B6/27 Exploration Drilling

Size: px
Start display at page:

Download "B6/27 Exploration Drilling"

Transcription

1 Environmental Impact Assessment Study for B6/27 Exploration Drilling February 2010

2 Project Location Project Egypt IRAN Australia

3 Near shoreline of Chumphon and Suratthani Covers an area of 1,307 sq.km. Chumphon Sawi Thung Tako Lang Suan Koh Tao Lamae Koh Samui Suratthani

4 Project Drilling Plan 12 wells will be drilled during Approx. 37 day/ well (to complete all activities) Approx day/ well (for drilling period)

5 Pictures of Existing Tripods in Block 6/27

6 CSR Activities

7 CSR Activities (cont d)

8 CSR Activities (cont d)

9 CSR Activities (cont d)

10 EIA Process Scoping Stakeholder Engagement Meetings (Round I) Review of Project Description Primary Data Baseline Survey Existing Environment Secondary Data Compilation Conduct of Impact Assessment Mitigation Measures and Monitoring Programme Stakeholder Engagement Meetings (Round II) Prepare a Draft EIA Report Submit the report to EIA Consent Agencies

11 EIA Study Timeline

12 Study Area Muang Chumphon Sawi Thung Tako Koh Tao Lang Suan Lamae Legend Proposed Well Location Block 6/27 Boundary Koh Samui

13 Aspects of Impact Assessment Environment Social Health Physical Environment Geography Climate and Meteorology Air Quality Oceanography Seawater Quality Geology Bathymetry Seabed Deposit Biological Environment Marine Species Rare or Endangered Species Sensitive Areas Protective Areas Human Use Fishery and Coastline Aquaculture Transportation, Navigation, and Port Sealine and Other Subsea Infrastructures Quality of Life Demography, and Socioeconomic Tourism Subsea Archaeological Sites Public Health and Safety Occupational Health and Safety of Project Employee Accidental Risk

14 Possible Impacts Obstructing navigation Loss of temporary fishery areas Damage on fishing gears Impacts on sediment Increase of accident cases

15 Stakeholder Engagement Activities Meetings Round I to introduce the Project as well as to disseminate information and study scope to stakeholders Round II to propose environmental measures to stakeholders Attitude Survey By using questionnaire to collect opinion/ comment/ suggestion from stakeholders

16 Stakeholder 1) Directly Impacted Group(s) 2) Group(s) gaining benefit/ advantage from the Project 3) Community Leader(s) 4) Relevant Governmental Agencies 5) Association, NGO, Savant, and Academic 6) Mass Media 7) Any Interested Parties

17 Mitigation Measures Environmental Measures Do not drill during the blockage period for fish spawning, to avoid adverse impacts from tophole cuttings discharge to seabed. Develop oil response plan. Provide supporting vessel(s) to warn any vessels that might intrude on platform.

18 Mitigation Measures (cont d) Environmental Measures Most cuttings shall be collected and transferred to shore for disposal. Tophole cuttings from 100-m drilling cannot be brought to rig floor, then the cuttings will be mound and spread at the seabed. Food waste shall be ground before discharge overboard. Other wastes shall be segregated and collected in proper containers before transferring to shore for disposal.

19 Mitigation Measures (cont d) Social Measures Arrange meeting(s) to notify stakeholder(s) exact project schedule at least a month ahead of time. Avoid drilling during high season of tourism from December to April. Compensate for damaged fishing gears at fair rate with agreement among fishermen, concerned government agencies, and Company. Provide channel(s) for comment and complaint. Offer opportunity to governmental agencies and people to observe implementation all the project life. Consider to support social activities continually, especially about education, public health, natural resources and environment conservation, and marine ecology restoration.

20 Mitigation Measures (cont d) Health Measures All employees shall be medically checked up prior to job commencement. Provide first aid kits on the rig, at Laem Rew Port, and at supporting base. Provide emergency response plan about health. Identify sanatoriums for illness and emergency case(s). Support activities about enhancing good health to local youth.

21 Monitoring Measures Drilling Phase Daily Report Well Summary Report Chemical Use Report Waste Report Marine Mammal Observation Report

22 Monitoring Measures (cont d) Post-drilling Phase Seawater Quality (temperature, ph, transparency, suspended solids, salinity, dissolved solids, odour, colour, dissolved oxygen, turbidity, petroleum hydrocarbon, and heavy metals) Sediment Quality (particle size distribution, total petroleum hydrocarbon, oil and grease, and heavy metals) Phytoplankton and Zooplankton Benthos

23 If there be any queries, please contact: PTTEP Siam Energy Complex Building, Building A Vibhavadi Rangsit Road, Chatuchak Bangkok Tel

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Corallian Colter Offshore Exploration Well - EIA Scoping Report

Corallian Colter Offshore Exploration Well - EIA Scoping Report Corallian Colter Offshore Exploration Well - EIA Scoping Report Bournemouth Borough Council comments on the potential scope of the Environmental Statement and the identification of sources of information.

More information

Presented by Joe Ferris, PhD 6 June 2014 BMT Cordah Limited Aberdeen Scotland

Presented by Joe Ferris, PhD 6 June 2014 BMT Cordah Limited Aberdeen Scotland Environmental Considerations in Offshore Decommissioning and Removal Presented by Joe Ferris, PhD 6 June 2014 BMT Cordah Limited Aberdeen Scotland Presentation Content Introduction Supporting Studies Selection

More information

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Scoping Document for the Environmental Assessment BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Exploration Licenses 2431, 2432, 2433, and 2434 August 2013 Contents 1.0 Purpose... 2 2.0 Regulatory

More information

Environmental Impact Assessment Report (Final Report Executive Summary)

Environmental Impact Assessment Report (Final Report Executive Summary) Environmental Impact Assessment Report (Final Report Executive Summary) Table of Content 1. Introduction... - 1-1.1 Background of the Project...- 1-1.2 Objectives of EIA Report...- 2-1.3 Guideline of Environmental

More information

8. Risk Assessment Process

8. Risk Assessment Process 134 Browse FLNG Development Draft Environmental Impact Statement 8. Risk Assessment Process This section provides an overview of the EIA process undertaken for the Browse FLNG Development, from identification

More information

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Paul Barnes, Manager - Atlantic Canada & Arctic NOTES 2015 St. John s, NL April 27, 2015 Overview Who is CAPP? Oil and Gas Lifecycle

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

Abate on Site This involves adding something to the design to abate the impact eg pollution controls.

Abate on Site This involves adding something to the design to abate the impact eg pollution controls. 6 MITIGATION AND MANAGEMENT MEASURES 6.1 INTRODUCTION A key objective of the EIA is to develop and describe practical, commensurate and cost effective mitigation measures that avoid, reduce, control, remedy

More information

"The preparation and execution of the National Plan for the protection of the marine environment in the State of Kuwait"

The preparation and execution of the National Plan for the protection of the marine environment in the State of Kuwait "The preparation and execution of the National Plan for the protection of the marine environment in the State of Kuwait" 1 Kuwait Environment Public Authority Content Why do we care about the marine environment?

More information

MAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS DAN

MAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS DAN Intended for Maersk Oil Document type Non-Technical Summary (NTS) Date August, 2015 MAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS DAN Non-Technical Summary ESIS DAN 1 of 11 PREFACE This document is the

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

Environmental Impact Assessment for Drilling of Three Exploration Wells in the Mayaro-Guayaguayare Block, Offshore Trinidad

Environmental Impact Assessment for Drilling of Three Exploration Wells in the Mayaro-Guayaguayare Block, Offshore Trinidad Environmental Impact Assessment for Drilling of Three Exploration Wells in the Mayaro-Guayaguayare Block, Offshore Trinidad February 2013 Prepared for: Voyager Energy (Trinidad) Ltd. Princes Court, Level

More information

Union Priority. Specific Objective. Output indicator name

Union Priority. Specific Objective. Output indicator name List of output s proposed to be used in the national database structure according 1 1 I.14 Article 37 Support for the design and implementation of conservation measures and regional co-operation 1 1 I.15

More information

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008 Spoil and Water Ciaran Callan Dublin Port Company Irish Ports Association Conference 2008 26 th September 2008 Disposal of Dredge Material: Regulation and Process of Application Requirement for disposal

More information

Background Information Document

Background Information Document Environmental Impact Assessment (EIA) of the Proposed Development of Phosphate Deposits off the Coast of Namibia Background Information Document Note 1. This BID addresses the proposed activities within

More information

Outline for. Protected Areas Management Planning

Outline for. Protected Areas Management Planning Outline for Protected Areas Management Planning Level One: Community-based protected area management organizations and Level Two: Conservation organizations / Non-governmental organizations Outline for

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

F2. Coastal General Coastal Marine Zone

F2. Coastal General Coastal Marine Zone F2. Coastal General Coastal Marine Zone [The regional coastal plan [rcp] provisions are not operative until the Minister of Conservation has formally approved the regional coastal plan part of the Auckland

More information

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study Appendix F Section 404(b)(1) APPENDI F. SECTION 404(B)(1) EVALUATION SHORT VERSION Herbert Hoover Dike Dam Safety Modification Study HHD Dam Safety Modification Study EIS June 2016 E i Appendix F Section

More information

ENVIRONMENTAL SCOPING PLAN

ENVIRONMENTAL SCOPING PLAN APPENDIX F ENVIRONMENTAL SCOPING PLAN F.1 DATA OF EXAMINATION Table F.1.1 Data of Examination No. Items Description 1 Full title of the Project and relevant report 2 Type of the study Development Study

More information

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Final Scoping Report - Non-Technical Summary Presentation Structure of the Presentation Introduction to the Tema LNG Project

More information

BEST MANAGEMENT PRACTICES TO MINIMIZE IMPACTS TO MARINE WATER QUALITY

BEST MANAGEMENT PRACTICES TO MINIMIZE IMPACTS TO MARINE WATER QUALITY Second International Seminar on the Design & Construction of the Second Penang Bridge 28 29 November 2012 BEST MANAGEMENT PRACTICES TO MINIMIZE IMPACTS TO MARINE WATER QUALITY ERE CONSULTING GROUP SDN

More information

LIMERICK COUNTY COUNCIL LOCAL GOVERNMENT (WATER POLLUTION) ACTS 1977 AND 1990

LIMERICK COUNTY COUNCIL LOCAL GOVERNMENT (WATER POLLUTION) ACTS 1977 AND 1990 1 LIMERICK COUNTY COUNCIL LOCAL GOVERNMENT (WATER POLLUTION) ACTS 1977 AND 1990 Application for licence to discharge trade effluent or other matter (other than domestic sewage or storm water) to a sewer.

More information

Activities and uses in SA s Marine Park zones

Activities and uses in SA s Marine Park zones Activities and uses in SA s Marine Park zones The following tables summarises how activities and uses will be managed once marine park management plans are adopted. The prohibitions and restrictions described

More information

ENVIRONMENT IMPACT ASSESSMENTS UNDER THE INTERNATIONAL SEABED AUTHORITY

ENVIRONMENT IMPACT ASSESSMENTS UNDER THE INTERNATIONAL SEABED AUTHORITY ENVIRONMENT IMPACT ASSESSMENTS UNDER THE INTERNATIONAL SEABED AUTHORITY Inaugural Pacific Ocean Alliance Meeting High Hopes for High Seas Implementing the United Nations Convention on Law of the Sea for

More information

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the

More information

Summary of Suggested Mitigation and Monitoring

Summary of Suggested Mitigation and Monitoring Chapter 25 Summary of Suggested Mitigation and Monitoring 25.1 Introduction 1 Mainstream Renewable Power (Mainstream) is committed to being a good neighbour and creating and maintaining a harmonious relationship

More information

THE CORPS REGULATORY AUTHORITY

THE CORPS REGULATORY AUTHORITY Regulatory Branch THE CORPS REGULATORY AUTHORITY THE U.S. ARMY CORPS OF ENGINEERS REGULATORY AUTHORITY IS BASED UPON 1. SECTION 10 OF THE RIVERS AND HARBORS ACT OF 1899 (RHA) AND 2. SECTION 404 OF THE

More information

Marine Consent Application and Environmental Impact Assessment Non-technical Summary

Marine Consent Application and Environmental Impact Assessment Non-technical Summary May 2014 Chatham Rock Phosphate Limited Proposed Mining Operation, Chatham Rise Marine Consent Application and Environmental Impact Assessment Non-technical Summary Prepared and compiled by Golder Associates

More information

Support Project of Total Pollutant Load Control System ( TPLCS ) introduction

Support Project of Total Pollutant Load Control System ( TPLCS ) introduction Support Project of Total Pollutant Load Control System ( TPLCS ) introduction Ryuji Tomisaka Director Office of Environmental Management of Enclosed Coastal Seas Ministry of the Environment of JAPAN (MOE

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT FOR SECOND ERAWAN GAS TRANSMISSION PROJECT 23 July 1993 2 SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT FOR SECOND ERAWAN GAS TRANSMISSION PROJECT

More information

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Insert then choose Picture select your picture. Right click your picture and Send to back. August 6-8 th, 2014 Craig A. Reid Partner,

More information

Navigating the U.S. Army Corps of Engineers Regulatory Process

Navigating the U.S. Army Corps of Engineers Regulatory Process Navigating the U.S. Army Corps of Engineers Regulatory Process Angela Ryan Biologist Tampa Permits Section May 16, 2012 US Army Corps of Engineers JACKSONVILLE DISTRICT Regulatory Mission To protect the

More information

Filling the gaps: The Case of the Yellow Sea

Filling the gaps: The Case of the Yellow Sea Filling the gaps: The Case of the Yellow Sea Sinjae Yoo KORDI, South Korea 1. Background 2. Knowledge gaps 3. YSLME Acknowledgements Details of the YSLME plan is an outcome of joint efforts by many members

More information

Offshore Oil Exploration: Probabilistic Simulations of Plume Dispersion and Potential Impacts on Beaches

Offshore Oil Exploration: Probabilistic Simulations of Plume Dispersion and Potential Impacts on Beaches Offshore Oil Exploration: Probabilistic Simulations of Plume Dispersion and Potential Impacts on Beaches Lindino Benedet, Msc, Ph. Oc. Rafael Bonanata, Msc, Ph. Oc. Thomas P. Pierro, Msc, P.E. Thomas Campbell,

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY S1 INTRODUCTION This Environmental Statement (ES) Addendum presents the findings of the Environment Impact Assessment (EIA) conducted by TOTAL E&P UK Limited (TOTAL) for the development

More information

Support Project of Total Pollutant Load Control System ( TPLCS ) introduction

Support Project of Total Pollutant Load Control System ( TPLCS ) introduction Support Project of Total Pollutant Load Control System ( TPLCS ) introduction Ryuji Tomisaka Director Office of Environmental Management of Enclosed Coastal Seas Ministry of the Environment of JAPAN (MOE

More information

Good Practice Guidance

Good Practice Guidance Good Practice Guidance Extraction by Dredging of Aggregates from England s Seabed April 2017 Summary Dredging of sand and gravel from the seabed is long established in England to secure material used as

More information

DRAFT FOR CONSULTATION

DRAFT FOR CONSULTATION DRAFT FOR CONSULTATION Exclusive Economic Zone and Continental Shelf (Environmental Effects Discharge and Dumping) Regulations 2014 Governor-General Order in Council At Wellington this day of 2014 Present:

More information

F. Impact on the Receiving Environment

F. Impact on the Receiving Environment F. Impact on the Receiving Environment Dredging is a necessity for the port to remain commercially active. However, over the past two decades the Port of Waterford has acquired numerous reports and investigations

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

EXECUTIVE SUMMARY. Impact Analyses: EMF; Temperature Impacts; Safety Issues and Impacts; and Installation and Maintenance Impacts.

EXECUTIVE SUMMARY. Impact Analyses: EMF; Temperature Impacts; Safety Issues and Impacts; and Installation and Maintenance Impacts. STUDY OBJECTIVES The Connecticut Academy of Science and Engineering (CASE) convened the Long Island Sound Symposium: A Study of Benthic Habitats on July 28-29, 2004 on behalf of the Connecticut Energy

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific

More information

ENVIRONMENTAL SCREENING REPORT

ENVIRONMENTAL SCREENING REPORT ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling

More information

Potential hydrocarbon and chemical spill

Potential hydrocarbon and chemical spill Potential hydrocarbon and chemical spill Table of Contents 20 POTENTIAL HYDROCARBON AND CHEMICAL SPILL 20-3 20.1 Introduction 20-3 20.2 Legislative framework and relevant guidance 20-3 20.3 Scoping and

More information

Protection of Ramsar Wetlands under the EPBC Act

Protection of Ramsar Wetlands under the EPBC Act Protection of Ramsar Wetlands under the EPBC Act 1. INTRODUCTION The Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (the EPBC Act ) commenced on 16 July 2000 and brought about

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring.

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Ad Stolk and Chris Dijkshoorn Ministry of Transport, Public Works and Water Management Rijkswaterstaat North

More information

Chapter II. Statistical Organization

Chapter II. Statistical Organization Chapter II. Statistical Organization 1. The Central Government Traditionally, Japan has had in place a decentralized statistical organization. As a general rule, individual ministries have a central statistics

More information

GMR Holdings Private Limited

GMR Holdings Private Limited GMR Holdings Private Limited Development of LNG Facility at Kakinada Deep Water Port PROPOSED TERMS OF REFERENCE April 2016 Submitted By: L&T Infrastructure Engineering Limited (formerly known as L&T-Ramboll

More information

POINTE DU BOIS MODERNIZATION PROJECT

POINTE DU BOIS MODERNIZATION PROJECT POINTE DU BOIS MODERNIZATION PROJECT CONSTRUCTION OF NEW FACILITIES AT PRESENT SITE AND DECOMMISSIONING OF EXISTING FACILITIES ENVIRONMENTAL ASSESSMENT DRAFT SCOPING DOCUMENT Submitted By Manitoba Hydro

More information

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Content Introduction... 2 Procedural Guidelines... 2 1. Scope of recommended procedural guidelines... 3 2.

More information

The Port of Vancouver Sustainability Plan. Presentation to AAPA June 2006

The Port of Vancouver Sustainability Plan. Presentation to AAPA June 2006 The Port of Vancouver Sustainability Plan Presentation to AAPA June 2006 Outline A model for Sustainability The 5 year plan VPA and the Port s progress to date The next five years Road Map Board Adopts

More information

NATIONAL INSTITUTE OF OCEANOGRAPHY AND FISHERIES, N I O F, EGYPT

NATIONAL INSTITUTE OF OCEANOGRAPHY AND FISHERIES, N I O F, EGYPT NATIONAL INSTITUTE OF OCEANOGRAPHY AND FISHERIES, N I O F, EGYPT Presentation prepared By Prof. Morad Bacily Awad Chairman of Division of Marine Environment, NIOF Submitted to MAMA Project, Kick off meeting,

More information

Mauritania a model response planning process

Mauritania a model response planning process Mauritania a model response planning process Chinguetti Project An Operator s Perspective Dr. Jeremy Colman Manager Environmental & Social Affairs (Africa) Woodside Energy Ltd Dr. Rob Holland Senior Consultant

More information

AP Environmental Science

AP Environmental Science AP Environmental Science Types of aquatic life zones MARINE Estuaries coral reefs mangrove swamps neritic zone pelagic zone FRESHWATER lakes and ponds streams and rivers wetlands Distribution of aquatic

More information

URS- EIA- REP Date of Issue 19th November 2012

URS- EIA- REP Date of Issue 19th November 2012 DocID: External DocID: URS-EIA-REP-201040 46369085_Doc020_REP_Rev03 Date of Issue 19th November 2012 This report has been prepared by URS Infrastructure & Environment UK Limited on behalf of South Stream

More information

PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN

PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN The Contracting Parties to the present Protocol, Being Parties to the Convention for the Protection of the Marine Environment and the

More information

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage MNZ Consolidation Marine Protection Rules ISBN 978-0-947527-29-7 Published by Maritime New Zealand,

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

Environmental Impact Assessment of Hindustan Oil Exploration Company s Drilling Project-Dirok and N.Ledo

Environmental Impact Assessment of Hindustan Oil Exploration Company s Drilling Project-Dirok and N.Ledo Environmental Impact Assessment of Hindustan Oil Exploration Company s Drilling Project-Dirok and N.Ledo EIA Executive Summary Prepared for Hindustan Oil Exploration Company Ltd Prepared by SENES Consultants

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

ENVIRONMENT AGENCY ABU DHABI

ENVIRONMENT AGENCY ABU DHABI Marawah Marine Biosphere Reserve (MMBR), Abu Dhabi, UAE and the Extractive Industry: An Exemplary Model The 4th World Congress of Biosphere Reserves 14-17 March 2016 Lima, Peru CONTENT Why Presenting Marawah

More information

9.6 Interfield Pipeline Installation and Commissioning and Operation

9.6 Interfield Pipeline Installation and Commissioning and Operation 9.6 Interfield Pipeline Installation and Commissioning and Operation As described in the Project Description (Chapter 5.7), Phase 3 will tie-in to the existing Azeri Project marine export pipeline infrastructure

More information

UNEP Principles 1. Integration of Tourism into Overall Policy for Sustainable Development

UNEP Principles 1. Integration of Tourism into Overall Policy for Sustainable Development UNEP Principles The principles cover: 1. Integration of Tourism into Overall Policy for Sustainable Development 2. Development of Sustainable Tourism 3. Management of Tourism 4. Conditions for Success

More information

Marche Region Pollution Control and Maritime safety strategy

Marche Region Pollution Control and Maritime safety strategy Marche Region Pollution Control and Maritime safety strategy MAREMED Seminar on Maritime Safety and Pollution Control 9 October 2012, Larnaca, Cyprus Marche Region, since 5 years, sets up a specific structure

More information

Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy. This policy shall be supported by three policy objectives which are to:

Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy. This policy shall be supported by three policy objectives which are to: Habitat Policy and Procedures: 1. Policy: Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy Because all species are dependent on the quantity and quality of their essential habitats, it

More information

Admiralty Inlet Pilot Tidal Project FERC No Appendix D. Water Quality Monitoring Plan

Admiralty Inlet Pilot Tidal Project FERC No Appendix D. Water Quality Monitoring Plan Appendix D Water Quality Monitoring Plan ADMIRALTY INLET PILOT TIDAL PROJECT FERC PROJECT NO. 12690 WATER QUALITY MONITORING PLAN (submitted with the Final Application for a New Pilot Project License)

More information

Navigating the Permit Process for Desalination LBWD Experience

Navigating the Permit Process for Desalination LBWD Experience Navigating the Permit Process for Desalination LBWD Experience AWWA Desalination Symposium May 8, 2006 Long Beach Water Department Tai Tseng, P.E. 1 Presentation Outline Long Beach Overview Permits for

More information

Day in the Life of the Hudson & Harbor Vocabulary

Day in the Life of the Hudson & Harbor Vocabulary Day in the Life of the Hudson & Harbor Vocabulary adapt: to develop a way of dealing with conditions in a particular environment adaptation: a feature that allows an organism to adjust to differing environmental

More information

The Distribution of Heavy Metal Pollutants in Suez Bay Using Geographic Information System (GIS)

The Distribution of Heavy Metal Pollutants in Suez Bay Using Geographic Information System (GIS) The Distribution of Heavy Metal Pollutants in Suez Bay Using Geographic Information System (GIS) H. B. Hassan, 1 and W. M. Mohamed 2 (1, 2) Siting & Environmental Department, Nuclear and Radiological Regulatory

More information

Aqaba Projects Partner Country Priorities NATO Forum

Aqaba Projects Partner Country Priorities NATO Forum Aqaba Projects Partner Country Priorities NATO Forum March 12 th 2008 Mohammad Badran and Mohammad Al Zibdah Marine Science Station; University of Jordan / Yarmouk University, Aqaba Jordan. 3/12/2008 1

More information

Baltic Marine Environment Protection Commission

Baltic Marine Environment Protection Commission Baltic Marine Environment Protection Commission HELCOM RECOMMENDATION 37/3 Adopted 11 March 2016, having regard to Article 20, Paragraph 1 b) of the Helsinki Convention SUSTAINABLE AQUACULTURE IN THE BALTIC

More information

Marine Management Organisation Marine Licence 1 Introduction

Marine Management Organisation Marine Licence 1 Introduction Marine Management Organisation Marine Licence 1 Introduction This is a licence granted by the Marine Management Organisation on behalf of the Secretary of State to authorise the licence holder to carry

More information

Gas Guzzlers. Biological Pump

Gas Guzzlers. Biological Pump Gas Guzzlers Biological Pump Aquatic Biodiversity Chapter 8 Coral Reefs Open Ocean Deep Sea Marine equivalent of tropical rain forests Habitats for one-fourth of all marine species Coral polyps, which

More information

Procedia - Social and Behavioral Sciences 186 ( 2015 ) th World Conference on Learning, Teaching and Educational Leadership, WCLTA 2014

Procedia - Social and Behavioral Sciences 186 ( 2015 ) th World Conference on Learning, Teaching and Educational Leadership, WCLTA 2014 Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Sciences 186 ( 2015 ) 325 330 5th World Conference on Learning, Teaching and Educational Leadership, WCLTA 2014

More information

Revised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity

Revised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity Revised mapping of the CITES Strategic Vision: 2008 2020 objectives and the Aichi Targets in the Strategic Plan for Biodiversity 2010-2020. Analysis of how CITES Strategic Vision objectives contribute

More information

MODULE 2 TOURISM AND DEGRADATION OF COASTAL RESOURCES

MODULE 2 TOURISM AND DEGRADATION OF COASTAL RESOURCES MODULE 2 TOURISM AND DEGRADATION OF COASTAL RESOURCES 16 TOURISM AND DEGRADATION OF COASTAL RESOURCES OBJECTIVES: To highlight the effects of tourism and its impact on the degradation of coastal resources

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Mrs. Butler Oceanography

Mrs. Butler Oceanography Mrs. Butler Oceanography InstrumentsLab.doc Instruments Lab This exercise is to be done in the classroom. At each of the seven stations you are to decide what tools or instruments are to be used to conduct

More information

OUR GOAL IS TO PREVENT SPILLS ENTIRELY

OUR GOAL IS TO PREVENT SPILLS ENTIRELY OUR GOAL IS TO PREVENT SPILLS ENTIRELY OUR GOAL IS TO NEVER HAVE AN OIL SPILL, AND THE INDUSTRY TAKES EXTENSIVE PRECAUTIONS TO PREVENT SPILLS FROM OCCURRING. TOPICS FOR DISCUSSION WHAT ARE OUR PRIMARY

More information

Independent Study of Marine Environmental Conditions and Influence of Oil and Gas Activities in Ghana

Independent Study of Marine Environmental Conditions and Influence of Oil and Gas Activities in Ghana Independent Study of Marine Environmental Conditions and Influence of Oil and Gas Activities in Ghana Launch of Final Report and Next Steps February 25, 2015 Accra Performed in collaboration with: Acorn

More information

MANAGING FRESHWATER INFLOWS TO ESTUARIES

MANAGING FRESHWATER INFLOWS TO ESTUARIES MANAGING FRESHWATER INFLOWS TO ESTUARIES Human Dimensions of the Yuna Watershed and Samana Bay Estuary James Tobey Presented to The Influence of the Yuna Watershed on Samana Bay September 21, 2004. Santo

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

GLOSSARY. Quantum Power Ghana Gas Limited ix Knight Piésold Consulting Environmental and Social Impact Assessment

GLOSSARY. Quantum Power Ghana Gas Limited ix Knight Piésold Consulting Environmental and Social Impact Assessment GLOSSARY Alternative Alternatives can refer to any of the following, but are not limited to: alternative sites for development, alternative projects for a particular site, alternative site layouts, alternative

More information

MTA EMPLOYMENT RELATIONS FACT SHEET

MTA EMPLOYMENT RELATIONS FACT SHEET MTA EMPLOYMENT RELATIONS FACT SHEET FAIR WORK ACT 2009 UNFAIR AND UNLAWFUL DISMISSAL 18 September 2009 Operative: On and from 1 July 2009 A fair go all round The Fair Work Act 2009 Part 3-2 Unfair dismissal

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

New Meadows Watershed Partnership Spring Public Forum May 3, 2017 West Bath Grange

New Meadows Watershed Partnership Spring Public Forum May 3, 2017 West Bath Grange Objective 1: Eliminate or reduce existing sources of polluted runoff, and prevent future problems from occurring throughout the watershed. (Submitted by Madelyn Hennessey) Action 1: Remediate selected

More information

From: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC

From: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC From: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC Dear Ms. Perry, The Canadian Environmental Assessment

More information

Recognizing that pollution of the Caspian Sea by oil and by oil pollution incidents of the sea threatens the marine environment,

Recognizing that pollution of the Caspian Sea by oil and by oil pollution incidents of the sea threatens the marine environment, PROTOCOL CONCERNING REGIONAL PREPAREDNESS, RESPONSE AND CO-OPERATION IN COMBATING OIL POLLUTION INCIDENTS TO THE FRAMEWORK CONVENTION ON THE PROTECTION OF THE MARINE ENVIRONMENT OF THE CASPIAN SEA Preamble

More information

ENVIRONMENTAL CODE OF CAMBODIA. Fourth Draft - DRAFT August Table of Contents

ENVIRONMENTAL CODE OF CAMBODIA. Fourth Draft - DRAFT August Table of Contents ENVIRONMENTAL CODE OF CAMBODIA Fourth Draft - 4.0 12 August 2016 Table of Contents Book 1 General Provisions... 3 Title 1 General Provisions... 3 Chapter 1 Objective of the Environmental Code... 3 Chapter

More information

Fiscal Policy for Sustainable Development

Fiscal Policy for Sustainable Development Fiscal Policy for Sustainable Development 1 Outline Elements of fiscal policy for Sustainable Development Environmental taxes and energy subsidies Searching for green economy sectors Sustainable development

More information

The challenges and complexities of impact assessment for a seismic survey in a remote coral reef environment

The challenges and complexities of impact assessment for a seismic survey in a remote coral reef environment The challenges and complexities of impact assessment for a seismic survey in a remote coral reef environment J.G. Colman 1,2, C.C. Grebe 1 & R.L. Hearn 1 1 Woodside Energy Ltd (cameron.grebe@woodside.com.au,

More information

7.1 Constitutional Requirement for Environmental Protection in Madagascar

7.1 Constitutional Requirement for Environmental Protection in Madagascar 7. MADAGASCAR 7.1 Constitutional Requirement for Environmental Protection in Madagascar The Constitution of the Republic of Madagascar was passed on 19th August 1992. In relation to the environment, Article

More information