1 CAPCOG Solid Waste Advisory Committee Conformance Review Subcommittee Report on MSW Permit No Background January 9, 2018 Under Texas law all solid waste management activities and state regulatory actions are required to conform to a regional solid waste management plan (RSWMP) adopted by a council of governments and by the Texas Commission on Environmental Quality (TCEQ) (see Texas Health and Safety Code and 30 Texas Administrative Code (TAC) ). Volume I of the Capital Area Council of Governments (CAPCOG) RSWMP includes goals and objectives for the region, and was adopted by the TCEQ on May 31, Volume II of CAPCOG s RSWMP provides an action plan for achieving these goals and objectives. In accordance with this requirements of 30 TAC (a)(3)(O), CAPCOG s action plan includes, identification of the process that will be used to evaluate whether a proposed municipal solid waste facility application will be in conformance with the regional plan. As required under state law, Lealco, Inc. submitted parts I & II of its application for a solid waste transfer station in Williamson County (MSW permit application number 2398) to CAPCOG in order to request a conformance review. CAPCOG received this information on August 11, 2017, and subsequently provided the applicant with a copy of CAPCOG s Conformance Review Checklist, guidance document, and Regional Solid Waste Management Plan. Lealco Inc. provided a completed checklist to CAPCOG on September 7, At the September 15, 2017, Solid Waste Advisory Committee (SWAC) meeting, CAPCOG staff requested the formation of a subcommittee to prepare a conformance review recommendation for the SWAC. The subcommittee consisted of: 1. Pete Correa, Williamson County 2. Joey Crumley, At-large Education Representative 3. Michael Mnoian, At-large - Private Industry The subcommittee members were provided copy of the Regional Solid Waste Management Plan, the applicant s completed checklist, a spreadsheet to use in documenting observations, CAPCOG s conformance review guidance document, and the to an online copy of the application: ( In order to obtain information for this review, on November 2, 2017, CAPCOG ed letters to Williamson County and the City of Hutto requesting information pertaining to this application 12/1/2017. CAPCOG received responses from both jurisdictions, and copies of these responses were provided to the Conformance Review Subcommittee members. On November 2, 2017, CAPCOG also sent a public comment to TCEQ on this application indicating that CAPCOG was initiating a conformance review of this application, requesting copies of all relevant information for our review, and the Page 1 of 7

2 opportunity to complete the conformance review process before the application being presented to the commissioners for action. CAPCOG indicated that it intended to bring the issue to its SWAC in January and seek a final determination and recommendation from its Executive Committee on February 14, Under CAPCOG s conformance review process, CAPCOG s Executive Committee, with input from the SWAC, may make one of the following determinations: 1. The permit conforms to the RSWMP and either: a. CAPCOG recommends approval of the permit b. CAPCOG recommends approval with specific conditions attached 2. The permit or registration does not conform to the RSWMP and either: a. CAPCOG recommends denial of the permit b. CAPCOG recommends withholding approval until specified deficiencies are corrected 3. CAPCOG lacks sufficient information to make a qualified conformance determination CAPCOG convened the Conformance Review Subcommittee meeting on December 5, 2017, in order to review the application and make a recommendation to the SWAC. The subcommittee recommended a determination that MSW permit application no does not conform to CAPCOG s RSWMP and a recommendation that the TCEQ deny the permit application. This memo explains CAPCOG s staff observations on this application, which were conveyed to the subcommittee members, as well as an elaboration for the technical basis for the subcommittee s recommendation. CAPCOG also notes that on December 6, 2017, in response to a November 6, 2017, request for comment on the application from TCEQ that was due within 30 days, CAPCOG sent a 2 nd letter to TCEQ reiterating CAPCOG s intent to complete a conformance review by February 14, 2018, and conveying the recommendations and findings of the conformance review subcommittee. Copies of both of CAPCOG s letters to TCEQ are included as additional reference information on this item. Subcommittee Recommendation to the SWAC The subcommittee made a recommendation for a determination of non-conformance and recommendation of denial of the permit application. This was based upon the following: 1. Incompatibility with the City of Hutto s Intended Land Use for Area: The City of Hutto has identified processing of MSW at this location, which is within its near-term growth boundary, as an incompatible land use, based on the Future Land Use Map adopted by the City. This map identified the appropriate land use for this area to be Industrial/Business Park, which refers to research laboratories, trade uses, and wholesale and distribution of manufactured products, but not processing or disposal of MSW (This is inconsistent with CAPCOG s Regional Solid Waste Management Plan (RSWMP) objectives 15A and 15C). 2. Incompatibility with Williamson County s Intended Land Use for Area: While there appears to be a disagreement between Williamson County and TCEQ regarding whether Williamson County s 2015 order restricts the processing of MSW, the County s response to CAPCOG s request for information and other input received from the County demonstrate that the County did not intend to allow for processing of MSW waste at the proposed location due to health and Page 2 of 7

3 safety concerns. The applicant failed to identify this as a potentially applicable regulation or explain why it contends that it does not apply to this proposed facility. Therefore, locating a transfer station at this location would be incompatible with the County s intended land use within this area (This is inconsistent with CAPCOG s RSWMP objectives 15A and potentially 15B) 3. Incompatibility with Existing and Future Land Use: Apart from items 1 and 2 listed above, the application does not appear to adequately account for existing and planned future land use within 1 mile of the facility, including areas that the City of Hutto is in the process of annexing, and Hutto Independent School District s (HISD s) plan for locating a school on the southeast corner of County Road 130 and Chandler Road. This specific planned future land use does not appear to be accounted for in this application, nor is there documentation that the applicant has communicated with the school district regarding this application. (This is inconsistent with CAPCOG s RSWMP objective 15A) 4. Lack of Documentation of Compliance with Local Land Use Regulations Generally: The applicant has not provided documentation that the proposed facility meets local land use regulations, and both Williamson County and the City of Hutto have indicated that they have not provided any such documentation to the applicant. (This is inconsistent with CAPCOG s RSWMP objective 15B and a material omission from its response to CAPCOG s Checklist, item 2.8, which requires that the applicant provide documentation from the applicable zoning or siting entity stating that the proposed facility will be in compliance with its regulations. ) 5. Concern About Facility Design and Potential Nuisance Conditions: The facility s design, which involves only two walls rather than full enclosure, would fail to eliminate or minimize the risks of nuisance odor conditions, controlling excessive noise and light pollution, and windblown litter, and would need, at a minimum, to fully enclose the building and install active emission controls in order to adequately address the concerns attributable to the facility design (This is inconsistent with CAPCOG s RSWMP objectives 15F and 15H) 6. Risk to Local Groundwater: Based on local geology (Blackland Prairie), there is a risk of the concrete slab, used for the tipping floor, could crack, which would generate a risk of liquids leaching into the soil and groundwater underneath the facility. (This is inconsistent with CAPCOG s RSWMP objectives 15G and 15H) 7. Impacts on Transportation Infrastructure, Safety, and Traffic Conditions: Transportation issues on County Road 130 and Chandler Road are not adequately assessed or addressed. These issues include: a) the impact of the expected 300 trucks a day on traffic congestion on these roads and at the intersection of County Road (CR) 130 and Chandler Road, b) safety concerns on these same roads, particularly in light of the fact that these are only 2-lane roads and the segment of CR 130 where the trucks would enter and exit the facility lack any lighting, and c) the adverse impact on the conditions and need for added maintenance to these roads and the bridge on CR 130 that traverses Mustang Creek. County officials have suggested that, at a minimum, widening CR 130, adding turn lanes on Chandler road at its intersection with CR 130, adding a full stop light at that intersection, reinforcing the bridge over Mustang Creek, and adding lighting to CR Page 3 of 7

4 130 at the facility s entrance would be needed to address these concerns. County officials also indicate that the applicant has not directly spoken with the County s Road and Bridge staff regarding this facility. Furthermore, the applicant s submittal of documentation of required coordination with the County, as provided in Appendix I/II-A-3, stating their conclusion that no public roadway improvements are necessary, is hardly coordination and is more like a letter of notice with little to no effort to coordinate with the County. (This is inconsistent with CAPGCOG s RSWMP objective 15C) 8. Lack of Coordination with Williamson County and Risks of Litter and Illegal Dumping: Risks associated with illegal dumping and windblown litter from the transportation of waste to the proposed site are not adequately addressed. Since there tend to be illegal dumping problems nearby MSW facilities if citizens do not have convenient and legal means to dispose of their waste, the addition of a citizens collection station would help deter illegal dumping that would likely otherwise occur nearby. As noted above, Williamson County officials state that the applicant has not directly spoken with or coordinated with the County s Road and Bridge staff regarding this facility, and the applicant has not addressed the County s concerns regarding abatement of litter along County rights of way due to the transportation of waste to and from the site. The County has noted that it requires the operator of its own landfill to abate litter within a 2-mile radius of that facility, and that it would expect this operator to abate litter within at least a 1-mile radius of the proposed facility. (This is inconsistent with CAPCOG s RSWMP objectives 15E and 15H) CAPCOG Staff Observations The following is a list of CAPCOG staff observations on items reported by the applicant on their conformance review checklist. As mentioned above, CAPCOG staff provided conformance review subcommittee members with a copy of these observations ahead of the December 5, 2017, subcommittee meeting. CAPCOG staff are amending these observations as indicated in mark-ups below. These observations are not directly part of the subcommittee s report, but do provide additional information that the SWAC may wish to consider in its consideration of this item. 1.6 Class 2 non-hazardous industrial waste and/or special wastes, as identified in the Application Section 2.2.1, may require special handling procedures and is not to be exposed to the elements which may pose a threat to public health and the environment as may be the case in an un-enclosed building open to the potential for such waste to be washed or blown offsite. Application Section defines special waste as: any solid waste or combination of solid waste that because of its quantity, concentration, physical of chemical characteristics, or biological properties requires special handling and disposal to protect the human health or the environment. The applicant should identify special handling procedures for each special waste to be received. 1.7 Section currently allows the facility to accept the following special wastes: dead animals; drugs, contaminated food, or contaminated beverages, other than those contained in normal household waste; pesticide (insecticide, herbicide, fungicide, or rodenticide) containers; discarded materials containing asbestos; waste from oil, gas, and geothermal activities subject to regulation by the Railroad Page 4 of 7

5 Commission of Texas when those wastes are to be processed, treated, or disposed of at a solid waste management facility authorized under 30 TAC 330; waste generated outside the boundaries of Texas that contains: any industrial waste, any waste associated with oil, gas, and geothermal exploration, production, or development activities, or any item listed as a special waste in 30 TAC 330. Essentially, this creates a situation where the facility bans in-state industrial waste, but not out of state industrial wastes. The facility has an intent to accept certain special wastes that are known carcinogens, e.g., asbestos and pesticides. As well, dead animals are very odorous, and pesticides, asbestos, and oil/gas/geothermal wastes are dangerous to the environment if allowed to be washed or blown off the tipping floor where they may mix with storm water, groundwater, or the atmosphere. These items are best handled appropriately, which is in an enclosed facility with active environmental controls to ensure no migration is allowed and the air is scrubbed prior to release to the elements. The applicant should identify special handling procedures for each special waste to be received. 1.8 Emphasis of this question needs to be placed on "odorous" wastes, as this facility is currently proposed to be an open aired structure with only two enclosed sides which provide no protection from odorous conditions. As well, Tthe facility has an intent to accept certain special wastes that are known carcinogens, e.g., asbestos and pesticides. Applicant should take measures to ensure adequate engineering to curtail odors from leaving the facility boundary. The applicant should identify special handling procedures for each special waste to be received TAC 330.9(e)(2) requires the applicant to identify landfills within a 50-mile radius [Removed because applicant did provide names of each landfill facility within the CAPCOG region. Comal County is greater than 50 miles away. CAPCOG staff believe that this is no longer a compliance issue] TAC addresses operational requirements for a Citizen s Collection Station CCS. The facility cannot be open to the public unless they include provision for such. In response to the Conformance Checklist item 2.1, the applicant states The facility will be available to the general public. 2.2 The applicant may plan to address illegal dumping prevention by participating in the Regional Environmental Task Force, posting NO DUMPS signs on property. 2.5 Lealco should provide more information on contracted customer's recycling programs, to ensure the required 10% is being diverted through local recycling programs. 2.6 See On July 21, 2015, Williamson County adopted an Order Regulating Solid Waste Disposal pursuant to Texas Health and Safety Code Sections & regulating the disposal and processing of solid waste. A copy Copy of this order has been provided to CAPCOG and the TCEQ. The County has stated it is their opinion this ordinance precludes allowing disposal or processing. Per TCEQ staff have indicated their opinion that correspondence received, this ordinance would preclude disposal only and not processing. The applicant has not acknowledged nor taken steps to abide by local government zoning or siting restrictions. Since this is a Williamson County order, deference should be given to the County s interpretation of its applicability. 2.8 Applicant has not provided "documentation from the applicable zoning or siting entity stating the proposed facility will be in compliance with its regulations." Williamson County reports: 1) order Regulating Solid Waste Disposal, stating the applicant would need to seek a variance from the Page 5 of 7

6 Williamson County Commissioners Court; 2) Flood Damage Prevention Ordinance - Williamson County follows the NFIP, except in a couple instances where they are more stringent (e.g., requires a finished floor elevation 1' higher than the BFE), and states the parcel does not infringe on a regulated floodplain; 3) If construction requires road closure of CR 130, it would need to be approved in Commissioner's Court before closure. Other authorizations required would include: a) County would request to review the site plan as per policy to review commercial sites; b) driveway application; c) certificate of compliance; d) review of ESD #3/Hutto Fire Rescue; e) Assignment of address; f) Onsite sewage permit, if applicable. Per the City of Hutto, at this time the City does not have any zoning requirements for the proposed site. The Future Land Use Map adopted by the City indicates the appropriate use for this area to be Industrial/Business Park. This refers to uses such as research laboratories, trade uses, and wholesale and distribution of manufactured products. Processing or disposal of municipal solid waste would not be compatible with that plan. The applicant has not acknowledged nor taken steps to abide by local government zoning or siting restrictions. Recommendation is in support of each local government s position Not certain how a two sided building protects from the wind. ensures the control of windblown litter, stormwater runoff, birds and disease vectors, odor, excessive noise, or light pollution. Applicant also needs to consult with the County on cleanup of rights of way per 30 TAC , not just TxDOT as stated here. The application does mention the County, but fails to provide documentation of consultation with the County The applicant indeed sent the County a letter, but this does not serve as documentation of demonstration or documentation from the County that the applicant has complied with any requests the County may have. The letter sent the County does not ask for such documentation See The applicant s this response does not address the highest elevation natural feature within two miles. Rather it only speaks to the highest elevation currently on the property. Notes on TCEQ Notices of Deficiencies and Amendments There have been several amendments to the application since it was initially filed August 8, 2017, in response to notices of deficiency (NOD) issued by TCEQ staff. A complete list of these are available at: August 22, 2017: TCEQ administrative NOD issued to applicant September 8, 2017: Lealco response to administrative NOD October 10, 2017: TCEQ s first technical NOD issued to applicant October 31, 2017: Lealco response to first technical NOD December 6, 2017: TCEQ s second technical NOD issued to applicant January 2, 2018: Lealco response to second technical NOD CAPCOG staff had reviewed the correspondence up through October 31, 2017, ahead of the subcommittee s meeting on December 5, 2018, and that review informed CAPCOG staff s written observations provided to the subcommittee members for that meeting. CAPCOG staff have reviewed Page 6 of 7

7 the additional correspondence between TCEQ and Lealco on December 6, 2017, and January 2, 2018, and determined that the applicant s changes do impact the subcommittee s findings. Options for SWAC Action The SWAC may consider the following actions in light of the recommendation from the subcommittee: Move the subcommittee s recommendation forward to CAPCOG s Executive Committee unmodified Move a modified recommendation forward to CAPCOG s Executive Committee Table consideration of action on the conformance review until a future date (backup for the February 14, 2018, Executive Committee meeting needs to be finalized by Friday, January 26, 2018.) Page 7 of 7

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING # 17 ) UN-101-14 DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN-101-14 Prepared by: Robert Eastman GENERAL

More information

CITY OF ARLINGTON LANDFILL MWS PERMIT NO. 358B TARRANT COUNTY, TEXAS

CITY OF ARLINGTON LANDFILL MWS PERMIT NO. 358B TARRANT COUNTY, TEXAS CITY OF ARLINGTON LANDFILL MWS PERMIT NO. 358B TARRANT COUNTY, TEXAS PERMIT AMENDMENT APPLICATION VOLUME II OF VI PART III SITE DEVELOPMENT PLAN PART III, ATTACHMENT 1 FACILITY DESIGN PART III, ATTACHMENT

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-44b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED RANDY S SANITATION TRANSFER FACILITY PROPOSED

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

Issue Paper: Solid Waste Disposal

Issue Paper: Solid Waste Disposal Issue Paper: Solid Waste Disposal 1. Introduction And Background 1.1. Purpose and Scope This issue paper discusses the ground water quality issues relating to solid waste disposal facilities in Kitsap

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

Solid Waste for the Environmental Advisory Council

Solid Waste for the Environmental Advisory Council Briefing on Solid Waste for the Environmental Advisory Council July 21, 2005 Jennifer Kaduck Chief, Land Protection Branch Georgia Environmental Protection Division Who is responsible for managing Solid

More information

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,

More information

Subtitle D Municipal Landfills vs Classical Sanitary Landfills: Are Subtitle D Landfills a Real Improvement?

Subtitle D Municipal Landfills vs Classical Sanitary Landfills: Are Subtitle D Landfills a Real Improvement? Subtitle D Municipal Landfills vs Classical Sanitary Landfills: Are Subtitle D Landfills a Real Improvement? G. Fred Lee, PhD, PE, DEE and Anne Jones-Lee, PhD G. Fred Lee & Associates El Macero, California

More information

Handling Routine Losses. TCEQ REGULATORY GUIDANCE Waste Permits Divison RG-326 August 2009

Handling Routine Losses. TCEQ REGULATORY GUIDANCE Waste Permits Divison RG-326 August 2009 TCEQ REGULATORY GUIDANCE Waste Permits Divison RG-326 August 2009 Handling and Disposal of Carcasses from Poultry Operations On farm disposal of dead animals should always be carried out in a manner that

More information

Sec Abandonment of Certain Oil/Gas Land Uses. (Added by Ord. 4551, 9/21/04)

Sec Abandonment of Certain Oil/Gas Land Uses. (Added by Ord. 4551, 9/21/04) Sec. 35-323. Abandonment of Certain Oil/Gas Land Uses. (Added by Ord. 4551, 9/21/04) Sec. 35-323.1. Purpose and Intent. This section establishes procedures to achieve the timely abandonment of applicable

More information

City of Novato Integrated Pest Management Policy

City of Novato Integrated Pest Management Policy ADMINISTRATIVE POLICY City of Novato Integrated Pest Management Policy A. CITY OF NOVATO S COMMITMENT TO INTEGRATED PEST MANAGEMENT (IPM) It is the purpose and intent of this Integrated Pest Management

More information

7.0 EVALUATION OF REMEDIAL ALTERNATIVES

7.0 EVALUATION OF REMEDIAL ALTERNATIVES 7.0 EVALUATION OF REMEDIAL ALTERNATIVES This section provides a description of the developed remedial alternatives based on viable remedial technologies and process options, as identified in Section 4.0,

More information

Harris County Pollution Control Services Department

Harris County Pollution Control Services Department Harris County Pollution Control Services Department Industrial Storm Water Inspections July 24, 2013 Nuguent Cotton, Field Manager Pollution Control Services In compliance with Harris County s TPDES MS4

More information

.. / '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY. Protecting Texas by Reducing and Preventing Pollution.

.. / '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY. Protecting Texas by Reducing and Preventing Pollution. B1yan W. Shaw, Ph.D., P.E., Chairman Toby Baker, Commissioner Zak Covar, Commissioner Richard A. Hyde, P.E., Executive Director.. / ~ '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

More information

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL CERTIFICATION AND FINANCING PROPOSAL SOLID WASTE TRANSFER STATION STARR COUNTY, TEXAS Submitted: June 25, 2012 CERTIFICATION AND FINANCING PROPOSAL SOLID WASTE TRANSFER STATION STARR COUNTY, TEXAS INDEX

More information

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING # 5 ) UN-74-16 THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: November 9, 2016 Item: UN-74-16 Prepared by: Marc

More information

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT EXHIBIT B CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT PROPOSED AMENDMENTS Table of Contents Objective Page Sanitary Sewer Sub-Element 3A.1 Secure reserve capacity at the South Central Regional

More information

Class III Composting Facility Requirements

Class III Composting Facility Requirements April 2012 Class III Composting Facility Requirements The State of Ohio has specific regulations regarding registered solid waste composting facilities. The detailed requirements for Class III composting

More information

We re going to look at why earlier consideration is better.

We re going to look at why earlier consideration is better. 1 2 3 4 We re going to look at why earlier consideration is better. Another way to think of this is exploiting the comparison of analysis and goals to find synergies, but nobody wants to think like that.

More information

APPENDIX A. NEPA Assessment Checklist

APPENDIX A. NEPA Assessment Checklist APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,

More information

SECTION 10. WASTE TIRE FACILITIES and WASTE TIRE HAULERS Standards for Tire Retailers, Wholesalers and Fleet Service Facilities

SECTION 10. WASTE TIRE FACILITIES and WASTE TIRE HAULERS Standards for Tire Retailers, Wholesalers and Fleet Service Facilities SECTION 10 WASTE TIRE FACILITIES and WASTE TIRE HAULERS 10.1 Scope and Applicability 10.2 General Provisions 10.3 Standards for Waste Tire Hauling 10.4 Standards for Tire Retailers, Wholesalers and Fleet

More information

STORM WATER MANAGEMENT PROGRAM. City of Jacksonville, Alabama Phase II Small MS4 NPDES General Permit ALR040004

STORM WATER MANAGEMENT PROGRAM. City of Jacksonville, Alabama Phase II Small MS4 NPDES General Permit ALR040004 STORM WATER MANAGEMENT PROGRAM City of Jacksonville, Alabama Phase II Small MS4 NPDES General Permit ALR040004 STORM WATER MANAGEMENT PROGRAM City of Jacksonville, Alabama Phase II Small MS4 NPDES General

More information

Appendix H Mitigation Monitoring Plan

Appendix H Mitigation Monitoring Plan Appendix H Mitigation Monitoring Plan Appendix H No. Impact/Mitigation Measure Implementation & Monitoring 1. Traffic and Transportation Impacts All traffic control plans and mitigation measures, prepared

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater

More information

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts. City of Watertown, South Dakota Storm Water Management Program for compliance with Federal Clean Water Act National Pollutant Discharge Elimination System Phase II Storm Water Program Revision Approved

More information

ADMINISTRATIVE HEARING STAFF REPORT

ADMINISTRATIVE HEARING STAFF REPORT ADMINISTRATIVE HEARING STAFF REPORT Salt Lake City Water Treatment Facility 1365 West 2300 North CONDITIONAL USE Case #PLNPCM2013-00762 December 12, 2013 Planning and Zoning Division Department of Community

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3 Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-3 Form 2448 IH 35E Managed Lanes Project Book 2 - Technical Provisions Attachment 4-3 Show Form

More information

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date

More information

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY Environmental Health Department 950 MAIDU AVENUE, SUITE 170 NEVADA CITY, CA 95959-8617 (530) 265-1222 FAX (530) 265-9853 http://mynevadacounty.com Amy Irani,

More information

TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

TEXAS COMMISSION ON ENVIRONMENTAL QUALITY COG Number: 16 TEXAS COMMISSION ON ENVIRONMENTAL QUALITY VOLUME I: REGIONAL SOLID WASTE MANAGEMENT PLAN adopted under provisions of Texas Health & Safety Code Ann. Chapter 363 (Vernon) Name of Council

More information

SOLID WASTE FACILITY PERMIT

SOLID WASTE FACILITY PERMIT 1. Name and Street Address of Facility: 2. Name and Mailing Address of Operator: 3. Name and Mailing Address of Owner: West County Integrated Resource Recovery Facility Central Processing Facility 101

More information

Best Management Practice (BMP) Water Quality Protection Guideline Commercial Landscaping and Lawn Care Services. Section 1.

Best Management Practice (BMP) Water Quality Protection Guideline Commercial Landscaping and Lawn Care Services. Section 1. WQ-11 Best Management Practice (BMP) Water Quality Protection Guideline Commercial Landscaping and Lawn Care Services For the purpose of this Water Quality Protection Guideline, Commercial Landscaping

More information

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

Ordinance amending the San Francisco Public Works Code by adding Article 4.2, FILE NO. ORDINANCE NO. 1 [Stormwater Management.] Ordinance amending the San Francisco Public Works Code by adding Article., sections., requiring the development and maintenance of stormwater management

More information

INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES

INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES GOALS, OBJECTIVES & POLICIES GOAL DR 1: STORMWATER MANAGEMENT/DRAINAGE SYSTEMS. It is the goal of the City of Casselberry to provide

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

SOLID WASTE AND RESOURCE RECOVERY ELEMENT

SOLID WASTE AND RESOURCE RECOVERY ELEMENT SOLID WASTE AND RESOURCE RECOVERY ELEMENT of the PINELLAS COUNTY COMPREHENSIVE PLAN Prepared By: The Pinellas County Planning Department as staff to the LOCAL PLANNING AGENCY for THE BOARD OF COUNTY COMMISSIONERS

More information

Staff Report. Agenda Item Title: 14-02: Northwest Santa Rosa Reorganization No Sequoia Park Associates, LP

Staff Report. Agenda Item Title: 14-02: Northwest Santa Rosa Reorganization No Sequoia Park Associates, LP SONOMA LOCAL AGENCY FORMATION COMMISSION 575 ADMINISTRATION DRIVE, ROOM 104A, SANTA ROSA, CA 95403 (707) 565-2577 FAX (707) 565-3778 www.sonomalafco.org Item 4.1 Staff Report Meeting Date: April 2, 2014

More information

CHAPTER GROUND WATER CLASSES, STANDARDS, AND EXEMPTIONS

CHAPTER GROUND WATER CLASSES, STANDARDS, AND EXEMPTIONS CHAPTER 62-520 GROUND WATER CLASSES, STANDARDS, AND EXEMPTIONS 62-520.100 Intent of Ground Water Classes, Standards, and Exemptions. (Repealed) 62-520.200 Definitions for Ground Water. 62-520.300 Purpose,

More information

Pesticide Safety Program

Pesticide Safety Program Pesticide Safety Program Environmental Health, Safety and Risk Management Department PO Box 6113, SFA Station Nacogdoches, Texas 75962 Thanks to Texas State University for the use of their pesticide chemical

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed Remer Wastewater Treatment Facility Expansion FINDINGS

More information

4.10 LAND USE/RECREATION 4.10 LAND USE/RECREATION

4.10 LAND USE/RECREATION 4.10 LAND USE/RECREATION 4.10 LAND USE/RECREATION This section details the existing land use and planning conditions in the vicinity of the Project Site, outlines applicable land use plans and policies, and summarizes potential

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL.

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL. 1482.09 ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL. (a) Purpose and Scope. The purpose of this regulation is to provide for the health, safety, and general welfare

More information

Table of Contents. City of Redlands - Redlands Crossing Center

Table of Contents. City of Redlands - Redlands Crossing Center City of Redlands - Redlands Crossing Center Executive Summary... ES-1 Section 1: Introduction...1-1 1.1 - Overview of the CEQA Process...1-1 1.2 - Scope of the EIR...1-5 1.3 - Organization of the EIR...1-8

More information

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013 HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP10-0003 Butte County Board of Supervisors January 29, 2013 Helena Chemical Nelson Terminal Project Develop the Nelson site for use as a regional

More information

Frequently Asked Questions

Frequently Asked Questions North Wake Landfill Q1. Where is the North Wake Landfill located? The North Wake Landfill is located at 9300 Deponie Drive, off of Durant Road in north Raleigh, between Falls of Neuse Road and Capital

More information

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING # 7 ) UN-53-16 MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-53-16 Prepared by: Marc Jordan GENERAL INFORMATION: Applicant:

More information

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway. Fullerton Creek Channel (OCFCD Facility. A03) Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana

More information

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE 62-621.300(7)(b), F.A.C.) For FDEP Internal Use Only Permit : FLR INSTRUCTIONS:

More information

Septic Tank Enforcement Project

Septic Tank Enforcement Project Septic Tank Enforcement Project 1 Agenda Introduction Pollution Sources The River Agenda Septic Tank Failure Areas Septic Tank Phase Out Q & A Closing 2 3 Pollution Sources Point Source pollutant enters

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

I-10 KENDALL EXTENSION. Open House

I-10 KENDALL EXTENSION. Open House I-10 KENDALL EXTENSION Open House The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY

DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY Proposed Leasing of Lands at Fort Bliss, Texas for the Proposed Siting, Construction, and Operation by the City of El Paso of a Brackish Water Desalination

More information

Wellhead and Excellent Groundwater Recharge Area Protection Ordinance

Wellhead and Excellent Groundwater Recharge Area Protection Ordinance Wellhead and Excellent Groundwater Recharge Area Protection Ordinance as developed by the Town of Blades, Delaware Whereas the Con1missioners of Blades recognize the importance of and the benefits to public

More information

CHAPTER 4-13 SOLID WASTE

CHAPTER 4-13 SOLID WASTE CHAPTER 4-13 SOLID WASTE 4-13-1 Authority and Scope Pursuant to the authority of the Colville Tribal Business Council, regarding the matter of solid waste storage, collection and disposal, and in the interest

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone: DIVISION 14. - PLANNED MIXED USE DEVELOPMENT (PMUD) Sec. 78-1021. - Purpose. The town is a community with a rich tradition of mixed use neighborhoods and a paucity of land area dedicated for large commercial,

More information

SOLID WASTE FACILITY PERMIT Facility Permit Number: 19-AR-1250

SOLID WASTE FACILITY PERMIT Facility Permit Number: 19-AR-1250 SOLID WASTE FACILITY PERMIT Facility Permit Number: 19-AR-1250 1. Name and Street Address of Facility: Active Recycling Material Recovery Facility and Transfer Station 2000 W. Slauson Avenue Los Angeles,

More information

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS ORDINANCE AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS WHEREAS, by virtue of Chapter 242-1.A. of the Cecil County Code of Public Laws, the Board of County Commissioners of Cecil

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

PUBLIC HEARING LOOP 9

PUBLIC HEARING LOOP 9 PUBLIC HEARING LOOP 9 From Interstate (I)-35E to I-45 Dallas and Ellis Counties, Texas CSJ: Loop 2964-10-005 9: I-35E to I-45 Tuesday, June 20, 20, 2017 2017 Public Hearing Introductions ELECTED & PUBLIC

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION REGION 1 50 CIRCLE ROAD STONY BROOK, NY 11790

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION REGION 1 50 CIRCLE ROAD STONY BROOK, NY 11790 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION REGION 1 50 CIRCLE ROAD STONY BROOK, NY 11790 Summary of Responses to Comments on Draft Material Removal Work Plan For Roberto Clemente Town Park,

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

Groundwater Pollution at the Existing Puente Hills Landfill. Testimony Presented to LA County Sanitation Districts

Groundwater Pollution at the Existing Puente Hills Landfill. Testimony Presented to LA County Sanitation Districts Groundwater Pollution at the Existing Puente Hills Landfill Testimony Presented to LA County Sanitation Districts G. Fred Lee, Ph.D., D.E.E. and Anne Jones-Lee, Ph.D. G. Fred Lee & Associates El Macero,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

The Village of Wellington NPDES Guidance/Reference Document

The Village of Wellington NPDES Guidance/Reference Document The Village of Wellington NPDES Guidance/Reference Document The following Permit Compliance Guidance/Reference Document has been compiled to assist the copermittee in fulfilling the requirements of the

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT p-ear2-59b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED HEARTLAND HUTTERIAN BRETHREN, INC. FEEDLOT

More information

Section 1 Introduction and Background

Section 1 Introduction and Background Section 1 Introduction and Background The following document is the City of Hamilton s updated Storm Water Management Plan. The purpose of this plan is provide guidance to City staff, residents, businesses,

More information

and the term landfill generically refers to all landfills, including the above types, unless specified otherwise.

and the term landfill generically refers to all landfills, including the above types, unless specified otherwise. 7 Landfills 7.1 Introduction Facilities for disposing of wastes to the ground have been variously described as landfills, tips, or dumps, without reference to the degree of environmental safeguards employed

More information

CITY OF PACIFICA 170 Santa Maria Avenue Pacifica, California

CITY OF PACIFICA 170 Santa Maria Avenue Pacifica, California CITY OF PACIFICA 170 Santa Maria Avenue Pacifica, California 94044-2506 www.cityofpacifica.org MAYOR Karen Ervin MAYOR PRO TEM Sue Digre Scenic Pacifica Incorporated Nov. 22, 1957 COUNCIL Mary Ann Nihart

More information

Barriere Area Eco-Depot Siting Analysis. Open House Presentation December 15, 2009

Barriere Area Eco-Depot Siting Analysis. Open House Presentation December 15, 2009 Barriere Area Eco-Depot Siting Analysis Open House Presentation December 15, 2009 Presentation Outline Introduction Project Background Review of Screening Analysis Identified Sites Next Steps Purpose of

More information

APPENDIX G Fire BMPs

APPENDIX G Fire BMPs APPENDIX G Fire BMPs BEST MANAGEMENT PRACTICES Plan for URBAN RUNOFF MANAGEMENT PARTICIPATING RIVERSIDE COUNTY FIRE FIGHTING AGENCIES City of Corona Fire Department City of Hemet Fire Department City of

More information

RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS

RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER 391-3-7 EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS 391-3-7.01 Definitions. 391-3-7.02 (Repealed) 391-3-7.03

More information

BAUM INDUSTRIAL PARK DEVELOPMENT, PERFORMANCE AND MAINTENANCE STANDARDS DOCUMENT. October, 1991

BAUM INDUSTRIAL PARK DEVELOPMENT, PERFORMANCE AND MAINTENANCE STANDARDS DOCUMENT. October, 1991 BAUM INDUSTRIAL PARK DEVELOPMENT, PERFORMANCE AND MAINTENANCE STANDARDS DOCUMENT October, 1991 PART I INTRODUCTION 1. The Baum Industrial Park includes about 150 acres of land generally located east of

More information

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider

More information

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN May, 2017 CITY OF MERCER ISLAND 2017 S T O R M W A T E R M A N A G E M E N T P R O G R A M ( S W M P ) P L A N May 2017 City of Mercer

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Application of the

More information

Customer Bulletin #117 Water Quality Regulations for property in the Edwards Aquifer Recharge Zone

Customer Bulletin #117 Water Quality Regulations for property in the Edwards Aquifer Recharge Zone TO: SUBJECT: Planning and Inspection Services departments Customers Customer Bulletin #117 Water Quality Regulations for property in the Edwards Aquifer Recharge Zone DATE: March 11, 2015, revised May

More information

SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM. Source Control Measures Guidance and Model List

SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM. Source Control Measures Guidance and Model List SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Source Control Measures Guidance and Model List The San Mateo Countywide Stormwater Pollution Prevention Program (STOPPP) has developed a model

More information

SANITARY LANDFILL FACILITY PERMIT

SANITARY LANDFILL FACILITY PERMIT Division of Solid & Hazardous Waste P.O. Box 414 Trenton, New Jersey 08625-0414 Tel. # (609) 984-6900 Fax. # (609) 984-6874 SANITARY LANDFILL FACILITY PERMIT Under the provisions of N.J.S.A. 13:1E-1 et

More information

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

Appendix C. BMPS, Measurable Goals, and Implementation Schedule Appendix C BMPS, Measurable Goals, and Implementation MCM 1 Public Education, Outreach and Involvement Public Education and Outreach Residents BMP 1.1 Utility Bill Insert Continue implementation of existing

More information

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: DESCRIPTION OF PROJECT: ESTIMATED VALUE: ADDRESS SUBDIVISION BLOCK: LOT: ZONING: PROPERTY INFORMATION

More information

CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance s

CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance s CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance 2010-70s Revisions to Title 2 Administration 2.45 Land Use Advisory Commissions. Twelve individual LUAC chapters were

More information

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008)

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008) Section I - Description CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008) A water quality buffer zone (a.k.a. a riparian zone) is a strip of undisturbed native (indigenous)

More information

Table 11: Active C&D Debris Facilities in Florida (November 1998) DISTRICT C&D Disposal Land Clearing Debris Disposal

Table 11: Active C&D Debris Facilities in Florida (November 1998) DISTRICT C&D Disposal Land Clearing Debris Disposal Landfill Disposal Overview In 1980, Florida had approximately 500 open dumps. During this time period, it was a common practice to either burn or use one of these open dumps in order to alleviate the solid

More information

PLANNING COMMISSION REPORT Regular Agenda -- Public Hearing Item

PLANNING COMMISSION REPORT Regular Agenda -- Public Hearing Item TA-16-00323 Item No. 4-1 PLANNING COMMISSION REPORT Regular Agenda -- Public Hearing Item PC Staff Report 09/26/2016 ITEM NO. 4 TEXT AMENDMENT TO ZONING REGULATIONS; SMALL SCALE INDUSTRIAL USES (MKM) TA-16-00323:

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations ENVIRONMENTAL MANAGEMENT 1 ENVIRONMENTAL CODE ADOPTION) E-10.22 REG 2 The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations being Chapter E-10.22 Reg 2 (effective

More information

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By:

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By: City of Fultondale 1210 Walker Chapel Road P.O. Box 699 Fultondale, Al 35068 Stormwater Management Program Plan () Revised May 31, 2017 Prepared By: 7110 University Court, Montgomery, Alabama 36117 (THIS

More information

Orange County Fertilizer Application Education Course for Citizens

Orange County Fertilizer Application Education Course for Citizens Orange County Fertilizer Application Education Course for Citizens Thanks for taking the time to learn how to keep Central Florida beautiful while protecting our water quality! Why is Orange County Requiring

More information

Solid Waste Facility Permit SW-601

Solid Waste Facility Permit SW-601 Solid Waste Facility Permit Permittee: Facility name: Issuance date: Modification date: Expiration date: Specialized Environmental Technologies, Inc. and Dakota County Empire MSW Processing & SSOM Compost

More information

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING

More information

PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY

PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY Department of Public Works Division of Environmental Management Updated October 2016 This page intentionally left blank.

More information

Title 15 BUILDINGS AND CONSTRUCTION

Title 15 BUILDINGS AND CONSTRUCTION Title 15 BUILDINGS AND CONSTRUCTION Chapters: 15.04 International Codes Adopted 15.08 Building Permits 15.12 Movement of Buildings Chapter 15.04 INTERNATIONAL CODE COMMISSION CODES Sections: 15.04.010

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

LAND USE PBF LDR ZONING PUD PUD. Proposed Maximum Density (DU/Acre) Existing Maximum Intensity (FAR) .30 FAR/ 173 dwelling units.

LAND USE PBF LDR ZONING PUD PUD. Proposed Maximum Density (DU/Acre) Existing Maximum Intensity (FAR) .30 FAR/ 173 dwelling units. PROPOSED LARGE SCALE FUTURE LAND USE MAP (FLUM) AMENDMENT OVERVIEW ORDINANCE: 2013-658 APPLICATION: 2013G-001-3-5 APPLICANT: PAUL HARDEN PROPERTY LOCATION: On the south side of Sunbeam Road, at the terminus

More information