1 Cold recycling: pioneering, economical, resource-efficient. Cutting-edge Wirtgen technology in successful operation on Interstate 81 JOBREPORTS ANDREFERENCES

2 02 03 Cold recycling Leading technology in structural road rehabilitation One of the major north-south routes in the eastern United States of America runs across the state of Virginia with two lanes in each direction Interstate I-81. Having been built in the late 1960s, I-81 had been in service for well over forty years. And time had not passed without leaving its mark on the heavily frequented highway. Continuously increasing traffic volumes and in particular the loads imposed by heavy-vehicle traffic had taken a heavy toll on the road pavement and caused damage to varying degrees. As a result, the pavement surface was covered with innumerable alligator cracks, wheel ruts, deformations and patches where minor repairs had been carried out. On several sections of Interstate 81, however, more and far greater evil was hiding a little bit deeper: the right-hand truck lane, which suffered the most from the high volumes of heavy-vehicle traffic, showed significant structural damage and an inadequate load-bearing capacity in its lower pavement layers. In previous years, Virginia Department of Transportation (VDOT), the building authority in charge, had been able to keep traffic up and running by carrying out extensive repair and maintenance operations at regular intervals but limited to the surface layer. In the spring of 2011, however, a 6-km long stretch of I-81 had clearly reached the end of its service life, and suitable measures that would go really deep needed to be taken as quickly as possible in the interests of traffic safety. Conclusion: a structural rehabilitation of the aged section of Interstate I-81 required more than just milling off the existing pavement and placing new base course and surface course layers. Instead, the asphalt layers of the right-hand truck lane needed to be removed at full depth and the subgrade needed to be stabilized. The asphalt material reclaimed during this operation was to be recycled and then reused in a cost-efficient and environmentally-friendly process. As it was mostly used by passenger cars and was therefore subject to

3 lower loads, the left-hand lane was to be rehabilitated by cold recycling to a depth of 12 cm. In this highly challenging construction project, rehabilitating the complete pavement structure involved the use of as many as three different recycling methods. All the more reason for VDOT to rely on the tried-and-tested high-per formance machines from the Wirtgen Group and use powerful cold milling machines and cold recyclers, a mobile cold recycling mixing plant from Wirtgen and an entire fleet of Hamm rollers to breathe new life into the age-worn road. REHABILITATION OF THE RIGHT-HAND LANE 1 Remove asphalt pavement to a depth of 25 cm 2 Pre-spread 5% of binding agent 1 2 In a first step, the schedule of operations specified the renewal of the right-hand truck lane over a length of 6 km. The compact dimensions of the Wirtgen Group machines used in the process caused only minimal disruptions to traffic: both the trucks and passenger cars were guided past the job site on the adjacent, left-hand lane, thus maintaining a continuous flow of traffic In the first step of the construction project, W 210 and W 2100 large milling machines from Wirtgen reported for duty. The two workhorses removed the entire asphalt material down to a depth of 25 cm in a single pass. 3 Stabilize to a depth of 30 cm 4 Pave 20 cm of cold recycled material 5 Pave 5 cm of asphalt Steps involved in rehabilitating the right-hand lane.

4 04 05 Off to a perfect start: the W 210 cold milling machine showed its mettle when excavating the right-hand lane at full depth. A big help in this truly demanding job: LEVEL PRO the levelling system specifically designed by Wirtgen for use in cold milling machines precisely maintained the selected milling depth. At the same time, the powerful conveyor systems of the two cold milling machines kept the waiting trucks busy. The trucks transported the reclaimed granulated material to the mobile mixing plant, which had been set up in the vicinity of the construction site, for recycling and subsequent reuse. In addition, traffic conditions required the entire milling operation to be carried out during night hours it was completed just in time thanks to the machines excellent lighting systems and backlit control panels. A Wirtgen WR 2400 cold recycler with a working width of 2.40 m was at the ready for the soil stabilizing operation to be carried out next, which would restore the subgrade to the required bearing capacity. Prior to stabilizing, a binding agent spreader spread 5 % of a lime-cement mixture in the milled cut. The WR 2400 then travelled over the milled cut and binding agent. In the process, the recycler s milling and mixing rotor mixed the existing, damaged subgrade material and pre-spread binding agent down to a depth of 30 cm, adding specified amounts of water to produce a homogeneous construction material. At the same time, the recycler pushed a tanker truck which provided water for the mixing process via a hose connection. The WR 2400 cold recycler thus produced a perfect foundation with excellent load-bearing properties that merely required compacting by single-drum compactors from Hamm and levelling by a grader. While the WR 2400 was completing the soil stabilizing operation, the KMA 220 cold recycling mixing plant was busy recycling the reclaimed asphalt material in an in-plant process for full reuse. The binding agents added to the recycling process included 1 % of cement and 2.2 % of innovative foamed bitumen.

5 1 2 1 The Wirtgen WR 2400 cold recycler stabilized the existing subgrade material and pre-spread binding agent to a depth of 30 cm. 2 The high-performance KMA 220 mobile mixing plant set up in the vicinity of the construction site produced high-quality cold mix. Preliminary investigations using the Wirtgen WLB 10 S laboratory plant enabled the foamed bitumen quality and, in combination with the Wirtgen WLM 30 laboratory mixer, the optimal mix proportion to be defined even prior to the start of construction. The powerful twin-shaft continuous mixer of the KMA 220 transformed the source material and the two additives into a homogeneous cold mix of high quality that was directly discharged into a waiting truck via a loading conveyor. Its mobile design enabled the mixing plant to be set up in the immediate vicinity of the construction site, which not only reduced the distance to be covered by the transport trucks, fuel consumption rates and CO 2 emissions but, in the final analysis, also resulted in a significant reduction of the overall construction costs. The material recycled and upgraded by the KMA 220 mixing plant was transported back to the construction site by trucks. In the next step, asphalt pavers placed it on the stabilized subgrade as a 20-cm thick layer that was then effectively compacted by tandem rollers from Hamm. The base course built from the recycled cold mix impressed with optimal resistance to deformation, improved flexibility and excellent durability. The last operational step in the rehabilitation of the right-hand lane consisted in a 5-cm thick asphalt layer being placed on top of the base course prior to the lane being reopened for use by traffic.

6 The 3800 CR recycled the subgrade in a single pass while adding foamed bitumen to the process. 2 Hamm tandem and pneumatictyred rollers quickly and reliably compacted the lefthand lane previously produced in an in-situ process. REHABILITATION OF THE LEFT-HAND LANE Following completion of the right-hand truck lane, the second project phase was next on the agenda: rehabilitation of the left-hand traffic lane. As it had mostly been used by passenger cars in the past, it was not as severely damaged, meaning that it also required less extensive rehabilitation methods. Similar to the rehabilitation of the right-hand lane, the traffic was guided past the construction site on the adjacent lane, this time on the previously recycled right-hand lane. In a first step, the schedule of operations specified milling off the 5-cm thick surface course at a gradient of 2% over the entire length of the construction site. The W 2100 large milling machine tackled this part of the job, completing it with great ease in cooperation with the tried-and-tested LEVEL PRO levelling system. After pre-spreading 1 % of pure cement, the Wirtgen 3800 CR cold recycler equipped with a 3.8-m wide integrated paving screed gained centre stage for the in-situ processing of the traffic lane.

7 It is a major advantage of the in-situ recycling process that neither the source material nor the recycled construction material mix require any transport effort. Preceding tanker trucks delivered bitumen and water to the 3800 CR via hose connections. The cold recycler milled off and granulated the damaged asphalt layer down to a depth of 12 cm in a single pass while the milling and mixing rotor mixed in foamed bitumen, cement and water at the same time. Foamed bitumen was produced by the 3800 CR by injecting water and compressed air into hot bitumen. The precise mix proportion was again determined in advance by the WLB 10 S laboratory plant and WLM 30 laboratory mixer. Following recycling, the 3800 CR paved and pre-compacted the recycled mix by means of the integrated Vögele paving screed, thus producing a bituminous bound base course of superior quality even at this early stage. Final compaction was, as usual, a routine job for the tandem rollers and pneumatic-tyred rollers from Hamm. Rehabilitation of the left-hand traffic lane and therefore the entire construction project was completed by paving an asphalt course on top of the recycled base Remove asphalt pavement to a depth of 5 cm 2 Process 12 cm of cold recycling material 3 Pave 5 cm of asphalt WIRTGEN TECHNOLOGY MAKES THE DIFFERENCE Ground-breaking cold recycling technologies from Wirtgen were the key to success in this showcase project: traffic on Interstate I-81 flowed smoothly again after a short construction period on a roadway of optimal structural integrity on a roadway of excellent durability on a roadway recycled in an economical, resource-efficient and environmentally-friendly process. Steps involved in rehabilitating the left-hand lane.

8 Illustrations and texts are non-binding and may include customized fi ttings. Subject to technical changes. Performance data depend on operational conditions. Nr EN-01/16 by Wirtgen GmbH Printed in Germany Wirtgen GmbH Reinhard-Wirtgen-Str Windhagen Germany Phone: +49 (0) / Fax: +49 (0) / Internet: info@wirtgen.com

Binder with a proven track record worldwide. Foamed bitumen

Binder with a proven track record worldwide. Foamed bitumen Binder with a proven track record worldwide. Foamed bitumen 02 03 Fit for the future with foamed bitumen. HIGH-QUALITY, COST-EFFICIENT, ENVIRONMENTALLY FRIENDLY. AND FUTURE-PROOF: COLD RECYCLING WITH FOAMED

More information

Remixer 4500: Rehabilitation of the B 9 using the Remix-Plus process, Germany

Remixer 4500: Rehabilitation of the B 9 using the Remix-Plus process, Germany Job Report Hot Recycling. Remixer 4500: Rehabilitation of the B 9 using the Remix-Plus process, Germany JOBREPORTS ANDREFERENCES Wirtgen Hot Recycling: Remixer 4500: Rehabilitation of the federal road

More information

Efficient hot recycling the internationally recognized method. The World of Wirtgen Hot Recyclers

Efficient hot recycling the internationally recognized method. The World of Wirtgen Hot Recyclers Efficient hot recycling the internationally recognized method. The World of Wirtgen Hot Recyclers 02 03 Breathing new life into old roads. ROADS ARE EXPOSED TO TREMENDOUS STRESSES INDUCED BY TRAFFIC LOADING

More information

Efficient hot recycling an accepted method around the globe The World of Wirtgen Hot Recyclers

Efficient hot recycling an accepted method around the globe The World of Wirtgen Hot Recyclers Efficient hot recycling an accepted method around the globe The World of Wirtgen Hot Recyclers contents Introduction 4-5 History 6-7 Hot recycling train in detail 8-15 Leadership in technology 16-21 Product

More information

Successful operations in soil stabilization and cold recycling

Successful operations in soil stabilization and cold recycling The WR model series in a variety of applications. Successful operations in soil stabilization and cold recycling JOBREPORTS ANDREFERENCES 02 03 Powerful soil stabilization produces homogeneous subgrade

More information

Job Report Cold Milling. Top job in motorway rehabilitation Wirtgen milling machines on the A99

Job Report Cold Milling. Top job in motorway rehabilitation Wirtgen milling machines on the A99 Job Report Cold Milling Top job in motorway rehabilitation Wirtgen milling machines on the A99 Wirtgen cold milling: Top job in motorway rehabilitation Wirtgen high-performance milling machines on the

More information

Job Reports WR 240 / WR 240 i. Performing to highest quality standards whatever the job

Job Reports WR 240 / WR 240 i. Performing to highest quality standards whatever the job Job Reports WR 240 / WR 240 i Performing to highest quality standards whatever the job Construction of a dam for effective fl ood control Job description In the event of floods, a dam of up to 6 m in height

More information

Full Depth Reclamation

Full Depth Reclamation Full Depth Reclamation FDR Has Been Around A While 2 3 What is Full Depth Reclamation (FDR)? Full Depth Reclamation is a pavement rehabilitation technique in which the full flexible pavement section and

More information

Cold Recycling a method of road construction with low CO 2

Cold Recycling a method of road construction with low CO 2 Cold Recycling a method of road construction with low CO 2 Martin Diekmann Developments in Asphalt Plant and Equipment London, October 24, 2013 Conventional road construction Excavating Transport CO 2

More information

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration Puerto Rico Pavement Preservation Conference and Technology Implementation US. Department of Transportation Federal Highway Administration Cold In-Place Asphalt Recycling Overview Michael L. Polak E.J.

More information

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process Emulsion Full Depth Reclamation and Granular Base Stabilization An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th, 2007 Full Depth Reclamation (FDR) What is it? Rehabilitation technique

More information

Cold Foam In-Place Recycling (CIR)

Cold Foam In-Place Recycling (CIR) Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

Economical paving of 4.0-m to 12.0-m wide concrete slabs Slipform Paver SP 1200

Economical paving of 4.0-m to 12.0-m wide concrete slabs Slipform Paver SP 1200 Economical paving of 4.0-m to 12.0-m wide concrete slabs Slipform Paver SP 1200 Concrete pavements of high quality produced at low cost Efficiency, high quality, flexibility The innovative SP 1200 slipform

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

An Overview of Low Cost Pavement Alternatives in Canada

An Overview of Low Cost Pavement Alternatives in Canada An Overview of Low Cost Pavement Alternatives in Canada Venkat Lakkavalli P. Eng., M. Sc. Leader, Pavement Engineering The City of Calgary Alberta, Canada Acknowledgement Acknowledge Authors, Co-authors

More information

Dear Friends, Welcome on behalf of EvoCrete & CCL International Ltd.

Dear Friends, Welcome on behalf of EvoCrete & CCL International Ltd. Dear Friends, Welcome on behalf of EvoCrete & CCL International Ltd. On short Presentation: Composite Pavement Construction with Binder Additives in Recycled Asphalt Roads By Andreas Korytowski, Germany

More information

COLD IN-PLACE RECYCLING (CIR) Starting with what is there i.e. in situ materials

COLD IN-PLACE RECYCLING (CIR) Starting with what is there i.e. in situ materials COLD IN-PLACE RECYCLING (CIR) Starting with what is there i.e. in situ materials Definitions: ARRA (Asphalt Recycling/Reclaiming Ass.) Cold In-Place Recycling (CIR) is the on-site recycling process to

More information

Airport Pavement Rehabilitation 2015 Minnesota Airports Conference

Airport Pavement Rehabilitation 2015 Minnesota Airports Conference Airport Pavement Rehabilitation 2015 Minnesota Airports Conference St. Cloud, Minnesota April 16, 2015 David L. Rettner, P. E. American Engineering Testing, Inc. Pavement Life Cycle Routine Maintenance

More information

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc. 1 How to Select the Appropriate Pavement Rehabilitation Option David Rettner, PE American Engineering Testing, Inc. 2 Pavement Rehabilitation Selection Understanding the Problem 3 Pavement Assessment Pavement

More information

Pavement Recycling Technology for Highways in Japan

Pavement Recycling Technology for Highways in Japan Pavement Recycling Technology for Highways in Japan Presented at 1st ICTI 2008 April 24, 2008 Beijing, China Hisashi Hosokawa CEO, Green ARM Co.,Ltd Tokyo, Japan 1 Contents 1. History of Pavement Recycling

More information

SUPER Paves Top Quality Wearing Course without Joints

SUPER Paves Top Quality Wearing Course without Joints New large VÖGELE paver delights German professionals when working in 12.5m width. SUPER 3000-2 Paves Top Quality Wearing Course without Joints New large VÖGELE paver delights German professionals when

More information

Cold In-Place Recycling

Cold In-Place Recycling Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,

More information

A Case Study of Work done by a HOT IN-PLACE RECYCLING (HIR) Machines

A Case Study of Work done by a HOT IN-PLACE RECYCLING (HIR) Machines A Case Study of Work done by a HOT IN-PLACE RECYCLING (HIR) Machines Hisashi HOSOKAWA Yasushi KANZAKI CEO, Green ARM CO., Ltd., COO, Green ARM Co., Ltd., Japan Japan hhosokawa@green-arm.com kanzaki@green-arm.com

More information

Efficient milling and granulating of road pavements. The World of Wirtgen Cold Milling Machines

Efficient milling and granulating of road pavements. The World of Wirtgen Cold Milling Machines Efficient milling and granulating of road pavements. The World of Wirtgen Cold Milling Machines 02 03 Cutting-edge technology for better roads. THE STATE-OF-THE-ART MILLING TECHNOLOGY MEETS ALL REQUIREMENTS

More information

TechnoSoil. stand on firm ground with TechnoSoil IMPROVEMENT AND STABILIZATION OF PRESENT SOILS FOR EACH KIND OF EARTHWORK AND ROAD CONSTRUCTION

TechnoSoil. stand on firm ground with TechnoSoil IMPROVEMENT AND STABILIZATION OF PRESENT SOILS FOR EACH KIND OF EARTHWORK AND ROAD CONSTRUCTION TechnoSoil IMPROVEMENT AND STABILIZATION OF PRESENT SOILS FOR EACH KIND OF EARTHWORK AND ROAD CONSTRUCTION before after Road before treatment with TECHNOSOIL Country road with TECHNOSOIL base course BUILD

More information

COLD-IN-PLACE RECYCLING

COLD-IN-PLACE RECYCLING COLD-IN-PLACE RECYCLING A Cost Effective Pavement Preservation Treatment Kit Black, P.E. October 15, 2013 Footer Text Outline 1 2 3 4 5 6 7 Definition Equipment & Construction Process Project Selection

More information

FIELD STUDY OF REPAIR METHODS FOR TRANSVERSAL CRACKS

FIELD STUDY OF REPAIR METHODS FOR TRANSVERSAL CRACKS FIELD STUDY OF REPAIR METHODS FOR TRANSVERSAL CRACKS Jarkko Valtonen and Ilmo Hyyppä Helsinki University of Technology, FINLAND Abstract Transversal thermal cracks are a difficult problem on Finnish roads.

More information

January 2008 No. 700

January 2008 No. 700 January 2008 No. 700 INDEX FOR SPECIFICATIONS FOR GRANULAR BASE COURSE Page 700. 1 SCOPE...1 1.1 Pre-Construction Meeting...1 1.2 Mobilization of Equipment...1 700. 3 MATERIALS 3.1 Granular Base Course

More information

Double-layer Asphalt Pavement in a Single Process and Noise Reductions Properties of Double-Layer Porous Asphalt

Double-layer Asphalt Pavement in a Single Process and Noise Reductions Properties of Double-Layer Porous Asphalt Double-layer Asphalt Pavement in a Single Process and Noise Reductions Properties of Double-Layer Porous Asphalt T. Saito NIPPO CORPORATION Technical Development Department, Saitama, Japan N. Inaba NIPPO

More information

ROAD PAVEMENTS GENERAL

ROAD PAVEMENTS GENERAL ROAD PAVEMENTS GENERAL Contents Clause Title Page 701 Pavement Construction... 2 702 Horizontal Alignments, Surface Levels and Surface Regularity of Pavement Courses... 2 703 Not Used... 4 704 Not Used...

More information

Highway construction C 5

Highway construction C 5 Highway construction C 5 Contents Equipments used in Highway Construction Construction of Earth Roads Gravel Roads Water Bound Macadam Roads Bituminous Pavements Cement Concrete Pavements Equipment used

More information

Reclamation Guidelines

Reclamation Guidelines Reclamation Guidelines MAAPT 63 rd Asphalt Conference December 7, 2016 Terry Beaudry MnDOT Grading Base, Recycling, and Aggregate Engineer Outline 2 Design and Preliminary Work Construction Production

More information

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer Life Cycle Cost Analysis Considerations in Pavement Type Selection in Red Deer and Construction Challenges Bozena Czarnecki, Ph.D., P.Eng., Principal Specialist, Engineering Practice, Tetra Tech Canada

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

Efficient milling in the 1-m class Cold Milling Machine W 100 / W 100 i

Efficient milling in the 1-m class Cold Milling Machine W 100 / W 100 i Efficient milling in the 1-m class Cold Milling Machine W 100 / W 100 i Effective cold milling machine for asphalt packages and surface courses Compact, reliable, geared for the future By designing the

More information

Full-Depth Reclamation with Cement

Full-Depth Reclamation with Cement Full-Depth Reclamation with Cement 28th Annual Regional Local Roads Conference David L. Rettner Sr. Vice President American Engineering Testing, Inc. Design Construction Field Testing Performance Types

More information

Module 1 - Introduction. Asphalt Plant Level 1. Release 10 4/19/

Module 1 - Introduction. Asphalt Plant Level 1. Release 10 4/19/ 1-1 What will be covered? Why you are here? What are the requirements? What will happen during the course? This is a basic introduction to asphalt testing. There are other courses in asphalt pavement construction.

More information

550 Surface Treatments

550 Surface Treatments Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2

More information

InLine Pave Train Widens Highway While Open to Traffic

InLine Pave Train Widens Highway While Open to Traffic Paving asphalt hot on hot on the B 50 federal highway in Germany. InLine Pave Train Widens Highway While Open to Traffic Paving asphalt hot on hot on the B 50 federal highway in Germany. InLine Pave Train

More information

Hydraulically Bound Mixtures

Hydraulically Bound Mixtures Hydraulically Bound Mixtures Cement Bound Granular Mixtures (CBGM) EN14227-1 / SHW 800 Intro to HBM Introduction to HBM An Introduction To Cement Bound Granular Mixtures (CBGM) Reduce your asphalt costs

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 9 truction and Rehabilitation Alternates MnDOT Pavement Engineer Date Contents Introduction... 1 900 Existing Pavement-Types... 2 910 Rehabilitation with HMA Overlay

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA 0 0 0 0 SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA Mohamed Elfino, Ph.D., P.E. * Assistant State Materials

More information

Successful Implementation of Warm Mix Asphalt in Ontario

Successful Implementation of Warm Mix Asphalt in Ontario Successful Implementation of Warm Mix Asphalt in Ontario Seyed Tabib, Senior Bituminous Engineer Materials Engineering and Research Office, Ministry of Transportation of Ontario Pamela Marks, Head Bituminous

More information

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING 402.1 Description. This work shall consist of placing, spreading and compacting a bituminous mixture as shown on the plans or as directed by the engineer.

More information

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION... Materials Division Page 1 TABLE OF CONTENTS EXECUTIVE SUMMARY...2 I. INTRODUCTION...4 II. Purpose...4 What is LCCA?...4 History of LCCA in VDOT...4 ECONOMIC ANALYSIS COMPONENTS...6 Analysis Period...6

More information

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services Nova Scotia 2009 Pavement Preservation Jim Chisholm Highway Construction Services 2009 Construction Overview Pavement Preservation Hot Mix Asphalt Overlays Cold in Place Recycling Pulverization/Graveling/HMA

More information

Paver Operations for Quality

Paver Operations for Quality Information Series 125 Paver Operations for Quality www.hotmix.org This publication is provided by the Members of the National Asphalt Pavement Association (NAPA), who are the nation s leading Hot Mix

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) S312EM2-1110 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) August 10, 2010 I. DESCRIPTION This work shall include furnishing and placing

More information

Renae Kuehl, PE, SRF Consulting Group Dan Wegman, PE, Braun Intertec Corporation November 2, 2017

Renae Kuehl, PE, SRF Consulting Group Dan Wegman, PE, Braun Intertec Corporation November 2, 2017 BASE STABILIZATION GUIDANCE AND ADDITIVE SELECTION FOR PAVEMENT DESIGN Renae Kuehl, PE, SRF Consulting Group Dan Wegman, PE, Braun Intertec Corporation November 2, 2017 Who is the LRRB? Serves local agencies

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

7.1 INTRODUCTION 7.2 MATERIALS 7.1 ROAD PAVEMENT REPAIRS - GENERAL

7.1 INTRODUCTION 7.2 MATERIALS 7.1 ROAD PAVEMENT REPAIRS - GENERAL CHAPTER 7. ROAD PAVEMENT REPAIRS - GENERAL 7.1 INTRODUCTION In this section the materials and equipment most commonly used in pavement repair work are outlined. Then follow descriptions of the various

More information

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic

More information

Review of Cold In-Place Recycling: Environmental, Economical, and Performance Analysis

Review of Cold In-Place Recycling: Environmental, Economical, and Performance Analysis Review of Cold In-Place Recycling: Environmental, Economical, and Performance Analysis Introduction Cold in-place recycling (CIR) is a rehabilitation method that recycles existing asphalt pavement in-place,

More information

asphalt applications Asphalt surfacings for high stress areas mpa asphalt Asphalt Information Service Mineral Products Association

asphalt applications Asphalt surfacings for high stress areas mpa asphalt Asphalt Information Service Mineral Products Association asphalt applications 6 Asphalt surfacings for high stress areas Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction Information Sheet 2 in this series, Construction

More information

Longitudinal Joint Construction

Longitudinal Joint Construction North Central Hot Mix Asphalt Technical Conference Illinois Bituminous Paving Conference January 9, 2008 Springfield, IL Longitudinal Joint Construction William J. Pine, P.E. Heritage Research Group A

More information

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro 1. Evolution of Screeds In the US 2. Inline Pave (Hot on Hot) 3. Spray Paver Technology 4. RCC, CTB & Applications 5. Foam Mix and Recycling 6. Narrow & Medium Width High Quality Pavement 7. Navitronic

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 SPECIFICATION FOR HIGHWAY WORKS SERIES 700 ROAD PAVEMENTS GENERAL

MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 SPECIFICATION FOR HIGHWAY WORKS SERIES 700 ROAD PAVEMENTS GENERAL MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 SPECIFICATION FOR HIGHWAY WORKS SERIES 700 ROAD PAVEMENTS GENERAL Contents Clause Title Page 700 (02/16) General 2 701 (02/16) Pavement Construction

More information

Shell Bitumen Shell U.K. Oil Products Limited Rowlandsway House Rowlandsway Wythenshawe Manchester M22 5SB United Kingdom

Shell Bitumen Shell U.K. Oil Products Limited Rowlandsway House Rowlandsway Wythenshawe Manchester M22 5SB United Kingdom For more information and individual expert advice regarding the use of clear binders and the benefits it may bring to your community, please contact your local Shell Bitumen sales representative. Shell

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

Guidelines for pothole repairs

Guidelines for pothole repairs POTHOLE Guidelines for pothole repairs (Annex of Final Report of the project POTHOLE ) Milestone No. 10 Deliverable 5 September 2013 Project Coordinator: Karlsruhe Institute of Technology Project Partner

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

Mix Design & Construction -1-

Mix Design & Construction -1- Mix Design & Construction -1- AGENDA RCC Mix Design RCC Mix Production RCC Construction Process -2- THE FINAL SURFACE TYPE WILL DICTATE THE NECESSARY TECHNIQUES & EQUIPMENT NEEDED TO BE SUCCESSFUL Natural

More information

Cement Stabilized Aggregate Base

Cement Stabilized Aggregate Base Supplemental Technical Specification for October 28, 2015 Cement Stabilized Aggregate Base SCDOT Designation: SC-M-308 (10/15) 1. SCOPE 1.1. Cement Stabilized Aggregate Base (CSAB) consists of aggregate,

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

Pavement Management Systems

Pavement Management Systems Pavement Management Systems Basics and Benefits David R. Johnson, P.E. Regional Engineer Asphalt Institute Rocky Mountain Region djohnson@asphaltinstitute.org Presentation Outline Definition Requirements

More information

Rehabilitation Recommendations for FM 97 in Gonzales County

Rehabilitation Recommendations for FM 97 in Gonzales County Rehabilitation Recommendations for FM 97 in Gonzales County Technical Memorandum TM-14-04 Prepared for Texas Department of Transportation Maintenance Division Prepared by Texas A&M Transportation Institute

More information

1985: FT02 Kuala Lumpur - Kuantan (Temerloh) 1988: FT08 Pagar Sasak - Merapoh, Pahang

1985: FT02 Kuala Lumpur - Kuantan (Temerloh) 1988: FT08 Pagar Sasak - Merapoh, Pahang Cold In-Place Recycling in Malaysia INTRODUCTION CIPR technique was first introduced in Malaysia in mid 1980 s. o o 1985: FT02 Kuala Lumpur - Kuantan (Temerloh) 1988: FT08 Pagar Sasak - Merapoh, Pahang

More information

Sasobit the versatile additive for asphalt mixes

Sasobit the versatile additive for asphalt mixes the versatile additive for asphalt mixes Product information Reliable quality for highest standards Sasobit reliable quality for highest standards Traffic volumes in Europe will continue to increase in

More information

Technology Transfer Program

Technology Transfer Program Technology Transfer Program TECHNICAL TOPICS #2 The Pothole Primer for Planners, Managers and Public Officials by Larry Santucci, LTAP Field Engineer and Pavement Specialist, Pavement Research Center,

More information

Alligator Cracking. Light. Medium. High

Alligator Cracking. Light. Medium. High Alligator Cracking Description: A series of interconnecting cracks caused by fatigue failure on the asphalt concrete surface under repeated traffic loading. Causes: Loads in excess of the current pavement

More information

Innovative Sustainable Pavement Solutions

Innovative Sustainable Pavement Solutions 2010 Concrete Sustainability Conference Innovative Sustainable Pavement Solutions Fares Abdo, P.E. and David Shepherd, AIA LEED AP Fares Abdo, P.E. and David Shepherd, AIA LEED AP Portland Cement Association

More information

FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015

FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015 FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES OTEC - October 27, 2015 OVERVIEW Time + Traffic + Environment = Deterioration Temporary repairs include overlays or mill and fills to extend service life

More information

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,

More information

DIVISION 32 EXTERIOR IMPROVMENTS

DIVISION 32 EXTERIOR IMPROVMENTS DIVISION 32 EXTERIOR IMPROVMENTS DIVISION 32 EXTERIOR IMPROVEMENTS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Shrinking the carbon footprint with sustainable pavement

Shrinking the carbon footprint with sustainable pavement Office of the Vice President for Research 301 Burruss Hall (0244) Blacksburg, Virginia 24061 540/231-6077 Fax: 540/231-4384 www.research.vt.edu Article from Virginia Tech Research Magazine, Spring 2013

More information

Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction

Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction Crack sealants are often utilized as a pavement preservation tool in asphalt pavements. These sealants are placed in

More information

SERVICE INFORMATION SYSTEMS: KNOW-HOW FOR YOUR SUCCESS.

SERVICE INFORMATION SYSTEMS: KNOW-HOW FOR YOUR SUCCESS. SERVICE INFORMATION SYSTEMS: KNOW-HOW FOR YOUR SUCCESS. ROAD AND MINERAL TECHNOLOGIES www.wirtgen-group.com CONTENTS OVERVIEW PAGE 4 WIDOS PAGE 6 Information news about all machine types Page 8 Navigation

More information

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay Overlays February 22, 2012 ACPA Pennsylvania Chapter Overlays John M. Becker, P.E. ACPA Penn Chapter February 22, 2012 One of 25 state paving associations affiliated with ACPA National Comprised of approximately

More information

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE Quality Assurance is not Quality Control Quality control is Contractors responsibility during construction. Quality Assurance

More information

Performance of Aggregate Base Course Pavements in North Carolina

Performance of Aggregate Base Course Pavements in North Carolina Performance of Aggregate Base Course Pavements in North Carolina Judith Corley-Lay, Ph.D., PE * Pavement Management Unit, NCDOT 1593 Mail Service Center Raleigh, NC 27699-1593 919-212-61 jlay@ncdot.gov

More information

4-07 Asphalt Treated Permeable Base (ATPB)

4-07 Asphalt Treated Permeable Base (ATPB) 1 1 0 1 0 1 Supplement Division with the following: (November 0,, APWA GSP) -0 Asphalt Treated Permeable Base (ATPB) -0.1 Description Asphalt treated permeable base (ATPB) consists of a compacted course

More information

The Cardiac Arrest of Hot Mix Asphalt Pavements

The Cardiac Arrest of Hot Mix Asphalt Pavements The Cardiac Arrest of Hot Mix Asphalt Pavements Timothy R. Murphy, P.E. President What Are You Really Going To Remember from this Convention? What will you really remember most about today? 70% of what

More information

Distresses within Asphalt Concrete Pavements and use of repave tool for Pavement Distress Management Paige Jordan 03/ 01/ 2016 Bradley University

Distresses within Asphalt Concrete Pavements and use of repave tool for Pavement Distress Management Paige Jordan 03/ 01/ 2016 Bradley University Distresses within Asphalt Concrete Pavements and use of repave tool for Pavement Distress Management Paige Jordan 03/ 01/ 2016 Bradley University Page 1 Introduction: Distresses A distressed pavement is

More information

Low-temperature asphalt with Ammann Foam

Low-temperature asphalt with Ammann Foam Technology Low-temperature asphalt with Ammann Foam Innovative and forward-looking Low-temperature asphalt is becoming increasingly popular Innovative and forward-looking Lowering the manufacturing temperature

More information

Pavement Design. TTP Orientation Seminar 2011

Pavement Design. TTP Orientation Seminar 2011 Pavement Design TTP Orientation Seminar 2011 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles

More information

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two. Design Manual Chapter 6 - Geotechnical 6C - Pavement Systems 6C-1 Pavement Systems A. General Information This section addresses the importance of pavement foundations and the potential for pavement problems

More information

Flexible Pavement of Ohio

Flexible Pavement of Ohio Flexible Pavement of Ohio 49 th Annual Meeting & Equipment Exposition Wednesday, March 9, 2011 Doug Davis, P.E., P.S. Muskingum County Engineer Zanesville, Ohio Roads are living and breathing organisms.

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

Proposed Structure and Construction Method for Improved Interlocking Concrete Block Pavement Used in Residential Parking Spaces

Proposed Structure and Construction Method for Improved Interlocking Concrete Block Pavement Used in Residential Parking Spaces Proposed Structure and Construction Method for Improved Interlocking Concrete Block Pavement Used in Residential Parking Spaces Akihiko Karasawa, 1 Masahiko Nakamura, 1 Yoshio Yanagisawa 1 1 S-BIC Company

More information

LIFE CYCLE COST ANALYSIS OF ROAD PAVEMENTS IN RURAL AREAS

LIFE CYCLE COST ANALYSIS OF ROAD PAVEMENTS IN RURAL AREAS LIFE CYCLE COST ANALYSIS OF ROAD PAVEMENTS IN RURAL AREAS 1 Mr. Akhai Mudassar Mohammed Shafi, 2 Mr. Ahmed Afaque Shakeel, 3 Prof. Siddesh Kashinath Pai 1 Student of postgraduate programme in advance construction

More information

Technical specification Slipform Paver SP 1600

Technical specification Slipform Paver SP 1600 Technical specification Slipform Paver SP 1600 Technical specification Slipform paver SP 1600 Range of applications Slab paving Concrete spreading Spreading plough for working width 5,000 16,000 mm Slab

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING 507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING

More information

PERFORMANCE EVALUATION OF CEMENT STABILISED ROAD BASE USING FALLING WEIGHT DEFLECTOMETER

PERFORMANCE EVALUATION OF CEMENT STABILISED ROAD BASE USING FALLING WEIGHT DEFLECTOMETER PERFORMANCE EVALUATION OF CEMENT STABILISED ROAD BASE USING FALLING WEIGHT DEFLECTOMETER Gary Chai, Pengurusan Lebuhraya Berhad, Kuala Lumpur Asmaniza Asnan, Projek Lebuhraya Utara-Selatan Berhad, Kuala

More information

Cost Considerations of Asphalt Rubber Hot Mix

Cost Considerations of Asphalt Rubber Hot Mix Cost Considerations of Asphalt Rubber Hot Mix Gene R. Morris, P.E. International Surfacing, Inc. Kent R. Hansen, P.E. International Surfacing Inc. MATERIAL DESCRIPTION AND PROPERTIES Asphalt-rubber (A-R)

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION During the early 1960s, the Virginia Department of Transportation undertook a program to upgrade aggregate materials. The Department felt this was necessary since the highway construction

More information