Spokane Regional Clean Air Agency (SRCAA) Consolidated Fee Schedule

Size: px
Start display at page:

Download "Spokane Regional Clean Air Agency (SRCAA) Consolidated Fee Schedule"

Transcription

1 Spokane Regional Clean Air Agency (SRCAA) Consolidated Fee Schedule Adopted: September 1, 2011 Most Recent Revision: January 4, 2018 Effective: March 1, 2018 Listed in chronological order by Section number as referenced in SRCAA Regulation I C - Asbestos-Containing Waste Material Temporary Storage Permit Asbestos-Containing Waste Material Temporary Storage Permit application fee: $ (B) - Annual Registration Registration Fee Categories Fee Fee Applicability Facility Fee $264 Per Source Emissions Fee $83 Per Ton Emission Point Fee $83 Per Stack/Point Synthetic Minor Fee $1,988 Per Source 10.06(C) Annual Air Operating Permit 10.06(C)(1)(a) Annual base fee: $3,000; 10.06(C)(1)(b) 10.06(C)(1)(c) Emission fee: $58 per ton of actual emissions from the previous calendar year; Agency time fee: The time fee is determined by the following formula: TF I (H = Where, I + H G H ) x RPC T TF I is the Agency time fee for AOP source, I; H I is the total Agency staff hours spent on AOP source, not including time spent on Notice of Construction application reviews, I; Consolidated Fee Schedule - Page 1

2 H G is the total general hours Agency staff spent on the AOP program divided by the total number of sources subject to the AOP program during any portion of the calendar year; RPC is the remaining Agency AOP program cost, calculated by subtracting the sum of the Section 10.06(C)(1)(a) and (b) fees from the total Agency AOP program costs; and H T is the total number of hours Agency staff spent on the AOP program, including total time spent on the AOP sources and general hours spent on the AOP program. Note: H I, H G, H T, and RPC are for the most recent Agency fiscal year. Note: H I, H G, and H T are obtained from Agency time accounting records (C)(1)(d) AOP Program Cost Correction: Cost Correction is determined by the following formula: PCC I = AOP Program Cumulative Deficit or Surplus x F I F T Where, PCC I is the AOP Program Cost Correction assessed to each AOP source, I; AOP Program Cumulative Deficit or Surplus is the cumulative financial deficit or surplus for Agency s AOP program at the end of the most recent SRCAA fiscal year; F I is the total individual fee assessed pursuant to Sections 10.06(C)(1)(a), (b), and (c); and F T is the sum of all the individual fees assessed pursuant to Sections 10.06(C)(1)(a), (b), and (c) (C)(1)(e) Share of the assessment by Ecology pursuant to RCW (3): The share of Ecology assessment is determined by the following formula: FI xa I = FT Where, E I is the individual share of the assessment; Consolidated Fee Schedule - Page 2

3 F I is the total individual fee assessed pursuant to Sections 10.06(C)(1)(a), (b), and (c); A E is the total Ecology assessment pursuant to RCW (3); and F T is the sum of all the individual fees assessed pursuant to Sections 10.06(C)(1)(a), (b), and (c). 10.6(C)(2)(a) (C)(2)(a)2. For affected units under Section 404 of the Federal Clean Air Act, an hourly AOP Acid Deposition Fee of $108 will be assessed for time expended in carrying out the fee eligible activities specified in RCW Share of the assessment by Ecology pursuant to RCW (3): The share of the Ecology assessment is determined by the following formula: FI xa I = FT Where, E I is the individual share of the assessment; F I is the total individual fee assessed pursuant to Section 10.06(C)(2)(a); A E is the total Ecology assessment pursuant to RCW (3); and F T is the sum of all the individual fees assessed pursuant to Section 10.06(C)(2)(a) of the fee schedule Notice of Construction (NOC) and Notice of Intent (NOI) 10.07(A)(1) Base Fee Class I Notice of Intent Includes Article IV, Exhibit R Category Asphalt plant 15 $1,000 Concrete batch plant / ready mix plant 22 $1,000 Rock crusher 36 $1,000 Class II Simple NOC (conforms to template, minimal off-site impact evaluation) Includes Article IV, Exhibit R Category Boiler and other fuel burning equipment 27 $2,290 Coffee Roaster 20 $2,290 Consolidated Fee Schedule - Page 3

4 Concrete batch plant / ready mix plant (for first time operation of temporary / portable sources.) 22 $1,250 Concrete batch plant / ready mix plant 22 $2,290 Dry cleaner 23 $2,290 Emergency generator 52 $2,290 Gasoline dispensing facility 28 $2,290 Lithographic printing / screen printing 9.e.5 $2,290 Material handling / transfer that exhausts >1, $2,290 acfm Rock crusher (for first time operation of temporary / portable sources.) 36 $1,250 Rock crusher 36 $2,290 Spray booth / surface coating operation 57 $2,290 Stationary internal combustion engine 53 $2,290 Sterilizer 9.e.8 $2,290 Stump / wood-waste grinder 54 $2,290 Class III Standard NOC (no template, minimal off-site impact evaluation) Includes Article IV, Exhibit R Category Soil and groundwater remediation operation 9.e.7 $3,525 Burn-out oven 43 $3,525 Chrome plating 35 $3,525 Incinerator / crematory 31 $3,525 Class IV Complex NOC (no template, more complex off-site impact evaluation) Includes Article IV, Exhibit R Category Asphalt plant (for first time operation of temporary / portable sources.) 15 $1,250 Asphalt plant 15 $5,700 Composting 21 $5,700 Refuse systems 48 $5,700 Rendering 49 $5,700 Sewerage systems 50 $5,700 For sources not listed above, the Control Officer will assign a Class at his/her discretion (A)(2) for Changes to Order of Approval or Permission to Operate Revision Minimum Fee, includes first three hours of review time $294 Revision Hourly Rate, charged after first three hours of review time $98 / hr Consolidated Fee Schedule - Page 4

5 10.07(A)(3) Additional (added to the Base Fee [10.07(A)(1)], if applicable) SEPA review $500 Toxics review SQER $620 Dispersion modeling $1,250 Advanced modeling $1,900 NSPS review 40 CFR Part 60, Subpart $450 OOO 1 Other 2 $600 NESHAP review 40 CFR Part 63, Subpart M, N & T 3 $1,250 Other $2,525 BACT review Generic $175 Non-generic $625 Top-down $3,200 1 Non-metallic mineral processing (e.g., rock crusher) 2 Other (e.g., boiler, hot mix asphalt plant, volatile organic liquid storage) 3 Dry cleaner, chrome plater, halogenated solvents 10.07(C) Compliance Investigation Fee Compliance investigation fee $ Miscellaneous 10.08(A) Miscellaneous Miscellaneous Emission Reduction Credit $98 / hr, hourly rate Variance Request $250 / filing fee (applied to final invoice fee) $91 / hr, outdoor burn program hourly rate, or $98 / hr, NOC/NOI program hourly rate actual Agency legal fees actual legal notice fee(s) Alternate Opacity $98 / hr, hourly rate Other $98 / hr, hourly rate Asbestos Project and Demolition Notification Waiting Period and Owner-occupied, single-family residence Waiting Period Notification Fee 0 ln ft and/or 0 sq ft asbestos Notification Not Not Applicable performed by residing owner Required Consolidated Fee Schedule - Page 5

6 < 10 ln ft and/or < 48 sq ft asbestos Notification Not Not Applicable NOT performed by residing owner Required 10 ln ft and/or 48 sq ft asbestos Prior Notice $0 NOT performed by residing owner All Demolition 3 Days $30 Not owner-occupied, single-family residence < 10 ln ft and/or < 48 sq ft asbestos, but asbestos removal threshold of 10 ln ft and/or 48 sq ft has not been exceeded for structure in calendar year and project WILL NOT exceed threshold of 10 ln ft and/or 48 sq ft asbestos removal from structure in calendar year Waiting Period Notification Not Required Notification Fee Not Applicable Project consists of < 10 ln ft and/or < 48 sq ft of Prior Notice $75 asbestos removal, but 10 ln ft and/or 48 sq ft asbestos has already been removed from structure in calendar year or project WILL exceed threshold of 10 ln ft and/or 48 sq ft asbestos removal from structure in calendar year ln ft and/or sq ft asbestos 3 Days $250 A ln ft and/or 160-4,999 sq ft asbestos 10 Days $500 A 1,000 ln ft and/or 5,000 sq ft asbestos 10 Days $1,250 A, B All Demolition 10 Days $250 Additional categories Waiting Period Notification Fee Emergency Prior Notice Twice the Regular Fee Amendment Prior Notice $0 Annual Notification ( 259 ln ft and/or 159 sq Prior Notice $750 ft) Alternate Asbestos Project Work Practices 10 days Twice the Regular Fee Demolition with Nonfriable Roofing 10 days Twice the Regular Fee Exception for Hazardous Conditions 10 days Regular Fee A B Includes demolition fee, if applicable, provided the asbestos removal project and demolition project are submitted to the Agency on one notification. When removing 2,000 ln ft and/or 10,000 sq ft, an additional fee of $250 shall be paid for each increment of up to 1,000 ln ft beginning at 2,000 ln ft and/or each increment of up to 10,000 sq ft beginning at 10,000 sq ft. Consolidated Fee Schedule - Page 6

7 Outdoor Burning Waiting Period and 10.13(C) Type of Outdoor Burning Advance Application Period 1 Fee 2 Social Event Fire Permit Review Fee (Section 10 working days $ D.9) Storm or Flood Debris Burning Permit Review Fee 10 working days $200 (Section 6.01.D.10) Other Outdoor Burning Permit (Section 6.01.D.13) 10 working days Review Fee, includes one hour of review time Hourly Rate $91 $91 / hr 1 Unless otherwise approved by the Agency, application must be submitted at least ten (10) working days prior to the first proposed burn date. 2 are nonrefundable Paving Waiver Review Fee $89 Review fee is nonrefundable Marijuana Production and Marijuana Processing Registration and Application 10.15(A) Initial Registration Fee Registration Fee Categories LCB Producer Tier Size LCB Tier 1 LCB Tier 2 LCB Tier 3 Producer with processor license $750 $1000 $1250 Producer only $525 Processor only $525 LCB = WA State Liquor and Cannabis Board Consolidated Fee Schedule - Page 7

8 10.15(B) Annual Registration Fee Registration Fee Categories LCB Producer Tier Size LCB Tier 1 LCB Tier 2 LCB Tier 3 Producer indoor only $528 $660 $824 Producer outdoor only $1030 $1286 $1606 Producer indoor and outdoor $1558 $1946 $2430 Producer w/ Agency granted production exemption Processor with producer license $264 + producer fee Processor only $528 LCB = WA State Liquor and Cannabis Board $3038 $3798 $ Production Exemption Application Fee Fee Application Fee $980 Consolidated Fee Schedule - Page 8