Lynas Environmental Management

Size: px
Start display at page:

Download "Lynas Environmental Management"

Transcription

1 Lynas Environmental Management

2 Lynas Occupational and Environmental Safety and Health Management Systems Hazards and risks regulated primarily by the AELB, DOE and DOSH Management involves hazards identification, Risks assessment, Risks Control and Continuous Improvements Management involves: Regulatory control through license conditions Regulators audits and inspections Third party audit and monitoring Self-regulations Recognition by peers, stakeholders and independent parties Recognition by peers and stakeholders Third Party Monitoring Regulatory Compliance Safety and Health at LAMP and the environment Self Regulation by Lynas Regulatory Monitoring

3 Lynas is compliant with its License Conditions FOSL TOL 1st (2 yrs) FOSL 2 nd (2 yrs) FOSL 3 rd FOSL (3 yrs) [50 major conditions] 78 EIA AC Conditions Routine audits and inspection by DOE/3 rd party EIA Routine audits inspections by AELB NOT under CIMAH regulations Routine inspection by DOSH OSH others MBK, MOH etc Inspections

4 Safety, Health and Environmental Management Lynas implements TWO Environmental Management Systems: RADIOLOGICAL and NON-RADIOLOGICAL 4

5 Radiation Safety and Health Management (RSHM) at LAMP RSHM is an integral and important part of the overall SHES Systems at the LAMP Radiation Safety and Health Radiation Protection Program (adopts RSMS and OHSAS 18001) 1. Occupational exposure 2. AMS AELB FOSL conditions Public and environmental exposure and impact Carried out by 3 rd party AELB regulatory Monitoring and Audit

6 Monitoring Programs - radiation Radiation: 4 types of monitoring programs by Lynas: a) Occupational Exposure Monitoring Program, b) Environmental Radiation Monitoring Program, c) Aerosol Monitoring System and d) AELB monitoring Lynas monitoring is carried out by 3 rd party consultant accredited by the AELB up to 20 km Real time and online monitoring using AMS located at LAMP and Kuantan AELB independent monitoring Lynas self regulatory monitoring Data available on line, and reported routinely. (The web address is: To date Lynas carried out 43 environmental and occupational monitoring

7 Monitoring is carried out independently by the regulators and 3 rd party and Lynas Monitoring Programs - environment Environmental: 3 rd party audit and inspection approved by DOE DOE routine regulatory inspection Lynas carries out it own monitoring and inspections Data presented on-line and display on digital board located at gate 1 for public to view Monitoring Monitoring frequency Vendor Monitoring, YTD (Jan,2010,2018) Ambient air Monthly PERMULAB 91 Balok River Monthly PERMULAB 91 Groundwater Monthly PERMULAB 91 Noise level Monthly PERMULAB 91 Stack sampling Half- yearly PERMULAB 17 Final Discharge Point Daily Weekly ESM 2, (starts 2011) Storm Retention Pond Daily Weekly ESM 2, (starts 2011) Sewerage Treatment Plant Weekly ESM 342 (starts 2012)

8 PERFORMANCES

9 Lynas is ISO certified with 3 integrated certifications Our Operational Standards align with International Standards for Safety, Environment, Quality and Social Responsibility Lynas Malaysia Sdn. Bhd. accredited with worldclass certifications by Bureau Veritas and NIOSH Certification Sdn Bhd: 1. Occupational Health and Safety Management Systems - OHSAS 18001: Environmental Management Systems- ISO 14001: Quality Management Systems - ISO 9001:2015 9

10 RADIATION PERFORMANCE

11 43 monitoring from showed NO radiological impact to public and environment Work Section Off-site of LAMP Critical Group External Radiation (msv/year) 222 Rn (msv/year) 220 Rn (msv/year) Dust (msv/year) 238 U 232 Th Total Dose (msv/year) 1 km workers working at adjacent plants km Public 10 km Public 20 km Public Permissible Limit for public = 1 msv per year; Permissible Limit for radiation workers = 20 msv per year NOTE: Dose values given an overestimate, MDL values were used for values less than MDL in calculating doses 1

12 2012 (1st 2013 (2nd Round) 2013 (3rd Round) 2013 (4th Round) 2013 (5th Round) 2013 (6th Round) 2013 (7th Round) 2013 (8th Round) 2013 (9th Round) 2013 (10th 2013 (11th 2013 (12th 2013 (13th 2014 (14th Round) 2014 (15th 2014 (16th Round) 2014 (17th Round) 2014 (18th Round) 2014 (19th Round) 2014 (20th Round) 2014 (21th Round) 2014 (22th Nov 2014 (1st Round) 2015 (2nd Round) 2015 (3rd Round) 2015 (4th Round) 2015 (5th Round) 2015 (6th 2015 (7th 2016 (8th Round) 2016 (9th Round) 2016 (10th Round) 2016 (11th Round) 2016 (12th 2016 (13th 2017 (14th Round) 2017 (15th Round) 2017 (16th Round) 2017 (7th Round) 2017 (18th 2017 (19th 2018 (20th Round) 2018 (21st Round) msv/year NO change in External Radiation Dose Rates since LAMP started operation 4 External Radiation msv/year (Excluding Background) 3.5 Genting Highland = 3.4 msv/year Offsite LAMP - 1 km Offsite LAMP - 5 km Public Dose Limit = 1mSv/year Offsite LAMP - 10 km Offsite LAMP - 20 km 0.5 Spikes at distances further than 5 km from LAMP indicates higher radiation levels 0 Environmental Radiological Monitoring Program (ERMP)

13 1/10/2012 1/12/2012 1/02/2013 1/04/2013 1/06/2013 1/08/2013 1/10/2013 1/12/2013 1/02/2014 1/04/2014 1/06/2014 1/08/2014 1/10/2014 1/12/2014 1/02/2015 1/04/2015 1/06/2015 1/08/2015 1/10/2015 1/12/2015 1/02/2016 1/04/2016 1/06/2016 1/08/2016 1/10/2016 1/12/2016 1/02/2017 1/04/2017 1/06/2017 1/08/2017 1/10/2017 1/12/2017 1/02/2018 1/04/2018 1/06/2018 NO CHANGE in Radon-Thoron levels since LAMP started operation Radon-Thoron (EEC) Measured by AMS at the LAMP & IPD AELB occupational limits: Radon = Bq/m 3 Thoron = 330 Bq/m 3 Radon 222 EEC LAMP (Radon) Radon 220 EEC LAMP (Thoron) Radon 222 EEC IPD (Radon) Radon 220 EEC IPD (Thoron) Bq/m Radon 220 Background Radon 222 Background Monitoring Date

14 ENVIRONMENTAL PERFORMANCE 1

15 Envirnmental Monitoring Frequency Monitoring Monitoring Monitoring, YTD Vendor frequency (Jan,2010,2018) Ambient air Monthly PERMULAB 91 Balok River Monthly PERMULAB 91 Groundwater Monthly PERMULAB 91 Noise level Monthly PERMULAB 91 Stack sampling Half- yearly PERMULAB 17 Final Discharge Point Daily Weekly ESM 2, (starts 2011) Storm Retention Pond Daily ESM 2,795 Sewerage Treatment Plant Weekly 394 (starts 2011) Weekly ESM 342 (starts 2012) 15

16 ph MONITORING TREATED EFFLUENT DISCHARGED Effluent ph ph Lower Limit Upper Limit

17 mg/l MONITORING TREATED EFFLUENT DISCHARGED Total Suspended Solid (TSS) SS Limit

18 mg/l MONITORING TREATED EFFLUENT DISCHARGED Effluent Chemical Oxygen Demand (COD) COD Limit

19 19 MONITORING TREATED EFFLUENT DISCHARGED mg/l Iron (Fe) Fe Limit

20 mg/l MONITORING TREATED EFFLUENT DISCHARGED Manganese (Mn) Mn limit Lynas has improved and rectified this issue

21 RADIATION AND RADIOACTIVITY IN PERSPECTIVE 2

22 Comparison Between Radioactivity in Amang (Tin Tailing) and Lynas NORM Material Typical Radioactivity (ppm) Uranium thorium Lynas NORM Lyas residue is comparabe References Lanthanide concentrate (3000 samples) WLP (ERMP 13-19) Amang Lynas Raw tailing Monazite Zenotime Zircon Alnour et al. (2017) AIP Conference Proceedings Ilmenite Waste

23 Lynas is DIFFERENT from Asia Rare Earth, Bukit Merah Lynas Asia Rare Earth Remark Raw Material Thorium content in raw material Thorium Concentration in residue Ore from Mt Weld, Australia Tin mining tailing (amang) Malaysia 0.16 % 6 % ARE is 37.5 x higher than Lynas % 10 % ARE is 60 x higher than Lynas 23

24 General Radiation Exposure relative to exposure from Lynas Operation Normal Human Activity Annual Exposure (msv/y) Dose to lungs from smoking a pack of cigarette daily 150 Yearly dose to airline crew 9 Medical or dental X-ray > 0.39 Doses from Background radiation: Worldwide average Kerala coast, India Norther Iran (Ramsar, Iran) Lynas operation: a. Workers at WLP RSF (radiation workers) b. I km away (public) Permissible Dose Limit for Radiation Workers Permissible Dose Limits for members of the public Background

25 WLP Residue Storage Facility is designed and constructed to meet PDF standards RAISES OF CONTROLLED FILL PLACED AND TRAFFIC COMPACTED WLP RESIDUE EROSION PROTECTION EXISTING GROUND LEVEL CONTROLLED FILL DUAL LINER SYSTEM EXISTING GROUND LEVEL CLAY LINER POLYETHYLENE (HDPE) LINER SCARIFY AND RECOMPACT DETAIL The RSF is built on top (not excavated!!) Dual liner consists of a 300 mm low permeability compacted clay liner overlaid with a 1.0 mm thick HDPE liner -25-