UTILITY AND SERVICES ENABLING WORKS. Addendum 2 to review of environmental factors

Size: px
Start display at page:

Download "UTILITY AND SERVICES ENABLING WORKS. Addendum 2 to review of environmental factors"

Transcription

1 UTILITY AND SERVICES ENABLING WORKS Addendum 2 to review of environmental factors OCTOBER 2016

2 (blank page)

3 Roads and Maritime Services WestConnex M4 East project Utility and Services Enabling Works Addendum to review of environmental factors October 2016 Prepared by: CPB Samsung John Holland Joint Venture

4 Document controls Title Utility and Services Enabling Works addendum to review of environmental factors for an extension for laydown area Approval and authorisation Prepared by: CPB Samsung John Holland Joint Venture Accepted on behalf of Roads and Maritime by: Name: Date: Location File name Document status Date Initial draft 25/08/2016 Reviewing register Review version Issued by Issued for Date of issue Draft A CSJ Review 26/08/2016 Rev 0 CSJ Approval 30/08/2016 Rev 1 CSJ Approval 10/10/2016

5 Contents 1 Introduction Proposal identification Purpose of the report Background Description of the proposed change The proposed change Statutory and planning framework Environmental Planning and Assessment Act State Environmental Planning Policies Local Environmental Plans Environmental assessment Applicable environmental factors Summary of beneficial and adverse effects Environmental management Justification and conclusion Certification References Appendices Appendix A Appendix B Consideration of clause 228(2) factors and matters of national environmental significance Environmental Constraints Map Utility and Services Enabling Works ii

6 1 Introduction 1.1 Proposal identification Roads and Maritime Services (Roads and Maritime) is undertaking works to adjust, relocate and / or protect existing utility services and install new utilities infrastructure to facilitate the construction of the WestConnex M4 East project. These activities were addressed in the Utilities and Services Enabling Works Review of Environmental Factors (the original REF, RMS January 2016). The proposed adjustment, which is the subject of this addendum, is the application for extension of the use of the laydown area off Queen Lane, North Strathfield. The submission for the use of this laydown area was addressed in the REF Addendum Utility Works (addendum 1 REF, RMS 2016), determined 1 April This addendum 2 REF should be read in conjunction with the original REF, as well as the addendum 1 REF. The location of the laydown area is generally bounded by Queen Street, Sydney Street and Queen Lane in North Strathfield, and is shown in Figure 1. The laydown area is within the Canada Bay Local Government Area (LGA). 1.2 Purpose of the report The laydown area has been used to enable access to material and equipment for the utility works assessed and approved under the original REF. The purpose of this addendum 2 REF is to extend the timeframe for the use of the laydown area for five months (to early 2017), and document any likely impacts of the proposed change, and to detail any additional protective measures to be implemented. This addendum 2 REF has been prepared by CPB Samsung John Holland Joint Venture (CSJ) on behalf of Roads and Maritime. For the purposes of these works, Roads and Maritime is the proponent and the determining authority under Part 5 of the Environmental Planning and Assessment Act 1979 (EP&A Act). The description of the proposed change and associated environmental impacts have been undertaken in the context of clause 228 of the Environmental Planning and Assessment Regulation 2000, the Threatened Species Conservation Act 1995 (TSC Act), the Fisheries Management Act 1994 (FM Act), and the Australian Government s Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). In doing so, the addendum 2 REF helps to fulfil the requirements of section 111 of the EP&A Act, which provides that Roads and Maritime Services is to examine and take into account to the fullest extent possible, all matters affecting or likely to affect the environment by reason of the activity. The findings of the addendum 2 REF would be considered when assessing: Whether the proposed change is likely to result in a significant impact on the environment and therefore the necessity for an environmental impact statement to be prepared and approval to be sought from the Minister for Planning under Part 5.1 of the EP&A Act. The significance of any impact on threatened species as defined by the TSC Act and/or FM Act, in section 5A of the EP&A Act and therefore the requirement for a Species Impact Statement. Utility and Services Enabling Works 1

7 The significance of any impact on nationally listed biodiversity matters under the EPBC Act, including whether there is a real possibility that the activity may threaten long-term survival of these matters, and whether offsets are required and able to be secured. The potential for the proposed change to significantly impact any other matters of national environmental significance or Commonwealth land and therefore the need to make a referral to the Australian Government Department of the Environment for a decision by the Commonwealth Minister for the Environment on whether assessment and approval is required under the EPBC Act. 1.3 Background The addendum 1 REF was determined on 1 April 2016 to enable the utilisation of the laydown area. As described in the original REF, Roads and Maritime proposed to conduct adjustments to, relocation of and protection of existing utility services and installation of new utilities infrastructure to facilitate the WestConnex M4 East project. The service and utility works are essential preparatory works to enable the construction and operation of the M4 East project. Utility and Services Enabling Works 2

8 2 Description of the proposed change CPB Samsung John Holland JV, on behalf of Roads and Maritime, is conducting adjustments to, relocating, and protecting existing utility services and installation of new utilities infrastructure to enable the M4 East project. This section describes the proposed change - an extension for the use of the established laydown area between Queen Street and Sydney Street, North Strathfield. 2.1 The proposed change To facilitate the utility and services enabling works, a laydown area has been established off Queen Lane, North Strathfield. The laydown area enables access to material and equipment required for the utilities works assessed and approved under the original REF. Utility ID No AGTP2, AGTP3, WW060 and WW070 (see Table 1) are not complete. As the laydown area is central to these utility works, and there is limited space within the construction boundary, keeping the laydown area for approximately a further five months (to early 2017) would be beneficial to ensuring the utility works can be completed without encroaching on the already restricted space within the construction footprint for equipment to enable the completion of utility works. As the utility works are generally undertaken within the road reserve, which are generally narrow in this area, the use of the laydown area will minimise potential traffic and access impacts associated with the utility works. The land on which the laydown area is located is owned by Roads and Maritime and is an irregular shaped property, approximately 25 m in length and 20 m in width at the longest and widest spots, respectively. The area is generally bounded by Queen Street, Sydney Street and Queen Lane in North Strathfield, and a row of large mature trees adjacent to the residential house at 13A Queen Lane. Access to the site is via an established gate off of Queen Lane. The laydown area would be utilised for the materials to enable utility and services works, such as plastic conduits and frames, associated sundries for use in the conduit laying, a small container (approximately 6 m in length) to store hand tools and small power tools associated with running the conduits. A portable toilet is also included within the area. Temporary fencing is installed around the laydown area. All necessary signage advising the general public of access restrictions has been provided. Use of the laydown area is primarily limited to standard daytime construction hours as follows: Monday to Friday: 7am to 6pm Saturday: 8am to 1pm Sunday and public holidays: No work. However, it is noted that some works may require night works, and therefore access to the site may be required. Access to the laydown area would primarily be at the beginning (approximately 8-9pm) and the end (approximately 6am) of the night shift. A noise assessment prepared for night-time access indicated that impacts would exceed the noise management level (NML) at the nearest receiver. Access to the site would be limited to three consecutive evenings or nights in a calendar week and not Utility and Services Enabling Works 3

9 more than four evenings or nights in a calendar week. Validation monitoring would be undertaken during representative works to confirm the predicted impacts. Upon completion of works, the laydown area would be demobilised, all rubbish and materials would be removed from site and the area would be rehabilitated to a state consistent with its current land use. No tree removal would be required as part of the proposed change. Utility and Services Enabling Works 4

10 Table 1: Utilities approved under the original REF that have not yet been completed Dwg ID No Site Service Service Provider Nearest Cross Street (Major) Service Type and Size AG TP2 Wattle Street Power Ausgrid Northcote Site 1 x 4MVA 1 x 5MVA Task Works Length of Adjustment Provide temporary power supply (11kV) to Northcote site compound. Trenching along Parramatta Road from Wolsley Rd and up Wattle St AG TP3 Wattle Street Power Ausgrid Wolsley Site 1 x 3MVA Provide temporary power supply (11kV) to ventilation building site compound. Trenching along Parramatta Rd from Wolsley Rd and up Wattle St WW060 WW070d Homebush Bay Homebush Bay Sewer Sewer SWC- Sewer SWC- Sewer M4 M4 Disused Sewer Disused Sewer Remove sewer through cut/ cover location. Diversion will be trenched with local excavation at tie-ins Remove sewer through cut/ cover location. Diversion will be trenched with local excavation at tie-ins Installation 407 Installation 70 Relocate 0 Relocate 0 Utility and Services Enabling Works 5

11 Figure 1 Laydown area location off Queen Lane, North Strathfield Utility and Services Enabling Works 6

12 3 Statutory and planning framework 3.1 Environmental Planning and Assessment Act 1979 Environmental assessment of the proposal is undertaken under Part 5 of the Environmental Planning and Assessment Act 1979 (EP&A Act). All matters affecting or likely to affect the environment as a result of the proposal are considered in this REF. 3.2 State Environmental Planning Policies State Environmental Planning Policy (Infrastructure) 2007 State Environmental Planning Policy (Infrastructure) 2007 (ISEPP) aims to facilitate the effective delivery of infrastructure across the State. Clause 94 of ISEPP permits development on any land for the purpose of a road or road infrastructure facilities to be carried out by or on behalf of a public authority without consent. As the proposed change is for a road or road infrastructure facility and is to be carried out on behalf of Roads and Maritime Services, it can be assessed under Part 5 of the Environmental Planning and Assessment Act Development consent from council is not required. The proposed change is not located on land reserved under the National Parks and Wildlife Act 1974 and does not affect land or development regulated by State Environmental Planning Policy No Coastal Wetlands, State Environmental Planning Policy No Littoral Rainforests, or State Environmental Planning Policy (Major Development) Part 2 of the ISEPP contains provisions for public authorities to consult with local councils and other public authorities prior to the commencement of certain types of development. No additional consultation would be required as a result of the proposed change State Environmental Planning Policy (State and Regional Development) 2011 State Environmental Planning Policy (State and Regional Development) 2011 (SRD SEPP) aims to identify development that is State significant infrastructure and critical State significant infrastructure. The WestConnex M4 East project has been declared critical State significant infrastructure (critical SSI) by Schedule 5, Clause 4(3) of the SRD SEPP. Clause 4(7) of the same Schedule excludes specific activities from the definition of development. In this clause: development does not include the following: (a) (b) surveys, test drilling, test excavations, geotechnical investigations or other tests, surveys, sampling or investigation for the purposes of the design or assessment of a project, in the case of the M4 East project, - any of the following undertaken prior to the commencement of the construction of the new multi-lane road: Utility and Services Enabling Works 7

13 (i) (ii) adjustments to, or relocation of, existing utilities infrastructure and installation of new utilities infrastructure, the establishment of construction compounds including the erection of temporary buildings and the provision of associated facilities including access roads and car parks. Consequently, works associated with the original REF were able to be commenced prior to the approval of the M4 East project, as it is specifically excluded from the description of the development in the SRD SEPP. The proposed change supports the works commenced under the original REF. 3.3 Local Environmental Plans The proposed works are located within Canada Bay LGA. Development on the proposed area would be subject to the Canada Bay Local Environmental Plan However, as identified in Section 3.2.1, consent from council is not required in accordance with ISEPP. Utility and Services Enabling Works 8

14 4 Environmental assessment This section of the addendum 2 REF provides a description of the potential environmental impacts associated with the proposed change. The existing environment is generally consistent with the existing environment described in the original REF. The proposed laydown area is located between Queen Street and Sydney Street, North Strathfield. Aspects of the environment potentially impacted upon by the proposed change are considered. This includes consideration of the factors specified in the guidelines Roads and Related Facilities (DUAP) and Is an EIS required? (DUAP 1999) as required under clause 228(1) of the Environmental Planning and Assessment Regulation The factors specified in clause 228(2) of the Environmental Planning and Assessment Regulation 2000 are also considered in Appendix A. Any additional site-specific mitigation and management measures are identified to minimise potential impacts. These management measures would be undertaken in combination with those identified in the original REF (Table 29). 4.1 Applicable environmental factors Table 2 Identification of relevant environmental factors Environmental factors Traffic and parking Noise and vibration Comments Access to the proposed laydown area is from Queen Street, a one way street running south to meet up with Sydney Street. Use of the laydown area would result in the short term increase in construction vehicle traffic to/from the proposed laydown area. Light vehicles are expected to enter the site, load up with materials and exit the site. Use of the site would primarily be at the commencement and completion of each shift. Transport noise is generally the primary contributor to background noise levels, largely due to the presence of the M4 Motorway and the Main North Line. A Construction Noise and Vibration Impact Statement has been prepared for the original REF, which identifies recommended management measures for the approved utilities works. Use of the proposed laydown area would generate some additional noise impacts that may affect nearby sensitive receivers. Noise would be associated with the arrival / departure of vehicles and loading / unloading of materials and tools. The useable area of the proposed site is at least 15 m from the edge of the nearest residential receiver, which is separated by some mature tree screening. Access to the laydown area would generally be during standard daytime construction hours. If access to the laydown area is required during night works, would be limited to the beginning and the end of the shift where practicable. Additional management measures Management measures identified in the original REF are considered sufficient to manage potential traffic and parking impacts. Space permitting, the site would be arranged to use the shipping container as shielding or to locate material as far from residential receivers as possible. Access to the site would be limited to three consecutive evenings or nights in a calendar week and a total of four evenings or nights in a calendar week. Validation monitoring would be undertaken to confirm impacts predicted in the noise assessment for the works. Utility and Services Enabling Works 9

15 Environmental factors Flora and fauna Soils, water and contamination Non-Aboriginal heritage Aboriginal heritage Air quality Waste Comments Vegetation in the area is not mapped within the OEH (2013) vegetation mapping, nor within the mapping prepared for the M4 East project (refer Annexure B). No threatened ecological communities (TECs) or endangered ecological communities (EECs) listed under the TSC Act are mapped within the proposed laydown area. The M4 East environmental impact statement (EIS) identified that no threatened flora species native to the area were recorded or considered likely to occur within the M4 East project footprint or its surrounds. No vegetation removal is expected for use of the proposed laydown area. Minor branch trimming / pruning may be required to enable vehicle access. Laydown of materials / storage container would be on top of planted grasses. No excavation works would be required for use of the proposed laydown area. Further, the area is located within an area with a low risk of contamination. The works are unlikely to impact on surface water, soils or contamination. The proposed laydown is located across from the Powells Estate Heritage Conservation Area (HCA). Use of the proposed laydown area may result in the short term impact on visual amenity from the edge of the HCA, particularly 39 Sydney Street, which faces the proposed laydown area. Some vegetation screening is located within the property s boundary and within the proposed laydown area. A Stage 2 PACHCI Aboriginal heritage assessment was undertaken for the potential M4 East project, which found that the project would not impact on any known Aboriginal objects or places. Due to the disturbed nature of the site and the distance to known and potential Aboriginal heritage objects or places identified in the M4 East assessment (included in the M4 East EIS (AECOM GHD 2015), no impact on Aboriginal heritage is expected to occur as a result of the works. The use of the proposed laydown area is not expected to improve or worsen the potential impacts to air quality identified in the original REF. Use of the proposed laydown area would not result in any additional generation of wastes above and beyond what was identified in the original REF. Additional management measures Management measures identified in the original REF are considered sufficient to manage potential flora and fauna impacts. Management measures identified in the original REF are considered sufficient to manage potential soils, water and contamination impacts. Management measures identified in the original REF are considered sufficient to manage potential non-aboriginal heritage impacts. N/A Management measures identified in the original REF are considered sufficient to manage potential air quality impacts. Management measures identified in the original REF are considered sufficient to manage potential waste impacts. Utility and Services Enabling Works 10

16 Environmental factors Flooding and drainage Socioeconomic Property and Land Use Visual amenity Greenhouse gas and climate change Hazard and risk Cumulative impacts Comments The proposed laydown area is within the Powells Creek catchment and would not impact the hydrology of the catchment, as the works would be localised, temporary and would not require any ground disturbance. There would be no impact on long-term flooding and drainage patterns as the laydown site would be reinstated to a pre-construction condition at the completion of the works. The use of the laydown area is not expected to improve or worsen the socio-economic impacts identified in the original REF. No property acquisition is required for the laydown area. The area is owned by Roads and Maritime and is fenced off as road reserve. Use of the laydown area would be short-term with no permanent changes to land use. Visual impacts associated with HCA are described above. The area is currently open space, fenced road reserve. Use of the laydown area would result in short-term impacts on visual amenity for nearby residents and passing traffic. Impacts on visual amenity are considered to be relatively minor and of short term duration. The use of the laydown area is unlikely to improve or worsen the greenhouse gas emissions described in the original REF. The potential impacts of climate change on the proposed laydown area are expected to be negligible. The use of the laydown area is unlikely to improve or worsen the hazards and risks associated with the works assessed in the original REF. The use of the laydown area is unlikely to improve or worsen the potential for minor cumulative impacts associated with nearby construction and development projects that were addressed in the original REF. Additional management measures Management measures identified in the original REF are considered sufficient to manage potential flooding and drainage impacts. Management measures identified in the original REF are considered sufficient to manage potential socio-economic impacts. N/A The proposed area would be surrounded with temporary fencing. N/A Management measures identified in the original REF are considered sufficient to manage potential hazards and risks. Management measures identified in the original REF are considered sufficient to manage potential cumulative amenity impacts. 4.2 Summary of beneficial and adverse effects The key beneficial outcome to the extension of the use of the laydown area is: Reduced long vehicle trips to collect necessary materials and tools for utility and services enabling works. Utility and Services Enabling Works 11

17 As there is restricted space in road reserves, allowing a laydown area for the utilities works will reduce over-crowding of construction equipment within the road reserves (usually of narrow local streets). The laydown area is central to the utilities to be completed. The land is RMS owned. The key potential adverse impact of the proposal is: Amenity impacts on nearby residents, particularly noise, visual and traffic impacts. With the implementation of the safeguards provided in this document and the original REF, these impacts are expected to be relatively minor. Furthermore, the above impacts are temporary in nature. Utility and Services Enabling Works 12

18 5 Environmental management Two additional environmental safeguards have been identified in this assessment undertaken in Section 4. These environmental safeguards would be implemented in addition to those environmental safeguards identified in the original REF (Table 29). Combined, the safeguards would be sufficient to minimise any potential adverse impacts arising from the approved works and proposed change. Table 3 Summary of additional environmental safeguards for the proposed laydown area No. Impact Environmental safeguards Responsibility Timing 1. Noise and vibration Space permitting, the site is arranged to use the shipping container as shielding or to locate material as far from residential receivers as possible. Project Manager During works 2. Visual amenity The laydown area is surrounded with temporary fencing. Project Manager During works Utility and Services Enabling Works 13

19 6 Justification and conclusion The Utility and Services Enabling Works Review of Environmental Factors was determined on 25 January 2016 under Part 5 of the EP&A Act. During detailed design, it was identified that a designated laydown area for utility works would be beneficial for materials and tools to be used specifically for the utility works. An REF Addendum Utility Works for the setup and use of the laydown was determined on 1 April An extension for the use of this laydown area is required to enable completion of utility works and is the subject of this addendum 2 REF. The proposed change facilitates the activities approved in the original REF and would result in short term impacts to the amenity of nearby residents including minimal noise, visual and traffic impacts. The proposed changes are generally consistent with the objects of the EP&A Act as described in the original REF. This addendum 2 to the REF has examined and taken into account to the fullest extent possible all matters affecting or likely to affect the environment as a result of the proposed change. This has included consideration of impacts on threatened species, populations and ecological communities and their habitats and other protected fauna and native plants. The safeguards and management measures as detailed in this addendum 2 REF and the original REF would ameliorate or minimise these expected impacts. The environmental impacts of the proposed change are not likely to be significant and therefore it is not necessary for an environmental impact statement to be prepared and approval to be sought for the proposal from the Minister for Planning under Part 5.1 of the EP&A Act. The proposed change is unlikely to affect threatened species, populations or ecological communities or their habitats, within the meaning of the Threatened Species Conservation Act 1995 or Fisheries Management Act 1994 and therefore a Species Impact Statement is not required. The proposed change is also unlikely to affect Commonwealth land or have an impact on any matters of national environmental significance. Utility and Services Enabling Works 14

20 7 Certification This review of environmental factors provides a true and fair review of the proposal in relation to its potential effects on the environment. It addresses to the fullest extent possible all matters affecting or likely to affect the environment as a result of the proposal. Prepared by: Alison Kriegel Approvals Coordinator CPB Samsung John Holland Joint Venture Date: Reviewed by: Ryan Franklin Environment and Sustainability Manager CPB Samsung John Holland Joint Venture Date: David Kelly Environm nt Manager Sydney otorways Corporation Terry hapman Stag 1 Project Director Sydney Motorways Corporation I have examined this review of environmental factors and the certification by the CPB Samsung John Holland Joint Venture and accept the review of environmental factors on alf of Roads and Maritime Services. p Knudsen Project Director WestConnex Delivery Interface Date: IA Cu( 020* Utility and Services Enabling Works 15

21 8 References AECOM GHD WestConnex M4 East Environmental Impact Statement, WestConnex Delivery Authority, September 2015 DoE 2015 EPBC Act Protected Matters Search Tool, accessed 28 October OEH Native Vegetation of the Sydney Metropolitan Area OEH 2015 NSW Vegetation Types Database. Utility and Services Enabling Works 16

22 Terms and acronyms used in this addendum REF Canada Bay LEP 2013 Canada Bay Council Local Environmental Plan 2013 CEMP Construction environmental management plan Critical SSI Critical State significant infrastructure, as declared by the State Environmental Planning Policy (State and Regional Development) EIS Environmental impact statement EP&A Act Environmental Planning and Assessment Act 1979 (NSW). Provides the legislative framework for land use planning and development assessment in NSW EPBC Act Environment Protection and Biodiversity Conservation Act 1999 (Commonwealth). Provides for the protection of the environment, especially matters of national environmental significance, and provides a national assessment and approvals process. FM Act Fisheries Management Act 1994 (NSW) ISEPP State Environmental Planning Policy (Infrastructure) 2007 LEP Local Environmental Plan. A type of planning instrument made under Part 3 of the EP&A Act. LGA Local Government Area OEH Office of Environment and Heritage PACHCI Procedure for Aboriginal Cultural Heritage Consultation and Investigation, prepared by Roads and Maritime (2011a) REF Review of environmental factors Roads and Maritime Roads and Maritime Services ROL Road Occupancy Licence SEPP State Environmental Planning Policy. A type of planning instrument made under Part 3 of the EP&A Act. SEPP 55 State Environmental Planning Policy No.55 Remediation of Land SMC Sydney Motorway Corporation, formerly WestConnex Delivery Authority (WDA) SRD SEPP State Environmental Planning Policy (State and Regional Development) 2011 SSI State significant infrastructure TSC Act Threatened Species Conservation Act 1995 (NSW) Utility and Services Enabling Works 17

23 Appendix A Consideration of clause 228(2) factors and matters of national environmental significance

24 Clause 228(2) Checklist In addition to the requirements of the Is an EIS required? guideline as detailed in the REF, the following factors, listed in clause 228(2) of the Environmental Planning and Assessment Regulation 2000, have also been considered to assess the likely impacts of the proposal on the natural and built environment. Factor a. Any environmental impact on a community? The proposed change may have minor temporary impacts on the local community during use of the laydown area with respect to noise and road use. Impact Minor short term impact during use of laydown area. Use of the laydown area would be short term. The proposed area is not a public space and is not expected to result in any impacts to access for local residents. b. Any transformation of a locality? The proposed change does not cause any transformation of locality as it is the temporary, short term use of a fenced road reserve area. No Impact c. Any environmental impact on the ecosystems of the locality? The proposed change would not require removal of any trees, but may require minor pruning to enable vehicle access to the proposed laydown area. The proposed change is not expected to impact on the ecosystems of this highly urbanised locality. No Impact d. Any reduction of the aesthetic, recreational, scientific or other environmental quality or value of a locality? The proposed change would not affect the aesthetic, recreational, scientific or other environmental quality or value of a locality. The laydown area would be used for approximately 5 months and would be rehabilitated to the existing condition upon completion of works. No Impact Temporary screening / fencing would reduce the temporary aesthetic impact of the proposed laydown area. e. Any effect on a locality, place or building having aesthetic, anthropological, archaeological, architectural, cultural, historical, scientific or social significance or other special value for present or future generations? The proposal would not affect any locality, place or building that has aesthetic, anthropological, architectural, cultural, historical, scientific or social significance or other special value for present or future generations. No Impact The proposed laydown area would be used and would include temporary screening / fencing to reduce the temporary aesthetic impact. Utility and Services Enabling Works Appendix A

25 Factor f. Any impact on the habitat of protected fauna (within the meaning of the National Parks and Wildlife Act 1974)? No habitat of protected fauna has been identified as occurring in the study area. The proposed change will not remove any habitat associated with protected fauna and therefore the proposal would not impact on the any protected fauna. Impact No Impact g. Any endangering of any species of animal, plant or other form of life, whether living on land, in water or in the air? The proposed change would not endanger any terrestrial or aquatic species of plant, animal or other life form. No trees would be cleared as a result of the proposed change. h. Any long-term effects on the environment? No Impact No Impact The proposed change would not have any long term effects on the environment. The works are short-term and the area would be reinstated at the completion of works. i. Any degradation of the quality of the environment? No Impact The proposed change would not cause any degradation of the quality of the environment. j. Any risk to the safety of the environment? No Impact The proposed change would not cause any risk to the safety of the environment. k. Any reduction in the range of beneficial uses of the environment? No Impact There will be no reduction in the range of beneficial uses of the environment as it involves the temporary use of a restricted access road reserve. l. Any pollution of the environment? No Impact The proposed change will not increase the risk of polluting the environment above what was identified in the original REF. m. Any environmental problems associated with the disposal of waste? No Impact The proposed change will not increase any environmental problems associated with the disposal of waste beyond what was identified in the original REF. n. Any increased demands on resources (natural or otherwise) that are, or are likely to become, in short supply? No Impact The proposed change does not result in any increased demands on resources beyond what was identified in the original REF. Utility and Services Enabling Works Appendix A

26 Factor o. Any cumulative environmental effect with other existing or likely future activities? Impact No Impact The proposed change will not have cumulative environmental effects on existing or future activities as it involves the short-term use of a restricted access road reserve. p. Any impact on coastal processes and coastal hazards, including those under projected climate change conditions? No Impact The proposed change would not impact on coastal processes or coastal hazards as it is not located within a coastal zone. Utility and Services Enabling Works Appendix A

27 Matters of National Environmental Significance Under the environmental assessment provisions of the Environment Protection and Biodiversity Conservation Act 1999, the following matters of national environmental significance and impacts on Commonwealth land are required to be considered to assist in determining whether the proposal should be referred to the Australian Government Department of Sustainability, Environment, Water, Population and Communities. Factor Impact Comments a. Any impact on a World Heritage property? Nil There are no world heritage properties in the study area. b. Any impact on a National Heritage place? c. Any impact on a wetland of international importance? d. Any impact on a listed threatened species or communities? e. Any impacts on listed migratory species? d. Any impact on a Commonwealth marine area? Nil There are no places of national heritage significance in the study area. Nil There are no wetlands of international significance the study area. Nil Nil Nil There are no listed threatened species of communities identified as occurring in the study area. There are no listed migratory species of communities identified as occurring in the study area. The proposed study area is not in a Commonwealth Marine Area. g. Does the proposal involve a nuclear action (including uranium mining)? Additionally, any impact (direct or indirect) on Commonwealth land? Nil Nil The proposed works do not involve a nuclear action. The proposed works will not occur on or impact Commonwealth land. Utility and Services Enabling Works Appendix A

28 Appendix B Environmental constraints map

29 NOISE! H H! H! NOISE CATCHMENT AREA VEGETATION PLANTATION (NATIVE AND/OR EXOTIC) EDUCATIONAL SENSITIVE RECEIVERS ESTUARINE SWAMP OAK FOREST PLACES OF WORSHIP SENSITIVE RECEIVERS ESTUARINE MANGROVE FOREST OTHER SENSITIVE RECEIVERS ESTUARINE SALTMARSH HERITAGE SYDNEY TURPENTINE-IRONBARK FOREST STATE HERITAGE URBAN EXOTIC/NATIVE ARCHAEOLOGICALLY SENSITIVE S170 HERITAGE CONTRIBUTORY HERITAGE WATER POTENTIAL FOR CONTAMINATION HIGH POTENTIAL HERITAGE MODERATE LOCAL HERITAGE LOW H! CONTAMINATED SITES Scales Sheet Index A Rev Issued for Information Date 10 1: m Client Approved WESTCONNEX M4 EAST Status MODIFIED TENDER DESIGN Original Size Coordinate System Height Datum Description 5 Filename: NOT TO BE USED FOR CONSTRUCTION A3 MGA ZONE 56 AHD Drawn JC Designed JC Date Printed ENVIRONMENTAL CONSTRAINTS QUEENS LANE.mxd ENVIRONMENTAL CONSTRAINTS MAP QUEENS LANE Project Company Area M4E LSJH 0000 Discipline LA Document SK Lot Number 020 Document No Rev A

30

Chapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements

Chapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Contents Page number 4. Planning and statutory requirements 4-1 4.1 Approval under the EPBC Act 4-1 4.1.1 Controlled

More information

Leighton Samsung John Holland Joint Venture. M4 East Design and Construct. Minor Works Review of Environmental Factors Geotechnical Investigations

Leighton Samsung John Holland Joint Venture. M4 East Design and Construct. Minor Works Review of Environmental Factors Geotechnical Investigations Leighton Samsung John Holland Joint Venture M4 East Design and Construct Minor Works Review of Environmental Factors Geotechnical Investigations August 2015 Table of contents 1. Introduction 3 1.1 Project

More information

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT May 2017 1 CONTENTS Part 1: The new Biodiversity Offsets Scheme 5 What is the Biodiversity Offsets Scheme? 6 Step 1: The proponent determines if the

More information

Environmental impact assessment of council roadside activities

Environmental impact assessment of council roadside activities Environmental impact assessment of council roadside activities Developed on behalf of LGNSW for the Council Roadside Reserve Project 2016-2019 Introduction These slides cover legislative obligations in

More information

Clyde Barging Facility

Clyde Barging Facility City & Southwest Clyde Barging Facility Review of Environmental Factors PROJECT: SYDNEY METRO CITY & SOUTHWEST TSE WORKS DECEMBER 2017 Document No: SMCSWTSE-JCG-TPW-EM-RPT-097239 Contents Glossary of terms...

More information

Environmental Risk Analysis

Environmental Risk Analysis Appendix 10 11 12 13 14 15 16 17 18 191 Groundwater Controlled UHSA Air Agricultural Historic EIS Preliminary Environmental Blasting Quality Surface Secretary s Noise Statement Aboriginal Economic Action

More information

STATE SIGNIFICANT DEVELOPMENT ASSESSMENT Metz Solar Farm (SSD 7931)

STATE SIGNIFICANT DEVELOPMENT ASSESSMENT Metz Solar Farm (SSD 7931) STATE SIGNIFICANT DEVELOPMENT ASSESSMENT Metz Solar Farm (SSD 7931) 1. BACKGROUND Infinergy Pacific (the Applicant) proposes to develop a new 100 megawatt (MW) solar farm near Armidale in the Armidale

More information

SEARs project justification and conclusion

SEARs project justification and conclusion 31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need

More information

Out of hours works protocol

Out of hours works protocol Out of hours works protocol March 2017 Document control File name TNR3N_OOH_Work _Protocol_Rev2 Report name Out of hours works protocol Revision number 2 Revision history Revision Date Description Approval

More information

Environmental Planning and Assessment Act 1979

Environmental Planning and Assessment Act 1979 New South Wales State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) Amendment 2010 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor,

More information

Section 4 Environmental Impact Assessment Framework

Section 4 Environmental Impact Assessment Framework Section 4 Environmental Impact Assessment Framework 4. ENVIRONMENTAL IMPACT ASSESSMENT FRAMEWORK 4.1 Environmental Impact Assessment in Western Australia The overall framework for EIA in WA is described

More information

Planning Approval Consistency Assessment Form

Planning Approval Consistency Assessment Form Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Assessment Name: Prepared by: Prepared for: Assessment number: Status:

More information

Zone R2 Low Density Residential. Zone R3 Medium Density Residential. Zone IN4 Working Waterfront. Zone SP1 Special Activities. Zone SP2 Infrastructure

Zone R2 Low Density Residential. Zone R3 Medium Density Residential. Zone IN4 Working Waterfront. Zone SP1 Special Activities. Zone SP2 Infrastructure Planning Proposal Lake Macquarie Local Environmental Plan 2014 (Amendment No. 21) Rezoning at Freemans Drive, Cooranbong and Permitting Utility Infrastructure in a Range of Zones RZ/3/2014 Local Government

More information

Western Rail Coal Unloader

Western Rail Coal Unloader ENVIRONMENTAL ASSESSMENT CHAPTER 1 - INTRODUCTION April 2007 Chapter 1 - Introduction Contents 1. Introduction 1-1 1.1 Overview 1-1 1.2 Project Objectives 1-1 1.3 The Proponent 1-3 1.4 Statutory Planning

More information

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement TABLE OF CONTENTS 1 INTRODUCTION 1-1 1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 1.1.2 Project Summary 1-1 1.1.3 Land Tenure, Development Application Area, Tenements and Zoning 1-7 1.1.4

More information

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION October 2005 Contents 1. 1-1 1.1 Background 1-1 1.1.1 The Applicant 1-1 1.1.2 Growth in Container Trade 1-1 1.1.3

More information

Council Roadside Reserves Project. Site Management Checklists and Safeguards

Council Roadside Reserves Project. Site Management Checklists and Safeguards Council Roadside Reserves Project Site Management Checklists and Safeguards Introduction These slides cover An introduction to checklists and safeguards Example pre-construction checklist Practical safeguards

More information

ENVIRONMENTAL REVIEW. Ancillary Facility Site 3. WestConnex M4 Widening Project

ENVIRONMENTAL REVIEW. Ancillary Facility Site 3. WestConnex M4 Widening Project ENVIRONMENTAL REVIEW Ancillary Facility Site 3 WestConnex M4 Widening Project NOVEMBER 2015 Document control File name Environmental Review of Ancillary Facility Sites 3 Rev2.docx Report name Environmental

More information

ARROW BOWEN PIPELINE PROJECT

ARROW BOWEN PIPELINE PROJECT ARROW BOWEN PIPELINE PROJECT APPENDIX A7 REGULATORY APPROVALS Arrow Bowen Pipeline Project Arrow Bowen Pipeline Project THIS PAGE INTENTIONALLY LEFT BLANK APPENDIX A9: REGULATORY APPROVALS Approval / permit

More information

Technical Report Flood Mitigation Strategy

Technical Report Flood Mitigation Strategy Technical Report Flood Mitigation Strategy Contract No. 15.7105.1373 Document No. Document Approval Rev Date Prepared by Reviewed by Approved by Remarks C_01 19/05/2016 J. Beck (AEH) L. Segundo T.Dias

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

tel fax ABN

tel fax ABN AECOM Australia Pty Ltd Level 21, 420 George Street Sydney NSW 2000 PO Box Q410 QVB Post Office NSW 1230 Australia www.aecom.com +61 2 8934 0000 tel +61 2 8934 0001 fax ABN 20 093 846 925 15 June 2018

More information

12. STATUTORY REQUIREMENTS

12. STATUTORY REQUIREMENTS 12. STATUTORY REQUIREMENTS (SMP GUIDELINES SECTION 6.9) This section identifies the statutory requirements that apply to the SMP Area and the proposed mining operation in relation to any potential subsidence

More information

IN THE MATTER OF THE MORDIALLOC BYPASS PROJECT ENVIRONMENT EFFECTS STATEMENT

IN THE MATTER OF THE MORDIALLOC BYPASS PROJECT ENVIRONMENT EFFECTS STATEMENT INQUIRY AND ADVISORY COMMITTEE APPOINTED BY THE MINISTER FOR PLANNING PLANNING PANELS VICTORIA IN THE MATTER OF THE MORDIALLOC BYPASS PROJECT ENVIRONMENT EFFECTS STATEMENT IN THE MATTER OF AMENDMENT GC107

More information

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION October 2005 Measures Contents 21. 21-1 21.1 Introduction 21-1 21.2 Construction 21-1

More information

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol 1/11 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP EM EPA ERAP OEH PAH OOHWP EIS MCoA Distribution

More information

The planning proposal is inconsistent with the following section 117(2) Directions:

The planning proposal is inconsistent with the following section 117(2) Directions: Attachment 2: Section 117(2) Directions The planning proposal has been assessed against all relevant section 117(2) Directions. The planning proposal has been assessed as follows: The planning proposal

More information

S e c t i o n B i o d i ve r s i t y

S e c t i o n B i o d i ve r s i t y S e c t i o n 2. 2 - B i o d i ve r s i t y The District has a wealth of ecosystems which support indigenous vegetation and habitats of indigenous fauna. Many of these ecosystems are the remnants of the

More information

8.1 ENVIRONMENTAL CONSTRAINTS / LAND CAPABILITY MAP OF THE OXFORD FALLS LOCALITY

8.1 ENVIRONMENTAL CONSTRAINTS / LAND CAPABILITY MAP OF THE OXFORD FALLS LOCALITY 5874\168 PAGE 168 ENVIRONMENTAL CONSTRAINTS / LAND CAPABILITY MAP OF THE OXFORD FALLS LOCALITY Reporting Officer General Manager Purpose To report to Council on the strategic land capability assessment

More information

ENVIRONMENTAL REVIEW

ENVIRONMENTAL REVIEW Addendum to ENVIRONMENTAL REVIEW Ancillary Facility Sites 7 and 13 WestConnex M4 Widening Project DECEMBER2015 Document control File name Addendum to Environmental Review of Ancillary Facilities 7 & 13

More information

River Murray to Broken Hill Pipeline

River Murray to Broken Hill Pipeline ouble River Murray to Broken Hill Pipeline Final Report Number DC16095 October 2017 Prepared for WaterNSW Document Control Version Authors Reviewer Approved for Issue Name Date Final Lara Hess Kristen

More information

Native Title Act 1993

Native Title Act 1993 APPENDIX A2: Regulatory approvals Table 1: Regulatory approvals Approval / permit type Commonwealth approvals Permission to intervene in matters where traditional cultural heritage interests are considered

More information

Compliance Tracking Program

Compliance Tracking Program Number Project: M4 East Design and Construct Contract Number: 15.7105.1373 Number: Revision Date: 7 April 2016 Rev Date Prepared by Reviewed by Approved by Remarks 0 16/03/2016 CSJ DP&E Submission to DP&E

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION

More information

General A. General A.1 Activities Not Specifically Provided For A.2 Temporary Activities... 3

General A. General A.1 Activities Not Specifically Provided For A.2 Temporary Activities... 3 Section Contents General... 2 4A. General... 2 4A.1 Activities Not Specifically Provided For... 2 4A.2 Temporary Activities... 3 4A.3 Activities on the Surface of Water... 6 4A.4 Status of Roads... 7 4A.5

More information

Awaba Waste Management Facility Biodiversity Offset Strategy

Awaba Waste Management Facility Biodiversity Offset Strategy Awaba Waste Management Facility Biodiversity Offset Strategy 0 Lake Macquarie City Council March 2017 Photo credits Lake Macquarie City Council i Contents Executive summary Introduction 1 Biodiversity

More information

Relevant legislation (Administering Authority Commonwealth legislation

Relevant legislation (Administering Authority Commonwealth legislation Commonwealth legislation Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) [Commonwealth Department of Sustainability, Environment, Water, Population and Communities (SEWPaC)] New

More information

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone Chapter 4 Mixed Activity Zone 4. MIXED ACTIVITY ZONE 4.1 RESOURCE MANAGEMENT ISSUES 1. Activities adjoining main arterial roads can adversely affect the safety, sustainability and efficiency of the network.

More information

I335. Western Springs Stadium Precinct

I335. Western Springs Stadium Precinct I335. Western Springs Stadium Precinct I335.1. Precinct description The Western Springs Stadium Precinct provides specific planning controls for the use and development of Western Springs Stadium as a

More information

Traffic Management Plan. Environmental Management and Monitoring Program. Appendix VI

Traffic Management Plan. Environmental Management and Monitoring Program. Appendix VI Traffic Management Plan Environmental Management and Monitoring Program Appendix VI Gunlake Quarries December 2009 Olsen Consulting Group Pty Ltd 6/25 Victoria Street WOLLONGONG 2500 PO Box 353 FIGTREE

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Appendix B6 Construction Heritage Management Plan

Appendix B6 Construction Heritage Management Plan Appendix B6 Project: Keepit Dam Work Package 2 - Post Tensioning Works Location: Keepit Dam, Namoi River, Northern NSW Client: WaterNSW Contract: 04532F31 Page 2 of 21 Document Acceptance and Release Notice

More information

APPENDIX B5. Construction Heritage Management Plan. WestConnex - M4 Widening Major Civil Works

APPENDIX B5. Construction Heritage Management Plan. WestConnex - M4 Widening Major Civil Works APPENDIX B5 Construction Heritage Management Plan WestConnex - M4 Widening Major Civil Works JUNE 2016 Document control File name App B5 HMP_Rev 5.docx Report name Document Number Revision number Rev 5

More information

The Standard Criteria, current as of November 2013, as defined in Schedule 4 of the EP Act are as follows:

The Standard Criteria, current as of November 2013, as defined in Schedule 4 of the EP Act are as follows: STANDARD CRITERIA The Taroborah Coal Mine Project (the Project) has been assessed against the relevant aspects of the Standard Criteria outlined in the Environmental Protection Act 1994 (EP Act). Particular

More information

State Environmental Planning Policy (Infrastructure) 2007

State Environmental Planning Policy (Infrastructure) 2007 New South Wales State Environmental Planning Policy (Infrastructure) 2007 under the Environmental Planning and Assessment Act 1979 Her Excellency the Governor, with the advice of the Executive Council,

More information

Contents. Sancrox Quarry Expansion Preliminary Environmental Assessment 2015

Contents. Sancrox Quarry Expansion Preliminary Environmental Assessment 2015 Contents 1 Introduction... 5 1.1 Site Description... 6 1.2 The Proponent... 6 1.3 Purpose of the Document... 6 2 Land Ownership... 8 2.1 Crown Land Purchase Site...10 3 Current Development Consent and

More information

Out of Hours Work Protocol

Out of Hours Work Protocol NorthConnex & M2 Integration Project Lend Lease Bouygues Joint Venture Document Number: Revision: 11 Document Control Title: General Description: Document Path: Out of Hours Work Protocol Document No/Ref:

More information

Construction Flora and Fauna Management Plan

Construction Flora and Fauna Management Plan Construction Flora and Fauna Management Plan Document Number Project: M4 East Design and Construct Contract Number: 15.7105.1373 Document Number: Revision Date: 6 December 2017 Document Approval Rev Date

More information

Transport Roads & Maritime Services

Transport Roads & Maritime Services Transport Roads & Maritime Services NSW EDO Level 5 263 Clarence Street SYDNEY NSW 2000 Attention: Elaine Johnson, Senior Solicitor 9 October 2015 Dear Ms Johnson Alexandria Landfill Site I refer to your

More information

Section 75J of the Environmental Planning & Assessment Act 1979

Section 75J of the Environmental Planning & Assessment Act 1979 Project Approval Section 75J of the Environmental Planning & Assessment Act 1979 I approve the project application referred to in schedule 1, subject to the conditions in schedule 2. These conditions are

More information

WENTWORTH GROUP OF CONCERNED SCIENTISTS

WENTWORTH GROUP OF CONCERNED SCIENTISTS WENTWORTH GROUP OF CONCERNED SCIENTISTS Dr Neil Byron, Mr Peter Cosier, Dr Richard Davis, Prof Tim Flannery FAA, Dr Ronnie Harding FEIANZ, Dr Terry Hillman AM, Prof Lesley Hughes, Prof David Karoly,Prof

More information

REPORT Condition D19 Permanent Noise Barriers

REPORT Condition D19 Permanent Noise Barriers REPORT Condition D19 Permanent Noise Barriers Project Name: WestConnex New M5 Project number: 15.7020.2597 Revision date: 19/08/2016 Revision: 1 Document Approval Rev. Prepared by Reviewed by Recommended

More information

transfer of treated water via pipelines to users on the BIP or to Bunnerong Canal, and of waste water to sewer; and

transfer of treated water via pipelines to users on the BIP or to Bunnerong Canal, and of waste water to sewer; and 6 6.1 Scope A number of statutory planning controls need to be addressed for the Activity (which is defined below) and other components of the BGC Project. This chapter reviews the Commonwealth and State

More information

6 IMPACT ASSESSMENT METHOD

6 IMPACT ASSESSMENT METHOD 6 IMPACT ASSESSMENT METHOD ENTER HERE BACK TO CONTENTS 6 Impact Assessment Method This chapter outlines the methods employed within the EIS specialist technical studies to undertake an assessment of potential

More information

Section 3 - Consultation and Issue Identification

Section 3 - Consultation and Issue Identification ENVIRONMENTAL ASSESSMENT 3-1 MUDGEE STONE COMPANY PTY LTD 3Section 3 Consultation and Issue Identification P R E A M B L E This section describes how the environmental issues assessed in the Environmental

More information

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores October 2015 Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores WaterNSW on behalf of the NSW Government

More information

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction

More information

1. The impacts of development and settlement intensification on biodiversity and Aboriginal cultural heritage;

1. The impacts of development and settlement intensification on biodiversity and Aboriginal cultural heritage; Your reference Our reference: DOC13/40624 Contact: Liz Mazzer (02) 68835325 Date 8 th August 2013 General Manager Lithgow City Council PO Box 19 Lithgow NSW 2790 Attention: Ms Sherilyn Hanrahan, Strategic

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00

Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00 Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00 Local Government Area: ame of Draft LEP: Lake Macquarie City Planning Proposal Biodiversity

More information

URBAN SETTLEMENT ZONE - RULES

URBAN SETTLEMENT ZONE - RULES URBAN SETTLEMENT ZONE - RULES.1 Rule Statement The following rules, shall apply to all land shown as being within the Urban Settlement Zone in the District Plan Maps. These rules shall be read in conjunction

More information

The Hon Pru Goward MP Minister for Planning SCHEDULE I. sst Roads and Maritime Services. Land in the suburbs of Hornsby, North Wahroonga,

The Hon Pru Goward MP Minister for Planning SCHEDULE I. sst Roads and Maritime Services. Land in the suburbs of Hornsby, North Wahroonga, I nfrastructu re approval Section 1152;8 of the Environmental Planning & Assessment Act 1979 I grant approval to the State significant infrastructure application referred to in schedule 1, subject to the

More information

Environmental Program

Environmental Program Environmental Program FLORA AND FAUNA MANAGEMENT BBA-ENP-1000-1400-0011 Revision Date Revision Description Prepared Reviewed Approved A0 30 April 2007 Draft for BBA review SW A1 9 May 2007 Draft for review

More information

Submission Guide: Ecologically Sustainable Development

Submission Guide: Ecologically Sustainable Development Submission Guide: Ecologically Sustainable Development A guide for making submissions on the NSW biodiversity reforms The biodiversity reforms will help deliver ecologically sustainable development in

More information

Environmental Impact Statement. Avoca Tank Project

Environmental Impact Statement. Avoca Tank Project ABN 88 100 095 494 Environmental Impact Statement for the Avoca Tank Project Prepared by: R.W. CORKERY & CO. PTY. LIMITED July 2014 This page has intentionally been left blank ABN 88 100 095 494 Environmental

More information

Some Sydney councils require 27 reports for a single house development application

Some Sydney councils require 27 reports for a single house development application Some Sydney councils require 27 reports for a single house development application Monday, 23 April 2018 Sydney councils are requiring an excessive number of specialist reports to submit a Development

More information

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007 Wytch Farm Pipeline Refurbishment Project Environmental Statement Non-Technical Summary November 2007 Location map 0 1 2 3 4 5 kilometres Development area Introduction BP Exploration Operating Company

More information

Ipswich City Council PLANNING SCHEME FACT SHEET NO. 4

Ipswich City Council PLANNING SCHEME FACT SHEET NO. 4 Ipswich City Council PLANNING SCHEME FACT SHEET NO. 4 Vegetation Management 1. Introduction This Fact Sheet is one of a series which deals with planning scheme related information. This Fact Sheet deals

More information

Notes for NEPA for Generic Terms of Reference

Notes for NEPA for Generic Terms of Reference TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation

More information

H28. Special Purpose Quarry Zone

H28. Special Purpose Quarry Zone H28. Special Purpose Quarry Zone H28.1. Zone description Mineral resources are important to Auckland s economy and development. The Special Purpose Quarry Zone provides for significant mineral extraction

More information

Impacts of Dredging and Reclamation on Noise and Amenity

Impacts of Dredging and Reclamation on Noise and Amenity Section 9.5 Impacts of Dredging and Reclamation on Noise and Amenity Section 9.5.1 Management Goals for Noise and Amenity The management goals for noise and vibration are to: Minimise the noise associated

More information

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013 Planning, Development & Heritage LEPs and SEPPs Last updated: January 2013 These Fact Sheets are a guide only and are no substitute for legal advice. To request free initial legal advice on an environmental

More information

CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK

CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK APPENDIX D Contents 1 Introduction... 1 1.1 Purpose and Scope... 1 1.2 Status... 1 1.3 Environment and Sustainability Policy... 1 1.4 Project Description...

More information

Appendix General Environmental Risk Analysis

Appendix General Environmental Risk Analysis Proposed Solar Power Station Near Moree, NSW (MOREE SOLAR FARM) Appendix Prepared by BP Solar & Walsh Consulting January 011 Background The body of the identifies all significant environmental risks identified

More information

Manningham Works Code of Practice

Manningham Works Code of Practice Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au

More information

SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 1 JUNE 2015 APPLICATION FOR PLANNING PERMISSION

SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 1 JUNE 2015 APPLICATION FOR PLANNING PERMISSION SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 1 JUNE 2015 APPLICATION FOR PLANNING PERMISSION ITEM: OFFICER: WARD: PROPOSAL: SITE: APPLICANT: AGENT: REFERENCE NUMBER: 15/00456/FUL

More information

Planning Proposal Amendment to Lake Macquarie Local Environmental Plan 2004 F3 Freeway Service Centre

Planning Proposal Amendment to Lake Macquarie Local Environmental Plan 2004 F3 Freeway Service Centre Planning Proposal Amendment to Lake Macquarie Local Environmental Plan 2004 F3 Freeway Service Centre Local Government Area: Lake Macquarie Name of Draft LEP: Lake Macquarie Local Environmental Plan 2004

More information

4. Legislative Framework

4. Legislative Framework 4. Legislative Framework 4.1 Overview This chapter provides the legislative background for the Project including relevant Commonwealth and Northern Territory legislation and guidelines. For background

More information

IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention

IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention Date of Council Resolution This guideline was adopted by Council on 12 December 2007 and takes effect on 19 December 2007, in accordance with section

More information

1 Introduction 1-1. Project Need and Objectives

1 Introduction 1-1. Project Need and Objectives Introduction 1 CONTENTS 1 Introduction 1-1 1.1 1.1 Introduction Introduction 1-1 1-1 1.2 1.2 Project Overview Project Overview 1-1 1-1 1.3 1.3 Project Site Project Site 1-1 1-1 1.4 1.4 The Proponent The

More information

Ancillary Facilities Management Plan

Ancillary Facilities Management Plan Unclassified Sydney Metro Integrated Management System (IMS) (Uncontrolled when printed) Integrated Management System Sydney Metro Truck Marshalling Yard Ancillary Facilities Management Plan SM-18-00030773

More information

ARBORICULTURAL REPORT. WestConnex Stage 2 33kV supply 71A Bourke Rd Alexandria

ARBORICULTURAL REPORT. WestConnex Stage 2 33kV supply 71A Bourke Rd Alexandria ARBORICULTURAL REPORT WestConnex Stage 2 33kV supply 71A Bourke Rd Alexandria WestConnex New M5 Prepared for CDS-JV Date 13 th October 2017 Table 1: Condition of Approval B63 Compliance Table Condition

More information

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B6 Construction Air Quality Management Plan

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B6 Construction Air Quality Management Plan Stage 2: WestConnex M5 King Georges Road Interchange Upgrade Appendix B6 Construction Air Quality Management Plan JULY 2016 DOCUMENT CONTROL File name Report name CEMP App B6 CAQMP Rev D Construction

More information

Six above ground substations would be constructed for the project. The construction methodology for these facilities would typically involve:

Six above ground substations would be constructed for the project. The construction methodology for these facilities would typically involve: Electrical substations Six above ground substations would be constructed for the project. The construction methodology for these facilities would typically involve: Excavation, footing and base slab installation

More information

Section 3. Legislative Framework and Impact Assessment Process

Section 3. Legislative Framework and Impact Assessment Process Section 3 Legislative Framework and Impact Assessment Process 22 Cameco Australia Pty Ltd 3. Legislative Framework and Impact Assessment Process 3.1 Key Legislative Requirements The Project requires environmental

More information

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017.

AT A GLANCE. Cairns Shipping Development Project. Revised Draft Environmental Impact Statement Fact Sheet July 2017. Cairns Shipping Development Project Revised Draft Environmental Impact Statement Fact Sheet July 2017 AT A GLANCE > An additional 70 cruise ships into Port of Cairns each year by 2031 > Project design

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Land Management and Biodiversity Conservation Reforms

Land Management and Biodiversity Conservation Reforms Land Management and Biodiversity Conservation Reforms Tom Celebrezze Director Biodiversity, Sustainable Development and Coastal Policy NSW Office of Environment and Heritage 6 December 2017 Simplifying

More information

EDO NSW Key Issues Summary Biodiversity Certification: Upfront planning for conservation & future impacts 1 November 2017

EDO NSW Key Issues Summary Biodiversity Certification: Upfront planning for conservation & future impacts 1 November 2017 EDO NSW Key Issues Summary Biodiversity Certification: Upfront planning for conservation & future impacts 1 November 2017 1. Biocertification: Quick guide and EDO NSW analysis What is Biocertification?

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

The Sydney Metropolitan Catchment Management Authority leading the recovery of Sydney s biodiversity into the future

The Sydney Metropolitan Catchment Management Authority leading the recovery of Sydney s biodiversity into the future The Sydney Metropolitan Catchment Management Authority leading the recovery of Sydney s biodiversity into the future Bob Junor SMCMA PO Box 3720 Parramatta NSW 2124. (This paper reflects the position as

More information

Commencement Date. This section applies to all land under Newcastle Local Environmental Plan 2012.

Commencement Date. This section applies to all land under Newcastle Local Environmental Plan 2012. 5.03 Tree Management Amendment history Version Number Date Adopted by Council Commencement Date 1 15/11/2011 15/06/2012 New Amendment Details Savings provisions Any development application lodged but not

More information

Section 89E of the Environmental Planning & Assessment Act 1979

Section 89E of the Environmental Planning & Assessment Act 1979 Development Consent Section 89E of the Environmental Planning & Assessment Act 1979 As delegate of the Minister for Planning, I approve the development application referred to in Schedule 1, subject to

More information

Supplementary Review of Environmental Factors Shallow Aquifer Monitoring Bore (SAMB) Project Kahlua - PEL 1 Gunnedah Basin

Supplementary Review of Environmental Factors Shallow Aquifer Monitoring Bore (SAMB) Project Kahlua - PEL 1 Gunnedah Basin Supplementary Review of Environmental Factors Shallow Aquifer Monitoring Bore (SAMB) Project Kahlua - PEL 1 Gunnedah Basin Prepared by: Santos QNT Pty Ltd ABN: 33083077196 Issue date: 18/11/2010 Executive

More information

Compliance Tracking Program. WestConnex M4 Widening

Compliance Tracking Program. WestConnex M4 Widening Compliance Tracking Program WestConnex - M4 Widening Major Civil Works MAY 2015 WestConnex M4 Widening Compliance Tracking Program Document control File name Report name CTP Rev 4.docx Revision number

More information

ULDA Decision Notice

ULDA Decision Notice ULDA Decision Notice Site Address Bowen St, Roma Real property description Lot 142 SP250497 Type of approval UDA development approval subject to conditions Aspects of development Reconfiguring a Lot with

More information

MAITLAND / NORTH ROTHBURY WATER SUPPLY AUGMENTATION - LOCHINVAR RESERVOIR

MAITLAND / NORTH ROTHBURY WATER SUPPLY AUGMENTATION - LOCHINVAR RESERVOIR MAITLAND / NORTH ROTHBURY WATER SUPPLY AUGMENTATION - LOCHINVAR RESERVOIR 301015-01507 February 2011 FINAL Infrastructure & Environment 3 Warabrook Blvd Warabrook 2304 Australia Telephone: +61 2 4985 0000

More information

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover. 5.3.2. Rural Zone 5.3.2.1. Permitted Activities 5.3.2.1.1. Residential, recreational, agricultural, exotic forestry or tourist related activities which comply with the standards for permitted activities

More information

Environment Protection Licence

Environment Protection Licence Licence Details Number: Anniversary Date: 20734 26-February Licensee JOHN HOLLAND PTY LTD SAMSUNG C&T CORPORATION CPB CONTRACTORS PTY LIMITED PO BOX 411 BURWOOD NSW 1805 Premises WESTCONNEX M4 EAST, HOMEBUSH

More information

Overview and key environmental issues

Overview and key environmental issues Blue Mountains Draft Local Environmental Plan 2013 1 Information Sheet 4 Overview and key environmental issues Use this document in conjunction with Information Sheet 5: SUBMISSION WRITING GUIDE AND SUMMARY

More information