CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN

Size: px
Start display at page:

Download "CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN"

Transcription

1 APA Group Young to Wagga Wagga Looping Pipeline Project No.: 8291 Doc. No.: 8291-PLN-003 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN D Draft (details added to multiple sections as per APA Environmental Representative comments) K. Sanson G. McAinch G. O Mahony C Draft Incorporating Client Comments K. Sanson G. McAinch G. O Mahony B Draft for Review & Approval K. Sanson G. McAinch G. O Mahony A Draft for Review K. Sanson G. McAinch G. O Mahony REV. DATE DESCRIPTION PREPARED CHECKED APPROVED Page 1 of 40

2 Contents 1 Introduction Purpose Project Overview Client Commitment References Definitions Project Management Environmental and Community Policies Planning Regulatory Requirements Objectives and Targets Document Control & Records Responsibilities Training Monitoring and Inspection Auditing Emergency Response Incident Management Community Liaison & Notifications Management Review Environmental Management Sub-plans Air Quality Management Plan (AQMP) Soil & Water Management Plan (SWMP) Erosion & Sediment Control Management Plan (ESCMP) Flora & Fauna Management Plan (FFMP) Noise Management Plan (NMP) Traffic Management Plan (TMP) Cultural Heritage Management Plan (CHMP) Landscape & Rehabilitation Management Plan (LRMP) Emergency Response Plan (ERP) Waste Management Plan (WMP) Page 2 of 40

3 Contents 4 Environmental Constraints Sensitive Areas Potential Environmental Incidents Special Construction Considerations Cultural Heritage Environmental Management of Activities Introduction Environmental Procedures Access and Worksite Preparation Office Management Clear and Grade Trenching Pipe Stringing and Bending Welding Laying and Backfilling Clean Up and Reinstatement Fencing and Gates Pre-Cleaning and Gauging Hydrotesting Dewatering, Cleaning and Drying Calliper Pigging Documentation Attachment 1 APA Group HSE Policy Attachment 2 QUA002 Action Request Page 3 of 40

4 List of Figures Figure 1: Location of YWL Project... 6 List of Tables Table 1: Project Environmental Objectives & Targets Table 2: Environmental Records Table 3: Applicable Environmental Aspects by Work Activities Table 4: Environmental Procedures o000o--- Page 4 of 40

5 1 Introduction 1.1 Purpose The purpose of this Construction Environmental Management Plan (CEMP) is to provide guidelines for the management of environmental aspects and impacts during the course of the construction of works by WDS Limited (WDS) on the Young to Wagga Wagga Looping Pipeline (YWL) for the APA Group. This document has been developed in accordance with the Australian Pipeline Industry Association Code of Environmental Practice for Onshore Pipelines (APIA Code). It is set out by functional activity rather than environmental aspect for ease of implementation. 1.2 Project Overview Refer to the contract for the scope of works and also to PLN-001 Project Management Plan. Briefly, WDS have been contracted by APA Group to undertake the following: construction set-out and survey supply of nominated materials clear and grade trenching and excavation as nominated installation and testing of nominated field pipeline systems installation and testing of other nominated equipment reinstatement, clean-up and demobilisation construction records and as-built documentation The complete scope of work is described in the Scope of Works for each job under the Contract. The location of the project is shown in Figure 1: Location of YWL Project (taken from the Young to Wagga Wagga Looping Pipeline Environmental Assessment Report, Jan 2010). 1.3 Client Commitment The APA Group as the proponent for the Young to Wagga Wagga Looping Pipeline Project are committed to providing an injury free working environment and ensuring that all activities are conducted in a manner that protects the environment and the greater community. The APA Group HSE Policy can be viewed at Attachment 1. Page 5 of 40

6 Figure 1: Location of YWL Project 1.4 References Company documentation referenced in this document is listed in 6 Documentation. Other documentation used in the preparation of this document is listed below: AS/NZS ISO 14001:2004 Environmental management systems Requirements with guidance for use AS Pipelines Gas and liquid petroleum Part 1: Design and construction Code of Environmental Practice On Shore Pipelines (Rev 2 March Original document prepared by Ecos Consulting (Aust) and updated by members of the APIA Working Group on the Environment) Young to Wagga Wagga Looping Pipeline Environmental Assessment Report Stage 1 (Rev 2 January, 2010) Young to Wagga Wagga Looping Pipeline Submissions Report (v2.0 April, 2010) Guidelines for Controlled Activities Laying Pipes and Cables in Watercourses (February Water Management Act, 2000) Guidelines for Controlled Activities In-stream Works (February 2008 Water Management Act, 2000) Page 6 of 40

7 1.5 Definitions Definitions shall be generally as stated in AS/NZS ISO 14001:2004. Some of the more common terms used in this document are as follows: Environment Surroundings in which an organization operates, including air, water, land, natural resources, flora, fauna, humans, and their interaction. Environmental aspect Element of an organization's activities or products or services that can interact with the environment. Environmental impact Environmental Management System (EMS) Any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organization's environmental aspects. Part of an organization's management system used to develop and implement its environmental policy and manage its environmental aspects. Riparian Of, or relating to, or located on, the banks of a river or stream. ROW Right of Way the strip of land over which facilities such as highways, railroads, pipelines or power lines are built. The Company (WDS) APA (the Client) YWL (the Project) WDS Limited East Australian Pipelines Pty Ltd. (APA Group) Young to Wagga Wagga Looping Pipeline Project 2 Project Management 2.1 Environmental and Community Policies Refer: WDS Environmental Policy WDS Community Policy The WDS Environmental and Community Policies (see p9 & p10) shall be displayed in all project site offices. They shall be reviewed from time to time by senior management and revised as appropriate. See Attachment 1 for APA Group HSE Policy. 2.2 Planning Refer: PR-601 Procedure for Environmental Aspects and Impacts HSE044 Environmental Aspects and Impacts Register Page 7 of 40

8 Work activities and the associated environmental aspects that may be impacted on have been identified in the tender and planning stage using a broad brush approach and the Corporate form HSE044 Environmental Aspects and Impacts Register as a basis. This is required so that: allowance can be made for controls that may be required to minimise that impact; and aspects and impacts that present a higher risk to the environment are identified early on for later assessment and management. 2.3 Regulatory Requirements Refer: PR-312 Procedure for Control of Standards and Codes HSE046 Legal and Other Requirements Register Commonwealth Legislation The main applicable Commonwealth environmental legislation is: Aboriginal and Torres Strait Islander Heritage Protection Act 1984 (Cwlth) Environmental Protection and Biodiversity Conservation Act 1999 (Cwlth) New South Wales Legislation In New South Wales, the main applicable environmental legislation is: Environmental Planning and Assessment Act, 1979 (NSW) Protection of the Environment Operations Act, 1997 (NSW) The Threatened Species Conservations Act, 1995 (NSW) Native Vegetation Act, 2003 (NSW) Noxious Weeds Act, 1993 (NSW) Heritage Act, 1977 (NSW) Page 8 of 40

9 Page 9 of 40

10 Page 10 of 40

11 2.4 Objectives and Targets Refer: PR-602 Procedure for Environmental Objectives and Targets Table 1: Project Environmental Objectives & Targets Item Objectives Targets To take all practicable steps to prevent environmental and cultural heritage incidents in construction activities. To identify and comply with environmental regulations, laws and contractual requirements. To develop, implement and maintain an effective and efficient environmental management system. To increase environmental awareness amongst all employees. To support the continual improvement of company environmental performance. All Environmental & Cultural Heritage Incidents to be reported. Project environmental inspections conducted weekly (using Environmental Inspection Checklist - form ENV003). No Major or Catastrophic consequence from environmental incidents. No Prosecutions Arising from Environmental Incidents. Zero stop work orders. 80% or better in all Environmental Audits. All Project Personnel to complete a project induction session. All environmental incidents raised at Pre-start or Tool Box Meetings. Monthly HSE Committee meeting. The HSE Officer will report item 1 on HSE017 Monthly Project Safety Report. A copy of the report is forwarded to the WDS H&S Manager to which the Systems & Environmental Manager has access. The HSE Officer will also complete the Environmental Inspection Checklist (ENV003) on a weekly basis and forward a copy to the Environmental Coordinator and Systems & Environmental Manager. All other items will be reported by exception 1 on form HSE017 in the Other Information section. 2.5 Document Control & Records Refer: PR-110 Procedure for Archiving PR-310 Procedure for Document Control PR-311 Procedure for Management Review This EMP will be subject to regular review and updated in accordance with PR-311 and PR-310. Records that must be maintained to demonstrate compliance to this EMP are listed in Table 2: Environmental Records. 1 By exception is the practice whereby only the information that indicates a significant deviation of actual results/targets from the planned results/targets is reported. Page 11 of 40

12 Table 2: Environmental Records Record Responsibility for maintenance File / Record Location Report against Objectives and Targets HSE Officer At site Environmental Checklists HSE Officer At site Environmental Audits Environmental Manager Brisbane and Site Induction Records Training Manager Brisbane and Site Incident Reports HSE Officer Intranet and Site Complaints HSE Officer At site 2.6 Responsibilities This section sets out the environmental responsibilities of key Project positions Project Manager The Project Manager is responsible for all construction activities including planning, procedure approvals, execution of works and the implementation of this EMP. The Project Manager will be kept informed of environmental matters through the monthly reporting system. The Project Manager will liaise with the Client and various other regulatory authorities as required Construction / Area Managers The Construction / Area Managers will direct work in a manner that complies with all relevant environmental procedures, adheres to all legislative requirements and ensures that all environmental objectives associated with the Project are achieved. This includes implementation of this EMP and directing implementation of any rectification or improvement works identified by the HSE Officer HSE Officer Responsible for overseeing the implementation of this EMP, for conducting weekly inspections during the construction period (refer to Environmental Inspection Checklist ENV003). The HSE Officer will advise the Construction/Area Managers immediately of any rectification or improvements identified during the inspections. The HSE Officer will report the findings to the Project Manager at monthly intervals, through the monthly report. Environmental issues will be tool-boxed regularly Subcontractors and Service Providers Subcontractors and service providers will be selected taking into consideration client acceptance, past performance on WDS projects, and where appropriate and practical, the assessment of their environmental performance on other projects. Subcontractors and service providers are responsible for undertaking the contracted works in a way which meets regulatory requirements and which is consistent with relevant environmental licences, approvals and guidelines, and which achieves environmental specifications and commitments. Works must as a minimum meet the requirements of this EMP or, if applicable, those items specified in form SUP018 Environmental Requirements. Page 12 of 40

13 2.6.5 Employees All employees are responsible for the environmental performance of their activities and for complying with the management measures set out in this EMP. Employees have a general duty of care to ensure that no environmental harm results from their actions. Employees are responsible for reporting any environmental incidents in accordance with the incident reporting system (refer 2.10 Emergency Response and 2.11 Incident Management). 2.7 Training Refer: PR-701 Procedure for Training All Managers are responsible for ensuring that personnel under their control have the required competencies, skills and training to carry out their assigned tasks and for identifying additional training and competency requirements. Managers are responsible for ensuring training records are maintained. The Project Manager, in conjunction with environmental staff, will approve an induction program to be delivered to all personnel and subcontractors personnel involved in the project prior to commencement of any construction work on site. The program will address environmental safeguards, safety, emergency procedures and incident reporting and management. The program must address the environmental constraints identified in 4 Environmental Constraints of this EMP and the related control measures contained in 5 Environmental Management of Activities and 6 Documentation of this EMP. Nominated personnel will be issued with, and trained in, that documentation listed in Table 4 of section 5.2 Environmental Procedures prior to undertaking that activity. The Project Manager is responsible for ensuring that records are maintained for all Project-related training. Induction records shall be maintained for all training using form HSE007 HSE Induction Record. 2.8 Monitoring and Inspection The Construction / Area Managers, or their line management delegate, shall inspect all construction activities on a daily basis. The Area Managers (or delegate) shall complete weekly reports to the Project Manager. Monitoring will be carried out in accordance with any identified requirements for the work activities/location as required. Any environmental incidents must be immediately reported through the incident reporting system refer 2.11 Incident Management. 2.9 Auditing Refer: PR-303 Procedure for Audits Page 13 of 40

14 Audits provide lead indicators for potential incidents and provide important information for corrective action and review of procedures. Issues including non-conformances, observations and suggestions for improvement identified during audits will be recorded and corrective actions implemented. Internal audit results will be made available, with the agreement of the WDS General Manager, to government agencies and/or clients on request. The Client may audit the project at any convenient time as agreed with the Project Manager Emergency Response Refer: Q8291-PR-001_A_ERP Potential environmental emergencies shall be identified in accordance with PR-601 Procedure for Environmental Aspects and Impacts. Refer to 4.2 Potential Environmental Incidents. Refer to PR-207 Procedure for Emergency Response for additional information and the site-specific document Q291-PR-001_A_ERP Incident Management Refer: PR-202 Procedure for Incident Reporting & Investigation Incident reporting will be implemented to record any safety or environmental nonconformances or incidents. Incidents will be notified, investigated and followed up and, where relevant, corrective actions nominated in accordance with PR Community Liaison & Notifications All community issues and complaints shall be managed by the APA Lands Manager (Vladeo Maric on or ) WDS personnel shall remain polite and courteous in any dealings/communications with members of the general public. Complaints shall be passed on to the Client immediately; Should any potential Heritage items be found, works in the immediate vicinity will be suspended and the area will be flagged off - the Client will be contacted immediately; All inquiries shall be passed on to the Client within 24hrs; The quality form QUA002 Action Request shall be used to log any complaints. Action Requests will then be logged for close-out in the Action Request Register (QUA008); WDS shall not undertake works close to residents or stakeholders without prior consultation; and WDS employees will remain considerate and polite if approached by the general public or landholders and record all contacts. Page 14 of 40

15 2.13 Management Review Refer: PR-311 Procedure for Management Review WDS management will review project environmental management systems as part of the management system review meeting held in accordance with PR-311. This review shall be based on, but not limited to, consideration of environmental performance as measured against nominated environmental objectives and targets (refer 2.4 Objectives & Targets) audit results feedback from the Client, internal personnel, regulatory authorities and other external parties (including complaints from the public) status of environmental non-conformances, corrective and preventive actions any outstanding action items from previous reviews changes to legislation or environmental aspects/impacts any recommendations/suggestions for improvement. The review shall cover the environmental management system, both Corporate and project. Minutes of this meeting shall be taken with resulting action items recorded, including the implementation timeframe. Page 15 of 40

16 3 Environmental Management Sub-plans 3.1 Air Quality Management Plan (AQMP) Objective To minimise impact and prevent excessive dust and odour emissions; no community complaints. Potential Impacts Impact Mitigation Measures Monitoring Dust from excavation, and backfilling Dust from dirt on roads Dust from ROW Greenhouse gas emissions from operating plant and equipment Dust received at sensitive receptors (nearby residents) Fumes from welding rods Water trucks/sprays as required. Note that water cannot be applied during shading and padding operations however, sprays can be used before and after. Excavation with limited soil free fall. Water trucks/sprays for dirt roads as required. Restricted/limited access only approved access roads used. All vehicles to remain within approved vehicular areas. Minimise areas of vegetation clearing and disturbed soils during construction where possible. All vehicles travel at 40km/hr or less on the ROW, 20km/hr max when driving past a work site (walking speed). Progressive rehabilitation of disturbed areas where feasible. Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioning running. Vehicles to be properly serviced and maintained. Speed reductions around sensitive receptors if required. Community complaints to be referred to the Client Suitable ventilation or blower/exhaust fans shall be used in confined spaces. Welders shall wear fume masks if required. Daily visual assessment of air emissions by supervisors Weekly inspections Incident reports (provided to APA as required) 3.2 Soil & Water Management Plan (SWMP) Objective No contamination of soil. No incidents of water contamination or uncontrolled runoff. Potential Impacts Impact Mitigation Measures Contamination and mixing of different soil horizons Compaction of topsoil Erosion of topsoil Bed/bank material, topsoil and subsoil will be kept separate and managed appropriately with erosion and sediment controls. All vehicles to drive on designated roads and access tracks. No vehicles shall be permitted to drive over topsoil stockpiles, nor park under trees unless in a designated parking area. Topsoil stockpiles will be placed in suitable locations and not in drainage channels or on the banks of watercourses. Where required, stockpiles shall be shaped to prevent erosion from surface water runoff, or have a diversion channel or sediment fence installed in appropriate locations. Page 16 of 40

17 Monitoring Contamination or pollution of soil or water Contamination of surrounding land by topsoil or sub-soil laden runoff Use of surface or groundwater water from unapproved or unlicensed sources Erosion of riparian soils Soil erosion and contamination through sedimentation All hazardous substances stored in accordance with the relevant MSDS and applicable regulations. Refuelling operations shall be conducted at least 50m away from waterways with spill kits on hand. Spill response training provided. No hazardous substances or possible pollutants stored near water bodies. Drip-trays shall be used where necessary. Contaminated soils shall be contained (e.g. bagged or excavated) and disposed of at a licensed facility. Drilling mud shall be contained on site and recovered and reused where practicable. Runoff from stockpiles shall be prevented by sediment fences to the extent required. Where required, stockpiles shall be shaped to prevent erosion from surface water runoff, or have a diversion channel or sediment fence installed in appropriate locations. Potable water used for construction to be sourced from standpipe at existing mains supply. Horizontal directional drilling where specified (Billabung Creek). Minimise period riparian soils disturbed. Minimise ROW width in areas of sensitive or riparian vegetation where possible (except for watercourse crossings with steep banks) Use geotextile or similar on exposed areas during heavy rain events or flooding where practical. Reinstatement as soon as practicable. Divert clean surface water runoff using surface water diversion berms (or similar) in steep sloping areas and where natural drainages have been altered to keep it away from the ROW and other work areas. Installation of erosion & sediment controls (e.g. berms / sediment fences) on the down slope of stockpiles and between construction areas and watercourses to minimise sedimentation (particularly if heavy rainfall is forecast). Water pumped out of excavations to be managed appropriately e.g. passed through a filter sock; released onto grassed filter strips; or trucked away for disposal into an approved facility Stormwater inlet protection and sediment controls. Vehicles to use designated roads and access tracks to minimise erosion and sedimentation. Implement open trench with flow diversions & other appropriate measures at crossings where water flows are very low or not present. Implement flow diversions when water flows increase (e.g. >1000L/s) Progressive rehabilitation of disturbed areas where feasible. Weekly inspections. Incident reports (provided to APA as required). Sampling and analysis of extracted or wastewater (if required). Page 17 of 40

18 3.3 Erosion & Sediment Control Management Plan (ESCMP) Objective To minimise erosion and sediment loads in runoff water. Containment of sediment inside work areas. Potential Impacts Impact Mitigation Measures Monitoring Erosion of work area caused by rain event Sediment leaving the stockpile area damaging flora and fauna Erosion of riparian soils Soil erosion and contamination through sedimentation Sedimentation damage caused by pump-out water Sediment plumes resulting in a poor visual aspect Divert runoff around work areas. Control runoff through work areas through use of erosion and sediment controls. Stormwater inlet protection and sediment controls. Stockpile protection for loose materials. Installation of erosion & sediment controls (e.g. berms / sediment fences) on the down slope of stockpiles Horizontal directional drilling where specified (Billabung Creek). Minimise period riparian soils disturbed. Minimise ROW width in areas of sensitive or riparian vegetation where possible (except for watercourse crossings with steep banks) Use geotextile or similar on exposed areas during heavy rain events or flooding where practical. Reinstatement as soon as practicable. Divert clean surface water runoff using surface water diversion berms (or similar) in steep sloping areas and where natural drainages have been altered to keep it away from the ROW and other work areas. Installation of erosion & sediment controls (e.g. berms / sediment fences) on the down slope of stockpiles and between construction areas and watercourses to minimise sedimentation (particularly if heavy rainfall is forecast). Water pumped out of excavations to be managed appropriately e.g. passed through a filter sock; released onto grassed filter strips. Stormwater inlet protection and sediment controls. Vehicles to use designated roads and access tracks to minimise erosion and sedimentation. Implement open trench with flow diversions & other appropriate measures at crossings were water flows are very low or not present. Implement flow diversions when water flows increase (e.g. >1000L/s) Progressive rehabilitation of disturbed areas where feasible. Pump-out water to be passed through a filter sock; released onto grassed filter strips; or Implement sediment controls listed above. Inspections before and after rain events. Weekly inspections. Incident/complaint reporting (provided to APA as required) Page 18 of 40

19 3.4 Flora & Fauna Management Plan (FFMP) Objective No incidents involving flora or fauna species Minimise clearing and disturbance to local wildlife populations. No net increase in declared weed population. Potential Impacts Impact Mitigation Measures Fauna and livestock injured by fall into, or drowning in flooded excavations Fauna injured during clear and grade operations Flora damaged or destroyed Spread of weeds Fauna / livestock struck by vehicles Minimise time excavations are left open backfill as soon as practical. Trench breaks where fauna / livestock tracks cross the trench line and barricades placed to direct fauna / livestock to these. For long trenches drop in tree branches (where possible) to assist fauna to exit the trench. Barricade excavations as much as practical. Keep excavations dry. No food scraps to be left around, or fauna fed. Fauna rescue service to be contacted in case of injured fauna. Appropriate control measures will be taken if working in the vicinity of livestock (for example, landowner advised and stock relocated to another paddock). Conduct pre-clearing surveys ahead of vegetation clearing operations. Retain and protect hollow-bearing trees whenever possible. Trees should be felled 48 hours before removal from easement to allow fauna to relocate. Removal of trees outside of known breeding seasons YWL Project to be completed over Winter Placement of site compounds/offices, parking areas, stockpiles and other ancillary works areas in locations already cleared and away from waterways or sensitive areas. Limit clearing to approved areas. Avoid removal of large paddock trees wherever feasible. Where appropriate restrict access from construction area into adjacent areas of native vegetation and waterways. Minimise clearing of riparian vegetation and minimise width of ROW where possible. Site personnel to be inducted into working around environmentally sensitive areas. All cleared trees in excess of 150mm in diameter to be placed in nearby areas within road reserves or riparian areas to provide habitat for native fauna (woody debris should also be relocated). Restoration work to be carried out in accordance with restoration procedures and the contract. Hollow-bearing trees in Old Sydney Road to Ulandra Creek area and the road reserve at Illabo meter station to be avoided if possible. If removed, all hollows must be reattached to healthy trees within the area (if hollows area damaged then nesting boxes suitable for Super Parrots should be installed). Weeds in work areas to be identified before clearing. Weeds to be removed if required in accordance with recommended practices. All plant and equipment to be cleaned before entering the project. Clean down bays will be used. All plant and equipment shall be thoroughly cleaned before leaving nominated areas. Implement and monitor speed limits. Implement in-vehicle monitoring systems (IVMS). Page 19 of 40

20 Monitoring Bushfires Incident reports (provided to APA as required) Monitor IVMS reports Completed Weed Inspection Checklists (ENV004) No open fires. No unnecessary build-up of flammable material in working areas, with vegetation and other flammable material stockpiled well clear of hot work activities. No burning of timber/vegetation stockpiles. If burning of weed material should be required, permits shall be obtained from the fire department prior to carrying out any such activity. Vehicle and machinery exhaust systems shall be inspected regularly for leaks and accumulated vegetation debris. Fuel systems shall also be inspected for leaks. Water trucks (also used for dust suppression) will be available for use as fire trucks in the event of fire. All vehicles will be equipped with portable fire extinguishers. Fire extinguishers and a water tank will be available to the welding crew. Hot work permits used where required with no hot work permitted on days of Total Fire Ban. Emergency response procedure developed and communicated at Toolbox or Prestart Meetings. 3.5 Noise Management Plan (NMP) Objective To minimise noise generation; no community complaints. Potential Impacts Impact Mitigation Measures Monitoring All equipment Construction equipment excavators; concrete trucks, generators, padding machines etc. Light vehicles and delivery trucks Notifications of impending works provided to residents by APA. Properly maintained equipment with effective exhaust systems Operate only within allowable working hours (6am-6pm 7 days a week). Disable reversing alarms and replace them with spotters if necessary in urban environments. Program loudest operations for the time of day likely to cause least impact wherever practicable. Restrict vehicle operation and deliveries to inside working hours. Noise level monitoring if required (in response to community complaints and at the request of DECCW). Weekly inspections. Incident reports (provided to APA as required) 3.6 Traffic Management Plan (TMP) Refer to document (to be advised) for detailed Traffic Management Plan. Page 20 of 40

21 3.7 Cultural Heritage Management Plan (CHMP) Objective No cultural heritage complaints or incidents. Potential Impacts Impact Mitigation Measures Monitoring Damage to unidentified cultural heritage items. Damage to known cultural heritage items Unreported damage to cultural heritage items Awareness training on identifying cultural heritage items. Cultural heritage monitors used wherever required. Should any potential Heritage items be found, works in the immediate vicinity will be suspended and the area will be flagged off - the Client will be contacted immediately; All identified cultural heritage items protected as agreed with traditional owners. (Some traditional owners prefer not to advertise some cultural heritage sites.) Work crews advised at Prestart Meetings of cultural heritage protection requirements. Cessation of work if a cultural heritage item is damaged, or potentially may have been damaged (for example, a near miss incident). Notification procedure for advising Client s Representative in place. Incident/complaint reporting (provided to APA as required) Client to be contacted immediately if suspected Heritage items discovered 3.8 Landscape & Rehabilitation Management Plan (LRMP) Objective Minimise re-work along ROW. Successful rehabilitation of disturbed areas. Potential Impacts Impact Mitigation Measures Monitoring Soil erosion and sedimentation of waterways or drainage lines Contamination and mixing of different soil horizons Spread of weeds Minimise ground disturbance during rehabilitation (as far as practicable). Rehabilitation to be conducted in order to ensure vegetation is returned to similar species, densities and compositions as the pre-clearing state. Installation and maintenance of erosion and sediment control measures (e.g. silt fencing around exposed areas and stockpiles). Surfaces to be re-contoured to match surrounding land profiles and natural drainage lines to be reinstated. Progressive rehabilitation of disturbed areas. Where possible / required install stock proof fencing to minimise access and maximise success of rehabilitation. Bed/bank material, topsoil and subsoil will be kept separate and replaced in the correct order during reinstatement.. Weed control measures to be implemented during construction and rehabilitation works if required. All plant and equipment to be cleaned before leaving the project. Incident/complaint reporting (provided to APA as required). Weekly inspections. Page 21 of 40

22 3.9 Emergency Response Plan (ERP) Refer to document Q8291-PLN-001_A_ERP for detailed Emergency Response Plan Waste Management Plan (WMP) Refer to document Q8291-PLN-004_A_WasteMgtPlan-APA for detailed Waste Management Plan. 4 Environmental Constraints 4.1 Sensitive Areas The ROW corridor will be as per the drawings and will be minimised wherever possible to minimise the impact on the environment. Localised sensitive areas (as identified by AECOM in the Environmental Assessment Report) include: Remnant woodland at Bethungra Mountain and Billabung Creek Hollow-bearing trees located within the Old Sydney Road to Ulandra Creek area and within the road reserve at Illabo metering station. 4.2 Potential Environmental Incidents Potential environmental incidents shall be determined from Client work documentation and previous experience of similar pipeline projects. Work in new areas shall give consideration to identifying potential environmental incidents associated with work in the following activities: known cultural heritage areas activities involving hydrocarbons (for example, refuelling operations) and hazardous substances open cut road and track crossings open cut watercourse crossings other facility crossings (e.g. gas, oil, water, power and telecommunication lines) horizontal directional drilling and road boring hydrotesting steep slopes susceptible to erosion the spread of weeds community impacts such as increased traffic hazards. 4.3 Special Construction Considerations Suitable and approved construction procedures shall be prepared for: Page 22 of 40

23 open cut road and track crossings open cut watercourse crossings other facility crossings horizontal directional drilling and road boring hydrotesting. Environmental management issues associated with these activities shall be included in these procedures. 4.4 Cultural Heritage Cultural heritage issues will be managed by the Client. Page 23 of 40

24 Access & Site Preparation Office Mgmt. Clear & Grade Trenching Pipe String & Bending Welding Laying In & Backfilling Clean Up & Reinstatement Fencing & Gates Pre-Cleaning & Gauging Hydrotesting Dewatering, Cleaning & Drying Calliper Pigging EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Table 3: Applicable Environmental Aspects by Work Activities Work Activity Comments Environmental Aspect/Value Community Impacts Noise Community Impacts Traffic Management Community Impacts - Property Access & Gen. Cultural Heritage Indigenous & European Air Quality Yes No Yes Yes Yes Yes A Yes Yes No Yes No Yes Yes A Welding fumes No No No No No No No No No No No No No Remote location and farm houses Yes Yes Yes Yes No No Yes Yes No No No No No Yes No Yes Yes Yes No Yes Yes No No No No No Yes No Yes Yes No No No No No No No No No Energy Management No Yes No No No Yes No No No No No No No Erosion & Sediment Control Yes D Yes Yes Yes Yes No Yes Yes No No No No No Flora & Fauna No No Yes Yes No No Yes Yes Yes No No No No Flora & Fauna (Pest Management) Yes F Yes Yes Yes Yes No Yes Yes No No No No No Soil Quality No No Yes Yes No No Yes Yes No No No No No Waste Management No Yes No No No Yes G No No No Yes Yes Yes No Water Quality No Yes Yes Yes No No Yes Yes No No No Yes No B Delivery vehicles; project light vehicles C Not considered an issue after site establishment D Erosion & sed. controls to be maintained throughout construction process E May be an issue if fauna enter site F An issue where vehicles travel from weed areas to non-weed areas G Welding rod stubs; abrasive grit; field joint coating materials The highest risk areas are generally considered to be: Clear and grade: erosion and sediment control; flora and fauna; spread of weeds; and water quality Trenching: erosion and sediment control; flora and fauna Laying and Backfilling: soil quality Clean Up and Reinstatement: soil quality; water quality Fencing and Gates: flora and fauna Page 24 of 40

25 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D 5 Environmental Management of Activities 5.1 Introduction Refer: PR-603 Procedure for Environmental Controls The highest risk areas are generally considered to be: camps, laydown areas and stores refuelling and trip hazards; working with electrical equipment (power tools, welders, etc) noise; working with hazardous substances spillage; clear and grade flora/fauna, cultural heritage objects/issues, weeds; trenching soil disturbance; fauna; hydrostatic testing high pressure water release, contamination from chemicals disposed to land or water; or possibly contaminated (e.g. saline) hydrotest water itself (regulated waste); HDD creek crossings escape of drilling mud and noise; and open cut creek crossings excessive sedimentation. Management of activities that have or may have an environmental impact shall be in accordance with the Environmental Management Sub-plans (Section 3), Environmental Procedures and the relevant sections below and in accordance with the principles of risk management as documented in PR-603 Procedure for Environmental Controls. 5.2 Environmental Procedures Crew and task specific environmental procedures have been developed for each crew on the project. The following table is provided as a guideline showing who is required to receive a copy of each procedure. Procedure General Construction Survey & Fencing Clear & Grade and Reinstatement Trenching & Excavation Table 4: Environmental Procedures Responsibility for Acceptance & Implementation All Crew Supervisors Surveying Subcontractor and Fencing Supervisor Clear & Grade Supervisor Reinstatement Supervisor Trenching & Excavation /Tie-ins Supervisor Delivery During site specific inductions Prior to commencement of surveying and fencing Prior to commencement of clearing Prior to commencement of reinstatement Prior to trenching, excavations or tie-ins Lowering-in & Backfill Lowering-in & Backfill Supervisor Prior to lowering-in Hydrotesting Hydrotesting Supervisor Prior to hydrotesting Erosion & Sediment Control Clear & Grade / Reinstatement / Excavation / Trenching Supervisors During site specific inductions Document Control\ Manuals and Plans\8291- PLN- Page 25 of 40

26 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Crew supervisors will conduct a training session by running through relevant sections of the procedure at a Prestart Meeting prior to commencement of that activity. Prestart Meetings are especially important for communicating departures from normal operating procedures, such as a reduced width in the Right of Way, identified cultural heritage items etc. 5.3 Access and Worksite Preparation Env. Aspect/Value The environmental values that could be affected by this work activity are: Community impacts Cultural heritage Erosion and sediment control Flora and fauna pest management Waste management Potential Impacts Impact Recommended Control Methods Air Quality Dust from dirt on roads Water trucks/sprays for dirt roads as required. Restricted/limited access only approved access roads used. All vehicles to remain within approved vehicular areas. Community Impacts Traffic Management Community Impacts Property Access & General Cultural Heritage Indigenous and European Erosion and Sediment Control Flora and Fauna Pest Management Greenhouse gas emissions from operating plant and equipment Disruption to local traffic; increased risk of traffic accidents Unauthorized access by members of the public Community grievances not addressed Damage to cultural heritage items Erosion of work area caused by rain event Spread of weeds Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioning running. Vehicles to be properly serviced and maintained. Approved Traffic Management Plan for works on roadways Signage & traffic controllers as per approved Traffic Management Plan Road closures planned to be outside peak hour traffic Affected residents notified. Minimise length of disruption by completing works as soon as practical. Clear signage and fences / barricades to separate the community from work areas. Implement and monitor community grievance procedure. Awareness training on identifying cultural heritage items. Cultural heritage monitors used if required. Work crews advised at Prestart Meetings of cultural heritage protection requirements. Cessation of work if a cultural heritage item is damaged, or potentially may have been damaged (for example, a near miss incident). Divert runoff around work areas. Control runoff through work areas through use of erosion and sediment controls. Stormwater inlet protection and sediment controls. Weeds to be removed if required in accordance with recommended practices. All plant and equipment to be cleaned before entering the project. Clean down bays and Weed Inspection Checklists will be used. Document Control\ Manuals and Plans\8291- PLN- Page 26 of 40

27 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D 5.4 Office Management Env. Aspect/Value The environmental values that could be affected by this work activity are: The community. Energy management. Erosion and sediment control. Waste management. Potential Impacts Impact Recommended Control Methods Community Impacts Traffic Management Energy Management Erosion and Sediment Control Flora and Fauna - Pest Management Waste Management Disruption to local traffic; increased risk of traffic accidents Community grievances not addressed Excessive use of energy Excessive consumption of fuel Erosion of work area caused by rain event Contamination of surface water from hydrocarbon or hazardous substance spill Contamination of surface water from contaminated wash-down water Increase in annoying insect population for example, mosquitoes and flies Excessive generation of waste Generation of regulated waste Approved Traffic Management Plan for works on roadways Signage & traffic controllers as per approved Traffic Management Plan Road closures planned to be outside peak hour traffic Affected residents notified. Minimise length of disruption by completing works as soon as practical. Implement and monitor community grievance procedure. Power turned off when not required for work, construction, safety or security purposes. Power saving set on computers and printers. Minimise use of air conditioners. Minimise use or diesel and petrol powered generators. Divert runoff around work areas. Control runoff through work areas through use of erosion and sediment controls. Stormwater inlet protection and sediment controls. No refuelling of plant and equipment near watercourses. Spill kit available during refuelling operations. Hydrocarbons to be stored in suitably sized and bunded areas and handled in accordance with the AS 1940 The storage and handling of flammable and combustible liquids. Hydrocarbons and hazardous substances to be stored in suitably sized and bunded areas and handled in accordance with the MSDS. Wash-down only in approved locations. Containment of wash-down runoff. Disposal of wash-down water by approved procedure. Cover all food wastes until prompt disposal in an approved manner. No free-standing water containers emptied, surface drainage effective Bins for general waste and recyclables to be conveniently located. Housekeeping, clean up and waste removal undertaken on a regular basis. Regulated material waste product stored prior to removal/disposal shall be in accordance with the MSDS. Removal/disposal of regulated waste to approved/licensed facilities shall be in accordance with regulations and conducted by authorized personnel. Recyclable regulated waste shall be disposed of by approved contractors to licensed recycling stations. Document Control\ Manuals and Plans\8291- PLN- Page 27 of 40

28 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Water Quality Incorrect disposal of waste Excessive use of potable water Waste must be disposed of at the appropriate facility. Regulated waste will be disposed of in accordance with local government and regulatory authority requirements with records of such disposal maintained as required. Install water saving appliances where practical. Maintain all water fixtures including toilets and taps. 5.5 Clear and Grade Env. Aspect/Value The environmental values that could be affected by this work activity are: Air quality. The Community. Cultural heritage. Erosion and sediment control. Flora and fauna. Flora and fauna pest management. Soil quality. Water quality. Potential Impacts Impact Recommended Control Methods Air Quality Community Impacts Traffic Management Community Impacts Property Access and General Cultural Heritage Indigenous and European Dust from excavation, and backfilling Dust from dirt on roads Greenhouse gas emissions from operating plant and equipment Disruption to local traffic; increased risk of traffic accidents Disruption to the community and local residents Unauthorized access by members of the public Community grievances not addressed Damage to unidentified cultural heritage items. Damage to known cultural heritage items Water trucks/sprays as required. Water trucks/sprays for dirt roads as required. Runoff to be prevented from entering the stormwater system. Restricted/limited access only approved access roads used. All vehicles to remain within approved vehicular areas. Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioner running. Vehicles to be properly serviced and maintained. Approved Traffic Management Plan for works on roadways Signage & traffic controllers as per approved Traffic Management Plan Road closures planned to be outside peak hour traffic Affected residents notified. Minimise length of disruption by completing works as soon as practical. Minimise length of time access is restricted. Parking of construction and delivery vehicles in designated areas. Minimise the number of construction vehicles. Notify affected residents. Clear signage and fences / barricades to separate the community from work areas. Notification in local newspapers or by letter drop if required. Implement and monitor community grievance procedure. Awareness training on identifying cultural heritage items. Cultural heritage monitors used wherever required. Cessation of work if a potential cultural heritage item is discovered. Work crews advised at Prestart Meetings of cultural heritage protection requirements. Cessation of work if a cultural heritage item is damaged, or potentially may be damaged (for example, a near miss incident). Document Control\ Manuals and Plans\8291- PLN- Page 28 of 40

29 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Erosion and Sediment Control Flora and Fauna Flora and Fauna - Pest Management Soil Quality Unreported damage to cultural heritage items Erosion of work area caused by rain event Sediment leaving the stockpile area damaging flora and fauna Contamination of surface water from hydrocarbon or hazardous substance spill Flora damaged or destroyed Fauna / livestock struck by vehicles Bushfires Spread of weeds Contamination of topsoil by sub-soil Contamination or pollution of soil Notification procedure for advising Client s Representative in place. Divert runoff around work areas. Control runoff through work areas through use of erosion and sediment controls. Stormwater inlet protection and sediment controls. Stockpile protection for loose materials. Stockpile management. Sediment erosion controls. No refuelling of plant and equipment near watercourses. Spill kit available during refuelling operations. Limit clearing to approved areas. Removal of large paddock trees to be avoided where possible. All cleared trees in excess of 150mm to be placed in nearby areas within road reserves or riparian areas to provide habitat for fauna. Hollow-bearing trees in the Old Sydney to Ulandra Creek area and the road reserve at Illabo metering station to be avoided if possible. If removed, all hollows must be reattached to healthy trees within the area. Site personnel to be inducted into working around environmentally sensitive areas. Implement and monitor speed limits. Implement in-vehicle monitoring systems (IVMS) if suitable. No open fires. No unnecessary build-up of flammable material in working areas, with vegetation and other flammable material stockpiled well clear of hot work activities. No burning of timber/vegetation stockpiles. If burning of weed material should be required, permits shall be obtained from the fire department prior to carrying out any such activity. Vehicle and machinery exhaust systems shall be inspected regularly for leaks and accumulated vegetation debris. Fuel systems shall also be inspected for leaks. Water trucks (also used for dust suppression) will be available for use as fire trucks in the event of fire. All vehicles will be equipped with portable fire extinguishers. Emergency response procedure developed and communicated at Toolbox or Prestart Meetings. Weeds in work areas to be identified before clearing. Weeds to be removed if required in accordance with recommended practices. All plant and equipment to be cleaned before entering the project. Clean down bays and Weed Inspection Checklists will be used. All plant and equipment shall be thoroughly cleaned before leaving nominated areas. Topsoil shall be stored and stockpiled separately from subsoil. All hazardous substances stored in accordance with the relevant MSDS and applicable regulations. Refuelling operations shall be conducted away from waterways with spill kits on hand. Document Control\ Manuals and Plans\8291- PLN- Page 29 of 40

30 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Water Quality Contamination of surrounding land by topsoil or sub-soil laden runoff Loss of topsoil Compaction of topsoil Erosion of riparian soils Contamination through sedimentation Contamination through pollution Runoff from stockpiles shall be prevented by sediment fences to the extent required. Topsoil stockpiles will be placed in suitable locations and not in drainage channel or on the banks of watercourses. Where required, stockpiles shall be shaped to prevent erosion from surface water runoff, or have a diversion channel or sediment fence installed in appropriate locations. All vehicles to drive on designated roads and access tracks. No vehicles shall be permitted to drive over topsoil stockpiles, nor park under trees unless in a designated parking area. Minimise period riparian soils disturbed. Use geotextile or similar on exposed areas during heavy rain events or flooding where practical. Reinstatement and revegetation. Divert other area runoff around work areas. Control runoff through work areas through use of erosion & sediment controls. Refuelling operations shall be conducted away from water bodies. 5.6 Trenching Env. Aspect/Value The environmental values that could be affected by this work activity are: Air Quality Community Impacts Traffic Management Community Impacts - Property Access & General Cultural Heritage Indigenous & European Erosion & Sediment Control Flora & Fauna Flora & Fauna (Pest Management) Soil Quality Water Quality Potential Impacts Impact Recommended Control Methods Air Quality Community Impacts Traffic Management Dust from excavation, and backfilling Dust from dirt on roads Greenhouse gas emissions from operating plant and equipment Disruption to local traffic; increased risk of traffic accidents Water trucks/sprays as required. Water trucks/sprays for dirt roads as required. Runoff to be prevented from entering the stormwater system. Restricted/limited access only approved access roads used. All vehicles to remain within approved vehicular areas. Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioner running. Vehicles to be properly serviced and maintained. Approved Traffic Management Plan for works on roadways Signage & traffic controllers as per approved Traffic Management Plan Road closures planned to be outside peak hour traffic Affected residents notified. Minimise length of disruption by completing works as soon as practical. Document Control\ Manuals and Plans\8291- PLN- Page 30 of 40

31 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Community Impacts Property Access and General Cultural Heritage Indigenous and European Energy Management Erosion and Sediment Control Flora and Fauna Disruption to the community and local residents Unauthorized access by members of the public Community grievances not addressed Damage to unidentified cultural heritage items. Damage to known cultural heritage items Unreported damage to cultural heritage items Excessive consumption of fuel Erosion of work area caused by rain event Sediment leaving the stockpile area damaging flora and fauna Sedimentation damage caused by pump-out water Fauna and livestock injured by fall into, or drowning in flooded excavations Flora damaged or destroyed Fauna / livestock struck by vehicles Minimise length of time access is restricted. Minimise the number of construction vehicles. Notify affected residents. Clear signage and fences / barricades to separate the community from work areas. Implement and monitor community grievance procedure. Awareness training on identifying cultural heritage items. Cessation of work if a potential cultural heritage item is discovered. All identified cultural heritage items protected as agreed with traditional owners. (Some traditional owners prefer not to advertise some cultural heritage sites.) Work crews advised at Prestart Meetings of cultural heritage protection requirements. Cessation of work if a cultural heritage item is damaged, or potentially may be damaged (for example, a near miss incident). Notification procedure for advising Client s Representative in place. Minimise use or diesel and petrol powered generators. Minimise use of vehicles. Utilize buses for people transportation. Divert runoff around work areas. Control runoff through work areas through use of erosion and sediment controls. Stockpile protection for loose materials. Stockpile management. Sediment erosion controls. Pump-out water to be passed through a filter sock; or released onto grassed filter strips. Minimise time excavations are left open backfill as soon as practical. Trench breaks where fauna / livestock tracks cross the trench line and barricades placed to direct fauna / livestock to these. Barricade excavations as much as practical. Keep excavations dry. No food scraps to be left around, nor fauna fed. Fauna rescue service to be contacted in case of injured fauna. Appropriate control measures will be taken if working in the vicinity of livestock (for example, landowner advised and stock relocated to another paddock). Limit clearing to approved areas. Site personnel to be inducted into working around environmentally sensitive areas. Restoration work to be carried out in accordance with restoration procedures and the contract. Implement and monitor speed limits. Implement in-vehicle monitoring systems (IVMS) if suitable. Document Control\ Manuals and Plans\8291- PLN- Page 31 of 40

32 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Flora and Fauna - Pest Management Soil Quality Water Quality Spread of weeds Contamination of topsoil by sub-soil Contamination or pollution of soil Contamination of surrounding land by topsoil or sub-soil laden runoff Loss of riparian topsoil Contamination through sedimentation All plant and equipment to be cleaned before entering the project. Clean down bays and Weed Inspection Checklists will be used. All plant and equipment shall be thoroughly cleaned before leaving nominated areas. Topsoil shall be stored and stockpiled separately from subsoil. All hazardous substances stored in accordance with the relevant MSDS and applicable regulations. Refuelling operations shall be conducted away from waterways with spill kits on hand. Runoff from stockpiles shall be prevented by sediment fences to the extent required. Horizontal directional drilling where specified. Stop trenching well back from waterways until ready for open-cut crossing as required. Minimise period riparian soils disturbed. Use geotextile or similar on exposed areas during heavy rain events or flooding where practical. Divert other area runoff around work areas. Control runoff through work areas through use of erosion & sediment controls Water pumped out of excavation to be managed appropriately e.g. passed through a filter sock; released onto grassed filter strips; or trucked away for disposal into an approved facility. 5.7 Pipe Stringing and Bending Env. Aspect/Value The environmental values that could be affected by this work activity are: Air Quality Community Impacts Traffic Management Community Impacts - Property Access & General Erosion & Sediment Control Flora & Fauna (Pest Management) Potential Impacts Impact Recommended Control Methods Air Quality Dust from dirt on roads Water trucks/sprays for dirt roads as required. Runoff to be prevented from entering the stormwater system. Restricted/limited access only approved access roads used. All vehicles to remain within approved vehicular areas. Community Impacts Traffic Management Greenhouse gas emissions from operating plant and equipment Disruption to local traffic; increased risk of traffic accidents Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioner running. Vehicles to be properly serviced and maintained. Approved Traffic Management Plan for works on roadways Signage & traffic controllers as per approved Traffic Management Plan Road closures planned to be outside peak hour traffic Affected residents notified. Minimise length of disruption by completing works as soon as practical. Document Control\ Manuals and Plans\8291- PLN- Page 32 of 40

33 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Community Impacts Property Access and General Erosion and Sediment Control Flora and Fauna - Pest Management Disruption to the community and local residents Unauthorized access by members of the public Community grievances not addressed Erosion of work area caused by rain event Spread of weeds Minimise length of time access is restricted. Minimise the number of construction vehicles. Notify affected residents. Clear signage and fences / barricades to separate the community from work areas. Notification in local newspapers or by letter drop if required. Implement and monitor community grievance procedure. Divert runoff around work areas. Control runoff through work areas through use of erosion and sediment controls. All plant and equipment to be cleaned before entering the project. Clean down bays and Weed Inspection Checklists will be used. All plant and equipment shall be thoroughly cleaned before leaving nominated areas. 5.8 Welding Env. Aspect/Value The environmental values that could be affected by this work activity are: Air Quality Community Impacts - Property Access & General Energy Management Waste Management Potential Impacts Impact Recommended Control Methods Air Quality Community Impacts Property Access and General Energy Management Waste Management Greenhouse gas emissions from operating plant and equipment Fumes from welding rods Disruption to the community and local residents Unauthorized access by members of the public Community grievances not addressed Excessive consumption of fuel Welding rod stubs, abrasive grit & field joint coating materials Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioner running. Vehicles to be properly serviced and maintained. Suitable ventilation or blower/exhaust fans shall be used in confined spaces. Welders shall wear fume masks if required. Minimise length of time access is restricted. Parking of construction and delivery vehicles in designated areas. Minimise the number of construction vehicles. Notify affected residents. Clear signage and fences / barricades to separate the community from work areas. Notification in local newspapers or by letter drop if required. Implement and monitor community grievance procedure. Minimise use of diesel and petrol powered generators. Minimise use of vehicles. Utilize buses for people transportation. Provision of waste bins for welding rod stubs near the welders. Selection of least hazardous abrasive grit and field joint coating materials which meet the specification. Provision of suitable receptacles for field joint coating material waste Provision of MSDS s for all materials and management of materials and waste in accordance with the MSDS. Document Control\ Manuals and Plans\8291- PLN- Page 33 of 40

34 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D 5.9 Laying and Backfilling Env. Aspect/Value The environmental values that could be affected by this work activity are: Air Quality Community Impacts Traffic Management Community Impacts - Property Access & General Erosion & Sediment Control Flora & Fauna Flora & Fauna (Pest Management) Soil Quality Water Quality Potential Impacts Impact Recommended Control Methods Air Quality Dust from backfilling Water trucks/sprays as required. Community Impacts Traffic Management Community Impacts Property Access and General Erosion and Sediment Control Dust from dirt on roads Greenhouse gas emissions from operating plant and equipment Disruption to local traffic; increased risk of traffic accidents Disruption to the community and local residents Unauthorized access by members of the public Community grievances not addressed Erosion of work area caused by rain event Sediment leaving the stockpile area damaging flora and fauna Sedimentation damage caused by pump-out water Water trucks/sprays for dirt roads as required. Runoff to be prevented from entering the stormwater system. Restricted/limited access only approved access roads used. All vehicles to remain within approved vehicular areas. Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioner running. Vehicles to be properly serviced and maintained. Approved Traffic Management Plan for works on roadways Signage & traffic controllers as per approved Traffic Management Plan Road closures planned to be outside peak hour traffic Affected residents notified. Minimise length of disruption by completing works as soon as practical. Minimise length of time access is restricted. Minimise the number of construction vehicles. Notify affected residents. Clear signage and fences / barricades to separate the community from work areas. Implement and monitor community grievance procedure. Divert runoff around work areas. Control runoff through work areas through use of erosion and sediment controls. Stockpile protection for loose materials. Stockpile management. Sediment erosion controls. Pump-out water to be passed through a filter sock; or released onto grassed filter strips. Document Control\ Manuals and Plans\8291- PLN- Page 34 of 40

35 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Flora and Fauna Flora and Fauna - Pest Management Soil Quality Water Quality Fauna and livestock injured by fall into, or drowning in flooded excavations Flora damaged or destroyed Fauna / livestock struck by vehicles Spread of weeds Contamination of topsoil by sub-soil Contamination or pollution of soil Contamination of surrounding land by topsoil or sub-soil laden runoff Loss of riparian topsoil Contamination through sedimentation Minimise time excavations are left open backfill as soon as practical. Barricade excavations as much as practical. Keep excavations dry. No food scraps to be left around, or fauna fed. Fauna rescue service to be contacted in case of injured fauna. Appropriate control measures will be taken if working in the vicinity of livestock (for example, landowner advised and stock relocated to another paddock). Site personnel to be inducted into working around environmentally sensitive areas. Restoration work to be carried out in accordance with restoration procedures and the contract. Implement and monitor speed limits. Implement in-vehicle monitoring systems (IVMS) if suitable. All plant and equipment to be cleaned before entering the project. Clean down bays and Weed Inspection Checklists will be used. All plant and equipment shall be thoroughly cleaned before leaving nominated areas. Topsoil reinstated after the subsoil has been backfilled. Compacted areas to be lightly scarified before spreading of topsoil. Refuelling operations shall be conducted away from waterways with spill kits on hand. Runoff from stockpiles shall be prevented by sediment fences to the extent required. Horizontal directional drilling where specified. Minimise period riparian soils disturbed. Use geotextile or similar on exposed areas during heavy rain events or flooding where practical. Divert other area runoff around work areas. Control runoff through work areas through use of erosion & sediment controls Water pumped out of excavation to be managed appropriately e.g. passed through a filter sock; released onto grassed filter strips Clean Up and Reinstatement Env. Aspect/Value The environmental values that could be affected by this work activity are: Air Quality Community Impacts Traffic Management Community Impacts - Property Access & General Erosion & Sediment Control Flora & Fauna Flora & Fauna (Pest Management) Soil Quality Water Quality Potential Impacts Impact Recommended Control Methods Document Control\ Manuals and Plans\8291- PLN- Page 35 of 40

36 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Air Quality Dust from dirt on roads Water trucks/sprays for dirt roads as required. Runoff to be prevented from entering the stormwater system. Restricted/limited access only approved access roads used. All vehicles to remain within approved vehicular areas. Community Impacts Traffic Management Community Impacts Property Access and General Erosion and Sediment Control Flora and Fauna Flora and Fauna - Pest Management Greenhouse gas emissions from operating plant and equipment Disruption to local traffic; increased risk of traffic accidents Disruption to the community and local residents Unauthorized access by members of the public Community grievances not addressed Erosion and sediment controls not correctly installed Flora damaged or destroyed Fauna / livestock struck by vehicles Spread of weeds Plant and equipment to be shut down when not required. Vehicles not to be left idling to keep the air conditioner running. Vehicles to be properly serviced and maintained. Approved Traffic Management Plan for works on roadways Signage & traffic controllers as per approved Traffic Management Plan Road closures planned to be outside peak hour traffic Affected residents notified. Minimise length of disruption by completing works as soon as practical. Minimise length of time access is restricted. Minimise the number of construction vehicles. Notify affected residents. Clear signage and fences / barricades to separate the community from work areas. Implement and monitor community grievance procedure. Install erosion and sediment controls in correct location (along natural or specified drainage lines) and in accordance with Contract requirements. Restoration work to be carried out in accordance with restoration procedures and the contract. Stockpiled timber and brush from clearing and grading operations will be re-spread on graded surfaces in filter strips to assist erosion and sediment control and re-vegetation. Implement and monitor speed limits. Implement in-vehicle monitoring systems (IVMS) if suitable. All plant and equipment to be cleaned before entering the project. Clean down bays and Weed Inspection Checklists will be used. All plant and equipment shall be thoroughly cleaned before leaving nominated areas. Soil Quality Loss of riparian topsoil Use geotextile or similar on exposed areas during heavy rain events or flooding where practical. Water Quality Contamination through sedimentation Control runoff through disturbed areas through use of erosion & sediment controls Fencing and Gates Env. Aspect/Value The environmental values that could be affected by this work activity are: Community Impacts Property Access & General Flora & Fauna Potential Impacts Impact Recommended Control Methods Community Impacts Property Access and General Disruption to the community and local residents Fences and gates not to standard / location Minimise length of time access is restricted. Minimise the number of construction vehicles. Notify affected residents. Install fences and gates as agreed under the terms of the Contract with landowners. Document Control\ Manuals and Plans\8291- PLN- Page 36 of 40

37 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Flora and Fauna Fauna / livestock water / feed routes affected Fences and gates will be installed to cater for access to water and feed as agreed with the landowner Pre-Cleaning and Gauging Env. Aspect/Value The environmental values that could be affected by this work activity are: Air Quality Waste Management Potential Impacts Impact Recommended Control Methods Air Quality Dust from line cleaning Suitable controls will be put in place to minimise dust and debris expelled from the pipelines during cleaning operations. Waste Management Contamination caused by waste water Waste water (flush and test water) from pre-cleaning and hydrotesting operations shall be contained and treated on site if required and wherever practicable. If necessary, waste water shall be analysed for contaminants. Only waste water meeting irrigation or freshwater guidelines shall be disposed of on site as approved by the Client. Regulated waste water shall be disposed of by approved contractors to a licensed liquid waste disposal facility Hydrotesting Env. Aspect/Value The environmental values that could be affected by this work activity are: Waste Management Potential Impacts Impact Recommended Control Methods Waste Management Contamination caused by waste water Waste water (flush and test water) from pre-cleaning and hydrotesting operations shall be contained and treated on site if required and wherever practicable. If necessary, waste water shall be analysed for contaminants. Only waste water meeting irrigation or freshwater guidelines shall be disposed of on site as approved by the Client. Regulated waste water shall be disposed of by approved contractors to a licensed liquid waste disposal facility Dewatering, Cleaning and Drying Env. Aspect/Value The environmental values that could be affected by this work activity are: Waste Management Potential Impacts Impact Recommended Control Methods Waste Management Contamination caused by waste water Waste water (flush water) from dewatering and cleaning operations shall be contained and treated on site if required and wherever practicable. If necessary, waste water shall be analysed for contaminants. Only waste water meeting irrigation or freshwater guidelines shall be disposed of on site as approved by the Client. Regulated waste water shall be disposed of by approved contractors to a licensed liquid waste disposal facility. Document Control\ Manuals and Plans\8291- PLN- Page 37 of 40

38 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D 5.15 Calliper Pigging Env. Aspect/Value The environmental values that could be affected by this work activity are: Air Quality Potential Impacts Impact Recommended Control Methods Air Quality Dust from pigging Suitable controls will be put in place to minimise dust and debris expelled from the pipelines during pigging operations. 6 Documentation The following documentation is referenced in this procedure: PLN-001 Project Management Plan... 5 PR-001 Emergency Response Procedure PR-110 Procedure for Archiving PR-202 Procedure for Incident Reporting & Investigation PR-207 Procedure for Emergency Response PR-303 Procedure for Audits PR-310 Procedure for Document Control PR-311 Procedure for Management Review... 11, 15 PR-312 Procedure for Control of Standards and Codes... 8 PR-601 Procedure for Environmental Aspects and Impacts... 7, 14 PR-602 Procedure for Environmental Objectives and Targets PR-603 Procedure for Environmental Controls PR-701 Procedure for Training Document Control\ Manuals and Plans\8291- PLN- Page 38 of 40

39 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Attachment 1 APA Group HSE Policy Document Control\ Manuals and Plans\8291- PLN- Page 39 of 40

40 EMP for Young to Wagga Wagga Looping Pipeline Doc. No PLN-003 Rev. D Attachment 2 QUA002 Action Request ---o000o--- Document Control\ Manuals and Plans\8291- PLN- Page 40 of 40

Alberta Transportation The City of Edmonton The City of Calgary

Alberta Transportation The City of Edmonton The City of Calgary Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for

More information

PS BIODIVERSITY PURPOSE AND SCOPE FAUNA CRITICAL CONTROLS FLORA CRITICAL CONTROLS

PS BIODIVERSITY PURPOSE AND SCOPE FAUNA CRITICAL CONTROLS FLORA CRITICAL CONTROLS PS BIODIVERSITY PURPOSE AND SCOPE The intent of this primary standard is to reduce and eliminate significant environmental impacts to biodiversity including native fauna and flora as a result of construction

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review Environmental Management Plan Introduction This Environmental Management Plan (EMP) has been prepared for SEF Energy Co. Ltd. for the purpose of providing a stand-alone plan for managing the potential

More information

Environmental Control Plan

Environmental Control Plan Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which

More information

NOISE MANAGEMENT PLAN

NOISE MANAGEMENT PLAN Young to Wagga Wagga Pipeline Looping Project Project No.: Q8291 Doc No: 8291-PLN-005 NOISE MANAGEMENT PLAN 1 07-08-10 Details revised as per NSW Dept of Planning G.O Mahony P. Grant G. O Mahony 0 28-07-10

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

Construction Environment Management Plan

Construction Environment Management Plan Construction Environment Management Plan Guidance Material July 2013 ABSTRACT This CEMP guidance material has been prepared by MAC to assist the identification and management of environmental risks associated

More information

Chapter 13 Management and Implementation

Chapter 13 Management and Implementation Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction

More information

Chapter 13 Management and Monitoring

Chapter 13 Management and Monitoring Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2

More information

Borrow Pit and Quarry Management Procedure Environmental

Borrow Pit and Quarry Management Procedure Environmental 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to borrow pit (BP) and quarry management at the Roy Hill Project. This procedure applies to all personnel

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date

More information

WI-ENV-PER-0013 GROUND DISTURBANCE PERMIT

WI-ENV-PER-0013 GROUND DISTURBANCE PERMIT WI-ENV-PER-0013 GROUND DISTURBANCE PERMIT PERMIT NUMBER PERMIT NAME DATE RECEIVED PERMIT APPROVAL DATE PERMIT EXPIRY DATE GDP- (Office use only) This Ground Disturbance Permit (GDP) is to be completed

More information

Council Roadside Reserves Project. Site Management Checklists and Safeguards

Council Roadside Reserves Project. Site Management Checklists and Safeguards Council Roadside Reserves Project Site Management Checklists and Safeguards Introduction These slides cover An introduction to checklists and safeguards Example pre-construction checklist Practical safeguards

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) Established 1907 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) DATE: JULY 2018 Version Date Section Modified 1 July 2018 All Reason for Modification Original Management Plan Review Team MCC Environmental,

More information

Site Inspection Checklists

Site Inspection Checklists AECOM I Appendix I Site Inspection Checklists WEEKLY INSPECTION CHECKLIST Note: Personnel undertaking this inspection are to have been briefed on the CEMP Inspection Item Yes No Comments/Required Actions

More information

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores October 2015 Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores WaterNSW on behalf of the NSW Government

More information

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN JSP Construction Ltd 11-13 City Road Cardiff CF24 3BJ Revisions Issue Description Approved By Signed Date 19/10/16 1st issue AN JP 19.10/16 Rev A Updated with

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Environmental Specialist Responsible Manager: Head of Environment Responsible Executive:

More information

Vladeo Maric APA Group CC: James Beckett, Derek Prentice, Brian Watson, Katrina O Reilly

Vladeo Maric APA Group CC: James Beckett, Derek Prentice, Brian Watson, Katrina O Reilly 7 December 2016 Vladeo Maric APA Group CC: James Beckett, Derek Prentice, Brian Watson, Katrina O Reilly Dear Vladeo, Please see attached the inspection report for 6 th December 2016. wagga wagga suite

More information

Emergency Contact Numbers: Police, Fire, Ambulance 000 SES Vic Roads EPA Vic 1300 EPA VIC ( ) Safe Work Method Statement

Emergency Contact Numbers: Police, Fire, Ambulance 000 SES Vic Roads EPA Vic 1300 EPA VIC ( ) Safe Work Method Statement Safe Work Method Statement Emergency Contact Numbers: Police, Fire, Ambulance 000 SES 132 500 Vic Roads 13 11 70 EPA Vic 1300 EPA VIC (1300 372 842) WMS No: Task/Activity Grader Operation SPH Job No: Date

More information

Environmental Management Plan

Environmental Management Plan CLYDE REFINERY REMOVAL Prepared by Liberty Industrial Pty Ltd for The Shell Company of Australia Limited Revision No. Revision Date Authority Changes A 04.02.2014 CD RFP Submission (FOR SHELL APPROVAL)

More information

Construction Management Plan (CMP) 227 Princess Highway, Dandenong

Construction Management Plan (CMP) 227 Princess Highway, Dandenong Construction Management Plan (CMP) 227 Princess Highway, Dandenong - Construction Management Plan (CMP) June 2017 S2966 CMP.D2 PREPARED BY: Sustainable Development Consultants 2nd Floor, 555 Riversdale

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

APRIL 2015 CONTINGENCY PLANS

APRIL 2015 CONTINGENCY PLANS APRIL 2015 CONTINGENCY PLANS Prepared by: TERRATEST (PTY) LTD PO Box 794 HILTON Postal code 3245 Telephone:0333436789 Email:terratest@terratest.co.za Project director: Simon Johnson TABLE OF CONTENTS 1

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

Construction Environment Management Plan (CEMP) Requirements

Construction Environment Management Plan (CEMP) Requirements Australia Pacific Airports (Melbourne) Issue No: 3 Issue Date: 19 December 2016 Construction Environment Management Plan (CEMP) Requirements DOCUMENT No. PP002 DOCUMENT CONTROLLER: APPROVED: NAME: Jesse

More information

Murra Warra Wind Farm Project Environmental Management Plan

Murra Warra Wind Farm Project Environmental Management Plan 1. Introduction This (EMP) covers the pre-construction, construction, operation and decommissioning phases for the Murra Warra Wind Farm Project. RES Australia recognises the importance of reducing human

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. Bargo/Buxton Wastewater Scheme

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. Bargo/Buxton Wastewater Scheme POLLUTION INCIDENT RESPONSE FOR Bargo/Buxton Wastewater Scheme Rev Date Revision Prepared Approved A 16 December 2013 Draft L O Hare B 25 January 2013 Draft L O Hare C 10 April 2013 Draft A.White D 24

More information

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION October 2005 Measures Contents 21. 21-1 21.1 Introduction 21-1 21.2 Construction 21-1

More information

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal

More information

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT 13 J:\Jobs\42626220\07 Deliverables\EIS\FINAL for Public Release\13. LNG Facility Environmental Management Plan\13 LNG Facility EMP () FINAL PUBLIC track.doc GLNG Project - Environmental Impact Statement

More information

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT 12 J:\Jobs\42626220\07 Deliverables\EIS\FINAL for Public Release\12. \12 Gas Transmission Pipeline EMP (Section 12) FINAL PUBLIC track.doc GLNG Project - Environmental Impact Statement Section 12 12.1

More information

Crushing and Screening Management Procedure Environment

Crushing and Screening Management Procedure Environment 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to crushing and screening management at the Roy Hill Project. This procedure applies to all personnel involved

More information

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Ball Plant in Germiston A Report For: Scaw South Africa

More information

Site EMP Kit- Guidance Notes

Site EMP Kit- Guidance Notes Site EMP Kit- Guidance Notes Introduction This Guide has been designed to assist applicants to understand council s requirements for Site Environmental Management Plans (Site EMP s) for subdivisions. The

More information

Hydrocarbon Management PROCEDURE

Hydrocarbon Management PROCEDURE Hydrocarbon Management PROCEDURE Doc No: Approved: PRO-0380 Operations Manager Table of Contents 1. PURPOSE... 3 2. SCOPE... 3 3. REFERENCES... 3 3.1 LEGISLATION/STANDARDS... 3 4. DEFINITIONS... 3 5. HYDROCARBON

More information

Gold Coast Airport Tenant Environment Management Guideline

Gold Coast Airport Tenant Environment Management Guideline Gold Coast Airport Tenant Environment Management Guideline July 2012 Introduction Implementation of sound environment management practices is critical in meeting legislative requirements and business objectives.

More information

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects Alberta Transportation Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects January 9, 2009 INFTRA Table of Contents Page Table of Contents... i 1.0 INTRODUCTION...1

More information

Environmental Guidelines for Construction Sites

Environmental Guidelines for Construction Sites Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building

More information

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities. Transit Systems NSW Environmental Management Plan GOAL 1: REDUCE THE GREENHOUSE IMPACT OF ENERGY USE To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

AM-PR-003 Construction Environmental Management Plan (C-EMP)

AM-PR-003 Construction Environmental Management Plan (C-EMP) OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been

More information

JBS Pollution Incident Response Management Plan

JBS Pollution Incident Response Management Plan JBS Pollution Incident Response Management Plan JBS Australia Pty Limited Prime City Feedlot, NSW Document Owner Troy White, Group Environment Manager Printed copies of this document are deemed uncontrolled

More information

Facilities Environmental Protection Plan: Burnaby Terminal

Facilities Environmental Protection Plan: Burnaby Terminal Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation

More information

Environment Management A TENANT INFORMATION HANDBOOK

Environment Management A TENANT INFORMATION HANDBOOK Environment Management A TENANT INFORMATION HANDBOOK 3 Avro Street Bankstown Airport NSW 2200 T 02 9796-2300 F 02 9791-0230 www.sydneymetroairport.com.au SYDNEY METRO AIRPORTS E N V I R O N M E N T M A

More information

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION) 8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION) In order to manage the construction phase impacts associated with the establishment of the Compilation Yard and the Common User

More information

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT 15 J:\Jobs\42626220\07 Deliverables\EIS\FINAL for Public Release\15. Environmental Managment Plan\15 Bridge and Services EMP (Section 15) FINAL PUBLIC (Track).doc GLNG Project - Environmental Impact Statement

More information

Kurnell Refinery Conversion Project

Kurnell Refinery Conversion Project Kurnell Refinery Conversion Project Waste Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site ) to a

More information

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) Tararua District Council Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) NOTE: This is a draft ESCP in current preparation. Additional and updated information will

More information

10.0 Environmental protection, follow-up and monitoring

10.0 Environmental protection, follow-up and monitoring 10.0 Environmental protection, follow-up and monitoring 10.1 Introduction Manitoba Hydro will implement the mitigation measures, monitoring and other follow-up actions identified in chapter 8 through an

More information

Environmental Management Programme (EMP)

Environmental Management Programme (EMP) Appendix D Environmental Management Programme (EMP) Please note that although Construction and Operational Phase measures are included in this EMP they are relevant to the issued Waste Management Licence

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

Native Title Act 1993

Native Title Act 1993 APPENDIX A2: Regulatory approvals Table 1: Regulatory approvals Approval / permit type Commonwealth approvals Permission to intervene in matters where traditional cultural heritage interests are considered

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

Ensuring that EMP s are a positive EIA legacy as the EAP s opportunity to facilitate sound project implementation.

Ensuring that EMP s are a positive EIA legacy as the EAP s opportunity to facilitate sound project implementation. Ensuring that EMP s are a positive EIA legacy as the EAP s opportunity to facilitate sound project implementation. Years of project implementation Implementation of international good practice Exposure

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other

More information

Outline Construction and Environmental Management Plan

Outline Construction and Environmental Management Plan 1.1.1 Gwent Farmers Community Solar Scheme January 2018 Outline Construction and Environmental Management Plan www.savills.co.uk Project: Client: Gwent Levels Community Solar Scheme Partnership Ltd Job

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

ROADS: OPERATION AND MAINTENANCE

ROADS: OPERATION AND MAINTENANCE ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service

More information

Traffic Management Plan

Traffic Management Plan Parkes PV power plant Traffic Management Plan Doc ID: PL-HS-02 Rev No.: 1 Rev Date: 10/02/2017 Prepared By: Benoit Arsac Construction Manager BYCA Reviewed by: Philippe Nguyen Senior Project Manager BYCA

More information

Environmental Risk Analysis

Environmental Risk Analysis Appendix 10 11 12 13 14 15 16 17 18 191 Groundwater Controlled UHSA Air Agricultural Historic EIS Preliminary Environmental Blasting Quality Surface Secretary s Noise Statement Aboriginal Economic Action

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan EMP for the Stage 1 Construction and Operation of the Trainers Allotment Area at the Pakenham Racecourse located at Nar Nar Goon / Longwarry Road, Tynong Pty Ltd abn: 44 706

More information

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) Disclaimer: The information contained in this communication document is intended solely for the use of guidance cannot be

More information

Date of Inspection 13/09/2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz Aaron Hawkins

Date of Inspection 13/09/2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz Aaron Hawkins Manildra Solar Farm ER Site Inspection Report Manildra Solar Farm Construction Environmental Representative (ER) Inspection Report For internal project use only. Document not for external release or use.

More information

EF10 Site Environmental Audit - 1 / 8

EF10 Site Environmental Audit - 1 / 8 EF10 Site Environmental Audit Site... Date... Internal/external audits 1. Have all corrective actions raised at previous audits been implemented (EF07)? O O O 2. Have actions taken been monitored to confirm

More information

Surface Water Management Procedure Environment

Surface Water Management Procedure Environment 1 Purpose and Scope This procedure specifies the operational environmental requirements that relate to surface water management at the Roy Hill Project. This procedure applies to all personnel involved

More information

Management Plan. Environmental Management Strategy

Management Plan. Environmental Management Strategy 3-3544 No. 9 31 Oct 18 PSE Manager Management Plan Environmental Management Strategy Risk Statement: High This document will be reviewed on a yearly basis, unless a process change occurs earlier than this

More information

METHOD STATEMENT. MVV O&M GmBH, South West Devon Waste Partnership & Kier Construction Limited. Document No: CMS/ E0788 /003 FOR

METHOD STATEMENT. MVV O&M GmBH, South West Devon Waste Partnership & Kier Construction Limited. Document No: CMS/ E0788 /003 FOR METHOD STATEMENT, South West Devon Waste Partnership & Kier Construction Limited Document No: CMS/ E0788 /003 FOR Construction of Bull Point Access Road DOCUMENT HISTORY DATE ISSUE COMMENTS ORIGINATOR

More information

Jemena Northern Gas Pipeline Pty Ltd

Jemena Northern Gas Pipeline Pty Ltd Jemena Northern Gas Pipeline Pty Ltd Northern Gas Pipeline Draft Environmental Impact Statement CHAPTER 14 - COMMITMENTS Public August 2016 14. COMMITMENTS The risk assessment documented in this EIS concludes

More information

ARROW BOWEN PIPELINE PROJECT

ARROW BOWEN PIPELINE PROJECT ARROW BOWEN PIPELINE PROJECT APPENDIX A7 REGULATORY APPROVALS Arrow Bowen Pipeline Project Arrow Bowen Pipeline Project THIS PAGE INTENTIONALLY LEFT BLANK APPENDIX A9: REGULATORY APPROVALS Approval / permit

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Site:.. Section 1 - Risk Assessment 1. Identify the environmental aspects relevant to your site. 2. Under notes, document the items that influence the assignment of the level

More information

For controlled copies of this EMS the copy number is shown below and initialled in Red by the Light Horse Business Centre Project Manager.

For controlled copies of this EMS the copy number is shown below and initialled in Red by the Light Horse Business Centre Project Manager. LHBC Old Wallgrove Road, Eastern Creek Environmental Management Strategy (EMS) Aboriginal Heritage Plan June 2011 ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) ABORIGINAL HERITAGE MANAGEMENT PLAN Former QUARRY

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan Gunnedah Quarry Products Pty Ltd Prepared by Tim MacKellar, Gunnedah Quarry Products Document created 13.10.13 Reviewed 10.10.14 Reviewed 12.10.15 Reviewed 02.02.18

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

Kendal /Kusile to Zeus Environmental Monitoring Report

Kendal /Kusile to Zeus Environmental Monitoring Report MONTHLY ENVIRONMENTAL MONITORING REPORT Power Lines from Kendal/Kusile to Zeus Substation Bravo Integration Project Bravo 4: Construction of two 400 kv lines DEA Ref # 12/12/20/1095 Report Prepared for:

More information

Date of Inspection 10 August 2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz

Date of Inspection 10 August 2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz Manildra Solar Farm ER Site Inspection Report Manildra Solar Farm Construction Environmental Representative (ER) Inspection Report For internal project use only. Document not for external release or use.

More information

Victorian Desalination Project

Victorian Desalination Project Victorian Desalination Project D&C PGA Attachment C - Environmental Register TDV 0 EV RG 0011.C 03 # D&C EMP ATTACHMENT C ENVIRONMENTAL RISK REGISTER - PLANT AND GENERAL AREA Construction Method Criteria

More information

CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK

CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK APPENDIX D Contents 1 Introduction... 1 1.1 Purpose and Scope... 1 1.2 Status... 1 1.3 Environment and Sustainability Policy... 1 1.4 Project Description...

More information

Construction of Dariali HEPP. Reinstatement Plan

Construction of Dariali HEPP. Reinstatement Plan Construction of Dariali HEPP Reinstatement Plan 2016 Table of Content 1. Introduction... 3 2. Site Clean-up... 4 3. Headwork Site Reinstatement... 4 4. Reinstatement Of The Pipeline Corridor.9 5. Cable

More information

BEVERAGE CANS REVESBY

BEVERAGE CANS REVESBY BEVERAGE CANS REVESBY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Environment Protection Authority License 643 Item ID: 8409 Version: 1.2 Page 1 of 16 1.0 OVERVIEW AND LEGAL REQUIREMENTS This Pollution

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN MET Recycling Pty Ltd Lease Areas 3 & 4 Corner of Newton St North & Carnarvon St Silverwater NSW 2128 Lot 1 in DP 713708 1 Revision History Revision Date Author/Reviewer

More information

Abbot Point Stormwater Return Dam (EPBC 2010/5561) Operation Annual Compliance Report, January 2016

Abbot Point Stormwater Return Dam (EPBC 2010/5561) Operation Annual Compliance Report, January 2016 Abbot Point Stormwater Return Dam (EPBC 2010/5561) Operation Annual Compliance Report, 2015 22 January 2016 Table of Contents 1. Introduction... 4 1.1. The purpose of this Document... 4 1.2. Project Background...

More information

Performance Standards Compliance Checklist

Performance Standards Compliance Checklist Truckee Meadows Regional Stormwater Quality Management Program Performance Standards Compliance Checklist The checklist that follows identifies the BMPs that can be used at construction sites to meet each

More information

Environmental Management Plan

Environmental Management Plan (Operational Sites) 1 P a g e A. Introduction An is a written document with the purpose to provide mitigation measures and principles for the management of sites in order to reduce potential impacts to

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV-000018-008 LNG Project Page 2 of 14 CONTENTS 1.0

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Oakleigh Oakleigh Lane, Tichborne NSW 2870 Document number: ANL.IMP1.OK 1 Contents 1. Introduction. Page 3 2. Objectives... Page 3 3. Principles. Page 3 4. What

More information

Builder s enviro guide

Builder s enviro guide BC3337 Builder s enviro guide Preventing pollution from your building project Find out more: phone Auckland Council on 09 301 0101 or visit aucklandcouncil.govt.nz Contents Why compliance matters 2 The

More information

ENVIRONMENTAL MANAGEMENT STRATEGY (EMS)

ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) Established 1907 ENVIRONMENTAL MANAGEMENT STRATEGY (EMS) APPROVED BY MSC DATE: JUNE 2017 Version 1 2 3 Date February 2005 December 2010 December 2015 Section Modified All All All 4 June 2017 All Reason

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES

ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5 Training materials produced in Turkey to aid reinstatement / biorestoration 5 5 ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5.1 PROJECT WIDE APPROACH Training

More information

Gunlake Quarry. Air Quality Management Plan

Gunlake Quarry. Air Quality Management Plan Gunlake Quarry Air Quality Management Plan August 2015 Table of Contents 1. Introduction 3 1.1 Overview 3 1.2 Aims and Objectives 3 2. Air Quality Criteria 3 2.1 Impact Assessment Criteria 4 2.2 Sources

More information

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management Standard Operating Guidance (SOGs) For Storm Drain System Management Phase II MS4 Creating a Clean Water Future. Standard Operating Guidance (SOGs) For Storm Drain System Management The City of Daphne

More information

GUIDELINES FOR PREPARING A CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN A334170

GUIDELINES FOR PREPARING A CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN A334170 GUIDELINES FOR PREPARING A CONSTRUCTION A334170 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. CRITERIA FOR AN APPROVED CEMP... 3 3. SIZE AND COMPLEXITY OF A CEMP... 4 4. KEY COMPONENTS OF A CEMP... 4 4.1 PROJECT

More information

WATER MONITORING MANAGEMENT PLAN

WATER MONITORING MANAGEMENT PLAN WATER MONITORING MANAGEMENT PLAN Project Name: Energy from Waste CHP Facility Project Number: Document Reference: /WWP/014 Location: Devonport, Plymouth Approved by: D. Primmer Dated: 10/11/11 Signed:

More information

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES SECTION 11 PART I STORMWATER QUALITY PROTECTION CONTENTS Page 11-1 Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES 11-2 Stormwater Pollution Prevention Plan (SWPPP) 11-3 11-3 Erosion and Sediment

More information

Kurnell Refinery Conversion Project

Kurnell Refinery Conversion Project Kurnell Refinery Conversion Project Air Quality Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site

More information