1 NGPL Pipeline Operations Review August 14, 2018 Danny Ivy Kinder Morgan, Inc. VP Gas Control

2 Pipeline Management Operations Review Winter Recap Summer Update Supply and Market Changes Storage Update Maintenance Completed Ongoing Contact list 2

3 Miles of pipe 9,100 Flow meters 840 Total HP 1,037,000 Total compressor stations 47 Total storage fields 12 Approximate values 3

4 Winter 2017/2018 Recap The period of Dec 27, 2017 to Jan 6, 2018 was 53% colder than normal Winter operational records set No pressure or deliverability issues 4

5 Winter Records - NGPL New Record Previous Record Daily Throughput (1/2/18) (1/6/17) Monthly Throughput * (Jan 2018) (Dec 16) Storage Withdrawals (12/27/17) (1/6/17) Power Generation (12/27/17) (7/20/17) LDC Takes (1/1/18) (1/5/17) * Daily average system wide deliveries Volumes in Bcf/d 5

6 Supply Area Changes January July daily averages % vs 2017 % vs 2016 Permian % + 51 % Iowa Illinois 1,665 1, % + 70 % Texok 1,303 1,265 1, % - 4 % South Texas % - 33 % Midcontinent 1,305 1,279 1, % + 11 % All volumes are MDth/d 6

7 Delivery Area Changes January July daily averages % vs 2017 % vs 2016 LA Line % + 72 % South Texas % + 9 % Midwest LDC s 2,405 2,069 2, % + 16 % Power % + 34 % All volumes are MDth/d 7

8 Significant Changes Summer 2018 April was approximately 45 % colder than normal System sendout was the highest April on record (5.4 Bcf/d) Record setting power loads in July Top 5 days for power loads were: July 16, Bcf/d July 10, June 18, July 5, July 17, Top 15 power load days: 12 in in 2017 Gulf Coast system continues to flow south from Station 310 Since Jan 1, 2017 flows are southbound approximately 50% of the time 8

9 Gulf Coast Flow Direction Daily Net Flows 1,500,000 1,000,000 North 500,000 South 0 - (500,000) (1,000,000) 9

10 Summer 2018 Transport Summary Amarillo transports near maximum capacity from Midcontinent Zone Managing around integrity remediation Capacity available north of Trailblazer Permian transports northbound near maximum capacity Gulf Coast utilization higher and less variable REX Moultrie receipts remain strong, many days > 1.4Bcf No restrictions on East Texas receipts Arkansas receipts averaging less than 50,000 MMBtu/d High utilization of the Louisiana system due to LNG exports Deliveries into South Texas remain strong due to exports to Mexico 10

11 NGPL Physical Storage Activity Injections Withdrawals 11

12 NGPL Maintenance Program Integrity IMP SCC General maintenance 2018 Spending will equal approximately $84 million Updated 12 Month Rolling Maintenance Plan is posted on EBB around the 20 th of each month A detailed listing/description of the next month s outages is also posted around the 20 th of each month. 12

13 Category Description In Line Inspection (ILI) Smart tools used to: Identify general internal and external corrosion using standard MFL Identify longitudinal defects including long-seam corrosion using C-MFL (also known as an AFD tool) EMAT Runs Smart tool used to identify Stress Corrosion Cracking (SCC) Pressure and Spike Tests Hydrostatic pressure tests performed in pipeline sections that are not piggable or to complement EMAT in pipeline sections within high consequence areas (HCAs) Direct Assessment Testing for HCAs (DE, ECDA, SCCDA) Visual pipe examinations performed in pipeline sections that are relatively short and/or not conducive to ILI or hydrostatic pressure tests KMI Assessment Digs Excavations performed to prove-up the existence of SCC using the KMI process 13

14 Category Description Remediation Pipeline repairs / remediation of anomalies identified by a smart tool run Gas Storage Well Integrity Program Activities related to down-hole logging (ILI) of storage wells and replacement of well head components Other (Geohazards, Misc) Reviews, assessments, and mitigation of pipeline hazards created by geological events such as land slides, floods, erosion, etc. Make Piggable Installing or replacing facilities to allow the use of smart tools in a previously unpiggable pipeline section Drip Replacement and Removal Removal or replacement of pipeline drips that are no longer necessary and may pose an integrity risk 14

15 2018 NGPL Maintenance Program TYPE 2018 Job Count 2017 Job Count 2016 Job Count Integrity O&M System Total Market Area and Storage Amarillo projects GC projects Posted Posted (with an impact) Not posted (no impact)

16 Managing Outages While some outages are immediate and/or unavoidable, where possible NGPL makes every attempt to minimize the duration of outages and consolidate work to limit the number of outages and minimize the impact to Shippers. Kinder Morgan has a dedicated mechanical and project support team available in addition to outside contract support Example Amarillo #3 Force Majeure 8 crews 7 days a week Consolidated work to limit outages 16

17 CS 104 to CS 105 AMA #3 Remediation: MLV 840 to MLV Digs MLV 843 to MLV Dig MLV 845 to MLV Dig MLV to MLV Digs MLV 849 to MLV Digs High Impact Integrity Work Amarillo #3 CS 194 CS 105 CS 105 Drip Removal: MLV 852 to MLV 855 RC (CS 105) CS 103 to CS 104 AMA #3 Remediation: MLV to MLV Dig MLV 835 to MLV Digs MLV 838 to MLV 840 RC (CS 104) 1 Dig 36-inch out of service CS 193 CS 104 CS 104 Drip Removal: MLV 838 to MLV 840 RC (CS 104) 712 MAOP CS

18 2018 Remaining Outage Schedule With Potential Impacts Integrity Description Type Segment Tool Run Date Expected results Amarillo AM # EMAT 11 4/20/2018 9/13/2018 AM # Re-run of EMAT 11 11/6/2018 5/7/2019 AM #3 109 to Miss River EMAT 14 5/17/ /14/2018 OE #1 156 to 184 MFL 6 6/12/2018 9/11/2018 OE #1 156 to 184 AFD 6 8/14/ /4/2018 OE #1 154 to 111 MFL 6 6/7/2018 9/6/2018 Gulf Coast GC #3 302 to 303 AFD 26 5/8/2018 8/15/2018 GC #3 302 to 303 EMAT 26 5/10/ /8/2018 LA # 1 Cleaning 23/24 9/25/2018 9/25/2018 Start Date End Date Remediation AG # Remediation 15 9/4/2018 9/22/2018 AM # digs Remediation 11 9/15/2018 9/30/2018 AM #3 South of Sta 107 Highway Encroachment 13?? New HP Station ,900 HP Mars /1/2018 Station ,800 HP Mars /1/2018 Station ,150 HP Taurus 70 10/1/

19 2018 Remaining Projects with Potential Impacts Amarillo Sta 312 Sta 206a OE # AFD & MFL AFD expected in December MFL expected in September OE # MFL Expect results in September AM # EMAT Expect results in September AM # re-run of EMAT Scheduled for early Nov (1 day) AM # Remediation 5 digs To be complete late September 6 AM #3 109 Miss River EMAT EMAT expected in November 7 AM #3 station 107 Highway encroachment?? 19

20 2018 Remaining Projects with Potential Impacts Gulf Coast Sta 312 Sta 206a 1 AG # remediation Expected in September 2 GC # EMAT & AFD AFD expected late August EMAT expected in November 3 LA # Hub cleaning pig 1 day late September 1 New Sta 394 New HP New HP 2 3 New HP at stations: 394, 303, 301 Potential outage during installation 20

21 Winter Preparedness Compression Test run all compression units prior to expected colder weather demand. Storage Achieve market storage plan by November 1 st. Pipeline Maintain linepack targets by area Maintain throughput targets Maintain pressures for key areas Field ops to man key sites Scheduled Maintenance Limit planned maintenance activities to those required by regulation or policy Customer Communication NGPL posts system capacity and outage information NGPL scheduling representatives and Account Directors available for questions 21

22 NGPL 2018/2019 Contact List Gas Control Emer hr Trennis Curry Cell Bill Weidlein Cell Kenny Robbins Transport and Stor Services TSS Hotline 24 hr Richard Williams Cell Gene Nowak Cell Account Services Dave Weeks Cell Mary Limbaugh Cell Jim Brett Cell Field Operations Dee Bennett Director Cell Joe Mclaughlin VP Cell Ken Grubb COO Cell Cell Danny Ivy Cell Tom Dender Cell Houston TX Office Louisiana St Houston, TX Downers Grove IL Office Lacey Rd Suite 700 Downers Grove, IL