1 Air Pollution Control Permitting - Customer Overview Self Generation Incentive Program Seminar CHP Project Planning & Permits March 11, 2003 San Diego, CA Presented by: Shirley F. Rivera Alternative Energy Systems Consulting, Inc. Carlsbad, CA
2 What to expect... Will provide... Perspective on Customer Role(s) Potential Pitfalls in the Air Quality Permit Process Customer responsibilities Application process Compliance demonstration Question & answer Will not provide... Details of specific agency requirements Details on vendor equipment Sample application Sample APCD info Authority to Construct Permit to Operate BACT evaluation 2
3 but first - a statewide perspective of the air quality process
4 Statewide: California Districts 58 Counties 35 Air Districts Nonattainment Areas Attainment Areas There are differences. Fees, forms, control requirements, process timeframe, expediting, emission factors (criteria, air toxics), etc. 4
5 Permitting: General Process Determine air permit applicability PERMIT Complete required application forms with technical information EXEMPT No Permit Required SB 1298 Emission estimates BACT* /controls evaluation Air toxics impacts Permit to Construct Emissions Testing Certification Permit to Operate *BACT Best Available Control Technology 5
6 Air Agency Permit Approval Several procedural issues Application forms, application fees Technical support documents to submit Agency interface Agency review time; iterative Agency can ask for more data 3-6 months for relatively simple 6-9 months for more complex 6
7 Perspective on Customer Role(s)
8 Project Development & Planning The Project Team In-house & Contract services 5 Considerations & Air Quality Project alternatives Project feasibility Approval requirements Construction & commissioning Project operations Defining the Project 8
9 The Project Team Design Engineering System Integration Construction Installation Operation Facility management includes, but not limited to, Project managers Sales Procurement Contracts Engineers Financial analysts Facility operators Government affairs Consultants 9
10 The Project: 5 Considerations Project alternatives Project feasibility Approval requirements Construction & commissioning Project operations & Air quality Agency jurisdiction Size & type of equipment Location of stack(s) Emissions (with & without controls) Impact to public 10
11 The Project: Characteristics Type of facility New or modified site (e.g., commercial, industrial) Existing minor or major source (per APCD) Type and number of units at a site One unit vs. multiple units; other equipment Fuel type(s) Natural gas, diesel, dual fuel, waste gas Emissions Impacts criteria pollutants (NOx, SOx, CO, PM10, VOC) air toxics (e.g., combustion by-products) Op hours: tons/year, lbs/hr, lbs/day, ppm, lb/mw-hr 11
12 Potential Pitfalls in the Air Quality Permit Process
13 Issue & Potential Pitfalls AB K-12 within 1,000 feet of site Requires public notification Additional ~45 days after draft A/C for public review Air toxics impact Data-specific needs In SDAPCD, complete ToxEval; get % VOC control May require public notification or revised project Source Agency defines certain way Definition includes common control/ownership, etc. May trigger complex AQ (e.g., offsets, netting, AQIA) 13
14 Issue & Potential Pitfalls (cont d) Design to comply Demonstrate BACT Generally prescriptive, but APCD allows top down Can conduct cost-effectiveness for top-down Emissions testing Initial & periodic SDAPCD must test witness, at a minimum Must include in project cost & schedule Operations Hardware/records needed Monitoring equipment of some level Recordkeeping, reporting, notification 14
15 Customer Responsibilities
16 Air Quality Permitting & Compliance: A 12-Step Program Application Process 1. Application Preparation 2. Pre-Application Meeting 3. Responding to Agency Data Requests 4. Negotiating Permit Conditions 5. Initial Source Testing 6. Facility Inspection Compliance Demonstration 7. Emission Limits 8. Monitoring 9. Notification 10. Recordkeeping of Operating Activities 11. Reporting of Select Operating Activities 12. Emissions Source Test 16
17 Application Process: 1 st 6 Steps Application Preparation Pre-Application Meeting Responding to Agency Data Requests Negotiating Permit Conditions Emissions Source Testing Facility Inspection 17
18 Permitting: General Process Determine air permit applicability PERMIT Complete required application forms with technical information EXEMPT No Permit Required SB 1298 Emission estimates BACT* /controls evaluation Air toxics impacts Permit to Construct Emissions Testing Certification Permit to Operate *BACT Best Available Control Technology 18
19 SDAPCD: Application Content General App116 Supplemental ToxEval Checklists Figures: site map, plot plan, receptors APCD fee estimate Emissions Equipment info Vendor info Optional Regulatory info AQ modeling/toxics Emission calcs 19
20 CHP: Controlled Emissions (BACT) Gas Turbines Zero NH 3 Technology SCR CO Oxidation Catalyst Combustion Modifications Dry Low NOx Catalytic Combustion Reciprocating Engines Rich burn (Natural Gas) NSCR, O2 controller Lean burn (Natural Gas) SCR OEM Diesel gensets with ultra-low sulfur fuel Possible PM filter 20
21 CARB SB1298 Guidance: GTs < 50 MW Pollutant < 3 MW 3-12 MW >12 & < 50 MW Waste Gas NOx 9 ppmvd 0.5 lb/mw-hr 5 ppm 0.25 lb/mw-hr 5 ppm 0.20 lb/mw-hr 25 ppm 1.25 lb/mw-hr CO 10 ppm 0.4 lb/mw-hr 6 ppm 0.2 lb/mw-hr 6 ppm 0.15 lb/mw-hr -- VOC 5 ppm 0.1 lb/mw-hr 2 ppm 0.04 lb/mw-hr 2 ppm 0.03 lb/mw-hr -- PM10 NG; S < 1 grain/100 scf -- - For GTs in electrical generation, 3-hr rolling avg; ppm by vol. (dry) at 15% O2. - Emission levels based on most stringent level deemed BACT or on most stringent level achieved in practice given source tests. [Reference: Guidance for Permitting of Electrical Generation Technologies, CARB, September 2001; see CARB website.] 21
22 CARB SB1298 Guidance: Recip Engines Pollutant NOx CO VOC PM10 Fossil Fuel 9 ppm; 0.15 g/bhp-hr 0.5 lb/mw-hr 56 ppm; 0.6 g/bhp-hr 1.9 lb/mw-hr 25 ppm; 0.15 g/bhp-hr 0.5 lb/mw-hr 0.02 g/bhp-hr 0.06 lb/mw-hr Waste Gas 50 ppm; 0.6 g/bhp-hr 1.9 lb/mw-hr 300 ppm; 2.5 g/bhp-hr 7.8 lb/mw-hr 130 ppm; 0.6 g/bph-hr 1.9 lb/mw-hr NA - For reciprocating engines in electrical generation; ppm by vol. (dry) at 15% O2. - Emission levels based on most stringent level deemed BACT or on most stringent level achieved in practice given source tests. [Reference: Guidance for Permitting of Electrical Generation Technologies, CARB, September 2001; see CARB website.] 22
23 Permitting: General Process Determine air permit applicability PERMIT Complete required application forms with technical information 30-day APCD review for completeness weeks EXEMPT Emission estimates BACT* /controls evaluation Completeness Air toxics impacts No Permit Required Permit to Construct SB 1298 Emissions Testing Certification Permit to Operate *BACT Best Available Control Technology 23
24 Authority/Permit to Construct will include, but not be limited to: SDAPCD rule requirements Policy and guidance (local, state, feds) Work practices to ensure compliance with rule requirements Completion of Construction (a.k.a. firstfire) form to notify SDAPCD 24
25 Source Testing: Initial & periodic Source Test Methods Emissions Testing (i.e., select pollutants) Source Test Contractor Source Test Protocol & Agency Approval Certified Test Firm Conduct of Source Test Source Test Results Prescriptive information needed 25
26 A/C Issued San Diego APCD: Testing 60-DAYS Construction Complete 3-5 Weeks before test date, protocol to SDAPCD. SDAPCD Protocol Review and Approval Schedule test witness at least 3-weeks, prior to source test. Notify Source Test Firm (Certified) Coordinate with Firm, APCD, Site Schedule Test Date CLOCK START: CONSTRUCTION COMPLETION DATE CRITICAL PATH: AVAILABILITY OF SOURCE TESTER & APCD TEST WITNESS Conduct Source Test 30-DAYS Within 30-days after test, submit results to SDAPCD. Coordinate with Firm and APCD Test results to SDAPCD 26
27 Permitting: General Process Determine air permit applicability PERMIT Complete required application forms with technical information 30-day APCD review for completeness weeks EXEMPT Emission estimates BACT* /controls evaluation Air toxics impacts Completeness weeks No Permit Required Permit to Construct Final A/C weeks SB 1298 Certification Permit to Operate Emissions Testing *BACT Best Available Control Technology First-fire (or start-up) + 60-days to complete test 27
28 Customer & Permitting Customer =========> Air District Drawings - site plan Nearby residents Nearby businesses Schools < 1,000 ft Stack parameters Emissions Post permit at site Engine installation Application Preparation Pre-App Meeting Respond to Agency Negotiate Conditions Application Forms Fee payment Tech Support Doc ts Emissions, Toxics 30-Day Review Permit to Construct Engine shakedown Pre-test engine Test Contractor Site compliance with conditions Initial Source Testing Facility Inspection Permit to Operate 28
29 Compliance Demonstration: 2 nd 6 Steps Emission Limits Monitoring Notification Recordkeeping Reporting Testing Inspection & Maintenance 29
30 Deciphering the Conditions Emission Limits ppmvd, gm/bhp-hr, lb/hr, etc. Monitoring visual for opacity, totalizing meter for hours, I&M log book operating parameters of engine & catalyst: T, O2, A/F ratio, inlet/outlet info Recordkeeping operating parameters of engine & catalyst: T, O2, A/F ratio, inlet/outlet info sulfur content Reporting construction completion, test protocol, test results Notification breakdown reporting Source Testing < 24 months, < 3 years, annual (depending on circumstances) 30
31 Non-Compliance Management NOT explicit in the SDAPCD Permit (!!!) Emergency breakdown Breakdown / malfunction Variance Notice to Comply; Notice of Violation Mutual settlement program Public Compliant Replacement of equipment 31
32 Customer & Compliance Customer =========> Air District Post permit at site Engine operations I & M APCD Fees Emission Limits Monitoring Permit to Construct Permit to Operate Completion of paperwork Customer/Site Procedures Engine Mfr Procedures Notification Recordkeeping Reporting Source Testing Annual Permit Renewal Inspections Breakdowns & Emergencies Complaints & Nuisance 32
33 For questions or more information: Alternative Energy Systems Consulting, Inc. ENERGY EFFICIENCY RESEARCH & TECHNOLOGY ENGINEERING & CONSULTING Shirley F. Rivera Tel: Fax:
TITLE V OPERATING PERMIT STATEMENT OF BASIS
TITLE V OPERATING PERMIT STATEMENT OF BASIS Facility Name: El Cajon Energy, LLC Title V Application Number: APCD2011-APP-001657 Facility ID: Equipment Address: APCD2009-SITE-06554 222 N. Johnson Ave. Facility
More informationTable of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2
RULE 20.4 NEW SOURCE REVIEW PORTABLE EMISSION UNITS (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED AND EFFECTIVE 4/27/16)
More informationTable of Contents. (a) APPLICABILITY... 1 (b) EXEMPTIONS... 1 (c) DEFINITIONS... 1 (d) STANDARDS... 2
RULE 20.4 NEW SOURCE REVIEW PORTABLE EMISSION UNITS (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED AND EFFECTIVE 4/27/16)
More informationENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION
SIC Code: 4911 (Energy Production) DATE: 02/06/2008 Page 1 of 5 DATE APPLICATION RECEIVED: December 14, 2007 (Application # FY07-0259) FACILITY DESCRIPTION Pinetree Power-Tamworth, Inc. (the Permittee)
More informationTable of Contents. (a) APPLICABILITY (b) EXEMPTIONS (c) DEFINITIONS... 2
RULE 20.2 NEW SOURCE REVIEW NON - MAJOR STATIONARY SOURCES (ADOPTED AND EFFECTIVE 5/17/94) (REV. ADOPTED AND EFFECTIVE 12/17/97) (REV. ADOPTED 11/4/98; EFFECTIVE 12/17/98) (REV. ADOPTED (date of adoption);
More informationSan Joaquin Valley Unified Air Pollution Control District
San Joaquin Valley Unified Air Pollution Control District Guideline for Expedited Application Review (GEAR) Ethylene Oxide (ETO) Sterilizers and Aerators Approved By: Signed Seyed Sadredin Director of
More informationBEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION
777 12 th Street, Third Floor Sacramento, CA 95814 BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION Category/General Equip Description: Equipment Specific Description: Equipment Size/Rating: DETERMINATION
More informationBOILER/HEATER > 5 MMBTU BACT Size: MINOR SOURCE BACT BOILER. BACT Determination Information
ACTIVE SMAQMD BACT CLEARINGHOUSE CATEGORY: BOILER/HEATER > 5 MMBTU BACT Size: MINOR SOURCE BACT BOILER BACT Determination Number: 157 BACT Determination Date: 6/19/2018 Equipment Information Permit Number:
More informationDRAFT PROPOSED PERMIT. San Diego County Air Pollution Control District Old Grove Rd San Diego, CA (858)
DRAFT PROPOSED PERMIT San Diego County Air Pollution Control District 10124 Old Grove Rd San Diego, CA 92131-1649 (858) 586-2600 TITLE V OPERATING PERMIT 960392 Issued To: Applied Energy North Island,
More informationTITLE V OPERATING PERMIT STATEMENT OF BASIS
Facility Name: Title V Permit No.: Permit Application Nos.: Site ID: Equipment Address: Goal Line, L.P. APCD2016-TVP-00043 APCD2016-APP-004597 APCD1992-SITE-08447 555 North Tulip Street Escondido, CA 92025
More informationBACT Determination Information
UNDER PUBLIC REVIEW SMAQMD BACT CLEARINGHOUSE CATEGORY: MISCELLANEOUS BACT Size: Tortilla Oven 500 F OVEN BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity: Equipment
More informationBACT Determination Information
ACTIVE SMAQMD BACT CLEARINGHOUSE CATEGORY: MISCELLANEOUS BACT Size: Tortilla Oven 500 F OVEN BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity: Equipment Location:
More informationSANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr
SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES Policy No. 6100.039.1993 Draft Div Pol Yr Supersedes No. Final x Div Pol Yr Date: May 28, 1993 Pages 14 Topic: Permit Requirements
More informationBEST AVAILABLE CONTROL TECHNOLOGY & TOXIC BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION
777 12 th Street, Third Floor Sacramento, CA 95814 BEST AVAILABLE CONTROL TECHNOLOGY & TOXIC BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION Category/General Equip Description: Equipment Specific Description:
More informationDRAFT AUTHORITY TO CONSTRUCT
A/C NO.: 25399 ISSUED BY: DATE ISSUED: TO BE DETERMINED DAVID R. GROSE DATE EXPIRES: ISSUED TO: TO BE DETERMINED MITSUBISHI CHEMICAL CARBON FIBER AND COMPOSITES, INC. LOCATION: 5900 88 TH STREET, SACRAMENTO,
More informationChapter 10 Inspecting Combustion Sources
Chapter 10 Inspecting Combustion Sources Editor s Note: Chapter 10 Inspecting Combustion Sources This section was written by Chuck Solt and is updated from material in the NOx Emissions course presented
More informationInspecting Combustion Sources
Chapter 10 Inspecting Combustion Sources Editor s Note: Chapter 10 Inspecting Combustion Sources This section was written by Chuck Solt and is updated from material in the NOx Emissions course presented
More informationAir Regulations Impacting the Pipeline Industry
Air Regulations Impacting the Pipeline Industry Presented by Jim McCarthy innovative environmental solutions, Inc. 1 Agenda Overview of federal air regulations that drive requirements for pipeline facilities
More informationSHASTA COUNTY DEPARTMENT OF RESOURCE MANAGEMENT AIR QUALITY MANAGEMENT DISTRICT
EXPIRATION DATE: January 3, 2020 PERMIT NO: 03-TV-02 SHASTA COUNTY DEPARTMENT OF RESOURCE MANAGEMENT AIR QUALITY MANAGEMENT DISTRICT City of Redding, Redding Power Plant (Applicant) IS HEREBY GRANTED A
More informationTANK/PIPELINE DEGASSING SYSTEM BACT Size: Minor Source BACT THERMAL OXIDIZING UNIT - PORTABLE. BACT Determination Information
UNDER PUBLIC REVIEW SMAQMD BACT CLEARINGHOUSE CATEGORY: TANK/PIPELINE DEGASSING SYSTEM BACT Size: Minor Source BACT THERMAL OXIDIZING UNIT - PORTABLE BACT Determination Number: 213 BACT Determination Date:
More informationSANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr
SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES Policy No. 6100.064.2017 Draft Div Pol Yr Supersedes No. 6100.064.2016 Final x Div Pol Yr Date: February 3, 2017 Pages 14 Topic:
More informationAIR PERMITTING CASE STUDY: HARVARD S CHP EXPANSION
Michael X. Macrae, PhD, Harvard University Environmental Health & Safety A.J. Jablonowski, PE, Epsilon Associates AIR PERMITTING CASE STUDY: HARVARD S CHP EXPANSION 1 Overview Harvard University is expanding
More informationBOILER/HEATER < 5 MMBTU BACT Size: Small Emitter BACT (PTE < 10 lb/day) BOILER. BACT Determination Information
DRAFT SMAQMD CLEARINGHOUSE CATEGORY: BOILER/HEATER < 5 MMBTU Size: Small Emitter (PTE < 10 lb/day) BOILER Determination Number: 136 Determination Date: 1/25/2017 Equipment Information Permit Number: N/A
More informationEvaluation of Gas Turbine Air Quality Impacts from a Community Perspective
Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective Steven J. Klafka, P.E. Wingra Engineering, S.C., 211 South Paterson Street, Madison, WI 53703 Kurt W. Jacobsen, P.E. Wingra Engineering,
More informationBEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION
777 12 th Street, Third Floor Sacramento, CA 95814 BEST AVAILABLE NTROL TECHNOLOGY DETERMINATION DETERMINATION NO.: 203 DATE: ENGINEER: Brian Krebs Category/General Equip Description: Equipment Specific
More informationDRAFT AUTHORITY TO CONSTRUCT
A/C NO.: 25596 ISSUED BY: DATE ISSUED: DRAFT JORGE DEGUZMAN DATE EXPIRES: ISSUED TO: DRAFT 28 TH STREET LANDFILL, SOLID WASTE DIVISION, CITY OF SACRAMENTO LOCATION: 20 28 TH STREET, SACRAMENTO, CA 95816
More informationSYCAMORE COGENERATION PROJECT (84-AFC-6C)
STATE OF CALIFORNIA NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov DATE: October 13, 2011 TO: FROM: Interested
More informationOe Overview Introductions South Coast Air Quality Management District ( SCAQMD ) RECLAIM Program SCAQMD Inspections and Audits Compliance Issues Regul
SCAQMD and RECLAIM: A discussion on regulations and compliance September 14, 2012 Marcus Ruscio Director of Environmental Affairs Lunday-Thagard Company Monitoring Seminar & Training 1 Oe Overview Introductions
More informationTennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1
Tennessee Gas Pipeline Company, LLC Compressor Station 563 7650 Whites Creek Pike Page 1 Joelton, Tennessee Reviewed by: Blake McClain RE: Installation of two Solar Titan 250-30000S natural gas-fired turbines
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) #20 Existing Chain-Driven Charbroilers
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) #20 Existing Chain-Driven Charbroilers Approved by: David Warner Director of Permit Services
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT Proposed Revision to State Implementation Plan (SIP) to Address Federal Clean Air Act Requirements for Reasonably Available
More informationNew Source Review Staff Presentation Community Advisory Council
New Source Review Staff Presentation Community Advisory Council DECEMBER 9, 2015 BUELLTON. SANTA YNEZ VALLEY MARRIOT T Staff Introductions Michael Goldman Engineering Manager Timothy Mitro Air Quality
More informationState of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit
State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: TP-0120 Date Issued: December 26, 2012 This certifies that: Northeast Utilities Public Service
More informationSANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr
SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES Policy No. 6100.042.2016 Draft Div Pol Yr Supersedes No. 6100.042.1994 Final x Div Pol Yr Date: August 25, 2016 Pages 11 Topic:
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. March 17, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION March 17, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL 220-03 ISSUED TO Federal Mogul Powertrain, Inc. LOCATED AT 560 Avis Drive Ann Arbor,
More informationSTATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN:
STATEMENT OF BASIS For the issuance of Draft Air Permit # 1987-AOP-R4 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317
More informationTitle V. Model General Permit Template SERIES 3 INTERAL COMBUSTION ENGINES. Template # SJV-IC-3-1
Title V Model General Permit Template SERIES 3 INTERAL COMBUSTION ENGINES Template # SJV-IC-3-1 full-time, rich-burn, IC engines with NSCR fired on PUC quality natural gas with a sulfur content of less
More informationRECOMMENDED CPCN CONDITIONS CASE NO CATOCTIN POWER, LLC
RECOMMENDED CPCN CONDITIONS CASE NO. 8997 CATOCTIN POWER, LLC General 1. Except as otherwise provided for in the following provisions, the application for the Certificate of Public Convenience and Necessity
More informationSan Diego County Air Pollution Control District Old Grove Rd San Diego, CA (858)
San Diego County Air Pollution Control District 10124 Old Grove Rd San Diego, CA 92131-1649 (858) 586-2600 TITLE V OPERATING PERMIT APCD2007-TVP-978478 Issued To: Escondido Energy Center, LLC Site ID #
More informationClean Air Act History
Clean Air Act Compliance Clean Air Act Compliance Clean Air Act History 1940s serious smog in LA, CA and Donora, PA raised concerns about air quality. 1955, Air Pollution Control Act was the 1st national
More informationSACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT EXPEDITED BARCT IMPLEMENTATION SCHEDULE FOR ASSEMBLY BILL 617.
SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT EXPEDITED BARCT IMPLEMENTATION SCHEDULE FOR ASSEMBLY BILL 617 Prepared by: Approved by: Kevin J. Williams, Ph.D. Program Supervisor Mark Loutzenhiser
More informationRegulating Stationary Sources RECLAIM Cap & Trade Program
Regulating Stationary Sources RECLAIM Cap & Trade Program U.S.-Iran Symposium On Air Pollution in Mega Cities September 4, 2013, UC Irvine Mohsen Nazemi, P.E. Deputy Executive Officer South Coast Air Quality
More informationSACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT. Board of Directors Sacramento Metropolitan Air Quality Management District
SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT For Agenda of August 24, 2006 To: From: Board of Directors Sacramento Metropolitan Air Quality Management District Larry Greene, Air Pollution Control
More informationBEST AVAILABLE CONTROL TECHNOLOGY & TOXIC BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION
777 12 th Street, Third Floor Sacramento, CA 95814 BEST AVAILABLE CONTROL TECHNOLOGY & TOXIC BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION DETERMINATION NO.: 145 Category/General Equip Description: Equipment
More informationFINAL DETERMINATION. To Grant a. Temporary Permit/Non-Attainment New Source Review Permit. For. Concord Steam Corporation.
FINAL DETERMINATION To Grant a Temporary Permit/Non-Attainment New Source Review Permit For Concord Steam Corporation To Construct a 305 MMBtu/hr Biomass Boiler (Wood & Natural Gas), 2 Auxiliary Boilers
More informationNO 2 /NO X ISR: Tier III and Beyond
NO 2 /NO X ISR: Tier III and Beyond presented to: EPA s R/S/L Modelers Workshop April 24, 2013 Dallas, TX Cleveland Holladay, EPA Holladay.Cleveland@epa.gov (415) 947-4140 POP QUIZ: What does the image
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT
DRAFT STAFF REPORT Proposed Amendment to the 2008 PM2.5 Plan to Extend the Rule Amendment Schedule for Rule 4905 (Natural Gas-Fired, Fan-Type Residential Central Furnaces) June 17, 2010 Prepared by: Reviewed
More informationSCAQMD Permit Streamlining Initiative
SCAQMD Permit Streamlining Initiative NACAA Joint Permitting & Enforcement Workshop December 9-11, 2014 Chicago, Illinois Mohsen Nazemi P.E. Deputy Executive Officer South Coast Air Quality Management
More informationUnited States Environmental Protection Agency, Region 9. Air Division. Technical Support Document. for. EPA s Notice of Proposed Rulemaking.
United States Environmental Protection Agency, Region 9 Air Division Technical Support Document for EPA s Notice of Proposed Rulemaking for the California State Implementation Plan San Joaquin Valley Unified
More informationBACT Determination Information
ACTIVE CATEGORY: BACT Size: SMAQMD BACT CLEARINGHOUSE Solvent Cleaning Vactube MFG BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity: Equipment Location: ROCs NOx
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2025
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2025 APPROVED: SIGNED DATE: June 14, 2007 Jon Adams Director of Compliance TITLE: SUBJECT: RULE 1080 STACK MONITORING
More informationSTATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P.
I. FACILITY INFORMATION Newark Bay Cogeneration Partnership L.P. is located at 414-514 Avenue P, Newark, New Jersey, Essex County and consists of a 120-megawatt cogeneration plant. The facility is owned
More informationUC Davis Air Quality Program. Aimee Pfohl, EH&S
UC Davis Air Quality Program Aimee Pfohl, EH&S ajpfohl@ucdavis.edu 754-5267 UC Davis Air Quality Program Campus Air Permitting Program What sources need a permit? Regulatory review of proposed new sources
More informationTECHNICAL FACT SHEET September 24, 2018
Copperwood Resources, Inc. Page 1 Purpose and Summary TECHNICAL FACT SHEET September 24, 2018 The Michigan Department of Environmental Quality (MDEQ), Air Quality Division (AQD), is proposing to act on
More informationClean Air Act Emission Limits
1 Clean Air Act Emission Limits CAA Emission Limits Authority for and Origin of Limits Federally promulgated regulations (e.g. NSPS, NESHAP, or MACT) SIP requirements PSD and N/A NSR permits 2 NSPS 3 New
More information07/08 TABLE OF CONTENTS: 1
TABLE OF CONTENTS REGULATION I. GENERAL Rule 1...Title Rule 2...Definitions Rule 3...Advisory Committee Rule 4...Rules Supplemental Rule 5...Effective Date Rule 6...Severability Rule 7...Zone Boundaries
More informationBOARD OF DIRECTORS Summary of Actions WEDNESDAY, OCTOBER 21, :30 P.M Silver Cloud Court, Board Room, 3 rd Floor, Monterey, California
Agenda Item No. 9 BOARD OF DIRECTORS Summary of Actions WEDNESDAY, OCTOBER 21, 2015 1:30 P.M. 24580 Silver Cloud Court, Board Room, 3 rd Floor, Monterey, California 1. CALL TO ORDER The meeting was called
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 8, PERMIT TO INSTALL No A
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION November 8, 2007 PERMIT TO INSTALL No. 541-88A ISSUED TO Clariant Corporation Masterbatches Division LOCATED AT 926 Elliott Road Albion,
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION November 15, 2013 PERMIT TO INSTALL 143-13 ISSUED TO Newberry Correctional Facility LOCATED AT 13747 East County Road 428 Newberry, Michigan
More informationBACT Determination Information
UNDER PUBLIC REVIEW SMAQMD BACT CLEARINGHOUSE CATEGORY: LANDFILL GAS FLARE BACT Size: Minor Source BACT LANDFILL GAS FLARE BACT Determination Number: Permit Number: Equipment Description: Unit Size/Rating/Capacity:
More informationPERMIT TO INSTALL. Table of Contents
Permit No. 77-17 Page 1 of 7 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit
More informationPOTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011)
RULE 370. POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011) A. Applicability 1. General Applicability: This Rule shall apply to any stationary source
More informationAPPENDIX C SCAQMD PERMIT APPLICATION
APPENDIX C SCAQMD PERMIT APPLICATION Application to the South Coast Air Quality Management District for a Permit to Construct and Permit to Operate for the Natural Gas-Fired Long Beach Emergency Repowering
More informationAIR EMISSION PERMIT NO IS ISSUED TO. LSP - Cottage Grove LP
AIR EMISSION PERMIT NO. 16300087-003 IS ISSUED TO LSP - Cottage Grove LP LSP COTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units,
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 26, NEW SOURCE REVIEW PERMIT TO INSTALL No.
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION January 26, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL No. 307-04 ISSUED TO Nitro-Vac Heat Treat, Inc. LOCATED AT 23080 Dequindre Warren,
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT FINAL STAFF REPORT
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT FINAL STAFF REPORT Update to Rule 2201 Best Available Control Technology (BACT) Cost Effectiveness Thresholds May 14, 2008 Prepared by: Reviewed by: Ben
More informationTECHNICAL FACT SHEET June 19, 2018
New Covert Generating Company, LLC Page 1 Purpose and Summary TECHNICAL FACT SHEET June 19, 2018 The Michigan Department of Environmental Quality (MDEQ), Air Quality Division (AQD), is proposing to act
More informationPART C - POLICY AND PROCEDURES FOR NON-MAJOR POLLUTING FACILITIES
PART C - POLICY AND PROCEDURES FOR NON-MAJOR POLLUTING FACILITIES BACT GUIDELINES PART C 30 DECEMBER 2016 Chapter 1 - How Is MSBACT Determined for Minor Polluting Facilities? This chapter explains the
More informationSUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015.
SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015 Air Emissions Permit Program Contents I. Air Permitting Introduction
More informationAir Permi>ng: A Major Piece of the Puzzle or Trying to Keep All of
Air Permi>ng: A Major Piece of the Puzzle or Trying to Keep All of the Balls in the Air Insert then choose Picture select your picture. Right click your picture and Send to back. The world s leading sustainability
More informationYOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)
YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA 95618 Phone (530)757-3650; Fax (530)757-3670 AUTHORITY TO CONSTRUCT (ATC) APPLICATION A separate application must be
More informationState of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit
State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: FP-T-0152 Date Issued: July 18, 2007 Administrative Permit Amendment: June 11, 2008 This certifies
More informationSANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr
SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES Policy No. 6100.058.2016 Draft Div Pol Yr Supersedes No. 6100.058.2004 Final x Div Pol Yr Date: August 25, 2016 Pages 7 Topic:
More informationThe Role of Combined Heat and Power (CHP) in Virginia s Energy Future
The Role of Combined Heat and Power (CHP) in Virginia s Energy Future Prepared for: Workshop on Combined Heat and Power Development in Virginia, Alexandria, VA Prepared by: M. Willingham and M. Pipattanasomporn
More informationPUBLIC PARTICIPATION DOCUMENTS For DCP Midstream, LP Hamilton Township, Michigan
STATE OF MICHIGAN Rick Snyder, Governor DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION CONSTITUTION HALL 525 WEST ALLEGAN STREET P.O. BOX 30260 LANSING, MICHIGAN 48909-7760 www.michigan.gov/air
More informationVista Canyon Transit Center - Air Quality Technical Memorandum
803 Camarillo Springs Road, Suite C Camarillo, California 93012 (805) 437-1900 FAX (805) 437 1901 www.impactsciences.com MEMORANDUM To: Kris Markarian, City of Santa Clarita Job No. 1046.003 From: Susan
More informationNew 2015 Ozone Standard and Implications. July 2016
New 2015 Ozone Standard and Implications July 2016 What is Ozone? Ground level ozone is formed from the mixture of sunlight, NOx and VOC. 2 Effects of Ground Level Ozone 3 Effects of Ground Level Ozone
More informationCONSTRUCTION PERMIT. Public Service Company
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 PERMIT NO: DATE ISSUED: ISSUED TO: CONSTRUCTION PERMIT 12AD2345 Public Service Company THE
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 6, NEW SOURCE REVIEW PERMIT TO INSTALL No
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION October 6, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL No. 206-04 ISSUED TO Excel Decorating & Finishing LOCATED AT 480 East Second Street
More information2 ENVIRONMENTAL REVIEW AND THRESHOLDS OF SIGNIFICANCE
2 ENVIRONMENTAL REVIEW AND THRESHOLDS OF SIGNIFICANCE 2.1 ENVIRONMENTAL REVIEW PROCESS The California Environmental Quality Act (CEQA) requires that public agencies (e.g., local, county, regional, and
More informationDTE Electric Company Belle River Combined Cycle Power Plant
DTE Electric Company Belle River Combined Cycle Power Plant RESPONSE TO COMMENTS DOCUMENT PERMIT No. 19-18 Rick Snyder, Governor Air Quality Division Michigan Department of Environmental Quality INTERNET:
More informationComments on Draft Permit #12-POY-079. FTS International Proppants, LLC. Acadia, Trempealeau, Wisconsin. March 15, 2013
Comments on Draft Permit #12-POY-079 FTS International Proppants, LLC Acadia, Trempealeau, Wisconsin March 15, 2013 FTS International Proppants, LLC has applied for an air pollution control construction
More informationPart 1 Introduction and Overview
Part 1 Introduction and Overview A. Applicability: This Application for Customer Generation Cost Responsibility Surcharge (CRS) Tariff Exemptions (Application) is for the purpose of requesting an exemption
More informationPRELIMINARY AUTHORITY TO CONSTRUCT
PRELIMINARY ISSUED BY: DATE ISSUED: SEPTEMBER XX, 2018 JORGE DeGUZMAN DATE EXPIRES: SEPTEMBER XX, 2020 ISSUED TO: SACRAMENTO MUNICIPAL UTILITY DISTRICT FINANCING AUTHORITY (SFA) COSUMNES POWER PLANT LOCATION:
More informationAdvances in NOx Compliance Testing with Portable Electrochemical Analyzers
Advances in NOx Compliance Testing with Portable Electrochemical Analyzers LADCO Workshop: Emission Control and Measurement Technology for Industrial Sources March 24-25, 2009 Craig McKim, Emission Division
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. October 24, 2005 PERMIT TO INSTALL
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION October 24, 2005 PERMIT TO INSTALL 263-05 ISSUED TO Superior Vault & Cremation Services LOCATED AT 345 East Mahoney Merrill, Michigan IN
More informationPrevention of Significant Deterioration (PSD) Permitting. Scoping Meeting
Prevention of Significant Deterioration (PSD) Permitting Scoping Meeting April 6, 2010 Dave Warner Director of Permit Services 1 Overview Prevention of Significant Deterioration (PSD) Permitting Program
More informationTITLE V PERMIT APPLICATION APPLICATION COMPLETENESS CHECK LIST
SHELBY COUNTY HEALTH DEPARTMENT POLLUTION CONTROL 814 JEFFERSON AVENUE MEMPHIS, TN 38105 Telephone: (901) 222-9599 FAX: (901) 222-9550 APC 35 TITLE V PERMIT APPLICATION APPLICATION COMPLETENESS CHECK LIST
More informationWhat information should be submitted to the District regarding Circulation Tanks for Well Stimulation Treatments?
Santa Barbara County Air Pollution Control District Greenhouse Gas Emission Standards for Crude Oil and Natural Gas Facilities Frequently Asked Questions Version 1.2 General The Regulation What is the
More informationSan Diego County Air Pollution Control District Old Grove Rd San Diego, CA (858)
San Diego County Air Pollution Control District 10124 Old Grove Rd San Diego, CA 92131 (858) 586-2600 TITLE V OPERATING PERMIT PERMIT # APCD2015-TVP-00042 Issued To: Sycamore Energy LLC Site Address: 8514
More informationSan Diego County Air Pollution Control District Old Grove Road San Diego, CA (858)
San Diego County Air Pollution Control District 10124 Old Grove Road San Diego, CA 92131 (858) 586-2600 TITLE V OPERATING PERMIT PERMIT #APCD2008-TVP-960380 Issued To: Naval Air Station North Island --
More informationUpdate on ICI Boiler MACT
Update on ICI Boiler MACT Bruce Hedman March 5, 2013 Clean Air Acts Standards for Boilers and Incinerators On December 20, 2012, EPA finalized a specific set of adjustments to March 2011 Clean Air Act
More informationCONSTRUCTION PERMIT. Denver Zoological Foundation THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 12DE2647 DATE ISSUED: December 15, 2014 ISSUED TO: THE SOURCE
More information15A NCAC 02D.0535 is amended as published in 30:23 NCR follows:
1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0D.0 is amended as published in 0: NCR - follows: 1A NCAC 0D.0 EXCESS EMISSIONS REPORTING AND MALFUNCTIONS (a) Applicability: 1A NCAC 0D.0 shall not be in effect if 1A NCAC
More informationPERMIT TO INSTALL. Table of Contents
Permit No. 134-16 Page 1 of 9 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit
More informationCAFO Air Emissions and Enforcement. Susan O Keefe STAPPA/ALAPCO National Meeting May 5, 2003
CAFO Air Emissions and Enforcement Susan O Keefe STAPPA/ALAPCO National Meeting May 5, 2003 Industry Consolidation Industry Consolidation Then. 1977: 850,000 pork farms 1988: 7% of pork from producers
More informationPROPOSED AMENDMENTS TO RULE 2.27, BOILERS DRAFT STAFF REPORT
Yolo-Solano Air Quality Management District 1947 Galileo Court, Suite 103 Davis, CA 95618 (530)757-3650 www.ysaqmd.org PROPOSED AMENDMENTS TO RULE 2.27, BOILERS DRAFT STAFF REPORT January 11, 2019 Prepared
More informationMeeting PM2.5 Standards in the San Joaquin Valley. September 26, 2017
Meeting PM2.5 Standards in the San Joaquin Valley September 26, 2017 Objectives of Today s Workshop 2 Describe Valley s PM challenge Outline attainment strategy Provide update on modeling analysis Solicit
More informationEmergency Engine and Turbine Requirements
1.0 Purpose and Applicability 1.1 The purpose of these guidelines is to identify the processes and requirements that must be followed to ensure compliance with the Massachusetts Department of Environmental
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT FINAL DRAFT STAFF REPORT
FINAL DRAFT STAFF REPORT Amendments to Rule 4905 (Natural Gas-fired, Fan-Type Central Furnaces) March 20, Prepared by: Reviewed by: Ariana Hooks, Air Quality Specialist Patrick Houlihan, Senior Air Quality
More information