2 Revised Price Form - May, 0 (Addendum ) For the complete supply and installation of five () Static Sign Support Structures; removal of four () existing overhead sign supports, and one () temporary side mounted sign; and repair of some steel beam guide rail systems along the Allen Expressway in the City of Toronto, from the period of award to December, 0. Item # Spec Description Unit Quantity Unit Price Net of HST Total Price Net of HST TS.00 Traffic Control Signing Lump Sum 00% $ OP 90 Site Preparation Lump Sum 00% $ OP 9 Site Restoration Lump Sum 00% $ OP 0 Removal of Sign Support Structure Each $ $ OP Repair of Single Rail Steel Beam Guide Rail with Channel M 0 $ $ OP 9 Coating New Structural Steel Sign Support Structures Each $ $ OP 9 Fabrication of Static Sign Boards Each $ $ 8 OP 9 Concrete in Ground Mounted Static Sign Support Footings Each $ $ 9 OP 9 Cantilever Static Sign Support Structures, Class Each $ $ 0 OP 9 Aluminium Bridge Mounted Sign Support Structures Each $ $ OP 0 Removal and Re-installation of Noise Barrier Wall (revised) M 00 $ $ OP 90 Site Preparation Issue Resolution (contingency for constructability issues arising) Each $, $0, Sub Total HST $ $ Total HST incl $ of Transfer this total to front of tender document

3 July, 0 File Burgess Engineering Inc. Lake St. Grimsby, Ontario LM G Attention Andrew Burgess, P.Eng. FOUNDATION INVESTIGATION REPORT OVERHEAD SIGN SUPPORTS GARDINER EXPREWAY & DON VALLEY PARKWAY TORONTO, ONTARIO Dear Mr. Burgess This letter presents the factual data obtained from a foundation investigation carried out by Thurber Engineering Ltd. (Thurber) for the proposed overhead cantilever and tri-cord signs within the City of Toronto. The signs will be positioned along Gardiner Expressway (FGG), Lakeshore Boulevard, Don Valley Parkway (DVP) and the Don Valley Parkway ramp to/from Bayview Avenue. The purpose of this investigation is to provide subsurface information at selected locations within the general vicinities of the sign locations. Design aspects of these signs are not part of this scope of work. Thurber has been retained by Burgess Engineering Inc. (BEI) to carry out this investigation on behalf of the City of Toronto (City).. BOREHOLE PROGRAM BEI provided Thurber with the approximate locations for each of the 9 proposed signs. A total of 0 boreholes were originally proposed to be drilled throughout the project areas; six holes would be drilled along the FGG and Lakeshore Boulevard, and four boreholes would be drilled for the DVP and the adjacent Bayview ramp. The borehole investigation was carried out during spring maintenance closures organized by the City. Drilling of the 0 proposed boreholes was subject to utility locate completion within the relatively short window of time available before the weekend closures. Utility locates were requested immediately upon receiving the information on the proposed sign locations. Based on completed utility locates and field assessment of drilling feasibility at each location, adjustments of drilling locations have been made and ultimately 8 out of 0 boreholes could be drilled. of

4 . INVESTIGATION PROCEDURES. Field Investigation The borehole investigation was carried out on April, 0 during the FGG closure and on May, 0 during the DVP closure. The as-drilled program consisted of drilling boreholes on the FGG and boreholes on the DVP and its adjacent ramp. Some borehole details are listed as follows Site location Borehole Drilling Date Coordinates Easting Northing Depth (m) Gardiner Expy. WB East of Grand Ave. Gardiner Expy. EB Between Wickman Rd. & Kipling Ave. Gardiner Expy. EB Between Kipling Ave. & Evans/Horner Ramp Gardiner Expy. WB Between Taymall Ave. & Plastics Ave. Gardiner Expy. WB Between Islington Ave. & Dorchester Ave. Gardiner Expy. EB Between Park Lawn Rd. & Rail underpass Don Valley Pkwy. NB Between Rail overpass & Sunlight Park Rd. Don Valley Pkwy. Ramp Bayview Ramp westbound lanes, West of Bayview Ave. BH-0 -Apr BH-0 -Apr BH- -Apr BH- -Apr BH- -Apr BH- -Apr BH-0 -May BH- -May Approximate borehole locations are shown on a series of photo images in Appendix B. Attempts were made to position the boreholes in close proximity to select sign locations. Some locations where it was not feasible to drill boreholes are as follows Sites and 8 Locator failed to show up at locate meeting; utility clearance incomplete. Site Located on Lakeshore Boulevard outside of FGG closure. Site 8 Located on Lakeshore Boulevard outside of FGG closure. Site 9 Multiple high-pressure buried pipelines in close proximity to proposed borehole locations; utilities not cleared and therefore unsafe for drilling. Client Burgess Engineering Inc. Date 0/0/0 File No Page of E-File H\9\0\0 - Gardiner and DVP OH signs\report\project Summary Letter_final.docx of

5 All boreholes were drilled by a specialist drilling contractor using truck mounted drill rigs and samples were recovered using Standard Penetration Testing (SPT). All drilling was supervised by a member of Thurber s staff. Boreholes were advanced to. m depth or auger/spt refusal. Sampling was carried out at selected intervals of depth. Groundwater conditions were observed and recorded during borehole advance and upon completion. Within shale bedrock, SPT was carried out until refusal. Coring of bedrock was not a part of this scope of work. Upon completion of drilling, backfilling of the boreholes was carried out in general accordance with the requirements of O.Reg. 90. Ground surface elevations are approximate and based on preliminary information provided by BEI.. Laboratory Testing Geotechnical laboratory testing consisted of natural moisture content determination and visual identification on all samples. Grain size analysis and Atterberg Limits testing were also conducted on selected samples. No chemical laboratory testing for environmental assessment purposes was conducted. All geotechnical laboratory testing results are presented in the Record of Boreholes immediately following the text.. SUBSURFACE STRATIGRAPHY This section presents a generalized summary of the subsurface conditions encountered in the boreholes. Detailed soil and groundwater conditions are presented in the Records of Boreholes immediately following the text. All boreholes were drilled within the paved portion of the roadways and encountered a pavement structure at the surface. In general, the pavement consisted of 00 to mm of asphalt overlying sand to sand and gravel up to 0. m in thickness.. Gardiner Expressway.. Clayey Silt Clayey silt was present in Boreholes BH-0 and BH- immediately beneath the pavement structure. The base of these layers was at about. to. m depths. This layer is brown in colour containing some sand and trace gravel. The SPT N values ranged from to 8 blows per 0. m penetration indicating a firm to very stiff consistency. Measured moisture contents ranged between % and %. Client Burgess Engineering Inc. Date 0/0/0 File No Page of E-File H\9\0\0 - Gardiner and DVP OH signs\report\project Summary Letter_final.docx of

6 .. Silts and Sands Deposits of silt and sand with varying composition of sandy silt, sand and silt to silty sand were encountered in Boreholes BH-0, BH- and BH-. The base of the silts and sands was at about. to. m depths. These soils are typically brown in colour with trace gravel and clay. The SPT N values ranged from 8 to blows per 0. m penetration with most values between and, indicating a typically compact condition. Measured moisture contents ranged between 0% and 8%. Gradation test results for these deposits are provided on the borehole logs... Silty Clay to Clayey Silt Till Silty clay to clayey silt till was encountered immediately above the weathered shale bedrock in Boreholes BH-0, BH-, BH- and BH-. The base of the till layer was at about.8 to.8 m depths where fully penetrated. Borehole BH- terminated within the till at a depth of. m. This till is generally brown in colour becoming grey with depth, and contains trace sand and gravel. The SPT N values ranged between and blows per 0. m penetration indicating a stiff to hard consistency. Measured moisture contents ranged between % and 0%. Gradation test results for the till are presented on the borehole logs. Glacial tills inherently contain cobbles and boulders... Weathered Shale Bedrock Underlying the above soils, weathered shale was encountered in Boreholes BH-0, BH-0, BH-, BH- and BH-. The depths to the weathered bedrock are tabulated below BH Depth to Weathered Bedrock (m) The shale is grey in colour and the upper part is generally in a highly weathered state. It is penetrable by augering to varying depths. Auger refusal was encountered at. m depth in Boreholes BH-0 and BH-, and SPT refusal was noted at. m depth in Borehole BH-. SPT N values in the weathered shale ranged from blows per 0. m penetration to greater than 00 blows for less than 0. m penetration. The moisture content of the weathered shale ranged from to %. The shale bedrock is known to contain very hard interbeds... Groundwater Conditions No free water was encountered in Boreholes BH-0, BH-0, BH-, BH- and BH- during drilling. In Borehole BH-, a water level at.0 m depth was observed upon completion. These are very short term observations and the stabilized water level may be higher. Client Burgess Engineering Inc. Date 0/0/0 File No Page of E-File H\9\0\0 - Gardiner and DVP OH signs\report\project Summary Letter_final.docx of

7 . Don Valley Parkway.. Fill Clayey silt fill was encountered in Boreholes BH- and BH- immediately beneath the pavement structure. Fill thickness ranged from. to. m and the base of the fill layers was at about. to. m depths. This fill is brown to dark brown in colour containing some sand and trace gravel. Measured SPT N values ranged from 9 to blows per 0. m penetration indicating a stiff to very stiff consistency. Measured moisture contents ranged between 9% and %. Gradation test results for the fill are presented on the borehole logs... Clayey Silt Clayey silt was encountered below the fill in Borehole BH-. The thickness of the layer is. m and the base of this deposit was at about. m depth. This soil is brown to grey in colour containing some wood fibres. The SPT N values ranged between and blows per 0. m penetration indicating a firm consistency. Measured moisture contents ranged between % and %... Silty Clay Till Silty clay till was encountered below the above soils in Boreholes BH- and BH-. Both boreholes were terminated in the till at. m depth. This till is brown to grey in colour containing some sand and trace gravel. The SPT N values ranged between and blows per 0. m penetration with most values lying between and, indicating a typically stiff to very stiff consistency. Measured moisture contents ranged between % and 0%. Gradation test results for the till are presented on the borehole logs. Glacial tills inherently contain cobbles and boulders... Groundwater Conditions No free water was encountered in Borehole BH-. A water level at. m depth was observed in open Borehole BH- upon completion of drilling. These are very short term observations and the stabilized water level may be higher. COMMENTS ON SIGN SUPPORT FOUNDATION INSTALLATION. General This section of the report presents foundation comments regarding the installation of augered caissons for the sign supports. These comments are based on the subsurface information encountered at the borehole locations. It should be anticipated that the subsurface conditions vary between and beyond the borehole locations. Design aspects of these sign supports are not part of the current scope of work and are not addressed in this letter. Client Burgess Engineering Inc. Date 0/0/0 File No Page of E-File H\9\0\0 - Gardiner and DVP OH signs\report\project Summary Letter_final.docx of

8 . Caisson Installation Caisson installation should generally be carried out in accordance with OP 90. The Contractor is advised that variable types of subsurface materials may be encountered at the locations of the sign foundations. For additional information regarding subsurface conditions, the Contractor is referred to the Foundation Investigation Report. For bidding purposes, the Contractor shall assume the following. For subsurface conditions at an augered caisson location, reference may be made to information encountered in the borehole(s) closest to the subject caisson location. It is important to note, however, that subsurface conditions vary between and beyond the borehole locations.. Cobbles, boulders and rock fragments may be encountered within the glacial till deposits. Obstructions including rubble, cobbles and boulders may also be present within the embankment fills. The soil matrix is anticipated to become harder or denser with depth. Caisson installation equipment must be able to dislodge, handle, remove or otherwise penetrate these obstructions and hard/very dense layers.. Weathered shale with very hard interbeds will be encountered at most locations. Caisson installation equipment must be able to penetrate the shale to reach the design caisson founding level. Coring of the shale and its hard layers may be required.. The groundwater conditions observed in the boreholes are very short term. Higher groundwater levels must be expected during installation especially during the wet seasons. Soil sloughing and water seepage will occur in unsupported holes especially in sands and silts below the groundwater level. The cohesionless soils would be susceptible to disturbance under conditions of unbalanced hydrostatic head. Temporary liners must be available to support the caisson sidewalls and to provide seepage cut-off where required. Any accumulated water may have to be pumped out from the hole prior to placing concrete. Should it be impractical to remove the accumulated water inside the hole, it is recommended that the concrete be placed by the tremie method. The Contractor is responsible for constructing the sign support foundations without disturbing the material at the sides or bases of the foundations. Client Burgess Engineering Inc. Date 0/0/0 File No Page of E-File H\9\0\0 - Gardiner and DVP OH signs\report\project Summary Letter_final.docx 8 of

9 9 of

10 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD GROUND SURFACE ASPHALT (0mm) Overhead Signs, Gardiner-DVP Toronto, ON April, 0 April, 0 SOIL PROFILE DESCRIPTION SAND, silty, some gravel, dense, brown, moist (FILL) SHALE, highly weathered, grey STRATA PLOT RECORD OF BOREHOLE BH-0 ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION Solid Stem Augers 0/ 0.00 AS END OF BOREHOLE AT.m ON AUGER REFUSAL. NO FREE WATER ENCOUNTERED. BOREHOLE BACKFILLED WITH CUTTINGS TO 0.m, CONCRETE TO 0.m THEN ASPHALT TO SURFACE / 0.0 THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION 0 of LOGGED CHECKED MW SKP

11 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD GROUND SURFACE ASPHALT (0mm) Overhead Signs, Gardiner-DVP Toronto, ON May, 0 May, 0 SOIL PROFILE DESCRIPTION CRUSHER RUN, dense, brown (FILL) STRATA PLOT RECORD OF BOREHOLE BH-0 ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION SILT, clayey, some sand, trace gravel, black oxide staining, very stiff to stiff, dark brown, moist (FILL) SILT, clayey, occasional wood fibres, firm, dark brown to grey, moist CLAY, silty, some sand, trace gravel, firm to very stiff, brown (TILL) Grain Size Analysis Gr 0%/ Sa %/ Si %/ Cl % 9 END OF BOREHOLE AT.m. BOREHOLE OPEN TO.m AND WATER LEVEL AT.m. BOREHOLE BACKFILLED WITH BENTONITE HOLEPLUG TO 0.m, CONCRETE TO 0.m THEN ASPHALT PATCH TO SURFACE THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION of LOGGED CHECKED GA SKP

12 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD GROUND SURFACE ASPHALT (mm) Overhead Signs, Gardiner-DVP Toronto, ON May, 0 May, 0 SOIL PROFILE DESCRIPTION STRATA PLOT RECORD OF BOREHOLE BH- ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION SAND, gravelly, some silt, dense, brown (FILL) SILT, clayey, some sand, trace gravel, stiff, brown to grey, moist (FILL) Grain Size Analysis Gr %/ Sa %/ Si %/ Cl % CLAY, silty, some sand, trace gravel, stiff to very stiff, grey (TILL) Grain Size Analysis Gr 0%/ Sa %/ Si %/ Cl % 0 8 >> 9 END OF BOREHOLE AT.m. BOREHOLE OPEN TO.m AND NO FREE WATER WAS ENCOUNTERED. BOREHOLE BACKFILLED WITH BENTONITE HOLEPLUG TO 0.m, CONCRETE TO 0.m THEN ASPHALT PATCH TO SURFACE THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION of LOGGED CHECKED GA SKP

13 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD GROUND SURFACE ASPHALT (0mm) Overhead Signs, Gardiner-DVP Toronto, ON April, 0 April, 0 SOIL PROFILE DESCRIPTION SAND and GRAVEL, some silt, dense, brown, moist (FILL) STRATA PLOT RECORD OF BOREHOLE BH-0 ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m 9 COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION SILT, clayey, some sand, trace gravel, oxide staining, firm, brown, moist.9 0. SILT, sandy to SILT and SAND, trace clay, trace gravel, oxide staining, compact to loose, brown, moist.8. Grain Size Analysis Gr %/ Sa %/ Si %/ Cl 8% 8 becoming compact CLAY, silty, some sand, hard, brown, moist (TILL).8.8 SHALE, highly weathered, some silty clay seams, grey..9 8 Grain Size Analysis Gr 0%/ Sa %/ Si %/ Cl 0% 9 END OF BOREHOLE AT.m. BOREHOLE OPEN AND NO FREE WATER ENCOUNTERED. BOREHOLE BACKFILLED WITH BENTONITE HOLEPLUG AND CONCRETE THEN ASPHALT COLD PATCH TO SURFACE..9. THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION of LOGGED CHECKED AH SKP

14 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD GROUND SURFACE ASPHALT (00mm) Overhead Signs, Gardiner-DVP Toronto, ON April, 0 April, 0 SOIL PROFILE DESCRIPTION SAND and GRAVEL, some silt, compact, brown, moist (FILL) STRATA PLOT RECORD OF BOREHOLE BH- ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m 8 COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION SAND, silty, trace gravel, occasional shale fragments, compact, moist SHALE, highly weathered, grey END OF BOREHOLE AT.m. NO FREE WATER ENCOUNTERED. 0.. THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION of LOGGED CHECKED AH SKP

15 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD GROUND SURFACE ASPHALT (0mm) Overhead Signs, Gardiner-DVP Toronto, ON April, 0 April, 0 SOIL PROFILE DESCRIPTION SAND, gravelly, some silt, trace shale fragments, compact, brown, moist (FILL) STRATA PLOT RECORD OF BOREHOLE BH- ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION Solid Stem Augers SILT, clayey, trace gravel, trace sand, stiff, brown to grey, moist (TILL) SHALE, highly weathered, grey 0.. 8/ 0.0 END OF BOREHOLE AT.m DUE TO AUGER REFUSAL. NO FREE WATER ENCOUNTERED. BOREHOLE BACKFILLED WITH CUTTINGS TO 0.m, CONCRETE TO 0. THEN ASPHALT TO SURFACE / 0.00 THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION of LOGGED CHECKED MW SKP

16 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD GROUND SURFACE ASPHALT (0mm) Overhead Signs, Gardiner-DVP Toronto, ON April, 0 April, 0 SOIL PROFILE DESCRIPTION SAND, gravelly, some silt, compact, medium brown, moist (FILL) STRATA PLOT RECORD OF BOREHOLE BH- ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION SAND, silty, trace clay, with oxide staining, compact, brown, moist to wet (SM) Grain Size Analysis Gr 0%/ Sa 8%/ Si %/ Cl % Solid Stem Augers SILT, sandy, compact, greyish brown, wet 0.. CLAY, silty, trace sand, trace gravel, very stiff, grey (TILL) SHALE, highly weathered, dark grey / 0.00 AS END OF BOREHOLE AT.m ON REFUSAL. NO FREE WATER ENCOUNTERED. BOREHOLE BACKFILLED WITH CUTTINGS TO 0.m, CONCRETE TO 0.m THEN ASPHALT TO SURFACE /0.0 THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION of LOGGED CHECKED MW SKP

17 DEPTH SCALE (metres) PROJECT LOCATION STARTED COMPLETED BORING METHOD Overhead Signs, Gardiner-DVP Toronto, ON April, 0 April, 0 SOIL PROFILE DESCRIPTION GROUND SURFACE ASPHALT (00mm) SAND and GRAVEL, compact (FILL) STRATA PLOT RECORD OF BOREHOLE BH- ELEV. DEPTH (m) SAMPLES NUMBER TYPE BLOWS/0.m COMMENTS DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH Cu, KPa nat V - Q - rem V - Cpen WATER CONTENT, PERCENT w wp wl Project No SHEET OF DATUM ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION SILT, clayey, trace sand, trace gravel, firm, brown, moist very stiff 8 CLAY, silty, trace sand, trace gravel, stiff, brown (TILL) 9..9 Grain Size Analysis Gr 0%/ Sa %/ Si %/ Cl % very stiff END OF BOREHOLE AT.m. BOREHOLE OPEN TO.m AND WATER LEVEL AT.0m THURBERS 00.GPJ // GROUNDWATER ELEVATIONS SHALLOW/SINGLE INSTALLATION DEEP/DUAL INSTALLATION of LOGGED CHECKED AH SKP

18 BH-0 Source "Ontario." August, m E 8 m N May, 0 Approximate drilled borehole location Google Earth GARDINER EXPREWAY - EAST OF GRAND AVE BH-0 AS-DRILLED LOCATION (N.T.S. SCHEMATIC ONLY) 8 of

19 BH-0 Source "Ontario." August, m E 880 m N May, 0 Approximate drilled borehole location Google Earth DON VALLEY PARKWAY - BETWEEN CN RAIL BRIDGE AND SUNLIGHT PARK RD BH-0 AS-DRILLED LOCATION (N.T.S. SCHEMATIC ONLY) 9 of

20 BH- Source "Ontario." August, m E 89 m N May, 0 Approximate drilled borehole location Google Earth DON VALLEY PARKWAY RAMP - WEST OF BAYVIEW AVE BH- AS-DRILLED LOCATION (N.T.S. SCHEMATIC ONLY) 0 of

21 BH-0 Source "Ontario." August, m E 809 m N May, 0 Approximate drilled borehole location Google Earth GARDINER EXPREWAY - WEST OF KIPLING AVE BH-0 AS-DRILLED LOCATION (N.T.S. SCHEMATIC ONLY) of

22 BH- Source "Ontario." August, m E 80 m N May, 0 Approximate drilled borehole location Google Earth GARDINER EXPREWAY - WEST OF EVANS/HORNER RAMP BH- AS-DRILLED LOCATION (N.T.S. SCHEMATIC ONLY) of

23 BH- Source "Ontario." August, m E 8098 m N May, 0 Approximate drilled borehole location Google Earth GARDINER EXPREWAY - BETWEEN PLASTICS AVE AND CANMOTOR AVE BH- AS-DRILLED LOCATION (N.T.S. SCHEMATIC ONLY) of

24 BH- Source "Ontario." August, m E 800 m N May, 0 Approximate drilled borehole location Google Earth GARDINER EXPREWAY - BETWEEN ISLINGTON AVE AND DORCHESTER AVE BH- AS-DRILLED LOCATION (N.T.S. SCHEMATIC ONLY) of