1 Enclave at Black Point Marina Community Development District 1 st Supplemental Engineer s Report Infrastructure Improvements Prepared for Enclave at Black Point Marina Community Development District Board of Supervisors City of Doral Miami-Dade County, Florida Prepared by Alvarez Engineers, Inc NW 41 Street, Suite 103 Miami, FL Telephone Facsimile Address: Info@Alvarezeng.com April 17, 2017

2 4/17/2017 Alvarez Engineers, Inc. TABLE OF CONTENTS Narrative Page I. Introduction 1 II. Purpose of this 1 st Supplemental Engineer s Report... 1 III. Location of the District IV. Description of the Supplemental Public Improvements. 1 V. Estimated Schedule of Construction of the Public Security Systems.. 2 VI. Ownership and Maintenance... 2 VII. Estimate of Supplemental Public Improvements Costs 2 VIII. Engineer s Certification. 3 Appendix Exhibit 1. CDD Properties. 5 Exhibit 2. Miami-Dade County Properties. 6 Exhibit 3. Security Gates.. 7 Exhibit 4. Security Fence Location NW 41 Street, Suite 103, Doral, Florida Telephone (305) Fax (305) Info@AlvarezEng.com

3 4/17/2017 Alvarez Engineers, Inc. I. Introduction. Enclave at Black Point Marina Community Development District (the District or CDD ) was established by the adoption and enactment of Miami-Dade County Ordinance No on September 26, Such Ordinance became effective on October 6, In February of 2007 the CDD issued $3,380,000 in Special Assessment Bonds, Series 2007A and $7,790,000 in Series 2007B to partially finance the public infrastructure that supports the development within the boundaries of the District (the Original Public Improvements ). The Original Public Improvements, which are described in the Engineering Report prepared by Ford Engineers, Inc. dated October 17, 2006 (the Original Report ), consist of onsite roadway improvements, onsite stormwater management system, and water and sanitary sewer improvements. On February 5, 2014, Alvarez Engineers, Inc., the current District Engineer, certified the completion of the Original Public Improvements. As each of the components of the Original Public Improvements was completed, the CDD either conveyed the completed facilities to the County, or retained them for ownership and maintenance. As a result, the County now owns the onsite road right of ways, together with the roadway improvements, drainage, water and sewer facilities within. The District retained ownership of the two stormwater management lakes, a park and a landscaping tract. The County and the District-owned facilities are shown in Exhibits 1 and 2, respectively. The District is currently proposing to refund the outstanding Series 2007A Bonds through the issuance of its Special Assessment Refunding and Improvement Bonds, Series The District intends to use a portion of the debt service savings and proceeds from the bond refinancing to construct additional public infrastructure that will benefit the property within the District (the Supplemental Public Improvements ). The estimated construction costs of the Supplemental Public Improvements presented in this 1 st Supplemental Engineer s Report (the Report ) will be allocated to each of the residential units within the District in accordance with the proportional benefit received by each unit. This Report supplements the Original Report. Refer to the Second Supplemental Assessment Methodology Report prepared by Governmental Management Services-South Florida, LLC ( GMS ) for a description of the allocated benefits. II. Purpose of this 1 st Supplemental Engineer s Report. This Report was prepared for describing the Supplemental Public Improvements and to report their estimated construction costs, schedule of construction and ownership upon completion of construction. III. Location of the District The District is located in unincorporated Miami-Dade County and is bounded by State Road 821 ( Homestead Extension of Florida s Turnpike or HEFT ) on the west, Old Cutler Road (SW 224 St) on the north, Black Creek Canal C-1 and SW 104 Avenue on the east and SW 232 Street on the south. Refer to Exhibit 1. IV. Description of the Supplemental Public Improvements. The Supplemental Public Improvements consist of the installation of security soft gates at the entrance to the community at Old Cutler Road and the installation of a security fence along the eastern boundary of the District, adjacent to the Black Creek Canal and the FDOT Drainage Right of Way. These Supplemental Public Improvements are referred hereafter as the Public Security Systems. 1. Public Security System Project No. 1: Installation of entrance and exit arm gates at Old Cutler Road and SW 104 Avenue (Refer to Exhibit 3). This improvement requires modifications to the entry road and the installation of electrical and mechanical gates for monitoring vehicles entering the community. The gates system will have cameras for NW 41 Street, Suite 103, Doral, Florida Telephone (305) Fax (305) Info@AlvarezEng.com

4 4/17/2017 Alvarez Engineers, Inc. capturing pictures of the vehicle s driver and registration tag. It will also have a kiosk for communicating remotely with a guard via the internet. The gates, and related traffic study, were designed and produced by Caltran Engineering Group, Inc. 2. Public Security System Project No. 2: The proposed security fence consists of a six-foothigh chain link fence with black vinyl fabric and two pedestrian gates. The security fence will be installed along the westerly right of way line of Canal C-1 and north of the Florida Department of Transportation lateral drainage ditch right of way (Refer to Exhibit 4). V. Estimated Schedule of Construction of the Public Security Systems. Table 1 Work Description Begin Date End Date Project 1 Security Gates 2 nd Semester st Semester 2018 Project 2 Security Fence 2 nd Semester nd Semester 2017 VI. Ownership and Maintenance. The District will be responsible for the construction of the Public Security Systems and it will then retain the improvements for ownership and maintenance as follows: Table 2 Work Description Future Ownership Future Maintenance Project 1 Security Gates CDD CDD Project 2 Security Fence CDD CDD VII. Estimate of Supplemental Public Improvements Construction Costs. Estimates of hard, soft and permitting are presented below: ENTRANCE ROAD IMPROVEMENTS Table 3 Public Security Systems Estimate of Probable Construction Costs Description Quantity Unit Unit Price Total Clearing and Grubbing 760 SY $1.00 $ Excavation, Haul and Dispose 160 CY $20.00 $3, Relocate Palm Trees 3 EA $2, $6, Landscape and Irrigation 246 SY $10.00 $2,460 Remove Exist. Sidewalk 30 SY $6.00 $ Remove Exist. Curbs 230 LF $4.00 $ Sawcut Existing Asphalt 230 LF $1.00 $ Subgrade Stabilization 270 SY $1.50 $ Baserock 260 SY $10.00 $2, Mill 1 Asphalt 1,000 SY $5.00 $5, ACSC (1 st Lift) 245 SY $7.50 $1, ACSC (2 nd Lift) 1,245 SY $7.50 $9, Type F Curb and Gutter 230 LF $12.50 $2, NW 41 Street, Suite 103, Doral, Florida Telephone (305) Fax (305) Info@AlvarezEng.com

5 4/17/2017 Alvarez Engineers, Inc. Table 3 Public Security Systems Estimate of Probable Construction Costs Description Quantity Unit Unit Price Total 4 Thick Sidewalk 30 SY $30.00 $ Traffic Separator 11 SY $30.00 $ Signing and Striping 1,245 SY $2.00 $2, Survey 1,500 LS $1.00 $1, Maintenance of Traffic 1.00 LS $2, $2, Mobilization 1.00 LS $10, $10, Subtotal Entrance Road Improvements $54, SECURITY GATES Visual Gate Guard System (24 Hour Monitoring) 1.00 LS $24, $24, Barrier Arms 1.00 LS $24, $24, Access Control System for Residents 1.00 LS $6, $6, Access Control Credentials (350 Windshield Stickers) 1.00 LS $4, $4, Subtotal Security Gates $59, SECURITY FENCE 6 High Chain Link Fence (Two Pedestrian Gates Included) 1,400 LF $12.50 $17, Black Vinyl Fabric for 6 High Fence 1,400 LF $14.00 $19, Subtotal Security Fence $37, Subtotal Hard Costs (Road, Gates, Fence) $121, Soft Costs (Professional Services, Permit Fees, Etc.) 25 % $121, $30, Subtotal Hard and Soft Costs $151, Contingency Available % $250,000 $98, Grand Total $250, VIII. Engineer s Certification. It is our opinion that the proposed improvements constituting the Supplemental Public Improvements and their estimated costs are fair and reasonable, and that the property within the District will receive a special benefit equal to or greater than the cost of such improvements. We believe that the improvements can be permitted, constructed and installed at the costs described in this report. I hereby certify that the foregoing is a true and correct copy of the 1 st Supplemental Engineer's Report for the Enclave at Black Point Marina Community Development District. Juan R. Alvarez, PE Florida Registration No Alvarez Engineers, Inc. April 17, NW 41 Street, Suite 103, Doral, Florida Telephone (305) Fax (305) Info@AlvarezEng.com

6 4/17/2017 Alvarez Engineers, Inc. APPENDIX NW 41 Street, Suite 103, Doral, Florida Telephone (305) Fax (305)

7 FLORIDA'S TURNPIKE SW 104 PL SW 104 CT OLD CUTLER RD SW 224 TR (SW 224 ST) SW 225 TR SW 226 ST PARK SW 103 PSG BLACK CREEK CANAL C-1 FDOT DRAINAGE R/W SW 228 TR SW 229 LN LANDSCAPE TRACT SW 232 ST LEGEND REFER TO SPECIAL WARRANTY DEED ORB 25445, PG 1877 ALVAREZ ENGINEERS, INC. ENCLAVE AT BLACK POINT MARINA C.D.D. CDD PROPERTIES 0 50' 200' 400' EXHIBIT 1 4/10/2017 P:\ Enclave at Black Point Marina\Yearly reports\2017 Report\Cadd\Exhibits\EXHIBIT-01.dgn 5

8 FLORIDA'S TURNPIKE SW 104 PL SW 104 CT OLD CUTLER RD SW 224 TR (SW 224 ST) SW 225 TR SW 226 ST PARK SW 103 PSG BLACK CREEK CANAL C-1 FDOT DRAINAGE R/W LIFT STATION SW 228 TR SW 229 LN SW 232 ST LEGEND REFER TO PLAT PB165, PG 77 REFER TO ORB 27264, PG 4544 ALVAREZ ENGINEERS, INC. ENCLAVE AT BLACK POINT MARINA C.D.D. MIAMI-DADE COUNTY PROPERTIES 0 50' 200' 400' EXHIBIT 2 4/10/2017 P:\ Enclave at Black Point Marina\Yearly reports\2017 Report\Cadd\Exhibits\EXHIBIT-02.dgn 6

9 7

10 END SECURITY FENCE CDD BO UNDAR Y OL DCUT L ERRD SW 1 03 PS G BLAC CDD BO U N DARY SW 225 TR K CR EEK CANA SW 224 TR L C1 ) 4ST 2 SW 2 ( SW 226 ST SECURITY FENCE PARK O D B E V UN DA KE S TURNPI DA' FLORI A CD 4 10 W S RY W NAGER/ DOTDRAI F BEGIN SECURITY FENCE CDD BO U N DARY CDD BO U N DARY SW 228 TR SW 229 LN SW 104 CT SW 104 PL LANDSCAPE TRACT 2ST 3 SW 2 LEGEND REFER TO SPECIAL WARRANTY DEED ORB 25445, PG 1877 ALVAREZ ENGINEERS, INC. 0 50' 200' 400' ENCLAVE AT BLACK POINT MARINA C.D.D. CDD PROPERTIES 4 EXHIBIT 1 4/10/2017 P:\ Enclave at Black Point Marina\Yearly reports\2017 Report\Cadd\Exhibits\EXHIBIT-01.dgn 8