1 (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1

2 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY 3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION 4.0 PROJECT DESCRIPTION 4.0 AVAILABLITY OF RAW MATERIAL 5.0 SELECTION OF SITE & LOCATION OF STONE MINE 6.0 PLANNING BRIEF 7.0 EXISTING INFRASTRUCTURE 8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 9.0 PROJECT SCHEDULE & COST ESTIMATES 10.0 ANALYSIS OF PROPSAL (FINAL RECOMMENDATION) 2

3 1.0 INTRODUCTION 1.1 Preamble Ordinary Sand is base of all types of Building works, Construction of Road, Construction of Cement Concrete road, The need of Ordinary Sand is in all fields are very essential as it is a compulsory material for all types of construction, and Industries fields, Ordinary Mines are providing employments to the local Labour in Rural area, as the labour of rural area have no any work for labour, They are Unemployed, Thus this existing mine is providing work to many labours and it is a good employment. 2.0 Executive Summary JASHUBEN CHHAGANBHAI OAD is an existing mine, as the demand of construction material in all sectors are highly necessary, and This project is providing and trying to fulfil major demands of Ordinary Sand in complete around area. About hectare of land is under possession JASHUBEN CHHAGANBHAI OAD At, Village :Timba, Taluka : Kamrej, Dist : Surat. As per the statuary obligation this project needs environmental clearance from department of Environment and forest dept. ( GPCB) Gujarat. it is an existing lease and to renew and start quarrying operations (production) Accordingly project proponent has submitted form 1, pre-feasibility report and copy of Approval letter from department of mines and geology Gujarat, to the state level environmental assessment authority of Gujarat constituted by MOEF, GOI for issuing environmental clearance, as per EIA, January Introduction of the Project/Background information : 3.1 Name of the existing unit : JASHUBEN CHHAGANBHAI OAD Registered Office : JASHUBEN CHHAGANBHAI OAD At Post-Timba, 3

4 Ta- Kamrej Surat. Location of existing unit : Village : TIMBA, OPP. Sr no 179 To 182 Tapi Nadi Patt Pakiy, Taluka : Kamrej, Dist : Surat. (Gujarat) Name of Owner : JASHUBEN CHHAGANBHAI OAD 3.2 Brief description of nature of the project : It is an Ordinary Sand Quarrying, it contains Ordinary Sand which is used in construction of infrastructures and road, railways and building construction etc. 3.3 Demand - Supply Gap : As sand is used as raw material in construction of building and infrastructure projects, the demand of sand is increasing day by day. In past, demand was not too much but now a days due to rapid industrialization and urbanization its demand increasing with pace of time. At present, demand of sand and is more than the supply. 3.4 Imports vs. Indigenous Production : In Surat of Gujarat, a number of sand and mines are there. There is abundance of sand in the area; it had become a major source of economy in the area/region. 3.5 Export Possibility : There is ban on sand export to other states in the Gujarat by Govt. so export possibility of river sand from this area is marginal. Major consumers of sand located almost in nearby areas in the district. 4

5 3.6 Domestic / Export Markets : Sand produced is used locally as well as circulated in nearby area. So clearly there is a huge market of sand in the area. 3.7 Employment Generation (Direct and Indirect) due to the project : By this mining project of river sand in the area, peoples get employment, The project directly generates the employment for the local people and indirectly for the others. Also the marketing of the product generates the employment for peoples. By this project, approximately Skilled labours-3 and Unskillled-10 to 15 labours on project site. 4.0 Project Description : 4.1 Type of project including interlinked and interdependent project if any : No others material is interlinked with this mining work. 4.2 Location (map showing general location, specific location and project boundary & project site layout) with co-ordinates : The area has been marked on Google map including the mining lease location. This comprises the mining lease near village : Timba, Taluka : Kamrej, Dist :Surat of Gujarat location of the mining lease is as under. 5

6 6

7 The geographical location of the project is as follows : Latitude (N) 21 16'40.16"N Longitude (E) 73 6'27.49"E 4.3 Details of alternate sites, considered and the basis of selecting the existing site, particularly the environmental considerations gone into should be highlighted : No other site is considered for the existing project. The land has been allocated by government for the mining only. As sand in the river is replenished every year by river so, site is adequate for sand mining. 4.4 Size or magnitude of operation : B category manual. The existing Capacity / year is 1,55,000 TPA. Total area of mining lease is Ha. The mining operation will 1,55,000 Tonne Production of River sand per annum. 4.5 Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. is given below: Open cast mining OB removal Loading Transportation to end use 7

8 4.6 Raw material required along with estimated quantity, likely source, marketing area of final products. Mode of transport of raw materials And finished products : No raw material is required during the mining process. 4.7 Resource optimization / recycling and reuse envisaged in the project. If any, should be briefly outlined : As a result of extraction of mineral, the rate of recharging of ground water is likely to be increased considerably. 4.8 Availability of water its source, Energy/power requirement and source should be given : Total water requirement in the mine will be about 3.0 KLD for drinking & domestic use, dust suppression and plantation. Drinking water will be brought by water tanker from nearby village TIMBA. Diesel will be used in dumpers and tractors. Nearby village TIMBA is well electrified. 4.9 Quantity of wastes to generated (liquid and solid) and scheme for their Management/disposal : No waste will be generated. All the material is saleable Schematic representations of the feasibility drawing which give information of EIA purpose : According to MOEF mining project containing area 5 Ha. are considered in category B 2. Schematic representations of the feasibility is as under. 8

9 Project Concept and Site selection Form 1,Form 1M pre-feasibility project report with existing TOR to DEAC Scoping by DEAC (site visit by sub group of DEAC, if necessary Category B 2 - EIA not required Appraisal and recommended by DEAC Approval by DEIAA Display on the SPCB/UTPCC website & project proponent website 5.0 Site Analysis : 5.1 Connectivity : Mine site is well connected with road transport. Nearest railway station is at Bardoli Railway Station ( km) of mine site. State Highway S.H. No. 165 (1.63 km). Surat is the taluka center and all the primary facilities like education, health centres including hospitals govt. as well as private, religious places are available. District centre Surat is connected by state highway 165 and 1.63 km. away from lease area. 5.2 Land Form - Land use and land Ownership : 9

10 The area of lease is Ha. Land is Govt. land ( Tapi River Patt Paiky). The lease area forms part of Tapi River Patt Paiky No forest land is involved in leased area. Details are given in below table. S. Type of Area in Near Tehsil District State No. Land (Ha.) Village 1 Opp.Sr no. 179 To 182 Tapi Nadi Patt Paiky TIMBA Kamrej Surat Gujarat 5.3 Topography (Google image) : The lease area is situated of village TIMBA. Topographically, the area is almost flat & river bed area. 10

11 11

12 5.4 Existing land use pattern (agriculture, non -agriculture, forest, water bodies including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given: Nearest Sensitive Area Name Distance from the Project within 10 kms a) Reserve Forest None None b) National Park None None c) Wild life Sanctuary d) Eco sensitive None None areas e) Water source Ground water Map None None The project is located in seismic zone-iii. There is no flood. cloudburst and landslide reported so far. f) CRZ None None 5.5 Existing infrastructure : Mine office is an existing in lease area. A well equipped first aid facility is an existing to be available at there. Temporary rest shelter urinal and latrine are an existing. Water will be purchased from nearby tube 12

13 well from nearby villages. A small water tank also exists in mine office premises. This can be used for supply of water to drinking purposes. 5.6 Soil classification : Soil of the region falls within Average rain fall zone of mm. The soils are Blackish brown loamy soil. 5.7 Climatic data from secondary sources : Surat has a tropical climate. Throughout the year there is little rainfall in Surat. According to Köppen and Geiger climate is classified as As. The average annual temperature in Surat is 27.4 C. The average annual rainfall is 1539 mm. 5.8 Social Infrastructure available : N.A. 6.0 Planning Brief : 6.1 Planning Concept (type of industries, facilities, transportation etc.) Town and country planning development authority classification : No industries and town planning programmers in the existing area. 6.2 Population projection : No Human settlements near project area. 6.3 Land use planning (breakup along with green belt etc) : Details will be given in land use pattern of quarry plan. 6.4 Assessment of Infrastructure Demand (Physical & Social) : There is no large infra structure demand near to existing area. 6.5 Amenities / Facilities : Not applicable as it is a small project. 7.0 Existing Infrastructure : 7.1 Industrial Area (processing Area) : --NA-- 13

14 7.2 Residential Area (Non Processing Area) : --NA Green Belt : The plant is following the norms and is in process to developing 33% green belt in lease area. 7.4 Social Infrastructure : N.A Connectivity (Traffic and Transportation Road/Rail/Metro/Water ways etc) : Well connected with Road/Rail. No metro and water ways. 7.6 Drinking Water Management (Source & Supply of water) : Drinking water is procured from tube well existing nearby. 7.7 Sewage system : The domestic wastewater treat in the septic tank followed by soak pit. 7.8 Industrial waste management : --NA Solid waste management : --NA Power Requirement & Supply / Source : --N.A Rehabilitation and Resettlement (R & R) Plan : Policy to be adopted (Central / State) in respect of the project affected persons including home outstees, land outstees and landless labourers (a brief outline to be given) : --NA Project Schedule & Cost Estimates : 9.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given) : It is an existing project. 14

15 9.2 Estimated project cost along with analysis in terms of economic viability of the project : Project cost No. Particulars Amounts (Rs.) 1 Mining equipments 50,000/- 2 Tanker based trolley with Tractor 1,50,000/- Total 2,00,000/- The existing cost of the project is Rs. 2,00,000 and it is economically 10.0 Analysis of proposal (Final Recommendation) : Financial and social benefits with special emphasis on the benefit to the This project is creating employment potential for approximately about 10 to 15 local people. Thanks 15