather Surcharge District Sewer Mains East Trunk Sewer District Boundary 30 W 13T h St E 13T h St W Base Line St E Base Line St N Tippecanoe Ave Bas e Lin e St Warm Creek Bas e lin e St Bou ld er Ave Ch urch S t North Fork Canal Oak Creek W 6 Th St W 5 Th St E 5 T h S t 3R d S t 5T h S t S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave E 3R d S t E Rialto Av e San Bernardino International Airport W Mi ll S t E Mil l St S Tippecanoe Ave 0 2,000 4,000 Redlands Municipal Airport Feet 1 inch = 4,000 feet S Waterman Ave Carnegie Dr Gage Canal California St San Bernardino Ave W Lugonia Ave W San Bernardino Ave Bucke ye St Te nn es see S t E San Bernardino Ave E Lugonia Ave Ju d so n S t 38 Me nto ne Blv d Figure 4-1 Existing District System Dry Weather Capacity Evaluation Figure4_1 March 29, 2013 K. McRae

4 S S ierra Way N E St S E S t N S ier ra Way N Waterman Ave Valencia Ave Harrison St Tippecanoe Ave S Tippecanoe Ave Del Ro sa Ave Sterling Ave Mountain View Ave N Mountain View Ave E 30 T h S t 18 East Twin Creek 30 E Lynw oo d Dr Little Sand Creek Lynwood Dr Wastewater Collection System Master Plan LEGEND Max d/d, Existing Dry Weather East Trunk Sewer only W Highland Ave E Highland Ave Highland Ave Surcharge District Sewer Mains East Trunk Sewer District Boundary W 1 3T h S t E 13 T h S t W Base Line St E Base Line St Base Line St W 6 Th St W 5 Th St E 5T h S t 5T h S t W 4 Th St S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave Warm Creek E Rialto Av e E 3R d S t City Creek 3R d S t W Mi ll S t E Mil l St San Bernardino International Airport 0 1,550 3, S Waterman Ave Carnegie Dr Gage Canal E San Bernardino Ave Feet 1 inch = 3,100 feet Figure 4-2 Existing Regional System Dry Weather Capacity Evaluation Figure4_2 March 29, 2013 K. McRae

5 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan Wet Weather The existing wastewater collection system model was run under wet weather conditions to identify any current capacity constraints in the system. Model results showed that 4,481 feet of pipeline surcharged under wet weather conditions. Figure 4-3 shows the District pipelines maximum d/d ratio during the existing system wet weather hydraulic model run. Figure 4-4 shows the Regional pipelines maximum d/d ratio during the existing system wet weather hydraulic model run. The model results identify three sections of the East Trunk Sewer as exceeding criteria. In all cases, the pipeline deficiencies were considered allowable under existing conditions and requiring upgrades to accommodate potential future flows. No capacity constraints were identified in District trunk sewers Regional Facilities A 3,213-foot section of the East Trunk Sewer, located along 6 th Street and Waterman Avenue, was identified in the model as surcharged under peak wet weather flow conditions. These pipeline segments were not identified as dry weather deficiencies. The maximum pipeline surcharge was approximately 5 inches, and had an approximate 8.2-foot freeboard to the manhole rim. The model only predicted minor surcharging and thus was not considered for immediate improvement. A 618-foot section of the East Trunk Sewer, located along Tippecanoe Avenue between Baseline Street and 9th Street, was identified in the model as surcharged under peak wet weather flow conditions. A portion of these pipeline segments were also identified as dry weather deficiencies. The pipeline crossing underneath Warm Creek is a bottleneck under wet weather flow conditions causing capacity constraints in upstream pipelines. The maximum pipeline surcharge was approximately 11 inches, and had an approximate 13.5-foot freeboard to the manhole rim. The model only predicted minor surcharging and thus was not considered for immediate improvement. A 650-foot section of 15-inch diameter pipeline located on Del Rosa Avenue just south of Pumalo Street was identified in the model as being surcharged under peak wet weather flow conditions. The as-built drawings suggest that the pipelines were designed to surcharge due to the drop manhole and flat sloped pipeline crossing underneath the drainage channel pipeline. The maximum surcharge was approximately 4.5 inches, and had an approximate 10.7-foot freeboard to the manhole rim. The pipeline was likely designed to surcharge, and the model only predicted minor surcharging thus, it was not considered for immediate improvement. BLACK & VEATCH Capacity Analysis 4-5

6 Electric Ave N S ier ra Way S S ierra Way N Waterman Ave Valencia Ave Tippecanoe Ave Del Ro sa Av e Mountain View Ave Arden Ave Alabama St Victoria Ave Sterling Ave Church Ave Oran ge St Palm Ave Wabash Ave Schenk Creek 40Th St 18 E 40 T h S t Canal E 39 T h S t 330 Fredalba Creek Wastewater Collection System Master Plan N Mountain View Ave E 30 T h S t East Twin Creek E Highland Ave Har ri so n St E Lynw oo d Dr Foothill Dr Little Sand Creek E Foothill Dr Highland Canal Lynwood Dr Sand Creek Highland Ave City Creek Little Mill Creek Creek Plunge LEGEND Max d/d, Existing Wet Weather Surcharge District Sewer Mains East Trunk Sewer District Boundary 30 W 13T h St E 13T h St W Base Line St E Base Line St N Tippecanoe Ave Bas e Lin e St Warm Creek Bas e lin e St Bou ld er Ave Ch urch S t North Fork Canal Oak Creek W 6 Th St W 5 Th St E 5 T h S t 3R d S t 5T h S t S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave E 3R d S t E Rialto Av e San Bernardino International Airport W Mi ll S t E Mil l St S Tippecanoe Ave 0 2,000 4,000 Redlands Municipal Airport Feet 1 inch = 4,000 feet S Waterman Ave Carnegie Dr Gage Canal California St San Bernardino Ave W Lugonia Ave W San Bernardino Ave Bucke ye St Te nn es see S t E San Bernardino Ave E Lugonia Ave Ju d so n S t 38 Me nto ne Blv d Figure 4-3 Existing District System Wet Weather Capacity Evaluation Figure4_3 March 29, 2013 K. McRae

7 S S ierra Way N E St S E S t N S ier ra Way N Waterman Ave Valencia Ave Harrison St Tippecanoe Ave S Tippecanoe Ave Del Ro sa Ave Sterling Ave Mountain View Ave N Mountain View Ave E 30 T h S t 18 East Twin Creek 30 E Lynw oo d Dr Little Sand Creek Lynwood Dr Wastewater Collection System Master Plan LEGEND Max d/d, Existing Wet Weather East Trunk Sewer only W Highland Ave E Highland Ave Highland Ave Surcharge District Sewer Mains East Trunk Sewer District Boundary W 1 3T h S t E 13 T h S t W Base Line St E Base Line St Base Line St W 6 Th St W 5 Th St E 5T h S t 5T h S t W 4 Th St S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave Warm Creek E Rialto Av e E 3R d S t City Creek 3R d S t W Mi ll S t E Mil l St San Bernardino International Airport 0 1,550 3, S Waterman Ave Carnegie Dr Gage Canal E San Bernardino Ave Feet 1 inch = 3,100 feet Figure 4-4 Existing Regional System Wet Weather Capacity Evaluation Figure4_4 March 29, 2013 K. McRae

8 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan SYSTEM CAPACITY EVALUATION Following the existing system capacity analysis, additional loads were applied to the hydraulic model to simulate flows in the District s wastewater collection system under the projected 2035 condition. The 2035 model was run under both dry weather and wet weather conditions in order to evaluate the ability of the system to accommodate future growth. Model results are summarized in Table 4-3. Table 4-3 Summary of 2035 System Model Results PARAMETER DRY WEATHER (¹) WET WEATHER (²) District Regional District Regional Pipe 12 in., d/d > 0.5 (ft) 14, Pipe > 12 in., d/d > 0.75 (ft) 4, Surcharged (ft) 11,313 3,500 20,771 12,439 Siphons Exceeding Criteria (ft) Total Length Exceeding Criteria (ft) 31,049 3,760 21,748 12,699 (1) Peak dry weather flow at = 26.9 mgd. (2) Peak wet weather flow at = 47.6 mgd. Identified lengths of wet weather capacity deficiencies are inclusive of dry weather. Only Surcharged pipeline lengths were shown for Wet Weather per evaluation criteria Dry Weather The projected 2035 model was run under dry weather conditions to identify any potential future capacity constraints in the wastewater collection system. Figure 4-5 shows the District pipelines maximum d/d ratio during the 2035 system dry weather hydraulic model run. Figure 4-6 shows the Regional pipelines maximum d/d ratio during the 2035 system dry weather hydraulic model run. The model results identified that 11,313 ft of District pipeline and 3,500 ft of Regional pipeline are expected to surcharge under dry weather conditions. An additional 18,759 ft of District pipeline are expected to exceed peak dry weather flow maximum d/d criteria. In total, model results indicate that 31,049 ft of District pipeline and 3,760 feet of Regional pipeline exceed peak dry weather flow d/d criteria Wet Weather The projected 2035 model was run under wet weather conditions to identify any potential future capacity constraints in the wastewater collection system. Figure 4-7 shows the District pipelines maximum d/d ratio during the 2035 system wet weather hydraulic model run. Figure 4-8 shows the Regional pipelines maximum d/d ratio during the 2035 system wet weather hydraulic model run. The model results identified that 21,748 ft of District pipeline and 12,699 ft of Regional pipeline are expected to surcharge under wet weather conditions. Capacity constraints expected to occur under future wet weather conditions are highly dependent on the projected aggressive growth due to development in east Highland. As shown in Figure 4-7, capacity deficiencies in the District s collection system occur along Greenspot Road, 6th Street, and Victoria Avenue. These model results provide the basis for the capacity improvement projects described in Section 4-4. As shown in Figure 4-8, capacity deficiencies in the Regional East Trunk Sewer occur downstream of the District s two main connection points on Baseline Street and 6th Street. BLACK & VEATCH Capacity Analysis 4-8

9 Electric Ave N S ier ra Way S S ierra Way N Waterman Ave Valencia Ave Tippecanoe Ave Del Ro sa Av e Mountain View Ave Arden Ave Alabama St Victoria Ave Sterling Ave Church Ave Oran ge St Palm Ave Wabash Ave Schenk Creek 40Th St 18 E 40 T h S t Canal E 39 T h S t 330 Fredalba Creek Wastewater Collection System Master Plan N Mountain View Ave E 30 T h S t East Twin Creek E Highland Ave Har ri so n St E Lynw oo d Dr Foothill Dr Little Sand Creek E Foothill Dr Highland Canal Lynwood Dr Sand Creek Highland Ave City Creek Little Mill Creek Creek Plunge LEGEND Max d/d, 2035 Dry Weather Surcharge District Sewer Mains East Trunk Sewer District Boundary 30 W 13T h St E 13T h St W Base Line St E Base Line St N Tippecanoe Ave Bas e Lin e St Warm Creek Bas e lin e St Bou ld er Ave Ch urch S t North Fork Canal Oak Creek W 6 Th St W 5 Th St E 5 T h S t 3R d S t 5T h S t S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave E 3R d S t E Rialto Av e San Bernardino International Airport W Mi ll S t E Mil l St S Tippecanoe Ave 0 2,000 4,000 Redlands Municipal Airport Feet 1 inch = 4,000 feet S Waterman Ave Carnegie Dr Gage Canal California St San Bernardino Ave W Lugonia Ave W San Bernardino Ave Bucke ye St Te nn es see S t E San Bernardino Ave E Lugonia Ave Ju d so n S t 38 Me nto ne Blv d Figure District System Dry Weather Capacity Evaluation Figure4_5 March 29, 2013 K. McRae

10 S S ierra Way N E St S E S t N S ier ra Way N Waterman Ave Valencia Ave Harrison St Tippecanoe Ave S Tippecanoe Ave Del Ro sa Ave Sterling Ave Mountain View Ave N Mountain View Ave E 30 T h S t 18 East Twin Creek 30 E Lynw oo d Dr Little Sand Creek Lynwood Dr Wastewater Collection System Master Plan LEGEND Max d/d, 2035 Dry Weather East Trunk Sewer only W Highland Ave E Highland Ave Highland Ave Surcharge District Sewer Mains East Trunk Sewer District Boundary W 1 3T h S t E 13 T h S t W Base Line St E Base Line St Base Line St W 6 Th St W 5 Th St E 5T h S t 5T h S t W 4 Th St S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave Warm Creek E Rialto Av e E 3R d S t City Creek 3R d S t W Mi ll S t E Mil l St San Bernardino International Airport 0 1,550 3, S Waterman Ave Carnegie Dr Gage Canal E San Bernardino Ave Feet 1 inch = 3,100 feet Figure Regional System Dry Weather Capacity Evaluation Figure4_6 March 29, 2013 K. McRae

11 Electric Ave N S ier ra Way S S ierra Way N Waterman Ave Valencia Ave Tippecanoe Ave Del Ro sa Av e Mountain View Ave Arden Ave Alabama St Victoria Ave Sterling Ave Church Ave Oran ge St Palm Ave Wabash Ave Schenk Creek 40Th St 18 E 40 T h S t Canal E 39 T h S t 330 Fredalba Creek Wastewater Collection System Master Plan N Mountain View Ave E 30 T h S t East Twin Creek E Highland Ave Har ri so n St E Lynw oo d Dr Foothill Dr Little Sand Creek E Foothill Dr Highland Canal Lynwood Dr Sand Creek Highland Ave City Creek Little Mill Creek Creek Plunge LEGEND Max d/d, 2035 Wet Weather Surcharge District Sewer Mains East Trunk Sewer District Boundary 30 W 13T h St E 13T h St W Base Line St E Base Line St N Tippecanoe Ave Bas e Lin e St Warm Creek Bas e lin e St Bou ld er Ave Ch urch S t North Fork Canal Oak Creek W 6 Th St W 5 Th St E 5 T h S t 3R d S t 5T h S t S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave E 3R d S t E Rialto Av e San Bernardino International Airport W Mi ll S t E Mil l St S Tippecanoe Ave 0 2,000 4,000 Redlands Municipal Airport Feet 1 inch = 4,000 feet S Waterman Ave Carnegie Dr Gage Canal California St San Bernardino Ave W Lugonia Ave W San Bernardino Ave Bucke ye St Te nn es see S t E San Bernardino Ave E Lugonia Ave Ju d so n S t 38 Me nto ne Blv d Figure District System Wet Weather Capacity Evaluation Figure4_7 March 29, 2013 K. McRae

12 S S ierra Way N E St S E S t N S ier ra Way N Waterman Ave Valencia Ave Harrison St Tippecanoe Ave S Tippecanoe Ave Del Ro sa Ave Sterling Ave Mountain View Ave N Mountain View Ave E 30 T h S t 18 East Twin Creek 30 E Lynw oo d Dr Little Sand Creek Lynwood Dr Wastewater Collection System Master Plan LEGEND Max d/d, 2035 Wet Weather East Trunk Sewer only W Highland Ave E Highland Ave Highland Ave Surcharge District Sewer Mains East Trunk Sewer District Boundary W 1 3T h S t E 13 T h S t W Base Line St E Base Line St Base Line St W 6 Th St W 5 Th St E 5T h S t 5T h S t W 4 Th St S Arrowhead Ave N Arrowhead Ave W 3 Rd St W Rialto Ave Warm Creek E Rialto Av e E 3R d S t City Creek 3R d S t W Mi ll S t E Mil l St San Bernardino International Airport 0 1,550 3, S Waterman Ave Carnegie Dr Gage Canal E San Bernardino Ave Feet 1 inch = 3,100 feet Figure Regional System Wet Weather Capacity Evaluation Figure4_8 March 29, 2013 K. McRae

13 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4.4 CAPACITY IMPROVEMENTS The capacity concern locations identified based on the evaluation criteria were analyzed in detail. Some involved only minor surcharging for a short duration, less than one-hour and these areas were identified as watch areas to be observed by the District. As a result of the hydraulic model runs, three areas were identified as potentially requiring capacity improvements. The proposed capacity improvements are shown in Figure 4-9 and described in more detail below. Before design or construction of the capacity improvements, the District should field verify the results of this analyses utilizing field inspections and surveys, and flow monitoring District Facilities The 2035 wet weather hydraulic model results identified three capital improvement projects in the District s collection system. Victoria Avenue. The 2035 model shows major surcharging in the existing Victoria Avenue Trunk Sewer between Highland Avenue and Mirada Road. The District identified that approximately 85 percent of the existing San Manuel Indian Reservation s wastewater flows are conveyed to this pipeline, and the TAZ projected population data showed significant increases in this area. The modeling evaluated two alternatives: 1) All of the flow enters the District s wastewater collection system through one of the connections tributary to Victoria Avenue; 2) Future non-residential flow enters the District wastewater collection system through the western-most San Manuel Indian Reservation connection, which is not tributary to the Victoria Avenue Trunk Sewer. Although moving the non-residential flows to another connection did not cause any additional capacity problems in the wastewater collection system, it did not eliminate the need for a capacity improvement in Victoria Avenue. For this assessment, it was assumed that all future flows from the San Manuel Indian Reservation will enter the District wastewater collection system at the Victoria Avenue Trunk Sewer. The 2035 model results show that approximately 2,030 ft of 8-inch gravity sewer pipeline between Mirada Road and Highland Avenue surcharges under wet weather conditions. Existing model results show no existing surcharging, however, there is no capacity to support additional growth. The recommended improvement consists of replacement of approximately 3,000 feet of existing 8-inch diameter gravity sewer pipeline with a 10-inch diameter pipeline. Pipeline replacement is the selected improvement method because of the age of the existing sewer pipeline (45 50 years old). The San Manuel Indian Reservation is not subject to state or local development guidelines or permitting and could move quickly on additional development. In order to have adequate time for capacity upgrades, the District should maintain communication with the San Manuel Indian Reservation to understand the timing and projected flows from future development. Before any improvements are made, the existing connection locations for the San Manuel Indian Reservation should be confirmed through closed-circuit television (CCTV) and the flows metered. BLACK & VEATCH Capacity Analysis 4-13

14 Electric Ave N S ier ra Way S S ierra Way N Waterman Ave Valencia Ave Del Ro sa Av e Mountain View Ave Arden Ave Alabama St Victoria Ave Sterling Ave Church Ave Oran ge St Palm Ave Wabash Ave Schenk Creek 40Th St 18 E 40 T h S t Canal E 39 T h S t 330 Fredalba Creek Wastewater Collection System Master Plan N Mountain View Ave W 13T h St E 13T h St W Base Line St E 30 T h S t East Twin Creek E Highland Ave E Base Line St Har ri so n St E Lynw oo d Dr Watch Area Del Rosa Ave North East Trunk Sewer Replace 7,500 feet of 21 to 30-inch with 30 to 36-inch Development Driven N Tippecanoe Ave Foothill Dr Little Sand Creek E Foothill Dr Warm Creek Highland Canal Lynwood Dr Sand Creek 30 Watch Area Pacific St Bas e Lin e St Bas e lin e St Victoria Avenue Replace 3,000 feet of 8-inch with 10-inch Development Driven Highland Ave City Creek Watch Area Webster St North Fork Canal Little Mill Creek Creek Plunge LEGEND Max d/d, 2035 Wet Weather Surcharge District Sewer Mains East Trunk Sewer Replacement Projects Victoria Ave Greenspot East Greenspot West East Trunk Sewer - 6th St North East Trunk Sewer Bou ld er Ave Ch urch S t District Boundary Oak Creek W 6 Th St W 5 Th St Tippecanoe Ave E 5 T h S t 3R d S t 5T h S t W 3 Rd St W Rialto Ave E 3R d S t E Rialto Av e San Bernardino International Airport S Arrowhead Ave N Arrowhead Ave W Mi ll S t E Mil l St Greenspot West Replace 15,400 feet of21 to 24-inch with 30-inch Development Driven Greenspot East 21,000 feet of parallel 12-inch Development Driven 0 2,000 4,000 S Waterman Ave Carnegie Dr Gage Canal S Tippecanoe Ave East Trunk Sewer - 6th Street Replace 5,500 feet of 27 to 39-inch with 36 to 48-inch Development Driven California St San Bernardino Ave W Lugonia Ave W San Bernardino Ave Bucke ye St Te nn es see S t E San Bernardino Ave E Lugonia Ave Ju d so n S t 38 Redlands Municipal Airport Me nto ne Blv d Feet 1 inch = 4,000 feet Figure 4-9 Capacity Improvements Figure4_9 March 29, 2013 K. McRae

15 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan Greenspot East. The 2035 model results show major surcharging in the existing Greenspot Road Trunk Sewer from Highway 210 to the eastern extent of the system. The model shows that over 2,000 ft of 12- to 15-inch diameter pipeline surcharge under wet weather conditions and that under dry weather conditions nearly all of the existing 12-inch diameter pipeline exceeds the d/d = 0.50 criteria. This proposed project also crosses Plunge Creek, which would require upgrading the existing triple barrel siphon. The recommended improvement consists of a 12-inch diameter parallel pipeline for approximately 21,000 ft. The existing pipelines can accommodate an additional 27.1 gpm or 0.04 mgd of peak flow or roughly 100 equivalent dwelling units (EDUs) (note: 1 EDU equals 3.5 people). Based on the limited number of future EDUs that the existing pipeline can accommodate it is recommended that this improvement be constructed in the next 1 2 years. Project scheduling assumes that initial growth will likely occur in the known developments at a rate of approximately dwelling units per year. Development planning should be closely monitored in order to accelerate or delay construction. Paralleling the existing pipeline was the selected improvement method because the pipeline is relatively new (20 30 years old). Greenspot West. The 2035 model results show major surcharging under dry and wet weather flow conditions for the Greenspot Road Trunk Sewer from the connection of the East Trunk Sewer back to East 3rd Street and Central Avenue. The model shows that approximately 12,300 ft of 21- to 24-inch pipeline surcharge under wet weather conditions. The recommended improvement consists of replacement of approximately 15,400 ft of existing 21- to 24-inch diameter pipeline with 30-inch diameter. The existing pipelines can accommodate an additional gpm or 0.22 mgd of peak flow or roughly 547 EDUs. Based on the limited number of future EDUs that the existing pipeline can accommodate it is recommended that this improvement be constructed in the next 2 4 years. Project scheduling assumes that initial growth will likely occur in the known developments at a rate of approximately dwelling units per year. Development planning should be closely monitored in order to accelerate or delay construction. Pipeline replacement was the selected improvement method because of the age of the existing sewer pipeline (45 50 years old) Regional Facilities The 2035 model results identified two capital improvement projects in the City of San Bernardino s East Trunk Sewer. East Trunk Sewer 6th Street. The 2035 model results show major surcharging under dry and wet weather flow conditions for the East Trunk Sewer from East 6th Street and Pedley Road to Waterman Avenue and East 3rd Street. The model shows that approximately 5,200 ft of 27- to 39-inch pipeline surcharge under wet weather conditions. This project also crosses a storm drain channel which would require upgrading the existing double barrel siphon. The recommended improvement consists of replacement of approximately 5,200 ft of existing 27- to 39-inch diameter pipeline with 36- to 48-inch diameter. The existing pipelines are at capacity under the modeled peak wet weather flows and need to be replaced prior to additional flows being added to the system. Pipeline replacement was the selected improvement method because of the age of the existing sewer pipeline (50 60 years old). BLACK & VEATCH Capacity Analysis 4-15

16 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan North East Trunk Sewer. The 2035 model results show major surcharging under wet weather flow conditions for the East Trunk Sewer north of 6th Street, along Pedley Road, 9th Street, Tippecanoe Avenue, and Baseline Street. The model shows that approximately 5,100 ft of 21- to 30-inch pipeline surcharged under wet weather conditions. This project crosses the Warm Creek channel which may require the installation of a siphon structure. The recommended improvement consists of replacement of approximately 7,500 ft of existing 21- to 30-inch diameter pipeline with 30- to 36-inch diameter. The existing pipelines are at capacity under the modeled peak wet weather flows and need to be replaced prior to additional flows being added to the system. Pipeline replacement was the selected improvement method because of the age of the existing sewer pipeline (50 60 years old) Watch List Areas with minimal surcharging for a short duration were not regarded as critical problem areas. Although no improvements were identified for these areas, if additional development, beyond what was considered in this report, is proposed upstream of these areas, additional analyses should be performed to evaluate the impact of the changes in proposed development on the wastewater collection system. It is also recommended that the District keep these locations on a Watch List and monitor, particularly during large storm events. These areas can be found in Figure 4-9 and are described below. Hydraulic profiles showing the projected surcharge for these areas are included in Appendix G District Facilities A 325-foot pipeline in Pacific Street, west of Valaria Drive is expected to surcharge under wet weather conditions. Due to unavailable as-built information, invert elevations were field verified by District staff. The pipeline expected to surcharge is a relatively flat pipeline, with a slope of 0.18 percent. The upstream manhole I6-140 is expected to experience a surcharge depth of approximately 3 inches into the manhole chamber, remaining nearly 11.5 ft below rim elevation. Approximately 50 ft of 15-inch pipeline in Webster Street, south of Cherokee Rose Drive, are expected to surcharge under wet weather conditions, and an additional 110 ft exceed peak dry weather flow d/d criteria of As-built drawings and aerial photographs were reviewed. The pipeline expected to surcharge is the first pipeline in a reach of relatively flat segments (slope of 0.06 percent), and is immediately downstream of a relatively steep-sloped 15-inch pipeline segment (slope of 5 percent) and an 8-inch sewer connection at Cherokee Rose Drive. The pipeline segments in Webster Street are flat in order to flow underneath a drainage channel. The upstream manhole K is expected to surcharge approximately 1.25 ft into the chamber, remaining nearly 20 ft below rim elevation Regional Facilities Approximately 650 ft of 15-inch sewer mains in Del Rosa Avenue, south of Pumalo Street, are expected to surcharge under wet weather conditions. As-built drawings confirmed that these segments have relatively flat slopes (average slope of 0.44-percent), and are immediately downstream of a drop manhole and a 12-inch sewer connection at Pumalo Street. These pipelines are expected to surcharge 1.25 ft into the chambers for manholes H4-113 and H4-114, but will remain approximately 15 and 12 ft below rim elevation, respectively. This deficiency occurs in BLACK & VEATCH Capacity Analysis 4-16

17 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan the existing system hydraulic model under wet weather conditions. It is also described above in Section Summary of Capacity Improvements A summary of the identified capacity improvements and their anticipated trigger points are provided in Table 4-4. Table 4-4 Summary of Capacity Improvements NAME DESCRIPTION DISTRICT/ REGIONAL TRIGGER Victoria Avenue Replace 3,000 ft of 8-inch with 10-inch diameter pipeline District 34.7 gpm peak flow 0.05 mgd peak flow Approximately 125 upstream EDUs Greenspot East Parallel 21,000 ft with 12-inch pipeline District 27.1 gpm peak flow 0.04 mgd peak flow Approximately 100 upstream EDUs Greenspot West Replace 15,400 ft of 21- to 24-inch with 30-inch pipeline District gpm peak flow 0.22 mgd peak flow Approximately 550 upstream EDUs East Trunk Sewer - 6th Street Replace 5,500 ft of 27- to 39-inch with 36- to 48-inch pipeline Regional At Capacity (Immediately) North East Trunk Sewer Replace 7,500 ft of 21- to 30-inch with 30- to 36-inch pipeline Regional At Capacity (Immediately) 4.5 WATER RECLAMATION PLANT OPTION ANALYSIS Given the size, timing, and concentrated location of the proposed developments, the District has a unique opportunity to consider expanding its services to include wastewater treatment and recycled water production. Developing reclamation capabilities provides benefits to the District such as creating a new water supply or supplementing groundwater reserves. Three alternative Water Reclamation Plant (WRP) options were evaluated against the current system operations, or baseline, to determine feasibility. This section describes the different WRP options, which vary in capacity from mgd. Each option was simulated in the 2035 wet weather model to determine the potential reduction in the identified capacity improvements. The proposed location for the WRP is along Greenspot Road. The current system operation and three alternatives include: Baseline: Continued. Use the existing system and to treat and dispose of all of the District s flows. This option requires the identified capacity improvements described previously in this chapter. WRP Option 1: Offload 1.33 mgd (Harmony Alternative). Build a WRP for the Harmony Development to treat and dispose of up to 1.33 mgd of average wastewater flows. WRP Option 2: Offload 2.25 mgd (Boulder Alternative). Build a WRP to treat and dispose of up to 2.25 mgd of average wastewater flows. It is assumed that wastewater flows in the system BLACK & VEATCH Capacity Analysis 4-17

18 Flow (mgd) EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan would be provided to the proposed treatment plant via a pump-back station along Greenspot Road near Boulder Avenue. WRP Option 3: Offload 3.85 mgd (Highway 210 Alternative). Build a WRP to treat and dispose of up to 3.85 mgd of average wastewater flows. It is assumed that wastewater flows in the system would be provided to the proposed treatment plant via a pump-back station along Greenspot Road near Hwy 210. Table 4-5 Summary of Offload Flow for WRP Options OPTION MINIMUM DRY WEATHER FLOW (MGD) AVERAGE DRY WEATHER FLOW (MGD) PEAK DRY WEATHER FLOW (MGD) PEAK WET WEATHER FLOW (MGD) WRP Option WRP Option WRP Option For each WRP option, Figure 4-10 presents the available ADDF that could be diverted to a potential WRP. Figure 4-10 Estimated Potential WRP Flows WRP Option MGD / Harmony WRP Option MGD / Boulder Ave. WRP Option MGD / Highway Interim 2035 Note: The Interim flow projection assumes half of the flow estimated from the known major developments. BLACK & VEATCH Capacity Analysis 4-18

19 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan The three WRP options were evaluated in the 2035 wet weather model to determine the potential reduction in the identified capacity improvements, as compared to those identified in the baseline scenario. Table 4-6 includes a summary of the required capacity improvements for each option. Table 4-6 Summary of Capacity Improvements Baseline Scenario: Continued OPTION WRP Option 1: Offload 1.33 mgd (Harmony Alternative) WRP Option 2: Offload 2.25 mgd (Boulder Alternative) WRP Option 3: Offload 3.85 mgd (Hwy 210 Alternative) REQUIRED CAPACITY IMPROVEMENT Greenspot East - 21,000 ft of 12-inch pipeline Greenspot West - 15,400 ft of 30-inch pipeline East Trunk Sewer 6th Street - 5,500 ft 36- to 48-inch pipeline Greenspot West - 15,400 ft of 30-inch pipeline East Trunk Sewer 6th Street - 5,500 ft 36- to 48-inch pipeline East Trunk Sewer 6th Street - 5,500 ft 36- to 48-inch pipeline East Trunk Sewer 6th Street - 5,500 ft 36- to 48-inch pipeline Note: Table does not include Victoria Avenue and North East Trunk Sewer capacity improvement projects because they are not affected by the potential WRP options. As shown in the Table 4-6, a potential WRP will offload the system by diverting flows to be treated at a local WRP instead of conveyed through the District s mains and East Trunk Sewer, and treated at. These alternative options assume that no flows will bypass the facility, meaning that the facility will include solids handling and have capacity to receive peak wet weather flows. Model results show that Greenspot East upgrades can be avoided if the District conveys no flows from Harmony Development. Moreover, the model shows that the Greenspot West replacement project can be avoided with the implementation of either a 2.25 mgd or 3.85 mgd WRP. The initial capacity of any WRP Option will be less than the projected 2035 flows. If a WRP Options is selected, the construction of the facility will likely be phased to accommodate existing and projected flows. For example, if WRP Option 3 is selected, the facility would likely have three phases. The initial phase may include 1.25 mgd of treatment with the remaining future phases adding an additional 1.25 mgd of treatment when required. To determine avoided capacity improvements for each WRP Option, it was assumed that the WRP Options would include solids handling and peak flow management. WRPs that do not include solids handling and/or peak flow management are typically referred to as Scalping Plants and require capacity in downstream sewers. Scalping Plants typically discharge solids ranging in flow from 5 to 15 percent of the treatment capacity to the downstream sewers with potentially minimal impacts to the collection system and increased Biological Oxygen Demand (BOD) concentrations at regional treatment facilities. Wet weather flows, if not stored at the WRP, could potentially overload downstream sewers providing limited or no reduction in the identified capacity improvements. Expanding District services to include water reclamation will have its benefits and constraints. Wastewater is being viewed more and more as a resource as opposed to a waste. The District s entry into water reuse would provide a new locally controlled resource available to help offset water supplies and to help comply with California SB X7-7 water conservation requirements. BLACK & VEATCH Capacity Analysis 4-19

20 EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan Having a WRP also opens up the possibility of eventually supplementing groundwater supplies. However, there will be large capital and operational costs associated with the construction and operation of a WRP that the District does not currently incur. The District currently does not operate wastewater pumping or treatment facilities and would need to provide training to existing staff and/or supplement current staff. Additional WRP considerations and disposal options are included in Appendix H. BLACK & VEATCH Capacity Analysis 4-20

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection 4.15.3.1 ENVIRONMENTAL SETTING Wastewater Collection The City owns, operates, and maintains the local sewer lines that collect wastewater generated within the City. The existing sewer lines include a gravity

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY Fernando Gonzalez, Adel Hagekhalil, Bryan Trussell, City of Los Angeles Bureau of Sanitation

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

SPILL ESTIMATION. Not Just A Guess Anymore

SPILL ESTIMATION. Not Just A Guess Anymore SPILL ESTIMATION Not Just A Guess Anymore SPILL ESTIMATION Under current regulations accurate spill estimation has become critical to the operation and maintenance of a sanitary collection system Reporting

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

Section 3 - Land Use, Population, and Water Demands. Section 3

Section 3 - Land Use, Population, and Water Demands. Section 3 Section 3 - Land Use, Population, and Water Demands Section 3 SECTION 3 DEMANDS LAND USE, POPULATION, AND WATER This section describes the existing water demands, the population projections, and the projected

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

CHAPTER 5 WASTEWATER FLOWS

CHAPTER 5 WASTEWATER FLOWS CHAPTER 5 WASTEWATER FLOWS 5.1 REGIONAL FACILITIES Regional Water Recycling Plants Figure 5-1 illustrates the service area boundaries for IEUA s four water recycling plants. The four Regional facilities

More information

CHAPTER 4 HYDRAULIC ANALYSIS

CHAPTER 4 HYDRAULIC ANALYSIS CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is

More information

TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS

TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS 6%34(6%4(2 )%&+-+4+(3 1-%/ 51 %4( :=>?;9 406/ 0) -0/ 0/ (227! /(6 *%.13*+2(,8A #""$ TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS SECTION DESCRIPTION PAGE ES

More information

Sag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11)

Sag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11) بسم هللا الرحمن الرحيم Sag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11) A sewer that drops below the hydraulic gradient to pass under an obstruction, such as a railroad cut,

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel 5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study Dynamic Hydraulic Modeling of a Wastewater Treatment Plant City of Fort Worth Case Study AGENDA Drivers for a Dynamic Integrated Large WWTP Hydraulic Model Model Development Modeling Conduits and Bends

More information

Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan

Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan Mark Andrews 1*, P.Eng., Imran Motala 2, P.Eng., Chris Hunniford 3, Jim Joyce

More information

Prepared for: Stanislaus County th Street Modesto, CA (209)

Prepared for: Stanislaus County th Street Modesto, CA (209) CROWS LANDING INDUSTRIAL BUSINESS PARK SANITARY SEWER INFRASTRUCTURE AND FACILITIES STUDY November 30, 2017 by AECOM Technical Services, Inc. 2020 L Street, Suite 400 Sacramento, CA 95811 (916) 414-5800

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

November 28, Dear Mr. Bechtold:

November 28, Dear Mr. Bechtold: 4000 Hollywood Boulevard Seventh Floor, North Tower Hollywood, Florida 33021 (954) 987-0066 Fax: (954) 987-2949 November 28, 2012 Wastewater Compliance and Enforcement Section FLORIDA DEPARTMENT OF ENVIRONMENTAL

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

4.1 Browns Canal Introduction Sub-basin Information

4.1 Browns Canal Introduction Sub-basin Information Section 4 Withlacoochee Basin 4.1 Browns Canal 4.1.1 Introduction The information presented in this sub-basin plan for Browns Canal is intended to provide the reader with information necessary to understand

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

Appendix B. Storm Drain System Data

Appendix B. Storm Drain System Data MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO

More information

SEWAGE TREATMENT AND DISPOSAL

SEWAGE TREATMENT AND DISPOSAL SEWAGE TREATMENT AND DISPOSAL QUANTITY OF SANITARY SEWAGE AND STORM WATER Zerihun Alemayehu Unpolluted cooling water Intercept or sewer Sources of Sewage Residential and commercial sewage Industrial wastewater

More information

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public

More information

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

SSO Response Standard Operating Procedures

SSO Response Standard Operating Procedures This Page Intentionally Left Blank SSO Response Standard Operating Procedures / OCTOBER 2007 This Page Intentionally Left Blank 2 ADMINISTRATIVE A. Introduction 1. This SOP is a set of instructions or

More information

4.1 General Methodology and Data Base Development

4.1 General Methodology and Data Base Development Chapter 4 METHODOLOGY 4.1 General and Data Base Development This report project utilized several computer software models and analysis techniques to create the numeric data on which decisions for this

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

Section 5 - Planning Criteria. Section 5

Section 5 - Planning Criteria. Section 5 Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 2545 Guy N Verger Boulevard, Tampa, FL 33605 www.tampagov.net TECHNICAL STANDARDS

More information

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge Integrated Water Resources Plan Option 11 Divert Water from Miocene and Hendricks Canal to Supply the Ridge This option would use water from the Miocene Canal and/or Hendricks Canal for municipal supplies

More information

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce Lake County Success Generating Environmental Gains With Geothermal Power By Mark Dellinger, Administrator, Lake County (CA) Sanitation District, and Eliot Allen, Principal, Criterion/Planners Engineers

More information

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

The City of Adel. Chapter 8 - Utilities Investment Plan. Prepared February 2009 by:

The City of Adel. Chapter 8 - Utilities Investment Plan. Prepared February 2009 by: The City of Adel Chapter 8 - Utilities Investment Plan Prepared February 2009 by: Adel Comprehensive Plan CHAPTER 8 Utilities Investment Plan Adel operates its own potable water system and facultative

More information

Chapter 8 Addressing I/I Issues and High Flows

Chapter 8 Addressing I/I Issues and High Flows Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of

More information

Phase 2 CSO Control Plan/Wellington Avenue CSO Facility

Phase 2 CSO Control Plan/Wellington Avenue CSO Facility 4.0 Hydrologic and Hydraulic Modeling 4.1 Overview and Modeling Approach In accordance with AECOM s scope of services for Phase 2, a hydrologic and hydraulic model was prepared for the Wellington Avenue

More information

Appendix A3 Connector Lines Between Stations June 1999 (Updated April 2010)

Appendix A3 Connector Lines Between Stations June 1999 (Updated April 2010) Appendix A3 Connector Lines Between Stations June 1999 (Updated April 2010) MADISON METROPOLITAN SEWERAGE DISTRICT COLLECTION SYSTEM TECHNICAL GUIDELINES APPENDIX 3 CONNECTOR LINES BETWEEN STATIONS Stations

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Northfield Township WWTP Capacity Evaluation Report

Northfield Township WWTP Capacity Evaluation Report Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100

More information

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177 WEST BRICKELL CENTRE Major Use Special Permit 290 SW 10 th Street, 245 SW 11 th Street,240-270 SW 10 th Street, 251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street Site Utility Study

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents

More information

LAFCO ANNEXATION TO JURUPA COMMUNITY SERVICES DISTRICT (TTM RIVERBEND)

LAFCO ANNEXATION TO JURUPA COMMUNITY SERVICES DISTRICT (TTM RIVERBEND) 4.a. 4/17/2014 TO: FROM: Local Agency Formation Commission Adriana Romo, Local Government Analyst II SUBJECT: LAFCO 2013-10-2 ANNEXATION TO JURUPA COMMUNITY SERVICES DISTRICT (TTM 36391-RIVERBEND) PRIOR

More information

WWTF Capacity Assessment Project

WWTF Capacity Assessment Project Wastewater Treatment Facility Evaluation The Richland WWTF was constructed in 1985 to provide primary and secondary treatment for the City's wastewater. Section 3 includes a general description of the

More information

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper F-3-05 PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

More information

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section April 20, 2015 Sanitation Districts of Los Angeles County Wastewater Collection

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

2.0 PROJ ECT D ESCRI PTION

2.0 PROJ ECT D ESCRI PTION 2.0 PROJ ECT D ESCRI PTION 2.1 PROJECT LOCATION The proposed project is in the City of Los Angeles (Figure 2.1-1, Regional Project Location Map) in the communities of Venice and Playa Del Rey (see Figure

More information

FY 2018 Proposed Capital Improvement Program

FY 2018 Proposed Capital Improvement Program FY 2018 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2018 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project. EXECUTIVE SUMMARY FINDINGS: Based on the results of this feasibility study, the Platte Republican Diversion Project would be cost-effective. With minimal improvements to the channel, and the existing bridge

More information

Section 6 Design Criteria Sanitation Facilities

Section 6 Design Criteria Sanitation Facilities Section 6 Design Criteria Sanitation Facilities 6.1 Background CVWD provides sanitation (wastewater) service for a large portion of the Coachella Valley including the communities of Bombay Beach, Cathedral

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

COMPREHENSIVE SANITARY SEWER SYSTEM PLAN

COMPREHENSIVE SANITARY SEWER SYSTEM PLAN COMPREHENSIVE SANITARY SEWER SYSTEM PLAN Prepared for: City of Rosemount 2875 145 th Street West Rosemount, MN 55068 December 28, 2007 Prepared by: WSB & Associates, Inc. 701 Xenia Avenue South, Suite

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

1969 Western Judgment History and Application. January 7, 2011 Board of Public Utilities

1969 Western Judgment History and Application. January 7, 2011 Board of Public Utilities 1969 Western Judgment History and Application January 7, 2011 Board of Public Utilities Presentation Overview Overview of the Judgment Safe Yield Summary RPU Water Rights by Basin Judgment Overview Complaint

More information

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS for WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY WASHINGTON TOWNSHIP, FRANKLIN COUNTY, PENNSYLVANIA Prepared by: CET Engineering Services

More information

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems

More information

Sewer Collection System Master Plan

Sewer Collection System Master Plan Sewer Collection System Master Plan Prepared for City of Pacific Grove Public Works Department May 2014 Prepared by 612 CLARION COURT SAN LUIS OBISPO CALIFORNIA 93401 T 805 544-4011 F 805 544-4294 www.wallacegroup.us

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

Start-up of a Secondary Water Supply Company. and First Phase Design of a Regional System

Start-up of a Secondary Water Supply Company. and First Phase Design of a Regional System Start-up of a Secondary Water Supply Company and First Phase Design of a Regional System by Stephen W. Smith and Amy L. Johnson Abstract. Highland Ditch Company formed the Highland Secondary Water Company

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

GOALS, OBJECTIVES, & POLICIES

GOALS, OBJECTIVES, & POLICIES ELEMENT 9 INFRASTRUCTURE ELEMENT STORM WATER MANAGEMENT SUB-ELEMENT Goal 1 To provide adequate stormwater management facilities and services to meet the present and future needs of the University and to

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

City of San Jose Storm Sewer Master Plan

City of San Jose Storm Sewer Master Plan City of San Jose Storm Sewer Master Plan Anne Symonds, PE and Mira Chokshi, PE 2016 Pacific Water Conference AWWA Hawaii Section HWEA February 4, 2016 Agenda Introduction and Goals of the Project Background

More information

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements: TNC Fisher Slough Final Design and Permitting Subject: Inverted Siphon Construction Feasibility To: From: Jenny Baker (TNC) Dave Olson (DD3) Brian Olson (DD17) Bob Boudinot Skagit County David Cline (Tetra

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

Raw Water Supply Master Plan Development

Raw Water Supply Master Plan Development Raw Water Supply Master Plan Development Stakeholder Outreach Meeting - II 31 August 2016 Welcome Introductions Master Plan Goals and Objectives Refine our standard approach to long-term plan for securing

More information

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT#

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT# 1 ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT# 2011-0504 FUNDED BY: MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY CLEAN MICHIGAN INITIATIVE CLEAN WATER FUND LANSING, MI PREPARED

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

3 PROJECT DESCRIPTION

3 PROJECT DESCRIPTION 3.1 PROJECT OVERVIEW 3 PROJECT DESCRIPTION The Rocklin 60 project (proposed project) includes the subdivision of 56.9 acres of land, construction of 179 single-family, detached dwelling units, and installation

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

CITY OF PITTSBURG DEVELOPMENT OF WATER AND SEWER FACILITY RESERVE CHARGES

CITY OF PITTSBURG DEVELOPMENT OF WATER AND SEWER FACILITY RESERVE CHARGES FINAL ADMINISTRATIVE DRAFT CITY OF PITTSBURG DEVELOPMENT OF WATER AND SEWER FACILITY RESERVE CHARGES April 2005 Prepared by: 201 North Civic Drive, Suite 115 Walnut Creek, California 94596-3864 March 28,

More information

CTCN assistance in Thailand

CTCN assistance in Thailand CTCN assistance in Thailand Strengthening Bangkok s Early Warning System to respond to climate induced flooding Deliverable 2 (Activity 1.2.1) Mapping and understanding of the existing BMA data management

More information