1 What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While we seem to intuitively understand that rain water will flow away to the lowest point the physical processes are not always well understood or predictable. This paper will discuss the physical hydrologic and hydraulic processes taking place, and how computer models replicate these processes. As these processes can be very complex, it is also important to carefully consider the different types of computer model available. This paper will provide key points for users to consider when deciding on what level of modelling to undertake to achieve the desired outcomes. Introduction We are all familiar with the part of the water cycle that drainage modelling attempts to predict. When water falls from the sky and there is enough rainfall then puddles will form. If the rainfall continues then surface flow will commence, and in extreme events flooding will occur. Flooding is simply having too much water at one location, but sometimes the cause of flooding may not be obvious. The water may have travelled long distances to cause these floods. Therefore to model drainage systems we need to understand where the water is coming from, determine how much there is, and where it will go. Sounds simple enough, so what s so hard? Before we can successfully model a situation we need to have identified a problem, and decided that a model would be a useful tool to help develop a solution. Often the problem is not clearly defined: in the case of drainage modelling problems are typically identified by localised failures (i.e. flooding) which have occurred as a result of system wide conditions. It will be necessary to develop a solution that considers the technical, financial, environmental, social and political aspects. Ideally this can be achieved but not with one single model. Determining whether a solution was successful will be mean different things for the stakeholders. Fundamental model differences Our first step is to determine which model we are to create. Broadly speaking there are two types of models; process models and data models. Process models are what we as engineers tend to be familiar with. Rain falls on a catchment; the catchment has some characteristics that generate runoff; this flows down a conduit to an outfall. Data models are different. Outputs are generated from inputs without describing the intermediate steps i.e. outflow is a function of rainfall. Both types of models are useful and if used appropriately can deliver an appropriate solution. Figure 1 shows an example of a process model and a data model.
2 Figure 1: A process model and a data model The simplest approaches to drainage modelling have often involved considering the peak water level of a historical event. These simplistic data sets provide a report on how the catchment has behaved for specific events, and if data is available for a range of events can allow the development of a mathematical prediction model. This type of model will not be satisfactory when the catchment is changing, or it is necessary to know the timing of an event (such as a road being flooded). In these instances we need to develop a processed based model to provide the required flexibility. To create a process model we will need to determine our catchment and conditions. By catchment we need to consider the area on which rain falls; the ground topography, the type of surfaces, and any pipes etc that will convey the water. The conditions include the rainfall both intensity and duration, whether the catchment is wet or dry and if there are flows from elsewhere entering the catchment. In helping to understand the wide range of process models available it is important to consider how drainage modelling has evolved. The significant increases in computing power and available software have allowed models of with increased degrees of freedom to be developed.
3 The Rational Method The Rational Method is one of the simplest models and was developed to predict a peak flow for an area. The formula is one of the best known hydraulic equations: Q=0.278*CIA where Q is peak flow (m³/s), C is the runoff coefficient, I is the rainfall intensity (mm/hr) and A is the catchment area (km²). While being a simplistic approach with only three variables, this equation has already identified information to be sourced:-catchment size, rainfall intensity and the runoff coefficient. Catchment size is easy to determine, however rainfall intensity and the runoff coefficient are not as simple as may first be thought. The recommended method for determining C is model calibration to a historic event. It is also necessary to note that Australian Rainfall and Runoff (AR&R) observes the value of the runoff coefficient C varies widely from storm to storm on a given catchment. It is therefore important to consider which C factor will be used in the final model. The derivation of a runoff coefficient (or equivalent parameters) applies to all process models, although the methodology for developing a C factor where limited calibration data is available varies. Section of AR&R contains important advice for anyone using the Rational Method. Rainfall intensities can be developed by following formulae provided in publications such as AR&R, and will depend on the location you are modelling. One limitation of the rational method is that it considers a single rainfall intensity over the whole catchment area. AR&R also highlights the inadequate manner in which the [rational] method considers physical factors such as the effects of temporary storage on the catchment, and temporal and spatial variations of rainfall intensity. If spatial rainfall is a concern it is possible to model several smaller connected catchments with different intensities, although now it will be necessary to consider how the flows are routed through the catchment. The simplest approach is simply to add the peak flows together. This will not consider any attenuation effects in the system and is not appropriate for complex systems. Unit Hydrographs AR&R defines a unit hydrograph as the hydrograph resulting from unit depth of surface runoff produced by a storm of uniform intensity and specified duration. Rather than give a single peak flow, this method allows the consideration of the variation in flow as the event progresses. Development of a unit hydrograph allows some consideration of the physical characteristics of the catchment under investigation such as baseflow and initial loss estimates. Baseflow is comprised of the elements of flow that typically have a longer lag or travel time, such as groundwater infiltration. A Unit Hydrograph study assumes: Catchment linearity; that there is a linear relationship between the input rainfall and the outflow hydrograph (interestingly AR&R observed that for flood events with an ARI greater
4 than 1.5 years this may be correct, but for smaller events a non linear runoff routing approach should be used); Catchment as a lumped system; that there is one single rainfall hyetograph evenly distributing rain over the catchment as a whole. As before, this limitation can be mitigated by creating smaller catchments and including a routing model. It is important to note that the unit hydrograph approach is usually not suitable for very large catchments, very small catchments, nor to urban catchments. As such it is important that while allowing more complex studies to be undertaken there are important assumptions that should be clearly understood before applying this method Routing models When we talk about routing models there are two main areas that need to be considered. Routing within a catchment can simply be considered using a time of concentration to delay the onset of the rainfall response, but this may not adequately represent a particular catchment. More complex methods such as single linear, single non-linear and double linear routing can be adopted. For example, a single linear method the surface runoff flow flows into an imaginary reservoir, which has a defined routing coefficient depending on the catchment characteristics, such as area, slope, impermeable areas, catchment length. The effect of this reservoir is that the inflow is stored and released at a later timestep, and at a reduced peak flow, and that this relationship is linear in nature. A double linear would have the outflow from the first imaginary reservoir entering a second reservoir before flowing from the catchment. Flow is also routed within the modelled assets, such as pipes and channels. A Energy Grade Line (EGL) analysis should be undertaken to determine the Hydraulic Grade Line (HGL) as shown in Figure 2. An EGL analysis is undertaken by using the energy equation and commences at the downstream end of system. Headlosses due to structures such as culverts and friction head are added to determine the energy line at the upstream end of the pipe and then the velocity head is subtracted to find the HGL, or water level, in the system. Figure 2: Hydraulic Grade Line Output Calibration and Verification Events When building a model of a drainage system it is very important to have historic events (ideally both rainfall and flooding) with which to check the model results. The level of detail available for these events will affect the confidence that can be applied to the model results.
5 It may be that there is detailed telemetry data available for both rainfall and flows, but this is unusual for drainage systems. It is far more common to have a single daily rainfall figure and top water level. Historical events are critical in creating a validated model that is capable of providing meaningful results. It is important to note that there is a key difference between model results from actual rainfall and model results from a design storm. Results obtained from design storm simulations will have a defined average recurrence interval (ARI), whereas actual rainfall events will only have an approximated ARI. Design Rainfall Events A design flood is a probabilistic or statistical estimate and is generally based on some form of probability analysis of flood or rainfall data. For the design situation, the antecedent conditions are unknown and must be assumed, often implicitly in the design values that are to be adopted. It will come as no surprise that the estimation of design rainfall to be applied on the model is another critical factor in predicting a response in the system. There are currently three different approaches for determining the input rainfall, and it is important to understand the differences in these. Deterministic (Single Event) As has already been mentioned there are well documented equations available for developing design storms with a defined Average Recurrence Interval (ARI) and duration. These equations consider the likelihood of an event and aim to provide an event of known statistical frequency. Thus a solution can be developed that performs satisfactorily for a specific ARI and this level of service can be regulated and applied across different organisations. It is important to not only consider, but also understand, the effects of the choice of initial conditions. As the rainfall is a mathematical construct and not a real event there is no information available as to whether the catchment is wet or dry at the commencement of the storm and whether storages are empty, full or somewhere in between. It is necessary for the modeller to clarify the position of these as this can have a significant effect on the system. Comprehensive (Continuous Simulations) In a continuous simulation a rainfall time series is used and the model s variables change throughout the simulation. Choice of a historic time series or generation of a synthetic series is very important as it is necessary to ensure that the series is representative of the situation to be modelled. For instance choosing a two year time series of rainfall may not be appropriate given we in Australia have a strong four to seven year El Nino cycle. Typically a larger period of time say 30 years is chosen to avoid these smaller climactic effects. Figure 3 shows a 30 year rolling average rainfall for Melbourne and demonstrates how the choice of time series can have a significant effect.
6 Figure 3: Melbourne Rainfall In the Melbourne scenario a wet 30 year period could have up to 12% more rainfall than a dry period. It is also important to consider whether the period included a few large events or was generally wetter. Also it is worth noting that the period with the highest 30 year average rainfall includes the driest recorded rainfall year. While providing a large set of results for analysis this type of analysis does require good quality data, and a lot of computer power as 30 years of data at 6 minute intervals gives a rainfall record with 2,629,800 entries! Computer models can incorporate parameters that change with time, and if the model is to show a real 30 years it will also be important to consider how the model catchments (runoff changes due to development) and assets (decreased pipe conveyance due to increased roughness or sedimentation) will change over this period. Alternately, time series data can be applied to a snapshot model, to increase confidence in the model s results by providing a larger data set. It is very important to understand the differences in these two approaches. Probabilistic (Monte Carlo Simulations) The probabilistic methods, such as Monte Carlo simulations, use historic information to generate mathematical models that can be used to predict data. These models can be used to generate synthetic rainfall records to apply to process models. As these models are mathematically based it is possible to generate many different probable rainfall scenarios. It is important to note that the new release of AR&R will have an increased focus on Monte Carlo Simulation and its uses. The Monte Carlo approach is often used with continuous simulation and can avoid some of the major assumptions required when using deterministic methods. Genetic Algorithms As with probabilistic simulations the increase in computing power and sophistication has allowed more consideration of more scenarios. Genetic algorithms while commonplace in pressurised water reticulation modelling are currently not widely used in gravity systems.
7 The main limitation is due to simulation times (gravity models tend to have significantly longer run times than pressure models). Dynamic or Steady State models? Steady state models consider the system at a snapshot and simply work from the upstream end of the system adding flows as the model considers different pipes. Obviously this can lead to errors, particularly when storage is an issue within the system as the model has no way of filling or emptying as there is no true comparison of different timesteps. For the uninitiated however, the replay of results from these steady state models can incorrectly imply that these models are able to consider these system effects. Dynamic models do fully solve the St Venant equations and undertake an iterative approach to solve the backwater equations. These models are able to consider networks with dynamic storage issues (such as detention basins, offline storage, pumped networks and flat systems). Multi dimensional models It can appear that the more dimensions a model considers the better the results will be but this is not always the case. To quickly summarise a very large topic a one dimensional (1D) model will consider flow in one dimension. This is justified and accepted for urban underground systems where flow can only occur in one direction along the pipe. Two dimensional (2D) models provide a framework where momentum is conserved in two dimensions and are suited to applications where flow paths are hard to determine or where point velocities are required. Three dimensional (3D) models conserve momentum in three dimensions. This detailed modelling is very useful in instances such as tidal intrusions where saline content will vary with depth and flows at the top of the river and the bottom may be different. More dimensions in a model will require more data and more equations, hence longer runtimes (or smaller catchment studies) and usually more cost. It is also very important to consider how these models are to be calibrated. It seems that the best solution will be nested models, where smaller pockets of 2D (or 3D) analysis will be included within a larger 1D model.
8 Other Modelling Considerations So far we have discussed many of the key elements of drainage modelling. There are however many other aspects which should be considered when selecting a method, or tool to use. If your rainfall is actually snow you will need to have a model that considers the accumulation and melting of snow on the catchment. If you have flows from sources other than rainfall, i.e. groundwater infiltration from high water table or tidal influences your mode will need a module that can consider this. Likewise evaporation effects may need to be included. More complicated structures such as culverts (and the different control regimes), bridges, pump stations, detention basins, roadside pits and sustainable urban drainage structures (SUDS) can all be considered within the model, and can have significant effects on estimated and observed flood levels. Conclusions In conclusion drainage modelling is not straightforward. While we all know what happens when it rains there are lots of areas where we are unable to completely describe the physical processes occurring in a form that is suitable for computer calculations. However there are many excellent tools available for anyone wishing to undertake a drainage study. It should be appreciated that these tools are very different and an inappropriate choice can lead to devastating consequences. The use of statistics and sensitivity analysis should not be overlooked as these additional studies can aid understanding and confidence in model results. And finally it Is very important to calibrate and validate any model whether it be process or data driven, dynamic or steady, 1D, 2D or 3D. References and further reading Hill, P and Mein, R and Siriwardena, L. (1998), How much rainfall becomes runoff? CRC for Catchment Hydrology, Report 98/5 Nathan, R. and Wienmann, E (2005), Presentation given at the November 2005 Workshop on the AR&R re-write, Book III Chapter 4 Monte Carlo Simulation. Nov%202005_Book3_Chapter4_%20MonteCarlo.pdf van Waveren, R.H et al (1999), Good Modelling Practice Handbook, Aquest Bureau of Meteorology, Monthly Data for Melbourne Regional Office, Bureau of Meteorology Wallingford Software Ltd, InfoWorks CS version 8 Online Help, Wallingford Software Ltd Institution of Engineers Australia, Australian Rainfall and Runoff Volumes 1 and 2, (2003), Engineers Australia
THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED
THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED Mark Pennington, Engineer, Pattle Delamore Partners Ltd, Tauranga ABSTRACT The Rational Method has been in use in some form or another at least since
More informationPhase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection
DRAFT Technical Memorandum Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility Hydraulic Modeling Software Selection Prepared for: City of Newport Public Works Department 70 Halsey Street Newport,
More informationChapter 7 : Conclusions and recommendations
Chapter 7 : Conclusions and recommendations 7.1 Conclusions The main goal of this research was to investigate the modelling and rainfall data requirements for the design of combined sewer systems and the
More informationIndex. Page numbers followed by f indicate figures.
Index Aerodynamic method, 103, 110 111 Algae, 131, 173, 175 Alternate depth, 88 Alternating block method, 132, 140 141 Attenuation, 106, 107f, 118, 120 Page numbers followed by f indicate figures. Baseflow
More informationINTEGRATION OF MONTE CARLO SIMULATION TECHNIQUE WITH URBS MODEL FOR DESIGN FLOOD ESTIMATION
INTEGRATION OF MONTE CARLO SIMULATION TECHNIQUE WITH URBS MODEL FOR DESIGN FLOOD ESTIMATION Ataur Rahman 1, Don Carroll 2, Erwin Weinmann 3 1 Physical Infrastructure Centre, School of Civil Engineering,
More informationSTORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies
STORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies Chapter 5 " HYDROLOGIC SYSTEMS " CHAPTER 5 5.1 INTRODUCTION 5.1.1 Training Objectives The objectives of this module are:! to
More informationUncertainty in Hydrologic Modelling for PMF Estimation
Uncertainty in Hydrologic Modelling for PMF Estimation Introduction Estimation of the Probable Maximum Flood (PMF) has become a core component of the hydrotechnical design of dam structures 1. There is
More informationURBAN FLOODING: HEC-HMS
1.0 Introduction URBAN FLOODING: HEC-HMS -Sunil Kumar, Director, NWA All major ancient civilisations were developed in the river valleys because river served as source of water, food, transportation and
More informationAPPENDIX G HYDRAULIC GRADE LINE
Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm
More informationSoftware Applications for Runoff Hydrological Assessment
Bulletin UASVM Horticulture, 67(2)/2010 Print ISSN 1843-5254; Electronic ISSN 1843-5394 Software Applications for Runoff Hydrological Assessment Severin CAZANESCU 1), Sorin CIMPEANU 1), Oana GUI 2), Dana
More informationUNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH
UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH INTRODUCTION Water is a common chemical substance essential for the existence of life and exhibits many notable and unique
More informationDRAINAGE & DESIGN OF DRAINAGE SYSTEM
Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means
More informationFlood Forecasting - What Can You Do With Your Data?
Flood Forecasting - What Can You Do With Your Data? C Druery 1, D McConnell,2 1 WorleyParsons, Sydney, NSW 2 WorleyParsons, Sydney, NSW Abstract Driven by the large scale flooding over the past several
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design
More informationImpact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour
9th International Conference on Urban Drainage Modelling Belgrade 2012 Impact of sewer condition on urban flooding: a comparison between simulated and measured system behaviour Marco van Bijnen 1,2, Hans
More informationAssessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia
Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Yuk San LIEW 1*, Fang Yenn TEO 1,2, Aminudin AB. GHANI 3 1 National Hydraulic Research Institute of Malaysia
More information2
1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.
More informationTaking the pain out of the treatment train: continuous simulation modelling for integrated water management
Engineers & Consultants Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Stu Farrant & Reuben Ferguson, Morphum Environmental Limited Abstract
More informationGwinnett County Stormwater System Assessment Program
Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced
More informationProject Drainage Report
Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater
More informationIntegrated urban water systems modelling with a simplified surrogate modular approach
Integrated urban water systems modelling with a simplified surrogate modular approach Z. Vojinovic 1 *, and S.D. Seyoum 2 Department of Hydroinformatics and Knowledge Management, UNESCO-IHE, Institute
More informationRAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT
10 th International Conference on Hydroinformatics HIC 2012, Hamburg, GERMANY RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT CHI DUNG DOAN (1)(3), JIANDONG LIU (1), SHIE-YUI LIONG (1), ADRI VERWEY
More informationThe Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces
The Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces M. Mansell* and F. Rollet School of Engineering and Science, University of the West of Scotland, Paisley
More informationHydrology and Water Management. Dr. Mujahid Khan, UET Peshawar
Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff
More informationThe role of domestic rainwater harvesting systems in storm water runoff mitigation
European Water 58: 497-53, 217. 217 E.W. Publications The role of domestic rainwater harvesting systems in storm water runoff mitigation I. Gnecco *, A. Palla and P. La Barbera Department of Civil, Chemical
More informationSection 600 Runoff Table of Contents
Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability
More informationHYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY
HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY Fernando Gonzalez, Adel Hagekhalil, Bryan Trussell, City of Los Angeles Bureau of Sanitation
More informationThe Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives
More informationRunoff Hydrographs. The Unit Hydrograph Approach
Runoff Hydrographs The Unit Hydrograph Approach Announcements HW#6 assigned Storm Water Hydrographs Graphically represent runoff rates vs. time Peak runoff rates Volume of runoff Measured hydrographs are
More informationChapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall
6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures
More informationSurge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel
5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan
More informationDefinitions 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology
GG22A: GEOSPHERE & HYDROSPHERE Hydrology Definitions Streamflow volume of water in a river passing a defined point over a specific time period = VxA discharge m 3 s -1 Runoff excess precipitation - precipitation
More informationA part of BMT in Energy and Environment Portarlington East Drainage / Flood Study Final Report
A part of BMT in Energy and Environment S Portarlington East Drainage / Flood Study Final Report R.M7373.003.02.FinalReport October 2009 Portarlington East Drainage/Flood Study Final Report Prepared For:
More informationModelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality
Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Frances J. CHARTERS 1, Thomas A. COCHRANE 1, Aisling D. O SULLIVAN 1 1
More informationAppendix 4 ADB. IN THE 6 CI's RIVER BASIN TERRITORY - PACKAGE B. Final Report B.2 - Strategic Spatial Planning
ADB TA 7189-INO: INSTITUTIONAL STRENGTHENING FOR INTEGRATED WATER RESOURCES MANAGEMENT (IWRM) IN THE 6 CI's RIVER BASIN TERRITORY - PACKAGE B Final Report B.2 - Strategic Spatial Planning Appendix 4 Modeling
More informationAppendix D. Flood Study Report
Appendix D Flood Study Report New Hope Coal Horse Creek Base Case (Natural Conditions) and Diversion Flood Study for Elimatta Mine 28 March 2014 Contents Page number 1. Introduction 1 1.1 Background 1
More information5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview
WinTR-55 for Plan Reviews Small Watershed Hydrology Overview 1 Overview Course Outline Historical Background Program Description Model Capabilities and Limitations This is the Overview portion of the training.
More informationWater sensitive urban design. Developing design objectives for urban development in South East Queensland
Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1
More informationDESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.
Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to
More information1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).
1. Stream Network The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). First Order Streams streams with no tributaries. Second Order Streams begin at
More informationReview & Design of the Apia Pressure Sewer System. Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions
Review & Design of the Apia Pressure Sewer System Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data Collection Physical
More informationTraining Course Brochure Building Capacity in Rural & Urban Water Management
Training Course Brochure 2015 Building Capacity in Rural & Urban Water Management Introduction The WastePro Academy seeks to encourage the use of desktop software applications in the water and environmental
More informationCLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 600 STORM RUNOFF TABLE OF CONTENTS 601 INTRODUCTION 603 601.1 - Basin Characteristics 603 602 TIME OF
More information6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff
October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design
More informationCity of Oakland. Public Works Agency Standards STORM DRAINAGE DESIGN GUIDELINES. Engineering Design & ROW Management Division
City of Oakland PUBLIC WORKS AGENCY 250 FRANK H. OGAWA PLAZA 4 TH FLOOR OAKLAND, CALIFORNIA 94612 (510) 238-3437 FAX (510) 238-7227 TTD (510) 238-3254 Public Works Agency Standards STORM DRAINAGE DESIGN
More informationSTORM WATER MANAGEMENT REPORT
Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek
More information10.0 Storm Sewer Systems
October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and
More informationUrban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr.
32 Urban Drainage A.Ramachandra Rao Purdue University C.B. Burke Christopher B. Burke Engineering, Ltd. T.T. Burke, Jr. Christopher B. Burke Engineering, Ltd. 32.1 Introduction 32.2 The Rational Method
More informationIntegrating soakaway infiltration devices in distributed urban drainage models from allotment to neighbourhood scale
Integrating soakaway infiltration devices in distributed urban drainage models from allotment to neighbourhood scale M. Bergman*, P. Binning*, G. Kuczera **, P. S. Mikkelsen* and O. Mark*** * Department
More informationUse of SWAT for Urban Water Management Projects in Texas
Use of SWAT for Urban Water Management Projects in Texas Jaehak Jeong and Allan Jones Texas AgriLife Research Presentation Outline Modeling of Urban Watersheds and Stormwater Best Management Practices
More informationTable of Contents. Overview... 1
Chapter 3 Chapter 3 Table of Contents Overview... 1 Rainfall... 2 3-2-1 Rainfall Depths and Intensities... 2 3-2-2 Design Storm Distribution for Colorado Urban Hydrograph Procedure (CUHP)... 5 3-2-3 Temporal
More informationModule 3. Lecture 4: Introduction to unit hydrograph
Lecture 4: Introduction to unit hydrograph (UH) The unit hydrograph is the unit pulse response function of a linear hydrologic system. First proposed by Sherman (1932), the unit hydrograph (originally
More informationUnderstanding. Hydraulics. palgrave macmillan. Les Hamill. University of Plymouth THIRD EDITION
Understanding Hydraulics THIRD EDITION Les Hamill Senior Lecturer in Civil Engineering, School of Marine Science and Engineering, University of Plymouth palgrave macmillan Preface to third edition Acknowledgements
More informationHighway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination
Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse
More informationContinuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2
Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2 PRESENTED AT THE SFWMD WORKSHOP PRE-DEVELOPMENT VERSUS POST DEVELOPMENT RUNOFF VOLUME ANALYSIS
More informationSustainable Urban Stormwater Best Management Practices with InfoSWMM Sustain plus InfoSWMM 2D and SWMMLive
Sustainable Urban Stormwater Best Management Practices with plus InfoSWMM 2D and SWMMLive Contents 01 Introduction to Sustain What is and How Can it Help Evaluate BMPs and LIDs for sustainability goals?
More informationPoints. To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants.
Points Available 3 Aim of Credit To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants. Credit Criteria Up to three points are available.
More informationFlood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE
10th International Drainage Workshop of ICID 06.-11. July 2008 Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE Background hydrological
More informationThe hydrologic and hydraulic study of the behaviour of the Nyl River floodplain
River Basin Management IV 149 The hydrologic and hydraulic study of the behaviour of the Nyl River floodplain C. F. B. Havenga 1, A. Jeleni 1, W. V. Pitman 2 & A. K. Bailey 2 1 Department of Water Affairs
More informationiswm TM Technical Manual Hydrology:
: 1.0 2.0 Downstream Assessment 3.0 Streambank Protection 4.0 Water Balance 5.0 Rainfall Tables 6.0 Hydrologic Soils Data Table of Contents 1.0... HO-1 1.1 Estimating Runoff... HO-1 1.1.1 Introduction
More information3.0 Planning and Submittal Requirements
October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)
More informationAdvice to decision maker on coal mining project
. Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January
More informationSECTION 6 STORMWATER AND LAND DRAINAGE
SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS... 2 6.1.1 General... 2 6.2 MEANS OF COMPLIANCE... 3 6.2.1 General...
More informationOverview of NRCS (SCS) TR-20 By Dr. R.M. Ragan
Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes
More information1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle
1.6 Influence of Human Activities and Land use Changes on Hydrologic Cycle Watersheds are subjected to many types of changes, major or minor, for various reasons. Some of these are natural changes and
More informationABSTRACT UNCERTAINTY AND SENSITIVITY ANALYSES OF THE MUSKINGUM-CUNGE CHANNEL ROUTING MODEL. Stephen Scott Reid, Master of Science, 2008
ABSTRACT Title of Thesis: UNCERTAINTY AND SENSITIVITY ANALYSES OF THE MUSKINGUM-CUNGE CHANNEL ROUTING MODEL Stephen Scott Reid, Master of Science, 2008 Thesis directed by: Professor Richard H. McCuen Department
More informationAPPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)
APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr
More informationANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER
Civil Engineering Forum Volume XXII/ - May 03 ANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER Ruhban Ruzziyatno Directorate General of Water Resources, Ministry of Public Works, Republic
More informationLa Riereta Catchment Sant Boi de Llobregat
La Riereta Catchment Sant Boi de Llobregat Final Report Team 2 Enrique Amaya (COL) Lilian Yamamoto (BRA) Martín Pez (ARG) Sergio Esquivel (MEX) Instructor: José Macor Summary Contents 1. Introduction...
More informationRainwater Harvesting for Domestic Water Supply and Stormwater Mitigation
Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation C Liaw 1, W Huang 2, Y Tsai 3, and, J Chen 4 1 President, Taiwan Rainwater Catchment Systems Association, Chliaw@ms41.hinet.net
More informationDRAINAGE CRITERIA MANUAL (V. 1) RUNOFF
Section CONTENTS Page RO- 1.0 OVERVIEW... 1 2.0 RATIONAL METHOD... 3 2.1 Rational Formula... 3 2.2 Assumptions... 4 2.3 Limitations... 4 2.4 Time of Concentration... 5 2.4.1 Initial Flow Time... 5 2.4.2
More informationRainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area
Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural
More informationNote that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools.
Remote Software This document briefly presents the hydrological and hydraulic modeling software available on the University of Nice Server with Remote Desktop Connection. Note that the Server provides
More information16.0 Water Quality Management Criteria for Developed Land
October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any
More informationStream Reaches and Hydrologic Units
Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation
More informationEvent and Continuous Hydrological Modeling with HEC- HMS: A Review Study
Event and Continuous Hydrological Modeling with HEC- HMS: A Review Study Sonu Duhan *, Mohit Kumar # * M.E (Water Resources Engineering) Civil Engineering Student, PEC University Of Technology, Chandigarh,
More informationDAM BREAK ANALYSIS & DISASTER MANAGEMENT PLAN
11 DAM BREAK ANALYSIS & DISASTER MANAGEMENT PLAN 11.1 INTRODUCTION 11.1.1 Dam Break Phenomenon The construction of dams in rivers can provide considerable benefits such as the supply of drinking and irrigation
More informationEffect of the Underlying Groundwater System on the Rate of Infiltration of Stormwater Infiltration Structures.
Effect of the Underlying Groundwater System on the Rate of Infiltration of Stormwater Infiltration Structures. Presented at: Storm Water Infiltration & Groundwater Recharge A Conference on Reducing Runoff
More informationSummary of Detention Pond Calculation Canyon Estates American Canyon, California
July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i
More informationCTCN assistance in Thailand
CTCN assistance in Thailand Strengthening Bangkok s Early Warning System to respond to climate induced flooding Deliverable 2 (Activity 1.2.1) Mapping and understanding of the existing BMA data management
More informationUsing SWMM 5 in the continuous modelling of stormwater hydraulics and quality
Using SWMM 5 in the continuous modelling of stormwater hydraulics and quality M.J. Cambez 1, J. Pinho 1, L.M. David 2 * 1 Trainee at Laboratório Nacional de Engenharia Civil (LNEC) 2 Research Officer at
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationFacilities Development Manual
State of Wisconsin Department of Transportation Facilities Development Manual ORIGINATOR Director, Bureau of Highway Development PROCEDURE 13-25-35 CHAPTER 13 Drainage SECTION 25 Storm Sewer Design SUBJECT
More informationRainfall - runoff: Unit Hydrograph. Manuel Gómez Valentín E.T.S. Ing. Caminos, Canales y Puertos de Barcelona
Rainfall - runoff: Unit Hydrograph Manuel Gómez Valentín E.T.S. ng. Caminos, Canales y Puertos de Barcelona Options in many commercial codes,, HMS and others HMS Menu Transform method, User specified,
More informationPre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015
Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What
More informationBrisbane River Catchment Flood Study overview
Brisbane River Catchment Flood Study overview Brisbane River Catchment Flood Study overview Floods can and do occur in the Brisbane River catchment. The Queensland Government, local councils and the community
More informationChapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY
Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY... 6-1 6.1 Introduction... 6-1 6.1.1 Objective... 6-1 6.1.2 Definition... 6-1 6.1.3 Factors Affecting Floods... 6-1 6.1.4 Sources of Information...
More informationCHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF
CHAPTER 3 STORMWATER HYDROLOGY Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF 3.1.1 Introduction to Hydrologic Methods...3.1-1 3.1.2 Symbols and Definitions...3.1-3 3.1.3 Rainfall
More informationCHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow
Engineering Hydrology (ECIV 4323) CHAPTER FIVE Runoff Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib Overland flow interflow Base flow Saturated overland flow ١ ٢ 5.1 Introduction To Runoff Runoff
More informationI/I Analysis & Water Balance Modelling. Presented by Paul Edwards
I/I Analysis & Water Balance Modelling Presented by Paul Edwards Contents Background Wet Weather Model Calibration Inflow / Infiltration Assessment Flow Containment Options Water Balance Model 20 Year
More informationLecture 9A: Drainage Basins
GEOG415 Lecture 9A: Drainage Basins 9-1 Drainage basin (watershed, catchment) -Drains surfacewater to a common outlet Drainage divide - how is it defined? Scale effects? - Represents a hydrologic cycle
More informationStanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado
7.5 FRASER RIVER EXTENDED STREAMFLOW PREDICTION SYSTEM Stanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado Esther Vincent and Andy Pineda * Northern
More informationHydraulic Analysis of Storm Diversion System (SDS) of Hatirjheel Begunbari Lake of Dhaka City
Hydraulic Analysis of Storm Diversion System (SDS) of Hatirjheel Begunbari Lake of Dhaka City Lamisa Malik and M. Abdul Matin Abstract This paper deals with the hydraulic analysis of storm diversion system
More informationUrban Flood Evaluation in Maceió, Brazil: Definition of the Critical Flood Event Supported by a Mathematical Cell Model
Urban Flood Evaluation in Maceió, Brazil: Definition of the Critical Flood Event Supported by a Mathematical Cell Model Vidal, D.H.F 1*, Barbosa, F.R 1, and Miguez, M.G 1 1 Federal University of Rio de
More informationIntegrated Catchment Modelling
Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration
More informationSuspended Sediment Discharges in Streams
US Army Corps of Engineers Hydrologic Engineering Center Suspended Sediment Discharges in Streams April 1969 Approved for Public Release. Distribution Unlimited. TP-19 REPORT DOCUMENTATION PAGE Form Approved
More informationStormwater Local Design Manual For Houston County, Georgia
Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.
More informationModelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity
9th International Conference on Urban Drainage Modelling, Belgrade 2012 C4. Climate change impacts, pp.287-288 Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity