1 Environental Copliance Audit Report 5 Kloof Extension 15 and 21 Housing Project, ethekwini Municipality Report Prepared for ethekwini Municipality Huan Settleents Unit Report Nuber /AR05 Report Prepared by August 2017

2 SRK Consulting: : Audit Report 05 Page i Environental Copliance Audit Report 5 - Kloof Extension 15 and 21 Housing Project, ethekwini Municipality ethekwini Municipality Huan Settleents Unit SRK Consulting (South Africa) (Pty) Ltd. Section A Second Floor, Suite 02/B1 Norfolk House 54 Norfolk Terrace, off Blair Atholl Drive Westville 3630 South Africa e-ail: Durban@srk.co.za website: Tel: +27 (0) Fax:+27 (0) SRK Project Nuber August 2017 Copiled by: Mr. T. Nebula Environental Scientist Eail: tnebula@srk.co.za Authors: Reviewed by: Mrs. P. Bureister Pr. Sci. Nat. Principal Environental Scientist Mr. N. Brien Pr. Eng. Partner Mr. T. Nebula; Mrs. P. Bureister. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

3 SRK Consulting: : Audit Report 05 Page ii Table of Contents 1 Introduction Details of the EAP Purpose and Scope Methodology Approach Consultation Assuptions and uncertainties Audit Findings Site Office (Access, Materials Storage, Waste Manageent, spill prevention, fire prevention, staff conduct) Dust Soil Erosion Sensitive Areas General Conclusions and Recoendations Appendices Appendix 1: EAP Declaration Appendix 2: EAP CV s Appendix 3: Updated Relocation Plan Appendix 4: Stor Water Manageent Plan Appendix 5: Verified Map showing Relocation of Phase 1 houses List of Tables Table 2-1: Drafters of the EMPr... 1 NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

4 SRK Consulting: : Audit Report 05 Page 1 1 Introduction The ethekwini Municipality Huan Settleents Unit (ethekwini) is in the process of undertaking the Kloof Extension 15 and 21 Housing Upgrade developent project. An Environental Authorisation (EA) was granted for this project on 11 August The Authorisation requites that environental copliance onitoring be undertaken during the construction phase. An independent qualified Environental Control Officer (ECO) is required to undertake environental copliance onitoring for the duration of the construction phase. 2 Details of the EAP Table 2-1 provides inforation on the copilers of this docuent and their related experience. Table 2-1: Drafters of the EMPr Nae Qualifications Years of experience Philippa Bureister Pr. Sci. Nat. B.Sc. (Hons) Environental Sciences 15 years Taaryn Hale B.Sc. (Hons) Environental Sciences 10 years Thula Nebula B.Soc.Sci. Counity Developent 4 years The EAP declaration is attached at Appendix 1 while the CV s of the tea are included at Appendix 2. 3 Purpose and Scope The purpose of the audit was to deterine copliance with the EA, EMPr and Section 19(1) (B) Directive fro the Departent of Water and Sanitation (DWS). This report provides a suary of the findings for the Environental Copliance site audits, undertaken on 12 July 2017 and 28 July 2017, and any issues identified. As noted in the previous audit report (July 2017), the scope of the site visit included the setup of the construction cap and site clearance for Phase 1 of the Kloof Extension 15 and 21 Housing Upgrade Developent Project. The environental site inspections were undertaken by Mrs. P. Bureister and Mr. T. Nebula of SRK, Mr. S. Masango of ethekwini Municipality and Ms. K. Naidoo and Mr. Suyesh Naidoo of Shula Construction. 4 Methodology 4.1 Approach The SRK approach included the following tasks: Conducting site visits on 12 July 2017 and 28 July Auditing the site based on the checklist copiled that is based on the requireents of the EA, EMPr and Section 19(1) (B) Directive fro DWS. Preparing a report docuenting the findings of the audit, observations ade while on site, and recoendations ade to address on-going issues. 4.2 Consultation A coplaints register is aintained on site. Coents fro Interested and Affected Party s (I&AP s) are recorded therein. No coents have been received to date. 4.3 Assuptions and uncertainties The findings, conclusions and recoendations provided in this Audit Report are based on the Auditor s legal and professional knowledge and inforation ade available to the auditor and NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

5 SRK Consulting: : Audit Report 05 Page 2 observations ade during the site visits. Although due care and diligence has been exercised in rendering services and preparing docuents, no liability is accepted as a result of use of the inforation contained in this docuent. In particular no liability is accepted for consequences should recoendations contained in this report not be ipleented. This audit report ust not be altered or added to without the prior written consent of the auditor. This also refers to electronic copies of this Audit Report. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

6 SRK Consulting: : Audit Report 05 Page 3 5 Audit Findings The findings fro the site audits and action ites required to itigate non-conforances, where required, are provided in the sub-sections below. 5.1 Site Office (Access, Materials Storage, Waste Manageent, spill prevention, fire prevention, staff conduct) Requireent Finding Notes Action Photograph The location of underground These conditions No non-conforances None required. None required. services, developent have been adhered noted. exclusion zone, and choice to. of access routes during construction, use of existing access roads and iniising disturbance to surrounding areas. (Condition of the EMPr). Copilation of an Environental Site Manageent Plan (ESMP) in consultation with the ECO. The ESMP has been copiled and saved in the environental file. No non-conforances noted. None required None required. (Condition of the EMPr). NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

7 SRK Consulting: : Audit Report 05 Page 4 Setting up of the construction cap. Storage areas will be appropriately secured to reduce the opportunity for criinal activity. All relevant Health and Safety legislation will be strictly adhered to including the Occupational Health & Safety Act, 1993 (Act No. 85 of 1993). A full Occupational Health and Safety Prograe will be developed and ipleented. Construction caps ust be situated away fro any adjacent properties and at a iniu distance of 50 away fro any watercourses, wetlands or drainage lines. As noted in the previous audit, the following still reains: The construction cap has been established and fenced with a controlled access point (refer to Plate 1). The fencing includes shade cloth that will act as a protection against wind for the waste storage areas used during construction. The cap is located on the only piece of Municipal owned land that was clear, easily accessible to all four phases of the project and not affected by the construction. Health and safety protocol and signage has been observed during the audit site inspection. No non-conforances were noted. As noted in the previous audit, the construction cap is secured thereby reducing the opportunity for criinal activity. The entrance to the construction site cap has been oved to the south for better access of the achinery (refer to Plate 1). No nonconforances were noted. All relevant health and safety requireents to be continuously adhered to.. Plate 1: Security controlled entrance to the construction site cap has oved to the south for better access of achinery. Location of the construction cap ust be negotiated and agreed upon by the holder of the EA, the contractor and ECO. (Conditions and of the EMPr and 3.3.2, 3.3.3, 3.3.5, 3.3.7, 3.11 and 3.12 of the EA) NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

8 SRK Consulting: : Audit Report 05 Page 5 Requireent Finding Notes Action Photograph Provision of toilet facilities The Containerised All staff ebers on site None required. for staff. Ablution Block (CAB) have access to the that was installed on Containerised Ablution (Conditions of the the ain site office Block (CAB) at the ain EMPr and Condition 3.13 of has now been site office (refer to plate the EA). connected to the 2). There are also two existing sewer CAB s observed on site pipeline located for the use of outside the counities, which the construction cap site, and therefore there s been no need for cheical toilets on site. construction staff ebers also have access to at their convenience. No non-conforances were noted. Plate 2: Containerised Ablution Block (CAB) (container on the left). Manageent of hazardous aterials. A Spill Contingency Plan (SCP) ust be copiled. (Conditions of the EMPr and 3.16 and 3.29 of the EA). As noted in the previous audit, all hazardous aterials will be stored in a locked container and a L above ground diesel tank will be installed within the construction cap site. The diesel tank will be within a bunded area to cater for a spill. A spill kit is available in the site office, a copy of the SCP is in the environental file kept in the site office and a list of hazardous aterials on site is kept on the wall in the site office A diesel tank trailer has been placed in a bunded area in the construction cap site office. It is noted that the diesel tank is obile and gets taken off site to refuel. Because it is obile it is not possible to copletely enclose the bunded area. Therefore, it has been recoended that the bunded area be constructed such that the floor slopes towards the back of the bunded area and includes a speed bup. This is to ensure that in the event of a spill the bunded area will be able to contain the spill. The bunded area is currently being Plate 4: A secure bunded area is currently being reconstructed in such a way that the floor slopes towards the back. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

9 SRK Consulting: : Audit Report 05 Page 6 Requireent Finding Notes Action Photograph Ceent batching on reconstructed (refer to A larger shutter-board is site was observed to plate 4) recoended during be done on a saller No non-conforances ceent ixing, to avoid Shatter-board. were noted. spills. The Containated soil should be dug out and Ceent batching on site be disposed of at an was observed to be done appropriate waste on a saller shutterboard and ceent spills were noted. A larger shutter-board has been anageent facility. recoended to be used to avoid spills (refer to plate 5) A inor nonconforance has been noted Plate 5: Ceent spills noted during batching on site Education of site staff on general and environental conduct (Conditions of the EMPr and 3.9 of the EA). Set up of Waste Manageent Procedures (Condition of the EMPr). As noted in the previous audit, Construction has coenced and the ain access road is being established. As noted in the previous audit, the set-up of the waste storage area has coenced with provision of a container for future storage of hazardous waste and drus for general waste. No hazardous waste has as yet been noted. Proof of staff inductions is provided in the environental file kept in the site office. No nonconforances were noted. The Contractor confired that rubble fro site clearance is loaded directly into ethekwini Durban Solid Waste (DSW) trucks for reoval and felled trees are being stockpiled for the counity to collect and use (refer to Plates 5). It was noted by the contractor that ost of the site has been cleared to date and as such there is inial disposal occurring at present. None required. Contractor to establish waste anageent areas in accordance with the EMPr. None required. Plate 5: DWS waybill showing proof of waste disposal at a registered facility. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

10 SRK Consulting: : Audit Report 05 Page 7 Requireent Finding Notes Action Photograph The waste anageent syste will be continuously reviewed in the upcoing site inspections. 5.2 Dust No non-conforances were noted. Requireent Finding Notes Action Photograph Production of dust and daage caused by dust will be liited through regular watering of the work areas (Condition of the EMPr). As noted fro the previous audit, the Contractor has anaged to use their water tanker fro another site for soil wetting to this site to iniise dust (refer to Plate 6). As noted in the previous audit, the whole of Phase 1 has been cleared and as such there is a large area of exposed soil. Sourcing raw water for construction and dust suppression is noted as a constraint as an abstraction point has yet to be identified by ethekwini in agreeent with DWS. The Contractor is currently aking use of an established abstraction point. It is however far fro the site resulting in increased costs and tie delays. Regular dust suppression spraying was however observed despite the issues (refer to Plate 6). No non-conforances were noted. Contractor to continue with regular watering of the work areas on site. ethekwini is to identify a closer water abstraction point in consultation with DWS. Plate 6: Soil wetting by the Contractor s Water Tanker to suppress dust on site. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

11 SRK Consulting: : Audit Report 05 Page Soil Erosion Requireent Finding Notes Action Photograph Iediately ahead of construction the developent area will be stripped and topsoil stockpiled. Works will be coordinated to liit unnecessarily prolonged exposure of stripped areas and stockpiles. Wind screening and stor water control will be undertaken to prevent soil loss. A foral stor water syste will be designed will be ipleented. (Conditions 5.1.5, 5.1.6, and of the EMPr and 3.31 and 3.39 of the EA) As noted fro the previous audit, the whole of Phase 1 has been cleared of vegetation and inforal structures. Soil copaction in the establishent of the platfors and roads has liited soil erosion and significant erosion has not been observed during site visits (refer to Plate 7). The Construction and Operation Stor Water Manageent Plan (SWMP) has been updated and sent to the departent of EDTEA and DWS, as a result to avoid a household that has been constructed along the pipeline to the discharge point. As noted in the previous audit report, the reason for the extensive clearing is twofold. Firstly, there are social issues with the counity that required the developable area to be cleared to avoid people returning to portions of the site during the construction phase. Secondly, it is not financially viable to keep a TLB on site for the duration of the construction phase. No non-conforance was noted. As noted in the previous audit report, the bers and grading of the site will not create sufficient stor water control and additional echaniss of stor water anageent were discussed with the Contractor. No nonconforance was noted. The Contractor, in consultation with the ethekwini Municipality and wetland specialist, ust ipleent ore foral stor water anageent easures to itigate the potential for soil erosion. This is particularly iportant as the site slopes north to the wetland and should a stor event occur the wetland could potentially be affected. Ipleentation of the updated SWMP will need to be prioritised. Plate 7: Current overview of the graded site and construction of platfors with no soil erosion. Construction of a sewage line is currently being constructed (refer to Plate 8). Plate 8: Overview of the construction of the sewage line A SWMP ust be copiled, reviewed by the DWS, approved by the ethekwini Coastal and Storwater Departent prior to An updated SWMP has been required to avoid a household that has been constructed along the pipeline to the discharge point. The updated The updated SWMP has been subitted to EDTEA and DWS. No noted. non-conforance None required. None required. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

12 SRK Consulting: : Audit Report 05 Page 9 Requireent Finding Notes Action Photograph coenceent construction. of (Condition and 3.4 of the EA) 5.4 Sensitive Areas SWMP has been subitted to EDTEA and DWS. Requireent Finding Notes Action Photograph Access to wetlands and riparian areas will be restricted. Wetland areas, buffers and other ecologically sensitive areas to be cordoned off with danger tape. (Conditions 5.1.1, and of the EMPr; Conditions 3.3.4, of the EA; and Condition 2 of the DWS Section 19(1)(B) Directive). As noted in the previous audit reports, that the counity was using the site as a vehicular access route and the counity has created a vehicle access point along the northern boundary of the site gaining access to the wetland. The concern noted in the previous audit regarding the relocated houses fro phase 1, into the wetland boundary, has been verified by the surveyor findings. There are fifteen (15) houses within the wetland buffer and only forty seven (47) houses outside the wetland buffer, (refer to appendix 5). There are however approxiately 120 beneficiary households in Phase 1. The dwellings established outside the wetland buffer will be used to ove people into, for the other phases. To prevent access to the wetland, the contractor has installed danger tape along the boundary of the access road and along the edge of the wetland buffer area (refer to the yellow arrows in Plate 8). Furtherore, concrete bollards have been placed at the ain entrance to the site thereby preventing access to the site and ergo access to the wetland (refer to Plate 9). These itigation easure appear to have liited vehicle access to the site and then through the wetland. Relocation of hoes into the wetland buffer is considered a ajor non-conforance ethekwini is to consult with Departent of Environental Planning & Cliate Protection Departent. (EPCPD) regarding an acceptable way forward with regards to the fifteen (15) houses within the wetland buffer. Plate 8: Danger tape placed fro the edge of the wetland and also 20 fro the edge of the wetland buffer NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

13 SRK Consulting: : Audit Report 05 Page 10 Requireent Finding Notes Action Photograph Sensitive trees to be arked with danger tape. (Condition of the EMPr). No sensitive trees were identified on site. As noted fro the previous audit, a total of 60 trees for Phase 1 will be reoved (refer to Plate 10) for an exaple of cleared trees). Trees eararked for reoval were arked with spray paint and trees reaining were not arked. No non-conforances noted. None required. Plate 9: Concrete bollards restricting access to the site and access to the wetland along the northern boundary of the site Plate 10: Trees cleared fro site 5.5 General Requireent Finding Notes Action Photograph Local labour and contractors to be used where possible. Local labour has been eployed. No non-conforances were noted. None required. None required. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

14 SRK Consulting: : Audit Report 05 Page 11 Requireent Finding Notes Action Photograph Counity Liaison Officer (CLO) to be appointed. An incident/ coplaints register will be housed at the site office and anaged by the CLO. (Condition of the EMPr) The ethekwini Municipality ust notify every registered interested and affected party, in writing and within fourteen 14 calendar days fro date of the Departent's decision A CLO has been appointed. An incidents/ coplaints register had been copiled and is in the environental file in the site office and no incidents have been noted to date. Proof of notification was provided in Audit 1. No non-conforances were noted. None required. None required. (Condition 3.2 of the EA). The EMPr is to be updated and subitted to the Departent of Econoic Developent, Touris and Environental Authorisation (EDTEA) for approval prior to coenceent of construction. The following aendents are required: Method stateent for the water crossings (Condition of the EA). Approved SMP (Condition of the EA). Water Use License / Directive fro the DWS dated 19 April 2016 (Condition of the EA). Relocation Plan (Condition of the EA) Construction has coenced, in the for of site clearance and establishent of services and platfors. An updated EMPr was subitted to the EDTEA on the 26 th of June 2017 for approval. The Method stateents have been reviewed by the ECO and saved on the Environental file. Approval of the EMPr subitted to the EDTEA on the 26 th of June 2017 is awaited. As per the concern noted in the previous audit, with regards to the verification of the relocated houses fro phase 1 into the wetland boundary. The findings have been verified by the surveyor. There are fifteen (15) houses within the wetland buffer and only forty seven (47) houses outside the wetland buffer. It should also be noted that there are approxiately 120 beneficiary households for Phase 1. This is considered a ajor non-conforance. ethekwini is to consult with Departent of Environental Planning & Cliate Protection Departent. (EPCPD) regarding an acceptable way forward. None required. The Relocation Plan subitted during the Basic Assessent Process required aending during the ipleentation thereof (refer to Appendix 3 for a copy of the revised plan). The counity fro Phase 1 were not teporarily relocated to a transit cap (refer to updated RAP for explanations) and as such were provided with aterials to construct teporary dwellings within Phases 3 and 4 of the project. The location of these new hoes have been verified by the surveyor s findings. Fifteen NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

15 SRK Consulting: : Audit Report 05 Page 12 Requireent Finding Notes Action Photograph The EMPr and EA ust be kept on site during all phases of the developent. (Conditions and of the EA) Not less than seven (7) days written notice ust be given to the EDTEA that the construction phase will coence. (Conditions 3.6 of the EA) The EA holder ust coply with the National Water Act, 1998 (Act No. 36 of 1998) and contact the DWS to obtain a water use license prior to the coenceent of construction (Conditions 3.33 of the EA) Design and ipleent a onitoring prograe with iediate effect to onitor the ipact of the proposed activity on the surface water, groundwater and wetlands. (Condition 4 of the DWS Section 19(1)(B) Directive). (15) houses are within the wetland buffer and forty seven outside the wetland buffer (refer to ap in Appendix 5 ) A copy of the draft EMPr is in the file kept in the site office. Approval of the EMPr subitted to the EDTEA on the 26 th of June 2017 is awaited. The letter of notification was subitted to the EDTEA and proof of subission included in Audit Report 1. A Section 19 (1)(B) directive was issued by the DWS for the site. A copy is kept in the file kept in the site office. As noted in the previous audit, a onitoring prograe is yet to be finalised and ipleented. Once approved, as noted above, the EMPr in the Environental file on site will need to be replaced. No non-conforances were noted. EMPr to be replaced once approved. None required. None. None required. None required. No non-conforances were noted. None required. None required. Monitoring has not been ipleented, as noted in the previous audit. There is unrestricted access to the wetlands and activity in the wetland area has increased as an indirect result of the construction activities. It is iperative that a onitoring prograe be established. This considered a ajor non-conforance ethekwini Municipality ust finalise and ipleent the onitoring prograe. None required NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

16 SRK Consulting: : Audit Report 05 Page 13 6 Conclusions and Recoendations Prior to and during the audit site inspection the following inor non-conforances with the EMPr, EA and Section 19(1)(B) Directive were recorded: Ceent spills were noted during ceent batching on the construction site. Prior to and during the audit site inspection the following ajor non-conforances with the EMPr, EA and Section 19(1)(B) Directive were recorded: There is no onitoring prograe in place to onitor the ipact of the proposed activity on the surface water, groundwater and wetlands. There are fifteen (15) houses noted as being relocated into the wetland buffer and forty-seven (47) houses outside the wetland buffer. Progress on the following actions required will be assessed at the next audit site visit. Prepared by Mr. T. Nebula Environental Scientist Reviewed by Mrs. P. Bureister Pr. Sci. Nat. Principal Environental Scientist Mr. N. Brien Pr. Eng. Project Reviewer NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

17 SRK Consulting: : Audit Report 05 Page 14 All data used as source aterial plus the text, tables, figures, and attachents of this docuent have been reviewed and prepared in accordance with generally accepted professional engineering and environental practices. NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

18 SRK Consulting: : Audit Report 05 Page 15 Appendices NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

19 SRK Consulting: : Audit Report 05 Page 16 Appendix 1: EAP Declaration NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

20 Declaration of interest by EAP DETAILS OF EAP AND DECLARATION OF INTEREST EIA File Reference Nuber: NEAS Reference Nuber: Waste Manageent Licence Nuber: (if applicable) Date Received: (For official use only) Application for environental authorisation in ters of the National Environental Manageent Act, 1998 (Act No. 107 of 1998) and the Environental Ipact Assessent Regulations, 2014 PROJECT TITLE Proposed Kloof Extension 15 and 21 Housing Project Environental SRK Consulting (South Africa)(Pty) Ltd Assessent Practitioner (EAP): 1 Contact person: Mrs. P. Bureister Pr. Sci. Nat. Postal address: PO Box 1969, Westville Postal code: 3630 Cell: Telephone: Fax: E-ail: pbureister@srk.co.za Professional affiliation(s) (if any) SACNASP; IAIAsa Project Consultant: Contact person: Postal address: Postal code: Telephone: E-ail: Cell: Fax: Leading the attainent of inclusive growth for job creation and econoic sustenance Page 1 of 3

21 Declaration of interest by EAP 4.2 The Environental Assessent Practitioner I,, declare that General declaration: PHILIPPA BURMEISTER I will coply with the requireents for EAPs as stipulated in Regulation 13(1) of the EIA Regulations, 2014; I act as the independent environental practitioner in this application I will perfor the work relating to the application in an objective anner, even if this results in views and findings that are not favourable to the applicant I declare that there are no circustances that ay coproise y objectivity in perforing such work; I have expertise in conducting environental ipact assessents, including knowledge of the Act, regulations and any guidelines that have relevance to the proposed activity; I will coply with the Act, regulations and all other applicable legislation; I have no, and will not engage in, conflicting interests in the undertaking of the activity; I undertake to disclose to the applicant and the copetent authority all aterial inforation in y possession that reasonably has or ay have the potential of influencing - any decision to be taken with respect to the application by the copetent authority; and - the objectivity of any report, plan or docuent to be prepared by yself for subission to the copetent authority; I will ensure that inforation containing all relevant facts in respect of the application is distributed or ade available to interested and affected parties and the public and that participation by interested and affected parties is facilitated in such a anner that all interested and affected parties will be provided with a reasonable opportunity to participate and to provide coents on docuents that are produced to support the application; I will ensure that the coents of all interested and affected parties are considered and recorded in reports that are subitted to the copetent authority in respect of the application, provided that coents that are ade by interested and affected parties in respect of a final report that will be subitted to the copetent authority ay be attached to the report without further aendent to the report; I will keep a register of all interested and affected parties that participated in a public participation process; and I will provide the copetent authority with access to all inforation at y disposal regarding the application, whether such inforation is favourable to the applicant or not all the particulars furnished by e in this for are true and correct; will perfor all other obligations as expected fro an environental assessent practitioner in ters of the Regulations; and I a aware that a person is guilty of an offence in ters of Regulation 48 (1) of the EIA Regulations, 2014, if that person provides incorrect or isleading inforation. A person who is convicted of an offence in ters of subregulation 48(1) (a)-(e) is liable to the penalties as conteplated in section 49B(1) of the National Environental Manageent Act, 1998 (Act 107 of 1998) Leading the attainent of inclusive growth for job creation and econoic sustenance Page 2 of 3

22 Declaration of interest by EAP Disclosure of Vested Interest (delete whichever is not applicable) I do not have and will not have any vested interest (either business, financial, personal or other) in the proposed activity proceeding other than reuneration for work perfored in ters of the Environental Ipact Assessent Regulations, 2014; I have a vested interest in the proposed activity proceeding, such vested interest being: Signature of the environental assessent practitioner: SRK CONSULTING Nae of copany: 12 APRIL 2016 Date: Leading the attainent of inclusive growth for job creation and econoic sustenance Page 3 of 3

23 Declaration of interest by EAP DETAILS OF EAP AND DECLARATION OF INTEREST EIA File Reference Nuber: NEAS Reference Nuber: Waste Manageent Licence Nuber: (if applicable) Date Received: (For official use only) Application for environental authorisation in ters of the National Environental Manageent Act, 1998 (Act No. 107 of 1998) and the Environental Ipact Assessent Regulations, 2014 PROJECT TITLE Proposed Kloof Extension 15 and 21 Housing Project Environental SRK Consulting (South Africa)(Pty) Ltd Assessent Practitioner (EAP): 1 Contact person: Mrs. T. Hale Postal address: PO Box 1969, Westville Postal code: 3630 Cell: Telephone: Fax: E-ail: thale@srk.co.za Professional affiliation(s) (if any) IAIAsa Project Consultant: Contact person: Postal address: Postal code: Telephone: E-ail: Cell: Fax: Leading the attainent of inclusive growth for job creation and econoic sustenance Page 1 of 3

24 Declaration of interest by EAP 4.2 The Environental Assessent Practitioner I,, declare that General declaration: TAMARYN HALE I will coply with the requireents for EAPs as stipulated in Regulation 13(1) of the EIA Regulations, 2014; I act as the independent environental practitioner in this application I will perfor the work relating to the application in an objective anner, even if this results in views and findings that are not favourable to the applicant I declare that there are no circustances that ay coproise y objectivity in perforing such work; I have expertise in conducting environental ipact assessents, including knowledge of the Act, regulations and any guidelines that have relevance to the proposed activity; I will coply with the Act, regulations and all other applicable legislation; I have no, and will not engage in, conflicting interests in the undertaking of the activity; I undertake to disclose to the applicant and the copetent authority all aterial inforation in y possession that reasonably has or ay have the potential of influencing - any decision to be taken with respect to the application by the copetent authority; and - the objectivity of any report, plan or docuent to be prepared by yself for subission to the copetent authority; I will ensure that inforation containing all relevant facts in respect of the application is distributed or ade available to interested and affected parties and the public and that participation by interested and affected parties is facilitated in such a anner that all interested and affected parties will be provided with a reasonable opportunity to participate and to provide coents on docuents that are produced to support the application; I will ensure that the coents of all interested and affected parties are considered and recorded in reports that are subitted to the copetent authority in respect of the application, provided that coents that are ade by interested and affected parties in respect of a final report that will be subitted to the copetent authority ay be attached to the report without further aendent to the report; I will keep a register of all interested and affected parties that participated in a public participation process; and I will provide the copetent authority with access to all inforation at y disposal regarding the application, whether such inforation is favourable to the applicant or not all the particulars furnished by e in this for are true and correct; will perfor all other obligations as expected fro an environental assessent practitioner in ters of the Regulations; and I a aware that a person is guilty of an offence in ters of Regulation 48 (1) of the EIA Regulations, 2014, if that person provides incorrect or isleading inforation. A person who is convicted of an offence in ters of subregulation 48(1) (a)-(e) is liable to the penalties as conteplated in section 49B(1) of the National Environental Manageent Act, 1998 (Act 107 of 1998) Leading the attainent of inclusive growth for job creation and econoic sustenance Page 2 of 3

25 Declaration of interest by EAP Disclosure of Vested Interest (delete whichever is not applicable) I do not have and will not have any vested interest (either business, financial, personal or other) in the proposed activity proceeding other than reuneration for work perfored in ters of the Environental Ipact Assessent Regulations, 2014; I have a vested interest in the proposed activity proceeding, such vested interest being: Signature of the environental assessent practitioner: SRK CONSULTING Nae of copany: 12 APRIL 2016 Date: Leading the attainent of inclusive growth for job creation and econoic sustenance Page 3 of 3

26 SRK Consulting: : Audit Report 05 Page 17 Appendix 2: EAP CV s NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

27 Resue Philippa Bureister (Eanuel) Principal Scientist Profession Education Registrations/ Affiliations Environental Science International Qualification, Environental Auditing, Aspects International, 2010 Dip, Project Manageent, Varsity College, 2008 BSc (Hons), Environental Science, Rhodes University, Grahastown, 2002 Pr Sci Nat, South Africa, /08 Meber of the South African Affiliate, International Association of Ipact Assessors Specialisation Philippa is a visionary thought leader in sustainability. Philippa partners with business to identify and execute innovative sustainability solutions to strategic resource challenges. Philippa specialises in large and sall scale sustainability assessent. This includes the use of a range of integrated environental anageent tools, listed below. The focus of her work is the identification of environental opportunities and constraints leading to the sustainable use of natural resources to efficiently eet socio-econoic needs. This includes auditing and the developent of environental anageent systes for existing developents. Expertise Philippa ais to change the perception of sustainability fro a requireent to an asset that business ay realise through the ipleentation of strategic planning and alternatives. Philippa has been involved in integrated environental anageent for the past 14 years. Her expertise includes: environental process anageent; environental ipact assessent; strategic environental assessent; strategic (unicipal or large scale) and project specific environental anageent plans; preparation of environental anageent fraeworks; land use planning with a focus on environental opportunity and constraint apping; developent of sustainability fraeworks and sustainability appraisal; preparation and auditing of environental anageent systes (ISO 14001) and environental anageent prograes. Eployent 2009 present SRK Consulting (Pty) Ltd, Senior Scientist, Environental Departent, Durban SRK Consulting (Pty) Ltd, Scientist, Environental Departent, Pieteraritzburg Udidi Environental Planning & Developent Consultants, Environental Planner Publications A nuber of publications on environental anageent. See list on the following page Languages English read, write, speak (Excellent) Afrikaans read, write, speak (Fair) Burp/Oar SRKZA_DBN_BureisterP_Feb_2017.docx_QR February 2017

28 Resue Taaryn Hale Environental Scientist Profession Education Registrations/ Affiliations Environental Scientist Aspects International Environental Auditors Course, IEMA, 2012 Cert, Bookkeeping, Varsity College, 2010 Cert, Financial Accounting, Varsity College, 2010 BSc (Hons), Environental Sciences, University of KwaZulu-Natal, 2007 BSc, Biological Sciences, University of KwaZulu-Natal, 2006 International Association of Ipact Assessent South Africa (IAIAsa) Specialisation Environental anageent; environental auditing and copliance; stakeholder engageent and water use authorisations. Expertise Tay has been involved in the field of environental anageent for the past 8 years. Her expertise include: integrated water use licenses and water use licenses for ining, linear and industrial developents; environental ipact assessents for ining, linear developents, petrol service stations and fertiliser plants; basic assessents for powerlines and substations, linear developents, waste facilities, housing estates, ixed use nodes, retireent villages and ceeteries; construction environental audits for industrial site developent; developent facilitation act applications and planning policy forulation; and stakeholder engageent. Eployent 2010 present SRK Consulting (Pty) Ltd, Environental Scientist, Durban Udidi Project Developent Consultants, Environental Planner, Pieteraritzburg Golder Associates, Public Participation Assistant, Durban Languages English read, write, speak (Excellent) Afrikaans read, write, speak (Fair) Halt/Oar SRKZA_DBN_HaleT_Feb_2017.docx_QR February 2017

29 SRK Consulting: : Audit Report 05 Page 18 Appendix 3: Updated Relocation Plan NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

30

31

32 SRK Consulting: : Audit Report 05 Page 19 Appendix 4: Updated Stor Water Manageent Plan NEMT/BURP _Kloof Ext_Audit Report 5_Final_ _Signed August 2017

33 WC WC689 WC722 WC697 WC : UPVC 4 O FL 3 32 D LI N E S G.P.O.CABLES S.A.R. CABLES OIL PIPE LINE X V Contract No: S258 0 S256A S Project Title: LOW LEVEL CROSSING WC S WC600 S VE 23 ER S AD RE RO D A RO 2 2 CURVE STORMWATER CONCRETE CHANNEL 0.7 STORMWATER CONCRETE CHANNEL NOTE: WC E.S.C. CABLES 4 GABION CHANNEL WITH GEOFABRICS 32 S253 SEWERS 2 CURVE STORMWATER CONCRETE CHANNEL ELECTRIC CABLES QZ O PUBLIC OPEN SPACE UNDERGROUND SERVICES CHECKED 2 CURVE STORMWATER CONCRETE CHANNEL S252A WATER MAINS 31 WC WC UE VEN R8 321 R ND CO SE U EN AV V 3 ER AD RO D RES A RO R WC HDUPVC WC WC689 WC WC WC WC663 QZ UPVC QZ107 LINE FLOOD PUBLIC OPEN SPACE 1:100 YEAR E WC WC WC Y X X WD WC649 VC UP HD WD375 WD WC WC WD209 WD068 WD301 XX WD011 WD150 UP X X WC946 WD206 VC WD WD314 HD WD VE 3 ER AD RO D RES A RO 34 R R1 0 ROAD 3 8 ROAD RESERV E R6 STORMWATER NOTES 1) ALL STORMWATER PIPES TO BE CONCRETE SPIGOT & SOCKET UNLESS OTHERWISE STATED. 2) ALL PIPE BEDDING TO BE CLASS B UNLESS OTHERWISE SHOWN. 3) ALL MANHOLE COVERS IN THE ROAD RESERVE TO BE HEAVY DUTY PRECAST CONCRETE COVERS. 3) ALL MANHOLE COVERS IN THE MIDBLOCK TO BE LIGHT DUTY PRECAST CONCRETE COVERS. 4) FOR CONSTRUCTION OF SWD MANHOLES REFER TO D.C. STANDARD DRAWING NUMBERS; 38570, 38571, AND SEWER NOTES 31 1) ALL SEWER PIPES TO BE 160 Ø UPVC CLASS 34 UNLESS OTHERWISE SHOWN. 2) ALL SEWER MANHOLES TO BE Ø PRECAST RING MANHOLES. 3) ALL MANHOLE COVERS IN THE ROAD RESERVE TO BE HEAVY DUTY PRECAST CONCRETE COVERS. 4) ALL MANHOLE COVERS IN THE MIDBLOCK TO BE LIGHT DUTY PRECAST CONCRETE COVERS. 5) MINIMUM COVER TO PIPES: - THE MINIMUM ALLOWABLE DEPTH OF COVER TO THE OUTSIDE OF THE BARREL OF PIPE IS AS FOLLOWS: 6) UNDERGROUND SERVICES TO BE PROVEN ON SITE PRIOR TO ANY EXCAVATIONS. 7) REFER TO DC. STANDARD DRAWING NUMBERS 38570, & FOR SEWER MANHOLE CONSTRUCTION. i) SERVITUDES ii) IN SIDEWALKS BELOW FINAL KERB LEVEL. III) CARRIAGEWAYS - 1.2M BELOW FINAL CONSTRUCTED LEVEL. Sheets 2 of Date... Sign Sheet: Drawing No WD LIN D QZ WD QZ110 QZ WD482 O FL 333 WC686 PUBLIC OPEN SPACE QZ O AR YE XX 00 1:1 WC QZ WC WC WD WC717 WC WC WC QZ QZ QZ116 QZ115 WD WC522 WC606 WC648 X WC667 WC595 WC731 WC768 WC WC X E UPVC WC QZ117 QZ A.M.Peters POINT ODLINE O EAR FL 1:100 Y S HW S251 S298B MH79A S298A QZ MH79 S298A S298 WC MH78B S297 R CONCRETE CHUTE TIE-IN AT ANGLE 45 CONCRETE CHUTE TIE-IN AT ANGLE 45 CONCRETE CHUTE TIE-IN AT ANGLE 45 2 CURVE STORMWATER CONCRETE CHANNEL RENO MATTRESS PROTECTION PVC COATED ON A4 BIDIM OR SIMILAR APPROVED S HW77 S250 S249 S248 MH CP S S304 S296 S S286A AR YE S291 S S S246 S282 S282A S247 S S S295 MH78A S QZ S CP VE S S QZ109 QZ WC QZ ROAD 22 8 R O AD RE SERVE G6 8 S S300 MH75A NA ROAD 21 6 ROAD RESER RVE S ROAD 20 6 ROAD RESE S285A G S S299 R S306 S290 S S281A RVE ROAD 18 6 ROAD RESE S279 G9 ROAD 19 6 ROAD RESER VE WC N10 R R S287 S S328 S327 CP R S S278 G WC CP73 G G WC S326 S277 S WC717 WC WC755 S WC CP34 MH35 EA ALO S151 CP36 S153A S158A 34 WC809 S MH S273 S Head : Engineering QZ PUBLIC OPEN SPACE WD QZ119 QZ121 QZ122 WD S WD QZ124 DL VC HDUP WD512 WD542 WD557 WD567 WD S QZ OO FL WD S QZ130 QZ QZ AR YE WD WD629 WD G8 344 QZ WD :1 00 INE 321 WD S218B 343 WD153 QZ127 QZ QZ129 QZ126 MK WD572 WD Reference: 329 PUBLIC OPEN SPACE WD597 WD689 WD MK685 MF431 WD : MK684 MF430 MF X X WD PVC HDU MK683 MF MH S HDUPVC WD186 WD246 MK MK682 MF427 WD TG WD VE WC888 WC953 WC970 WD030 WD128 WD083 WD151 WD227 WD267 VC UP HD MF426 WD ROAD 16 6 ROAD RESER S268 S269 S244 CONCRETE CHUTE TIE-IN AT ANGLE 45 X WD125 WD215 C 160 HDUPV 0 15 MF425 WD R S267 G CONCRETE CHUTE TIE-IN AT ANGLE 45 WD Drawn: SHEET LOCALITY PLAN WD RETICULATION NOTES UPV C S S S243 S242A S 359 CONTRACTOR TO CONTACT THE ENGINEER IMMEDIATELY, SHOULD THERE BE ANY CLASHES WITH ANY OF THE SERVICES CONTRACTOR TO CHECK ALL THE TIE IN MANHOLE POSITIONS AND INVERTS BEFORE COMMENCING CONSTRUCTION, TO REPORT ANY PROBLEMS TO THE ENGINEER IMMEDIATELY THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND PROTECTING ALL EXISTING SERVICES ON SITE THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE WORKS FROM SURFACE WATER RUNOFF THAT MAY CAUSE EROSION DAMAGE, USING CHANNELS, BERNS, PUMPS etc, AS AND WHEN REQUIRED ALL ELECTRICAL LINES AND INSTALLATIONS ARE TO BE TREATED AS LIVE EXERCISE EXTREME CAUTION WHILST WORKING WITHIN THE VICINITY OF OTHER SERVICES. THE ETHEKWINI MUNICIPALITY STANDARD DETAIL DRAWINGS ARE TO BE ADHERED TO. SOUTH AFRICAN ROAD TRAFFIC SIGN MANUAL IS TO BE EXERCISED AT ALL TIMES. REMOVAL AND PLANTING OF ALL FLORA IS TO BE CARRIED OUT UNDER THE SUPERVISION OF the engineer. SURVEY AND SETTING OUT INFORMATION IS BASED ON WGS 84 HARTEBEESPOORT 317 S218A G S242B AN EV 335 FOR CONSTRUCTION 315 S S222 R8 S ROAD 15 6 ROAD RESER VE R STORMWATER LAYOUT WD Manager: Developent Engineering 336 SIGNATURE DATE SERVICE 01/11/2013 RV GENERAL NOTES 329 S S264 S S259 S260 S242 C WD S217 S ROAD 17 8 ROAD RESERVE S R8 S263 G S241 PV U D Drawing Title: H 351 S218 CP S195 S224 G S S S R10 S196 0 S228 S233 S261 S230A S WD MH S197 S S S S S MH92 S R1 MH S232 S QZ112 S S210 MH93 WD S164 MH CP CP S S MH43 S198 S200 S199 S QZ113 S208 ROAD 4 VE D RESER 6 ROA S212A Y Y Y S163 S112 MH CP S237 S236 S207 S S S230 S205 6 ABANDONED SEWER S Deputy Head: Developent Engineering S S168 S R1 2 MH52 0 R1 S202 S203 S204 6 R MH CROSS SECTIONS QZ117 S Y Y KLOOF EXT 15 AND 21 PHASE 3 WD X S ROAD R O AD RESE RVE S81 S82 MH63 CP53 R QZ WD Y Y UPVC Date: Designed: HARMONY Scales: 338 S.W.DRAINS 31 3 Only underground services affected by new construction work are shown.care ust be taken during excavations for road foundations,trenches etc...to avoid daage to underground services such as sewers, drains, cables, water ains and connections. Wherever possible these ust be located before work proceeds. 311 Engineer DATE Description Date NORTH Acquisitions copleted NA Checked: 319 UPV C Y Y NOTE:No construction work to coence until land and servitude acquisitions have been copleted Revision WD UPVC Y Y Y Y VC UPVC 160 R1 318 CP S114 S115A CP S CP MH QZ118 UPVC HW REDUCED PLAN USE SCALE BELOW S CONTINUED FROM S98A S104 ABANDONED SEWER S85 MH56 S83 ROAD 4 6 R O A D R ESER VE S MH S PUBLIC OPEN SPACE SURVEY LAYOUT S99 S100 QZ S115 S WD S RO AD R UP R8 R SHEET NO. DWG. NO. PLAN DESCRIPTION DI NK EL MA N R R RO OAD AD 1 RE 4 SE RV E ROAD 1 8 ROAD RES ERVE ROAD 1 8 ROAD RES ERVE ON ORIGINAL PLAN VE RD3 0 RO ROA AD D RE 1 SE R TYPICAL CROSS SECTION R CONTINUED ON R10 ESE RVE ENGINEERING UNIT DEVELOPMENT ENGINEERING R10 AD R 6 R O 150 FC 316 E