1 Water + Shelter + Power = Recovery + Relief & Rebuilding Communities

2 Mission Statement Provide, Safe Living Habitats for Families Impacted by Disasters, through rapid deployment of large scale emergency water treatment systems and emergency housing Solutions; that allow for life saving essentials and the tools to start the rebuilding process.

3 SLH uses reverse osmosis technology, considered the best way to purify to water Efficient and scalable, whether supporting a single facility or an entire community Reverse Osmosis Water Purification ROWPU systems purify brackish and can purify pure salt water The parts in a RO system are easy to maintain and replace, making them a reliable solution to improve water quality, for years to come

4 PHASE 1. AIR Deploy ROWPU and Ground Team Install Make Water ROWPU, are the ideal hardware for disaster situations. Quality, high volume, water treatment equipment; combined with specialist operations team supporting operational deployment. Disaster situations require critical personnel to ensure clean water needs are met All units will come with critical support team featuring: Dedicated Team of Military veterans specializing in water purification & disaster relief situations OSHA safety manager ensuring safety and site coordination during rapid deployment Professional US-based and Local logistics team

5 Purchase and Deployment cost of Water Relief System A. Commercial ROWPU Cost B. Commercial ROWPU Deployment Cost ONE 15,000 *GPD Brackish Water $25,000 One 9,000 *GPD Brackish Water $20,000 One 4,700 *GPD Salt Water $40,000 5x3,000 Gallon Bladder Tanks $10,000 Chemicals & fittings $ 5,000 Generators 10kw-15-20kw $15,000 Transport to Miami for Flight $15,000 Total $130,000 OPTION 1 Send on next cargo flight-skype training technician for qualified local operations Transport logistics to Puerto Rico $20,000 Operational Management $30,000 Water Specialist Team 6@2 weeks Travel-Food $16,500 Lodging $ 7,000 Fuel $ 8,100 Total $81,600 Full Deployment to Puerto Rico Grand total A&B $211,600 OPTION 2 Land all resources in Puerto Rico become operational After 15 days deployment per day cost $3,200 =$.11PG At capacity 28,700GPD 30days = $.11 PG 60 =.05 PG 90 =.03 PG *GPD-GALLONS PER DAY

6 Phase One Full Deployment $211,600 Approve Budget Purchase units Air Deploy With Team Pump Water 28,000GPD Save Lives

7 RECOMMENDATIONS With the purchase and deployment of the first 3 commercial units with ground team - clean lifegiving water will flow within days of acquisition and help the process of rebuilding lives Water Relief Systems Complete Operational Deployment

8 Phase One is Underway Our Proposal Phase Two Water + Shelter + Power = Recovery + Relief & Rebuilding Communities

9 WATER SOLUTIONS Military-Grade High Capacity Water Treatment ROWPU Able to convert both brackish and sea water 60,000 gallons of fresh water conversion per day 40,000 gallons of sea water conversion per day 60KW max demand powergen equipped 19,000 thousand gallon bladder bag storage 10 Person Team-Military trained water treatment and deployment specialists Two units and team ready to deploy immediately

10 Deployment Lease Operations Cost of Water Relief System days Two 60,000 GPD Brackish, Or 40,000 Salt Water ROWPU Total Cost 2x10,000 Gallon Bladder Storage 6x3,000 Gallon Bladder Storage Chemicals Transport logistics Operational Management 10 Specialists (30 day of Operations) *120,000 Gallons Per Day at capacity Full deployment operations at capacity 120,000GPD = $.19 PG 3.6 Million GPMonth Water Specialist Team Installations-Operations & Local Training 10 specialist 30day deployment Total $500,000 Additional 30day deployed $195,000 = $.07PG

11 Phase Two Military ROWPU $500,000 Ground team Preps new site Military ROWPU Mobilization Pump Water 120,000GPD Save Lives

12 Safe Living Habitat Logistical Support Our Team of specialists are trained on the deployment and operations of ROWPU s. We provide an experienced ground team in prepping the water site, maintaining equipment, operations and provide qualified training of local civilians. Ensuring qualified and safe local operating of commercial ROWPU post disaster situations. All essentials for ROWPU production (Genpower, chemicals, transport logistics, distribution equipment, bladder storage, 2-5 gallon flat pack water bags, are deployed.

13 Ground Team Logistics Site Preparation Ground Team Objectives Local assets site identification and pre-preparation Site survey and begin preparations Clear and smooth site for drive in access Work area 35x70 FT Clear path to water source Clear work area above raw water source Level surface for bladder storage Deploy ROWPU max 200ft from water source Water pump station A water depth minimum of 3ft from bottom of source to allow strainer (depth of 5ft is preffered)

14 Total System Deployment With Ground Team Logistics Fully Operational Deployment 4.4million gallon a month ROWPU Systems and Ground team $ 711,000 = 4.4million gallons per month - $.16 cent a gallon

15 Moving Community Forward Well-known and widely used reverse osmosis technology is very efficient in small to large scale deployment All forms are mobile and can be moved to help the most needy whether brackish water or sea water available For such challenging disaster situations, military grade equipment and personnel ready for initial and long term set up For Further Information:

16 ADDITIONAL GROUND EQUIPTMENT OPTIONS UNIMOG MULTI UTILITY DIESEL POWERED Front Loader Backhoe - Post Hole Attachment OSHKOSH HEMTT DIESEL POWERED - ALLISON AUTOMATIC TRANSMISSION Trailer - Knuckle-Boom-Crane Landed with Drivers Total $125,000