A PIANC Standard of Practice for Performing Initial Assessments of Environmental Effects for Navigation Infrastructure Projects

Size: px
Start display at page:

Download "A PIANC Standard of Practice for Performing Initial Assessments of Environmental Effects for Navigation Infrastructure Projects"

Transcription

1 A PIANC Standard of Practice for Performing Initial Assessments of Environmental Effects for Navigation Infrastructure Projects Burton Suedel,* Edmond J. Russo, Todd S. Bridges and Sandra M. Brasfield USACE-ERDC-EL Vicksburg, MS Transportation Research Board Conference Washington, DC 26 June 2012 US Army Corps of Engineers

2 WG 143 Member Dr. Burton Suedel Dr. Sandra Brasfield Dr. Amy Oen Gudveig C. Bellen Nordahl Erik Mink Henrich Röper Ruben Abma Anneke Hibma Dr. Thomas J. Vanagt Dr. Tomonari Okada Dr. Igor Linkov Jorge Nasarre Claudio Luis Daniele Organization US Army ERDC US Army ERDC Norwegian Geotechnical Institute (NGI) Port of Drammen Representing IADC/EuDA c/o Interel European Affairs Hamburg Port Authority AöR Witteveen+Bos EcoShape Grontmij National Institute of Land, Infrastructure and Management (NILIM) US Army ERDC Port Authority of the Balearic Islands Estudio de Ambiente y Desarrollo 2

3 Background Procedures already developed to assess environmental risks for navigation and port infrastructure projects Methodology lacking for identifying stressors and pathways contributing to environmental impacts early in the project A new standard of practice being developed by PIANC EnviCom WG 143 providing a transparent method for performing the initial assessment process for navigation and port infrastructure projects

4 Purpose Identify and describe the stressors and pathways of potential environmental effects, from the possible external driving forces, and the likely environmental resources that might be affected by navigation and infrastructure projects

5 Scope Projects related to navigation and infrastructure include but are not limited to maintenance and new work dredging, port and harbor development and construction of waterways, locks, canals, quays, breakwaters, jetties, and groins Terminals, berthing facilities, barge flotilla areas, turning basins Identifies aspects of navigation and infrastructure projects that need in-depth investigation Identifies the need to investigate possible alternatives early in the project

6 Figure 1. Initial Assessment Process Flowchart (31 May 2012) From WG 100 Starting a Project Initiation (4) Project Formulation (4.1) Define project scope Define the problem Establish project objectives Identify project alternatives and reference area Identify and engage stakeholders and other actors Identify preferred effects assessment method Iterate, as Needed Engage Stakeholders Exploration (5) Gather Information (5.1) Review and compile existing relevant physical, chemical and biological information Obtain additional information, as needed Complete checklist Define Assessment Criteria (5.2) Identify environmental resources of interest using appropriate assessment criteria Develop Conceptual Model (5.3) Identify and describe relevant drivers and stressors, environmental resources of interest, and pathways Integrate stressor sources, pathways and resources of interest No Is information gathered sufficient for decision making? Assess Environmental Effects (5.4) Perform environmental effects assessment using preferred effects classification method Assess effects to identified resources Address uncertainty Identify preferred alternative Yes Complete Initial Assessment Process No Does the site require further evaluation? (5.5) Yes Conduct Further Assessment (5.5.1) Coordinate with relevant PIANC risk assessment guidance 6 Process Step Decision Point

7 Working with Nature Incorporates PIANC s Working with Nature philosophy focusing on: Achieving project objectives in an ecosystem context rather than assessing the consequences of a predefined project design Identifying win-win solutions rather than simply minimizing ecological harm Working with Nature advocates the following steps: Establish project need and objectives Understand the environment Make meaningful use of stakeholder engagement; identify win-win options Prepare project proposals/design to benefit navigation and nature

8 Project Formulation Initiation Phase Define project scope - Identify the information needed to complete the initial assessment Define the problem Develop problem statement that identifies the essential elements of the problem and explicitly defines the problem Establish project objectives Identify the fundamental project objectives to develop a structured decision making process Define project alternatives Develop a list of alternatives that represents the range of potential choices the decision makers will have for pursuing the stated objectives Identify reference locations - To evaluate project alternatives via comparisons with a reference location or baseline alternative Engage stakeholders and other actors Identify who needs to be a part of this process Identify preferred effects assessment method

9 Engaging Stakeholders Developing a process to engage stakeholders is needed to ensure a successful project Stakeholder involvement should start early to promote transparency and ensure the assessment proceeds effectively, efficiently and credibly Effective stakeholder engagement involves active stakeholder participation at appropriate points in the assessment process rather than as passive recipients of the results To meet challenges, get the participation right

10 Exploration Phase Gather information Define assessment criteria and indicators Develop conceptual model Define project alternatives Assess environmental effects Case Studies Sand hunger Port expansion

11 Information Gathering - Checklist Identifies potential environmental resources in project area and potential for the project to cause adverse effects Checklist organized by the description of the: Project area Environment potentially affected by the project Construction and maintenance related operations Description of Project Area Project Attribute Project and Adjacent Infrastructure Areas Project boundaries (e.g., water catchment, airshed) Location, size, general layout (using maps, drawings, etc.) Geographic siting (e.g., estuary, river, marine inlet, embayment, protected coast, or engineered coastline) Other relevant project area attributes Biological Environment of project and adjacent areas Flora Fauna Rare and endangered species Habitat type(s) (wetland, mangrove, estuary, coral reefs, seagrass beds, etc.) Sensitive or protected habitats (e.g., parks and preserves) Species of commercial or recreational importance Current or potential nuisance species Other biological attributes, as appropriate Description

12 Environmental Indicator - Defined A measurable feature that provides useful information on ecosystem status, quality or trends and the factors that affect them

13 Environmental Indicators Pressure Indicators - Direct and indirect pressures impacting the environment (human activities) Marine transportation patterns Human population growth (sprawl) Invasive species introduction rates Land use change

14 Environmental Indicators State Indicators - Physical, chemical and biological conditions of nature and human health and welfare Chemical concentrations in environmental media (abiotic and biotic) Wildlife population levels (e.g., bird counts) Disease rates Abundance, deformities, and reproductive success of key wildlife species Climate change - Water temperature, fish migration timing, precipitation rates, water level, ice coverage

15 Environmental Indicators Response Indicators - Societal actions undertaken to improve or protect ecosystems Pollution regulations Habitat restoration Use of clean technologies Remediation of contaminated media Nutrient loadings

16 Conceptual Models Projects may result in stressors being placed on the ecosystem - these stressors must be identified Pathways as links between stressors and environmental receptors Conceptual models required to fully support the initial environmental assessment Communicate the rationale behind the selection and integration of stressors, pathways and receptors Developing example conceptual models

17 Example Conceptual Model

18 Assess Environmental Effects Multi Criteria Analysis Modified URE Method Socio-economic Cost Benefit Analysis Cost Efficiency Analysis

19 Uncertainty Acknowledgment and treatment of uncertainty key elements Addressing uncertainty: Should be consistent with the overall scope and purpose of the initial assessment Initial assessments conducted in data-poor environments Much of the information required to quantify uncertainty may be lacking Characterize the types, sources, extent and magnitude of substantial uncertainties consistent with available data Communicate nature, magnitude and implications of uncertainties to decision makers and stakeholders

20 Summary Develops understanding of project components and their effects on the environment Engages stakeholders early and often Uses conceptual models to illustrate pathways from stressors to the environment Develops assessment of environmental impacts Investigates and evaluates possible alternatives Is compatible with Working with Nature philosophy Reduce lead times to project execution 20

21 Take Home Points Early communication with stakeholders prerequisite for success Indicator selection quantification critical Lessons, not limits, should drive indicator use 21

Notes for NEPA for Generic Terms of Reference

Notes for NEPA for Generic Terms of Reference TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation

More information

Problem Formulation and Conceptual Model Development for Aquatic Placement

Problem Formulation and Conceptual Model Development for Aquatic Placement Problem Formulation and Conceptual Model Development for Aquatic Placement Burton Suedel, Ph.D. burton.suedel@usace.army.mil DMAM Seminar Day 1 15 Sept 2009 Objectives Overview of problem formulation Overview

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

Action plan of the International Coral Reef Initiative (ICRI) Secretariat ( )

Action plan of the International Coral Reef Initiative (ICRI) Secretariat ( ) Action plan of the (ICRI) Secretariat (2016-2018) Adopted on November 4 th, 2016, at the 31st ICRI General Meeting (Paris, France) Theme 1 Help raise awareness of how coral reefs and related ecosystems

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-D Regulation No. 1110-2-1404 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDRAULIC DESIGN OF DEEP-DRAFT NAVIGATION PROJECTS Distribution

More information

Ecological and Human Health Risk Assessment Guidance for Aquatic Environments

Ecological and Human Health Risk Assessment Guidance for Aquatic Environments Technical Report DOER-4 December 1999 US Army Corps of Engineers Engineer Research and Development Center Dredging Operations and Environmental Research Program Ecological and Human Health Risk Assessment

More information

European sediment regulations: Gaps and bridges

European sediment regulations: Gaps and bridges Sednet Conference, Venice 2004 European sediment regulations: Gaps and bridges Helge Bergmann Federal Institute of Hydrology Koblenz (Germany) Sednet 2004 Folie 1 Professional background contaminants in

More information

Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101

Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101 Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempêtes PIANC WG 101 Guidelines for environmental impacts of vessels InCom

More information

Gulf Coast Ecosystem Restoration Task Force

Gulf Coast Ecosystem Restoration Task Force Gulf Coast Ecosystem Restoration Task Force The Gulf of Mexico Regional Ecosystem Restoration Strategy The Consortium for Ocean Leadership Public Policy Forum The Capitol March 7, 2012 1 An Unprecedented

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

PLANT AND ANIMAL DIVERSITY

PLANT AND ANIMAL DIVERSITY by the planning rule team as of. These ideas are for discussion purposes and do not What we want to achieve PLANT AND ANIMAL DIVERSITY The Forest Service is committed to protecting species and sustaining

More information

US Army Corp of Engineers

US Army Corp of Engineers US Army Corp of Engineers Each year thousands of construction projects are undertaken in the United States that could potentially impact the nation s rivers, streams, wetlands and other aquatic resources.

More information

Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy. This policy shall be supported by three policy objectives which are to:

Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy. This policy shall be supported by three policy objectives which are to: Habitat Policy and Procedures: 1. Policy: Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy Because all species are dependent on the quantity and quality of their essential habitats, it

More information

P.O. Box 216 Frazier Park, CA 93225

P.O. Box 216 Frazier Park, CA 93225 Tejon Ranch Conservancy P.O. Box 216 Frazier Park, CA 93225 January 23, 2009 Ms. Amy Burgard Group Project Coordinator Bren School of Environmental Science & Management 2510 Bren Hall UC Santa Barbara,

More information

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE 5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE This section discusses the effect of the Proposed Action on navigable waterways, and the Proposed Action s consistency with coastal zone policies. 5.5.1 Navigable

More information

Inventory, assessment and monitoring of wetlands: An integrated approach

Inventory, assessment and monitoring of wetlands: An integrated approach Inventory, assessment and monitoring of wetlands: An integrated approach Parikshit Gautam Director Freshwater & Wetlands Programme WWF - India Email: pgautam@wwfindia.net Taal 2007-12th World Lake Conference,

More information

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the

More information

Environmental Benefits and Performance Measures: Defining National Ecosystem Restoration and how to measure its achievement.

Environmental Benefits and Performance Measures: Defining National Ecosystem Restoration and how to measure its achievement. Environmental Benefits and Performance Measures: Defining National Ecosystem Restoration and how to measure its achievement. A Discussion Paper Adopted by the Chief of Engineers Environmental Advisory

More information

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION US Army Corps of Engineers Organization The Wilmington District Regulatory Division consists of 4 field offices in Wilmington, Washington,

More information

Developing Ecological Offsets for U.S. Shale Plays: Five Years of Learning(s)

Developing Ecological Offsets for U.S. Shale Plays: Five Years of Learning(s) Developing Ecological Offsets for U.S. Shale Plays: Five Years of Learning(s) Russ Krauss Vice President, Marketing & Analysis Resource Environmental Solutions, LLC Seventh Environmental Issues and Solutions

More information

Dang Thi Tuoi Biodiversity Conservation Agency (BCA) Ministry of Natural Resources and Environment of Vietnam (MONRE)

Dang Thi Tuoi Biodiversity Conservation Agency (BCA) Ministry of Natural Resources and Environment of Vietnam (MONRE) Dang Thi Tuoi Biodiversity Conservation Agency (BCA) Ministry of Natural Resources and Environment of Vietnam (MONRE) Main Contents: 1. Roles of biodiversity in Vietnam 2. Threats to biodiversity in Vietnam

More information

Climate Change, Water Levels, Adaptation, and the Lake Erie Ecosystem

Climate Change, Water Levels, Adaptation, and the Lake Erie Ecosystem Climate Change, Water Levels, Adaptation, and the Lake Erie Ecosystem Scudder D. Mackey, Ph.D. University of Windsor/Habitat Solutions Lake Erie Millennium Conference April 2010 Windsor, Ontario Today

More information

U. S. Army Corps of Engineers Charleston District Overview

U. S. Army Corps of Engineers Charleston District Overview U. S. Army Corps of Engineers Charleston District Overview Diane C. Perkins, AICP Charleston District Chief, Planning & Environmental Branch Diane.Perkins@usace.army.mil US Army Corps of Engineers General

More information

HEIDI J. CLARK, PH.D.

HEIDI J. CLARK, PH.D. Qualifications Summary 15 years of research and consulting experience with industry, government, and scientific institutions Extensive field sampling and laboratory work on large and small projects in

More information

Compliance with the USEPAs Section 404(b)(1) Guidelines

Compliance with the USEPAs Section 404(b)(1) Guidelines Compliance with the USEPAs Section 404(b)(1) Guidelines February 13, 2015 Regulatory Program Workshop Lisa Gibson Regulatory Permit Specialist US Army Corps of Engineers, Sacramento District US Army Corps

More information

Resilience and Climate Change Adaptation Session

Resilience and Climate Change Adaptation Session KATHERINE TOUZINSKY U.S. Army Engineer Research and Development Center (ERDC) Resilience and Climate Change Adaptation Session JENNIFER OGRODNICK PIANC Working Group 178 / Baird & Associates HELEN BROHL

More information

ASSESSING THE FINANCIAL RESOURCES NEEDED TO IMPLEMENT THE STRATEGIC PLAN FOR BIODIVERSITY AND ACHIEVE THE AICHI BIODIVERSITY TARGETS

ASSESSING THE FINANCIAL RESOURCES NEEDED TO IMPLEMENT THE STRATEGIC PLAN FOR BIODIVERSITY AND ACHIEVE THE AICHI BIODIVERSITY TARGETS ASSESSING THE FINANCIAL RESOURCES NEEDED TO IMPLEMENT THE STRATEGIC PLAN FOR BIODIVERSITY 2011-2020 AND ACHIEVE THE AICHI BIODIVERSITY TARGETS Draft Methodology Paper Fourth draft, 14 June 2012 1 Context

More information

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade December 16, 2016 On Oct. 13 14, 2016, a partnership of river stakeholders hosted the ninth annual Upper Mississippi River Conference,

More information

Science Plan. Executive Summary. Introduction

Science Plan. Executive Summary. Introduction Science Plan Executive Summary This Science Plan will establish and define the focus of the Peninsular Florida Landscape Conservation Cooperative (PFLCC) science investments. The data and products derived

More information

Models Quantify the Relationship Between Water Flows/Levels and Ecological Endpoints

Models Quantify the Relationship Between Water Flows/Levels and Ecological Endpoints National Conference on Ecosystem Restoration Los Angeles, CA July 20-24, 2009 Models Quantify the Relationship Between Water Flows/Levels and Ecological Endpoints Joseph V. DePinto, Todd M. Redder, Scott

More information

Santa Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007

Santa Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007 Santa Clara River Watershed Feasibility Study Information Meeting City of Santa Clarita August 16, 2007 Darrell Buxton Los Angeles District U.S. Army Corps of Engineers Public Issues and Concerns Balance

More information

The Port of New York and New Jersey. The Environment

The Port of New York and New Jersey. The Environment The Environment The An Important Environment Resource for Our Region As the premier cargo center on the eastern seaboard, the Port of New York and New Jersey connects our region to both the international

More information

Cleveland Bay Marine Water Quality (Turbidity and Available Light) Monitoring Plan

Cleveland Bay Marine Water Quality (Turbidity and Available Light) Monitoring Plan Cleveland Bay Marine Water Quality (Turbidity and Available Light) Monitoring Plan 1 BACKGROUND Port of Townsville Limited (PoTL) administers the Port of Townsville, a general purpose cargo port in North

More information

ERDC and e-nav Data Use

ERDC and e-nav Data Use ERDC and e-nav Data Use Ned Mitchell, PhD Research Civil Engineer ERDC Coastal and Hydraulics Lab Vicksburg, Miss. AAPA Harbors and Navigation 30 MAR 2016 Traditional ERDC Harbors and Navigation Support

More information

Initial Application of a Landscape Evolution Model to a Louisiana Wetland

Initial Application of a Landscape Evolution Model to a Louisiana Wetland Initial Application of a Landscape Evolution Model to a Louisiana Wetland by Carl F. Cerco PURPOSE: Corps planning projects encompass a wide variety of restoration goals. These include wetland restoration,

More information

D9. Significant Ecological Areas Overlay

D9. Significant Ecological Areas Overlay D9. Significant Ecological Areas Overlay D9.1. Background Auckland's indigenous biodiversity is unique with a diverse range of ecosystems reflecting the complex physical environment of the region. Natural

More information

Guidelines for Preparing a Compensatory Mitigation Plan

Guidelines for Preparing a Compensatory Mitigation Plan Compensatory Mitigation Guidelines Last Revised October 7, 2010 Guidelines for Preparing a Compensatory Mitigation Plan Page 1 of 18 Compensatory Mitigation Guidelines Last Revised October 7, 2010 TABLE

More information

AP Environmental Science

AP Environmental Science AP Environmental Science Types of aquatic life zones MARINE Estuaries coral reefs mangrove swamps neritic zone pelagic zone FRESHWATER lakes and ponds streams and rivers wetlands Distribution of aquatic

More information

From the thousands of miles of coastal shoreline

From the thousands of miles of coastal shoreline Water Resources VALUE OF OUR NATION S WATER RESOURCES From the thousands of miles of coastal shoreline and rivers to the lakes and wetlands that dot our nation s landscape, America is fortunate to have

More information

Lecture 1 Integrated water resources management and wetlands

Lecture 1 Integrated water resources management and wetlands Wetlands and Poverty Reduction Project (WPRP) Training module on Wetlands and Water Resources Management Lecture 1 Integrated water resources management and wetlands 1 Water resources and use The hydrological

More information

The Coastal and Hydraulics Laboratory Mission The National Agenda

The Coastal and Hydraulics Laboratory Mission The National Agenda The Coastal and Hydraulics Laboratory Mission The National Agenda Ing. José E. Sánchez, SES Director US Army Engineer R&D Center 1927 Flood Establishment of WES 300 deaths, $1B damages Flood Control Act

More information

Info Sheet for Port Everglades NEPA Rescoping Public Meeting February 22, 2017

Info Sheet for Port Everglades NEPA Rescoping Public Meeting February 22, 2017 Info Sheet for Port Everglades NEPA Rescoping Public Meeting February 22, 2017 About the Florida Reef Tract South Florida is home to the only nearshore, barrier reef system in the continental United States.

More information

Assessment of Ecosystem Services Values for the Central Everglades

Assessment of Ecosystem Services Values for the Central Everglades Assessment of Ecosystem Services Values for the Central Everglades Leslie Richardson, Lynne Koontz, Chris Huber - USGS Fort Collins Science Center Laila Racevskis - University of Florida Kelly Keefe U.S.

More information

ENVIRONET Conceptual Site Model

ENVIRONET Conceptual Site Model ENVIRONET Conceptual Site Model Peter Booth Senior Technical Director 17/04/2012 Definition The conceptual site model (CSM) can be seen as; A representation which sets out the critical pollutant linkages

More information

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 Draft Feasibility Study Report with Integrated Environmental Assessment St. Paul District U.S. Army Corps of Engineers March 2018

More information

Integrated Coastal Zone Management Project Republic of India

Integrated Coastal Zone Management Project Republic of India Integrated Coastal Zone Management Project Republic of India Restoration and conservation of mangroves, coral reefs transplantation along the coastline of Gujarat and Orissa regions Abstract The ICZM project

More information

Operational Policy Statement

Operational Policy Statement Operational Policy Statement Determining Whether a Designated Project is Likely to Cause Significant Adverse Environmental Effects under the Canadian Environmental Assessment Act, 2012 November 2015 i

More information

Outline of Risk Assessment Training and Experience (RATE): Basic Understanding and Application of Risk Assessments

Outline of Risk Assessment Training and Experience (RATE): Basic Understanding and Application of Risk Assessments Outline of Risk Assessment Training and Experience (RATE): Basic Understanding and Application of Risk Assessments Summary: Environmental risk Assessment 1 plays a unique role in serving the needs of various

More information

ESPO / EcoPorts Port Environmental Review 2009

ESPO / EcoPorts Port Environmental Review 2009 ESPO / EcoPorts Port Environmental Review 2009 European Sea Ports Organisation s Review of Environmental Benchmark Performance in collaboration with the EcoPorts Foundation (EPF) Foreword This summary

More information

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT BUILDING STRONG APPLICATION FOR PERMIT Port of Los Angeles Berths 182-186: Wilmington Waterfront Promenade Public Notice/Application No.:

More information

The Importance of the Pearl River to Mississippi s Estuarine Habitats Jennifer Buchanan Education Coordinator

The Importance of the Pearl River to Mississippi s Estuarine Habitats Jennifer Buchanan Education Coordinator The Importance of the Pearl River to Mississippi s Estuarine Habitats Jennifer Buchanan Education Coordinator 2006 Pearl River Basin Symposium May 5-6, 2006 Topics for Discussion What s an estuary? Pearl

More information

Distribution Restriction Statement

Distribution Restriction Statement CECW-A Engineer Regulation 1165-2-501 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 1165-2-501 30 September 1999 Water Resources Policies and Authorities CIVIL WORKS

More information

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project Dr. Gretchen Ehlinger Senior Biologist US Army Corps of Engineers Jacksonville District November 15, 2016 AWRA Conference

More information

Navigating the U.S. Army Corps of Engineers Regulatory Process

Navigating the U.S. Army Corps of Engineers Regulatory Process Navigating the U.S. Army Corps of Engineers Regulatory Process Angela Ryan Biologist Tampa Permits Section May 16, 2012 US Army Corps of Engineers JACKSONVILLE DISTRICT Regulatory Mission To protect the

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Ecological Risk Assessment and the Tittabawassee River, Why, How and Who Cares

Ecological Risk Assessment and the Tittabawassee River, Why, How and Who Cares Ecological Risk Assessment and the Tittabawassee River, Why, How and Who Cares Chippewa Nature Center, April 13 2006 Matthew Zwiernik, PhD Professor Zoology/Vet Med. Michigan State University Special Thanks

More information

Land Accounting for SDG Monitoring and Reporting

Land Accounting for SDG Monitoring and Reporting Regional Expert Workshop on Land Accounting for SDG Monitoring and Reporting Bangkok - Thailand 25-27 September 2017 Mrs. Niroshinie De Silva Assistant Director Ministry of Mahaweli development & Environment

More information

Hudson Raritan Estuary Comprehensive Restoration Plan and Feasibility Study

Hudson Raritan Estuary Comprehensive Restoration Plan and Feasibility Study Restoring America s Estuaries 5 th National Conference on Coastal and Estuarine Habitat Restoration 16 November 2010 Hudson Raritan Estuary Comprehensive Restoration Plan and Feasibility Study Lisa Baron

More information

2016 Lake Worth Lagoon CAP 1135 Benthic Macroinvertebrate Study. Preliminary Results

2016 Lake Worth Lagoon CAP 1135 Benthic Macroinvertebrate Study. Preliminary Results 2016 Lake Worth Lagoon CAP 1135 Benthic Macroinvertebrate Study Preliminary Results Study Objectives Section 1135 of the Water Resources Development Act of 1986 - U.S. Army Corps of Engineers may plan,

More information

Coastal Zone Planning for Belize

Coastal Zone Planning for Belize Coastal Zone Planning for Belize Chantalle Clarke, Samir Rosado, Amy Rosenthal, Katie Arkema, Maritza Canto, Ian Gillett, Gregg Verutes, Spencer Wood Key Message The government of Belize is developing

More information

THE FIRST IRAQI NATIONAL REPORT TO THE CONVENTION ON BIOLOGICAL DIVERSITY

THE FIRST IRAQI NATIONAL REPORT TO THE CONVENTION ON BIOLOGICAL DIVERSITY THE FIRST IRAQI NATIONAL REPORT TO THE CONVENTION ON BIOLOGICAL DIVERSITY CHAPTER I BIODIVERSITY VALUES MARSH Most Most important fresh fresh and and brackish water water system of of the the region Breeding

More information

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 June 2, 2015 CESAM-RD-C PUBLIC NOTICE NO. SAM-2015-00573-PAH JOINT PUBLIC NOTICE SAM-2015-00573-PAH

More information

The 3 rd National Biodiversity Strategy and Action Plan. Ministry of the Environment, JAPAN

The 3 rd National Biodiversity Strategy and Action Plan. Ministry of the Environment, JAPAN The 3 rd National Biodiversity Strategy and Action Plan Ministry of the Environment, JAPAN Brief History of Japan s National Biodiversity Strategies 1993: Entry into force of the Convention on Biological

More information

3 Objectives 3 Ob jec tives

3 Objectives 3 Ob jec tives 3 Objectives 3 Objectives 3 Objectives 3 Objectives contents Objective number Page 3.1 Ki uta ki tai: mountains to the sea O1-O5 37 3.2 Beneficial use and development O6-O13 38 3.3 Māori relationships

More information

Biscayne Bay. A Jewel in Jeopardy? Stephen Blair 1 and Sarah Bellmund 2

Biscayne Bay. A Jewel in Jeopardy? Stephen Blair 1 and Sarah Bellmund 2 Biscayne Bay A Jewel in Jeopardy? Stephen Blair 1 and Sarah Bellmund 2 1 Department of Regulatory and Economic Resources; Division of Environmental Resources Management (DERM), Miami, FL 2 National Park

More information

Environmental Assessment Tool for Cage Aquaculture in the Great Lakes Version 1.1

Environmental Assessment Tool for Cage Aquaculture in the Great Lakes Version 1.1 Environmental Assessment Tool for Cage Aquaculture in the Great Lakes Version 1.1 by Deborah J. Brister 1,3 and Anne R. Kapuscinski 1,2,3 1 University of Minnesota, Department of Fisheries and Wildlife

More information

Coastal and Marine Species (and Ecosystem) Protection and Management: What Does Economics Bring to the Table? Peter Schuhmann UNC Wilmington

Coastal and Marine Species (and Ecosystem) Protection and Management: What Does Economics Bring to the Table? Peter Schuhmann UNC Wilmington Coastal and Marine Species (and Ecosystem) Protection and Management: What Does Economics Bring to the Table? Peter Schuhmann UNC Wilmington Coastal and Marine Resources Beaches Dunes Estuaries Mangroves

More information

by 2010 or beyond and what are the implications for the Convention on Biological Diversity?

by 2010 or beyond and what are the implications for the Convention on Biological Diversity? 6. What are the prospects for reducing the rate of loss of biodiversity by 2010 or beyond and what are the implications for the Convention on Biological Diversity? Biodiversity will continue to decline

More information

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote

More information

Science For Coastal Wetland Restoration

Science For Coastal Wetland Restoration Science For Coastal Wetland Restoration Dr. Alfred F. Cofrancesco Technical Director Engineer Research and Development Center; Vicksburg, MS 24 May 2010 US Army Corps of Engineers Coastal Wetlands Restoration

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean

More information

Climate Data Training Session April 26, 2017 Ontario Science Centre

Climate Data Training Session April 26, 2017 Ontario Science Centre Adaptive Management To Address Climate Change Uncertainty in EA Process A Case Study of the Don Mouth Naturalization and Port Lands Flood Protection Project EA (DMNP EA) Climate Data Training Session April

More information

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved.

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved. Federal Regulation Copyright 2011 Gary A. Robbins. All rights reserved. Roles Different Federal agencies have different jurisdictions over water resources Main agencies Army Corp of Engineers (USACE) Bureau

More information

Reviewing Ecological Risk Assessment Deliverables

Reviewing Ecological Risk Assessment Deliverables Reviewing Ecological Risk Assessment Deliverables Abstract The goal of this paper is to give remedial project managers (RPMs) some tools to help efficiently and effectively review ecological risk assessment

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

Environment & Conservation Introduction

Environment & Conservation Introduction Environment & Conservation Introduction Anacortes is blessed with an abundance of natural beauty. Residents identify marine shorelines, streams, lakes, forested areas, and other natural features as defining

More information

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN): This PCN integrates the requirements of the U.S. Army Corps of Engineers (Corps) Nationwide Permit Program within the South Pacific Division (SPD), including the Albuquerque, Los Angeles, San Francisco,

More information

Gulf of Mexico Program

Gulf of Mexico Program Gulf of Mexico Program Gulf of Mexico Program Mission Protect, restore, and maintain the Gulf of Mexico in ways consistent with the economic well-being of the region Committed to voluntary, non-regulatory

More information

Community Benefits of Land Restoration

Community Benefits of Land Restoration Community Benefits of Land Restoration Introducing Green Infrastructure for Coastal Resilience Matt Fulda, Acting Director Monroe May 23 rd, 2017 Avery Point Campus, University of Connecticut Easton Trumbull

More information

The TIDE Project: An overview. - Kirsten Wolfstein, Hamburg Port Authority -

The TIDE Project: An overview. - Kirsten Wolfstein, Hamburg Port Authority - The TIDE Project: An overview - Kirsten Wolfstein, Hamburg Port Authority - The main objective of estuarine management is to maintain and protect the natural ecology while safeguarding the delivery of

More information

Regulatory Guidance Letter 93-02

Regulatory Guidance Letter 93-02 Regulatory Guidance Letter 93-02 SUBJECT: Guidance on Flexibility of the 404(b)(1) Guidelines and Mitigation Banking DATE: August 23, 1993 EXPIRES: December 31, 1998 1. Enclosed are two guidance documents

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

MARINELAB & the AP ENVIRONMENTAL SCIENCE COURSE

MARINELAB & the AP ENVIRONMENTAL SCIENCE COURSE Astronomy/Plankton Tow Summary: Astronomy will discussed aboard the boat. Discussion will include location of Polaris and how it is used for navigation, identification of visible constellations and identification

More information

Gladstone Australia s 21 st Century Industrial City

Gladstone Australia s 21 st Century Industrial City Gladstone Australia s 21 st Century Industrial City A DECADE OF GROWTH, PROSPERITY, COMMUNITY The Powerhouse of the Eastern Seaboard 2005-2015 Cairns Gladstone Region Brisbane $40 billion of direct investment

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

LIVING LANDS Helping Land Trusts Conserve Biodiversity

LIVING LANDS Helping Land Trusts Conserve Biodiversity LIVING LANDS Helping Land Trusts Conserve Biodiversity Habitat Restoration: Information for Land Trusts What is Habitat Restoration? Habitat restoration is defined as the process of assisting the recovery

More information

Chapter 4 Watershed Goals and Objectives

Chapter 4 Watershed Goals and Objectives Chapter 4 Watershed Goals and Objectives Eight (8) long-term watershed goals have been developed by the NEW Watershed Advisory Group (WAG) after consideration of discussions held during monthly watershed

More information

Overview of Dredged Material Testing and Evaluation

Overview of Dredged Material Testing and Evaluation Overview of Dredged Material Testing and Evaluation Jeffery Steevens US Army Corps of Engineers Engineer Research and Development Center 23 July 2012 Guidance Documents for Management of Dredged Material

More information

Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill

Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill Port of Long Beach Category: Environmental Enhancement Heather Tomley Director of Environmental Planning Port of Long Beach 4801 Airport

More information

Sea Level Rise: Impacts, Adaptation and Information Gaps

Sea Level Rise: Impacts, Adaptation and Information Gaps University of New Orleans ScholarWorks@UNO Coastal Resilience Workshop Coastal Resilience Workshop 2015 Oct 28th, 10:00 AM - 12:00 PM Sea Level Rise: Impacts, Adaptation and Information Gaps Jeffrey R.

More information

Engineering with Nature for Natural Infrastructure

Engineering with Nature for Natural Infrastructure Engineering with Nature for Natural Infrastructure Dr. Todd S. Bridges Senior Research Scientist, Environmental Science U.S. Army Engineer Research and Development Center, USACE todd.s.bridges@usace.army.mil

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 1949 INDUSTRIAL PARK ROAD, ROOM 140 CONWAY, SOUTH CAROLINA 29526 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office

More information

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study Stakeholder Partnering Forum Modernizing of the GIWW August 4, 2016 Partnering Under a Systems Approach for Sustaining Commercial

More information

Alcoa Mosjøen Harbor Remediation Project Information and Fender Design

Alcoa Mosjøen Harbor Remediation Project Information and Fender Design Alcoa Mosjøen Harbor Remediation Project Information and Fender Design Trygve Isaksen and Maiken Eng, Norconsult 1 Content Short presentation of Norconsult, Port and Coastal Engineering and Trygve Introduction

More information

CHNEP/SWFRPC Climate Ready Programs

CHNEP/SWFRPC Climate Ready Programs CHNEP/SWFRPC Climate Ready Programs Southwest Florida is currently experiencing climate change. The natural setting of southwest Florida coupled with extensive overinvestment in the areas closest to the

More information

St. Lawrence Action Plan Presentation to the Great Lakes and St. Lawrence Cities Initiative. Québec City June 28, 2012

St. Lawrence Action Plan Presentation to the Great Lakes and St. Lawrence Cities Initiative. Québec City June 28, 2012 St. Lawrence Action Plan 2011-2026 Presentation to the Great Lakes and St. Lawrence Cities Initiative Québec City June 28, 2012 1 Canada/Quebec cooperation on the St. Lawrence River PHASE I 1988-1993 Conservation

More information

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study Appendix F Section 404(b)(1) APPENDI F. SECTION 404(B)(1) EVALUATION SHORT VERSION Herbert Hoover Dike Dam Safety Modification Study HHD Dam Safety Modification Study EIS June 2016 E i Appendix F Section

More information

US Army Corps of Engineers

US Army Corps of Engineers I I I ' A I US Army Corps of Engineers LA River Ecosystem Restoration, CA Preconstruction Engineering and Design Phase 104791 LOS ANGELES DISTRICT SOUTH PACIFIC DIVISION August 15, 2017 1 Table of Contents

More information