Clarabelle Mill and Water Treatment Plants Joint Facility

Size: px
Start display at page:

Download "Clarabelle Mill and Water Treatment Plants Joint Facility"

Transcription

1 December 2013 Toxic Reduction Plan Summaries Clarabelle Mill and Water Treatment Plants Joint Facility Ammonia Carbon disulphide Nitrate ion Nitrogen oxides Particulate Matter (TSP. PM10, PM2.5) Total Reduced Sulphur

2 Toxic Substance Reduction Plan Summaries for Toxic Substances at Clarabelle Mill 1. Facility information NPRI identification number: 1465 NAICS identification number: NAICS Canada code: 21 Legal and trade name of company: Vale Canada Limited Facility Street Address: Clarabelle Mill, 1701 Elm Street, Unit 1, Copper Cliff, Ontario Facility Mailing Address: Clarabelle Mill, Copper Cliff, Ontario Number of full time employee equivalents (2012): 116 UTM x: UTM y: Public Contact: Frank Javor, Manager Environment (Air) Central Engineering Building, Copper Cliff, Ontario Prepared Plan: Vanessa Bonanno Intermediate Analyst Environment (Air) Central Engineering Building, Copper Cliff, Ontario, Highest ranking official: Duncan Ross,

3 Manager Operations, Clarabelle Mill and Central Mills Clarabelle Mill, Copper Cliff, Ontario, Toxic Reduction Planner and certifier: Mary Dubel Licence number: TSRP0118 Company information: Vale Canada Limited Business Number: DUNS number: Street Address: 200 Bay Street, Suite 200, South Tower, P.O. Box 70 Toronto, Ontario M5J 2K2 Parent Company: Companhia Vale Do Rio Doce (Vale) Business Number: DUNS Number: Graça Aranha Avenue, Rio de Janeiro, Brazil 2. List of Toxic Substances used at Clarabelle Mill and CAS # of Substance Ammonia, NA-16 Carbon disulphide, Nitrate ion, NA-17 Nitrogen oxides, Particulate Matter (TSP. PM10, PM2.5), NA-M08, NA-M09, NA-M10 Total Reduced Sulphur, NA-M14 3. Toxic Reduction Policy Statement of Intent At Vale s Sudbury Operations, we are committed to sustainable development meeting the needs of the present without compromising the ability of future generations to meet their own needs. Vale believes in zero harm, to our people, to our workplaces, to the communities in which we operate and to the natural environment. Vale Canada Sudbury Operation s is committed to playing a leadership role in protecting the environment. While, for milling, smelting and refining, this primarily means reducing toxic substances end-of-pipe emissions, wherever feasible, Vale will adopt safer alternatives and

4 technologies to reduce the use and release of toxic substances. Toxic substance reduction will be a continuing effort in our company and new technologically and economically feasible reduction options will be considered if opportunities become available in the future and are in compliance with all federal and provincial regulations. 4. Objectives 4.1. Ammonia and nitrate ion At this time, Vale s Sudbury Operations does not intend to reduce the creation of ammonia and nitrate ion at the Clarabelle Mill. Several reduction options were identified, however, at this time all options were not technically or economically feasible for the operation. Vale will continue its efforts to reduce the release of ammonia and nitrate ion into the environment Carbon disulphide and total reduced sulphur At this time, Vale s Sudbury Operations does not intend to reduce the creation of carbon disulphide and total reduced sulphurs at the Clarabelle Mill. Several reduction options were identified, however, at this time all options were not technically or economically feasible for the operation. Vale will continue its efforts to reduce the creation of carbon disulphide and total reduced sulphurs during the milling process, with the goal of creating a safe and harm-free work environment Particulate matter At this time, Vale s Sudbury Operations does not intend to reduce the creation particulate matter at Clarabelle Mill. Several reduction options were identified, however, at this time all options were not technically and/or economically feasible for the operation. Vale will continue its efforts to mitigate fugitive dust creation at the Central Tailings area Nitrogen oxides Vale s Sudbury Operations does not intend to reduce the creation of nitrogen oxides at Clarabelle Mill. As per Vale s policy, all new and replacement natural gas heaters/burners must meet a low NO x specification as part of Vale s engineering standards. 5. Description of Substances 5.1. Ammonia and nitrate ion Ammonia and nitrate ion are not used at Clarabelle Mill. The Clarabelle Mill facility includes a large Central Tailings area, which receives various waste and wastewater inputs for Vale Sudbury Mines and surface plants. The effluent that is collected in the tailings area is treated by the Copper Cliff Wastewater Treatment Plant before discharge into the environment. The Nolin Creek Wastewater Treatment Plant is also located within the Clarabelle Mill facility boundary, and treats surface water runoff from Vale s property. Ammonia and nitrate ion are created as a by-product from explosive use at the Sudbury Mines, sewage waste disposal, sewage effluent treatment, and surface run-off (run-off would include ammonia and nitrate ion found in animal excrement). A portion of the ammonia

5 discharged into the tailings area comes from the use of ammonia at the Copper Cliff Nickel refinery, used as a reagent to purify process gas Carbon disulphide and total reduced sulphur Carbon disulphide and total reduced sulphurs are created from the decomposition of Potassium Amyl Xanthate (PAX), a reagent used at Clarabelle Mill. It is the goal of the milling process to remove the unwanted components of the ore to produce a valuable concentrate product, in the case of Vale s Clarabelle operation, nickel and copper concentrate. The use of this reagent is necessary to achieve this goal. Potassium Amyl Xanthate (PAX) is the most powerful and most commonly employed collector for chalcopyrite applications and is the current collector employed at Clarabelle Mill Particulate matter It is the goal of the milling, smelting and refining process to remove unwanted impurities to produce a valuable base metal product. Particulate matter is created through the handling of feed material throughout the milling process, from grinding to flotation. Particulate matter is also created through wind erosion of the tailings area that is located at the Clarabelle Mill facility. Particulate matter is defined as microscopic solid and liquid particles that remain suspended in the air. Total Particulate matter, also known as TSP or TPM, is any airborne particulate matter with a diameter less than 100 microns. PM10 and PM2.5 are particle size fractions of the total particulate matter produced and emitted. PM10 dust particles are approximately 10 micrometers in size or less and PM2.5 are particle size of approximately 2.5 micrometers or less Nitrogen oxides Nitrogen oxides (NO x ) are created from the combustion of natural gas in burners/heaters used to heat the building and/or process equipment. NO x is created through the thermal dissociation and subsequent reaction of nitrogen (N 2 ) and oxygen (O 2 ) molecules in the combustion air. 6. Rationale as to Why No Reduction Options Were Selected 6.1. Ammonia and nitrate ion Even though several reduction options were identified for ammonia and nitrate ion creation, at this time, these options were not selected for implementation. The options presented did not meet the technical or economic feasibility criteria established by the facility Carbon disulphide and total reduced sulphurs Even though several reduction options were identified for carbon disulphide and total reduce sulphur creation, at this time, these options were not selected for implementation. The options presented did not meet the technical or economic feasibility criteria established by the facility.

6 6.3. Particulate matter Even though several reduction options were identified for particulate matter creation, at this time, these options were not selected for implementation. The options presented did not meet the technical or economic feasibility criteria established by the facility Nitrogen oxides As part of Vale s policy of zero harm, Vale s Sudbury Operations intends to reduce the creation of nitrogen oxides at Clarabelle Mill. This strategy was developed prior to TRA legislation. In , a selection of natural gas combustion heaters was replaced with low NO x burners in the Clarabelle Mill building. As per Vale s policy, all new and replacement natural gas heaters/burners must meet a low NO x specification as part of Vale s engineering standards. 8. Additional Information Vale has incorporated the concept of sustainability into the mining, milling, smelting and refining practices in Ontario, endeavoring to achieve zero harm to our people, to our workplaces and to the natural environment. For the Base Metals Industry, this is primarily accomplished through pollution control of end-of-pipe emissions. For the Sudbury Operations, past pollution control projects have reduced property source fugitive air emissions and reduced process air emissions, which included the construction of new storage handling facilities for feed material, re-vegetation of property boundary areas, and the installation of new baghouses and electrostatic precipitators to capture dust emissions. The new CORe (Challenging Ore Recovery) project at the Mill is expected to result in increased metals extractions, while removing impurities, from the concentrate product. This will have a positive effect on downstream facilities in Sudbury with less impurities being carried through the process. Vale is undertaking its Clean AER (Atmospheric Emissions Reduction) project to reduce sulphur dioxide emissions by a further 70%, to significantly reduce particulate and metal emissions and improve local air quality. These projects will ensure Vale s Sudbury Operations will continue to contribute decades of employment, economic growth and community support. 9. Plan Summary Statement This plan summary is an accurate synopsis of the content of the toxic substance reduction plan for ammonia, carbon disulphuide, nitrate ion, nitrogen oxides, particulate matter (TSP, PM 10, PM 2.5 ) and total reduced sulphur creation at Clarabelle Mill and the Copper Cliff Waste Water Treatment Plant, Sudbury Operations, prepared for Vale Canada Limited, dated December The content of the summary is up to date and reflects the current version of the toxic substance reduction plan.

7

Copper Cliff Nickel Refinery Complex

Copper Cliff Nickel Refinery Complex December 2013 Toxic Reduction Plan Summaries Copper Cliff Nickel Refinery Complex Carbon monoxide Iron pentacarbonyl Particulate matter (TSP, PM10, PM2.5) Nitrogen oxides Sulphur dioxide Toxic Substance

More information

Copper Cliff Smelter Complex

Copper Cliff Smelter Complex December 2013 Toxic Reduction Plan Summaries Copper Cliff Smelter Complex Carbon monoxide Sulphur dioxide Particulate Matter (TSP, PM10, PM2.5) Nitrogen oxides VOCs Toxic Substance Reduction Plan Summaries

More information

Copper Cliff Nickel Refinery Complex

Copper Cliff Nickel Refinery Complex December 2012 Toxic Reduction Plan Summaries Copper Cliff Nickel Refinery Complex Arsenic Cadmium Chromium Cobalt Copper Dioxins, Furans and Hexachlorobenzene Lead Nickel Selenium Sulphuric Acid Toxic

More information

Report for Ontario Regulation 455/09: Toxics Reduction Act

Report for Ontario Regulation 455/09: Toxics Reduction Act Report for Ontario Regulation 455/09: Toxics Reduction Act The Province of Ontario developed a Toxics Reduction Strategy that included the introduction of the Toxics Reduction Act, 2009 to reduce toxic

More information

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT REPORTING YEAR 2016 Basic Facility Information Company Name Facility Name Alamos Gold Inc. Young-Davidson Mine Facility physical and mailing address Mine

More information

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT

TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT TOXICS REDUCTION ACT PUBLIC ANNUAL SUMMARY REPORT REPORTING YEAR 2017 Basic Facility Information Company Name Facility Name Alamos Gold Inc. Young-Davidson Mine Facility physical and mailing address Mine

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Manager, Engineering Services

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Manager, Engineering Services TRA ANNUAL SUMMARY OPERATIONAL COMPARISON 2015-2016 BASIC FACILITY INFORMATION Company Name: Nestle Canada Inc. Contact Information: Technical Contact: Parent Company: Facility Address: Brand Barber Manager,

More information

Toxic Substance Reduction Plan Summaries. for 2012 Reporting Year. Kimberly-Clark Inc. Huntsville Mill

Toxic Substance Reduction Plan Summaries. for 2012 Reporting Year. Kimberly-Clark Inc. Huntsville Mill Toxic Substance Reduction Plan Summaries for 2012 Reporting Year Kimberly-Clark Inc. Huntsville Mill Basic Facility Information Legal Name of Company Company Street Address/Mailing Address Kimberly-Clark

More information

ONTARIO TOXICS REDUCTION ACT

ONTARIO TOXICS REDUCTION ACT ONTARIO TOXICS REDUCTION ACT DE BEERS CANADA INC. VICTOR MINE 2017 REPORT ON TOXIC SUBSTANCE ACCOUNTING SUMMARY INTRODUCTION In 2009, the Toxics Reduction Act (Act) and its associated regulation (O.Reg.

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

TOXICS REDUCTION ACT

TOXICS REDUCTION ACT ISLAND GOLD MINE RICHMONT MINES INC. TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLANS FOR TRA PHASE II SUBSTANCES Table of Contents TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLANS FOR TRA PHASE

More information

Toxics Reduction Act Public Annual Report 2017

Toxics Reduction Act Public Annual Report 2017 Toxics Reduction Act Public Annual Report 2017 The legal and trade names of the owner and the operator of the facility, the street address of the facility and, if the mailing address of the facility is

More information

O.Reg. 455/09 Toxic Substance Reduction Plan Summary Parmalat Canada Inc.

O.Reg. 455/09 Toxic Substance Reduction Plan Summary Parmalat Canada Inc. O.Reg. 455/09 Toxic Substance Reduction Plan Summary Parmalat Canada Inc. Substance & CAS No: Substances at the Facility for which a Plan has been developed: Company Name Facility Name Facility Address

More information

Toxic Substance Reduction Plan

Toxic Substance Reduction Plan Toxic Substance Reduction Plan Pembroke MDF Colin Welburn, M.Eng., P.Eng., TSRP colin@welburnconsulting.ca 1 TOXIC SUBSTANCE REDUCTION PLAN SUMMA RY 1 Substances Included in the Plan CAS Number Substance

More information

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Operations Manager % ownership

TRA ANNUAL SUMMARY OPERATIONAL COMPARISON Operations Manager % ownership TRA ANNUAL SUMMARY OPERATIONAL COMPARISON 2015-2016 BASIC FACILITY INFORMATION Company Name: Wallenstein Feed & Supply Limited Wallenstein Operations Facility Address: 7307 Highway 86 Wallenstein, Ontario

More information

PLAN SUMMARY 2012 REPORTING YEAR. Pioneer Construction Inc. FACILITY: Sudbury, Skead Rd. Aggregate. Operation & Hot Mix Asphalt Plant

PLAN SUMMARY 2012 REPORTING YEAR. Pioneer Construction Inc. FACILITY: Sudbury, Skead Rd. Aggregate. Operation & Hot Mix Asphalt Plant 2012 REPORTING YEAR FACILITY: Sudbury, Skead Rd. Aggregate Operation & Hot Mix Asphalt Plant 2340 Skead Rd. Garson, ON ASPHALT PLANT March 2014 2 This Plan Summary has been prepared in accordance with

More information

November Nanticoke Refinery Reduction plan summary (OR 455/09)

November Nanticoke Refinery Reduction plan summary (OR 455/09) R. Henderson Nanticoke Refinery Manager 519.587.4992 November 2014 Nanticoke Refinery Reduction plan summary (OR 455/09) Provincial regulations set out requirements for business owners to inform Ontarians

More information

NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II Substances

NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II Substances NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II Substances PARTICULATE MATTER

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

TOXIC REDUCTION POLICY STATEMENT OF INTENT

TOXIC REDUCTION POLICY STATEMENT OF INTENT TOXIC REDUCTION POLICY STATEMENT OF INTENT Hexachlorobezene is created and released at the DeBeers Canada Inc Victor Mine site during the incineration of mine waste. Although the camp facility at the Victor

More information

SPINRITE LP 320 LIVINGSTONE AVENUE S, LISTOWEL, ONTARIO, N4W 3H3

SPINRITE LP 320 LIVINGSTONE AVENUE S, LISTOWEL, ONTARIO, N4W 3H3 SPINRITE LP 320 LIVINGSTONE AVENUE S, LISTOWEL, ONTARIO, N4W 3H3 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED FOR: SPINRITE LP OCTOBER

More information

2016 Toxics Reduction Act Public Report Goderich Salt Mine 300 North Harbor Road Goderich, Ontario N7A 3Y9

2016 Toxics Reduction Act Public Report Goderich Salt Mine 300 North Harbor Road Goderich, Ontario N7A 3Y9 2016 Toxics Reduction Act Public Report Goderich Salt Mine 300 North Harbor Road Goderich, Ontario N7A 3Y9 Compass Minerals GHD 651 Colby Drive Waterloo Ontario N2V 1C2 70756 21 Report 11 June 7 2017 Page

More information

November Nanticoke Refinery Reduction plan summary (OR 455/09)

November Nanticoke Refinery Reduction plan summary (OR 455/09) S. Kuntz Nanticoke Refinery Manager 519.587.4992 November 2015 Nanticoke Refinery Reduction plan summary (OR 455/09) Provincial regulations set out requirements for business owners to inform Ontarians

More information

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2013 Toxics Accounting Report - to Public & Staff

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2013 Toxics Accounting Report - to Public & Staff Effective Date June 1, 2014 Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2013 Toxics Accounting Report - to Public & Staff Category Substance Name(s) and CAS #(s) Data

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the minimum Plan Summary content

More information

GKN SINTER METALS LTD. 7 MICHIGAN BLVD., ST THOMAS, ONTARIO N5P 1H1

GKN SINTER METALS LTD. 7 MICHIGAN BLVD., ST THOMAS, ONTARIO N5P 1H1 GKN SINTER METALS LTD. 7 MICHIGAN BLVD., ST THOMAS, ONTARIO N5P 1H1 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED FOR: PATRICK AMBROSE

More information

CAMPBELL COMPANY OF CANADA TORONTO PLANT

CAMPBELL COMPANY OF CANADA TORONTO PLANT CAMPBELL COMPANY OF CANADA TORONTO PLANT 2016 TOXICS REDUCTION PLAN SUMMARY REPORT 60 Birmingham St. Toronto, ON M8V 2B8 CAMPBELL COMPANY OF CANADA TORONTO PLANT TOXICS REDUCTION PLAN SUMMARY AND 2016

More information

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2012 Toxics Accounting Report - to Public & Staff

Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2012 Toxics Accounting Report - to Public & Staff Effective Date June 1, 2013 Douglas Barwick Inc. (Brockville, Ontario) Toxics Reduction Act Plan Report / 2012 Toxics Accounting Report - to Public & Staff Category Substance Name(s) and CAS #(s) Data

More information

Toxic Reduction Act Gerdau Ameristeel Corporation Whitby Mill Phase 2 Toxics Reduction Plan Summaries

Toxic Reduction Act Gerdau Ameristeel Corporation Whitby Mill Phase 2 Toxics Reduction Plan Summaries Toxic Reduction Act Gerdau Ameristeel Corporation Whitby Mill Phase 2 Toxics Reduction Plan Summaries December 2013 Table of Contents 1. INTRODUCTION... 1 2. CERTIFICATION BY HIGHEST RANKING EMPLOYEE...

More information

Toxic Reduction Act Gerdau Ameristeel Corporation Cambridge Mill Phase 2 Toxics Reduction Plan Summaries

Toxic Reduction Act Gerdau Ameristeel Corporation Cambridge Mill Phase 2 Toxics Reduction Plan Summaries Toxic Reduction Act Gerdau Ameristeel Corporation Cambridge Mill Phase 2 Toxics Reduction Plan Summaries December 2013 Table of Contents 1. INTRODUCTION... 1 2. CERTIFICATION BY HIGHEST RANKING EMPLOYEE...

More information

Toxics Reduction Regulation. Annual Report Ontario Regulation 455/09. Report for Prepared by: Janet Payette. P.Eng. Sr Environmental Engineer

Toxics Reduction Regulation. Annual Report Ontario Regulation 455/09. Report for Prepared by: Janet Payette. P.Eng. Sr Environmental Engineer Toxics Reduction Regulation Annual Report Ontario Regulation 455/09 Report for 2017 Prepared by: Janet Payette. P.Eng. Sr Environmental Engineer INVISTA (Canada) Company Kingston Site This report is prepared

More information

SONOCO CANADA CORPORATION BRANTFORD OPERATIONS 33 PARK AVENUE EAST, BRANTFORD, ONTARIO N3S 7R9

SONOCO CANADA CORPORATION BRANTFORD OPERATIONS 33 PARK AVENUE EAST, BRANTFORD, ONTARIO N3S 7R9 SONOCO CANADA CORPORATION BRANTFORD OPERATIONS 33 PARK AVENUE EAST, BRANTFORD, ONTARIO N3S 7R9 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED

More information

Toxics Reduction Act Public Annual Report Calendar 2017

Toxics Reduction Act Public Annual Report Calendar 2017 Toxics Reduction Act Public Annual Report Calendar 2017 The legal and trade names of the owner and the operator of the facility, the street address of the facility and, if the mailing address of the facility

More information

NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II AMMONIA (TOTAL)

NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II AMMONIA (TOTAL) NESTLE CANADA INC. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2012 Operations Phase II AMMONIA (TOTAL) Submitted to: Brand Barber Manager, Engineering Services 980 Wilton Grove Road London, Ontario N6A 6C5

More information

In 2011, Brigus Gold employed 76 full time employees (equivalent). The NAICS codes applicable to the facility are:

In 2011, Brigus Gold employed 76 full time employees (equivalent). The NAICS codes applicable to the facility are: PLAN SUMMARY Brigus Gold Corporation (Brigus Gold) operates the Black Fox mill site which is located at 5300 Hiwy 101 Highway East, Matheson centered at UTM coordinates (518449.79, 5377463.55) (NAD83 datum).

More information

TOXICS SUBSTANCE REDUCTION PLAN SUMMARY

TOXICS SUBSTANCE REDUCTION PLAN SUMMARY TOXICS SUBSTANCE REDUCTION PLAN SUMMARY Ontario Redimix, a division of Holcim (Canada) Inc. Portlands Plant 8 Unwin Avenue Toronto, ON M5A 3L1 www.holcim.ca December 2013 Strength. Performance. Passion.

More information

Toxics Substance Reduction Plan Summary For PM 2.5 Particulate Matter (CAS #NA-M10)

Toxics Substance Reduction Plan Summary For PM 2.5 Particulate Matter (CAS #NA-M10) Toxics Substance Reduction Plan Summary For PM 2.5 Particulate Matter (CAS #NA-M10) KTH Shelburne Manufacturing Inc. 300 Second Line Shelburne, Ontario L0N 1S0 Prepared for: Jim Clayton EHS Associate November

More information

In 2016, Nanticoke refinery prepared new plans for the following substances:

In 2016, Nanticoke refinery prepared new plans for the following substances: S. Kuntz Nanticoke Refinery Manager 519.587.4992 December 2016 Nanticoke Refinery Reduction plan summary (OR 455/09) Provincial regulations set out requirements f business owners to infm Ontarians about

More information

CAMPBELL COMPANY OF CANADA TORONTO PLANT

CAMPBELL COMPANY OF CANADA TORONTO PLANT CAMPBELL COMPANY OF CANADA TORONTO PLANT 2017 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARIES Campbell Company of Canada 60 Birmingham St. Toronto, ON M8V 2B8 June 1, 2018 Version Control

More information

Toxic Reduction Plan BASIC FACILITY INFORMATION

Toxic Reduction Plan BASIC FACILITY INFORMATION Resolute Growth - Atikokan Sawmill TRA Reduction Plan December 2016 Toxic Reduction Plan BASIC FACILITY INFORMATION Substance Name & CAS # PM NA - M08 PM10 NA - M09 PM2.5 NA - M10 VOC NA - M16 alpha-pinene

More information

ExxonMobil Chemical Films Canada Ltd. 321 University Avenue Bellville, Ontario K8N 5A2. Prepared for: Jeannette Hull, SSHE Supervisor

ExxonMobil Chemical Films Canada Ltd. 321 University Avenue Bellville, Ontario K8N 5A2. Prepared for: Jeannette Hull, SSHE Supervisor Toxics Substance Reduction Plan Summary For Ethylene glycol hexyl ether (CAS # 112-25-4) PM 10 Particulate matter (CAS # NA-09) PM 2.5 Particulate matter (CAS # NA-10) ExxonMobil Chemical Films Canada

More information

Toxics Reduction Plan -

Toxics Reduction Plan - Toxics Reduction Plan - Public Summary Particulate Matter 2.5 Microns (CAS # - N/A) Prepared for: 875 Speedsville Road Cambridge, ON N3H4S8 Prepared by: 222 Matheson Blvd E Mississauga, ON L4Z 1X1 December

More information

ON MOE Reg. 127/01 - Ontario Ministry of the Environment for the Airborne Contaminant Discharge Monitoring and Reporting Regulation

ON MOE Reg. 127/01 - Ontario Ministry of the Environment for the Airborne Contaminant Discharge Monitoring and Reporting Regulation Page 1 of 34 Single Window NPRI and Partners Report Preview Company Details Name: Corporation of the City of London Address: 300 Dufferin Avenue, London (Ontario) Report Details Report Status: Ready to

More information

Toxics Reduction Plan Summary

Toxics Reduction Plan Summary Toxics Reduction Plan Summary Nickel (and its compounds) CAS # - NA - 11 December 15, 2017 Prepared for: Samuel Plate Sales () 12 Teal Avenue Stoney Creek, Ontario L8E 3Y5 Prepared by: 222 Matheson Blvd

More information

TEMBEC HEARST OPERATIONS 67 FONTAINE DRIVE, HEARST ONTARIO, P0L 1N0

TEMBEC HEARST OPERATIONS 67 FONTAINE DRIVE, HEARST ONTARIO, P0L 1N0 TEMBEC HEARST OPERATIONS 67 FONTAINE DRIVE, HEARST ONTARIO, P0L 1N0 TOXICS REDUCTION ACT TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 2013 REPORT PREPARED BY: O2E INC. REPORT PREPARED FOR: TINA RENAUD TEMBEC

More information

Maple Leaf Foods Inc. 321 Courtland Avenue Kitchener, Ontario N2G 3X8. December 6, 2013 Pinchin File: 82392

Maple Leaf Foods Inc. 321 Courtland Avenue Kitchener, Ontario N2G 3X8. December 6, 2013 Pinchin File: 82392 Toxic Substance Reduction Plans Summary For Ammonia (total) (CAS # NA-16) Particulate Matter 2.5 (CAS# NA-M10) Particulate Matter 10 (CAS# NA-M09) Sulphuric Acid (CAS# 7664-93-9) Maple Leaf Foods Inc.

More information

In 2016, Sarnia chemical plant prepared a new plan for the following substance:

In 2016, Sarnia chemical plant prepared a new plan for the following substance: D. Luecke Sarnia Chemical Plant Manager 519.339.2757 December 2016 Sarnia Chemical Plant Reduction plan summary (OR 455/09) Provincial regulations set out requirements for business owners to inform Ontarians

More information

1. Basic Facility Information

1. Basic Facility Information 1. Basic Facility Information Name & CAS # of Substance Manganese (and its compounds) PM10 PM2.5 NA-09 NA-M09 NA-M10 Company Name Facility Name Facility Address Facility Identification and Site Address

More information

TOXIC REDUCTION POLICY STATEMENT OF INTENT

TOXIC REDUCTION POLICY STATEMENT OF INTENT TOXIC REDUCTION POLICY STATEMENT OF INTENT De Beers Canada Inc., is committed to playing a leadership role in protecting the environment. Our employees are encouraged to participate in all types of toxic

More information

Toxics Substance Reduction Plan Summary For. Particulate Matter PM-10 (CAS # NA-M09) Particulate Matter PM-2.5 (CAS # NA-M10)

Toxics Substance Reduction Plan Summary For. Particulate Matter PM-10 (CAS # NA-M09) Particulate Matter PM-2.5 (CAS # NA-M10) For Particulate Matter PM-10 (CAS # NA-M09) Particulate Matter PM-2.5 (CAS # NA-M10) 300 Sprucewood Avenue Windsor, Ontario N9C 0B7 Prepared for: November 18, 2013 Pinchin File: 85518 Copyright 2013 by

More information

Toxics Reduction Plan Summary

Toxics Reduction Plan Summary Toxics Reduction Plan Summary Manganese (CAS # - NA-09) Prepared for: 875 Speedsville Road Cambridge, ON N3H4S8 Prepared by: 222 Matheson Blvd E Mississauga, ON L4Z 1X1 December 19, 2016 1.0 Introduction

More information

FINAL Toxics Substance Reduction Plan Summary for PM10 (CAS# NA-M09) & PM2.5 (CAS# NA-M10) 15 Biggar Avenue, Hamilton, Ontario

FINAL Toxics Substance Reduction Plan Summary for PM10 (CAS# NA-M09) & PM2.5 (CAS# NA-M10) 15 Biggar Avenue, Hamilton, Ontario Toxics Substance Reduction Plan Summary for PM10 (CAS# NA-M09) & PM2.5 (CAS# NA-M10) 15 Biggar Avenue, Hamilton, Ontario Prepared for: Canadian Liquid Processors Limited 15 Biggar Avenue Hamilton, Ontario

More information

BASIC FACILITY INFORMATION

BASIC FACILITY INFORMATION Toxic Substance Reduction Plan Summary BASIC FACILITY INFORMATION Substance Name & CAS # Sulphuric Acid 7664 93 9 Substance Name & CAS # Methanol 67 56 1 Substance Name & CAS # Toluene 108 88 3 Substance

More information

2016 Public Report of Accounting Results for Tenaris Algoma Tubes, Sault Ste. Marie

2016 Public Report of Accounting Results for Tenaris Algoma Tubes, Sault Ste. Marie 2016 Public Report of Accounting Results for Tenaris Algoma Tubes, Sault Ste. Marie 1. General Information Substance Information Substance Name CAS # Manganese (and its compounds) NA - 09 Particulate Matter

More information

Toxic Reduction 2015 Plan Summary Zinc

Toxic Reduction 2015 Plan Summary Zinc Toxic Reduction 2015 Plan Summary Zinc Date Amended: August 17, 2016 388 Goodyear Rd. Napanee, Ontario SUBSTANCE AND FACILITY INFORMATION Toxic Substances Substance Name Zinc CAS # CAS 7440-66-6 Other

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 3M CANADA, LONDON, ONT.

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 3M CANADA, LONDON, ONT. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY 3M CANADA, LONDON, ONT. 2012 REPORTING YEAR BASIC FACILITY INFORMATION Name and CAS # of Substance(s) for which plans are required n-butyl alcohol Cyclohexane Isopropyl

More information

ON MOE TRA - Ontario Ministry of the Environment for the Toxic Reductions Act

ON MOE TRA - Ontario Ministry of the Environment for the Toxic Reductions Act Report Preview Company Details Name Liberty Mines Inc Address Stringers Road, South Porcupine (Ontario) Report Details Report Status Submitted 2014 Report Type Inventory Facility Name Redstone Mine Facility

More information

Single Window Reporting

Single Window Reporting Page 1 of 73 Single Window Reporting www.ec.gc.ca Page 2 of 73 Company Details Name: Corporation of the City of London Address: Page 3 of 73 Report Details Report Status: Completed Facility Name: Adelaide

More information

Ontario Toxics Reduction Program. A Guide For Regulated Facilities

Ontario Toxics Reduction Program. A Guide For Regulated Facilities Ontario Toxics Reduction Program A Guide For Regulated Facilities Queen s Printer for Ontario, 2012 PIBS 8695e Table Of Contents Introduction 1 Rationale 2 What Regulated Ontario Facilities Need To Do

More information

TRA SUMMARY-GEORGETOWN

TRA SUMMARY-GEORGETOWN TRA SUMMARY-GEORGETOWN TOXIC SUBSTANCE REDUCTION PLAN SUMMARY This Toxic Substance Reduction Plan Summary has been prepared in accordance with Section 8(2) of the Toxics Reduction Act and satisfies the

More information

Ivaco Rolling Mills Report on Toxics Reduction

Ivaco Rolling Mills Report on Toxics Reduction Toxics Reduction Act Public Annual Report for 2015 Calendar Year This report was prepared for the purposes of Ontario Regulation 455/09, Toxics Reduction Act, 2009 and the Ontario Toxics Reduction Program

More information

General Motors of Canada Company. Ontario Regulation 455/09. Public Summary. December 2016 for the 2015 Reporting Year

General Motors of Canada Company. Ontario Regulation 455/09. Public Summary. December 2016 for the 2015 Reporting Year General Motors of Canada Company Ontario Regulation 455/09 Public Summary December 2016 for the 2015 Reporting Year OUR PURPOSE OUR VALUES WAYS GM IS LEADING GM Canada s Environmental Policy As a responsible

More information

2016 CpK Interior Products Inc. Port Hope [ANNUAL PUBLIC REPORT UNDER O. REG. 455/09]

2016 CpK Interior Products Inc. Port Hope [ANNUAL PUBLIC REPORT UNDER O. REG. 455/09] 2016 CpK Interior Products Inc. Port Hope [ANNUAL PUBLIC REPORT UNDER O. REG. 455/09] Environmental Reporting: The National Pollution Release Inventory (NPRI) is Canada s legislated, publically accessible

More information

Toxic Substance Reduction Summary Plans. ArcelorMittal Woodstock Tubular Products

Toxic Substance Reduction Summary Plans. ArcelorMittal Woodstock Tubular Products Toxic Substance Reduction Summary Plans BASIC FACILITY INFORMATION Substances Included in the Plan Manganese (CAS No. 7439-94-5) Sulphuric Acid (CAS No. 7664-93-9) Facility Identification and Site Address

More information

Toxics Reduction Plan Summary

Toxics Reduction Plan Summary Toxics Reduction Plan Summary Ethylene Glycol CAS: 107-68-8 Prepared for: Atlas Roofing Corporation-Toronto Facility 55 Akron Road Etobicoke, Ontario M8W 1T3 Prepared by: 222 Matheson Boulevard East Mississauga,

More information

2012 Toxic Reduction Plan Summary Zinc

2012 Toxic Reduction Plan Summary Zinc 2012 Toxic Reduction Plan Summary Zinc Date Issued: December 07, 2012 Last Update (Version 2): April 11, 2016 388 Goodyear Rd. Napanee, Ontario SUBSTANCE AND FACILITY INFORMATION Toxic Substances Substance

More information

2013 TOXIC REDUCTION PLAN SUMMARY for CHROMIUM. DCL International Inc. Bradwick Facility 27812

2013 TOXIC REDUCTION PLAN SUMMARY for CHROMIUM. DCL International Inc. Bradwick Facility 27812 2013 TOXIC REDUCTION PLAN SUMMARY for CHROMIUM BASIC FACILITY INFORMATION Facility Identification Company Facility National Pollutant Release Inventory (NPRI) Identification Number Bradwick Facility 27812

More information

TRA PLAN SUMMARY PM2.5

TRA PLAN SUMMARY PM2.5 Basic Facility Information TRA PLAN SUMMARY PM2.5 Name & CAS # of Substance PM2.5 N/A Substance for which other Plans have been prepared Company Name Facility Name Facility Address Spatial Coordination

More information

Toxic Substance Reduction Plan Summary

Toxic Substance Reduction Plan Summary Toxic Substance Reduction Plan Summary BASIC FACILITY INFORMATION Substance Name & CAS # Volatile Organic Compound - Toluene 108-88-3 Substance Name & CAS # Volatile Organic Compound Benzene 71-43-2 Substance

More information

Toxics Substance Reduction Plan Summary For PM 10 Particulate Matter (CAS #NA-M09) PM 2.5 Particulate Matter (CAS #NA-M10)

Toxics Substance Reduction Plan Summary For PM 10 Particulate Matter (CAS #NA-M09) PM 2.5 Particulate Matter (CAS #NA-M10) Toxics Substance Reduction Plan Summary For PM 10 Particulate Matter (CAS #NA-M09) PM 2.5 Particulate Matter (CAS #NA-M10) Bell City Foundry (Brantford) Limited 411 West Street Brantford, Ontario N3R 3V9

More information

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY FOR SULPHURIC ACID. Sivaco Ontario, 330 Thomas Street Ingersoll Ontario N5C 3K5.

TOXIC SUBSTANCE REDUCTION PLAN SUMMARY FOR SULPHURIC ACID. Sivaco Ontario, 330 Thomas Street Ingersoll Ontario N5C 3K5. TOXIC SUBSTANCE REDUCTION PLAN SUMMARY FOR SULPHURIC ACID Sivaco Ontario, 330 Thomas Street Ingersoll Ontario N5C 3K5 December 20, 2012 Table of Contents 1 General Information...2 1.1 Basic Facility Information...2

More information

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.: 12-XXX

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.: 12-XXX FINAL REPORT SANDVIK MATERIALS TECHNOLOGY CANADA 425 MCCARTNEY STREET, ARNPRIOR, ONTARIO TOXIC SUSTANCE REDUCTION PLAN SUMMARY (CHROMIUM) REF.: 12-XXX Submitted: December 21, 2012 Prepared by: SNC-Lavalin

More information

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) TAILINGS DISPOSAL Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) Tailings must be disposed of in a manner that optimizes protection of human

More information

Toxic Substance Reduction Plan. Particulates PM PM10 PM2.5

Toxic Substance Reduction Plan. Particulates PM PM10 PM2.5 Toxic Substance Reduction Plan Particulates PM PM10 PM2.5 Plan Date: December 16, 2013 Date of Plan: December 16, 2013 1 BASIC FACILITY INFORMATION: Name and CAS # of PM Substance PM10 Substances for which

More information

Plan Summary Preview. Company Details. Report Details. Activities. Select the Facility Contacts. Organization Validation. Contacts

Plan Summary Preview. Company Details. Report Details. Activities. Select the Facility Contacts. Organization Validation. Contacts Plan Summary Preview Company Details Company Legal Name: Air Products Canada Ltd. Company Address: 989 Derry Road, Mississauga () Report Details Facility: Nanticoke Facility Address: 1020 Regional #3 Road,

More information

ON MOE TRA - Ontario Ministry of the Environment for the Toxic Reductions Act

ON MOE TRA - Ontario Ministry of the Environment for the Toxic Reductions Act Report Preview Company Details Name Meridian Technologies Inc. Address 155 High Street East, Strathroy (Ontario) Report Details Report Status Submitted 2013 Report Type Inventory Facility Name Meridian

More information

Toxics Reduction Plan Summary for Viasystems (formerly DDi Toronto Corp.)

Toxics Reduction Plan Summary for Viasystems (formerly DDi Toronto Corp.) Toxics Reduction Plan Summary for Viasystems (formerly DDi Toronto Corp.) (Prepared in Compliance with the Toxics Reduction Act, 2009 & Ontario Regulation 455/09) December 2012 Ref: 3197-01 Prepared for:

More information

Toxic Reduction 2014 Plan Summary Toluene

Toxic Reduction 2014 Plan Summary Toluene Toxic Reduction 2014 Plan Summary Toluene Date Issued: April 22, 2016 388 Goodyear Rd. Napanee, Ontario SUBSTANCE AND FACILITY INFORMATION Toxic Substances Substance Name Toluene Chemical Abstracts Service

More information

Final Report. Toxic Reduction Plan. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario N2V 1C2.

Final Report. Toxic Reduction Plan. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario N2V 1C2. www.craworld.com Final Report Toxic Reduction Plan 10 µm Particulate Matter 2.5 µm Particulate Matter Prepared for: Firestone Textiles Co. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario

More information

Toxic Substance Reduction Plans. Nemak of Canada Windsor Aluminum Plant

Toxic Substance Reduction Plans. Nemak of Canada Windsor Aluminum Plant Toxic Substance Reduction Plans Nemak of Canada Windsor Aluminum Plant BASIC FACILITY INFORMATION Phenol (CAS No. 108-95-2) Aluminum (Fume or Dust) (CAS No. 7429-90-5) Company Name Facility Name Facility

More information

NESTLÉ CONFECTIONARY NESTLÉ CANADA INC. STERLING ROAD FACTORY 72 Sterling Road, Toronto, Ontario M6R 2B6

NESTLÉ CONFECTIONARY NESTLÉ CANADA INC. STERLING ROAD FACTORY 72 Sterling Road, Toronto, Ontario M6R 2B6 NESTLÉ CONFECTIONARY NESTLÉ CANADA INC. STERLING ROAD FACTORY 72 Sterling Road, Toronto, Ontario M6R 2B6 Toxic Substance Reduction Plan Summary: PM10, PM2.5 Toxics Reduction Act & O. Reg. 455/09 C 2013

More information

Plan Summary Preview. Company Details. Report Details. Activities Contacts. Facility Contacts. Organization Validation. Company Legal Name

Plan Summary Preview. Company Details. Report Details. Activities Contacts. Facility Contacts. Organization Validation. Company Legal Name Plan Summary Preview Company Details Company Legal Name PepsiCo Canada ULC Company Address 5550 Explorer Drive, Mississauga () Report Details NPRI ID 4511 Facility Name Cambridge Manufacturing Facility

More information

2015 Toxics Reduction Plan Summary INVISTA (Canada) Company Maitland Site

2015 Toxics Reduction Plan Summary INVISTA (Canada) Company Maitland Site 2015 Toxics Reduction Plan Summary INVISTA (Canada) Company Maitland Site This Toxic Reduction Plan (TRP) Report is prepared under O.Reg. 455/09 for the INVISTA (Canada) Company, Maitland Site. This TRP

More information

Toxics Substance Reduction Plan Summary For. Particulate Matter (PM10) (CAS #NA M09) Particulate Matter (PM2.5) (CAS #NA M10)

Toxics Substance Reduction Plan Summary For. Particulate Matter (PM10) (CAS #NA M09) Particulate Matter (PM2.5) (CAS #NA M10) Toxics Substance Reduction Plan Summary For Particulate Matter (PM10) (CAS #NA M09) Particulate Matter (PM2.5) (CAS #NA M10) Eurocopter Canada Limited 1100 Gilmore Road Fort Erie, Ontario L2A 5M9 December

More information

TRA Plan Summary Heavy Aromatic Naphtha

TRA Plan Summary Heavy Aromatic Naphtha TRA Plan Summary Heavy Aromatic Naphtha Basic Facility Information Name & CAS # of Substance Heavy Aromatic Naphtha 64742-94-5 Substances for which other Methyl Ethyl Ketone 78-93-3 plans have been prepared

More information

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09)

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Issued June 1, 2017 Basic Facility Information Section 1 Facility Information Owner U. S. Steel Canada Inc. Facility name Hamilton

More information

2017 National Pollutant Release Inventory (NPRI) Report

2017 National Pollutant Release Inventory (NPRI) Report 2017 National Pollutant Release Inventory (NPRI) Report City of London s Environmental and Engineering Services Division June 5, 2018 Page 1 of 14 Table of Contents 2017 NPRI... 3 Brief explanatory notes

More information

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.:

425 MCCARTNEY STREET, ARNPRIOR, ONTARIO REF.: FINAL REPORT SANDVIK MATERIALS TECHNOLOGY CANADA 425 MCCARTNEY STREET, ARNPRIOR, ONTARIO TOXIC SUSTANCE REDUCTION PLAN SUMMARY (HEAVY ALKYLATE NAPHTHA) REF.: 615482 Submitted: December 18, 2013 Prepared

More information

2016 Environment Management System & Community Engagement Report

2016 Environment Management System & Community Engagement Report 2016 Environment Management System & Community Engagement Report March 28, 2017 3 Table of Contents Summary 1. Background 2. Communications and Community Engagement 3. Community Air Quality Monitoring

More information

Toxic Reduction Plan Summary

Toxic Reduction Plan Summary i Toxic Reduction Plan Summary Substance Substance Name and CAS # Substances for which other plans have been prepared Beneficial Uses at Facility Reasons for Use Reasons for use - summary Reasons for Creation

More information

Toxics Substance Reduction Plan Summary For. Sulphuric Acid (CAS # ) DJ Galvanizing LP 300 Sprucewood Avenue Windsor, Ontario N9C 0B7

Toxics Substance Reduction Plan Summary For. Sulphuric Acid (CAS # ) DJ Galvanizing LP 300 Sprucewood Avenue Windsor, Ontario N9C 0B7 Toxics Substance Reduction Plan Summary For Sulphuric Acid (CAS # 7664-93-9) 300 Sprucewood Avenue Windsor, Ontario N9C 0B7 Prepared for: November 18, 2013 Pinchin File: 85518 Copyright 2013 by Pinchin

More information

Toxic Substance Reduction Plan Summary. Phase I Chemicals

Toxic Substance Reduction Plan Summary. Phase I Chemicals Bramalea, Ontario, Canada Toxic Substance Reduction Plan Summary Phase I Chemicals In compliance with the Toxics Reduction Act (2009) and Ontario Regulation 455/09 INTRODUCTION: TI Automotive Canada Inc.

More information

FRANKE KINDRED CANADA LIMITED 1000 Kindred Road, Midland, Ontario L4R 4K9

FRANKE KINDRED CANADA LIMITED 1000 Kindred Road, Midland, Ontario L4R 4K9 FRANKE KINDRED CANADA LIMITED 1000 Kindred Road, Midland, Ontario L4R 4K9 Toxic Substance Reduction Plan Summary: Nickel Toxics Reduction Act & O. Reg. 455/09 C 2013 ENVIRONMENTAL REPORTING SYSTEMS LIMITED

More information

Toxics Substance Reduction Plan Summary For Toxics Substances Contained in Metals

Toxics Substance Reduction Plan Summary For Toxics Substances Contained in Metals Toxics Substance Reduction Plan Summary For Toxics Substances Contained in Metals MJ Manufacturing, a Division of Martinrea International Inc. 2457 Lakeshore Road West Mississauga, Ontario L5J 1J9 Prepared

More information

Toxics Reduction Act Public Annual Report Calendar 2012

Toxics Reduction Act Public Annual Report Calendar 2012 Toxics Reduction Act Public Annual Report Calendar 2012 The legal and trade names of the owner and the operator of the facility, the street address of the facility and, if the mailing address of the facility

More information

FINAL Toxic Substance Reduction Summary Plan for Butane (all isomers) (CAS# NA - 24) 100 West Drive, Brampton, ON

FINAL Toxic Substance Reduction Summary Plan for Butane (all isomers) (CAS# NA - 24) 100 West Drive, Brampton, ON Toxic Substance Reduction Summary Plan for Butane (all isomers) (CAS# NA - 24) 100 West Drive, Brampton, ON Prepared for: 100 West Drive Brampton, ON L6T 2J5 Attn: Mimo Stanghini Engineering Manager August

More information

Toxic Substance Reduction Plan Summaries Phase 2 Substances

Toxic Substance Reduction Plan Summaries Phase 2 Substances 2012 TOXICS REDUCTION ACT Toxic Substance Reduction Plan Summaries Phase 2 Substances VERSION 1.0 Petro-Canada Lubricants Inc. 385 Southdown Road Mississauga, Ontario L5J 2Y3 December 1, 2013 Version Control

More information