EA Frameworks Case Study

Size: px
Start display at page:

Download "EA Frameworks Case Study"

Transcription

1 EA Frameworks Case Study Tajikistan Community Agriculture & Watershed Management The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008

2 Project Safeguard Policy Process Integrated Safeguards Data Sheet (ISDS) Trigger 4.01/4.09 EA EMP EA Pest Management Plan Project Appraisal Document (PAD) identifies triggered safeguards, project classification, and safeguard provisions PAD Annex 10 Safeguard Policy Issues Legal Covenants: Implement with agreed EMP & PMP

3 Project Components Rural Production Investments ($12 million): farm productivity investments, land resource management, rural infrastructure (average $4800) Institutional Support and Capacity Building ($4.3 million): research and demonstration, community mobilization and subproject preparation Project Management and Coordination ($3.6 million): national project management unit, project coordination units for 4 watersheds, and evaluation

4 Rural Production Investments: Farm productivity investments - input for annual crops, horticulture, livestock, processing, distribution, leasing, credit facilities Land resource management land groups apply soil conservation, moisture management, investments such as horticulture, woodlots, fodder Rural infrastructure drinking water, small irrigation, rural track rehabilitation, small power generation

5 Potential Impacts The environmental impact is expected to be largely positive. Potential negative impacts could result from poor design and implementation: soil erosion due to poorly managed farm management systems and degradation of adjacent natural habitats and plant species; improper and indiscriminate disposal of animal wastes; environmental damages caused by improper construction activities; and increased use of pesticides and fertilizers resulting in increased pollution of surface and groundwater

6 EA/Environmental Management Framework - disclosed WB EA Policy & EA Requirements Tajikistan Environmental Policy and EA Requirements EA Frameworks for Subprojects - procedures for subproject environmental assessment, - roles and responsibilities for implementation, - environmental management guidelines, - environmental monitoring and supervision arrangements, - institutional strengthening steps

7 EA/Pest Management Plan- disclosed Provisions of integrated pest management assessment, development, training, and networking Replacement of harmful pesticide regimes with environmentally friendly alternatives

8 Additional Key Attributes Minor impacts from small works will follow proper design standards. Before approval, authorities will verify subprojects comply with relevant national. local environmental laws and regulations and be consistent with Bank policy and procedures. Projects will be reviewed by different authorities depending on the overall project cost. As a condition of disbursement, the PMU was required to hire an Environmental Specialist. $50,000 was allocated for training and equipment to enhance environmental assessment and management of government, civil society and project related staff

9 Operational Manual Initial communications Initial participatory analysis by local inhabitants Indicative descriptions of potential rural production investment activities Group process and eligibility guidelines Village and CIG organizational issues Involvement of Jamoat Development Committee Involvement of Watershed Development Committee and State Level Steering Committee Involvement of Project Management Unit, Project Coordination Unit, contracted facilitators and specialists, and line agency personnel

10 Operational Manual Annex 1 lists possible tools to be used in the participatory analysis Annex 2 provides an indicative list of detailed questions on feasibility and eligibility that the subproject proposals will need to address Annex 3 provides a format for the subproject Memorandum of Understanding (MOU) Annex 4 outlines a checklist for project committees to use when reviewing subproject proposals, and Annex 5 provides suggested terms of reference for the NGO contracts.

11 Operational Manual Annex 4 Environmental Soundness & Sustainability Does the subproject involve pest management, and if so, are integrated pest management methods being proposed? Will the subproject generate any wastes during construction or operation (air, liquid or solid)? If so, how will these be handled? Have measures been devised to prevent, minimize or treat these wastes? Have measures been devised for ultimate disposal of any waste residues? Does the subproject involve land use? If so, does the subproject design provide for sustainable land resource management? Does the subproject impact endangered plant or animal species (e.g., risk of invasive exotic weeds, conversion of natural habitats)? If so have alternative site and design options been evaluated to prevent or minimize these impacts? Does the subproject affect any surface or ground water sources? If so, have the impacts on downstream users been assessed and measures provided for source protection?

12 Operational Manual Annex 4 Environmental Soundness & Sustainability Does the subproject site present environmentally viable location and have alternative sites been considered for the proposed activity? Have alternative activities been considered for the proposed site? Does the subproject require an Environmental Management Plan (EMP), or a limited environmental assessment plus EMP? If so, has the raion level environmental inspector cleared the subproject (if subproject requires financing US$5,000 or below) or make recommendations (if required financing is US$5,000 or more)? If requiring more than US$5000 financing or special cases, has the Ministry of Nature Protection provided environmental clearance? If an EMP is required, is the capacity for implementing and monitoring the EMP adequate? If an EMP is required, have its costs been accounted for? Might the subproject have environmental implications for other subprojects, and if so, have these subprojects been considered within a larger planning context?

13 Community-level environmental assessments Key Environmental Categories and Questions Examples of Category Questions 1a) Surface Water: How will/does the subproject activity affect surface water runoff? How will/does it affect the peaks (flood discharges)? How will/does it affect the amount of water flow? 2 Vegetation: How will/does the subproject affect the quantity/amount of vegetation in the area covered? Will the amount of vegetation be reduced or increased overall? How will/does the subproject affect the demand on trees, bushes, grasses, etc? Will the demand increase or decrease?

14 Community-level environmental assessments 3a) Soil Erosion:Where land surfaces will be /are affected by the subproject, will/does the subproject produce favorable or unfavorable results? Will erosion be more or less likely as a result of the subproject activities? 4 BiodiversityHow will/does the subproject affect the natural fauna and flora? How will/does the subproject affect natural regeneration of vegetation? How will/does the subproject affect the demand for local biodiversity?

15 Community-level environmental assessments 6 Legal: What official approvals are needed in order to implement the subproject? Do subproject activities violate local/national regulations?

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 06-Feb-2013

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Date ISDS Prepared/Updated: 28-May-2015

More information

Safeguard Requirements And the Framework Process

Safeguard Requirements And the Framework Process Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/05/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

Status of climate change adaptation in agriculture sector for Lao PDR.

Status of climate change adaptation in agriculture sector for Lao PDR. Status of climate change adaptation in agriculture sector for Lao PDR. 1 st Rhine-Mekong Symposium Climate change and its influence on water and related sectors 8-9 May 2014, Koblenz, Germany Vanxay, DDMCC

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 22-Jul-2015 Report.: ISDSC13452 Date ISDS Approved/Disclosed: 06-Aug-2015 Public Disclosure Authorized

More information

Integrated Dairy Productivity Improvement Project. Environmental and Social Management Framework *

Integrated Dairy Productivity Improvement Project. Environmental and Social Management Framework * Kyrgyz Republic Integrated Dairy Productivity Improvement Project Environmental and Social Management Framework * Bishkek, 2018 * The new edition of the document is prepared due to the restructuring of

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02-Nov-2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB447 Project Name. KRASNODAR AGRICULTURAL NUTRIENT REDUCTION PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB447 Project Name. KRASNODAR AGRICULTURAL NUTRIENT REDUCTION PROJECT Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB447 Project Name KRASNODAR AGRICULTURAL NUTRIENT REDUCTION PROJECT Region EUROPE AND CENTRAL ASIA Sector General agriculture, fishing and

More information

Report No.: ISDSA1091

Report No.: ISDSA1091 Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 04-Mar-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Approved/Disclosed: 22-Apr-2015 Report No.: ISDSA1091 Public Disclosure

More information

Component 1: Building Climate Resilience of Watersheds in Mountain Eco-Regions

Component 1: Building Climate Resilience of Watersheds in Mountain Eco-Regions Component 1: Building Climate Resilience of Watersheds in Mountain Eco-Regions Rationale The Project will support the implementation of the Strategic Program for Climate Resilience (SPCR) which has been

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 19-Feb-2014

More information

ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CHINA ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 11-Sep-2013

More information

Policy on Payment for Ecosystem Services (PES) in Himachal Pradesh

Policy on Payment for Ecosystem Services (PES) in Himachal Pradesh Policy on Payment for Ecosystem Services (PES) in Himachal Pradesh 1. INTRODUCTION i. The people of Himachal Pradesh have traditionally depended on rich and diverse mountain ecosystems. The State has a

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5868. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5868. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

ARMENIA: Access to Finance for Small and Medium Enterprises Environmental Safeguard Review Framework

ARMENIA: Access to Finance for Small and Medium Enterprises Environmental Safeguard Review Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E2058 ARMENIA: Access to Finance for Small and Medium Enterprises Environmental Safeguard

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/25/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

SHARE AND CARE NEPAL Lalitpur. Environmental Policy 2066 (2009) Share and Care Nepal P.O. Box: Kathmandu

SHARE AND CARE NEPAL Lalitpur. Environmental Policy 2066 (2009) Share and Care Nepal P.O. Box: Kathmandu SHARE AND CARE NEPAL Lalitpur Environmental Policy 2066 (2009) Share and Care Nepal P.O. Box: 10657 Kathmandu Table of Content CHAPTER 1: BACKGROUND... 2 CHAPTER 2: OBJECTIVES... 2 CHAPTER 3: POLICIES/STRATEGIES...

More information

( ) Page: 1/10 NOTIFICATION

( ) Page: 1/10 NOTIFICATION 20 September 2016 (16-4994) Page: 1/10 Committee on Agriculture Original: Spanish NOTIFICATION The following submission, dated 12 September 2016, is being circulated at the request of the delegation of

More information

Summary - Project/Program Concept Note for the Use of Additional PPCR Resources. XPCRTJ040A SPCR endorsement date: 10 November 2010

Summary - Project/Program Concept Note for the Use of Additional PPCR Resources. XPCRTJ040A SPCR endorsement date: 10 November 2010 PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Concept Note for the Use of Additional PPCR Resources 1. Country/Region: Tajikistan 2. CIF Project ID#: XPCRTJ040A ---- -- 3. SPCR endorsement

More information

Greening Rural Development in India

Greening Rural Development in India Greening Rural Development in India UNDP s report shows that greening the Government s rural development schemes will have positive economic impact because greening will: contribute to inclusive local

More information

Addressing Key Environmental Hazards after an Earthquake

Addressing Key Environmental Hazards after an Earthquake Addressing Key Environmental Hazards after an Earthquake A. International Experience 1. Environmental management is not a well-recognized priority issue in an emergency situation. So rather than confine

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: October 21, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Western Africa Project Name: Africa Emergency Locust Project

More information

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc Dubrovnik, 07 October 2009 Structure of Presentation 1. A Bit

More information

INTEGRATEDSAFEGUARDSDATASHEET APPRAISAL STAGE

INTEGRATEDSAFEGUARDSDATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATEDSAFEGUARDSDATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Development Bank of Ethiopia Small and Medium Enterprises Finance Project. Environmental and Social Risk Management Summary of Policy and Procedures

Development Bank of Ethiopia Small and Medium Enterprises Finance Project. Environmental and Social Risk Management Summary of Policy and Procedures Development Bank of Ethiopia Small and Medium Enterprises Finance Project Environmental and Social Risk Management Summary of Policy and Procedures Addis Ababa, Ethiopia Updated on August, 2016 Table of

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Irrigated Agriculture Inclusive Development Project (RRP MYA 712) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The technical assistance (TA) attached to the Asian Development Bank (ADB) Irrigated Agriculture

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 05-Aug-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 11-Sep-2015 Report.: ISDSC14874 Date ISDS Approved/Disclosed: 11-Sep-2015 I. BASIC INFORMATION A. Basic Project Data Country:

More information

BETTER COTTON ASSURANCE PROGRAM

BETTER COTTON ASSURANCE PROGRAM BETTER COTTON ASSURANCE PROGRAM CONTINUOUS IMPROVEMENT PLAN TEMPLATE FOR SMALLHOLDERS APPLICABLE FROM 2014 HARVEST SEASON Orientation The Better Cotton Performance Scale for Smallholders includes as Minimum

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 15-May-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/10/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/15/2015 INTEGRATED SAFEGUARDS DATASHEET

More information

S e c t i o n B i o d i ve r s i t y

S e c t i o n B i o d i ve r s i t y S e c t i o n 2. 2 - B i o d i ve r s i t y The District has a wealth of ecosystems which support indigenous vegetation and habitats of indigenous fauna. Many of these ecosystems are the remnants of the

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 03/08/2007 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2566 1. Basic Project Data Country: Lesotho Project ID: P088544 Project Name: Private

More information

Greening Agriculture Policies and Laws

Greening Agriculture Policies and Laws Greening Agriculture Policies and Laws What? Greening agricultural business is introducing environmental measures to result in sustainable economic benefits - reducing overconsumption (losses pollution,.

More information

o o o

o o o o o o o o o o o o o o o o o o o Percentage of Respondents 7 66 6 25 25 9 11 22 13 28 0-10 years 11-20 years 21-30 years 30+ years Percentage of Decision Maker Respondents Percentage of Respondents 6

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Promoting Innovation for Inclusive Financial Access Project Environmental and Social

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Agriculture and Forestry No 0538/MAF Vientiane, Date 09/02/2011 Agreement of the Minister on Good Agriculture

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date prepared/updated: l 6~November-2016 ISDSA13271 I. Basic Information INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Report No.: 1 B as1c. P ro.1ec ' td a t a Country: South Africa Project ID: P150008

More information

Participatory Agricultural Development and Empowerment Project (PADEP)

Participatory Agricultural Development and Empowerment Project (PADEP) The United Republic of Tanzania MINISTRY OF AGRICULTURE AND FOOD SECURITY Participatory Agricultural Development and Empowerment Project (PADEP) ENVIRONMENTAL AND SOCIAL FRAMEWORK Environmental Guidelines

More information

FOREST, WETLANDS AND HABITAT A SYST FOR FOREST, WETLANDS AND HABITAT LANDOWNERS. FAS 115 October 2014 New

FOREST, WETLANDS AND HABITAT A SYST FOR FOREST, WETLANDS AND HABITAT LANDOWNERS. FAS 115 October 2014 New FOREST, WETLANDS AND HABITAT A SYST FOR FOREST, WETLANDS AND HABITAT LANDOWNERS FAS 115 October 2014 New FWH A Syst System Improvement Action Plan Risk question List high-risk practice(s) from FWH A Syst

More information

UNIVERSITY OF GUYANA SCIENCE AND TECHNOLOGY SUPPORT PROJECT (P125288) Environmental Management Framework for the Research Fund

UNIVERSITY OF GUYANA SCIENCE AND TECHNOLOGY SUPPORT PROJECT (P125288) Environmental Management Framework for the Research Fund Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GUIDE FOR SCREENING AND ENVIRONMENTAL PROJECT MANAGEMENT OF THE RESERCH FUND UNIVERSITY

More information

Conservation Practices for Water Quality: Sediment & Nutrient Control. Trap Sediments/Trap Nutrients on the Field. Improve Soil Health.

Conservation Practices for Water Quality: Sediment & Nutrient Control. Trap Sediments/Trap Nutrients on the Field. Improve Soil Health. Conservation Practices for Water Quality: Sediment & Nutrient Control. Trap Sediments/Trap Nutrients on the Field. Improve Soil Health. Sediment Conservation Cover Cover Crop Critical Area Planting Field

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/21/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291 Project Name

More information

Potentialities for CDM in Africa Sudan case Abdalla Gaafar Mohammed Forests National Corporation Sudan

Potentialities for CDM in Africa Sudan case Abdalla Gaafar Mohammed Forests National Corporation Sudan Potentialities for CDM in Africa Sudan case Abdalla Gaafar Mohammed Forests National Corporation Sudan 1 Forest Cover Background Forest area in the Sudan declined from 43% (estimated by and Harrison and

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1030 Project Name. WATER RESOURCE MANAGEMENT PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1030 Project Name. WATER RESOURCE MANAGEMENT PROJECT Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1030 Project Name WATER RESOURCE MANAGEMENT PROJECT Region EUROPE AND CENTRAL ASIA Sector Irrigation and drainage (100%) Project ID P087964

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized b Date ISDS Prepared/Updated: 13-Feb-212 1. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 04/13/2006 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2194 1. Basic Project Data Country: Burkina Faso Project ID: P098956 Project Name: Post-Primary

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Country Partnership Strategy: People s Republic of China, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Sector Road Map A. Sector Performance, Problems,

More information

Soil and Water Conservation/ Watershed Management

Soil and Water Conservation/ Watershed Management Vandna B.Tech., 6 th Semester Department of Civil Engineering JNGEC Sundernagar, Mandi (H.P.) 175018 ABSTRACT The watershed is a geographical area through which water flows in the form of streams, rivers,

More information

ISSUES PROPOSED INTERVENTIONS. Water Scarcity and Pollution. Inadequate Legislation. Overexploitation. Human Settlements and Migration

ISSUES PROPOSED INTERVENTIONS. Water Scarcity and Pollution. Inadequate Legislation. Overexploitation. Human Settlements and Migration Sindh Strategy 66 CHAPTER 6 Wetlands Wetlands are amongst the most productive ecosystems in the world with extensive and rich food webs and biodiversity. Due to their location on the flyway to Central

More information

SOURCE WATER ASSESSMENT SUMMARY BROCHURE

SOURCE WATER ASSESSMENT SUMMARY BROCHURE SOURCE WATER ASSESSMENT SUMMARY BROCHURE USFS WOLF CREEK JOB CORPS PWS # 4101095 WHAT IS A SOURCE WATER ASSESSMENT? The Source Water Assessment was recently completed by the Department of Environmental

More information

Horticultural Development within the Peel-Harvey Coastal Plain Catchment

Horticultural Development within the Peel-Harvey Coastal Plain Catchment Local Planning Policy Horticultural Development within the Peel-Harvey Coastal Plain Catchment Introduction The expansion of in-ground horticulture in Peel-Harvey Coastal Catchment Area (Coastal Catchment

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Report No. PID5987 Project Name Turkey-Sanliurfa and Harran Plains (+)... Onfarm and Village Development Project Region Sector Project ID Borrower Europe and Central Asia Agriculture and Rural Development

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 30-May-2013

More information

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved.

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved. STANDARD Document information Version: v4.8 Dec 2012 Language: English Date: Dec 2012 (c) 2012 European Water Partnership. All rights reserved. PAGE LEFT BLANK ON PURPOSE European Water Stewardship (EWS)

More information

Formation, Achievements and Challenges of Water User Associations: The case of Ilonga Water User

Formation, Achievements and Challenges of Water User Associations: The case of Ilonga Water User Formation, Achievements and Challenges of Water User Associations: The case of Ilonga Water User Association in Kilosa district By Laurent Kadeng`uka, Chairman, Ilonga Water User Association, P.O. Box

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Chapter 13 of Agenda 21

Chapter 13 of Agenda 21 Chapter 13 of Agenda 21 What is Agenda 21? Agenda 21 is the global plan of action that was adopted at the United Nations Conference on Environment and Development (UNCED) held in Rio de Janeiro, Brazil,

More information

Popular Kheti. Volume-2, Issue-3 (July-September), 2014 Available online at popularkheti.info ISSN:

Popular Kheti. Volume-2, Issue-3 (July-September), 2014 Available online at popularkheti.info ISSN: Watershed Management- Solution to Water Crisis Rahul Chopra*, Ajeet Singh, Pravisha Lahoty and Manisha Rana Rajasthan College of Agriculture, MPUAT, Udaipur-313001 *Email of corresponding author: rahulrockingcool969@gmail.com

More information

Carter Holt Harvey Woodproducts Australia: Verification of controlled wood supply according to FSC-STD (V2-1) EN Annex 3: woodchip supply.

Carter Holt Harvey Woodproducts Australia: Verification of controlled wood supply according to FSC-STD (V2-1) EN Annex 3: woodchip supply. Woodproducts Australia Timber Carter Holt Harvey Woodproducts Australia: Verification of controlled wood supply according to FSC-STD-40-005(V2-1) EN Annex 3: woodchip supply. Contents Introduction... 1

More information

Sarina Abdysheva, TCI, Ankara Kunduz Masylkanova, TCI, Rome Dinara Rakhmanova, AFAOR, Bishkek. Investment Days, Rome 14 December 2011

Sarina Abdysheva, TCI, Ankara Kunduz Masylkanova, TCI, Rome Dinara Rakhmanova, AFAOR, Bishkek. Investment Days, Rome 14 December 2011 Sarina Abdysheva, TCI, Ankara Kunduz Masylkanova, TCI, Rome Dinara Rakhmanova, AFAOR, Bishkek Investment Days, Rome 14 December 2011 FAO office and ongoing activities in Kyrgyzstan Cooperation between

More information

Role of Soils in Water Quality. Mike Marshall Extension Associate Texas A&M-Institute of Renewable Natural Resources

Role of Soils in Water Quality. Mike Marshall Extension Associate Texas A&M-Institute of Renewable Natural Resources Role of Soils in Water Quality Mike Marshall Extension Associate Texas A&M-Institute of Renewable Natural Resources Water Quality in Texas Water is a finite resource that can be impaired by pollution from

More information

Soil Degradation. Lesson Plan NRES B2-9

Soil Degradation. Lesson Plan NRES B2-9 Soil Degradation Lesson Plan NRES B2-9 Objectives 1. What is soil degradation? 2. How can construction result in soil degradation? 3. What are the sources of contamination, and how do they result in soil

More information

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components:

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/17/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Olives ecosystems and biodiversity - considerations for action in the EU

Olives ecosystems and biodiversity - considerations for action in the EU Olives ecosystems and biodiversity - considerations for action in the EU IOC Madrid 18/11/09 Guy Beaufoy EFNCP 1 How important are olive ecosystems for European biodiversity? The EU aims to stop biodiversity

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

FSC Principles and Criteria for Forest Stewardship

FSC Principles and Criteria for Forest Stewardship Country/ Organization Initiative Membership Governing bodies Type and implementation approach Feedstock(s) covered Type(s) of biofuels covered Link Overview. FSC Principles and Criteria for Forest Stewardship

More information

Factors affecting agricultural production

Factors affecting agricultural production Annex 11 Factors affecting agricultural production Agricultural production, including food and other crops and livestock husbandry, is determined by the interaction of farmers with: natural resources -

More information

Policy Brief. Kazakhstan Case Study Policy Brief. #ELDsolutions

Policy Brief. Kazakhstan Case Study Policy Brief.   #ELDsolutions THE ECONOMICS OF LAND DEGRADATION www.eld-initiative.org #ELDsolutions Policy Brief Kazakhstan Case Study Policy Brief More sustainable land management in desert forests can lead to economic and environmental

More information

SABI Code of Practice for On-farm Irrigation Design

SABI Code of Practice for On-farm Irrigation Design SABI Code of Practice for On-farm Irrigation Design This code was developed to provide guidelines for irrigators and those servicing irrigators on developing a new irrigation system or upgrading an existing

More information

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT

More information

Watercourses and Wetlands and Agricultural Activities

Watercourses and Wetlands and Agricultural Activities Watercourses and Wetlands and Agricultural Activities Watercourses and regulated wetlands can be found throughout New Brunswick, including on agricultural lands. The Clean Water Act defines a watercourse

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date prepared/updated: 10/09/12 I. Basic Information INTEGRATED SAFEGUARDS DATASHEET

More information

STRATEGIC PLAN Introduction II. Mission Statement III. The Challenge Federal Noxious Weed Act of 1974

STRATEGIC PLAN Introduction II. Mission Statement III. The Challenge Federal Noxious Weed Act of 1974 VENTURA COUNTY WEED MANAGEMENT AREA (VCWMA) STRATEGIC PLAN 2010 I. Introduction The Ventura County Weed Management Area (VCWMA) is a focused group of individuals, Federal, State and County public agencies,

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

Conservation Planning

Conservation Planning Conservation Planning Good Conservation Planning vs Good Conservation Plan Good Planning = Following the 9 step planning process with proper documentation(including CPA-52 Environmental Worksheet and CPA-15

More information

LAND, WATER AND ENVIRONMENT FARM AFRICA S APPROACH

LAND, WATER AND ENVIRONMENT FARM AFRICA S APPROACH LAND, WATER AND ENVIRONMENT FARM AFRICA S APPROACH CONTENTS Farm Africa s vision Preface What s the issue? Theory of change Farm Africa s approach Methodology How to use Farm Africa s approach papers FARM

More information

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores October 2015 Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores WaterNSW on behalf of the NSW Government

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

E2227 V2 THE GOVERNMENT OF RWANDA MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)

E2227 V2 THE GOVERNMENT OF RWANDA MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E2227 V2 THE GOVERNMENT OF RWANDA MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI)

More information

INTRODUCTION TO HOBBY FARMING AND WATER QUALITY

INTRODUCTION TO HOBBY FARMING AND WATER QUALITY SECTION ONE INTRODUCTION TO HOBBY FARMING AND WATER QUALITY This is a handbook for owners of Hobby Farms - small scale farms operated primarily as a residential lifestyle - to provide their owners with

More information

NATURAL RESOURCE SCIENCE I (170)

NATURAL RESOURCE SCIENCE I (170) DESCRIPTION Students will demonstrate knowledge and skills related to production management and conservation of natural resources. Major units will include ecology, range resources, waste managements,

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 31-Mar-2016

More information

Introduction of Spate Irrigation in Somalia/Somaliland

Introduction of Spate Irrigation in Somalia/Somaliland Introduction of Spate Irrigation in Somalia/Somaliland Abdiwahab Hamud Ahmed/Amina Muhumed Abdilahi FAO-Somalia Nairobi, Kenya 4th March 2016 Outline of presentation Status of climatic conditions of Somalia

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK MINISTRY OF SCIENCE AND TECHNOLOGY VIETNAM CLIMATE INNOVATION CENTER PROJECT P 155260 ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Report No.: ISDSA12877

Report No.: ISDSA12877 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o O Date ISDS Prepared/Updated: 15-Apr-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I069892

More information

Water Quality and Agriculture - a water industry perspective

Water Quality and Agriculture - a water industry perspective Water Quality and Agriculture - a water industry perspective Arjen Frentz, Vewin Chair EurEau Committee on Drinking Water FAIRWAY-Waterprotect meeting on 6 December Who is EurEau? EurEau Our We Employing

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information