1
2 Practical and Regulatory Aspects of Clearance and Exemption of Non-Nuclear Waste Dr. J. Feinhals DMT GmbH & Co. KG Folie 2 DMT Präsentation
3 Content 1 Dose Concept and Derived Values 2 Regulation in Germany 3 Some Good Experiences 4 The Important Role of Clearance Folie 3 DMT Präsentation
4 1 Dose Concept and Derived Values IAEA standard 1988: some mrem are negligible (de minimis concept: dose is of no regulatory concern) IAEA RS-G => IAEA BSS 2014 nuclide specific values for general clearance EC BSS 2015 => nat. legislation 2018 Revision of RS-G-1.7???. surface specific values, values for specific clearance
5 2 Regulation in Germany unrestricted Clearance solid materials with surface liquid material building rubble excavated soil in case of > 1000 Mg/a nuclear sites buildings unrestricted for reuse
6 2 Regulation in Germany Specific Clearance solid materials with surface solid materials with surface buildings metal scrap with surface landfill waste incineration demolition melting values for specific clearance > values for unrestricted clearance
7 2 Regulation in Germany Nuclide Exemption limit Surface contamina tion Activity [Bq] Specific activity [Bq/g] [Bq/cm 2 ] Solid substances, liquids, with the exception of column 6 [Bq/g] General Clearance of Specific Clearance of Half-life Building rubble, excavated soil, in amounts over 1,000 Mg/a [Bq/g] Sites [Bq/cm 2 ] Buildings for reuse or continued use [Bq/cm 2 ] Solid substances and liquids for disposal, with the exception of column 6 [Bq/g] Buildings for demolition [Bq/cm 2 ] Metal Scrap for Recycling [Bq/g] a 11 H-3 1 E+7 1 E E E+3 1 E+3 4 E+3 1 E+3 12,3 a Be-7 Mn-54 Fe-55 Zn-65 Co-60 Co-58 Ag-110m+ Sb-124 Cs-137+ Cs-134 Am E+7 1 E+6 1 E ,4 30 0,3 1 E+6 1 E E ,5 0,4 1 E ,1 0,09 1 E ,9 0,2 1 E ,1 0,08 1 E ,5 0,5 1 E ,5 0,4 1 E ,2 0,1 2 0, E ,3 312,2 d d 6 1 E+3 1 E+4 2 E+4 1 E+4 2,7 a 0, ,5 244 d 0,03 0, ,6 5,3 a 0, ,8 d 7E-3 0, ,5 249,9 d 0, ,5 60,3 d 0, ,6 30,2 a 0,05 0, ,2 2,1 a 1 E ,3 432,6 a
8 2 Regulation in Germany Average Mass unrestricted: 300 kg general specific: 1 Mg for debris and excavated material in single case higher values can be licensed Average Area unrestricted: specific: 1000 cm² general 1 m² for buildings poss. more 100 m² for land areas Page 8
9 Recommendations given by the EC RP 65: Principles and methods for establishing concentrations and quantities (Exemption Values) below which reporting is not required in the European Directive, 1993 RP 89: Recommended radiological protection criteria for the recycling of metals from the dismantling of nuclear installations, 1998 RP 101: Basis for the definition of surface contamination clearance levels for the recycling or reuse of metals arising from the dismantling of nuclear installations, 1999 RP 113: Recommended radiological protection criteria for the clearance of buildings and building rubble from the dismantling of nuclear installations, 2000 RP 117: Methodology and models used to calculate individual and collective doses from the recycling of metals from the dismantling of nuclear installations, 2000 RP 122: Practical use of the concepts of clearance and exemption part I: Guidance on general clearance levels for practices, 2000 part II: Application of the concepts of exemption and clearance to natural radiation sources, 2001
10 3 Some Good Experiences General Process for Clearance of Materials assessment of history, estimation of activation pre-classification application to authority incl. clearance plan for campaign rad. waste clearable waste DGDF Konrad determination of nuclide mixtures choice of appropriate measurements techn. decay storage decision on clearance transport off site pre-decision measurement decision measurement verification measurement necessary execution of campaign according clearance plan approved by authority, inspections by experts permit for clearance by authority on basis of data for each batch or entire campaign
11 Folie 11 DMT Präsentation Checks performed by independent experts or by operator
12 Clearance plan checked by experts, approved by authority Folie 12 DMT Präsentation
13 3 Some Good Experiences Application of Removal Plant Greifswald site Mg Category I Not contaminated Ca Mg Plant components TH 1 6, IH 6 Ca Mg Building structures Ca Mg Removal 2 / 3 Clearance 1 / 3 Category II and III Potentially contaminated Ca Mg Plant components Ca Mg Remaining building structures Ca Mg Concrete Ca Mg
14 4 The Important Role of Clearance Operational time of disposal facilities in Germany ? Asse ERAM Konrad In Germany, there has always been a lack of disposal facilities. To keep the amount of waste as low as reasonably possible Germany developed many regulations for clearance of materials. These regulations are based on IAEA s de minimis concept of a trivial dose of some 10 µsv/y.
15 1 /3 2 / 3 4 The Important Role of Clearance Supervised zone 97,2% Clearance (several pathways are possible) Unrestricted clearance Recycling Landfilling Controlled zone 2,4% 0,4% Radioactive waste Reuse (under defined circumstances)
16 1 /3 2 / 3 4 The Important Role of Clearance Supervised zone What happens, if clearance levels will be reduced (e.g. by EU-BSS)? 97,2% => 90% 2,4% => 9,6% more waste by factor of 4! 90,0% Clearance / Exemption (several paths are possible) Unrestricted release Recycling Landfilling Controlled zone 9,6% Radioactive waste 0,4% Reuse (under defined circumstances)
17 4 The Important Role of Clearance Reducing the activity Exemption Specific Clearance RS-G- 1.7 Juli 2014 DMT-Präsentation Folie 17
18 4 The Important Role of Clearance Waste generator Interim storage Disposal facility Clearance Generation of radioactive waste shall be kept to the minimum practicable. Principle 7 of IAEA Safety Fundamentals Juli 2014 DMT-Präsentation Folie 21
19 Questions?
Global Experience with Implementation of Clearance
Global Experience with Implementation of Clearance Dr. J. Feinhals, DMT IAEA International Experts Meeting on Decommissioning and Remediation after a Nuclear Accident IAEA IEM on Decommissioning and Remediation
More informationIAEA and EC Regulations for Clearance of Materials and Release of Buildings and Sites
IAEA and EC Regulations for Clearance of Materials and Release of Buildings and Sites Dr. J. Feinhals TÜV NORD SysTec IAEA Training Course :Release of Sites - Karlsruhe 2010 1 Content 1. Exemption, exclusion
More informationRegulatory Aspects of Clearance and Recycling of Metallic Material forming Part of Buildings of Nuclear Facilities in Germany
Regulatory Aspects of Clearance and Recycling of Metallic Material forming Part of Buildings of Nuclear Facilities in Germany S. Thierfeldt, S. Wörlen, P. Harding Brenk Systemplanung GmbH, Aachen (Germany)
More informationCLEARANCE IN THE FRAMEWORK OF DECOMMISSIONING OF NUCLEAR POWER PLANTS IN GERMANY. Thomas Pöhlsen Clearance of Radioactive Material
CLEARANCE IN THE FRAMEWORK OF DECOMMISSIONING OF NUCLEAR POWER PLANTS IN GERMANY Clearance of Radioactive Material 127.540 Mg 272.100 Mg WHY IS CLEARENCE OF IMPORTANCE IN GERMANY? IN THE FRAMEWORK OF DECOMMISSIONING
More informationCurrent and future Belgian regulatory requirements on Clearance and Release from regulatory control of radioactive materials and sites
Current and future Belgian regulatory requirements on Clearance and Release from regulatory control of radioactive materials and sites BVS SCIENTIFIC MEETING - 25 MAY 2018 FREDERIK VAN WONTERGHEM FEDERAL
More informationSome Impact of Melting Scrap for the Decommissioning of Nuclear Power Plant Stade
Some Impact of Melting Scrap for the Decommissioning of Nuclear Power Plant Stade Dr. Georg U. Bacmeister. E.ON Kernkraft GmbH, NPP Stade Introduction The German NPP Stade (PWR, 630 MW electric) was shut
More informationNew Swedish Regulations for Clearance of Materials, Rooms, Buildings and Land Efraimsson, Henrik Swedish Radiation Safety Authority, SWEDEN
New Swedish Regulations for Clearance of Materials, Rooms, Buildings and Land Efraimsson, Henrik Swedish Radiation Safety Authority, SWEDEN Abstract The Swedish Radiation Safety Authority (SSM) has developed
More informationPROPOSAL FOR UNCONDITIONAL CLEARANCE LEVELS FOR CONTAMINATED SOIL FROM ITALIAN NPP
PROPOSAL FOR UNCONDITIONAL CLEARANCE LEVELS FOR CONTAMINATED SOIL FROM ITALIAN NPP F. Mancini 1, M. Fumagalli 1, M. Caldarella 1 1 Sogin via Torino, 6-00184 Rome - Italy 1. ABSTRACT The paper purpose is
More informationNew Swedish regulations for clearance of materials, rooms, buildings and land
New Swedish regulations for clearance of materials, rooms, buildings and land NKS Seminar on Decommissioning of Nuclear Facilities 14-16 September 2010 Henrik Efraimsson Dep of Radioactive Materials henrik.efraimsson@ssm.se
More informationProcedures for the Release of Sites
Procedures for the Release of Sites Dr. J. Feinhals DMT Dr. M. Bothe VKTA IAEA Regional Workshop on Clearance of Decommissioning Waste Bangkok, 6-9 Nov. 2012 Research Site Rossendorf Verein für Kernverfahrenstechnik
More informationClearance, Reuse, Recycle, disposal as VLLW.
Clearance, Reuse, Recycle, disposal as VLLW. A role for all of these options in the optimisation of rad management in decommissioning more work needed on optimisation Claudio Pescatore, OECD NEA Decommissioning
More informationSome Impact of Melting Scrap for the Decommissioning of Nuclear Power Plant Stade. Dr. Georg Ulrich Bacmeister
Some Impact of Melting Scrap for the Decommissioning of Nuclear Power Plant Stade Dr. Georg Ulrich Bacmeister Content 1. Introduction 2. Overfiew on the dismantling of NPP Stade 3. Main criteria to choose
More information3. International Concept of Clearance in RWM
3. International Concept of Clearance in RWM 3.1 ICRP The followings show the standpoint of ICRP on the use of the term clearance. These are derived from a reference document for a draft of ICRP future
More informationThe relevance for the nuclear industry decommissioning programmes
Control and Management of Inadvertent Radioactive Material in Scrap Metal Tarragona, 23-27 February 2009 The relevance for the nuclear industry decommissioning programmes Patrick J O Sullivan Radiation
More informationAN ASSESSMENT OF THE FREE RELEASE CRITERIA FOR DECOMMISSIONING PROJECTS. Jas Devgun Sargent & Lundy 55 E. Monroe St.
AN ASSESSMENT OF THE FREE RELEASE CRITERIA FOR DECOMMISSIONING PROJECTS Jas Devgun Sargent & Lundy 55 E. Monroe St. Chicago, IL 60603 ABSTRACT Robert Wills, and Mark Lesinski Consumers Energy Big Rock
More informationDecommissioning three main strategies: Immediate dismantling, Safe enclosure (Deferred dismantling), Entombment
: Immediate dismantling, Safe enclosure (Deferred dismantling), Entombment Dr. M Knaack TÜV NORD GmbH, Hamburg / Germany Overwiew Decommissioning when and why? Law, regulations and guidelines Three main
More informationSymposium on Recycling of metals, April 8-10, 2014, Studsvik. The Metal Recycling Process and its Nuclide Distribution
Symposium on Recycling of metals, April 8-1, 214, Studsvik The Metal Recycling Process and its Nuclide Distribution Per Lidar*, Maria Lindberg*, Arne Larsson*, and Patrik Konneus* * Studsvik Nuclear AB
More informationExperiences on a Regulatory Clearance of the Radioactive Wastes at KAERI
Experiences on a Regulatory Clearance of the Radioactive Wastes at KAERI - 8323 D.S. Hong, Y. Y. Ji, J. S. Shon, S. B. Hong Korea Atomic Energy Research Institute 1045 Daedeokdaero, Yuseong, Daejeon, Korea
More informationConcepts of Exemption and Clearance
Concepts of Exemption and Clearance name of presenter (e-mail) training event title dates location, host organization, host country International Atomic Energy Agency Overview Concept of controlling radioactive
More informationIAEA Perspective on Management of NORM Waste
IAEA Perspective on Management of NORM Waste Zhiwen FAN Waste and Environmental Safety Section Department of Nuclear Safety and Security Email: z.fan@iaea.org IAEA International Atomic Energy Agency Outline
More informationInfluence of Clearance Regulations on Decommissioning Projects
Influence of Clearance Regulations on Decommissioning Projects NIS September 2010 NIS Information 07.2010 Seite 1 Object of the Presentation A Try in 7 Steps to Analyse the Effects of Clearance Regulations
More informationExpected Waste Streams Originating from the Decommissioning of NPPs: German Situation as Compared to International Standards 16447
Expected Waste Streams Originating from the Decommissioning of NPPs: German Situation as Compared to International Standards 16447 Dr. Gerd Bruhn, Dr. Boris Brendebach Gesellschaft fuer Anlagen- und Reaktorsicherheit
More informationIAEA Activities Related to Clearance and Exemption
Eleventh Annual Meeting of the International Decommissioning Network (IDN) 5-7 December 2017 IAEA, Vienna, Austria IAEA Activities Related to Clearance and Exemption Vladan Ljubenov (V.Ljubenov@iaea.org)
More informationThird Int. Workshop on Environmental Coal Ash Uses Tel Aviv, December, 2012
Third Int. Workshop on Environmental Coal Ash Uses Tel Aviv, 11 12 December, 2012 Legal and administrative control measures to limit the exposure of the public to ionizing radiation due to coal ash utilization
More informationManagement of Radioactive Residues & Wastes Generated During Remediation of Uranium Production Legacy Sites in Germany
Management of Radioactive Residues & Wastes Generated During Remediation of Uranium Production Legacy Sites in Germany Peter Schmidt, Wismut GmbH Chemnitz, Germany Head of Department of Environmental Monitoring
More informationTransfrontier shipment of NORM waste
Transfrontier shipment of NORM waste Mette Nilsen, Norwegian Radiation Protection Authority Hasselt, 29.11.2011 Overview EC regulation of import and export of waste and radioactive waste Example of practice
More informationRegulatory projects with Rostechnadzor and SEC-NRS Tacis/INSC Projects
Regulatory projects with Rostechnadzor and SEC-NRS Tacis/INSC Projects IAEA CEG Workshop on Management of SNF and RW: Regulatory and Licensing Issues (including a special session on Mayak) St. Petersburg,
More informationOECD/NEA Workshop on Radiological Characterisation for Decommissioning. Radiological characterisation - the Greifswald NPP approach
OECD/NEA Workshop on Radiological Characterisation for Decommissioning Abstract Studsvik, April 2012 Session A - Decommissioning, general issues Radiological characterisation - the Greifswald NPP approach
More informationOverview and Activities of MEXT
Safety Regulations for Radioactive Waste Disposal Ⅲ Overview and Activities of MEXT February 23, 2010 Yoshinari AKENO Director, Nuclear Safety Division Science and Technology Policy Bureau 1.Safety Regulations
More informationB. Hartmann, M. Häger Energiewerke Nord GmbH P.O.Box 1125, Lubmin, Germany
Revk a Tool for the Fulfilment of Requirements from National Rules for Tracking and Documentation of Radioactive Residual Material and Radioactive Waste B. Hartmann, M. Häger Energiewerke Nord GmbH P.O.Box
More informationRadioactive Waste Management at the NCSR Demokritos - Greece
Radioactive Waste Management at the NCSR Demokritos - Greece Anastasia Savidou Radioactive Materials Management Laboratory Institute of Nuclear & Radiological Sciences & Technology, Energy & Safety, National
More informationIAEA-TECDOC-8S5. Clearance levels
IAEA-TECDOC-8S5 Clearance levels The IAEA does The originating Section of this publication in the IAEA was: Waste Management Section International Atomic Energy Agency Wagramerstrasse ALL PLEASE BE AWARE
More informationUnrestricted Release of Buildings and Site of NPP Versuchsatomkraftwerk Kahl - VAK
Unrestricted Release of Buildings and Site of NPP Versuchsatomkraftwerk Kahl - VAK Ingolf Auler, NIS Gerald Rudolph, NIS Walter Hackel, VAK IAEA Training Course on Release of Sites and Building Structures,
More informationVINCA Institute of Nuclear Sciences. Vinča Institute. Dragana Nikolić. Centre for Nuclear Technologies and Research 'NTI' Belgrade, Serbia
INN Vinča VINCA Institute of Nuclear Sciences Decommissioning of the RA Reactor at the Vinča Institute Dragana Nikolić Centre for Nuclear Technologies and Research 'NTI' Belgrade, Serbia R2D2P: Workshop
More informationHIGH COST SAVINGS DUE TO THE SEPARATION OF CLEAN FROM CONTAMINATED CONCRETE AND CABLES
HIGH COST SAVINGS DUE TO THE SEPARATION OF CLEAN FROM CONTAMINATED CONCRETE AND CABLES by Dr. Lutz Bergemann, Nuclear Power Station Gundremmingen, Germany Stefan Rosenberger, NUKEM Nuclear Technologies,
More informationThe Disposal of Large Components Strategies
The Disposal of Large Components Strategies Dr. M. Bauerfeind Dr. J. Feinhals TÜV NORD SysTec TÜV NORD SysTec GmbH & Co. KG Seite 1 An Overview of the Disposal of Large Components During the decommissioning
More informationRADIATION PROTECTION
RADIATION PROTECTION Evaluation of the application of the concepts of exemption and clearance for practices according to title III of Council Directive 96/29/Euratom of 13 May 1996 in EU Member States
More informationEnvironmental Protection and Control Standard of Solid Waste Imported as Raw Materials - Waste and Scrap of Paper or Paperboard
ICS 13.030.50 Z 70 National Standard of the People's Republic of China GB 16487.4-201_ Superseding GB 16487.4-2005 Environmental Protection and Control Standard of Solid Waste Imported as Raw Materials
More informationRelease and demolition of buildings and concrete structures on the Greifswald site
Release and demolition of buildings and concrete structures on the Greifswald site Ronald Zimmer Eberhard Thurow Energiewerke Nord GmbH (December 2010) Page 1 Content 1. Strategy and boundary conditions
More informationRECYCLING OF URANIUM- AND PLUTONIUM-CONTAMINATED METALS FROM DECOMMISSIONING OF THE HANAU FUEL FABRICATION PLANT
RECYCLING OF URANIUM- AND PLUTONIUM-CONTAMINATED METALS FROM DECOMMISSIONING OF THE HANAU FUEL FABRICATION PLANT T. Kluth, U. Quade Siempelkamp Nukleartechnik GmbH Siempelkampstrasse 45, 47803 Krefeld,
More informationP. Brennecke, S. Steyer Bundesamt für Strahlenschutz Willy-Brandt-Strasse 5, D Salzgitter, Germany
WASTE CERTIFICATION, ACCEPTANCE AND DISPOSAL FOR LLW/ILW/MW/HW MANAGEMENT OF RADIOACTIVE WASTE IN GERMANY: QUALITY ASSURANCE OF WASTE PACKAGES WITH RESPECT TO IAEA RECOMMENDATIONS P. Brennecke, S. Steyer
More informationDecommissioning and Site Release Problems for Georgian Nuclear Research Reactor IRT-M
Decommissioning and Site Release Problems for Georgian Nuclear Research Reactor IRT-M Giorgi Nabakhtiani Grigol Kiknadze Nuclear and Radiation Safety Service Ministry of Environment Protection and Natural
More informationNational Standards of the People's Republic of China
BIR provides this translation into English for information only, please refer to the original and authoritative Chinese text LINK ICS 13.030.50 Z 70 National Standards of the People's Republic of China
More informationWM 2010 Conference, March 7-11, 2010 Phoenix, AZ
Optimized Planning of the Disposal of radioactive Waste Packages exceeding the German Waste Acceptance Criteria Limits for Fissile Material Content and for Heat Generation - 10450 Peter Brennecke, Stefan
More informationNational Standards of the People s Republic of China
ICS 13.030.50 Z 70 National Standards of the People s Republic of China GB 16487.8 2017 Replace GB 16487.8 2005 Environmental Protection Control Standard for Imported Solid Wastes as Raw Materials Waste
More informationIMPACT OF LACK OF CONSISTENT FREE RELEASE STANDARDS ON DECOMMISSIONING PROJECTS AND COSTS
ABSTRACT IMPACT OF LACK OF CONSISTENT FREE RELEASE STANDARDS ON DECOMMISSIONING PROJECTS AND COSTS Jas S. Devgun, Ph.D. Senior Project Engineer/Program Manager Sargent & Lundy LLC 55 E. Monroe St. Chicago,
More informationNational Standards of the People s Republic of China
ICS 13.030.50 Z 70 National Standards of the People s Republic of China GB 16487.4 2017 Replace GB 16487.4 2005 Environmental Protection Control Standard for Imported Solid Wastes as Raw Materials Waste
More informationDecommissioning of Nuclear Facilities - Regulatory Requirements -
Decommissioning of Nuclear Facilities - Regulatory Requirements - Ernst Warnecke; NSRW R²D²Project: Basics of Decommissioning of Research Reactors / Manila; 16-20 October 2006 1 International Atomic Energy
More informationNational Standards of the People s Republic of China
ICS 13.030.50 Z 70 National Standards of the People s Republic of China GB 16487.12 2017 Replace GB 16487.12 2005 Environmental Protection Control Standard for Imported Solid Wastes as Raw Materials Waste
More informationNuclear Physics. Expertise in nuclear calculations, safety, radiation protection, fluid and structural dynamics simulations
Nuclear Physics Expertise in nuclear calculations, safety, radiation protection, fluid and structural dynamics simulations www.steag-energyservices.com Safety and innovation through computations The Nuclear
More informationCONDITIONING OF OPERATIONAL AND DECOMMISSIONING WASTES AT THE KARLSRUHE RESEARCH CENTER
CONDITIONING OF OPERATIONAL AND DECOMMISSIONING WASTES AT THE KARLSRUHE RESEARCH CENTER Iris Hillebrand, Reinhard Pfeiffer, Forschungszentrum Karlsruhe GmbH The Karlsruhe Research Center was founded in
More informationDecontamination of Uranium Contaminated Metals 15 Years of Experience Arne Larsson, Per Lidar, Maria Lindberg, and Bo Wirendal Studsvik
Decontamination of Uranium Contaminated Metals 15 Years of Experience - 15528 Arne Larsson, Per Lidar, Maria Lindberg, and Bo Wirendal Studsvik ABSTRACT Uranium contaminated waste is somewhat of a special
More informationJoint ICTP-IAEA School on Nuclear Energy Management. 15 July - 3 August, Lecture Notes. I. Mele IAEA, Vienna, Austria
2473-9 Joint ICTP-IAEA School on Nuclear Energy Management 15 July - 3 August, 2013 Lecture Notes I. Mele IAEA, Vienna, Austria The IAEA Nuclear Energy Management School ICTP, Trieste, 15-2 August 2013
More informationIAEA CLASSIFICATION OF RADIOACTIVE WASTE
IAEA CLASSIFICATION OF RADIOACTIVE WASTE GERARD BRUNO Workshop on Clearance of Decommissioning Waste 6 9 November 2012, Bangkok, Thailand Outline Overview of radioactive waste arising Waste management
More informationGreifswald Project Introduction/Experience summary Axel Bäcker
Decommissioning operation of large decommissioning projects 20 years experience Decommissioning management of five power reactors on the Greifswald site Greifswald Project Introduction/Experience summary
More informationNational Standards of the People s Republic of China
ICS 13.030.50 Z 70 National Standards of the People s Republic of China GB 16487.6 2017 Replace GB 16487.6 2005 Environmental Protection Control Standard for Imported Solid Wastes as Raw Materials Waste
More informationRegulations on Radioactive Waste Management PAK/915
Regulations on Radioactive Waste Management PAK/915 PART-II Statutory Notification (S.R.O) Government of Pakistan PAKISTAN NUCLEAR REGULATORY AUTHYORITY Notification Islamabad, the 14 th December, 2004
More informationDECONTAMINATION-MELTING OF URANIUM- CONTAMINATED METAL
DECONTAMINATION-MELTING OF URANIUM- CONTAMINATED METAL Joachim Lorenzen and Maria Lindberg, Project Managers, Studsvik RadWaste AB, SE-611 82 Nyköping, SWEDEN ABSTRACT Studsvik RadWaste AB (SRW) has since
More informationAs amended upto 8 th March, 2010
As amended upto 8 th March, 2010 The Gazette of Pakistan PART II Statutory Notification (S.R.O.) GOVERNMENT OF PAKISTAN PAKISTAN NUCLEAR REGULATORY AUTHORITY NOTIFICATION Islamabad, the 13 th July, 2005
More informationImplementing Waste Led Decommissioning in Practice - Experiences from a Research Facility
Implementing Waste Led Decommissioning in Practice - Experiences from a Research Facility 2017-02-07 Per Lidar and Karin Strid, Studsvik Magnus Hörling, MAX IV Laboratory, Lund University Arne Larsson,
More informationClearance Considerations for Slightly-Irradiated Components of Fusion Power Plants
Clearance Considerations for Slightly-Irradiated Components of Fusion Power Plants L. El-Guebaly 1, R. Pampin 2, M. Zucchetti 3 1 University of Wisconsin-Madison, Madison, WI, U.S. (elguebaly@engr.wisc.edu)
More informationRadiation Protection during Decommissioning of Nuclear Facilities Experiences and Challenges
Radiation Protection during Decommissioning of Nuclear Facilities Experiences and Challenges IRPA Glasgow 13 th International Congress of the International Radiation Protection Association 13 18 May 2012
More informationTHE CONTROL OF SAFETY OF RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN AUSTRIA
THE CONTROL OF SAFETY OF RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN AUSTRIA 1.1 National framework 1.1.1 National policy The Austrian Federal Constitutional Law on Nuclear Free Austria prohibits
More informationRadioactive Waste Management Agency. and. Nuclear Safety Authority. in Belgium
Radioactive Waste Management Agency and Nuclear Safety Authority in Belgium Luc Baekelandt, FANC, Belgium LB/IAEA/2010-06-08/00 Contents 1. Institutional framework 2.The actors FANC ONDRAF/NIRAS 3. Co-operation
More informationDefinition of Clearance Levels for the Release of Radioactively Contaminated Buildings and Building Rubble
Definition of Clearance Levels for the Release of Radioactively Contaminated Buildings and Building Rubble European Commission Radiation protection 114 Definition of Clearance Levels for the Release of
More informationRadioactive Waste Management
Keynote lecture IRPA 12 Radioactive Waste Management Jean-Christophe NIEL, Director General Nuclear Safety Authority, Paris E-mail: jean-christophe.niel@asn.fr 1 Content Liquid and gaseous discharges treatment
More informationWM 00 Conference, February 27 March 2, 2000, Tucson, AZ CLEARANCE STANDARDS RECOMMENDED IN THE EUROPEAN UNION
ABSTRACT CLEARANCE STANDARDS RECOMMENDED IN THE EUROPEAN UNION R.Simon/EC-retired and A. Janssens/EC DG XI.C.1 Following a revision of the EURATOM Basic Safety Standards two new sets of recommendations
More informationClearance of radioactive material and removal of non-radioactive material from the dismantling of nuclear power plants. Contents
Note: This is a translation of the summary information paper entitled Freigabe radioaktiver Stoffe und Herausgabe nicht radioaktiver Stoffe aus dem Abbau von Kernkraftwerken. In case of discrepancies between
More informationRELEASE OF RESIDUES FROM MELTING NORM-CONTAMINATED STEEL SCRAP. - A German Approach -
RELEASE OF RESIDUES FROM MELTING NORM-CONTAMINATED STEEL SCRAP - A German Approach - U. Quade Siempelkamp Nukleartechnik GmbH, Siempelkampstrasse 45, 47803 Krefeld,Germany S. Thierfeldt, S. Wörlen Brenk
More informationInternational Conference on Control and Management of Inadvertent Radioactive Material in Scrap Metal
Co-60 contaminated stainless steel in Gemany - experiences and first steps Dr. Renate Sefzig / Dr. Bejoy Saha / Gisela Stoppa Germany Supervision in the Field of Radiological Protection Federal Ministry
More informationDRAFT NATIONAL RADIOACTIVE WASTE MANAGEMENT PROGRAMME ACC. ART. 36b RADIATION PROTECTION ACT
DRAFT NATIONAL RADIOACTIVE WASTE MANAGEMENT PROGRAMME ACC. ART. 36b RADIATION PROTECTION ACT LEGAL INFORMATION Owned and published by: AUSTRIAN FEDERAL MINISTRY FOR SUSTAINABILITY AND TOURISM Stubenring
More informationPractical challenges in implementing the BSS requirements (Regulatory Control of NORM): MALAYSIA. Dr. TENG IYU LIN LICENSING DIVISION
Practical challenges in implementing the BSS requirements (Regulatory Control of NORM): MALAYSIA Dr. TENG IYU LIN LICENSING DIVISION Atomic Energy Licensing Board Ministry of Science, Technology and Innovation
More informationDISPOSAL OF THE CONTROL RODS OF THE EXPERIMENTAL AND RESEARCH REACTOR (FMRB) OF PTB, GERMANY
ABSTRACT DISPOSAL OF THE CONTROL RODS OF THE EXPERIMENTAL AND RESEARCH REACTOR (FMRB) OF PTB, GERMANY W. Anspach, DETEC GmbH, D-63754 Alzenau Dr. B. Christ, DETEC GmbH, D-63754 Alzenau This paper describes
More informationInterim Guidance on the Regulation of In-situ Disposals of Radioactive Waste and Residual Radioactive Contamination on Nuclear Authorised Premises
Interim Guidance on the Regulation of In-situ Disposals of Radioactive Waste and Residual Radioactive Contamination on Nuclear Authorised Premises Issue 1 May 2014 Contents 1.1 Introduction... 2 1.2 Site
More informationBasic Radiological Definitions 3 29/06/2011 EBC - Fukushima Nuclear Accident and Industrial Impact Basic Radiation Protection Definitions Dose-Equival
Fukushima Nuclear Accident and Industrial Impact Experiences and Expectations from the European and Japanese Industry Perspectives 2011 June 29th European Business Council in Japan Dr. Jens-Uwe Schmollack,
More informationBasic Radiological Definitions 3 29/06/2011 EBC - Fukushima Nuclear Accident and Industrial Impact Basic Radiation Protection Definitions Dose-Equival
Fukushima Nuclear Accident and Industrial Impact Experiences and Expectations from the European and Japanese Industry Perspectives 2011 June 29th European Business Council in Japan Dr. Jens-Uwe Schmollack,
More informationDecay Storage of Large Components from Decommissioning of Nuclear Power Plants
Decay Storage of Large Components from Decommissioning of Nuclear Power Plants M. Wagner(markus.wagner@grs.de), K. Hummelsheim, U. Hesse, M. Kirsch, M. Wehrfritz (GRS) T. Cramer(t.cramer@brenk.com), S.
More informationGeneric Aspects for Dismantling Preparation of INPP Reactor Facilities. Aleksej Merežnikov, Ignalina NPP, July 2014
Generic Aspects for Dismantling Preparation of INPP Reactor Facilities Aleksej Merežnikov, Ignalina NPP, July 2014 Agenda INTRODUCTION REGULATORY FRAMEWORK RBMK-1500 FEATURES GENERAL APROACH STATUS AND
More informationSAMPLING AND RADIOLOGICAL ANALYSIS OF COMPONENTS OF THE TRIGA REACTOR AT THE MEDICAL UNIVERSITY OF HANNOVER
SAMPLING AND RADIOLOGICAL ANALYSIS OF COMPONENTS OF THE TRIGA REACTOR AT THE MEDICAL UNIVERSITY OF HANNOVER ABSTRACT Gabriele Hampel, Heinrich Harke, Medical University of Hanover, Germany Uwe Klaus, Wieland
More informationWM'00 Conference, February 27 - March 2, 2000, Tucson, AZ DECOMMISSIONING OF FOUR GERMAN FUEL CYCLE FACILITIES
DECOMMISSIONING OF FOUR GERMAN FUEL CYCLE FACILITIES Dr. Helmut Rupar, Roland Baumann, Peter Faber, Dr. Manfred Ruhbaum, Helmut Schmitt Siemens AG, Power Generation Group (KWU), Germany ABSTRACT The decommissioning
More informationMethodology and models used to calculate individual and collective doses from the recycling of metals from the dismantling of nuclear installations
Methodology and models used to calculate individual and collective doses from the recycling of metals from the dismantling of nuclear installations European Commission Radiation protection 117 Methodology
More informationJ. Kaulard B. Jünger-Gräf. Comparison of decommissioning options for the example of 2 research reactors of type TRIGA
J. Kaulard B. Jünger-Gräf Comparison of decommissioning options for the example of 2 research reactors of type TRIGA In Remembrance to Mrs. Barbara Jünger-Gräf Content Introduction Background Overview
More information进口可用作原料的固体废物环境保护控制标准 废纸或纸板
ICS 13.030.50 Z 70 National Standards of the People s Republic of China GB 16487.4 2017 Replace GB 16487.4 2005 进口可用作原料的固体废物环境保护控制标准 废纸或纸板 Environmental Protection Control Standard for Imported Solid Wastes
More informationHow will Belgium implement the European directive with regard to NORM? S. Pepin (Federal Agency for Nuclear Control, Belgium)
How will Belgium implement the European directive with regard to NORM? S. Pepin (Federal Agency for Nuclear Control, Belgium) BVS-ABR meeting Why should we be concerned about NORM?, Brussels, October 28,
More informationWASTE ACCEPTANCE REQUIREMENTS FOR THE KONRAD REPOSITORY
WASTE ACCEPTANCE REQUIREMENTS FOR THE KONRAD REPOSITORY Peter W. Brennecke Bundesamt für Strahlenschutz (BfS) Salzgitter, Germany IAEA - DISPONET Workshop " Waste Acceptance Criteria For Disposal of Very
More informationNORM Waste Treatment System for oil and Gas Industry
NORM Waste Treatment System for oil and Gas Industry SangBae Son KEPCO Engineering & Construction Company, Inc. (KEPCO E&C) 269 Hyeoksin-ro, Gimcheon-si, Gyeongsangbuk-do, 39660, Republic of Korea Phone:
More informationWaste Management of LLW / ILW at HDB
Rückbau- und Entsorgungs- GmbH Ein Unternehmen des EWN-Verbundes Waste Management of LLW / ILW at HDB EURATOM Collaborative Project CAST (CArbon-14 Source Term) Felix Himmerkus, Training Course C-14 behaviour
More informationPAKISTAN NUCLEAR REGULATORY AUTHORITY P.O 1912, G-8/1,
CNS-WM-042-122 February, 2012 A Case Study for Safety Assessment of Pre-Disposal Waste Management Using SAFRAN Tool PAKISTAN NUCLEAR REGULATORY AUTHORITY P.O Box 1912, G-8/ /1, Mauve Area, Islamabad Table
More informationPrevention, Detection and Response System. for Inadvertent Radioactive Material in the Scrap Metal in Ukraine
State Nuclear Regulatory Committee of Ukraine Prevention, Detection and Response System 3 for Inadvertent Radioactive Material in the Scrap Metal in Ukraine Olga Makarovska, International Conference on
More informationManagement of NORM A Canadian perspective. John M. Takala ICRP Workshop on Surface Disposal of Radioactive Waste November 6, 2017 Fukushima, Japan
Management of NORM A Canadian perspective John M. Takala ICRP Workshop on Surface Disposal of Radioactive Waste November 6, 2017 Fukushima, Japan DISCLAIMER u Views and opinions are mine and I am not representing
More informationDecommissioning of Nuclear Facilities. The Decommissioning Process. Lesson Objectives. Decommissioning. Decontamination. Decommissioning Objective
Lesson Objectives International Atomic Energy Agency Define specific decommissioning terms of Nuclear Facilities The Process Understand the decommissioning process Review the various decommissioning strategies
More informationADVANCED DECOMMISSIONING COSTING CALCULATION TOOLS FOR PILOT VIENNA TRIGA MARK-II RESEARCH REACTOR
ADVANCED DECOMMISSIONING COSTING CALCULATION TOOLS FOR PILOT VIENNA TRIGA MARK-II RESEARCH REACTOR K. KRISTOFOVA, M. HORNACEK, V. SLUGEN Institute of Nuclear and Physical Engineering, Faculty of Electrical
More informationJoint Convention on the Safety of Spent Fuel and on the Safety of Radioactive Waste Management
THIRD NATIONAL REPORT OF AUSTRIA on the implementation of the obligations of the Joint Convention on the Safety of Spent Fuel and on the Safety of Radioactive Waste Management October 2008 Executive Summary
More informationSafety Related Documentation and Regulatory Review for PRR-1 1 Decommissioning Project
Safety Related Documentation and Regulatory Review for PRR-1 1 Decommissioning Project Eulinia M. Valdezco Nuclear Regulations, Licensing and Safeguards Division (NRLSD) Philippine Nuclear Research Institute
More informationGuidance for NORM industrial activities on how to comply with the radioactive substances exemption regime
Exemption guidance Guidance for NORM industrial activities on how to comply with the radioactive substances exemption regime February 2013 Version 1 Radioactive Substances Act 1993 The Environmental Permitting
More informationInventory of radioactive waste, disused and orphan sources and materials and sources in use
Inventory of radioactive waste, disused and orphan sources and materials and sources in use TABLE 1 : Resins in drums Location: Interim storage facility of NCSR "Demokritos" Form Resins Origin: Past activities
More informationOverview of Philippine Nuclear Regulations. Eulinia M. Valdezco Nuclear Regulations, Licensing and Safeguards Division
Overview of Philippine Nuclear Regulations Eulinia M. Valdezco Nuclear Regulations, Licensing and Safeguards Division Legal Framework Three (3) Laws exist but not covering decommissioning RA 2067 (The
More informationDEVELOPMENT OF REGULATORY FRAMEWORK FOR IMPLEMENTING RADIOLOGICAL EXEMPTION/CLEARANCE BASED ON ALARA PRINCIPLES AND CURRENT PARACTICES IN KOREA
DEVELOPMENT OF REGULATORY FRAMEWORK FOR IMPLEMENTING RADIOLOGICAL EXEMPTION/CLEARANCE BASED ON ALARA PRINCIPLES AND CURRENT PARACTICES IN KOREA ABSTRACT Jae Hak CHEONG, Hong Tae KIM, Tae Won SUK, and Sang
More informationDECOMMISSIONING OF MINERAL PROCESSING PLANT AND REMEDIATION OF NORM CONTAMINATED SITES
DECOMMISSIONING OF MINERAL PROCESSING PLANT AND REMEDIATION OF NORM CONTAMINATED SITES Teng Iyu Lin (Ph.D) Atomic Energy Licensing Board, Batu 24 Jalan Dengkil, 43800 Dengkil, Selangor, Malaysia yulin@aelb.gov.my/
More informationDecommissioning in Germany: Greifswald NPPs. Bernd Rehs Federal Office for Radiation Protection (BfS)
Decommissioning in Germany: Greifswald NPPs Bernd Rehs Federal Office for Radiation Protection (BfS) 12 th Meeting of the Working Party on Decommissioning and Dismantling (WPDD), 15 th -17 th November
More information