1 Dansk Træpillekonference 2015 Teknik til pilleproduktion og håndtering - Nyt om pillepresning og biopillemarked v/ Lars Bloch, Andritz Feed & Biofuels

2 Agenda ANDRITZ GROUP Overview Nyt om pillepresning Biomax pelletmill Pellet production Development Test center Pellets standards Biopillemarked Pellets Market Focus Investment & Technology Wood pellets - Particle Size Matters Torrefaction Self-heating in woodpellets

3 The ANDRITZ GROUP Overview Company ANDRITZ AG, Graz, Austria (Group headquarters) ANDRITZ operates over 250 sites worldwide Employees: almost 25,000 employees worldwide (as of end of 2014) Key figures 2011 Order intake: 6,101 MEUR Sales: 5,859 MEUR Products and services Plants and services for hydropower stations, the pulp and paper industry, solid-liquid separation in the municipal and industrial sectors, the steel industry, and the production of animal feed and biomass pellets 3

4 Biomax wood pelletmill The new boy in class Design power 800 kw Die size Ø 1200 x 190 Rolls size Ø 520 Weight Main dims. L x W x H kgs x x 5000

5 Pellet production - Development????? Energy forest (logs) Wet chips / (logs) Wet sawdust Dry sawdust Shavings Straw xx

6 Pellet production Development Raw materials for Green fuel pellets Wood and forest residues Plantation crops; eucalyptus and yellow pine Energy Crops; willow, poplars and grass Agricultural byproducts

7 Test center Sdr. Stenderup, Denmark

8

9 Pellets Market Focus Buyer Focus Commencing pressure in USA Co-firing in power plants Municipalities, large industries and new projects Medium market and consumers through distributors (quality restrictions & volatility in volume and price) Geographical Focus European Union will remain as a large market USA and Asia can quickly grow into a very large marke

10 Investment & Technology US pellet mill developments and capacity update During 2014 there was a pause in the previously rapid expansion of wood pellet manufacturing capacity in the US South. Industrial pellet manufacturing capacity at the end of the year was just under 5.0Mt/y, much the same as at the beginning. With approximately 2.1Mt/t of additional capacity currently under construction in the South there will be no such pause in By the end of 2015, industrial pellet capacity in the South is likely to have reached approximately 7.0Mt/y, almost all of it destined for European utility customers. Further expansions are scheduled for 2016 and

11 Investment & Technology US pellet mill developments and capacity update 11

12 Investment & Technology Asian pellet mill developments and capacity update South Korea and Japan will become large importers of pellets and energy chips in the coming decade, reports the Wood Resource Quarterly. The governments in Japan and South Korea have announced definite plans to increase their usage of green and low carbon energy alternatives. 12

13 13 Torrefaction

14 Wood pellets - Particle Size Matters Grinding Pellet plant Power plant to make the final size reduction Summery on grinding: Pellet mill plants have no incitement to make fine grinding (powder) for pellet production. Powder / fine grinding can be made where energy cost are lowest. Particle size can be optimized acc. to actual boiler requirement if powder / fine grinding is made at the power plant Minor savings in energy consumption seem to be possible if pellets are ground in a hammer mill at the power plant. 14

15 Self-heating in woodpellets during storage

16 Legal Disclaimer All data, information, statements, photographs, and graphic illustrations in this leaflet are without any obligation and raise no liabilities to or form part of any sales contracts of ANDRITZ AG or any affiliates for equipment and/or systems referred to herein. ANDRITZ AG All rights reserved. No part of this copyrighted work may be reproduced, modified or distributed in any form or by any means, or stored in any database or retrieval system, without the prior written permission of ANDRITZ AG or its affiliates. Any such unauthorized use for any purpose is a violation of the relevant copyright laws. ANDRITZ AG, Stattegger Strasse 18, 8045 Graz, Austria.

17 Thank you for your attention For further information please contact: ANDRITZ Lars T. Bloch Sales Manager Biomass Mobile