1 Erection

2 BIOMASS-FIRED COMBINED HEAT AND POWER PLANT delivery and erection of 240 tons of steel structure, 2800 m2 of cladding, roofing, doors and windows and installation of ducts and technological equipment like: fuel storage and handling devices: 2xfuel conveyors, fuel screws, vibrating feeders and magnet separators combustion air devices: air ducts, air preheaters, dryers, compressors and all kind of fans boiler devices: start-up burner and valves, sight glasses etc. ash handling devices: rotary feeders, ash screws, pneumatic transmitters, ash conveyors and containers UUSIKAUPUNKI, FINLAND BIOMASS-FIRED COMBINED HEAT AND POWER PLANT steel structure delivery and erection including 160 tons of supporting and secondary steel, maintenance platforms and 1400 m2 of claddings (including doors, windows, ventilation grids), 270 m2 of isolated roof with drainage units and downpipes of a biomass fired heat and power plant EPINAL,FRANCE 1 Erection

3 PULP AND PAPER MILL delivery and erection of 500 tons of supporting steel structure, platforms, stainless steel handrails, wall cladding, roofing as well as mechanical erection of technological equipment and welding of ducts in the areas of a Dryer Building, Gasifier Building and Acid Sulphuric Plant at Metsä Fibre s pulp mill ÄÄNEKOSKI, FINLAND PULP AND PAPER MILL manufacturing, delivery and erection of complete steel support structure (incl. walking platforms, hoist beams, minor tank lifting) for new production line of bleached softwood kraft pulp in Timra, Sweden; works divided into 3 stages: Evaporation, Cooking and Fiberline; total weight of delivery is over 1000t and works are scheduled for period between February 2017 and January 2018 ÖSTRAND, SWEDEN Erection 2

4 BIOMASS-FIRED POWER PLANT steel structure deliveries and erection of two maintenance platforms, over 65 meter-long conveyor bridge and fuel as well as installation of the technology, ei. screw and chain conveyors that allow smooth flow of wood residues from storage building to boiler house TEMPLEBOROUGH, UK BIOMASS-FIRED COMBINED HEAT AND POWER PLANT steel structure delivery and erection including 110 tons of supporting and secondary steel, maintenance platforms and 1200 m2 of claddings (including doors, windows, ventilation grids), 270 m2 of isolated roof with drainage units and downpipes of a biomass fired heat and power plant SAINT DENIS, FRANCE 3 Erection

5 COMBINED HEAT AND POWER PLANT supply of flue gas catalytic denitrification and desulphurization installations for four boilers at CIECH Soda Polska S.A. combined heat and power plant. The scope of our works included: design services replacing and modification of technological equipment during boilers shout downs including: replacing of id-fans and motors, replacing of air pre-heaters together with heat baskets and modification of necessary installations, installation of dampers, modification of boilers walls production, delivery and erection of c a 700 tons of support steel structures for technological buildings and ca 290 tons of Absorber, 4 SCR reactors, Limestone silo, Lime silo, Emptying Tank and Flue Gas Ducts delivery and installation of technical insulation delivery and installation of cladding (sandwich wall elements and roof insulation with corrugated sheet) including windows, doors and gates m2 mechanical installation of technological equipment like conveyors, pumps, tanks and gears app 90 elements (50 tons) INOWROCLAW, POLAND WASTE WOOD COMBINED HEAT AND POWER PLANT erection of 800 tons of supporting steel structure, platforms and gratings at waste to energy power plant WIDNES, UK Erection 4

6 WASTE TO ENERGY POWER PLANT preassembly and assembly of 2 stacks; lamella separators erection inside the scrubbers; secondary steel structure modifications at FGT line; welding and delivery of platforms, painting services AMAGER, DENMARK WOODCHIP COMBINED HEAT AND POWER PLANT erection of 700 tons of supporting steel structure, platforms and gratings at waste to energy power plant SPEYSIDE,UK 5 Erection

7 PULP AND PAPER MILL dismantling of old and erection of new galleries, platforms and fuel handling equipment of fuel conveyors at the existing pulp fabrication plant SAINT GAUDENS, FRANCE PAPER PULP DRYER delivery and erection of 200 tons of supporting steel structure, gratings, handrails and mechanical assembly of the following components at the paper pulp dryer 60t of stainless ducts steam fans super heater 40t loop heater 48t steam cyclone 20t pumps, tanks, valves ROCKHAMMAR, SWEDEN Erection 6

8 MKL BAU sp. z o.o. Starzyńskiego Siedlce Poland mkl@mkl.pl EPC contracting Power sector Steel products Erection