Proposed Stormwater Management Regulations: 314 CMR 21.00
|
|
- Hannah Quinn
- 5 years ago
- Views:
Transcription
1 Proposed Stormwater Management Regulations: 314 CMR Stormwater General Permit Requirements Engineering Perspective Craig C. Lizotte, P.E. Manager of Land Development
2 Stormwater General Permit What and When Intended to help improve water quality by treating and infiltrating stormwater Target sites with > 5 Acres Regulated Impervious Area (RIA) State Wide > 2 Acres RIA in TMDL Areas Details for compliance to be in: RIA General Stormwater Permit Workbook Out for public comment, summer 2009 Promulgation late 2009 early 2010 Source: Riverways Website Source: Charles River Watershed Website
3 Stormwater General Permit Requirements All existing sites: baseline performance standards No retrofits required for non TMDL sites New development of RIA Install LID techniques and stormwater BMPs to meet Standards 3-6 of MA Stormwater Management Standards Redevelopment of RIA Install LID BMPs that maintain existing peak rate, recharge and treatment Include infiltration of at least 40% of the redevelopment volume TMDL areas: stormwater discharges from RIA Infiltration BMPs for pollutant reduction required by TMDL
4 Baseline Performance Standards: All Sites All sites: baseline performance standards (Threshold: 5 acres or 2 acres impervious intmdl area) Stormwater Management Plan & Team Operation and Maintenance Plan Snow & deicing practices management plan Pavement sweeping 2X per year Self Certification forms and fees -180 days
5 Stormwater General Permit Requirements Redevelopment of > 5 acres Redevelopment of RIA Redevelopment includes some level roof and pavement repair Install LID BMPs that maintain or enhance existing: Peak discharge rate, recharge volume, water quality treatment Include infiltration of at least 40% of the redevelopment volume Redevelopment volume = recharge volume or the WQV (whichever is greater) Details/clarification on implementation and calculation needed If infiltration not possible, enhanced treatment or reduction of impervious area required Off-site mitigation allowed Variance if cant comply
6 Stormwater General Permit Requirements New Development >5 acres New development of RIAs > 5 acres Development definition is for pavement and/or roof Install LID techniques and stormwater BMPs that can meet Standards 3-6 of the Massachusetts Stormwater Management Standards Standard 3: Recharge. Post development recharge to approximate existing recharge (issue: permeable pavement considered impermeable) Standard 4: TSS Removal. Post development annual removal of 80% TSS loads Standard 5: Land Uses with Higher Potential Pollutant Loads (LUHPPLs) Standard 6: Water Quality Discharge to Critical Areas, ORWS, Drinking Water Supplies, Etc. Requirements generally same as WPA stormwater management standards, but... Will include some upland sites not under WPA Site development is not the trigger but it is the size of roof and/or pavement being developed Off-site mitigation not allowed
7 TMDL Areas: Additional Requirements Existing Sites Existing sites: TMDL areas Stormwater discharge from RIA > 2 acres Retrofits for infiltration BMPs for pollutant reduction required by TMDL Pollutant reduction based on TMDL (65% phosphorous in Charles River) 4.5 years for retrofit design 10 years for construction completion Off-site mitigation allowed
8 TMDL Areas: Additional Performance Standards for Redevelopment/Development Sites Redevelopment/Development of RIAs in TMDL areas > 2 acres In addition to the 65% phosphorous reduction these sites must meet the performance standards for >5 acres sites previously identified.
9 Ssource: Stormwater BMP Manual EPA/Tetratech Pollutant Reduction Calculators Use EPA's "BMP Performance Curve" model to estimate pollution reduction from BMPs 8 BMPs identified: infiltration basin, infiltration trench, gravel wetland, porous pavement, wet pond, dry pond, bioretention, grass swale Removal based on soil type, land use, BMP type and runoff volume directed to BMP BMPs must be designed in accordance with the Stormwater Management Handbook
10 What Does This Mean to You? Regulations still in draft form Non-TMDL areas: more formalized requirements for O&M, new annual compliance efforts New development or redevelopment (Non TMDL): Increased applicability of stormwater management standards. TMDL Areas: retrofits required, must comply with TMDL treatment requirements.
11 Existing Conditions
12 Stormwater Retrofit, Suitable Soils
13 Stormwater Retrofit, Unsuitable Soils
SHA MDE Water Quality Bank
SHA MDE Water Quality Bank Sonal Sanghavi, PE Maryland State Highway Administration TMDL Implementation Workshop for Local Governments September 13, 2004 2 SHA MDE Water Quality Bank Goal To establish
More informationOHIO S NPDES STORMWATER GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES OHC Justin Reinhart, PE Division of Surface Water
OHIO S NPDES STORMWATER GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES OHC00005 Justin Reinhart, PE Division of Surface Water ASCE Spring Seminar Columbus, Ohio April 26, 2018 Goals / Outline 1. CGP background
More informationRhode Island DOT Consent Decree: Quantitative Targets for Stormwater Control
Rhode Island DOT Consent Decree: Quantitative Targets for Stormwater Control Andrew Spejewski, Water Enforcement EPA Region I February 20, 2018 National Stormwater Roundtable, Atlanta GA Or, How I Learned
More informationComparing Treatment and Siting Criteria for Stormwater BMPs near Drinking Water Supply Areas
Comparing Treatment and Siting Criteria for Stormwater BMPs near Drinking Water Supply Areas Are Restrictions on these Infiltration BMPs Enough to Protect Wellhead Protection Areas, Stream Buffer Zones
More informationSuffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation
Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE
More informationFINAL MA MS4 GENERAL PERMIT NEWTON TEDDER EPA REGION 1 BOSTON
FINAL MA MS4 GENERAL PERMIT NEWTON TEDDER EPA REGION 1 BOSTON PRESENTATION OVERVIEW HISTORY GENERAL OVERVIEW MS4 PERMIT REQUIREMENTS AND CHANGES FROM THE DRAFT PERMIT EPA TOOLS DISCUSSION MASSDEP TOOLS
More informationOverview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit
Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit Outline Regulatory Context and MS4 Permit Status 2016 MS4 Permit Requirements NOI, SWMP, Annual Reports Minimum Control Measures
More informationLOW IMPACT DEVELOPMENT ( LID ) STANDARDS
LOW IMPACT DEVELOPMENT ( LID ) STANDARDS January 9, 2013 Prepared By Truong Huynh, PE, CBO Superintendent of Building & Safety, Acting OVERVIEW Part I LID Applicability and Requirements Part II Plan Check
More informationRhode Island Stormwater Design and Installation Standards Manual-- Final Draft: Public Informational Session May 26, 2010 at CCRI
Rhode Island Stormwater Design and Installation Standards Manual-- Final Draft: Public Informational Session May 26, 2010 at CCRI Questions and Answers Chapter 3 Q1. Will there be a provision for revising
More informationAppendix A. Compliance Calculator Guidance
Compliance Calculator Guidance Appendix A Appendix A. Compliance Calculator Guidance A.1 Introduction The Center for Watershed Protection created the compliance calculator spreadsheet to allow a designer
More informationStormwater Utility Credits. February 25, 2014
Stormwater Utility Credits February 25, 2014 Stormwater Utility Overview Effective January 1, 2014 Billed 2X/YR with Real Estate Taxes A stormwater utility is a fee for service and all eligible properties
More informationStormwater Management Standards
Stormwater Management Standards In 1996, the Massachusetts Department of Environmental Protection (the Department or MassDEP ) issued the Stormwater Policy that established Stormwater Management Standards
More informationReview of State and Federal Stormwater Regulations November 2007
Review of State and Federal Stormwater Regulations November 2007 By: James T. Spaulding, PE, CPESC Joseph M. Ducharme, Jr., PE TTG ENVIRONMENTAL CONSULTANTS, LLC 27 LOCKE ROAD, CONCORD, NH 03301-5301 TELEPHONE:
More informationLow Impact Development in Western WA Municipal Stormwater Permits
Low Impact Development in Western WA Municipal Stormwater Permits USGS Tacoma Office September 19, 2012 E-mail: eobr461@ecy.wa.gov ttp://www.ecy.wa.gov/programs/wq/stormwater/municipal/index.html Municipal
More informationSTORMWATER FINANCING THE REGULATIONS
Save The Bay STORMWATER FINANCING THE REGULATIONS ROBERT BRUTUS CANTOREGGI TOWN OF FRANKLIN DPW DIRECTOR NOVEMBER 17, 2011 Franklin, At a Glance Suburban, Bedroom Community Population: 32, 800+ Density:
More informationMeadow Walk at Lynnfield Design, Permitting and Implementation for Low Impact Development in 2008
Meadow Walk at Lynnfield Design, Permitting and Implementation for Low Impact Development in 2008 June 23, 2008 EOEA Low Impact Development Conference for Developers P Project Perspectives Developer Ed
More informationCredit Calculations and Calculator Functions
MIDS Work Group Meeting May 20, 2010 Credit Calculations and Calculator Functions p-gen3-13c Today s Goals The Foundation for the Credits & Calculator Discuss proposed calculations Performance goal requirement
More informationOpti-Tool: A BMP Optimization Tool for Stormwater Management in EPA Region 1
Opti-Tool: A BMP Optimization Tool for Stormwater Management in EPA Region 1 Mark Voorhees, EPA Region 1 Khalid Alvi, Tetra Tech April 20, 2016 Project Background Massachusetts (MA) MS4 General Permit
More informationMatt Lundsted Principal Comprehensive Environmental Inc.
Matt Lundsted Principal Comprehensive Environmental Inc. Traditional Development vs. LID Application of LID to New and Redeveloped Sites Standard Engineering Practice Q = CIA Minimum velocity of 3 ft/sec.
More informationPROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS
PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS Public Information Meeting ~ May 2, 2018 Public Works Stormwater Management Division OVERVIEW Surface Water Quality Protection Municipal
More informationPractices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.
Chapter 5: Acceptable Stormwater Management Practices (SMPs) This section presents a list of practices that are acceptable for water quality treatment. The practices on this list are selected based on
More informationPOST-CONSTRUCTION STORM WATER
POST-CONSTRUCTION STORM WATER 2013 Update for NPDES Permit #OHC000004 Dan Bogoevski Ohio EPA Division of Surface Water June 20, 2013 Post-Construction Impacts degraded streams and Increased imperviousness
More informationProject Name: Add a unique name that appropriately identifies the submission
PTAPP Online Municipal Tracking Tool Instructions Project Name: Add a unique name that appropriately identifies the submission Municipal Project: Check this box if the project is part of municipal efforts
More informationWater Resources Management Plan
B u r n s v i l l e M i n n e s o t a Water Resources Management Plan - Volume Control / Infiltration Worksheet This Appendix contains a worksheet and related information that can be used for evaluating
More informationNew Hampshire s Impaired Waterbodies and BMP s for Treating Nitrogen and Phosphorus
New Hampshire s Impaired Waterbodies and BMP s for Treating Nitrogen and Phosphorus Bethann McCarthy, P.E. Alteration of Terrain Bureau Deb Loiselle Watershed Assistance Section Let s start from the beginning
More informationFred Civian MassDEP Stormwater Coordinator.
Fred Civian MassDEP Stormwater Coordinator Frederick.Civian@state.ma.us Current Stormwater Regulations in Massachusetts Federal Regulations Construction General Permit Multi Sector General Permit Municipal
More informationEffectiveness of Non-Structural Measures in Watershed Restoration
Effectiveness of Non-Structural Measures in Watershed Restoration Bill Frost, PE, D.WRE Sr. Water Resources Engineer KCI Technologies, Inc. Sparks, MD 2011 Low Impact Development Symposium Philadelphia,
More informationStormwater Treatment Practice (STP) Calculator Instructions
Stormwater Treatment Practice (STP) Calculator Instructions The STP Calculator is a tool developed by the Department of Environmental Conservation (DEC) to estimate total phosphorus load reductions achieved
More informationA Case Study of Suburban Infill Redevelopment, Stormwater challenges, and Partnerships
A Case Study of Suburban Infill Redevelopment, Stormwater challenges, and Partnerships Matt Meyers and Ronald Tuttle Fairfax County, Department of Public Works and Environmental Services Stormwater Management
More informationSTORMWATER MANAGEMENT AND IMPAIRED WATERS. Eric H. Livingston Watershed Management Services, LLC Crawfordville, FL
STORMWATER MANAGEMENT AND IMPAIRED WATERS Eric H. Livingston Watershed Management Services, LLC Crawfordville, FL Impaired Waters Not meet their WQS Loss of designated uses TOTAL MAXIMUM DAILY LOADS Section
More informationSimple Method for Estimating Phosphorus Export
Appendix L Simple Method for Estimating Phosphorus Export 1. The Simple Method The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. The method
More informationSWMM5 LID Control for Green Infrastructure Modeling
SWMM5 LID Control for Green Infrastructure Modeling Ohio Water Environment Association Collection Systems Workshop Matt McCutcheon, E.I. Water Resources Engineer CDM Smith May 9, 2013 11:15 AM 11:45 AM
More informationTMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders
14 th Annual EPA Region 6 Stormwater Conference 26 June 2012 TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders Michael F. Bloom, PE, CFM, BCEE
More informationGUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT
GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT Elevated bacteria in stormwater runoff in urban areas are well documented by many researchers. Monitoring
More informationBuilding Resilience to Flooding and Climate Change in the Moonlight Brook Watershed
Building Resilience to Flooding and Climate Change in the Moonlight Brook Watershed Robert Roseen, Jake Sahl, Waterstone Engineering Nigel Pickering, Rich Claytor, Horsley Witten Group DOWNPOURS AND DROUGHT,
More informationRegulatory Perspective: Case for Gray and Green Infrastructure
Regulatory Perspective: Case for Gray and Green Infrastructure Presentation Outline Common Drivers and Regulatory Framework Benefits of green infrastructure Case studies EPA post-construction cost analysis
More informationNorth Allston Sub watershed Restoration Plan. Green Infrastructure Concept Plan and Strategies
North Allston Sub watershed Restoration Plan Green Infrastructure Concept Plan and Strategies Study Area for Green Infrastructure Retrofits Environmental Design Goals for Study Area: Manage stormwater
More informationVirginia Stormwater Regulations Proposed Changes. Planning Commission May 5, 2009
Virginia Stormwater Regulations Proposed Changes Planning Commission May 5, 2009 WHY MANAGE STORMWATER ANYWAY?? ISSUES OF: 1. Pollution runoff from surfaces 2. Increased volumes of water 3. Increased velocities
More informationBeyond Pipe and Pond. Research Based Stormwater System Design. August 9, 2010
Beyond Pipe and Pond Research Based Stormwater System Design August 9, 2010 Agenda for the Day Introduction UNHSC: UNHSC: A Resource A for Independent Data Data Unit (UOPs) Unit Operations & Processes
More informationHydrology/Stormwater. Tom Ballestero University of New Hampshire Stormwater Center. Urban Forestry Workshop February 2013
Hydrology/Stormwater Tom Ballestero University of New Hampshire Stormwater Center Urban Forestry Workshop 25 26 February 2013 Biophysical Services of the urban forest 1 Low Impact Development and Green
More informationMinimum Design Criteria: Shaping the Future of Stormwater Management
Minimum Design Criteria: Shaping the Future of Stormwater Management Annette Lucas, PE (919) 807-6381 annette.lucas@ncdenr.gov NC Division of Energy, Mineral and Land Resources Stormwater Program Minimum
More informationThe Pennichuck Brook Watershed
The Pennichuck Brook Watershed Watershed Protection & Recharge What s In It For Me? Compliance with EPA stormwater permit Save money & help protect your citizens o Opportunity to combine efforts & materials
More informationORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements
ORDINANCE # 854 Stormwater Management / Operation and Maintenance Requirements Section 1. Purpose and Authority In accordance with the provisions of Chapters 98, 124, 126, 440, 444, and 446h of the General
More informationStorm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water
Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until
More informationProtect Your Community s Drinking Water Supply While Managing Stormwater in Your Community
Protect Your Community s Drinking Water Supply While Managing Stormwater in Your Community Stormwater impacts drinking water what can you do about it? State and Federal requirements protect supplies from
More informationPOST-CONSTRUCTION STORMWATER MANAGEMENT FOR EROSION CONTROL PROFESSIONALS
POST-CONSTRUCTION STORMWATER MANAGEMENT FOR EROSION CONTROL PROFESSIONALS Shannon Tillack, P.E., CPESC Wright Water Engineers, Inc. Why do we care about stormwater quality? Board 1 Recreational Uses Slide
More informationUW-MADISON GREEN INFRASTRUCTURE PLAN
UW-MADISON GREEN INFRASTRUCTURE PLAN Gary Brown, UW-Madison David Wolmutt, SmithGroupJJR GROWING SUSTAINABLE COMMUNITIES OCTOBER 3, 2017 PRESENTATION AGENDA Project Context Evolution of Campus Green Infrastructure
More information495/MetroWest Water Resources Strategy
495/MetroWest Water Resources Strategy Trends and Tools for a Water Smart Region U. Mass. Water Resources Conference April 8, 2008 Martin Pillsbury Metropolitan Area Planning Council Gerry Preble, PE Beals
More informationGeorgia DOT s Fresh Approach to Improving Water Quality on Roadway Projects. The New Drainage Manual October 10, 2014
Georgia DOT s Fresh Approach to Improving Water Quality on Roadway Projects The New Drainage Manual October 10, 2014 Presenters Charles Crowell, PE, CPESC, CPSWQ, CFM Project Manager, URS Charles.Crowell@urs.com
More informationMunicipal Stormwater Management Planning
Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental
More informationWELCOME ASSESSING ENVIRONMENTAL IMPACTS: CONSIDERING STATE REGULATIONS IN SITE PLAN REVIEW
WELCOME ASSESSING ENVIRONMENTAL IMPACTS: CONSIDERING STATE REGULATIONS IN SITE PLAN REVIEW CONSIDERING STATE REGULATIONS IN SITE PLAN REVIEW ASSOCIATION OF NEW JERSEY ENVIRONMENTAL COMMISSIONS MARCH 30,
More informationPresented to the WQGIT August 13, 2012
RETROFIT PANEL RECOMMENDATIONS Presented to the WQGIT August 13, 2012 The Expert Panel Panelist Ray Bahr Ted Brown LJ Hansen Joe Kelly Jason Papacosma Virginia Snead Bill Stack Rebecca Stack Steve Stewart
More informationMEMORANDUM. BMP O & M Verification Work Group. Paul Randall and John Fusco, Program Staff. September 24, 2003 [FINAL]
MEMORANDUM Campbell Cupertino Los Altos Los Altos Hills Los Gatos Milpitas Monte Sereno Mountain View Palo Alto San Jose Santa Clara Saratoga Sunnyvale Santa Clara County Santa Clara Valley Water District
More informationShifting Tides: Florida's Changing Water Quality Regulations
Shifting Tides: Florida's Changing Water Quality Regulations Statewide Stormwater Rule & EPA Numeric Nutrient Criteria Chris Martinez Assistant Professor University of Florida Outline - Statewide Stormwater
More informationUpdates on EPA Stormwater Program
Updates on EPA Stormwater Program Jeremy Bauer U.S. Environmental Protection Agency Office of Water Washington, DC August 2012 1 OVERVIEW OF STORMWATER IMPACTS 2 Impervious Cover and Stormwater Hydrology
More informationFebruary 17, 2012 MIDS Work Group Meeting
Flexible Treatment Options: Potential performance goal for sites with restrictions and calculator results February 17, 2012 MIDS Work Group Meeting p-gen3-13z Presentation Outline Address comments from
More informationThe Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers
The Next Generation of Stormwater Management and Site Design Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers History of WMD Stormwater Rule Florida passed the first rule requiring
More informationUsing LID for TMDL Compliance: Stairway to Heaven or Highway to Hell? Dustin Bambic, PH Tetra Tech, Nashville TN
Using LID for TMDL Compliance: Stairway to Heaven or Highway to Hell? Dustin Bambic, PH Tetra Tech, Nashville TN Jason Wright, PE Tetra Tech, Raleigh NC 1 Overview TMDL Compliance Planning for TMDL Compliance
More informationFlexible Treatment Options Conclusions. May 18, 2012 MIDS Work Group Meeting. p-gen3-14f
Flexible Treatment Options Conclusions May 18, 2012 MIDS Work Group Meeting p-gen3-14f Presentation Outline Goal: Prepare for vote on performance goal for new developments with restrictions Review past
More information4. PRELIMINARY NITROGEN CONTROL PLAN
4. PRELIMINARY NITROGEN CONTROL PLAN The Preliminary Nitrogen Control Plan detailed in the following sections is intended to meet the requirements of the Exeter NPDES Permit No. NH0100871 and associated
More informationA Summary of the International Stormwater BMP Database
A Summary of the International Stormwater Tuesday, February 12, 2013, 1:00PM Presented by: Katie Blansett, Ph.D., P.E. Pennsylvania Housing Research Center www.engr.psu.edu/phrc Objective The objective
More information10/16/2013. The Big Picture of LID and Green Infrastructure. Learning Objectives
Low impact development (LID) the basic idea behind LID is to manage stormwater in a way that imitates the natural hydrology of a site. Details Matter Selection, Design, and Implementation of Low Impact
More information2016 New Hampshire Water & Watershed Conference Plymouth State University Friday, March 18, 2016
Robert Roseen rroseen@waterstone-eng.com Waterstone Engineering Nigel Pickering npickering@horsleywitten.com Horsley Witten Group 2016 New Hampshire Water & Watershed Conference Plymouth State University
More informationPresented by: Donald L. Ware, P.E. Chief Operating Officer Pennichuck Corporation
Presented by: Donald L. Ware, P.E. Chief Operating Officer Pennichuck Corporation Overview I. Watersheds and the Hydrologic Cycle II. The Pennichuck Watershed Where We Have Been III. The Pennichuck Watershed
More informationPermeable Pavement: A New Chapter
Permeable Pavement: A New Chapter Annette Lucas, PE (919) 807-6381 annette.lucas@ncdenr.gov NC Division of Water Quality Wetlands & Stormwater Branch Final Chapter Released: October 16, 2012 We Bring Engineering
More information(Total Maximum Daily Load) What Does the Federal Government Require for Storm Water Management Under Phase II?
Who is Regulated Under Phase II? Automatically Included Owners/operators of Small Municipal Separate Storm Sewer Systems located in urbanized areas including military facilities, large hospitals, prisons,
More informationApplying the Water Quality Volume
Applying the Water Quality Volume Justin Reinhart, PE Division of Surface Water Northeast Ohio Stormwater Training Council Cleveland, Ohio & Richfield, Ohio July 12, 2018 July 25, 2018 Post-Construction
More informationWestern Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington
Western Washington Hydrology Model (WWHM) Software Introduction Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek
More informationShirley E. Clark, Ph.D., P.E. October 5, /30/2012
Shirley E. Clark, Ph.D., P.E. October 5, 2012 Prior development decisions have led to directly connected impervious areas and pervious areas with heavily-compacted soils. Prince Georges Cty, MD photo 1
More informationSeptember 15, 2014 Winston Salem, VA Stormwater Capital Improvement Planning for Total Maximum Daily Load Compliance
September 15, 2014 Winston Salem, VA Stormwater Capital Improvement Planning for Total Maximum Daily Load Compliance An Approach to Compliance with Stormwater MS4 Permits and TMDLs Outline TMDL Requirements
More informationNonpoint Source Storm Water Management Plan
Nonpoint Source Storm Water Management Plan Christine Pomeroy Dept. of Civil & Environnmental Eng. University of Utah Carl Adams Watershed Protection Utah Division of Water Quality Definitions Nonpoint
More informationPresented by Jane Clary, CPESC Wright Water Engineers, Inc. For Mountain States Chapter, IECA Dec. 2011
Presented by Jane Clary, CPESC Wright Water Engineers, Inc. For Mountain States Chapter, IECA Dec. 2011 Brief Background on Proposed CO Nutrient Criteria November 21, 2011 Water Quality Control Division
More informationCSN TECHNICAL BULLETIN No. 6 TESTING DRAFT. Users Guide for the ESD to the MEP Compliance Tool Version 1.0 February 15, 2010
CSN TECHNICAL BULLETIN No. 6 TESTING DRAFT Users Guide for the ESD to the MEP Compliance Tool Version 1.0 February 15, 2010 Important Note: This technical bulletin is intended to accompany the ESD to MEP
More informationStormwater BMP Maintenance
Stormwater BMP Maintenance Background and Definitions What is Stormwater Runoff? Stormwater Stormwater is the result of precipitation that flows overland to streams and other bodies of water Stormwater
More informationBS8582, Code of Practice for Surface Water Management for Development Sites
BSI Draft Review BS8582, Code of Practice for Surface Water Management for Development Sites Code of Practice for Surface Water Management Comment: The introduction of a specific British Standard which
More informationThe Use of WinSLAMM in the Selection, Design and Placement of Stormwater BMPs. Stephen J. Souza, Ph.D. Jacob E. Helminiak, P.E. Princeton Hydro, LLC
The Use of WinSLAMM in the Selection, Design and Placement of Stormwater BMPs Stephen J. Souza, Ph.D. Jacob E. Helminiak, P.E. Princeton Hydro, LLC 1108 Old York Rd., Ringoes, NJ 08551 908.237.5660 The
More informationSecond Wednesdays 1:00 2:15 pm ET USDA is an equal opportunity provider and employer.
Second Wednesdays 1:00 2:15 pm ET www.fs.fed.us/research/urban-webinars USDA is an equal opportunity provider and employer. Eric Kuehler Science Delivery/Technology Specialist USDA Forest Service ekuehler@fs.fed.us
More informationIntroduction. Definitions of Land Use Terms Used in Spreadsheets. Tar-Pamlico Stormwater Rule 15A NCAC 2B.0258 Last Modified 3/20/2017
Tar-Pamlico Stormwater Rule 15A NCAC 2B.0258 Last Modified 3/20/2017 Introduction The set of worksheets included in this file will enable stormwater permit applicants to comply with, and local governments
More informationLow Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How
Low Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How Matt A. Yeager, D.Env San Bernardino County Stormwater Program Coastal Coalition April 24, 2008
More informationSustainable Stormwater: Optimized Management of Ponds and Other BMPs. Kerry A Reed, P.E., LEED AP MACTEC Engineering and Consulting, Inc.
Sustainable Stormwater: Optimized Management of Ponds and Other BMPs Kerry A Reed, P.E., LEED AP MACTEC Engineering and Consulting, Inc. Preliminary Conceptual Sustainability Planning for Stormwater Ponds
More informationCity of Tacoma Stormwater Management Program Assessment. Attachment B3
City of Tacoma Stormwater Management Program Assessment Attachment B3 Attachment B3. City of Tacoma Stormwater Management Program Assessment The following discussion includes an assessment of the appropriateness
More informationPost-Development Stormwater Runoff Performance Standards
Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final
More informationDetermining How Much You Need: Stormwater Program Cost
Determining How Much You Need: Stormwater Program Cost Glenn Barnes UNC Environmental Finance Center 919-962-2789 glennbarnes@sog.unc.edu www.efc.unc.edu www.efc.unc.edu Session Objectives Discuss the
More informationUpper Eastern Shore WIP Workshop November 21, 2014
Clean Water Optimization Tool for Maryland s Eastern Shore Karen Cappiella Program Director Center for Watershed Protection Upper Eastern Shore WIP Workshop November 21, 2014 Funded by the Town Creek Foundation
More informationNet Present Value of Low Impact Development Retrofits in Edmonton, AB
Net Present Value of Low Impact Development Retrofits in Edmonton, AB MN Water Resources Conference October 16 th, 2018 Brett H. Emmons, PE, ENV SP, LEED AP Principal + Water Resource Engineer, EOR Introductions
More informationSTORMWATER MANAGEMENT REPORT PROVINCETOWN MUNICIPAL AIRPORT PROVINCETOWN, MASSACHUSETTS
STORMWATER MANAGEMENT REPORT PROVINCETOWN MUNICIPAL AIRPORT PROVINCETOWN, MASSACHUSETTS Prepared for: TOWN OF PROVINCETOWN 260 Commercial Street Provincetown, MA 02657 Prepared by: Horsley Witten Group,
More informationCalculating Stormwater Volume & TSS Reduction under Urban Tree Canopy in Wisconsin using Available Research
Calculating Stormwater Volume & TSS Reduction under Urban Tree Canopy in Wisconsin using Available Research WAFSCM 2018 Annual Conference November 8, 2018 Steve Gaffield & Dane Wudel Project Overview UW-Madison
More informationMeeting the Chesapeake Bay TMDL
Meeting the Chesapeake Bay TMDL Local Stormwater Perspective Presented by Rob Hopper, PE Developed with Mike Morgan, PE September 14, 2015 Chesapeake Bay TMDL Local Stormwater Perspective Virginia Stormwater
More informationResults shown on 'Detailed Summary' tab
Fill in site's Pre Development parameters on 'Pre' tab (Site Area, Drainage Area, Impervious Area, CNpre, tc) Prior to using BSD or BMP practices, fill in site's Post Development parameters on 'Post' tab
More informationUrban NPS Measures. Thomas Davenport
Urban NPS Measures Thomas Davenport davenport.thomas@epa.goc Typical Pollutant Loadings from Runoff by Urban Land Use (lbs/acre-yr) Land Use TSS Total P TKN NH 3 -N NO 2 +NO 3 -N BOD COD Pb Zn Cu Commercial
More informationMaine Stormwater Conference (Portland, ME, 2015)
Maine Stormwater Conference (Portland, ME, 2015) Development of LID facilities Decision Support System using Multiple Attribute Decision Making(MADM)Method LID DSS TOOL BOX: Facility Ver. 1.0 LID DSS TOOL
More informationInfiltration Trench Factsheet
Infiltration Trench Factsheet Infiltration Trench is a practice that provides temporary storage of runoff using the void spaces within the soil/sand/gravel mixture that is used to backfill the trench for
More informationPREPARED UNDER. The 319 Nonpoint Source Pollution Grant Program FUNDED BY. MA Department of Environmental Protection Boston, MA PREPARED BY
PREPARED UNDER The 319 Nonpoint Source Pollution Grant Program FUNDED BY MA Department of Environmental Protection Boston, MA PREPARED BY Vanasse Hangen Brustlin, Inc. Watertown, MA Horsley Witten Group,
More informationStormwater Management Fact Sheet: Porous Pavement
Stormwater Management Fact Sheet: Porous Pavement Description Porous pavement is a permeable pavement surface with an underlying stone reservoir that temporarily stores surface runoff before infiltrating
More informationApproaches for Determining and Complying with Total Maximum Daily Load Requirements Related to Stormwater Runoff. Presented by Anna Lantin, P.E.
Approaches for Determining and Complying with Total Maximum Daily Load Requirements Related to Stormwater Runoff Presented by Anna Lantin, P.E. Presentation Overview / Introduction Impaired Waters Program
More informationProject Priority List scoring worksheet - stormwater Guidance document
www.pca.state.mn.us Project Priority List scoring worksheet - stormwater Guidance document PLEASE NOTE: THE MINNESOTA STATE FISCAL YEAR IS FROM JULY 1 JUNE 30 The first step towards receiving either a
More informationIntroduction to Stormwater Treatment Practices
Introduction to Stormwater Treatment Practices Municipal Inland Wetland Commissioner s Training Program Cheryl Chase, P.E. DEP Inland Water Resources Division Acclaimimages.com 2 Introduction Do these
More informationCHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC
CHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC TODAYS AGENDA TMDL BACKGROUND WIP DEVELOPMENT PROGRESS AND TIMELINE 2017 NUTRIENT PROGRESS
More informationA Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June
A Primer on Stormwater Management, your Facility and the Chesapeake Bay Tom Schueler Chesapeake Stormwater Network June 5. 2017 Key Themes Why do we need to be concerned about Stormwater? What are all
More information