Annual 2012 Asphalt Overlay Work Order Construction Contract Job No Solicitation No. B MR BID PROPOSAL. PROPOSAL OF, a corporation a

Size: px
Start display at page:

Download "Annual 2012 Asphalt Overlay Work Order Construction Contract Job No Solicitation No. B MR BID PROPOSAL. PROPOSAL OF, a corporation a"

Transcription

1 Job No Solicitation No. B MR BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned proposes to furnish all labor, materials, and equipment as specified and required to perform street maintenance construction and required appurtenances for the San Antonio Water System (SAWS) in accordance with the Plans and Specifications for the Annual 2012 Asphalt Overlay Work Order Construction Contract, Job No The undersigned acknowledges and understands that all projects are unspecified at the time of bidding, all quantities are estimated, and it is the intent of this proposal and the quantities herein to establish a unit price for various line items to be paid the Contractor by SAWS on an annual basis. No change in the unit price will be made, regardless of the actual quantity of the item of work performed. The work will be performed for the following prices to wit: EA Emergency Mobilization (24-Hour Response); EA Small Project Mobilization (900SF or less); C.Y. Excavation; per Cubic Yard BP-1

2 C.Y. Flexible Base (Compacted in place); per Cubic Yard GAL. Prime Coat; per Gallon ,577 GAL. Tack Coat; per Gallon ,000 S.Y. One Course Surface Treatment; 205.3A 750 S.Y. Hot Mix Asphaltic Pavement Type C (2 Compacted Depth); 205.3B 42,000 S.Y. Hot Mix Asphaltic Pavement Type C (3 Compacted Depth); BP-2

3 205.4A 233,770 S.Y. Hot Mix Asphaltic Pavement Type D (2 Compacted Depth) 205.4B 750 S.Y. Hot Mix Asphaltic Pavement Type D (3 Compacted Depth) C.Y. Asphalt Treated Base (Compacted in place); per Cubic Yard ,800 S.Y. Single Course Bituminous Slurry Seal; ,495 C.Y. Milling of Asphaltic Concrete Pavement (Salvaging, Hauling, and Stockpiling Reclaimable Asphaltic Pavements); per Cubic Yard S.Y. Replacing Base and Pavement with Asphalt Treated Base and Pavement (2 HMAC Type D over 6 ATB); BP-3

4 S.Y. Replacing Base and Pavement with Asphalt Treated Base and Pavement (2 HMAC Type D over 8 ATB); ,300 S.Y. Replacing Base and Pavement with Asphalt Treated Base and Pavement (3 HMAC Type C over 10 ATB); EA. Barricades, Signs, and Traffic Handling; HR Police Officer (Maximum Bid of $45.00 per HR); per Hour ,400 L.F. Hot Applied Thermoplastic Pavement Markings (4 Wide Yellow Line); BP-4

5 ,000 L.F. Hot Applied Thermoplastic Pavement Markings (4 Wide White Line); L.F. Hot Applied Thermoplastic Pavement Markings (8 Wide Yellow Line); L. F. Hot Applied Thermoplastic Pavement Markings (8 -Wide White Line); L.F. Hot Applied Thermoplastic Pavement Markings (12 Wide White Line); L.F. Hot Applied Thermoplastic Pavement Markings (16 Wide White Line); BP-5

6 ,200 L.F. Hot Applied Thermoplastic Pavement Markings (24 Wide White Line); EA. Hot Applied Thermoplastic Pavement Markings (Right White Arrow); EA. Hot Applied Thermoplastic Pavement Markings (Left White Arrow); EA. Hot Applied Thermoplastic Pavement Markings (Comb. Thru Right White Arrow); EA. Hot Applied Thermoplastic Pavement Markings (Comb. Thru Left White Arrow); BP-6

7 EA. Hot Applied Thermoplastic Pavement Markings (Word ONLY ); EA. Hot Applied Thermoplastic Pavement Markings (Straight White Arrow); EA. Hot Applied Thermoplastic Pavement Markings (Railroad Crossing Symbol, including two R s, crossbuck and 3 transverse bars); EA. Hot Applied Thermoplastic Pavement Markings (Wheelchair Sign); EA. Hot Applied Thermoplastic Pavement Markings (Bicycle Rider Symbol); BP-7

8 537 1,100 EA. Raised Pavement Markers (all types); LF. Vehicle Loop Detectors (Saw Cut); EA. Valve Box Adjustment; EA. Adjust Existing Manholes; ,000 SY Geogrid Reinforcement; BP-8

9 SF Painting Concrete Curbs; per Square Foot GAL Utra-Thin Bonded Hot Mix Wearing Course (Membrane) (Type A); per Gallon TON Utra-Thin Bonded Hot Mix Wearing Course (Asphalt) (PG 64-22) (Type A); per Ton TON Utra-Thin Bonded Hot Mix Wearing Course (Aggregate) (SAC A) (Type A); per Ton EA. VIVDS Processor System 1 channel; BP-9

10 EA. VIVDS Processor System 2 channel; EA. VIVDS Camera Assembly; EA. VIVDS Set-up System; LF VIVDS Communication Cable (Coaxial); BP-10

11 TOTAL BID $ DOLLARS AND CENTS BIDDER'S SIGNATURE & TITLE FIRM'S NAME(TYPE OR PRINT) FIRM'S ADDRESS FIRM S PHONE NO./FAX NO. FIRM S ADDRESS The Contractor herein acknowledges receipt of the following: Addendum Nos. OWNER RESERVES THE RIGHT TO ACCEPT THE OVERALL MOST RESPONSIBLE BID. The bidder offers to construct the Project in accordance with the Contract Documents for the contract price, and to complete the Project within 365 days from the notice to proceed date or until funds are exhausted from the contract, as set forth in the Authorization to Proceed. The bidder understands and accepts the provisions of the contract Documents relating to liquidated damages of the Project if not competed on time. Special Items are included in the SPECIAL CONDITIONS. Complete the additional requirements of the Proposal, which are included on the following pages. BP-11