1 SECTION 858 REGULATIONS FOR SURFACE MINING AND RECLAMATION IN ALL DISTRICTS This Section sets forth regulations for conducting surface mining and reclamation in a manner consistent with California Surface Mining and Reclamation Act of 1975 (Public Resources Code Sections 2710 et seq.), as amended, hereinafter referred to as SMARA, Public Resources Code (PRC) Section 2207 (relating to annual reporting requirements), and State Mining and Geology Board (SMGB) Regulations (hereinafter referred to as State Regulations ) for surface mining and reclamation practice (California Code of Regulations [CCR], Title 14, Division 2, Chapter 8, Subchapter 1, Sections 3500 et seq.). The regulations contained herein are created in Ordinance T adopted and shall apply in all Zone Districts. Mineral resources are valuable community assets which must be safeguarded against preemption by competing or conflicting land uses. However, mineral deposits are frequently located in areas which are also suited for other types of development or are in areas characterized by significant natural resources. Care must be taken to ensure that mineral resources are recovered efficiently and safely, with minimal disruption to surrounding land uses and environmental values, and that sites are reclaimed to a usable condition which is readily adaptable for alternative land uses. A. USES PERMITTED SUBJECT TO CONDITIONAL USE PERMIT Surface mining operations, including the use of such equipment, structures, and facilities as are necessary or convenient for the extraction, processing, storage, and transport of materials, including but not limited to the following (except for those uses specifically exempted under Section 858-B): 1. Sand and gravel separation plants. 2. Rock crushers. 3. Concrete batch plants. 4. Asphalt batch plants. 5. Rock, sand, and gravel trucking operations. (Amended by Ord adopted ) These uses shall be subject to all regulations of this Section and Section 873 (including the public hearing as required under Section 873). Except as provided in this Section, no person shall conduct a surface mining operation unless a Conditional Use Permit (CUP), Mining and Reclamation Plan and the Financial Assurances for reclamation have first been approved by the County. B. EXEMPTIONS This Section shall not apply to the following activities: 1. Excavation or grading conducted for farming or on-site construction or for the purpose of restoring land following a flood or natural disaster.

2 2. On-site excavation and on-site earthmoving activities which are an integral and necessary part of a construction project which has been approved by the County and which are undertaken to prepare a site for construction of structures, landscaping, or other land improvements, including the related excavation, grading, compaction, or the creation of fills, road cuts, and embankments, whether or not surplus materials are exported from the site. Surplus materials shall not be exported from the site until actual construction work has commenced and shall cease if it is determined that construction activities have terminated, have been indefinitely suspended, or are no longer being actively pursued. 3. Prospecting for, or the extraction of, minerals for commercial purposes and the removal of overburden in total amounts of less than 1,000 cubic yards in any one location of one acre or less. 4. Surface mining operations that are required by Federal law in order to protect a mining claim, if those operations are conducted solely for that purpose. 5. Emergency excavations or grading conducted by the State Department of Water Resources or the Reclamation Board for the purpose of averting, alleviating, repairing, or restoring damage to property due to imminent or recent floods, disasters, or other emergencies. 6. Excavation or grading for the exclusive purpose of obtaining materials for roadbed construction and maintenance conducted in connection with timber operations or forest management on land owned by the same person or entity, where slope stability and erosion are controlled in accordance with the applicable performance standards of the State Reclamation Regulation, Sections 3704(f) and 3706 (d) and, upon closure of the site, the person closing the site implements, where necessary, revegetation measures and postclosure uses in consultation with the Department of Forestry and Fire Protection. This exemption is limited to excavation and grading that is conducted adjacent to timber operation or forest management roads and shall not apply to on-site excavation or grading that occurs within 100 feet of a Class One watercourse or 75 feet of a Class Two watercourse, or to excavation for materials that are, or have been, sold for commercial purposes. 7. Excavation, grading, or other earthmoving activities by the property owner or operator in an oil or gas field that are integral to, and necessary for, on-going operations for the extraction of oil or gas and no excavated materials are sold for commercial purposes. C. DEFINITIONS The definitions set forth below shall apply to this Section. 1. BORROW PIT - Excavation created by the surface mining of rock, unconsolidated geologic deposits or soil to provide material (borrow) for fill elsewhere. 2. DOC - California State Department of Conservation, the administrative department for the Surface Mining and Reclamation Act of 1975, as amended. 3. DOC DIRECTOR - Director of the California State Department of Conservation.

3 4. IDLE - Surface mining operations curtailed for a period of one year or more, by more than 90 percent of the operation's previous maximum annual mineral production, with the intent to resume those surface mining operations at a future date. 5. MINED LANDS - The surface, subsurface, and groundwater of an area in which surface mining operations will be, are being, or have been conducted, including private ways and roads appurtenant to any such area, land excavations, workings, mining waste, and areas in which structures, facilities, equipment, machines, tools, or other materials or property which result from, or are used in, surface mining operations are located. 6. MINING WASTE - The residual of soil, rock, mineral, liquid, vegetation, equipment, machines, tools, or other materials or property directly resulting from, or displaced by, surface mining operations. 7. MINERALS - Any naturally occurring chemical element or compound, or groups of elements and compounds, formed from inorganic processes and organic substances, including, but not limited to, coal, peat, and bituminous rock, but excluding geothermal resources, natural gas, and petroleum. 8. OPERATOR - Any person who is engaged in surface mining operations, or who contracts with others to conduct operations, except a person who is engaged in surface mining operations as an employee with wages as sole compensation. 9. OVERBURDEN - Soil, rock, or other materials that lie above a natural mineral deposit or in between mineral deposits, before or after their removal by surface mining operations. 10. RECLAMATION - The combined process of land treatment that minimizes water degradation, air pollution, damage to aquatic or wildlife habitat, flooding, erosion, and other adverse effects from surface mining operations, including adverse surface effects incidental to underground mines, so that mined lands are reclaimed to a usable condition which is readily adaptable for alternate land uses and create no danger to public health or safety. The process may extend to affected lands surrounding mined lands, and may require backfilling, grading, resoiling, revegetation, soil compaction, stabilization, or other measures. 11. RESOILING - The process of artificially building or reconstructing a soil profile. 12. SMARA - State of California Surface Mining and Reclamation Act of 1975, as amended. 13. SMGB - State Mining and Geology Board. The SMGB oversees the administration and enforcement of SMARA. 14. STREAMBED SKIMMING - Excavation of sand and gravel from streambed deposits above the mean summer water level or stream bottom, whichever is higher. 15. SURFACE MINING OPERATION - All, or any part of, the process involved in the mining of minerals on mined lands by removing overburden and mining directly from the mineral deposits, open-pit mining of minerals naturally exposed, mining by the auger method, dredging and quarrying, or surface work incident to an underground mine. Surface mining operations include, but are not limited to, inplace distillation or retorting or leaching, the production and disposal of mining waste, prospecting and exploratory activities, borrow pitting, streambed skimming, and segregation and stockpiling of mined materials and

4 recovery of same. A surface mining operation may include the use of such equipment, structures, and facilities as are necessary or convenient for the extraction, processing, storage, and transport of materials. D. REQUIRED SUBMISSIONS The application for a CUP shall include a Mining and Reclamation Plan. The Plan shall encompass the entire property and shall be separated into phases of operation and reclamation. No phase shall exceed eighty (80) acres. Reclamation of areas previously excavated by the operator pursuant to a nonconforming right or under a previous CUP will not be required unless such areas are proposed for fill or reworking to added depths. The Mining and Reclamation Plan must include the following and contain sufficient detail to enable the Planning Commission to make the required finding pursuant to Section 858-F: 1. Project Information a. The name and address of the operator and any person designated by the operator as an agent. b. The names and addresses of the owners of all surface interests and mineral interests in the lands. c. The size and legal description of the lands that will be affected by the surface mining operation including related processing and storage. d. A vicinity map. e. A map of the subject property including boundaries and topographic details of the land. f. (Optional) Background information on the operator or company s experience with surface mining. 2. Environmental Data a. A description of the environmental setting of the site and surrounding area, including: (1) Existing land use including location of all streams, roads, railroads, utility facilities and structures within, or adjacent to the subject property. (2) Vegetation types and condition. (3) Soil types and condition. (4) Groundwater elevation. (5) Surface water characteristics. (6) Other factors as may be required related to environmental impacts and their mitigation and reclamation. b. A geologic description, including the general geologic setting, a detailed description of the geology of the area in which surface mining is to be conducted including principal minerals or rocks present c. An estimate of the quantity and quality of groundwater and surface water present in the vicinity of the proposed operation. (Added by Ord adopted ) 3. Mining Plan

5 a. A site plan which includes the following: (1) Existing and proposed roads, including ingress-egress roads and on-site roads; proposed surface treatment and means to limit dust. (2) Processing and storage areas including locations of equipment, structures, and facilities. (3) Proposed setbacks, screening, fencing, gates, parking, and signs. (4) Proposed phasing for the mining operation and reclamation work. (5) Cross section (typical) defining planned slopes, extent of overburden, extent of sand and gravel deposits, and water table. (6) Such other data necessary to adequately review the proposal. b. A map showing routes between the property and the nearest arterial c. A statement of anticipated quantity and type of minerals for which the surface mining operation is to be conducted. d. A statement of operations including: (1) Commencement of operations. (2) Proposed hours and days of operation. (3) Anticipated duration of operation. (4) Maximum anticipated depth of the mining operation. (5) Proposed method of extraction and processing. (6) Proposed equipment. (7) Operating practices proposed to be used to minimize noise, vibration and dust. (8) An estimate of the quantity and quality of water required by the proposed operation specifying proposed sources, conveyances, quantity and quality, and disposal methods of used and surplus water, and methods to be employed to prevent pollution of surface and/or groundwater. (Amended by Ord adopted ) (9) Disposal methods for tailings or other wastes resulting from any aspect of the proposed operation. (Amended by Ord adopted ) (10) For each standard identified in the Mining and Reclamation Standards (858-H) the operator shall specify how the requirement will be addressed in the mining operation. The implementation proposal for each standard must be site specific, measurable and verifiable. The list will be the basis for compliance determinations during annual inspections. (The list may be combined with that required in Subsection 4.a.(8) below.) 4. Reclamation Plan a. A description of planned reclamation of the site including the following: (1) Description of the proposed use of the mined lands after reclamation. (2) Evidence that all owners of a possessory interest in the land have been notified of the proposed use. (3) Description of the manner in which reclamation, adequate for the proposed use will be accomplished, including the following: (a) The manner in which contaminants will be controlled, and mining waste will be disposed. (b) The manner in which affected streambed channels and stream banks will be rehabilitated to a condition minimizing erosion and sedimentation.

6 E. PROCESSING (4) Time schedule for the completion of surface mining on each segment of the mined lands. (5) The phasing plan for reclamation activities and schedule for completion. (6) Statement of how reclamation of the site may affect future on-site mining and mining in the surrounding area. (7) Measures proposed to protect public health and safety with consideration given to the degree and type of present and probable future exposure of the public to the site. (8) For each standard identified in the Mining and Reclamation Standards (858-H) the operator shall specify how the requirement will be addressed in the reclamation activity. The implementation proposal for each standard must be site specific, measurable and verifiable. The list will be the basis for compliance determinations during annual inspections. (The list may be combined with that required in Subsection 3.d.(10) above.) (9) Type of Financial Assurances proposed. (10) The disposition of any equipment or structures. b. A site plan showing the reclamation proposal including: (1) New Contouring. (2) Water features and methods planned to overcome stagnation. (3) Vegetative planting. (4) Access and treatment thereof. (5) Phasing. c. A soil salvage plan and if proposed for refill, definition of refill material, and probable sources. The Mining and Reclamation Plan shall be processed as a part of the CUP application pursuant to the provisions of Section 873. The following provisions shall also apply to processing of the Plan. 1. The following notices and requests for comments shall be given: a. State Department of Conservation: (1) The Department shall notify the DOC Director of the acceptance of an application for a CUP and Mining and Reclamation Plan for a surface mining operation, or an amendment thereto within thirty (30) days of acceptance. (2) Prior to approval of the Mining and Reclamation Plan, amendment thereto, or Financial Assurances, the Department shall submit, by certified, return receipt requested mail to the DOC Director, the Mining and Reclamation Plan, information prepared pursuant to CEQA and any other pertinent information for use in the review of the Plan along with a certification from the Director that the Mining and Reclamation Plan is in compliance with the applicable requirements of Article 1 of the State Regulations, set forth in subsections 858-D, and -H of this Section. The DOC Director shall have 30 days from the receipt of said information in which to prepare written comments. The review period for Financial Assurances shall be 45 days. The Financial Assurances may be processed and reviewed separately but mining work shall not commence until all reviews are completed.

7 b. State Department of Transportation: Whenever a mining operation is proposed in the 100-year flood plain of any stream, as shown in Zone A of the Flood Insurance Rate Maps issued by the Federal Emergency Management Agency, and is within one mile, up or down-stream, of any State highway bridge, the Department shall notify Caltrans that the application has been received. Caltrans shall have not more than 45 days to review and comment on the proposed operation. The County may not issue nor renew a permit until a comment has been received or the 45-day review period has lapsed, whichever occurs first. 2. The Department shall evaluate any written comments from the DOC Director and prepare a written response describing the disposition of the major issues raised. If the County s position is at variance with the DOC Director s comments, the written response shall address, in detail, why specific comments and suggestions were not accepted. Copies of the written comments and responses shall be forwarded to the operator/applicant. 3. The Planning Commission may not take action on the CUP and Mining and Reclamation Plan until such time as the DOC Director s 30-day review period has ended and a written response to any comments has been prepared. In addition to the findings set forth in Section 873, the Planning Commission shall make a finding on the Mining and Reclamation Plan pursuant to Section 858-F. The CUP approval shall be conditioned upon acceptance of Financial Assurances by the Director. 4. Before any mining or reclamation activity is begun or any building or structure is erected, a site plan reflecting all conditions of approval shall have been submitted to and approved by the Director, pursuant to the provisions of Section 874, Site Plan Review. The site plan shall encompass all that area shown on the approved Mining and Reclamation Plan. The Department shall not approve the Site Plan Review application for the mining operation and the mining operation may not commence until the DOC Director s 45 day review period for Financial Assurances is complete, a written response has been prepared for any comments and the Director has accepted the Financial Assurances. 5. Following the approval of the CUP, Mining and Reclamation Plan and Financial Assurances, or amendments thereto, the Department shall forward a copy of the CUP for surface mining operations, the approved Mining and Reclamation Plan, and the approved Financial Assurances to the California State Department of Conservation. 6. When a Reclamation Plan is processed without the need for a CUP, such as on federal lands, the procedures of Section 873, including a public hearing, shall apply. F. FINDINGS FOR APPROVAL In addition to findings required by the Section 873, the approval of a CUP for a surface mining operation shall be subject to the following finding: The Mining and Reclamation Plan has been reviewed for compliance with the Regulations for Surface Mining and Reclamation in All Districts, Section 858, and meets the applicable requirements therein. G. FINANCIAL ASSURANCES

8 1. To ensure that reclamation will proceed in accordance with the approved Mining and Reclamation Plan, the County shall require, as a condition of approval, security which will be released upon satisfactory performance. The applicant may pose security in the form of a surety bond, trust fund, irrevocable letter of credit from an accredited financial institution, or other method acceptable to the County and the SMGB as specified in State regulations, and which the County reasonably determines are adequate to perform reclamation in accordance with the surface mining operation's approved Mining and Reclamation Plan. Financial Assurances shall be made payable to the County of Fresno and the State Department of Conservation. 2. Financial Assurances will be required to ensure compliance with elements of the Mining and Reclamation Plan, including but not limited to, revegetation and landscaping requirements, restoration of aquatic or wildlife habitat, restoration of water bodies and water quality, slope stability, erosion and drainage control, and disposal of hazardous materials. 3. Cost estimates for the Financial Assurances shall be submitted to the Department of Public Works & Development Services for review and approval prior to the operator securing Financial Assurances. The Director shall forward, by certified mail return receipt requested, a copy of the cost estimates, together with any documentation received supporting the amount of the cost estimates, to the State Department of Conservation for review. If DOC does not comment within 45 days of receipt of these estimates, it shall be assumed that the cost estimates are adequate, unless the County has reason to determine that additional costs may be incurred. The Director shall then have the discretion to approve the Financial Assurances if it meets the requirements of this Section, SMARA, and State regulations. 4. The amount of the Financial Assurances shall be based upon the estimated costs of reclamation for the years or phases stipulated in the approved Mining and Reclamation Plan, including any maintenance of reclaimed areas as may be required, subject to adjustment for the actual amount required to reclaim lands disturbed by surface mining activities in the upcoming year. Cost estimates should be prepared by a California registered Professional Engineer and/or other similarly licensed and qualified professional retained by the operator and approved by the Director. The estimated amount of the Financial Assurances shall be based on an analysis of physical activities necessary to implement the approved Mining and Reclamation Plan, the unit costs for each of these activities, the number of units of each of these activities, and the actual administrative costs. Financial Assurances to ensure compliance with revegetation, restoration of water bodies, restoration of aquatic or wildlife habitat, and any other applicable element of the approved Mining and Reclamation Plan shall be based upon cost estimates that include but may not be limited to labor, equipment, materials, mobilization of equipment, administration, and reasonable profit by a commercial operator other than the permittee. A contingency factor of ten percent (10%) shall be added to the cost of Financial Assurances. 5. In projecting the costs of Financial Assurances, it shall be assumed without prejudice or insinuation that the surface mining operation could be abandoned by the operator and, consequently, the County or DOC may need to contract with a third party commercial company for reclamation of the site. 6. The Financial Assurances shall remain in effect for the duration of the surface mining operation and any additional period until reclamation is completed including any maintenance required.

9 7. The amount of Financial Assurances required of a surface mining operation for any one year shall be adjusted annually to account for new lands disturbed by the surface mining operation, inflation, and reclamation of lands accomplished in accordance with the approved Mining and Reclamation Plan. The Financial Assurances shall include estimates to cover reclamation for existing conditions and anticipated activities during the upcoming year, excepting that the operator may not claim credit for reclamation scheduled for completion during the coming year. The updated cost estimates shall be considered during the Department s annual inspection and accepted thereafter if further adjustment is not required. Any required changes shall be completed and submitted within thirty (30) days of notice from the County. 8. Revisions to Financial Assurances shall be submitted to the Director for approval by July 1st each year. The Financial Assurances shall cover the cost of reclamation of existing disturbance and anticipated activities for the next calendar year, including any required interim reclamation. If revisions to the Financial Assurances are not required, the operator shall explain, in writing, why revisions are not required. H. MINING AND RECLAMATION STNADARDS The standards for surface mining operations and reclamation shall be as follows: 1. No extraction of material or overburden shall be permitted within twenty-five (25) feet of any property boundary nor within fifty (50) feet of a boundary contiguous with a public road right-of-way or recorded residential subdivision. 2. No stockpiled soil or material shall be placed closer than twenty-five (25) feet from a property boundary. 3. No production from an open pit shall create a slope steeper than 2:1 within fifty (50) feet of a property boundary nor steeper than 1½:1 elsewhere on the property, except steeper slopes may be created in the conduct of extraction for limited periods of time prior to grading the slope to its reclamation configuration, and slopes of 1:1 may be maintained five (5) feet below the lowest water table on the property, experienced in the preceding three (3) years. 4. Security fencing four (4) feet in height consisting of not less than three (3) strands of barbed wire, or an approved equivalent, shall be placed along any property line abutting a public right-of-way and around any extraction area where slopes steeper than two (2) feet horizontal to one (1) foot vertical are maintained. Such interior fencing will not be required where exterior fencing surrounds the property. 5. Screening of the site shall be achieved by planting trees of a variety approved by the Director along all property lines adjacent to a public road right-of-way or a recorded residential subdivision. Adequate screening can generally be achieved with evergreen trees planted in two (2) staggered rows, with twenty (20) feet between the rows and between the trees in each row. As an alternative, oleanders or shrubs of a similar size and density may be planted in the same pattern at ten (10) foot intervals. The plant species and planting plan and timetable shall be designated in the Mining and Reclamation Plan. All required plants shall be maintained in a good horticultural manner. In areas where it is found that the planting of trees or shrubs will not achieve the desired screening effect due

10 to soil conditions, the Director may approve an alternate method of screening consisting of meandering dirt berms of sufficient height to screen the site. (Amended by Ord. T-252 adopted ) 6. The first one hundred (100) feet of access road(s) intersecting with a County maintained road shall be surfaced in a manner approved by the Board and shall not exceed a two (2) percent grade and shall have a width of not less than twenty-four (24) feet. 7. Where an access road intersects a County Maintained road, it shall be improved with a driveway approach constructed to Fresno County Standards. 8 All interior roads within the site shall be maintained so as to control the creation of dust. 9. Traffic control and warning signs shall be installed as required by the Commission at the intersection of all private roads with public roads. The placement, size, and wording of these signs shall be approved by the Director. (Amended by Ord. T-252 adopted ) 10. When the plan calls for resoiling, coarse hard mine waste shall be leveled and covered with a layer of finer material or weathered waste. A soil layer shall then be placed on this prepared surface. Surface mine operators who do not salvage soil during the initial operations shall attempt, where feasible, to upgrade remaining materials. The use of soil conditioners, mulches, or imported topsoil shall be considered where revegetation is part of the Mining and Reclamation Plan and where such measures appear necessary. It is not justified; however, to denude adjacent areas of their soil, for any such denuded areas must in turn be reclaimed. 11. The species selected for revegetation shall be those with good survival characteristics for the topography, resoiling characteristics, and climate of the mined area. The operator shall provide a schedule and methodology for monitoring vegetation and replacing vegetation should the Department determine that replacement is necessary. 12. Additional vegetative planting may be required in the interest of erosion control. 13. Grading and revegetation shall be designed to minimize erosion and to convey surface runoff to natural drainage courses or interior basins designed for water storage. Basins that will store water during periods of surface runoff shall be designed to prevent erosion of spillways when these basins have outlet to lower ground. 14. Stockpiles of overburden and minerals shall be managed to minimize water and wind erosion. 15. Erosion control facilities such as settling basins, ditches, stream bank stabilization, and dikes shall be constructed and maintained where necessary to control erosion. 16. Extraction operations adjacent to any flowing stream shall be separated from the stream by closed dikes. No extractions within the stream will be permitted. 17. All water utilized in the plant operation shall be disposed of behind a closed dike so that it will not cause impairment of water in any stream.

11 18. Operations shall be conducted to substantially prevent siltation of groundwater recharge areas. 19. Settling ponds or basins shall be constructed to prevent potential sedimentation of streams at operations where they will provide a significant benefit to water quality. 20. Good operating practices shall at all times be utilized to minimize noise, vibration, dust and unsightliness. In reviewing a proposal the Planning Commission shall consider: a. The location of the processing plant. b. The location where unused equipment will be stored. c. Proposals for the removal of all structures, metallic equipment, debris, or objects upon conclusion of the extraction operations. 21. Operating hours may be limited to designated periods except during periods of public emergency affecting the health and welfare of the community requiring continuous operation. 22. Any night lighting established on the property shall be arranged and controlled so as not to illuminate public rights-of-way or adjacent properties. 23. Processing and storage yards shall be centrally located on the site whenever possible. (Added by Ord adopted ) 24. All surface mining operations and reclamation activities shall be conducted consistent with all policies of the Noise Element of the Fresno County General Plan. (Added by Ord adopted ) 25. The Department shall consider the potentially adverse environmental effects of surface mining operations and will generally require that: a. Disturbances of vegetation and overburden in advance of mining activities be minimized. b. Sufficient topsoil be saved to perform site reclamation in accordance with the Mining and Reclamation Plan. c. All reasonable and practical measures be taken to protect the habitat of fish and wildlife. d. Temporary stream or watershed diversion be restored. e. Permanent piles or dumps of mine waste rock and overburden be stabilized and not restrict the natural drainage without suitable provisions for diversion and toxic materials be removed or confined to control leaching. (Added by Ord adopted ) 26. Reclamation of mined lands shall be implemented in conformance with applicable performance standards as set forth in the State Regulations Sections 3703 et seq. pertaining to the subjects listed below: a. Wildlife habitat. b. Backfilling, regrading, slope stability, and recontouring. c. Revegetation. d. Drainage, diversion structures, waterways, and erosion control. e. Prime and other agricultural land reclamation. f. Building, structure, and equipment removal. g. Stream protection including surface and groundwater. h. Topsoil salvage, maintenance, and redistribution.

12 I. Tailing and mine waste management. j. Closure of surface openings. (Note: The performance standards are detailed in the Department s application materials for Mining and Reclamation Plans.) I. EXCEPTION TO STANDARDS 1. The approved Mining and Reclamation Plan shall be complied with. The Director may, upon written request, approve, subject to limitations imposed by other provisions of law or regulation, minor deviations that are determined not to be significant, will have no adverse effect upon nearby properties and will not constitute a nuisance. A minor deviation may include a change in the excavation phasing and subsequent reclamation phasing; the type of plant materials along the public right-of-way; or operational requirements. In no case will a minor deviation be approved that is in conflict with any condition of the approved CUP, or standard or condition of this Section, unless previously approved by the Planning Commission or Board of Supervisors. Proposed revisions to setbacks, hours or days of operation, life of the permit or additional uses or activities are not to be considered minor deviations. (Amended by Ord. T-252 adopted ; Ord. No. T adopted ) 2. The Planning Commission may grant an exception to any standard contained herein upon written request when such exception will not result in a hazardous condition; the cost of strict compliance would be unreasonable in view of all the circumstances; it is consistent with the planned or actual subsequent use or uses of the mining site; the replacement provision is no less stringent than the initial standard; and the exception will not adversely affect property or persons in the area. Such request may be filed with the original or a subsequent application and shall include a complete statement of justification. J. SPECIAL CONDITIONS 1. Where the reclamation work on any phase is not completed within the time period set forth in the approved Mining and Reclamation Plan or as extended by the Director, the County or its contractor may enter upon the operator's premises to perform said work and use the financial assurance security funds to pay for the cost thereof. In the event the operator fails to complete reclamation work as required herein and the security as specified herein is not sufficient for the cost of reclamation work, the operator shall then be liable to the County for the cost of any work required to be performed by the County in accordance with the Mining and Reclamation Plan. Where the County is authorized to enter upon property to cause work to be done, the CUP may be revoked by the Board of Supervisors upon thirty (30) days written notice first being given to the operator. 2. Prior to the excavation of any material, the operator shall execute a recordable agreement, binding upon his successors, heirs or assigns, covenanting to perform all reclamation in the manner prescribed by the approved CUP and Mining and Reclamation Plan. Said person shall agree to pay all court costs, attorney fees and interest at the legal rate from the date on which such costs have been incurred and further shall waive any and all defenses, legal or equitable, if an action at law is instituted to enforce the provisions of said agreement. The owner(s) shall execute a recordable agreement, binding upon his successors, heirs or assigns, which shall permit the County to enter upon the property to enforce completion of the Mining and Reclamation Plan.

13 3. Reclamation work in any phase shall proceed in such a manner that no excavated area within that phase is allowed to remain in an unreclaimed state for more than three years. Reclamation of any phase shall be completed within one year of commencing operation in any subsequent phase. K. INTERIM MANAGEMENT PLAN 1. Within 90 days of a surface mining operation becoming idle, the operator shall submit to the Department a proposed Interim Management Plan (IMP). The proposed IMP shall fully comply with the requirements of this Section and the conditions of the CUP for the site and shall provide measures the operator will implement to maintain the site in a stable condition, taking into consideration public health and safety. Application shall be made for a modification of the CUP. The proposed IMP shall be processed as an amendment to the Mining and Reclamation Plan as set forth in Section 858-E including the thirty (30) day review by the DOC Director. IMPs shall not be considered a project for the purposes of environmental review. 2. The Financial Assurances for an idle operation shall be maintained as though the operation were active. 3. Within sixty (60) days of receipt of the proposed IMP, or a longer period mutually agreed upon by the Director and the operator, the Planning Commission shall review and approve or deny the IMP in accordance with this Section. If there are deficiencies in the Plan, the operator shall have thirty (30) days, or a longer period mutually agreed upon by the operator and the Director, to submit a revised IMP. The Planning Commission shall approve or deny the revised IMP within sixty (60) days of receipt. If the Planning Commission denies the revised IMP, the operator may appeal that action to the Board of Supervisors. The appeal hearing shall be scheduled within forty-five (45) days from the filing of appeal or a longer period if mutually agreed upon. 4. The IMP may remain in effect for a period not to exceed five (5) years. At that time, upon application by the operator, the Planning Commission may renew the IMP for another period not to exceed five (5) years if the operation is in full compliance with the IMP, or require the operator to commence reclamation in accordance with its approved Mining and Reclamation Plan. L. OPERATOR S ANNUAL REPORT REQUIREMENTS 1. The surface mining operator shall forward an annual surface mining report to the State Department of Conservation and to the County Department of Public Works & Development Services on a date established by DOC, upon forms furnished by SMGB. The State s prescribed fees shall be forwarded to DOC with the annual report. A new mining operator must file an initial surface mining report and applicable filing fee with DOC prior to commencement of operations or within thirty (30) days of Site Plan Review approval, whichever is sooner. The DOC Director shall provide notification of receipt of the report and fee and shall also advise of any deficiencies in the report within ninety (90) days of receipt of said report. The operator or agent shall have thirty (30) days in which to submit a revised report.

14 2. The operator shall also submit annual adjustment information to the Department for updating of the Financial Assurances consistent with Section 858-G. This is required prior to July 1 of each year. M. ANNUAL INSPECTIONS AND REPORTS 1. The Department shall conduct or cause an inspection of the surface mining operation within six (6) months of receipt of the operator s annual report to determine whether the surface mining operation is in compliance with the approved CUP and Mining and Reclamation Plan, approved Financial Assurances, and State Regulations. At least one inspection shall be conducted in each calendar year. Said inspections may be made by a State-registered geologist, State-registered civil engineer, State-licensed landscape architect, or State-registered forester, who is experienced in land reclamation and who has not been employed by the mining operation in any capacity during the previous twelve (12) months, or other qualified specialists, as selected by the Director. The annual inspection shall be conducted using a form approved and provided by the SMGB. The Department shall submit the completed inspection form to the DOC Director within thirty (30) days of the date of completion of the inspection along with a notice of completion of the inspection which contains statements on compliance with SMARA, any inconsistencies with SMARA and any pending action on the Mining and Reclamation Plan, amendments, or Financial Assurances. Copies shall also be sent to the operator. The operator shall be responsible for the reasonable cost of the inspection. 2. By July 1 of each year, the Department shall submit to the DOC Director a report on each active or idle mining operation. The report shall consist of a copy of any CUP or Mining and Reclamation Plan amendment, as applicable, or a statement that there have been no changes during the previous year. 3. The Department shall annually review and update, as necessary, the Financial Assurances of each surface mining operation based on annual adjustment data submitted by the operator pursuant to Section 858-G. N. PUBLIC RECORDS Mining and Reclamation Plans, reports, applications, and other documents submitted to the County are public records unless it can be demonstrated to the satisfaction of the County that the release of such information, or part thereof, would reveal production, reserves, or rate of depletion entitled to protection as proprietary information. The County shall identify such propriety information as a separate part of each application. A copy of all permits, Mining and Reclamation Plans, reports, applications, and other documents submitted pursuant to this Section, including proprietary information, shall be forwarded to the DOC by the Department. Proprietary information shall be made available to persons other than the DOC Director only when authorized by the mine operator and by the mine owner. O. VIOLATIONS AND PENALTIES If the Director, based upon an annual inspection or otherwise confirmed by an inspection of the mining operation, determines that a surface mining operation is not in compliance with this Section, the Conditional Use Permit and/or the Mining and Reclamation Plan, the County shall follow the procedures set forth in SMARA (Public Resources Code, and ) concerning violations and penalties, as well as those provisions of the County Zoning Ordinance for revocation of the CUP which are not preempted by SMARA.

15 (Note: Failure of the County to comply with provisions of SMARA and the State Regulations may be grounds for the SMGB to take action to assure compliance through administration of SMARA.) ---- P. FEES The County may establish such fees as it deems necessary to cover the reasonable costs incurred in implementing this Section and the State regulations, including but not limited to, processing of applications, annual reports, inspections, monitoring, enforcement and compliance. Such fees shall be paid by the operator, as required by the County at the time of filing of the CUP application, Mining and Reclamation Plan application, and at such other times as are determined by the County to be appropriate in order to ensure that all reasonable costs of implementing this Section are borne by the mining operator.

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS 20.8.10 PURPOSE AND INTENT... 8-2 20.8.20 INCORPORATION OF SMARA AND STATE REGULATIONS... 8-2 20.8.30 APPLICABILITY...8-2 20.8.40 CONTENTS OF

More information

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS CHAPTER 19.66 SURFACE MINING AND RECLAMATION PLAN REGULATIONS Section: 19.66.010 PURPOSE AND INTENT 19.66.020 INCORPORATION OF SMARA AND STATE REGULATIONS 19.66.030 APPLICABILITY 19.66.040 EXEMPTIONS 19.66.050

More information

Surface Mining and Reclamation

Surface Mining and Reclamation Page 1 of 17 Surface Mining and Reclamation A. PURPOSE AND INTENT: The County of Trinity recognizes that the extraction of minerals is essential to the continued economic well-being of the County and to

More information

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Chapter SURFACE MINING AND RECLAMATION

Chapter SURFACE MINING AND RECLAMATION Chapter 18.02 SURFACE MINING AND RECLAMATION Sections: 18.02.010 Authority and purpose. 18.02.020 Definitions. 18.02.025 Designation of areas of Regional/Statewide Significance and State policy. 18.02.030

More information

Jim Pompy Assistant Director

Jim Pompy Assistant Director California Department of Conservation Office of Mine Reclamation Jim Pompy Assistant Director Managing California s Working Lands (SMARA) an OVERVIEW Supports production and conservation of California

More information

Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages...

Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages... Chapter 34 Index Article I Definitions; General Provisions 34-1 Definitions... 34-1 34-2 Purpose... 34-2 34-3 Application; Variances; Minimum Requirements... 34-3 34-4 Reserved... 34-3 34-5 Reserved...

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

CHAPTER 9: BUILDING REGULATIONS

CHAPTER 9: BUILDING REGULATIONS 9-2-1 Permit Required... 210 9-2-2 Exempted Work... 210 9-2-3 Application for a Grading Permit... 210 9-2-4 General Grading Permit... 211 9-2-5 Engineered Grading Permit... 211 9-2-6 Hazards... 212 9-2-7

More information

ROBINSON TOWNSHIP th Avenue, Grand Haven, Michigan

ROBINSON TOWNSHIP th Avenue, Grand Haven, Michigan ROBINSON TOWNSHIP 12010-120 th Avenue, Grand Haven, Michigan 49417 616-846-2210 REQUEST FOR EARTH CHANGE - CLASS A REQUEST FEE: $150.00 + ESCROW FEE MINIMUM OF $300.00 (Escrow fees cover additional Township

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO ADOPTED: October 1, EFFECTIVE: October 22, 2018

TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO ADOPTED: October 1, EFFECTIVE: October 22, 2018 TOWNSHIP OF STURGIS ST. JOSEPH COUNTY MICHIGAN ORDINANCE NO. 2018-1 ADOPTED: October 1, 2018 EFFECTIVE: October 22, 2018 An Ordinance to add provisions for large solar energy systems to the Township Zoning

More information

DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE , 6206, 6207, /09/03

DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE , 6206, 6207, /09/03 DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE 03-005 03-45 6102.01, 6206, 6207, 6402 06/09/03 03-061 03-71 Deleted berm regs (moved to Chapter 3) 9/8/03 04-077 07-44 Comprehensive

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL ARTICLE 20 SOIL EROSION AND SEDIMENT CONTROL 20.01 Activities Affected... 20-1 20.02 Exemptions to Soil Erosion and Sediment Control Requirements... 20-2 20.03 Basic Erosion Control Objectives... 20-3

More information

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO: PERMIT NUMBER: GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD 57701 ID NO: (605) 394-4157 PIN NO: APPLICATION DATE: DATE ISSUED: PROPERTY INFORMATION CONTRACTOR INFORMATION LOT ADDRESS

More information

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL 150.270 STATUTORY AUTHORIZATION. This subchapter is adopted pursuant to the authorization and policies contained in M.S. Chs.

More information

Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act Application

Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act Application COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act

More information

(B) "Facility," for the purposes of this rule, means:

(B) Facility, for the purposes of this rule, means: 3745-27-13 Procedure to engage in filling, grading, excavating, building, drilling, or mining on land where a hazardous waste facility or solid waste facility was operated. (A) No person shall, without

More information

SURFACE MINING PERMIT AND RECLAMATION PLAN

SURFACE MINING PERMIT AND RECLAMATION PLAN Sutter County Community Services Department 1130 Civic Center Boulevard Yuba City, California, 95993 (530) 822-7400 APPLICATION PACKET FOR SURFACE MINING PERMIT AND RECLAMATION PLAN The attached information

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

CHAPTER MANUFACTURED HOME PARKS

CHAPTER MANUFACTURED HOME PARKS CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 18.65 MANUFACTURED HOME PARKS Sections: 18.65.010 Intent 18.65.020 Binding Site Plan 18.65.030 Permitted Uses and General Requirements 18.65.040 Manufactured Home

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

GRADING PERMIT APPLICATION

GRADING PERMIT APPLICATION Butte County Department of Public Works Butte County Department of Development Services/Planning Division 7 County Center Drive, Oroville, CA 95965 (530) 538-7266 / (530) 538-7601 GRADING PERMIT APPLICATION

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements PURPOSE OF THIS DOCUMENT: This document contains preliminary draft language related to silica sand

More information

Wind Energy ARTICLE XL - WIND ENERGY AN ORDINANCE REGULATING THE DEVELOPMENT OF WIND ENERGY SYSTEMS

Wind Energy ARTICLE XL - WIND ENERGY AN ORDINANCE REGULATING THE DEVELOPMENT OF WIND ENERGY SYSTEMS Wind Energy ARTICLE XL - WIND ENERGY AN ORDINANCE REGULATING THE DEVELOPMENT OF WIND ENERGY SYSTEMS 40.0 Authority. 40.1 Purpose. 40.2 Applicability. 40.3 Definitions. 40.4 Standards. 40.5 Permit Requirements.

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

Title 15 BUILDINGS AND CONSTRUCTION

Title 15 BUILDINGS AND CONSTRUCTION Title 15 BUILDINGS AND CONSTRUCTION Chapters: 15.04 International Codes Adopted 15.08 Building Permits 15.12 Movement of Buildings Chapter 15.04 INTERNATIONAL CODE COMMISSION CODES Sections: 15.04.010

More information

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application WORK SITE INFORMATION: Address: City: State: Zip Code: Foreman: Phone: ( ) Email Address: Purpose: CONTRACTOR INFORMATION:

More information

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information. MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

TEXAS SURFACE MINING RECLAMATION ACT (SMRA) 2017

TEXAS SURFACE MINING RECLAMATION ACT (SMRA) 2017 TEXAS SURFACE MINING RECLAMATION ACT (SMRA) 2017 Summary; As Texas develops into the 21 st century the amount of sand and gravel needed for infrastructure growth will expand exponentially. Sand and gravel

More information

CHAPTER 14 BUILDING CODE

CHAPTER 14 BUILDING CODE CHAPTER 14 BUILDING CODE 14.01 Title 14.02 Purpose 14.03 Scope 14.04 State Codes Adopted 14.05 Building Inspector 14.06 Building Permits and Inspection 14.07 Erosion Control 14.08 Permit Fees 14.09 Residential

More information

Fence and Wall Requirements

Fence and Wall Requirements Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include

More information

SECTION 2-8 BED AND BREAKFAST FACILITIES (inclusive of Bed and Breakfast, Bed and Breakfast Establishments With and Without Public dining, and Inns)

SECTION 2-8 BED AND BREAKFAST FACILITIES (inclusive of Bed and Breakfast, Bed and Breakfast Establishments With and Without Public dining, and Inns) CHAPTER 2: GENERAL STANDARDS OF PERFORMANCE SECTION 2-1 - ENVIRONMENTAL Soil Suitability Prevention of Erosion Mineral Exploration, Excavation and Gravel Pits Floodplain Management Shoreland Area Protection

More information

INSTRUCTIONS FOR PREPARATION OF APPLICATION FORM FOR SURFACE MINING PERMIT AND/OR RECLAMATION PLAN

INSTRUCTIONS FOR PREPARATION OF APPLICATION FORM FOR SURFACE MINING PERMIT AND/OR RECLAMATION PLAN INSTRUCTIONS FOR PREPARATION OF APPLICATION FORM FOR SURFACE MINING PERMIT AND/OR RECLAMATION PLAN KERN COUNTY PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT 2700 "M" Street, Suite 100 Bakersfield, CA 93301

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

Town of Whitby Public Works Department

Town of Whitby Public Works Department Town of Whitby Public Works Department Guide to Site Alteration Pre-Screening Questionnaire and Site Alteration / Haul Route Permit Application NOTE: FOR AN ACCESSIBLE VERSION OF THIS DOCUMENT PLEASE CONTACT

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket10-13-2015part3-1Nsm 10.19. SMALL SCALE SAND AND GRAVEL EXTRACTION. 10.19.1. Applicability. This section applies to any mineral

More information

914. "I-1", LIGHT INDUSTRIAL DISTRICT

914. I-1, LIGHT INDUSTRIAL DISTRICT 914. "I-1", LIGHT INDUSTRIAL DISTRICT 914.010. PURPOSE. The purpose of the "I-1", Light Industrial District is to provide for the establishment of warehousing and light or limited industrial development

More information

SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089

SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089 SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089 1. The approval herein granted is limited to beneficial use of lime kiln dust (LKD) as a soil amendment, for stabilization/solidification of soils and sludges,

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements. AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE Sec. 13-1-34 is created to read as follows: Sec. 13-1-34 Lake Superior Shoreland Lot Development Requirements. Introduction. Much of Bayfield County s Lake

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER BUREAU PART 17. SOIL EROSION AND SEDIMENTATION CONTROL

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER BUREAU PART 17. SOIL EROSION AND SEDIMENTATION CONTROL DEPARTMENT OF ENVIRONMENTAL QUALITY WATER BUREAU PART 17. SOIL EROSION AND SEDIMENTATION CONTROL (By authority conferred on the department of environmental quality by sections 9104 and 9114 of 1994 PA

More information

Sec Abandonment of Certain Oil/Gas Land Uses. (Added by Ord. 4551, 9/21/04)

Sec Abandonment of Certain Oil/Gas Land Uses. (Added by Ord. 4551, 9/21/04) Sec. 35-323. Abandonment of Certain Oil/Gas Land Uses. (Added by Ord. 4551, 9/21/04) Sec. 35-323.1. Purpose and Intent. This section establishes procedures to achieve the timely abandonment of applicable

More information

LYNNE MOUNDAY COUNTY OF MONTEREY. In the matter of the application of FINDINGS AND DECISION Randall Ricketts (PLN020164)

LYNNE MOUNDAY COUNTY OF MONTEREY. In the matter of the application of FINDINGS AND DECISION Randall Ricketts (PLN020164) LYNNE MOUNDAY COUNTY OF MONTEREY ZONING ADMINISTRATOR STATE OF CALIFORNIA 020164 RESOLUTION NO. 000 A. P. # 187-111-026- In the matter of the application of FINDINGS AND DECISION Randall Ricketts (PLN020164)

More information

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2)

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2) WASHINGTON COUNTY DIVISION OF PLAN REVIEW AND PERMITTING 80 West Baltimore Street Hagerstown, Maryland 21740-6003 Telephone: (240) 313-2460 FAX: (240) 313-2461 Hearing Impaired call 7-1-1 for Maryland

More information

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE Sec. 16-291. Construction site management. (a) Construction site management plan required. No building permit shall be issued unless a construction site management plan has been submitted and approved

More information

UC SANTA CRUZ EROSION AND SEDIMENT CONTROL STANDARDS FOR PROJECTS UNDER ONE ACRE

UC SANTA CRUZ EROSION AND SEDIMENT CONTROL STANDARDS FOR PROJECTS UNDER ONE ACRE CAMPUS STANDARDS APPENDIX D UC SANTA CRUZ EROSION AND SEDIMENT CONTROL STANDARDS FOR PROJECTS UNDER ONE ACRE July 9, 2012 UCSC Campus Standards Handbook Erosion and Sediment Control Standards Appendix

More information

Lane Code CHAPTER 16 CONTENTS

Lane Code CHAPTER 16 CONTENTS Lane Code CHAPTER 16 CONTENTS SAND, GRAVEL & ROCK PRODUCTS ZONE (SG-RCP) 16.217 Sand, Gravel & Rock Products Zone (SG-RCP). SAND, GRAVEL & ROCK PRODUCTS-CONTROLLED PROCESSING ZONE (SG-CP-RCP) 16.218 Sand,

More information

ORD WHEREAS, the public necessity, convenience, general welfare and good zoning practice so require;

ORD WHEREAS, the public necessity, convenience, general welfare and good zoning practice so require; ORD-3370 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 AN ORDINANCE TO AMEND SECTIONS 1, 2, 3, 5, 7, 9, 11, 12 AND 14 OF THE SOUTHERN WATERSHEDS

More information

SOLID WASTE MANAGEMENT FACILITY STRUCTURAL FILL, MINE RECLAMATION Permit No Green Meadow, LLC and Charah, Inc. are hereby issued a

SOLID WASTE MANAGEMENT FACILITY STRUCTURAL FILL, MINE RECLAMATION Permit No Green Meadow, LLC and Charah, Inc. are hereby issued a Facility Permit No:1910 Page 1 of 9 Pat McCrory Governor North Carolina Department of Environment and Natural Resources Division of Waste Management Donald R. van der Vaart Secretary STATE OF NORTH CAROLINA

More information

Revised Code of Ordinances of the City of Hallowell (1997) SUBCHAPTER VIIIA SITE PLAN REVIEW

Revised Code of Ordinances of the City of Hallowell (1997) SUBCHAPTER VIIIA SITE PLAN REVIEW SUBCHAPTER VIIIA SITE PLAN REVIEW [Subchapter Derivation: Ord. No. 09-08, effective 7/23/2009] SECTION 9-861 PURPOSE The site plan review provisions set forth in this subchapter are intended to protect

More information

CHAPTER 11 Grading, Erosion and Sediment Control

CHAPTER 11 Grading, Erosion and Sediment Control CHAPTER 11 Grading, Erosion and Sediment Control Section 11-1. Introduction/ Purpose During the construction process, soil is highly vulnerable to erosion by wind and water. Eroded soil endangers water

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

CHARTER TOWNSHIP OF PORT HURON

CHARTER TOWNSHIP OF PORT HURON CHARTER TOWNSHIP OF PORT HURON 3800 Lapeer Road Phone: (810) 987-6600 Port Huron Twp., Michigan 48060 Fax: (810) 987-6712 www.porthurontownship.org KLavigne@PortHuronTownship.org MEMORANDUM To: Chairman

More information

2.04 Applicability. This ordinance applies to all unincorporated lands within the boundaries of Henry County.

2.04 Applicability. This ordinance applies to all unincorporated lands within the boundaries of Henry County. Henry County Zoning Ordinance Appendix B Wind Energy As Amended December 12, 2009 Appendix B Wind Energy 2.01 Title. Wind Energy Ordinance 2.02 Authority. 2.03 Purpose. 2.04 Applicability. 2.05 Definitions.

More information

ARTICLE IV: DEVELOPMENT STANDARDS GRADING AND DRAINAGE

ARTICLE IV: DEVELOPMENT STANDARDS GRADING AND DRAINAGE ARTICLE IV: DEVELOPMENT STANDARDS IV-63 410 GRADING AND DRAINAGE 410-1 General Provisions 410-1.1 All grading and drainage activities are to occur pursuant to the provisions of Chapter 14.12 of the Washington

More information

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION 1 TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION Draft 2/08/10 (Revised 02-14-11,Revised 02-21-11, Revised 03-03-11, Revised 04-19-11, Revised 04-20-11, Revised 05-05-11, Revised 05-09-11). DEFINITIONS

More information

ARTICLE III: LAND USE DISTRICTS EXCLUSIVE FOREST AND CONSERVATION DISTRICT (EFC)

ARTICLE III: LAND USE DISTRICTS EXCLUSIVE FOREST AND CONSERVATION DISTRICT (EFC) ARTICLE III: LAND USE DISTRICTS III-129 342 EXCLUSIVE FOREST AND CONSERVATION DISTRICT (EFC) 342-1 Intent and Purpose The Exclusive Forest and Conservation District is intended to provide for forest uses

More information

GRADING GUIDELINES. Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011

GRADING GUIDELINES. Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011 GRADING GUIDELINES Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011 County Surveyor - Building Inspection - Drainage - Floodplain - Special

More information

James & Nanci Dobbins (PLN030106)

James & Nanci Dobbins (PLN030106) MIKE NOVO ZONING ADMINISTRATOR COUNTY OF MONTEREY STATE OF CALIFORNIA RESOLUTION NO. 030106 A. P. # 007-341-005-000 In the matter of the application of James & Nanci Dobbins (PLN030106) FINDINGS & DECISION

More information

TABLE OF CONTENTS. PLANNING COMMISSION MEETING December 4, 2018

TABLE OF CONTENTS. PLANNING COMMISSION MEETING December 4, 2018 TABLE OF CONTENTS PLANNING COMMISSION MEETING December 4, 2018 FILE NUMBER: MA 2018-001 PROPERTY OWNER: Frank Turner TYPE OF APPLICATION: Minor Amendment Staff Report...001 Vicinity Map and Site Maps...006

More information

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6 minus) L. Road Construction All roads shall be a minimum of 200' in length and shall comply with all applicable provisions of this ordinance. No building permit shall be issued for a property until the road constituting

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:

More information

TITLE TEN - STREETS AND SIDEWALKS

TITLE TEN - STREETS AND SIDEWALKS TITLE TEN - STREETS AND SIDEWALKS Table of Contents CHAPTER 1 - IMPROVEMENTS, EXCAVATIONS, ALTERATIONS... 2 CHAPTER 2 - OBSTRUCTIONS... 5 CHAPTER 3 - SIDEWALK INSTALLATION... 6 CHAPTER 4 - COMMERCIAL LANDSCAPING...

More information

Grading & Excavation Information Application & Checklist

Grading & Excavation Information Application & Checklist Grading & Excavation Information Application & Checklist Yakima County Public Services ~ Building & Fire Safety Division 128 North 2 nd Street, Yakima, WA 98901 ~ Office (509) 574-2300 Building & Fire

More information

HEIGHT, TOTAL SYSTEM: The height above grade of the system, including the generating unit and the highest vertical extension of any blades or rotors.

HEIGHT, TOTAL SYSTEM: The height above grade of the system, including the generating unit and the highest vertical extension of any blades or rotors. SECTION I - INTENT The intent of this ordinance is to balance the need for clean, renewable energy resources and the necessity to protect the public health, safety and welfare of the community. The [City/County]

More information

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY The Right-of-Way Encroachment, Excavation & Grading Permit issued by the Public Works Department

More information

Chapter 9.37 Soil Erosion and Dust Control

Chapter 9.37 Soil Erosion and Dust Control Chapter 9.37 Soil Erosion and Dust Control Sections: 9.37.010- Purpose 9.37.020- Applicability 9.37.030- Exempt Activities 9.37.040 Soil Erosion, Sediment and Dust Control Plans 9.37.050- Wind-Borne Soil

More information

SPECIAL CONDITIONS GENERAL PERMIT NO. WMGM016

SPECIAL CONDITIONS GENERAL PERMIT NO. WMGM016 1. The approval herein granted is limited to the processing and beneficial use of trees, tree stumps, limbs, clean pallets, untreated and unpainted scrap lumber, packing crates and brush, hereinafter referred

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

(1) Deliver the scrap tires only to destinations listed in paragraph (C)(1) of this rule.

(1) Deliver the scrap tires only to destinations listed in paragraph (C)(1) of this rule. 3745-27-56 Standards for transporters of scrap tires. (A) Applicability. Any person transporting scrap tires in Ohio shall comply with the standards for transportation of scrap tires in this rule and the

More information

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS Section 1201 Applicability For the purpose of this Article, recreation vehicles and recreational vehicle

More information

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Section 5. DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Earthen slopes shall conform to the following: Maximum slope should not be steeper than 6:1 (horizontal to vertical) unless protected from

More information

Grading Requirements City of Red Bluff Table of Contents. Introduction and Scope...1. Permit Exempt Work...1. Permit Application Submittals...

Grading Requirements City of Red Bluff Table of Contents. Introduction and Scope...1. Permit Exempt Work...1. Permit Application Submittals... Table of Contents General Notes Introduction and Scope...1 Permit Exempt Work...1 Permit Application Submittals...2 Other Procedural Requirements...3 Exhibit A - Grading Plans...4 Exhibit B - Milestones

More information

STAFF REPORT TOMMER SHORT TERM MINERAL EXTRACTION

STAFF REPORT TOMMER SHORT TERM MINERAL EXTRACTION STAFF REPORT TOMMER SHORT TERM MINERAL EXTRACTION TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE: Tommer, CUP-2017-05 DATE: August 16, 2018 I. GENERAL INFORMATION Requested

More information

Oklahoma Underground Facilities Damage Prevention Act

Oklahoma Underground Facilities Damage Prevention Act Oklahoma Underground Facilities Damage Prevention Act For your reference a copy of the act has been included in this guide. The act may be changed at any time and you should contact Oklahoma One-Call System,

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus

More information

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

SECTION TEMPORARY ENVIRONMENTAL CONTROLS SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall provide environmental controls consistent with regulatory requirements throughout the duration

More information

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit

More information

Washoe County PLAN SUBMITTAL

Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Grading Residential and Commercial Washoe County Permits Plus Zone 1001 East Ninth Street PO Box 11130 Reno, NV 89520-0027 GRADING PERMIT SUBMITTAL GUIDELINES The following

More information

7 Mineral and Energy Resources

7 Mineral and Energy Resources 7 Mineral and Energy Resources This chapter examines Humboldt County s mineral (including sand and gravel extraction) and energy (oil, gas, and geothermal) resources. Existing General Plan policies and

More information

SECTION DEFINITIONS. For the purposes of this chapter, the following definitions shall apply.

SECTION DEFINITIONS. For the purposes of this chapter, the following definitions shall apply. COUNTY OF SAN MATEO ENVIRONMENTAL SERVICES AGENCY PLANNING AND BUILDING DIVISION REGULATIONS FOR EXCAVATING, GRADING, FILLING AND CLEARING ON LANDS IN UNINCORPORATED SAN MATEO COUNTY [From Chapter 8, Division

More information

Chapter 9. Grading and Excavating

Chapter 9. Grading and Excavating Chapter 9 Grading and Excavating Part 1 Grading, Clearing, Excavating, and Filling 9-101. General Requirements 9-102. Permit Fees 9-103. Inspections 9-104. Excavation Standards 9-105. Fill Standards 9-106.

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

AN ORDINANCE OF THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, ADDING ARTICLE 5 TO CHAPTER 6 OF DIVISION

AN ORDINANCE OF THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, ADDING ARTICLE 5 TO CHAPTER 6 OF DIVISION ORDINANCE NO. AN ORDINANCE OF THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, ADDING ARTICLE TO CHAPTER OF DIVISION OF TITLE OF THE SAN BERNARDINO COUNTY CODE RELATING TO GROUNDWATER MANAGEMENT IN THE

More information

Soil Removal and Deposit Regulation Bylaw No. 3786, 1992

Soil Removal and Deposit Regulation Bylaw No. 3786, 1992 District of West Vancouver Soil Removal and Deposit Regulation Bylaw No. 3786, 1992 Effective Date March 22, 1993 Consolidated for Convenience Only This is a consolidation of the bylaws below. The amendment

More information

CHAPTER 3 EXCAVATIONS

CHAPTER 3 EXCAVATIONS 7-3-1 7-3-1 CHAPTER 3 EXCAVATIONS SECTION: 7-3-1: Permit Requirements 7-3-2: Bond Required 7-3-3: Subject and Excluded Excavations 7-3-4: Standards 7-3-5: Protection of Public 7-3-6: Relocation and Protection

More information

Drainage District(s):

Drainage District(s): APPLICANT: APPLICATION FOR APPROVAL OF CONSTRUCTION ACROSS ESTABLISHED SAC COUNTY DRAINAGE DISTRICTS AND ESTABLISHED MULTI-COUNTY DRAINAGE DISTRICTS Name of Individual or Company Street Address or P. O.

More information

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY CULVERTS, ROAD BORES, USE OF HEAVY EQUIPMENT AND UTILITY LINES WITHIN GRAYSON COUNTY ROAD

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information