Proposed Test Protocol for Evaluating Performance of Sediment Control Devices for Roadside Storm Water Runoff

Size: px
Start display at page:

Download "Proposed Test Protocol for Evaluating Performance of Sediment Control Devices for Roadside Storm Water Runoff"

Transcription

1 Proposed Test Protocol for Evaluating Performance of Sediment Control Devices for Roadside Storm Water Runoff Jett McFalls, Aditya Raut Desai, Derrold Foster, and Ming-Han Li This paper details an official testing program developed by researchers at the Texas Transportation Institute (TTI) to classify sediment retention devices on the basis of their sediment removal performance. The testing facility designed as part of this study was constructed at the Texas Department of Transportation TTI Hydraulics, Sedimentation, and Erosion Control Laboratory (HSECL) located at the Texas A&M University Riverside Campus. The facility consists of a parabola-shaped testing channel 4.6 m (15 ft) wide and 5.5 m (18 ft) long with a maximum depth of 0.8 m (2.5 ft) at the center and a slope of 3%. Two commercially available artificial sediments were mixed in equal proportions to create the artificial storm water for testing. The flow rate and turbidity of the water entering and leaving the channel were monitored for the duration of the test. The turbidity measurements were converted to suspended solid concentration by using a relationship developed in the HSECL laboratory. A simple mass balance calculation was used to determine the amount of sediment trapped in the channel. Transportation construction activities such as the building of highways, streets, and bridges in the United States represent approximately 7% ($83 billion) of the total amount of dollars spent annually by the construction industry (1). In Texas, the Texas Department of Transportation is responsible for the construction and maintenance of the 80,000-mi network of state roadways. Construction activities associated with highway projects involve heavy earthmoving operations that disturb several square miles of undisturbed land areas. In 2007 alone, the Texas DOT reported 1,541 active construction contracts throughout Texas that resulted in significant areas of topsoil disturbance. The most detrimental environmental impact of highway construction and maintenance results from erosion of the exposed topsoil during storm events. Although erosion is a naturally occurring phenomenon, construction activities disturb the natural vegetative cover, causing the erosion processes at such sites to proceed at a significantly higher rate than the natural erosion rate. Landphair and colleagues reported that erosion from construction sites in the United States deposits approximately 3.5 billion metric tons of sediment into streams and rivers annually (2). The concen- J. McFalls and D. Foster, Texas Transportation Institute, 3135 TAMU; A. R. Desai, Department of Civil Engineering, 3136 TAMU; and M.-H. Li, Department of Landscape Architecture and Urban Planning, 3137 TAMU, Texas A&M University, College Station, TX Corresponding author: J. McFalls, j-mcfalls@ttimail. tamu.edu. Transportation Research Record: Journal of the Transportation Research Board, No. 2170, Transportation Research Board of the National Academies, Washington, D.C., 2010, pp DOI: / trations of sediment released from construction sites range from being 10 to 20 times higher than the concentrations released from agricultural lands and 1,000 to 2,000 times higher than the concentrations released from naturally forested land (3). Barrett et al. reported a fivefold increase in the suspended solids concentration (SSC) in a creek receiving water from an active construction site during and immediately after storm events (4). Therefore, a few hours of discharge from a construction site can contribute more sediment to streams and rivers in comparison with what can be deposited from other natural or anthropogenic sources over a much longer period of time. This accounts for a potentially large volume of sediment that could be carried off by storm water to the receiving water bodies. Several problems are associated with soil erosion. Erosion degrades the quality of the water in the receiving water bodies and causes other problems, such as sedimentation in streams. Sediment increases the turbidity of water, causing a nuisance to aquatic life while also affecting the aesthetics of the receiving water body. Furthermore, pollutants like heavy metals and hydrocarbons in runoff water partition onto the soil particles and are transported with the sediments to the receiving water bodies (5 7). Past studies have indicated that the effects downstream from construction activities are temporary and that the total SSC normalizes after construction activities have stopped (4). To mitigate the problems associated with sediment migration from construction sites to receiving bodies, it is imperative that proper erosion and sediment control measures be incorporated during the construction and postconstruction phases of projects until adequate protective vegetative cover has become reestablished at the disturbed site. The Texas DOT has defined critical performance factors for erosion control products and has established minimum performance standards that must be met for any product seeking to be approved for use as part of any of the construction or maintenance activities of the Texas DOT. The Texas DOT currently has a program in place to evaluate the performance of erosion control products through a series of controlled tests. The Texas DOT bases its approved product list on this documented field performance of the erosion control products. Performance data on erosion control materials are readily available. However, information on the performance of sediment control best management practices (BMPs) is limited. Most designers and engineers are left with no informational options other than manufacturers claims or simple field observations. Establishment and classification of available sediment retention device (SRD) BMPs based on their measured performance would assist the designers and engineers with selecting the appropriate product and methods for sitespecific application. The standard presented in this report is similar to that described by ASTM (ASTM D6459). 74

2 McFalls, Desai, Foster, and Li 75 DESCRIPTION OF TESTING FACILITY Researchers conceptualized several designs for the testing facility on the basis of the protocol available at the time. The current design was selected from these designs. The testing facility is composed of the following five distinct elements: Mixing tank, Sediment delivery system, Testing channel, Sediment collection system, and Monitoring system. Mixing Tank To mix and deliver the sediment into the test channel, a 1,600-gal polypropylene cylindrical tank with a conical hopper bottom with a 6-in. butterfly valve is used. A three-phase electric motor and double mixing paddles ensure proper mixing of the sediment-laden test water. Figure 1 shows the mixing tank with the motor at its present location in the testing facility. Sediment Delivery System The sediment delivery system is an assembly of 6-in.-diameter pipes used to convey sediment from the mixing tank to the testing channel. Figures 2a and 2b show the two locations in the sediment delivery system where ports for measuring the turbidity and flow rate of the sediment-laden water entering the testing channel are provided. Testing Channel The testing channel is a parabola-shaped, concrete conduit 4.6 m (15 ft) wide and 5.5 m (18 ft) long with a maximum depth of 0.8 m (2.5 ft) at the center and with a constant slope of 3%. The testing channel is made up of three distinct zones (Figure 3): Retention zone, Installation zone, and Collection zone. The retention zone is 3.7 m (12 ft) long. The sediment-laden water entering the channel is retained behind the SRD in this zone, which allows the sediment to settle out of the water. The installation zone is a 4-ft opening between the retention zone and the collection zone with metal sliding gates on either side. The installation zone can be filled with any type of test soil. The proposed soil for testing SRDs is a clay with a high plasticity index. The surface of the clay in the installation zone was shaped to match the profile of the channel. The installation zone serves as a region for installing the SRD to be tested according to the specifications of each manufacturer. The collection zone is a concrete section 0.6 m (2 ft) long at the downstream end of the testing channel, where the water passing through the SRD could be directed into the collection zone. The sediment collection system is attached to the end of the collection zone. Sediment Collection System The sediment collection system consists of an aluminum tray attached to the collection zone that channeled the water, which leaves the testing channel and enters a series of 6-in.-diameter pipes (Figure 4a). Two ports in the sediment collection system provide access for measuring the turbidity and flow rate of the sediment-laden water entering the testing channel (Figure 4b). The water leaving the testing channel passes through the sediment collection system and is discharged into a nearby pond after the turbidity and flow rate within the sediment collection system are measured. Monitoring System Two turbidity probes connected to a single controller system and two flowmeters are used to monitor the turbidity and flow rate, respectively. 3-phase motor Mixing tank 6-inch butterfly valve Sediment delivery system FIGURE 1 Polypropylene tank used to mix sediment and create a slurry of known SSC.

3 76 Transportation Research Record inch butterfly valve Port for turbidity probe (a) Port for bubbler tube (b) FIGURE 2 Sediment delivery system from mixing tank to testing channel: (a) port for turbidity probe and (b) port for bubbler tube. Collection zone Installation zone Retention zone Sliding doors Back wall FIGURE 3 Testing channel from SRD evaluation.

4 McFalls, Desai, Foster, and Li 77 Collection tray Port for turbidity probe (a) Port for bubbler tube (b) FIGURE 4 Sediment collection system from testing channel: (a) collection tray and port for turbidity probe and (b) port for bubbler tube. Turbidity Meter Two turbidity sensors installed at the inlet and outlet continuously measure (at 5-s intervals) and record the turbidity of the water entering and leaving the channel. Both sensors are connected to a controller system. Computer software facilitates the retrieval of the turbidity data, which go from the controller system to a field laptop. Flowmeter Two bubbler flowmeters are used to monitor the flow at the inlet and the outlet of the channel. TESTING FACILITY CALIBRATION Before SRDs were tested in the testing facility, the researchers characterized the channel and sediment and calibrated the measuring instruments. Channel The researchers studied the geometry of the channel to determine the relationship between ponding depth and factors that would help quantify the performance of the SRDs tested in the channel (Figure 5). The particle size distribution of sediment was determined on the basis of the information provided by the manufacturers. The flowmeters and turbidity meters were calibrated to determine their ability to measure accurately the flow rate and turbidity, respectively. The testing channel has a known geometry for which the ponding volume can be determined from the ponding depth. The test channel designed as a longitudinal section of a cylinder 25 ft (300 in.) in diameter (D) inclined at a 3% slope (φ =1.72 degrees). The x-, y-, and z-axes are aligned with the cylinder, and the z-axis runs longitudinal to the cylinder. The length of the channel (L) can range from 12 to 16 ft (or 144 to 192 in.), depending on the location of the SRD within the installation zone. The liquid in the cylinder is the volume bounded by four surfaces: the liquid surface, the cylinder wall, the bottom end of the cylinder, and the top end of the cylinder. The relationship between the SRD height and the ponding volume for the testing channel used to evaluate SRDs in this study was determined mathematically by solving Equation 1. The results are indicated in Figure 6. 2r H 2 2 y r cos φ r r y + S + tan φ tan φ sin φ υ = 2r 2 2 H r y 0 r cos φ S + tan φ tan φ sin φ dxdydz () 1

5 78 Transportation Research Record 2170 Sediment The particle size distributions of four different silica sediment combinations, as provided by the manufacturer, are shown in Figure 8. After the particle size distribution of each of the silica sands was examined and laboratory standardization tests of the turbidity probes were performed with each of the silica grades, it was determined that the SIL-CO-SIL-49 product (where 49 indicates that 99% of the particles are less than 49 µm) was the most accurate, potential sediment to be used for testing. Because of the need to mix the silica with ball clay, a 50:50 mixture (by weight) of SIL-CO-SIL-49 and ball clay was also examined as a potential sediment to be used for testing. Monitoring Equipment The turbidity meters and probes were calibrated to determine the abilities of these instruments to measure accurately the turbidity and flow rate, respectively. FIGURE 5 Testing channel designed as longitudinal section of inclined cylinder. where υ=ponding volume, y = coordinates along y-axis, as shown in Figure 5 (in.), r = radius of the cylinder (in.), φ=slope of the channel (radians), S = distance along channel bottom from SRD to depth measurement location (in.), and H = ponding depth measured at a distance S from the SRD (in.). Ponding Volume Ponding volume is the volume of water retained behind an SRD and is a function of the ponding depth at any given time. Figure 7 shows the water retained behind SRDs of five different ponding depths. Turbidity Meter The turbidity meters and probes were calibrated by measuring the turbidity of known concentrations of water with SIL-CO-SIL-49, ball clay, and a 50:50 mixture (by weight) of SIL-CO-SIL 49 and ball clay. A 2-ft-long section of a 6-in.-diameter PVC pipe was cut, and the ends of the pipe were capped to form a watertight chamber. A hole in which to insert the turbidity probe was drilled 1 ft from either end of this chamber. A predetermined amount of SIL-CO-SIL-49 was weighed and mixed thoroughly with 2 L of water to prepare artificial sediment-laden water with a known SSC. This artificial sedimentladen water was poured into this chamber and the turbidity was measured by using both of the probes. The turbidity was measured for SSCs ranging from 0 to 5,000 mg/l or until the measurement limit of the turbidity probes was exceeded. This process was repeated by using ball clay and a 50:50 mixture (by weight) of SIL-CO-SIL-49 and ball clay. FIGURE 6 Relationship between ponding depth and ponding volume for different lengths of channel.

6 McFalls, Desai, Foster, and Li 79 FIGURE 7 Water ponding behind SRD set up in center of installation zone at various depths. After the turbidity meters were calibrated in the laboratory, multiple test runs were conducted in the SRD testing facility with actual sediment retention devices to further evaluate the effectiveness and accuracy of these instruments. of flow, and the flowmeters were calibrated for both total flow volume accuracy and instantaneous flow accuracy. These runs were conducted multiple times to ensure the accuracy and repeatability of the ISCO flowmeters. Flowmeters The flowmeters were calibrated by conducting runs with clear water in the sediment retention device facility. The sediment mixing tank was filled with a known volume of water, and the flowmeters were inserted into their ports in the inlet and outlet pipes, respectively. The water was then released from the mixing tank at a known rate TESTING PROTOCOL DEVELOPMENT Effect of Testing Conditions on Performance of SRDs Calibration tests were conducted with various SRDs to determine the effects of sediment type, the initial sediment concentration, FIGURE 8 Particle size distribution of silica examined for use as sediment in testing.

7 80 Transportation Research Record 2170 and overtopping on removal efficiency. For the initial runs, a geosynthetic dike was used as the sediment retention device. The type of device used during these initial experiments was not critical, as the experiments were conducted simply to evaluate the effects that various testing conditions had on performance. A geosynthetic dike was chosen simply to evaluate the performance of one type of SRD. Effect of Sediment Type Researchers conducted tests with three types of sediments: 1. Silica sediment (SIL-CO-SIL-49), 2. Ball clay sediment, and 3. A 50:50 mixture (by weight) of silica and ball clay sediment. The runoff slurry used in this experiment had an inlet SSC of 2,000 mg/l. Figure 9 shows that the removal efficiency of the SRD was the highest for the silica sediment and the lowest for the ball clay sediment. The 50:50 mixture (by weight) of the silica and the ball clay sediment results in a sediment removal efficiency between that for the silica and ball clay sediment. Silica particles are larger than clay particles and thus settle faster. Because of their composition, many SRDs target these large particles. However, many SRDs use flocculants and are designed to remove finer clay particles that have a surface electrostatic charge. The researchers decided that because of the many variations in sediment retention devices, a sediment mixture prepared by combining silica and ball clay would be the best option for evaluating and comparing the performance characteristics of all SRDs. with and without overtopping to determine the effect of the initial SSC on the removal efficiency of the SRD. Figure 10 illustrates that the removal efficiency of the geosynthetic dike increased when the SSC in the runoff to be treated was doubled from 2,000 to 4,000 mg/l. Effect of Overtopping Overtopping can cause water to leave the site without getting treated. The researchers conducted experiments using silica sediment (SIL-CO-SIL-49) on an SRD (geosynthetic dike). The overtopping experiments delivered 1,500 gal of sediment-laden water into the channel. The experiments with no overtopping delivered sediment-laden water into the channel until overtopping was observed. Once overtopping was observed, the delivery of sediment-laden water into the channel was stopped. Figure 11 shows that the removal efficiency increased when water was not allowed to overtop the SRD (geosynthetic dike). SRD TESTING After examination of the effects of various sediment concentrations and the results of overtopping tests versus those of nonovertopping tests, the researchers decided to conduct comparative testing with five different types of SRDs. These SRDs were not tested to evaluate their individual sediment retention effectiveness but were tested to evaluate the testing protocol itself. Geosynthetic dikes, untreated wattles, wattles treated with flocculants, silt fences, and rock check dams were evaluated during these test runs. Effect of Sediment Concentration The SSC in the runoff to be treated affects the removal efficiency of the SRD. The researchers tested two concentrations of silica sediment Ponding Volume Figure 12 shows that the geosynthetic dike and wattles (untreated and treated) retained water in amounts equal to their design capacities, FIGURE 9 Removal efficiency measured using geosynthetic dikes for three sediment types (suspended sediment concentration 2,000 mg/l); SIL-CO-SIL-49, SIL-CO-SIL-49 plus ball clay, and ball clay.

8 McFalls, Desai, Foster, and Li 81 FIGURE 10 Removal efficiency measured using geosynthetic dikes for SIL-CO-SIL-49 (overtopping and no overtopping) at 2,000 and 4,000 mg/l. whereas the silt fence and rock check dam did not retain amounts of water equal to their design capacities. Both the silt fence and the rock check dam had very high design capacities and flow-through rates, which resulted in a volume of sediment-laden water less than the design capacity being retained behind these SRDs. Sediment Removal Efficiency Table 1 indicates the sediment removal efficiency of the five SRDs tested during calibration of the facility. This removal efficiency percentage is representative of the performance results of the proposed tests. RECOMMENDATIONS FOR TEST PROTOCOL On the basis of the test results from 2008 and 2009 discussed above, Texas Transportation Institute (TTI) researchers have developed a protocol for evaluation for SRDs. This protocol is designed to test the many various types of SRDs available to the Texas DOT construction and maintenance divisions effectively, consistently, and fairly. 1. Preparing the channel. The testing channel shall be cleaned and the soil in the installation zone shall be resurfaced to match the channel profile. 2. Installing the SRD. The SRD shall be installed in the installation zone according to the manufacturer s instructions. Note that in the FIGURE 11 Removal efficiency measured using geosynthetic dikes for SIL-CO-SIL-49 (suspended sediment concentration 2,000 and 4,000 mg/l) under two conditions: overtopping and no overtopping.

9 82 Transportation Research Record 2170 FIGURE 12 Design capacity and ponding volume for five SRDs. Values below the name of SRD indicate total volume of sediment-laden water treated. absence of specific instructions from the manufacturer, SRD installation shall be carried out according to the discretion of the technicians. The installation details, such as the number of stakes, the spacing between stakes, the presence or absence of an apron, the trenching depth, and the height of SRD after installation shall be recorded. 3. Testing. Instrumentation. The turbidity probes and bubbler tubes shall be connected to the appropriate locations at the inlet and the outlet. Technicians shall ensure that the flowmeters and turbidity meter are recording data correctly. Note that while the turbidity probes and bubbler tubes are being connected, special attention shall be directed to ensuring that the locations are dirt free. TABLE 1 Removal of Sediment by Five SRDs Tested at the Channel Sediment Control Mass In Mass Out Removal Device kg (lb) kg (lb) Efficiency (%) Geosynthetic dike 2.8 (6.1) 2.2 (4.8) (7.2) 2.7 (6.0) (7.2) 2.7 (6.0) 17 Wattle: untreated 0.58 (1.3) 0.31 (0.69) (1.4) 0.36 (0.79) (1.6) 0.39 (0.85) 46 Wattle: treated 0.67 (1.47) 0.24 (0.54) (1.54) 0.28 (0.61) (1.47) 0.30 (0.67) 54 Silt fence 14.3 (31.4) 12.2 (26.9) (31.6) 12.7 (28.0) (30.1) 11.5 (25.3) 16 Rock check dam 12.7 (28.0) 12.4 (27.3) (27.6) 12.2 (27.0) (28.4) 12.7 (27.9) 2 Test to determine SRD flow-through characteristics. The test is optional if the manufacturer can provide TTI staff with the established flow-through rate(s) of the product. Sediment preparation. No sediment shall be added to the 1,500 gal of water in the mixing during this process. Testing flow. Water shall be released into the channel at a flow rate of 60 gal/min by controlling the butterfly valve on the mixing tank. The valve shall be closed and the flow of water into the channel shall be stopped when water begins to overtop the SRD. The maximum flow rate at the outlet shall be recorded and the inflow rate to be applied during performance testing on the SRD shall be determined. For example, if the maximum flow rate observed at the outlet is 15 gal/min, the SRD falls in the flow category of 10 to 20 gal/min and a maximum inflow rate of 20 gal/min will be applied during performance testing of the SRD. Performance testing of SRD. Three repetitions of the performance test will be conducted on the SRD before it is removed from the installation zone. Sediment preparation. A total of 12.5 lb of SIL-CO-SIL-49 and 12.5 lb of ball clay shall be mixed in 1,500 gal of water to create sediment-laden water with an SSC of 2,000 mg/l. The sediment-laden water shall be kept stirred in the mixing tank until the test has ended. Testing flow. Water shall be released into the channel at a flow rate defined by the SRD flow category by controlling the butterfly valve on the mixing tank. The entire 1,500 gal of sediment-laden water shall be emptied into the channel. The test will continue until no water is retained behind the SRD. Data processing. Data from the flowmeter and turbidity meter shall be downloaded to the field laptop. All relevant calculations will be performed using the Excel spreadsheet program. 4. Data recording. The following data will be reported to the Texas DOT following each product evaluation: Product installation details, Flowthrough rate (ft 3 /s),

10 McFalls, Desai, Foster, and Li 83 Maximum flow rate (gal/min), Ponding volume (gal), Turbidity (nephelometric turbidity unit) at inlet and outlet, SSC (mg/l) at inlet and outlet, Mass loading (lb), and Removal efficiency (%). CONCLUSIONS The test protocol proposed here is capable of quantifying the sediment removal performance of SRDs with reasonable accuracy. It is expected that SRDs will soon be scrutinized for their effectiveness in retaining sediments. The availability of this protocol is timely, and the protocol should contribute significantly to the transportation and construction fields. ACKNOWLEDGMENT This study was sponsored by the Texas Department of Transportation Research and Technology Implementation Office under the Roadside Sediment Control Device Evaluation Program. REFERENCES 1. U.S. Census Bureau Economic Census: Schedules of Industry Schedule Series, Accessed June 10, Landphair, H. C., J. R. Schutt, B. E. Peterson, and M. Li. Alternatives to Silt Fence for Temporary Sediment Control at Highway Construction Sites: Guidelines for TxDOT. Technical Report S. Texas Transportation Institute, College Station, Storm Water Phase II Final Rule: Construction Site Runoff Control Minimum Control Measure. Report EPA 833/F-00/008. Office of Water, U.S. Environmental Protection Agency, Washington, D.C., Barrett, M. E., J. F. Malina, Jr., R. J. Charbeneau, and G. H. Ward. Water Quality and Quantity Impacts of Highway Construction and Operation: Summary and Conclusions. Center for Research in Water Resources Technical Report 266. University of Texas Press, Austin, Viklander, M. Particle Size Distribution and Metal Content in Street Sediments. Journal of Environmental Engineering, Vol. 124, No. 8, 1998, pp Liebens, J. Heavy Metal Contamination of Sediments in Stormwater Management Systems: The Effect of Land Use, Particle Size, and Age. Environmental Geology, Vol. 41, No. 3 4, 2001, pp Lee, J. H., K. W. Bang, L. H. Ketchum, J. S. Chloe, and M. J. Yu. First Flush Analysis of Urban Storm Runoff. Science of the Total Environment, Vol. 293, No. 1 3, 2002, pp The Physicochemical and Biological Processes in Soils Committee peer-reviewed this paper.

20. Security Classif.(of this page) Unclassified

20. Security Classif.(of this page) Unclassified 1. Report No. FHWA/TX-10/0-5948-1 4. Title and Subtitle ROADSIDE SEDIMENT CONTROL DEVICE EVALUATION PROGRAM: TECHNICAL REPORT Technical Report Documentation Page 2. Government Accession No. 3. Recipient's

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-08/0-4611-2 4. Title and Subtitle UNDERGROUND STORMWATER QUALITY DETENTION BMP FOR SEDIMENT TRAPPING IN ULTRA-URBAN ENVIRONMENTS:

More information

Manual for Erosion and Sediment Control Updates

Manual for Erosion and Sediment Control Updates Manual for Erosion and Sediment Control Updates Chapter 1 - The Erosion and Sedimentation Act of 1975 Minor revisions were made to content Existing pictures were replaced with new ones Chapter 2 Sediment

More information

20. Security Classif. (of this page) Unclassified

20. Security Classif. (of this page) Unclassified 1. Report No. FHWA/TX-13/5-9048-01 4. Title and Subtitle SEDIMENT AND EROSION CONTROL LABORATORY FACILITY EXPANSION 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

CLEAR-WATER AND SEDIMENT-LADEN-FLOW TESTING OF THE E-TUBE SEDIMENT RETENTION DEVICE

CLEAR-WATER AND SEDIMENT-LADEN-FLOW TESTING OF THE E-TUBE SEDIMENT RETENTION DEVICE CLEAR-WATER AND SEDIMENT-LADEN-FLOW TESTING OF THE E-TUBE SEDIMENT RETENTION DEVICE Prepared for North American Tube Products, Inc. Prepared by Amanda L. Cox Christopher I. Thornton Michael D. Turner October

More information

Large-Scale Sediment Retention Device Testing (ASTM D 7351) FLEXSTORM Inlet Filter

Large-Scale Sediment Retention Device Testing (ASTM D 7351) FLEXSTORM Inlet Filter Large-Scale Sediment Retention Device Testing (ASTM D 7351) of FLEXSTORM Inlet Filter February 2009 Submitted to: Inlet & Pipe Protection, Inc. 24137 W. 111 th St., Unit A Naperville, IL 60564 Attn: Mr.

More information

Organic Filter Tubes. Fe= (Depends on soil type)

Organic Filter Tubes. Fe= (Depends on soil type) 3.6 Sediment Control Description: Organic filter tubes are comprised of an open weave, mesh tube that is filled with a filter material (compost, wood chips, straw, coir, aspen fiber, or a mixture of materials).

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Construction Site Erosion Control and Phase II of the Stormwater Permit Program Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL Some Features of Phase

More information

Common Construction-Site BMPs Quick Reference Guide

Common Construction-Site BMPs Quick Reference Guide Common Construction-Site BMPs Quick Reference Guide Installation and Inspection Requirements For more information visit the Town of Truckee Clean Water Program Website: http://www.townoftruckee.com/engineering/clean-water-program

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Materials and Waste Management - WM DESCRIPTION AND PURPOSE A gravel

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

April 2008 USE DESIGNATIONS FOR EROSION AND SEDIMENT CONTROL. for

April 2008 USE DESIGNATIONS FOR EROSION AND SEDIMENT CONTROL. for Engineering Summary Page 1 8/22/2008 April 2008 USE DESIGNATIONS FOR EROSION AND SEDIMENT CONTROL for Chitosan-Enhanced Sand Filtration using 3% StormKlear LiquiFloc chitosan acetate solution Ecology s

More information

DOWNSTREAM DEFENDER TESTING USING MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION PROTOCOL UTILIZING OK-110 FEED SAND

DOWNSTREAM DEFENDER TESTING USING MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION PROTOCOL UTILIZING OK-110 FEED SAND DOWNSTREAM DEFENDER TESTING USING MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION PROTOCOL UTILIZING OK-110 FEED SAND JULY 2002 Copyright 2001 H.I.L. Technology, Inc. All rights reserved. This report was

More information

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff. Technical Guidance for the Use of Polyacrylamides (PAM) and PAM Blends for Soil Erosion Control and Storm Water clarification (Courtesy of Applied Polymer Systems, Inc.) Practice Description PAM is a water-soluble

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

Large-Scale Sediment Retention Device Testing Representing Exposure to Post-Construction Sediment Load. FLEXSTORM PC Inlet Filters

Large-Scale Sediment Retention Device Testing Representing Exposure to Post-Construction Sediment Load. FLEXSTORM PC Inlet Filters Large-Scale Sediment Retention Device Testing Representing Exposure to Post-Construction Sediment Load of FLEXSTORM PC Inlet Filters November 2009 Submitted to: Inlet & Pipe Protection, Inc. 24137 W. 111

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

Inlet Protection. Fe= (Depends on soil type)

Inlet Protection. Fe= (Depends on soil type) 3.4 DESIGN CRITERIA: KEY CONSIDERATIONS Evaluate drainage patterns to ensure inlet protection will not cause flooding of roadway, property or structures Never block entire inlet opening Size according

More information

Conditional Interim Certification Findings

Conditional Interim Certification Findings NJDEP Technology Certification Program: Conditional Interim Certification Findings Bureau of Sustainable Communities & Innovative Technologies Division of Science, Research & Technology 401 E State Street,

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.) Module 2: Selection of Controls and Site Planning for Construction Site Erosion Prevention Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa,

More information

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components

More information

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number: CITY OF CHICO Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Address: Building Permit Number: What is this document for? The City s Phase II MS4 NPDES General

More information

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Name: Page intentionally left blank. - 2 - What is this document for? The City s Phase II MS4 NPDES General Permit

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

The Next Generation of Storm Water Treatment Technology

The Next Generation of Storm Water Treatment Technology The Next Generation of Storm Water Treatment Technology Tubes Fiber Filtration Tubes Tubes are the industry s most cost effective storm water treatment device designed to effectively trap, filter and treat

More information

The Construction General Permit and Erosion Prevention and Sedimentation Control

The Construction General Permit and Erosion Prevention and Sedimentation Control The Construction General Permit and Erosion Prevention and Sedimentation Control Presented at the Tennessee Gas Association Conference April 23, 2008 More than thirty years ago, two-third of the nation's

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Single Family Residential Construction Erosion/Sediment Control Standards

Single Family Residential Construction Erosion/Sediment Control Standards Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended

More information

3.11 Sand Filter Basin

3.11 Sand Filter Basin 3.11 Sand Filter Basin Type of BMP Priority Level Treatment Mechanisms Maximum Drainage Area Flow-Through Treatment Priority 3 Treatment Control BMP Filtration 25 acres Description The Sand Filter Basin

More information

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS City Utilities of Springfield, Missouri REVISED: 06/18/2018 **DISCLAIMER** IT IS THE RESPONSIBILITY OF THE END USER OF THIS WATER STANDARDS BOOK TO MAKE

More information

APPENDIX A - SURFACE OUTLET AND BAFFLE SEDIMENT BASINS

APPENDIX A - SURFACE OUTLET AND BAFFLE SEDIMENT BASINS APPENDIX A - SURFACE OUTLET AND BAFFLE SEDIMENT BASINS AND MULTIPURPOSE BASINS This Appendix contains requirements for the design, materials, equipment, and construction of temporary Surface Outlet and

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Description. Installation and Implementation Requirements

Description. Installation and Implementation Requirements Earth Dike SC-6 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Structure that prevents erosion by intercepting, diverting, and conveying surface run-on (storm water

More information

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity

More information

Performance Standards Compliance Checklist

Performance Standards Compliance Checklist Truckee Meadows Regional Stormwater Quality Management Program Performance Standards Compliance Checklist The checklist that follows identifies the BMPs that can be used at construction sites to meet each

More information

Construction Entrance / Construction Road Stabilization Alturnamats & Versamats Dewatering Dandy Dewatering Bag / Dirt Bag...

Construction Entrance / Construction Road Stabilization Alturnamats & Versamats Dewatering Dandy Dewatering Bag / Dirt Bag... CONTENTS Construction Entrance / Construction Road Stabilization... 1 Alturnamats & Versamats... 1 Dewatering... 8 Dandy Dewatering Bag / Dirt Bag... 8 Diversion Dike... 10 Diversion Dike of Compacted

More information

TOTAL SUSPENDED SOLIDS REMOVAL TEST OF A HIGH DENSITY POLYETHYLENE WATER QUALITY UNIT. By James T. Mailloux Dean K. White

TOTAL SUSPENDED SOLIDS REMOVAL TEST OF A HIGH DENSITY POLYETHYLENE WATER QUALITY UNIT. By James T. Mailloux Dean K. White TOTAL SUSPENDED SOLIDS REMOVAL TEST OF A HIGH DENSITY POLYETHYLENE WATER QUALITY UNIT By James T. Mailloux Dean K. White Submitted to ADVANCED DRAINAGE SYSTEMS 250-04/H1098F September 2004 TOTAL SUSPENDED

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Construction Site Erosion Control and Phase II of the Stormwater Permit Program Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,

More information

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Fabric Drop Inlet Protection

Fabric Drop Inlet Protection Fabric Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Block

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage

More information

High-Rate Stormwater Treatment with Up-Flow Filtration

High-Rate Stormwater Treatment with Up-Flow Filtration 21 High-Rate Stormwater Treatment with Up-Flow Filtration Noboru Togawa and Robert Pitt The objective of this research is to examine the removal capacities of a highrate stormwater filtration device, in

More information

Soil erosion and resulting sedimentation from developing areas are leading sources of water quality degradation.

Soil erosion and resulting sedimentation from developing areas are leading sources of water quality degradation. & Soil erosion and resulting sedimentation from developing areas are leading sources of water quality degradation. Sediment is the number one pollutant, by volume, of surface water. The major source of

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-07/0-4611-1 4. Title and Subtitle THE DEVELOPMENT OF NON-PROPRIETARY UNDERGROUND STORMWATER QUALITY STRUCTURES 2. Government Accession No. 3. Recipient's Catalog No. Technical Report

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Erosion and Sediment Control Fundamentals

Erosion and Sediment Control Fundamentals Erosion and Sediment Control Fundamentals Erosion and Sediment Control Manage the following Communication Work Water Erosion Sediment..in that order! Five Pillars - Barry Fagan, PE; Alabama DOT Communication

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

Oklahoma DOT E&SC Workshop June 13, 2016

Oklahoma DOT E&SC Workshop June 13, 2016 Controlling Turbidity on Work Sites Polyacrylamide (PAM) for Turbidity Control Water soluble synthetic polymer of acrylamide Forms: dry powder, solution, emulsion, logs Suspended Silt & Clay PAM No PAM

More information

Part IV(b) Best Management Practices for Erosion, Sediment, and Velocity Control Continued. Good Housekeeping Practices

Part IV(b) Best Management Practices for Erosion, Sediment, and Velocity Control Continued. Good Housekeeping Practices Part IV(b) Best Management Practices for Erosion, Sediment, and Velocity Control Continued Good Housekeeping Practices Inlet Protection Consist of a variety of manufactured sediment barriers and products

More information

IN T R A / M IN T R A M

IN T R A / M IN T R A M SPRING MESA SUBDIVISION CONSTRUCTION PLANS A PART OF SECTION 35, TOWNSHIP 2 SOUTH, RANGELINE 70 WEST, 6th. PRINCIPAL MERIDIAN. CITY OF ARVADA, COUNTY OF JEFFERSON, STATE OF COLORADO COVER SHEET MARTIN

More information

De-watering Activities General

De-watering Activities General De-watering Activities General SEDIMENT CONTROL TECHNIQUES Photo 1 De-watering an isolated work area Photo 2 De-watering of sediment prior to removal from a stormwater drain Introduction De-watering activities

More information

EXHIBIT 2:Optional Online Installation Re-entrainment/scour testing of the Terre Kleen18 Hydrodynamic Separator Stormwater Treatment unit per NJDEP

EXHIBIT 2:Optional Online Installation Re-entrainment/scour testing of the Terre Kleen18 Hydrodynamic Separator Stormwater Treatment unit per NJDEP EXHIBIT 2:Optional Online Installation Re-entrainment/scour testing of the Terre Kleen18 Hydrodynamic Separator Stormwater Treatment unit per NJDEP Testing Protocol dated: August 25, 2009, as amended December

More information

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Construction Site Erosion Control and Phase II of the Stormwater Permit Program Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

Rock Sock (RS) Rock Sock height.

Rock Sock (RS) Rock Sock height. Rock Sock (RS) SC-5 Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as

More information

Module 6 Temporary Pond and Silt Fence. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Module 6 Temporary Pond and Silt Fence. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Module 6 Temporary Pond and Silt Fence by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University of Alabama Tuscaloosa,

More information

Earth Dikes and Drainage Swales

Earth Dikes and Drainage Swales Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

1. Overview 2 2. Definitions 2 3. Laboratory Testing Criteria 2. A. Laboratory Qualifications 2. B. Analysis of TSS Samples 2. C.

1. Overview 2 2. Definitions 2 3. Laboratory Testing Criteria 2. A. Laboratory Qualifications 2. B. Analysis of TSS Samples 2. C. New Jersey Department of Environmental Protection Laboratory Protocol to Assess Total Suspended Solids Removal by a Hydrodynamic Sedimentation Manufactured Treatment Device January 25, 2013 Contents 1.

More information

BMP #: Water Quality Inserts

BMP #: Water Quality Inserts Structural BMP Criteria BMP #: Water Quality Inserts Catch basin inserts are commercially available (manufactured) devices and are generally configured to remove one or more of the following contaminants:

More information

SEDIMENT TRAP PILOT PROJECT: Design and Bench-Testing

SEDIMENT TRAP PILOT PROJECT: Design and Bench-Testing StormCon 2017 Paper, Packman and Schmoyer, Q12 James Packman, Aspect Consulting LLC, Seattle Beth Schmoyer, Seattle Public Utilities, Seattle SEDIMENT TRAP PILOT PROJECT: Design and Bench-Testing INTRODUCTION

More information

Block & Aggregate Drop Inlet Protection

Block & Aggregate Drop Inlet Protection Block & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR. Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR. Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL Reader Notes (1/18/17 draft) CWS has drafted proposed changes to Chapter 6 to incorporate

More information

Sediment Control Practices

Sediment Control Practices Sediment Control Practices SMP-05 Temporary Diversions, Berms or Ditches Symbol TD Description These temporary drains offer features such as conveyance for runoff down cut or fill slopes, subsurface drains

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

Tips with Creation of your Erosion and Sediment Control Plan

Tips with Creation of your Erosion and Sediment Control Plan Tips with Creation of your Erosion and Sediment Control Plan By Chris Droste, CESCO Senior Erosion Control Specialist Westmoreland Conservation District Forming Your Narrative Use the DEP checklist. Page

More information

High-Rate Stormwater Treatment with Up-Flow Filtration

High-Rate Stormwater Treatment with Up-Flow Filtration 1 High-Rate Stormwater Treatment with Up-Flow Filtration Noboru Togawa and Robert Pitt The objective of this research is to examine the removal capacities of a highrate stormwater filtration device, in

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

Diversion Dikes. Fe=0.95

Diversion Dikes. Fe=0.95 2.2 Diversion Dike Erosion Control Description: A diversion dike is a compacted soil mound, which redirects runoff to a desired location. The dike is typically stabilized with natural grass for low velocities

More information

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET July 15, 2011 DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET GENERAL PERMIT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT TO DISCHARGE STORMWATER FROM CONSTRUCTION

More information

Capability of the Aqua-Swirl Concentrator to Remove Trash from Stormwater Runoff

Capability of the Aqua-Swirl Concentrator to Remove Trash from Stormwater Runoff Capability of the Aqua-Swirl Concentrator to Remove Trash from Stormwater Runoff June 27, 2012 The purpose of this document is to demonstrate the capability of the Aqua-Swirl Concentrator to capture trash

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

TEMPORARY SEDIMENT TRAP CODE

TEMPORARY SEDIMENT TRAP CODE ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY SEDIMENT TRAP CODE 960 Source: DEFINITION A small temporary stormwater storage structure designed to trap sediment. PURPOSE The purpose of this practice

More information

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11 Appendix 11 Erosion and Sediment Control Management Plan Appendix 11 OTAIKA QUARRY - PROPOSED OVERBURDEN DISPOSAL AREA Application for Land Use Consent and Assessment of Environmental Effects Otaika Quarry

More information

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist UMD Storm Water Program Construction Requirements Greg Archer, MBA Environmental Compliance Specialist Phase 2 Regulatory Overview Dec. 1999 EPA issues Phase 2 Federal Register Municipalities (MS4) from

More information

Best Management Practice (BMP) Guidance Manual

Best Management Practice (BMP) Guidance Manual Best Management Practice (BMP) Guidance Manual INTRODUCTION BMP examples in this guide provide ways to meet erosion and sediment control requirements. Best Management Practices are not limited to these

More information

A. Manufactured Treatment Device Characteristics

A. Manufactured Treatment Device Characteristics Requirements for Interim Certification of Hydrodynamic Sedimentation Devices for Total Suspended Solids Based on Laboratory Testing DRAFT April 28, 2009 The New Jersey Stormwater Management Rules at N.J.A.C.

More information