1 COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD, FANCY BAZAR GUWAHATI (ASSAM) Page 1 of 5

2 Name of The Company : M/s. Gasgen Ferro Alloys LLP Project : Ferro Alloy Unit (4 MVA SEAF for production of Fe-Si - 4,000 TPA or Si- Mn -8,000 TPA) along with 3.8 MW Gas based Captive Power Plant at Dag No. 103, Village Chalakotoki, Kathalguri Panchayat, near Duliajan, District Dibrugarh, Assam. Environmental : Clearance Letter F. No. J-11011/309/2011-IA-ll (I) Dated 4 th September, A. SPECIFIC CONDITIONS: NO. CONDITION COMPLAINCE STATUS (i) (ii) (iii) (iv) (v) (vi) (vii) No charcoal shall be used as fuel. Pet coke shall be used as fuel instead of charcoal from unknown sources. Continuous monitoring facilities for the major stacks and sufficient air pollution control equipments viz. fume extraction system with bag filers, ID fan and stack of adequate height to submerged arc furnace shall be provided to control emissions below 50 mg/nm 3. The National Ambient Air Quality Standards issued by the Minis try vide GSR. No 826(E) dated 16th November, 2009 shall be followed. Secondary fugitive emissions from all the sources shall be controlled within the latest permissible limits issued by the Ministry and regularly monitored. Guidelines / Code of Practice issued by the CPCB shall be followed. Regular monitoring of influent and effluent surface, subsurface and ground water shall be ensured and treated wastewater shall meet the norms prescribed by the State Pollution Control Board or described under the Environment (Protection) Act, 1986 whichever are more stringent. Leachate study for the effluent generated and analysis should also be regularly carried out and report submitted to the Ministry's Regional Office at Shillong. SPCB and CPCB. The total water requirement shall not exceed 15 m 3 /day. 'Zero' effluent discharge shall be strictly followed and no wastewater should be discharged outside the premises. Efforts shall be made to make use of rain water harvested. If needed, capacity of the reservoir should be No charcoal is used as fuel only coke is being used as fuel. - We are in process to install continuous online monitoring facility. Order has been given to NEVCO Engineers. - Fume extraction system with Reverse pulse jet type bag filter, ID fan and stack having 30m height is installed to submerged arc furnace as a pollution control equipment. - Regular monitoring is carried out through recognized monitoring agency by Assam Pollution Control Board. - Monitoring reports are enclosed as We are following the National Ambient Air Quality Standards issued by the Ministry vide GSR. No 826(E) dated 16th November, Secondary fugitive emissions from transfer points, Furnace, storage area, etc are being controlled and monitored regularly observing all guidelines issued by CPCB in this regard. - Monitoring reports is enclosed as - Being a zero discharge unit, no waste water is generated. - Water requirement does not exceed 10 m 3 /day. - Strictly following 'Zero' effluent discharge. Roof top rain water is harvested and stored in water reservoir for the future use to Page 2 of 5

3 (viii) (ix) (x) (xi) (xii) (xiii) enhanced to meet the maximum water requirement. Only balance water requirement should be met from other sources. Slag produced in Ferro Manganese (Fe-Mn) production shall be used in manufacture of Silico Manganese (Si- Mn), All the other ferro alloy slag shall be used in the preparation of building materials. No Ferro Chrome shall be manufactured without prior approval from the Ministry of Environment & Forests, Risk and Disaster Management Plan along with the mitigation measures should be prepared and a copy submitted to the Ministry's Regional Office at Shillong, SPCB and CPCB within 3 months of issue of environment clearance letter. As proposed, green belt should be developed in at least 33% of the project area, Selection of plant species shall be as per the CPCB guidelines in consultation with the DFO. At least 5% of the total cost of the project should be earmarked towards the Enterprise Social Commitment based on locals need and item-wise details along with time bound action plan should be prepared and submitted to the Ministry's Regional Office at Shillong, Implementation of such program shall be ensured accordingly in a time bound manner. Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, Safe drinking water, medical health care, crèche, etc. The housing may be in the form of temporary structures to be removed after the completion of the project. reduce fresh water demand. - Fe-Si slag is being sold to welding rod manufacturers. - Si-Mn slag is being sold to fly ash bricks manufacturers for their use as building material after processing, wherever it will be produced. Risk and Disaster Management Plan along with the mitigation measures is submitted to Ministry's Regional Office at Shillong and Assam Pollution Control Board along with EIA report. We are developing Green belt in 33% of the project area with plant species selected as per the CPCB guidelines in consultation with the local DFO. - Rs Crores i.e. 5% of total project cost is earmarked for CSR activities. - This fund will be utilized over a period of 5 years. - Item-wise details along with time bound action plan on CSR activities is prepared and submitted to MoEF. Complied with. B. GENERAL CONDITIONS: NO. CONDITION COMPLAINCE STATUS (i) (ii) (iii) The project authorities must strictly adhere to the stipulations made by the Assam Pollution Control Board (APCB) and the State Government. No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment and Forests. At least four ambient air quality monitoring stations shall be established in the downward direction as well as where maximum ground level concentration of SPM, SO2 and NOx are anticipated in consultation with the APCB including one ambient air quality monitoring station in the downwind direction. Data on ambient air quality and stack emission should be regularly submitted to this Ministry including its Regional Office at Shillong and the APCB / CPCB once in six months. - Four monitoring locations were established in consultation with Assam Pollution Control Board. - Air quality and stack monitoring is done on regular basis and data are being submitted to concerned authority. Monitoring reports are enclosed as Page 3 of 5

4 (iv) (v) (vi) (vii) (viii) Industrial wastewater shall be properly collected, treated so as to conform to the standards prescribed under GSR 422 (E) dated 19 th May, 1993 and 31 st December, 1993 or as amended form time to time. The treated wastewater shall be utilized for plantation purpose. The overall noise levels in and around the plant area shall be kept well within the standards (85 dba) by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise levels should Conform to the standards prescribed under EPA Rules, 1989 viz. 75 dba (daytime) and 70 dba (nighttime). Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act. The company shall develop rain water harvesting structures to harvest the rain water for utilization in the lean season besides recharging the ground water table. The project proponent shall also comply with all the environmental protection measures and safeguards recommended in the EIA/EMP report Further, the company must undertake socio-economic development activities in the surrounding villages like community development programmes, educational programmes, drinking water supply and health care etc. It is a zero discharge unit so no industrial waste water is generated. Noise level is being monitored around the plant and the measured values are well within the prescribed limits. Monitoring reports are enclosed as We are carrying out adequate occupational health check up of the workers on a regular basis and records maintained as per the Factories Act The medical examination date upto September 16 are mention in below table: Test No. of Persons Complete blood 39 count (CBC) Pulmonary 40 Function Tests (PFT) X-ray (Chest) 44 - Rain water harvesting structure has been developed to collect rooftop rain water. - A water storage tank is provided to store rain water for the use during lean season. - Complied, All the environment management measures given in the EIA/EMP are being implemented. Following socioeconomic development activities have been undertaken by us: 1. Participate in local festival. 2. Free Medical checkup. 3. Drinking water facilities. (ix) Requisite funds shall be earmarked towards the capital cost and recurring cost/annum for environmental protection measures and judiciously utilized to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government The funds so provided shall not be diverted for any other purpose. Rs. 80 lacs are allocated for capital cost and Rs. 5 lacs as recurring cost for the environmental protection measures. Sl.No PARTICULARS 1. Air & Noise Pollution Control 2 Occupational Health RECURRING COST PER ANNUM(in Rs Lakhs) Green Belt Community 1.00 Welfare 5 Environmental 1.00 Page 4 of 5

5 (x) (xi) (xii) (xiii) (xiv) (xv) A copy of clearance letter shall be sent by the proponent to concerned Panchayat, Zila Parishad / Municipal Corporation, Urban Local Body and the local NGO, if any. from whom suggestions / representations, if any, were received while processing the proposal. The clearance letter shall also be put on the web site of the company by the proponent. The project proponent shall upload the status of compliance of the stipulated environment clearance conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of the MoEF, the respective Zonal Office of CPCB and the APCB. The criteria pollutant levels namely; PM10 SO2, NOx (ambient levels as well as stack emissions) or critical sectoral parameters, indicated for the projects shall be monitored and displayed at a convenient location near the main gate of the company in the public domain. The project proponent shall also submit six monthly reports on the status of the compliance of the stipulated environmental conditions including results of monitored data (both in hard copies as well as by ) to the Regional Office of MoEF at Shillong, the respective Zonal Office of CPCB and the SPCB. The Regional Office of this Ministry at Shillong / CPCB / APCB shall monitor the stipulated conditions. The environmental statement for each financial year ending 31st March in Form V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company alongwith the status of compliance of environmental conditions and shall also be sent to the respective Regional Offices of the MoEF by . The Project Proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the APCB and may also be seen at Website of the Ministry of Environment and Forests at This shall be advertised within seven days from the date of issue of the clearance letter, at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the Regional office at Shillong. Project authorities shall inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work. Monitoring Total 5.00 Complied, -No suggestions / representations were received from concerned Panchayat, Zila Parishad / Municipal Corporation, Urban Local Body and the local NGO. -Clearance letter is uploaded in our company s website i.e - Every six month the status of compliance of the stipulated environmental clearance conditions, including monitoring results is uploaded on our company s website and sent to Regional Office of the MoEF at Shillong and Assam pollution control board regularly. - One Notice board indicating Pollutants limit prescribed by Pollution control board along with monitoring results (levels) of ambient air and stack emission is placed near the gate. Six monthly reports are regularly submitted to Regional Office of this Ministry at Shillong and CPCB/SPCB also. Environmental statement in Form V for the financial year was submitted on 30/05/2016 to competent authority. Complied with. Complied with. Dated of financial closure was 16/01/2013 Page 5 of 5

6 9. The Ministry may revoke or suspend the clearance, if implementation of any of the above conditions is not satisfactory. 10. The Ministry reserves the right to stipulate additional conditions if found necessary. The Company in a time bound manner shall implement these conditions. 11. The above conditions shall be enforced, inter- alia under the provisions of the Water (Prevention & Control of Pollution) Act, 1974, the Air (Prevention & Control of Pollution) Act, 1981, the Environment ( Protection) Act, 1986, Hazardous Wastes (Management, Handling and Transboundary Movement) Rules, 2008 and the Public (Insurance) Liability Act,1991 along with their amendments and rules. Page 6 of 5

7 ANNEXURE I MONITORING REPORTS

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Telefax: 011: Dated:10 th May, 2013

Telefax: 011: Dated:10 th May, 2013 F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Janki Corp. Ltd., Six Monthly Compliance Report

Janki Corp. Ltd., Six Monthly Compliance Report Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6

More information

Telefax: 011: Dated: 8 th March, 2013

Telefax: 011: Dated: 8 th March, 2013 F. No. J-11011/321/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax:

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

Name of the Project:- J&K Mineral Development Corporation Limited.

Name of the Project:- J&K Mineral Development Corporation Limited. Name of the Project:- J&K Mineral Development Corporation Limited. Sub:- Six Monthly report of the status of the compliance of the stipulated environment condition of Environment clearance granted vide

More information

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and. Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata SIX MONTHLY COMPLIANCE REPORT (Period: October, 2016 to March, 2017) Refer EC File No. J-11011/258/2012-IA II (I)) dated 27 th August, 2015 Proposed expansion of Steel Melting shop unit (50,400 TPA to

More information

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA 6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA As on 01.04.2014 General Condition: Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly adhere to the stipulations made by the

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct 2016 to March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/472/2010- IA II (I) dated 11 th September,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi - 416108, Taluka - Shirol, Dist Kolhapur, Maharashtra Compliance of Conditions Stipulated in environmental clearance granted

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power.

Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power. Ref EC No. J-11013/14/2007-IAII (I) dated 12.06.2007. To For Status IG Petrochemicals Ltd, T-2, MIDC Taloja Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power. Project Implementation

More information

(A) Specific Conditions

(A) Specific Conditions J.K. Cement WORKS, Mangrol (RAJ) Dated 01.06.2017 Six Monthly Compliance report of Environment Clearance for Mangrol Cement Plant Line-3 (For the Period from October 2016 to March 2017) Reference Letter

More information

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project IOC/BGR/ENV/INDMAX/MoEF/2013-14/01 Date: 19.11.2013 To The Chief Conservator of Forests Regional Office, North East Region Ministry of Environment & Forests Law-U-SIB, Lumbatngen, Near M.T.C. Workshop,

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017 A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011 Ref.No:POL/U-II/EC/12-13/176 Date : 23.11.2012 To, Dr. A. Mehrotra, Director (S) Ministry of Environment & Forests, Regional Office, Western Region, Kendriya Paryavaran Bhavan Link Road No.3, E-5, Ravi

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : pb.rastogi@nic.in Telefax

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited Page 1 of 27 Half yearly Compliance report for Environment and CRZ Clearance for development of East quay -1 (EQ-l) by replacing the existing EQ-l berth and part of EQ-2 berth. Sr. No. Conditions Compliance

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE PREAMBLE: EIA follow up commonly referred to as Compliance reporting is the process of monitoring, evaluation and validation of the

More information

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra 1 Environmental Clearance Point Wise Half YearlyCompliance Report(April 2015 to September 2015) Cement Plant -EC No: F.No. J-11011/21/2014-IA-II (I) dated: 28 th April 2015. A. SPECIFIC CONDITIONS : S.NO.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

Telefax : 011: Dated 1 st November, 2011

Telefax : 011: Dated 1 st November, 2011 Drilling of Development Well (17 Nos.) and Exploratory Well (14 Nos.) at Tengakhat Kathaloni Dikom Area, District Dibrugarh, Assam by M/s Oil India Limited Environmental Clearance reg. ***********************

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd.

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd. COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER 2013 Name of The Company : M/s. Subham Planners Ltd. Project : Construction of group housing project at Village Betkuchi,

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

Ministry of Environment and Forests   Telefax : 011: M/s Posco India Private Limited F. No. J-11011/285/2007- IA II (I) Government of India Ministry of Environment and Forests Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : tchand2003@yahoo.co.uk Telefax : 011: 24363963

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

iii Continuous stack monitoring facilities to monitor gaseous emissions from the process stack shall be provided. After expansion, limit of PM shall b

iii Continuous stack monitoring facilities to monitor gaseous emissions from the process stack shall be provided. After expansion, limit of PM shall b Name & Location of the Project : Expansion of Integrated Cement Project Clinker (6.0MTPA to 9.5 MTPA),Cement (8.0 MTPA to 12.0 MTPA) CTPP (80.0 MW to 140 MW), & WHRB (18 MW to 30 MW) by M/s., Located at

More information

; Fax No. :

; Fax No. : F. No. J-11011/281/2007- IA \I (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi - 110 003 To, Mis Jindal Stainless Ltd. Jindal

More information

Mill Expansion Cum Augmentation Project Compliance

Mill Expansion Cum Augmentation Project Compliance Mill Expansion Cum Augmentation Project Compliance S No Description Remarks i. The company shall comply with the conditions Steps have already been taken to comply with all stipulated for the existing

More information

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated 1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the

More information

Six Monthly Compliance Status Report

Six Monthly Compliance Status Report Six Monthly Compliance Status Report Annexure -1 Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan)

More information

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur.

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur. Date: 04.06.2018 M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaraji, Kolhapur. Compliance to the Environmental Clearance for Co-generation Plant 30 MW. Ref: SEAC 2009/CR16/TC2, Dated: 18

More information

SREE RENGARAAJ ISPAT INDUSTRIES (P) LIMITED MM1,2 &5 SIPCOT Industrial Growth Center, Perundurai, Erode district

SREE RENGARAAJ ISPAT INDUSTRIES (P) LIMITED MM1,2 &5 SIPCOT Industrial Growth Center, Perundurai, Erode district SREE RENGARAAJ ISPAT INDUSTRIES (P) LIMITED MM1,2 &5 SIPCOT Industrial Growth Center, Perundurai, Erode district Half Yearly Compliance Report (OCTOBER 2017 MARCH`2018) ENVIRONMENTAL CLEARANCE REF. SEIAA/TN/F.2581/EC/1(d)

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 S. N. Conditions Remarks 2 The Ministry of Environment and Forests has

More information

SIX MONTHLY COMPLIANCE REPORT OF BORHAT-TITLAGARH AREA

SIX MONTHLY COMPLIANCE REPORT OF BORHAT-TITLAGARH AREA SIX MONTHLY COMPLIANCE REPORT OF BORHAT-TITLAGARH AREA General Conditions: (For the period from 1 st October, 2016 to 31 st March, 2017) Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly

More information

M/s Balasore Alloys Ltd

M/s Balasore Alloys Ltd M/s Balasore Alloys Ltd At Balgoplapur, Balasore, Odisha Period: October 2017 To March 2018 Submitted to: Regional office, MoEF & CC, Bhubaneswar 1 Specific Conditions & Status Sl.No. Conditions Status

More information

J.K. Cement WORKS, NIMBAHERA (RAJ)

J.K. Cement WORKS, NIMBAHERA (RAJ) A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference

More information

F. No. J-11011/28/2007- IA II (I)

F. No. J-11011/28/2007- IA II (I) "T /h F. No. J-11011/28/2007- A () Government.of ndia Ministry of Environment and Forests (.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi - 110 003 E-mail: pb.rastogi@>.nic.in Telefax:

More information

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) (i) (ii) (iii) (iv) (v) SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) ENVIRONMENT CLEARANCE LETTER

More information

HALF YEARLY COMPLIANCE REPORT

HALF YEARLY COMPLIANCE REPORT Environment clearance of 256 MW power plant Letter no.: J-13012/77/2011-I-A.II (T) dated 12 th February 2015 SL. STIPULATED CONDITIONS COMPLIANCE STATUS i Vision document specifying prospective plan for

More information

Six Monthly Compliance Status Report

Six Monthly Compliance Status Report Six Monthly Compliance Status Report Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan) Project

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF MARCH TO AUGUST -2013

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF MARCH TO AUGUST -2013 COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE Name of Company : FOR THE PERIOD OF MARCH -2013 TO AUGUST -2013 M/s. GNRC Institute of Medical Sciences (a unit of GNRC Ltd). Project : Construction of Medical

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

BHUSHAN STEEL LIMITED

BHUSHAN STEEL LIMITED for the period April2017 to September 2017 Environment Clearance of 256 MW Power Plant Letter no.: J-13012/77/2011-I-A.II (T) dated 12 th February 2015 BHUSHAN STEEL LIMITED Narendrapur, Kusupanga, Meramandali,

More information

Compliance Report of EC : Compliance Status

Compliance Report of EC : Compliance Status Report of EC : S. i. Permission/recommendation shall be obtained from State Forest Department regarding Banni area, which is declared as a protected forest land ii. iii iv v GPCB vide letter no. GPCB/Unit-I/FT-

More information

A. SPECIFIC CONDITION COMPLIANCE

A. SPECIFIC CONDITION COMPLIANCE Six monthly compliance report of conditions laid down vide letter no. J-11011/438/2007-IA II (I), Dtd.02.02.2009 of Ministry of Environment & Forest, Government of India in respect of Integrated Steel

More information

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory To 13 th August, 2018 The Director Government of India Ministry of Environment & Forest (I.A. Division) Paryavarn Bhavan, CGO COMPLEX, Lodhi Road New Delhi- 110 003 Sub: Compliance status of conditions

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

BHUSHAN STEEL LIMITED

BHUSHAN STEEL LIMITED for the period October 2017 to March 2018 Environment Clearance of 256 MW Power Plant Letter no.: J-13012/77/2011-I-A.II (T) dated 12 th February 2015 BHUSHAN STEEL LIMITED Narendrapur, Kusupanga, Meramandali,

More information

F. No. J-13012/02/2012-IA.II(T) Government of India Ministry of Environment & Forests

F. No. J-13012/02/2012-IA.II(T) Government of India Ministry of Environment & Forests F. No. J-13012/02/2012-IA.II(T) Government of India Ministry of Environment & Forests Ph: 011-2436 4067 E-mail: sarojmoef@yahoo.com Paryavaran Bhawan CGO Complex, Lodi Road New Delhi-110 003 Dated: 25.02.2014.

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

COMPLIANCE REPORT TO THE CONDITION MENTIONED IN MOE&F LETTER NO. J-17011/11/2000-IA-III, DATED: 14 TH NOVEMBER, 2008.

COMPLIANCE REPORT TO THE CONDITION MENTIONED IN MOE&F LETTER NO. J-17011/11/2000-IA-III, DATED: 14 TH NOVEMBER, 2008. Half Yearly Compliance Report with respect to conditions stipulated by Ministry of Environment & Forests, Government of India and Department of Forests, Government of Gujarat for setting up of standby

More information

NMDC Iron and Steel Plant, Nagarnar, Dist-Bastar, (C.G.) Six Monthly Progress Report

NMDC Iron and Steel Plant, Nagarnar, Dist-Bastar, (C.G.) Six Monthly Progress Report NMDC Iron and Steel Plant, Nagarnar, Dist-Bastar, (C.G.) Six Monthly Progress Report (April 2017 to September 2017) Compliance Report of Environment Clearance issued vide- 1)Letter No- F.No. J-11011/681/2008-I.A.11(J)

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat)

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat) SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR Expansion of Viscose Staple Fibre Unit, Captive Power Plant and Setting up Solvent Spun Cellulosic Fibre At Plot No. 1, GIDC Industrial Area,

More information

J-11011/371/2016-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division)

J-11011/371/2016-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division) .-:-==----- J J-11011/371/2016-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division) Indira Paryavaran Bhawan Jor Bagh Road, Delhi - 3 Dated: 29

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

COMPLIANCE TO EC CONDITIONS

COMPLIANCE TO EC CONDITIONS COMPLIANCE TO EC CONDITIONS MINISTRY OF ENVIRONMENT & FORESTS ENVIRONMENTAL CLEARANCE FOR EXPANSION OF SMELTER PLANT FROM 100 KTPA TO 360 KTPA AND CAPTIVE POWER PLANT FROM 267.5 MW TO 967.5 MW AT HIRAKUD

More information

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS The status of Environmental Clearance accorded by Ministry of Environment and Forests, I.A. Division, New Delhi to M/s HINDALCO INDUSTRIES LIMITED, CHOTAMURI, Jharkhand for expansion of Alumina Refinery

More information

(E.C. Letter No. F.No.J-11011/316/2006-IA II (I) Dated 21-11-2007 and EC extension letter dated 01-03-2013) (For the Period 1 st April 15 to 30 th Sept. 15) FOR Dahej Petrochemical Complex M/s. ONGC Petro

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

INDIA: Dahej Liquefied Natural Gas Terminal Project

INDIA: Dahej Liquefied Natural Gas Terminal Project Environmental Monitoring Report Project Number: 37905 October 2006 INDIA: Dahej Liquefied Natural Gas Terminal Project Prepared by Anil K. Joshi New Delhi, India For Petronet LNG Limited This report has

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) (i) (ii) (iii) (iv) (v) SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) ENVIRONMENT CLEARANCE LETTER

More information

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:-

More information

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 PART A : SPECIFIC CONDITIONS 1. CONSTRUCTION PHASE S. 1